ck40n常见报错(Ck40ncommonmistakes)

合集下载
  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

ck40n常见报错(Ck40n common mistakes)
CK40N cost estimation error handling
1, raw materials: whether to maintain the standard unit price, no cost accounting (NCOST), this section, procurement type, material status, these fields are maintained correctly?
2, semi-finished products and finished products, the problem is much more, in addition to the above mentioned:
1) whether there is a downward expansion of BOM
2), whether the process of l: L4 & B* z$|: B3 C*?
3) whether to maintain job type, job price, cost center availability, etc.
4) whether or not the material in the lower BOM is reported wrong
5) and some logical relations
Therefore, when doing CK40N COSTING, after this step, the error message poured out a check, from raw materials to start because there may be some common materials, as a raw material prices without causing a number of semi-finished products and finished products of error, error checking this action very headache. The root of the problem is still not well connected business!
E 300032271001 CK 467 no Waixiejiagong price could be determined for "X- H. J/ V6 v& `'* D2 X
No, price, could, be, determined, external, processing, O8, r&, ~6, * A, K2, E, ~ m-, W, U, for
Description: material 30003227 (process) Waixiejiagong price is not b$M/ ~ B D7 #, P9 @ u&
Processing: A. check material 30003227 process route (Tcode:CA03)
Check the validity of B. (process) Waixiejiagong information recording (Tcode:ME13); J1 V2 R7 t]& "~9 E8 K
C. check whether the supplier tax rate is set correctly in the information record (Tcode:MEK3)
O/ e (Z, V (w*, d#, H)
E ML92-32037M 2201 CK 380 did not find a valid source of supply"
No, valid, source, of, supply, could, be, found
Explanation: material ML92-32037M purchase price information record?
Processing: A. checks the validity of purchased information records (Tcode:ME13)
B. check whether the supplier tax rate is set correctly in the information record (Tcode:MEK3)
C. check the material source list (Tcode:ME03), D D/ `* ~ y.
There is no valid price plan for E SOH-AA 2201 CK 359 for PK110 /LV, in fiscal year 2002
Here, was, no, activity, price, planning, for, PK110, /LV,, in, fiscal, year,...
Explanation: the planned price is not available in the job type LV of the cost center PK110
Processing: A. checks the job type of PK110, the planned price of LV (Tcode:KP26)
E 2201-000319 2201 CK 240 cost component breakdown cost is zero & P; J2 J (K; Q; P4 R; U
Cost, component, split, costed, with, value, of, zero
Note: if the material as raw material, then no corresponding price,
If the semi-finished products and finished products, then check whether there is a corresponding BOM and process routes
Treatment: A. (if the material is ROH) to check the procurement of raw materials, the main information recording data, whether price plan price data (Tcode:MM03)
B. (if the material is HALB/FERT) check the material whether homemade or purchased, "s'W* X8 (Tcode:MM03) \5 P8 |7 M
C. (if the material for the homemade HALB/FERT) check and BOM process (Tcode:CS03/CA03) Z2 P& A8 [4 ^!: w& {D1 R)"
D. check the background configuration (Tcode:OKKN) # X* p't% P, D8 B
I 300003581001, CK 694, has no structure that can be defined to the internal activity LAB01 (P010011)
No, structure, could, be, determined, for, internal, activity, LAB01 (P010011) / h, D0, T4, T', J, Z,}, K
Explanation: the internal job LAB01 has no cost splitting structure
Handling: the cost cut structure (Tcode:OKES/OKEW) must be maintained when the actual operating price needs to be revalued at the end of the month
W 2401-000140 2201, CK 310 material 2401-000140 as deletion mark
Material, 2401-000140, is, marked, for, deletion
Explanation: the material 2401-000140 has already been marked off
Treatment: confirm whether it is normal to use this material, such as for normal use, release the delete mark (Tcode:MM06): X+ E8 ~3 l s. L6 V9 o) _* U:]!
I PSSF810201A (C) 2201 CK 229 no process route can determine the material PSSF810201A (C) B T3 b* P0 |); X
No, routing, could, be, determined, for, material, PSSF810201A (C) + I3, N+, [7, M3, N; ` `
Description: material PSSF810201A (C) V8 {+ / no route; G3 J D!
Handling: check to see if the material requires process route, and maintain the process route (Tcode:CA03) if necessary
E CK 239 cost element 5316002001 is not allocated to cost components
Cost element 5316002001, is, not, assigned, to, a, component, cost
Description: CO cost component is not configured, or FI OBYC GBB-VBR automatic posting account not configured E D3 A #) G9 M
Processing: configuring in OBYC) M7, P7, E
Run in the running cost accounting cost accounting (CK40N) when in error "not on the cost accounting object" error message can't show which department of material errors, so we must first release false information
Path: R/3 SPRO> product cost control plan with the number of structure cost estimation definition of costing variant
selection, cost accounting of JY01 variant in the "miscellaneous" option which has a "error management", then you can choose the wrong way to let it show, there are three options as W warning information release;
E is issued as an error message; A is issued as an end message
Resolvent:
In ZCOQ01, select the factory according to the factory, have the BOM or ROUTING incorrect product number, and then eliminate the mistakes when the first part makes a choice
In doing cost calculation, if it will be wrong, a finished / semi-finished products, there is no BOM, you have to check the BOM status of this material is 1 or 2, because if it is 2, it is not activated, nor can participate in the accounting.]3。