地面监控系统之地面服务器安装配置手册

合集下载

Ground Control Station 使用说明

Ground Control Station 使用说明
Ground Control Station 地面站软件使用说明
Ground Control Station 使用说明
Ground Control Station 地面站软件使用说明
目录
1. 串口驱动安装与连接....................................................................................................................1 1.1. USB-TTL 串口驱动的安装.............................................................................................. 1 1.2. 串口连接............................................................................................................................ 3
2.删除全部航点 在工具栏中点击“清除航点”
测距 要测量地图上两点间的距离,点击“使用测距”进入测距模式,光标变为十字形 按住鼠标左键拖动,左键按下时的位置为起点,释放时的位置为终点。下方的状态栏将会显示该线段 的距离。
8
Ground Control Station 地面站软件使用说明
点击鼠标右键退出测距模式。 要清除测距痕迹,点击“清除测距”。
2. 主界面介绍.................................................................................................................................... 4 2.1. 各功能板块介绍................................................................................................................ 4 2.2. 工具栏“控制”页面........................................................................................................5 2.3. 工具栏“航线”页面........................................................................................................6 2.4. 工具栏“参数”页面......................................................................................................11 2.5. 其他信息显示.................................................................................................................. 11

服务器监控系统的搭建与配置教程

服务器监控系统的搭建与配置教程

服务器监控系统的搭建与配置教程随着互联网的快速发展,服务器已经成为现代社会中不可或缺的重要设备。

为了确保服务器的稳定运行和安全性,监控系统的搭建和配置显得尤为重要。

本文将介绍服务器监控系统的搭建与配置教程,帮助管理员更好地管理和监控服务器。

一、选择合适的监控系统在搭建服务器监控系统之前,首先需要选择一款适合自己需求的监控系统。

常见的监控系统有Zabbix、Nagios、Prometheus等,每种系统都有其特点和适用场景。

在选择监控系统时,需要考虑到自己的服务器规模、监控需求以及个人偏好等因素,选择最适合自己的监控系统。

二、安装监控系统1. 下载监控系统安装包根据选择的监控系统,到官方网站下载对应的安装包。

一般来说,官方网站会提供详细的安装教程和文档,可以按照文档进行安装。

2. 安装监控系统解压下载的安装包,按照官方文档的指引进行安装。

通常安装过程中会涉及到数据库的配置、Web服务器的配置等步骤,按照提示逐步进行即可。

三、配置监控系统1. 添加服务器安装完成监控系统后,需要添加需要监控的服务器。

在监控系统的管理界面中,找到添加主机的选项,填写服务器的IP地址、主机名等信息,保存配置。

2. 配置监控项根据实际需求,配置监控系统需要监控的指标和阈值。

可以监控服务器的CPU利用率、内存使用情况、磁盘空间等指标,设置相应的告警阈值,确保在异常情况下及时通知管理员。

3. 设置监控报警监控系统一旦检测到服务器异常,需要及时发送告警通知。

在监控系统中设置告警规则,可以选择邮件、短信等方式发送告警信息,保障服务器的稳定运行。

四、监控系统的优化1. 定期维护监控系统也需要定期维护和更新,及时安装最新的补丁和更新,确保监控系统的稳定性和安全性。

2. 数据分析与优化监控系统会生成大量的监控数据,管理员需要对数据进行分析和优化。

通过分析监控数据,可以及时发现服务器性能问题,优化服务器配置,提升服务器性能。

3. 定期备份监控系统中存储了大量的监控数据和配置信息,需要定期进行备份。

DS5000___安装配置手册v1.0

DS5000___安装配置手册v1.0

DS5000___安装配置手册v1.0DS5000安装配置手册v1.0目录一、DS5000磁阵配置 (3)1.磁盘规划 (3)2.连接磁盘阵列 (3)3.使用存储管理软件系统 (5)4.创建Array和LUN (11)5.创建第一个LUN (15)6.增加LUN (21)7.创建hotspare (21)二、将LUN映射给主机 (25)1.将磁盘柜与主机正确连接 (25)2.Lun与主机映射步骤: (26)3.在主机上使用lun创建VG,LV,FS (35)4.参数调整 (36)附录 (36)附录一:条带化建议 (36)附录二:-e’x’选项与-S选项说明 (37)本文档仅供研发内部使用,如需在生产环境使用,请先对指导书各步骤进行验证。

一、DS5000磁阵配置1.磁盘规划本次磁阵配置为16块硬盘的DS5020,采用RAID5建两个Array。

每个array包含8个盘。

每个array上建一个lun,分别是Omc1和Omc2。

在主机上分别对应为hdisk2、hdisk3。

分别将Omc1和Omc2分配到控制器A、B,以分担负荷。

2.连接磁盘阵列DS5020后板示意图其中Ethernet ports (以太网口)用于跟PC 连接,配置磁盘Serial port 串口Ethernet ports 以太网口Dual-port drive channel 扩展柜接口Fibre Channel host channels 主机接口DS5020有两个控制器:ControllerA 和ControllerB 。

每个控制器有一个网口,ControllerA的网口默认IP地址为192.168.128.101/255.255.255.0,ControllerB 的网口默认IP 地址为192.168.128.102/255.255.255.0。

控制台需要配置和DS5020控制器同一网段的IP 地址,用来连接DS502,此网段要求是一个独立的网络,不要加入其它的机器,以免IP 地址变更。

安装指导手册

安装指导手册

ECS-700系统安装指导手册浙江中控技术股份有限公司声明严禁转载本手册的部分或全部内容。

在不经预告和联系的情况下,本手册的内容有可能发生变更,请谅解。

本手册所记载的内容,不排除有误记或遗漏的可能性。

如对本手册内容有疑问,请与我公司联系。

文档标志符定义警告:标示有可能导致人身伤亡或设备损坏的信息。

WARNING: Indicates information that a potentially hazardous situation which, if not avoided,could result in serious injury or death.电击危险:标示有可能产生电击危险的信息。

Risk of electrical shock: Indicates information that Potential shock hazard where HAZARDOUSLIVE voltages greater than 30V RMS, 42.4V peak, or 60V DC may be accessible.防止静电:标示防止静电损坏设备的信息。

ESD HAZARD: Indicates information that Danger of an electro-static discharge to whichequipment may be sensitive. Observe precautions for handling electrostatic sensitive devices注意:提醒需要特别注意的信息。

ATTENTION: Identifies information that requires special consideration.提示:标记对用户的建议或提示。

