法国,巴黎,Convention街住宅楼/Jean Paul
Viguier Architecture
建筑师: Jean-Paul Viguier et Associés
地点: 法国,巴黎
建筑设计项目经理: Octave Parant
建筑设计项目领导人: David Cisar
建造领导小组: Jean Blondel, Patrick Tavernier
技术顾问和经济: ARCOBA
代表公司: Bouygues Bâtiment
建筑面积: 18,200 sqm
预算: 20 M €
年代: 2010
摄影: <ahref="/" target="_blank">Yves Marchand & Romain Meffre
住宅的平面户型成组,使得整个住宅楼的体型简洁,既能表达一些实验性的概念,也能回应住宅楼周围的环境。
周围的环境包括花园区域和后面的建筑的立面。
块体围绕着紧密的服务中心和交通核心,避免了“楼梯综合症”
采用了一系列的可持续设计方法,让它具有‘HQE’状态。
原文:
Architects: <a href="/" target="_blank">Jean-Paul Viguier et Associés</a>
Location: Paris, France
Architect project manager: Octave Parant
Contractors: Paris-Habitat for 128 housings / Vinci for 78 housings
Technical consultant and economist: ARCOBA
Representative company: Bouygues Bâtiment
Project Area: 18,200 sqm
Budget: 20 M €
Project Year: 2010
Photographs: <ahref="/" target="_blank">Yves Marchand & Romain Meffre</a>
The plan layout is grouped to form a compact building entity, providing both a coherent base for environmental performance concepts and a reply to the insertion of the program within the existing site. The density of the resulting model frees up the garden area and the facade of the building behind.
This ‘compacting’ of the building is the result of a study to optimise its volumetric constraints and orientation in order to gain a maximum of direct sunlight without penalising the existing neighbours. All apartments have a dual orientation which allows direct sunlight both morning and evening together with the additional comfort of cross-ventilation.
The operation takes the form of a series of blocks of progressive height, linked by veranda type walkways. This principle generates a cascade of landscaped elements at the heart of the building. The blocks are organised around compact, day lit services and circulation cores thus avoiding the ‘staircase syndrome’.
A series of measures have been undertaken in respect of sustainable design to give the project its‘HQE’ status.。