A feasibility study to determine if minimally trained medical students can identify marker

合集下载

可行性分析报告英文

可行性分析报告英文

可行性分析报告英文你知道什么是可行性分析报告吗?项目可行性分析报告又可以称为项目可行性研究报告、可研报告,是一种格式比较固定的、用于向国家项目审核部门(如发展改革委员会)进行项目立项申报的商务文书。

那么可行性分析报告英文怎么写呢?以下是关于可行性分析的英文可行性报告英文Feasibility Report on Collaboration with Partner Agency in ParisTo: Bill Baker, Managing DirectorFrom: Lily BatesDate: April 2, 2009INTRODUCTIONThree days ago, I visited our partner agency in Paris to see whether we could collaborate on a big marketing program for Soda-Taste.This report is to describe the situation and to demonstrate whether this program is feasible or not and to make recommendations about how we can work together on this important project with our partner agency in Paris.METHODOLOGYThe information was mainly achieved by observing personally what they were working on and discussing with their managers.FINDINGSThe French agency is already working on the plans for the marketing campaign now.They are very positive about the idea of working together with us.They propose an idea of a pan-European advertisement, that is, to use the same advertisement for promotion in different countries, but with local and famous actors in each country.CONCLUSIONSThe Soda-Taste program is very important to both of our markets and it,s very profitable across Europe. This project looks feasible and beneficial, and it shows a high possibility for success.RECOMMENDATIONSThus, we should invite their CEO to join meetings to discuss budgets and begin planning the program as soon as possible, and decide on the time schedule with their I managers.可行性报告英文Feasibility study report is engaged in a kind of economic activity (investment), before the two sides should from economy,technology, production, supply and marketing to a variety of factors such as social environment, law specific investigation, research,analysis, determine the favorable and unfavorable factors, the project is feasible, estimated size, economic benefit and social effect,the success rate for policy makers and the competent authority for examination and approval report file.Feasibility study is to determine the decisive work before construction projects, is before the investment decision, the proposed project to conduct a comprehensive technical and economic analysis of scientific reasoning, in investment management,feasibility study refers to the planned project about nature, society, economy, technology and research, comparative analysis and prediction after the completion of social and economic benefits.On this basis, the necessity of comprehensive demonstration projects, financial profitability, economic rationality,technical advancement and adaptability as well as the possibility and feasibility of the construction conditions, so as to provide scientific basis for investment decision.Feasibility study report is divided into the government approved by the examination and approval in the feasibility study report and financing in the feasibility study report.Approved by the examination and approval in the feasibility study report on attention and influence of the social economic benefits of the project; Financing with report focused attention project is economically feasible.Specific summarized as: the government project examination and approval, industrial support, bank loans, financing, investment, investment construction,foreign investment, public finance, the Chinese and foreign cooperation, share cooperation, companyestablishment, land requisition, application feasibility report of various types, such as high and new technology enterprise.Feasibility study report1, used in corporate finance, feasibility study report of foreign investment cooperation.Such study usually requires accurate market analysis, investment plan is reasonable, and provide competitive analysis, marketing planning, management plan, technology research and development, such as the actual operation.2, for national development and reform commission (planning commission) project feasibility study report.This file is based on the administrative permit law of the People’s Republic of China “and” make of the state council of the People’s Republic of China “and writing, is the basis of the larg e infrastructure project file,the national development and reform commission according to the feasibility study report for approval, registration or approval, to determine whether aproject implementation.Pharmaceutical enterprises when applying for a certificate also need to write the feasibility study report.3, feasibility study report for bank loans.Conduct the risk assessment of commercial Banks in the former, the need to project the detailed feasibility study report, issued by the national development bank and other domestic Banks,the report issued by the qualification of grade a units, usually don’t have to organize the expert review, part of the bank loans do not need qualification of feasibility study report,but it requires the financing scheme is reasonable, the analysis is correct, comprehensive information. To apply for national policy support funds, industrial and commercial registration also often need to write the feasibility study report, feasibility study report the file similar to bank loans.4, used for applying for import equipment duty-free.Is mainly used to import equipment duty-free withfeasibility study report, apply for sino-foreign joint venture enterprises, domestic enterprises projects need to provide the project feasibility study report of the project confirmation.5, feasibility study report for approval of overseas