TIP:Identifies advice or hints for the user.设备安全警示标志下表列出了在设备中使用的安全警示标志符号及描述。

地面站的基本配置

地面站的基本配置

地面站的基本配置
嘿,咱今儿来聊聊地面站的基本配置哈!这地面站啊,就好比是一个超级大管家,掌控着各种关键信息和操作呢!
你想想看,地面站得有强大的通信系统吧,这就像是我们的嘴巴和耳朵,要和天上的飞行器随时保持畅通无阻的交流,要是没了它,那不就抓瞎啦!还有啊,数据处理系统那也是必不可少的呀,这就如同一个超级大脑,把各种复杂的数据快速整理、分析,给出最有用的信息。

再有就是显示系统啦,这可是我们能直观看到各种情况的窗口啊!它得清晰、准确,让我们能一下子就了解到飞行器的状态、位置等等。

这就好像我们有了一双千里眼,能洞察一切呢!监控系统也不能少呀,它时刻盯着飞行器的一举一动,稍有异常就能马上察觉,多厉害呀!
而且呀,地面站还得有可靠的电源供应,这就像人的心脏一样重要,没有电,啥都干不了!还有操作控制台,就像是我们的双手,能精准地发出各种指令。

这地面站的每一个部分都至关重要,缺一不可!它们紧密配合,才能让飞行器在天空中安全、高效地飞行。

没有这些基本配置,那还怎么玩呀!所以说呀,地面站真的是太重要啦,大家可千万别小瞧了它!它就是那个默默在背后支撑着一切的强大存在!。

环境监控监控管理系统操作手册[第四版]

环境监控监控管理系统操作手册[第四版]

111111111111111111111111111111111111111111111信息资产综合监控管理系统用户操作手册[第四版]杭州赛恩信息技术有限公司2014年05月目录[第四版] (1)1 系统概述 (5)1.1 系统架构 (5)1.2 系统运行环境 (6)1.3 系统述语定义 (8)1.4 系统功能和特点 (9)1.5 系统操作流程 (11)2 系统安装和配置 (12)2.1.1 系统安装部署概述 (12)2.1.1.1 安装部署方式 (12)2.1.1.2 安装介质 (13)2.1.2 系统安装 (14)2.1.2.1 支持系统软件安装 (14)2.1.2.2 系统软件安装 (15)3 系统登录/工作框架 (19)3.1 系统登录 (19)3.2 系统工作框架 (20)3.3 系统报警窗口 (21)4 系统首页 (22)4.1 首页 (22)4.2 设备监测情况 (24)4.3 设备报警统计 (24)4.4 监测设备报警事件 (25)5 综合监控 (27)5.1 机房环境 (27)(一)机房环境按房间展示 (27)(二)机房环境按类别展示 (28)二、机房环境监测指标 (29)5.2 动力设备 (30)5.2.1 UPS (30)(一)概览 (30)(二)详细信息 (30)5.2.2 电量仪 (33)(一)概览 (33)二、电量仪监测指标 (34)5.2.3 电源 (34)(一)概览 (34)5.2.4 精密空调 (36)一、精密空调监测展示 (36)二、精密空调监测指标 (36)5.3 视频监控 (38)5.3.1 海康视频监控 (38)2、视视参数 (40)6 综合视图 (42)6.1 概述 (42)6.2 综合视图展示 (42)(一)综合视图总图展示 (42)(二)综合视图二层视图展示 (44)(三)综合视图机房监测视图展示 (45)7 事件和报表 (46)7.1 事件 (46)7.1.1 报警事件汇总 (46)7.1.2 设备报警事件 (47)7.1.3 门禁事件 (48)7.2 报表 (50)7.2.1 报警情况表 (50)7.2.2 设备运行报表 (53)7.2.3 设备报警统计表 (54)7.2.4 监测设备清单 (55)7.2.5 报警配置清单 (57)7.3 操作日志 (58)7.4 报表定义 (59)7.4.1 报表定义总览 (59)7.4.2 报表查询 (60)7.4.3 报表定义 (61)8 监测配置 (63)8.1 监测设备配置 (63)8.1.1 监测设备配置 (63)8.1.1.1 监测设备通用参数配置 (65)8.1.1.2 机房环境和动力设备参数配置 (66)8.1.1.3 环境监测器参数配置 (67)8.1.1.4 报警配置 (70)(一)批量报警配置显示如下界面: (70)(二)报警配置窗口如下图所示: (71)8.1.1.5 监测周期配置 (73)8.1.2 视频监控设备配置 (74)8.1.2.1 矩阵设备配置 (74)8.1.2.2 视频设备配置 (76)8.1.2.3 报警侦听设备配置 (77)8.1.2.4 摄像机配置 (78)8.1.2.5 监视器配置 (79)8.1.2.6 报警侦听监测器配置 (81)8.1.2.7 布防配置 (82)8.1.3 监测视图配置 (84)8.1.3.1 监测视图配置 (85)8.1.3.2 图形配置 (85)8.1.4 遥测遥信配置 (87)8.1.4.1 遥测遥信详细配置 (89)8.2 报警配置 (90)8.2.1 基本配置 (90)8.2.2 短信报警配置 (91)8.2.2.1 接收报警信息配置 (93)8.2.2.2 值班配置 (94)8.2.3 电话报警配置 (96)8.2.4 邮件报警配置 (97)8.2.5 声光报警配置 (99)8.2.5.1 声光报警详细配置 (100)9 系统管理 (101)9.1 用户管理 (101)9.1.1 用户管理 (101)9.1.1.1 用户详细信息配置 (102)9.1.1.2 用户权限配置 (103)9.1.2 部门管理 (104)9.1.3 用户组管理 (105)9.2 数据维护 (106)9.2.1 数据备份和下载 (106)1 系统概述欢迎使用赛恩信息资产综合监控管理系统!赛恩信息资产综合监控管理系统是杭州赛恩信息技术有限公司为广大用户推出的安全监控产品,对用户的机房环境、动力设备、门禁、视频、网络设备、计算机硬件系统和软件系统的安全运行提供了全方位的监控和服务。

服务器安装与配置手册

服务器安装与配置手册

服务器安装与配置手册一、前言服务器是计算机网络中的核心设备之一,负责存储和处理数据,并提供各种网络服务。

本手册旨在提供服务器安装与配置的详细指南,帮助用户正确地进行服务器的安装和配置,以确保服务器的正常运行和高效性能。

二、硬件准备1. 选择合适的服务器硬件在选择服务器硬件时,需要考虑数据处理需求、服务器规模和扩展性等因素。

根据实际情况选择合适的服务器类型,例如塔式服务器、机架式服务器或刀片服务器,同时确保服务器硬件具备足够的计算能力、存储容量和网络连接。

2. 安装服务器硬件根据服务器硬件的安装手册,依次按照指引安装服务器主板、CPU、内存、硬盘、网卡等硬件组件。

务必注意静电防护,在安装过程中避免对硬件造成静电损害。

三、操作系统安装1. 选择合适的操作系统根据服务器的应用需求选择合适的操作系统,如Windows Server、Linux等。

要考虑操作系统的稳定性、兼容性和安全性等因素。

2. 准备安装媒体下载或购买所选择操作系统的安装媒体,确保安装媒体的完整性和可靠性。

同时准备一个可引导的USB闪存驱动器或光盘作为安装媒体的载体。

3. 安装操作系统将安装媒体插入服务器并设置服务器从媒体引导。

按照操作系统安装向导的提示,选择安装类型、分区设置、用户名密码等配置项,并完成操作系统的安装过程。

四、网络配置1. 配置IP地址根据网络环境和需求为服务器配置正确的IP地址、子网掩码和默认网关。

确保服务器与局域网或互联网正常通信。

2. 设置DNS服务器配置服务器的DNS服务器地址,以便服务器可以通过域名进行网络通信和域名解析。

3. 防火墙设置按照网络安全策略,配置服务器的防火墙规则,限制外部访问并保护服务器免受网络攻击。

五、服务配置1. 网络服务配置根据服务器的具体用途,配置相应的网络服务,如Web服务器、文件共享服务器、邮件服务器等。

根据服务特点和需求进行参数设置和权限控制。

2. 安全配置配置服务器的安全策略,包括访问控制、用户权限管理、安全补丁更新等,确保服务器数据的安全性和可靠性。

服务器安装配置文档范本

服务器安装配置文档范本

服务器安装配置文档范本一、引言服务器是承载和提供网络服务的关键设备,其安装配置的正确性和稳定性对于保障网络环境的正常运行至关重要。

本文档旨在提供服务器安装配置的指导,并包含相关范本供参考。

二、服务器环境概述1. 服务器用途:说明该服务器的主要用途,例如Web服务器、数据库服务器等。

2. 硬件概述:列出服务器的硬件配置,包括处理器型号、内存容量、硬盘规格等。

3. 软件概述:列出服务器所需的操作系统及其他相关软件。

三、服务器安装步骤1. 硬件安装:(1)安全措施:介绍安装服务器时应采取的安全措施,如戴上防静电手环、确保通电前关机等。

(2)安装位置:确定服务器的安装位置,应保证通风良好、温度适宜,并与供电与联网设备相连。

(3)组件安装:按照服务器硬件安装指南,依次安装处理器、内存、硬盘等组件。

(4)连接配线:将服务器与电源和网络连接,确保配线正确无误。

2. 软件配置:(1)操作系统安装:按照操作系统安装指南,选择适合的安装方式(光盘、USB等),进行操作系统的安装和配置。

(2)驱动程序安装:根据服务器硬件型号,安装相应的驱动程序,确保硬件设备的正常工作。

(3)网络配置:配置服务器的网络参数,包括IP地址、网关、子网掩码等。

(4)安全配置:设置服务器的安全策略,例如防火墙配置、访问控制列表的配置等。

(5)服务配置:根据服务器用途,配置相应的服务,例如Web服务器配置虚拟主机、数据库服务器创建数据库等。

四、服务器监控与维护1. 监控系统:介绍服务器监控系统的安装和配置,包括监控软件的选择、报警设置等。

2. 日志管理:说明服务器日志的重要性,介绍日志管理工具的配置和使用。

3. 定期维护:列出服务器的定期维护计划,包括系统更新、硬件巡检、备份等内容。

五、故障排除与恢复1. 常见故障排查:列举服务器常见的故障现象和解决方法,例如硬件故障、网络故障等。

2. 系统恢复:介绍服务器系统崩溃或无法启动时的恢复方法,如使用系统恢复盘、备份恢复等。

服务器安装实施手册

服务器安装实施手册

服务器安装实施手册1. 引言服务器是企业中至关重要的硬件设备之一,它提供了数据存储、网络连接和应用程序运行等核心功能。

本手册旨在提供一个详细的服务器安装实施指南,以确保服务器正确安装、配置和初始化。

2. 准备工作在开始服务器安装之前,需要进行一些准备工作,以确保顺利完成安装过程。

以下是一些常见的准备工作:2.1 硬件准备确保所有必要的硬件已经准备好,包括服务器主机、磁盘存储设备、网络适配器等。

检查硬件设备的状态和连接是否正常,并准备好相应的接口线缆。

2.2 软件准备安装服务器所需的操作系统和应用程序之前,需要准备相应的软件安装介质。

确保已经获取了合法的软件许可证,并确保安装介质的完整性和可用性。

2.3 网络准备在服务器安装过程中,需要确保网络环境的稳定和可靠。

检查网络连接是否正常,确保服务器可以正常访问互联网和局域网。

根据实际情况,为服务器配置静态IP地址或DHCP服务器。

3. 服务器安装步骤以下是服务器安装的一般步骤:步骤 1:安装服务器主机将服务器主机放置于合适的位置,确保有足够的空间和良好的通风。

连接主机电源,打开主机电源开关,确认主机正常启动。

步骤 2:连接外部设备将显示器、键盘和鼠标等外部设备连接到服务器主机。

确保连接稳固并正确插入。

步骤 3:安装操作系统按照操作系统安装介质的说明,选择合适的安装选项,安装操作系统到服务器主机。

根据实际情况,进行必要的初始化配置,如设置管理员密码、安装驱动程序等。

步骤 4:配置网络连接根据实际情况,为服务器配置网络连接。

可以选择手动配置静态IP地址,也可以使用DHCP服务器自动获取IP地址。

步骤 5:安装必要的应用程序根据服务器的用途和需求,安装必要的应用程序和服务,如数据库服务器、Web服务器、邮件服务器等。

确保应用程序的安装路径、配置文件和日志文件等正确设置。

步骤 6:配置安全策略根据实际需求,配置服务器的安全策略,确保服务器的数据和系统安全。

可以设置防火墙规则、访问控制列表和安全策略文件等。

监控系统技术手册

监控系统技术手册

监控系统技术手册
随着社会的不断发展和科技的不断进步,监控系统已经得到了广泛
的应用。

因为监控系统可以有效的维护公共安全和环境秩序,所以很
受人们的欢迎。

本手册针对监控系统的技术细节,提供了详细的说明
和操作方法,旨在帮助使用者更好的理解和使用监控系统。

一、监控系统的基本架构
监控系统的基本架构包括监控器、数字录像机、网络传输设备、存
储设备等。

监控器用来实时显示监控画面;数字录像机用来对监控画
面进行录像;网络传输设备用来实现远程监控功能;存储设备用来存
储录像文件等。

二、监控系统的安装方法
首先,需要确定监控系统的监控范围和监控位置。

然后,根据监控
位置选择合适的监控器和数字录像机,安装网络传输设备和存储设备。

安装过程需要注意防水、防尘、防雷等问题,并且需要进行合理的线
缆布线,保证监控画面的稳定和可靠。

三、监控系统的连接设置
为了实现监控系统的正常工作,需要进行合理的连接设置。

具体来说,需要按照监控设备的使用说明进行网络配置、IP配置、录像格式
设置、图像质量设置等。

还需要进行用户和权限设置,确保监控系统
的安全性和稳定性。

四、监控系统的日常维护
监控系统是一项长期而复杂的工程,需要进行日常的维护工作。

包括检查监控设备的电源、传输线路、存储设备等的工作状态,有关故障及时进行修复,对系统进行升级和更新等。

总之,监控系统技术手册通过对监控系统的基本架构、安装方法、连接设置和日常维护的详细说明,帮助使用者更好地运用监控系统,从而维护公共安全和环境秩序。

监控系统操作手册

监控系统操作手册

监控系统操作手册1. 简介监控系统是一种用于实时监测和记录网络、服务器或设备状态的工具。

本操作手册旨在提供用户如何操作和使用监控系统的指导。

2. 安装和配置2.1 硬件要求- 一台运行稳定的服务器或计算机- 网络连接2.2 软件安装2. 运行安装程序,按照提示完成安装过程。

3. 配置监控系统的基本设置,包括服务器地址、端口号等。

4. 设置用户权限和访问控制。

3. 主要功能介绍监控系统提供以下主要功能:3.1 实时监测监控系统可实时监测网络、服务器或设备的运行状态,如CPU 使用率、内存使用率、网络延迟等。

3.2 告警通知监控系统可设置告警规则,当监测到异常情况时,自动发送告警通知给管理员,以便及时处理。

3.3 数据记录与分析监控系统能够记录监测数据并进行分析,提供数据报表和可视化图表展示,帮助管理员分析系统运行状况和趋势。

3.4 历史记录与日志监控系统会保存监测数据的历史记录和系统日志,方便用户查看和排查问题。

4. 操作指南4.1 登录系统1. 打开监控系统登录界面。

2. 输入用户名和密码。

3. 点击登录按钮。

4.2 实时监测1. 在主界面上选择需要监测的对象。

2. 查看实时监测数据,如CPU使用率、内存使用率等。

3. 如需获得更详细信息,点击相应的指标或图表。

4.3 设置告警规则1. 进入告警设置界面。

2. 根据需求,设置告警规则和接收告警通知的方式。

3. 确认设置并保存。

4.4 数据分析与报表1. 进入数据分析界面。

2. 选择要分析的监测数据和时间范围。

3. 生成报表或图表进行数据分析。

4.5 查看历史记录与日志1. 进入历史记录或日志界面。

2. 根据需要选择日期和时间范围,查看历史记录和系统日志。

5. 常见问题解答以下是一些常见问题及其解答:- 如何添加新的监测对象?在系统设置或配置界面中,选择添加监测对象,输入相关信息并保存。

- 如何修改登录密码?进入个人设置界面,找到修改密码选项,输入旧密码和新密码,保存修改。

监控服务器安装操作规程

监控服务器安装操作规程

监控服务器安装操作规程监控服务器是现代企业重要的网络安全措施之一,可以帮助企业实时监测服务器运行状态,及时发现和解决问题,确保服务器的正常运行。

为了正确安装和配置监控服务器,以下是一个基本的操作规程。

第一步:评估需求在安装监控服务器之前,首先需要明确企业的监控需求。

包括企业的服务器数量、服务器类型、监控指标等。