investment.Enterprises in implementing the strategy of going out to foreign mineral resources, and other industrial investment, you need to write the feasibility study report to the national development and reform commission or the provincial development and reform commission (NDRC),need to apply for overseas investment of the export-import bank of China credit support for key projects, also need the feasibility study report.In the above five kinds of feasibility study, 2, 3, 4, and the highest barriers to entry, you need to write the unit with engineering consulting qualification,the qualification issued by the national development and reform commission, fall into three grades,class a, class b and class c class a qualification of the highest, national possess class a qualification of engineering consulting unit have dozens.All kinds of feasibility study content emphasis difference is bigger, but generally should include the following contents:1.The investment is necessary.Mainly according to the result of market investigation and forecast, as well as the relevant industrial policies, demonstrates the necessity of construction of project investment.2.The feasibility of the technology.Mainly engaged in the project implementation technology perspective, reasonable design scheme, and carry on comparison and evaluation.3.The financial feasibility.Mainly from the perspective of the project and investors, design reasonable financial plan, from the perspective of enterprise financing capital budgeting, evaluation of project financial profitability, investment decision-making,and evaluation from the perspective of financingmain body (enterprise) shareholder investment earnings, cash flow plan and debt repayment ability.anize feasibility.Reasonable project schedule plan, choice of reasonable design of organizations, experienced management personnel, establish good cooperation relations, develop appropriate training programs, etc, ensure the project smooth implementation.5.Economic feasibility.Mainly from the perspective of resource allocation to measure the value of the project,the project evaluation in regional economic development goals, the efficient allocation of economic resources, and increasing supply, create jobs and improve the environment,enhance the ben efit of the people’s life, etc.Such as:First of all, tell from the economic benefits, and the development of this system, for the statistics personnel work efficiency brings a qualitative leap. First, the operation of this system can be many multifarious replace artificial labor;Second, the operation of this system can save a lot of resources;Third, the operation of this system can greatly improve the work efficiency of statistical personnel; Followed by, from the work required, for a small library management system, the investment cost is very low.There should be no more than 5000 yuan.Therefore, the system is feasible in economy.6.Feasibility of society.Mainly analyzed the influence of the project to the society, including political system, policies and regulations, economic structure, legal, moral and religious minorities, women and children and the social stability, etc.7.The risk factors and countermeasures.Mainly to the project of market risk, technology risk, financial risk, organizing risk, legal risk,economic and social risk factors such as evaluation, formulate countermeasures of avoiding risk, provide the basis for the whole process of project risk management.The main content of the feasibility study report and request are as follows:(a) basic information: name of the sino-foreign joint venture, legal address, purpose, business scope, and scale;The name of the parties to the joint venture, registered state, legal address and legal representative’s name, position and nationality;Total investment and registered capital share capital (self-owned funds, investment scale, investment mode, the parties to the joint venture equity pay period); The duration of the joint venture company,the jv party profit distribution and loss allocation proportion; Project proposal approval document;Feasibility study report, the head of the list; An overview of feasibility study report, the conclusion, questions and Suggestions.(2) production schedule and its basis.To market demand and the market prediction at home and abroad, at home and abroad and the current existingand under construction ability of production equipment.(3) the material supply arrangements (including energy and transportation) and its basis.(4) the project selection and the basis.(5) and the evidence for the selection of technical equipment and technological process (including the arrangement of the equipment delivery spread at home and abroad).(6) production organization arrangement (including the total number of employees, structure, source and management) and its basis.(7) environment pollution control and labor safety protection, sanitation and its basis.(eight) construction method, construction schedule and evidence.Financing (9) and the basis (including plant, equipment, investment calculation basis).Foreign exchange collection and payment arrangement (10) and the basis.(11) comprehensive analysis (including economic, technical, financial and legal aspects of theanalysis).Method using the dynamic method and risk (or sensitivity analysis) methods to analyze project efficiency and the foreign exchange receipts and payments, and so on and so forth.