这个评估过程需要与企业的IT团队进行充分沟通,了解他们对监控服务器的期望和要求。

第二步:选择监控服务器软件根据企业的需求,选择适合的监控服务器软件。

市面上有很多开源和商业的监控服务器软件可供选择,如Nagios、Zabbix等。

选择合适的软件可以根据它们的功能、性能、易用性和可扩展性等因素进行比较。

第三步:准备服务器环境在安装监控服务器之前,需要准备好服务器的环境。

这包括选择合适的硬件设备、操作系统和网络配置。

要确保监控服务器的硬件资源足够,操作系统兼容监控软件,并根据需求进行网络配置,确保监控服务器能够与被监控服务器通信。

第四步:安装监控服务器软件根据所选的监控服务器软件,按照官方提供的安装文档进行安装。

一般来说,安装过程包括下载安装包、解压安装包、配置软件参数、创建数据库等步骤。

在配置参数时,要根据具体的需求进行配置,如定义被监控的服务器、设置监控指标、配置报警规则等。

第五步:测试和调试安装完成后,需要对监控服务器进行测试和调试,确保它能正常工作。

可以使用一些模拟故障的工具或者手动触发一些故障,检查监控服务器是否能够准确地监测到问题,并发送相应的告警通知。

第六步:部署监控客户端为了监控服务器,需要在被监控服务器上部署监控客户端。

监控客户端是一个将被监控服务器状态信息发送到监控服务器的软件。

根据监控服务器的要求,选择适合的监控客户端,并按照官方文档进行部署。

第七步:集中管理监控服务器如果企业有多个监控服务器,需要考虑建立一个集中管理的系统。

通过集中管理系统,可以方便地对多个监控服务器进行配置、管理和监控,提高运维效率。

监控设备的安装及操作维护手册

监控设备的安装及操作维护手册

4设备的安装及操作维护手册;线管预埋敷设积极与土建配合施工,争取做到同步进行。

本弱电施工前我们会充分了解其它风、水管道的分布、位置和技术与工艺要求,以免与这些管道发生布置上的矛盾。

穿线管的弯曲半径,我们会严格遵守在放缆线时不小于缆线外径的10倍,在穿普通导线时不小于导线外径的6倍。

大楼内摄像机的连接电缆经电缆走线槽或出线盒引出后,均会加金属蛇皮管。

平面图中监控、探测器各类电缆穿出各出线盒后,我们均会督促施工人员盘留3m,便于以后各前端设备调整位置。

电梯轿厢摄像机视频线和电源线在制作电梯扁带时我们会一起做到扁带中(这样做的原因主要是避免线缆外皮擦破,造成信号中断)。

同时系统的电源线与视频线、信号线分管敷设;导线敷设后,每一回路的导线的对地绝缘电阻值做到不小于20M欧。

设备安装1)摄像机安装时我们会逐个检查摄像机所有微动开关是否调整正常要求位置。

2)我们将对摄像机逐个通电进行检测和粗调,严格按《摄像机后焦调整方法》进行仔细调整后焦,实看图像清晰度质量。

3)摄像机我们会放在监视目标附近不易受外界损伤的地方,安装位置做到不影响现场设备运行和人员正常活动。

安装高度宜距地面3.5~5mm。

4)摄像机镜头我们严格做到避免强光直射,保证摄像管靶面不受损伤。

镜头视场内,做到没有明显遮挡监视目标的物体。

5)摄像机镜头做到从光源方向对准监视目标,同时避免逆光安装,当需要逆光安装时,我们会设法尽量减弱逆光强度,换配有逆光补偿摄像机。

6)对墙角支装摄像机,支架离墙角我们会严格做到有300mm间距,离顶有大于200mm间距。

争取做到即要美观,又不要影响破坏装饰表面。

7)在石膏板吊顶支装摄像机,其支架做到牢靠,稳固,如果条件允许的话,我们会在其石膏板上部应加小木板作村板,帮助紧固支架螺钉。

8)对嵌入式摄像机安装,我们会预先开孔,与装潢同步进行。

9)我们将严格按照现场视角要求选配安装相应焦距的固定镜头。

并按现场光射度确定好光圈,按现场物距,景深要求粗调好聚焦。

重tractable地面接地设备安装说明书

重tractable地面接地设备安装说明书

6687ArapahoeRoad•Boulder•Colorado•80303•00+1.303.447.2828•******************Installation InstructionsRetractable Grounding Assembly (RGA)Rev M, 10/4/10II 2 G T4Manufactured for Lightning Eliminators & Consultants, Inc.by Conductix, Inc. 10102 F St Omaha, NE 68127.IntroductionThe RGA is designed to create the lowest impedance connection between the roof and shell of a floating roof tank by creating the shortest possible path between the two. This connection is obtained by keeping constant tension on the wide tinned copper braided cable.The following manual outlines the procedures required for proper installation of an RGA. If a custom installation or installation on a closed roof tank is desired, please contact your LEC Sales Manager or Technical Support.In many cases, the RGA is sold in conjunction with LEC’s Dissipation Array System (DAS). A LEC site supervisor is an important and critical part of the DAS installation. The Supervisor will assist the on-site contractor that will be responsible for installing the DAS. This assistance includes training the contractor in the nuances of the installation and thereby ensuring proper installation. Further, the Supervisor will be available to address any questions that may occur during installation.Note: Review all documents and drawings prior to commencing work. The RGA can be installed on a tank during maintenance shut downs or while the tank is in service. Follow allLightning Eliminators & Consultants, Inc.Equipment and Tools RequiredPneumatic or Hand Punch or drill to create 7/16” [11mm] diameter holes7/16” or Adjustable Wrench9/16” or Adjustable Wrench x 2Wire Wheel or BrushLectra ShieldPreparing MaterialsInspect reel, cable, hardware, grounding straps, mount and wire guide. Do not remove the shrink-wrap from the cable on the reel at this time. Contact your LEC representative or LEC Sales Manager and DO NOT INSTALL the RGA if any of the parts is missing or damaged.Figure 2: RGA AssemblyLayout and Tank PreparationIf an installation drawing with the RGA quantity and location is provided by LEC, mark the location(s) of where the RGA should be placed in accordance with the print. If a drawing is not provided, the RGAs should be equally spaced from each other (i.e. if 5 RGAs were purchased for one 100ft [30m] diameter tank, each RGA will be placed 72º apart or roughly 61ft - 10in[18.85m] on the circumference of the rim of the tank.). Mark these locations. Ideally, the RGA will be placed on the highest possible location of the tank: the fire suppression/swash plate, because explosive gases must not be present immediately around the reel during regular use. If the RGA cannot be mounted on the fire suppression plate or directly to the tank rim, use the Horizontal Bracket.Note: Ensure that the RGA will not interfere with the tank roof when fully filled. Finally, if any obstacles or interferences are encountered, contact the LEC Sales Manager for assistance.Attaching the RGA to the TankThe RGA can be mounted directly to the fire suppression plate/tank wall or to the tank lip using the supplied Horizontal Bracket. The drawing “RGA Mount”, inserted at the end of this document, illustrates the two mounting methods. This can be used as an aide to assist in determining which mounting option is best suited for your application; directly to the vertical tank wall or utilizing the supplied Horizontal Bracket to mount to the rim of the tank.Ground StrapsWire GuideMountMounting the RGA directly to the Tank Wall – Remove the Reel from the mount by removing the ¼” bolts attaching the Hold Down Bars. Four (4) 7/16” [11mm] diameter holes need to be made in the field in the tank wall using the RGA Mount as a template. See Figure 3, RGA Mount - Hole Dimensions. Scrape paint and rust from around the drilled holes to bare metal. Apply Lectra Shield to both sides of the hole to prevent rusting. Using the supplied hardware, secure the RGA Mount to the tank wall and apply Lectra Shield to the hardware after assembly, See Figure 4, Mounting the RGA Mount to the Tank Wall.Figure 3: RGA Mount – Hole DimensionsFigure 4: Mounting the RGA Mount to the Tank WallMounting the RGA using the Horizontal Bracket – Two (2) 7/16” [11mm] diameter holes need to be made in the field on the tank lip using the Horizontal Bracket as a template. See Figure 5, Horizontal Bracket - Hole Dimensions. Scrape paint and rust from around the drilled holes to bare metal. Apply Lectra Shield to both sides of the hole to prevent rusting. Using the supplied hardware, secure the Horizontal Bracket to the tank lip and apply Lectra Shield to the hardware after assembly. Attach the RGA Mount to the Horizontal Bracket. See Figure 6, Mounting the Horizontal Bracket to the Tank Lip.Figure 5: Horizontal Bracket – Hole Dimensions36 ¼ ” [184~921mm] from the tank wall as shown in Figure 8.Figure 8: Horizontal Mounting Bracket with RGA AssemblyThe attachment point on the floating roof foam dam must align vertically with the center of the braided cable wire, as shown in Figure 9. To facilitate vertical alignment, the RGA should be installed when the tank is at its fullest capacity. A ‘plumb bob’ or laser level can be used for best possible results (caution – a ‘plumb bob’ should be utilized when the wind is calm). Maintaining vertical cable alignment within +/- 12” [305mm] will minimize cable wear and maximize cable life. Once you locate the attachment point, create two (2) 7/16” [11mm] diameter holes using the Ground Strap as a template, see Figure 10. Scrape paint and rust from around the drilled holes to bare metal. Apply Lectra Shield to both sides of the holes to prevent rusting.Figure 9: RGA Front ViewLightning Eliminators & Consultants, Inc.Figure 10: 12” Flexible Ground Strap EndPre-tensioning the RGAThe RGA cable should be tensioned such that when the floating roof is at the top (full) position, a minimum number of pre-tension rotations are applied to the spool. This spring pre-tension will need to be adjusted in the field. To pre-tension the RGA, rotate the RGA as shown in Figure 11 below. See the Pre-tension Chart attachment at the end of this manual to determine the required number of pre-tension turns for your application.If the tank is not full, the amount of pre-tension rotation to be applied should be enough to re-coil the cable if fully extended (floating roof tank at its empty state).Figure 11: Pre-TensionWhen the tank is ready to be placed into service, follow the steps below to pre-tension the RGA:1.Prior to removing the shrink-wrap from the cable, turn the RGA reel back and forth tomake sure that the spring is in its most relaxed state.2.Rotate the RGA reel against the spring's tension shown above (complete rotations, if 24required - 24 x 360°) to pre-tension the system.3.Without allowing the spring motor to recoil, carefully remove the shrink-wrap (do not usesharp objects to cut shrink-wrap) and pre-tension tag.4.Un-reel the RGA cable to the top of the foam dam of the tank.5.Pull the cable out the intended travel distance and allow it to rewind. This procedureshould be repeated five (5) to ten (10) times in order to set the spring. Walk the cableback to the foam dam to set the spring.6.Secure the supplied Ground Straps to the