(12) the necessary accessories.Such as the copy of business license of the parties to the joint venture; Certificate of the legal representative; The assets of the parties to the joint venture, business data; The competent department.Investment project network in heilongjiang province and surrounding areas to assist in heilongjiang province customer in project investment, planning and design,project for the record, policy support, capital, land application, project financing, bank loans, promote efficiency and success rate of enterprise project ascertained for the mission,providing professional construction project feasibility study report, project proposal, project application report,the fund application report, the energyconservation evaluation report, business plan, planning consulting project land, the loan financing business documentation services.My company has completed nearly all kinds of consulting project example,not only provide customers with timely, accurate, and conforms to the specification of project report, also provide customers with detailed reporting guidance and project construction,to provide more realistic consultant service, the enterprise should be resolved in the construction of investment,project application and project operation in the face of difficulties, to high quality service to win customer widespread praise.Investment projects in heilongjiang province network establishment of each report is made up of project related senior professional team responsible for drafting, compiled by each report must go through the first draft,correct version, sample, finalized four procedures completed, strictly control the quality.Each report must meet customer demand, to achieve customer satisfaction, are final.可行性分析报告英文Feasibility Study Report (English Translation for General Reference Only)〔-〕Company Limited Feasibility Study Report _GoBack Table of Contents Contents Chapter 1 Name of Project 2 Chapter 2 Basic Information of the Investor 2 Chapter 3 Product Selection, Current Chinese Market Analysis, Sales Revenue and Future Development Plans 2 Chapter 4 Distribution,Importation and Exportation 3 Chapter 5 Advanced Management Techniques 3 Chapter 6 Organizational Structure, Personnel and Recruitment 3 Chapter 7 Total Investment, Registered Capital and Capital Contribution 3 Chapter 8 Source of Capital 4 Chapter 9 Economic Benefits Analysis4 Chapter 10 Foreign Exchange Balance Analysis 4 Chapter 11 Project Implementation and Progress Schedule 4 Chapter 12 Summary of Assessment 4 〔-〕Company Limited Feasibility Study Report , a duly organized and existing under the laws of(hereinafter referred to as the “Investor”), hereby wishes to establish a wholly foreign-owned enterprise,(hereinafter referred to as the “Company”)in accordance with the Company Law of the People’s Republic of China, the Law of the People’s Republic of China on Wholly Foreign-Owned Enterprises,the Detailed Rules for the Implementation of the Law of the People’s Republic of China on Wholly Foreign-owned Enterprises and other relevant and officially promulgated laws and regulations of the People’s Republic of China (hereinafter referred to as the “PRC”)._Toc310463945 Chapter 1 Name of Project Name of Company: Company Limited Address: Business Scope of Company: _Toc310463946 Chapter 2 Basic Information of the Investor The Investor, with its headquarter located in Hongkong, is a .The Investor has approximately employees and operates throughout .In , the annual consolidated net sales of the Investor exceeds ._Toc310463947 Chapter 3 Product Selection, Current Chinese Market Analysis, Sales Revenue and Future Development Plans 1.Service / Product Selection and Introduction The Company will concentrate on the .The Company will also .2.Chinese Market Condition Therefore, the Investor decides to set up the Company in Shanghai.3.Sales Revenue After the Company starts its formal operation, its annual sales revenue is projected at .4.Future Development Plans _Toc310463948 Chapter 4 Main businesses _Toc310463949 Chapter 5 Advanced Management Techniques _Toc310463950 Chapter 6 Organizational Structure, Personnel and Recruitment 1. The Company’s Management Structure 2.Labour The Company will recruit its employees based on its business needs.It is estimated that number of employees of the Company will be increased to over the next several years.The recruitment of management staff and employees will be based on their merits and ability.As required under PRC Labour Law, all employees will be employed through execution of appropriate employment contracts._Toc310463951 Chapter 7 Total Investment, Registered Capital and Capital Contribution 1.Total Investment Total investment of the Company shall be .2.Registered Capital The registered capital of Company shall be , all of which shall be contributed by the Investor.3.Capital Contribution The Investor intends to contribute its investment in the form of ._Toc310463952 Chapter 8 Source of Capital _Toc310463953 Chapter 9 Economic Benefits Analysis _Toc310463954 Chapter 10 Foreign Exchange Balance Analysis The Company will comply with all applicable laws and regulations regarding foreign exchanges control and balancing._Toc310463955 Chapter 11 Project Implementation and Progress Schedule The Investor has entered into a lease agreement with a company in , Shanghai.This Feasibility Study Report, the Articles ofAssociation of the Company and other relevant documents will be submitted to the relevant government authorities for examination and approval in ._Toc310463956 Chapter 12 Summary of Assessment In view of the foregoing, we consider establishment of the Company a feasible project.BY: _________________________________ NAME: TITLE: DATE: 1。

计算机专业英语第三版教学课件Unit5 Software Engineering

计算机专业英语第三版教学课件Unit5 Software Engineering
Mr. Brown: Zhonghua Computers. What can I do for you?
布朗先生:您好!中华计算机公司。我能为您做些什么?
Linda: Hello, Mr. Brown. It is Linda. Got a minute?
琳达:您好,布朗先生。我是琳达。您有时间吗?
Mr. Brown: I see your point. If we have to spend more time on developing the second version, we’ll have to adjust the schedule. People need to know that we have adjusted the project development plan as soon as possible. Do you want me to call the project manager?
Look and Learn Dialogue Reading Learn More New Words and Phrases
A software development project organization.
Lesson 14
Unit 5
Look and Learn Dialogue Reading Learn More New Words and Phrases
Mr. Brown: Yes.We planned to put the two versions in the same development process. Well, what kind of problem are you having now?
布朗先生:是的。我们计划在同一个开发过程中投入两个版本。那您现在遇到什么问题了?

feasibility study英文解释

feasibility study英文解释

Feasibility Study的英文解释1. DefinitionFeasibility study is the process of evaluating the potential for a project or business idea to be a successful and profitable endeavor. It involves analyzing various factors such as market demand, financial viability, technical feasibility, and legal and environmental considerations.2. PurposeThe m本人n purpose of a feasibility study is to determine whether a proposed project or business idea is viable and worth pursuing. It helps decision-makers to assess the risks and benefits associated with the project and make informed judgments about its potential success.3. ComponentsA typical feasibility study consists of several keyponents, including:3.1 Market Analysis: This involves researching the target market to assess the demand for the product or service, as well as identifying potentialpetitors and market trends.3.2 Financial Analysis: This involves conducting a thoroughassessment of the financial implications of the project, including cost estimates, revenue projections, and potential return on investment.3.3 Technical Analysis: This involves evaluating the technical requirements and capabilities needed to implement the project, such as the av本人lability of resources and expertise.3.4 Legal and Environmental Analysis: This involves assessing the legal and regulatory requirements, as well as the potential environmental impact of the project.4. ProcessThe process of conducting a feasibility study typically involves the following steps:4.1 Identifying the need for the study: This involves determining the specific objectives and goals of the project, as well as the potential benefits and risks.4.2 Data collection: This involves gathering relevant information and data related to the project, including market research, financial records, and technical specifications.4.3 Analysis: This involves analyzing the collected data to evaluate the feasibility of the project, including conducting cost-benefit analysis and risk assessment.4.4 Report preparation: This involves documenting the findingsand rmendations of the feasibility study in a det本人led report, which is presented to the relevant stakeholders for decision-making.5. BenefitsThe benefits of conducting a feasibility study include:5.1 Minimizing risks: By identifying potential obstacles and challenges, a feasibility study helps to minimize the risks associated with the project.5.2 Informed decision-making: A feasibility study provides decision-makers with the necessary information to make informed judgments about the project's viability and potential for success.5.3 Cost savings: By identifying potential pitfalls and challenges early on, a feasibility study can help to avoid costly mistakes and inefficiencies.6. ConclusionOverall, a feasibility study is an essential tool for evaluating the potential of a project or business idea. By assessing various factors such as market demand, financial viability, technical feasibility, and legal and environmental considerations, a feasibility study helps decision-makers to make informedjudgments about the viability and potential success of the project. It is an important step in the planning and development of any new venture, and can significantly impact the ultimate success or f本人lure of the project.。

Project Management智慧树知到答案章节测试2023年嘉兴学院

Project Management智慧树知到答案章节测试2023年嘉兴学院

第一章测试1.The main objectives of project management are ()A:Time, cost, quality, and/or scopeB:Profitability, cost, timeC:Customer satisfaction, cost, timeD:Calendar dates, facilities available, funding答案:A2.The person responsible for balance the time, cost and quality objectives toachieve project success is ()A:The project managerB:The Human Resources DepartmentC:The executive sponsorD:The line manager答案:A3.The knowledge areas in PMBOK include: ()A:Scope managementB:Cost managementC:Risk managementD:Information management答案:ABC4.The temporary nature of projects means that a project has a shortduration. ()A:对B:错答案:B5.There are five process groups in PMBOK.()A:错B:对答案:B第二章测试1.In which organization structure would the project manager is fullyresponsible for the project ( )A:Strong matrixB:ProjectizedC:Weak matrixD:Functional答案:B2.In which type of matrix structure would a project manager most likely have acommand of technology ( )A:Strong matrixB:Balanced matrixC:Cross-cultural matrixD:Weak matrix答案:A3.Which of the following items are the roles of a project manager ( )A:Project manager should be a generalistB:Project manager should own comprehensive ability to solve problemsC:Project manager is a facilitator in terms of responsibilities to determine tasks, deadlines, and required resourcesD:Project manager should be an expert in a particular area答案:ABC4.Project team member probably may lose his or her job in matrixorganizational form if the project gets cancelled. ( )A:对B:错答案:B5.Generally, project manager is the soul of project team. ( )A:对B:错答案:A第三章测试1.The document that officially sanctions the project is the ()A:Benefit/Cost analysisB:Project charterC:Feasibility studyD:Project plan答案:Bmonly, Work Breakdown Structure can be constructed as ()A:BaselineB:Analysis tableC:Tree diagramD:Dictionary答案:C3.Project initiation is approved for the following main reasons ()A:Market demandB:Technological advanceC:Customer requestD:Executive requirement答案:ABC4.Project scope can influence the time, quality and cost of the project. ()A:对B:错答案:A5.Work Package is in the managerial level of the WBS.()A:对B:错答案:B第四章测试1.Which of the following principles is the most basic methodology of projecttime management. ()A:Principle of network schedulingB:Dynamic control theoryC:Principle of elasticityD:Principle of information feedback答案:B2.Which of the following network scheduling technique is mostly used inschedule software systems today.()A:Gantt ChartB:Activity-on-arrow NetworkC:PERTD:Activity-on-node Network答案:D3.Which of the following are the common techniques for schedule compression()A:Doing series work in parallelB:Reducing the manpowerC:OutsourcingD:Adding more resources答案:ACD4.Critical Path Method (CPM) is suitable for complex but fairly routine projectwith minimal uncertainty in the project completion time. ()A:对B:错答案:A5.Crashing and outsourcing are two main techniques can be used for durationcompression. ()A:错B:对答案:A第五章测试1.The common types of project estimating exclude ( )A:Quick-and-dirty estimatingB:Bottom-up estimatingC:Analogous estimatingD:Parametric estimating答案:A2.If BCWP=1200, BCWS=1000, and ACWP=1300, the project is ( )A:Ahead of schedule and over budgetB:Behind schedule and under budgetC:Behind schedule and over budgetD:Ahead of schedule and under budget答案:A3.The evaluation index of variance analysis in EVM include ()A:Project performance index (PPI)B:Cost variance (CV)C:Cost performance index (CPI)D:Schedule variance (SV)答案:BCD4.Bottom-up estimating is the definitive estimate, which is made without anydetailed engineering data. ()A:对B:错答案:B5.The abbreviation of actually expended amount in completing the workaccomplished within a given time period is BCWP.()A:对B:错答案:B第六章测试1.Which of the following items on project quality management is false? ()A:It has higher priority than time and cost management.B:It refers to a subset of project management that includes the processesrequired to ensure a project will satisfy the needs of customerC:It includes the activities of quality objectives establishment, qualityplanning, quality control, quality assurance and quality improvement.D:The ultimate responsibility for quality management lies with the project manager.答案:A2.What is the percentage range of of cumulative frequency for major qualityfactors (i.e. A factors) in Pareto analysis should be ()A:90-100%B:85-90%C:80-85%D:0-80%答案:D3.Which of the following items are the features of TQM?()A:Comprehensive management approachB:Total employee involvementC:Entire process managementD:Pre-control of quality objectives答案:ABC4.Project manager has the ultimate responsibility for quality management onthe project.()A:错B:对答案:B5.ISO 9000 standards are the series of standards that outline the requirementsfor quality management system developed by PMI.()A:对B:错答案:B第七章测试1.In which life-cycle phase would project uncertainty be the greatest ()A:Project initiationB:Project closureC:