tank and RGA cable, one on each side of thefoam dam and RGA Cable, see Figure 12.7.Check retraction by pulling the cable out and letting it retract back. Repeat steps 2 and 5,if necessary, to add tension.8.Verify that all bolts and nuts are mechanically tight with clean electrical contact.Figure 12: Ground Straps on Either Side of the Foam DamFinally, coat all mechanical ground connections with Lectra Shield. If you encounter any problems, contact the LEC Site Supervisor immediately or the LEC Sales Representative in the absence of a Site Supervisor.To maximize cable and strap service life, LEC recommends disconnecting the ground straps from the foam dam and allowing the cable to retract if the tank will be out of service for an extended period of time. The RGA Ground Straps should be reconnected before the tank is placed back into service. When reconnecting the Ground Straps remove any rust at the connection point to bare metal and apply Lectra Shield before and after securing the straps. Welding the Horizontal BracketThe Horizontal Bracket should be welded onto the tank lip during a maintenance shut down or when feasible to do so.Corrosion ProtectionFor the RGA to function properly LEC requires a coating of Lectra Shield, a corrosion inhibitor, to be applied to all mechanical grounding connections as described above. Lectra Shield can be purchased directly from LEC.•Lectra Shield LEC Part #0000120 o LEC Approved Alternatives (if Lectra Shield is unavailable):▪Emerson & Cummings: ECCOCOAT CC 40 A▪Sanchem Inc.: N O-OC-IC SpecialUninstallIn the event that the RGA must be removed from the tank, the following steps should be followed. The tank should be at its fullest capacity to minimize stored energy in the springs. Unbolt the ground strap from the foam dam wall without allowing the spring motor to recoil. Next, carefully retract the strap to the reel. Secure the strap to the reel with shrink-wrap or heavy-duty tape. In a controlled fashion, carefully allow the RGA to rotate until all stored energy has been removed from the springs and they are in a completely relaxed state. Unbolt the hold down bars and remove the RGA from the mount. The RGA mount and horizontal bracket, if present, may then be unbolted from the tank.Note: Never remove the reel from the mount if there is tension in the springs as the handles will rotate in and uncontrolled manner.MaintenanceRGAs are often installed in corrosive environments. The more corrosive the environment, the more frequently inspection and maintenance must be performed. At a minimum, the following should be performed on an annual basis. LEC recommends an increase in the frequency of inspection/maintenance as conditions require.•Remove build-up from RGA cable and reel.•Keep the bearing well lubricated using mineral oil, WD40 or any electrically conductive lubricant.•Visually inspect the Ground Strap for dirt, corrosion or tearing; if there is a tear in the strap, replace immediately.•Visually inspect the RGA cable for dirt, corrosion or tear; if there is a tear in the cable, call your LEC Sales Manager immediately.•Ensure that all Ground Strap, Mount, and Horizontal Bracket nuts and bolts are mechanically tight. Tighten any loose hardware immediately.Replacement Parts•12” Tinned Flexible Ground Strap LEC Part #0008529 •12” Tinned Flexible Ground Straps (x2) and 3/8” Bronze Hardware LEC Part #0009433 •60 ft 864/30 Tinned Braided Copper Cable LEC Part #0010424 •80 ft 864/30 Tinned Braided Copper Cable LEC Part #0004070 ATEX CertificationThe CE/Ex markings on the RGA signify the RGA’s compliance with the requirements of Directive 94/9/EC involving potentially explosive atmospheres. The various markings are described below.II 2 G T4CE CE MarkEx Specific mark for explosion protectionII Equipment Group II: intended for use above ground, not for use in mines2Equipment Category 2: the equipment is protected against ignition hazards in normal operation where a gas is likely to occur under normal conditionsG Equipment is intended for exposure to explosive gasses and mists only(not protected against explosive dusts)T4In normal operation, the maximum surface temperature of the equipment will not exceed 275 deg. F (135 deg. C).Technical SupportFor technical support please contact:Lightning Eliminators & Consultants, Inc.6687 Arapahoe RoadBoulder, Colorado 80303 USAPHONE: (+1)303/447-2828FAX: (+1)303/447-8122Lightning Eliminators & Consultants, Inc.11。

场地监控安装实施方案

场地监控安装实施方案

场地监控安装实施方案一、背景介绍。

随着社会的不断发展,场地监控系统在各个领域的应用越来越广泛,包括但不限于公共安全、交通管理、企业生产等方面。

在这样的背景下,我们有必要对场地监控系统的安装实施方案进行深入的研究和探讨,以确保系统的稳定性和可靠性。

二、需求分析。

1. 确定监控范围,首先需要明确监控的范围,包括需要监控的区域大小、监控的目标物体等。

2. 确定监控要求,根据实际需求,确定监控系统对画质、视角、远程控制等方面的要求。

3. 确定监控设备,根据监控范围和监控要求,确定适合的监控设备,包括摄像头、录像机、监控软件等。

三、安装实施方案。

1. 确定安装位置,根据监控范围和监控要求,确定摄像头的安装位置,保证其能够最大限度地覆盖监控范围。

2. 安装设备连接,将监控设备按照要求连接到电源和网络,保证设备的正常运行。

3. 调试监控系统,安装完成后,对监控系统进行全面的调试,确保画质清晰、视角合适、远程控制正常。

4. 安装固定设备,将摄像头等设备进行固定安装,保证设备的稳定性和安全性。

四、实施方案的注意事项。

1. 安全第一,在安装过程中,要严格遵守安全操作规程,确保操作人员的人身安全和设备的完好。

2. 环境适应,在选择监控设备时,要考虑设备的环境适应性,确保设备能够在各种恶劣环境下正常运行。

3. 节约成本,在安装监控系统时,要合理利用资源,尽量减少不必要的浪费,降低成本。

4. 定期维护,安装完成后,要定期对监控系统进行维护和检修,确保系统的长期稳定运行。

五、总结。

通过对场地监控安装实施方案的研究和探讨,我们可以更好地了解监控系统的安装流程和注意事项,为实际操作提供了一定的指导和参考。

在今后的实际操作中,我们需要严格按照安装实施方案的要求进行操作,确保监控系统的稳定性和可靠性,为各个领域的安全管理提供有力的支持。

监控系统安装说明书

监控系统安装说明书

监控系统安装说明书一、卡及软件的安装1;主机的要求:INTEL赛扬2G(或更大)的CPU,现代256M(或更大)的内存,INTEL 845/848系列的主板,独立GF64M(或更大)的显卡,希捷8 0GB(或更大)的硬盘,长城300W的电源,17寸(或更大)的显示器,散热较好的机箱。

2;系统分区(C区或C盘)一般情况4GB即可。

3;分一个2GB左右的分区做为备份分区,用以放置一些备份文件,如操作系统,采集卡程序,驱动等等;4;操作系统为WIN2000SP4版或WINXPSP2版,Directx 8.0以上。

5;保证设备管理器没有任何黄色的问号或叹号,系统运行良好。

6;将操作系统显示模式设置为“1024 X 768像素”,颜色质量设置为“最高(32位)”,纯平屏幕刷新频率设备为“85赫兹”,液晶显示器设备为70或75均可。

7;保证一切运行稳定,我们用GHOST软件将操作系统做一个备份,备份到最后一个预留的小分区里面。

8;将采集卡靠近显卡安装,以不挡住显卡的散热风扇为宜。

9;采集卡与显卡之间不可安装其它卡,可将离显卡最近的第一个槽闲置,在第二个槽上安装采集卡。

10;安装好采集卡硬件后,在开机BIOS自检的时候,我们会发现新增加了很多设备,这是正常的。

11;开机后,系统会自动识别到很多硬件设备,此时在设备管理器里面会有8个或16个黄色的叹号或问号,我们逐一将它们指向我们的安装光盘下的D IRVER目录,单击"浏览"选中光盘"Driver"目录,即可正常安装该卡驱动。

12;安装驱动时要自上而下,按照顺序安装。

13;驱动程序安装后,我们必须重新启动计算机。

14;现在,我们安装采集卡的用户程序,在光盘SITE目录下面有SETUP. EXE,按照提示即可完成,重新启动计算机是必须的。

15;启动后计算机会自动扫描并加载程序。

16;在启动中将出现一个对话框,我们根据提示内容,并按照自己的要求合理分配空间。

数字监控系统DSS安装手册

数字监控系统DSS安装手册

数字监控系统DSS安装手册数字监控系统DSS安装手册1.最低系统配置要求服务器:z CPU 酷睿2双核2.2z内存 1Gz硬盘 5G剩余空间(不带存储)z Microsoft Windows 2003 Serverz Internet Explorer 6.0z100M以太网卡客户端:z CPU P4 2.4Gz内存 512Mz硬盘 100M剩余空间z DirectX 8z1024*768分辨率显示器及显卡z Internet Explorer 6.02.安装说明服务器安装1)运行“DSSServer_V1.0_build_20090116_CHS.exe”进行数字监控系统程序的安装,首先进入安装界面2)单击按键进入选择安装路径界面在此步骤可点击按键更改默认安装路径(默认为“C:\Program Files\数字监控系统”)。

3)确认安装路径后,单击按键继续安装操作4)单击按键继续安装5)安装完成后,自动进入配置向导界面此步骤中可选择按键直接完成安装,但建议按照下述介绍逐步进行配置后再完成安装。

配置向导介绍表配置项说明开机自动运行选择此项则后续服务器开机时程序将自动运行服务器地址服务器使用的本机IP ,如192.168.0.1普通设置外网映射地址服务器在内网,并且使用了路由器DMZ 映射供外网用户使用时,需要设置外网的DMZ 映射IPCMS 设置 CMS 监听端口 CMS 工作端口,默认9000 DMS 设置DMS 监听端口 DMS 工作端口,默认9200MTS 的RTSP 端口 MTS 工作的RTSP 端口,默认9100 MTS 的RTP 端口范围MTS 的RTP 端口,默认10000到30000,端口数必须大于等于2000MTS 设置UDP 包长UDP 数据分组长度,默认1400BYTE ,局域网下推荐1400,窄带带宽下需要设置小些的数值,一般设置为500SS 的RTSP 端口 SS 的RTSP 端口,默认9320 SS 的RTP 起始端口范围默认30000,必须大于MTS 的RTP 端口 RTP 传输协议UDP/TCP 可选。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

地面服务器安装配置手册目录1编写说明 (4)2地面服务器安装 (4)2.1 选择安装NET2.0 (4)2.2 选择安装MS SQL2005E XPRESS (4)2.3 安装SQL S ERVER 2005管理工具 (5)2.4 控制服务器安装 (8)2.5 M ODBUS服务安装 (12)3地面服务器配置 (13)4数据服务器配置 (14)4.1 数据库配置 (14)4.1.1 启用sa账号 (15)4.1.2 创建数据库 (18)4.1.3 导入系统表和数据 (20)4.1.4 开启远程连接SQL Express 2005服务 (24)4.1.5 配置ODBC连接 (27)4.2 控制服务器配置 (32)4.3 M ODBUS服务配置 (33)4.4 启动控制服务器程序 (34)4.5 配置为NTP服务器 (36)4.5.1 配置步骤 (36)4.5.2 验证NTP服务器 (37)5控制服务器日常维护 (39)1编写说明本文档主要介绍地面监控系统的控制服务器的安装配置步骤以及日常维护工作。

其主要面向对象为软件实施维护人员。

2地面服务器安装2.1 选择安装NET 2.0如果系统未安装.net 2.0安装程序将提示下图界面:2.2 选择安装MS SQL2005 Express点击下一步,直至安装完成。

2.3 安装SQL Server 2005 管理工具在安装目录下,点击SQLServer2005_SSMSEE.msi 启动SQL Server 2005 管理工具安装。

点击下一步:点击下一步:点击下一步:启动安装:点击完成,安装成功。

2.4 控制服务器安装相关组件安装完成后,自动启动控制服务器安装向导。

点击下一步。

选择安装目录,点击下一步。

确认安装,点击下一步。

安装完成,点击关闭按钮。

完成后,进入安装目录,运行install.bat ,将软件安装成系统服务。

!安装确认,控制服务器安装后需要确认控制服务器是否已经成功安装到计算机上。

进入Windows2003的服务管理器,查看ControlServer服务是否存在。

修改该服务的启动状态为自动,点击确定。

2.5 Modbus服务安装运行SZ04-MODBUS_Vx.x.x.x.exe ,如下图:按下一步按下一步安下一步按下一步3地面服务器配置控制服务器要正常运行,在安装结束后需要进行相关的配置,其中包括数据库配置、服务启动顺序配置、配置文件相关配置等。

4数据服务器配置数据服务器要正常运行,在安装结束后需要进行相关的配置,其中包括数据库配置、服务启动顺序配置、配置文件相关配置等。

4.1 数据库配置点击开始->程序Microsoft SQL Server 2005->SQL Server Management Studio Express。

进入连接服务器界面,默认连接本机,点击连接。

连接成功进入管理界面4.1.1启用sa账号在默认情况下,SQL Server 2005 Express是采用集成的Windows安全验证且禁用了sa登录名。

为了工作组环境下不使用不方便的Windows集成安全验证,我们要启用SQL Server 2005 Express的混合安全验证,也就是说由SQL Server来验证用户而不是由Windows来验证用户。

设置sa的密码并启用sa登录名由于我们不知道sa的密码,所以我们设置一个(一般为1234),不要关闭这个窗口,接着选择左侧的“状态”,默认情况下,sa登录名是禁用的,因此,我们必须启用sa登录名,选择右侧的登录下的“启用”最后,我们点击窗口下面的“确定”按钮。

好了,到此为止,SQL Server 2005 Express服务器已经可以让sa登录了,不过,要重新启动一下,让配置生效。

验证sa账号是否生效。

关闭SQL Server 2005 管理工具,重新打开。

在登陆界面中的身份验证选择SQL Server 身份认证,输入用户名、密码。

点击连接。

连接成功,进入管理界面,说明sa账号已经生效。

4.1.2创建数据库在管理界面,右键点击数据库,选择新建数据库。

输入数据库名称(SZMC),初始大小(500M),以及路径d:\database。

添加成功后在对象管理器里面可以看到SZMC这个数据库。

4.1.3导入系统表和数据导入数据服务器系统表:选择打开->文件,选择建表脚本文件(SZMCTable.sql),点击打开选择数据库SZMC点击执行执行成功可以在对象管理器里看到,具体的表已经创建导入基础数据:打开基础数据脚本SZMCData.sql:选择数据库SZMC点击执行4.1.4开启远程连接SQL Express 2005服务因为系统需要通过控制服务器管理端远程连接控制服务器,而SQL Express 2005 Express 默认没有开启远程连接,需要配置远程连接。

执行sp_configure 'remote admin connections', 1; GORECONFIGURE;GO打开远程连接的协议、运行SQL Server Configuation Manager重启服务开启SQL Server Browser服务启动类型改为自动,点击确认。

点击启动,启动结束后点击确认。

4.1.5配置ODBC连接选择管理工具,数据源(ODBC)选择系统dns,点击添加。

选择SQL Server 点击完成选择服务器,点击下一步选择用户输入ID和密码的SQL Server验证,输入sa账号和密码,点击下一步。

选择更改默认数据库为,选择SZMC3,点击下一步。

点击完成点击测试数据源测试成功点击确定,保存配置。

4.2 控制服务器配置进入程序安装目录,默认是C:\Program Files\glink\ControlServer,打开ControlServer.ini配置文件配置文件说明如下:;///////////////////////网络配置//////////////////////////[NetConfig];服务器端口ServerPort=7900;线程数ThreadNum=5[Database]Dsn=ccUser=saPwd=1234;///////////////////////日志配置//////////////////////////[LogConfig]LogPath=c:\log\其中ServerPort是控制服务器的监听端口,默认是7900,一般不需要修改。

ThreadNum是处理线程数,默认5个,一般不需要修改Dsn:ODBC里面配置的系统dsnUser:数据库用户名Pwd:数据库密码LogPath:日志文件保存路径4.3 Modbus服务配置进入Modbus服务安装目录,打开modbus_config.ini配置文件,具体内空如下(参数需按实际情况配置):[SYSTEM]//本机IP地址HostIP = 127.0.0.1//MCS主用主机IP地址MCSMasterIP = 192.168.0.71//MCS备用主机IP地址MCSSlaverIP = 192.168.0.72//与MCS通信端口MCSPORT = 502//是否打印详细日志1:打印详细日志0:不打印详细日志DETAIL = 1//刷新车次号的间隔时间,单位:分钟RefreshTrainNoTime =60[DB]//数据库服务器地址DataSource = 192.168.1.55\SQLEXPRESS//数据库名DataBase=SZMC//数据库用户名UserName = sa//数据库密码Password=12344.4 启动控制服务器程序启动服务管理器,选择ControlServer服务,点击启动。

进度条结束后,启动完毕。

这时候查看控制服务器日志,是否是正常启动。

如果控制服务器正常启动,日志文件打印Connect DB Successfully Server Start Successfully。

Mobus服务配置4.5 配置为NTP服务器控制服务器需要配置为NTP服务器,以便本系统其它机器与之进行时间同步。

4.5.1配置步骤进入安装目录,执行NTP服务器自动配置.bat文件。

执行界面如下运行结束后,窗口自动关闭。

这样,NTP服务器配置完毕。

4.5.2验证NTP服务器在其中一台客户机上,双击任务栏下的时间出现日期和时间属性窗口,选择Internet时间页,选择自动与Internet时间服务器同步,输入控制服务器地址,点击立即更新。

更新结果如下5控制服务器日常维护控制服务器程序是以无人值守的服务方式运行的,随机器启动自动启动服务。

无界面操作。

系统的相关参数设置和监控主要通过控制服务器管理端进行,控制服务器管理端具体安装和使用可参看《深圳地铁4号线地面监控系统安装使用手册(控制服务器管理端).doc》文档。

如果出现客户端无法登陆,或者出现无法调用视频的情况,先排除客户端问题和网络问题后,可远程连接(通过远程桌面)到控制服务器系统上,打开服务管理器,查看ControlServer的服务是否正常运行,可重启该服务看是否恢复正常。

如果故障依然存在,再查看数据库相关服务是否正常运行(包括SQL Server (SQLEXPRESS)服务和SQL Server Browser服务),重启上述两个服务和ContolServer服务。

具体故障信息可以查看控制服务器的日志文件。

相关文档
最新文档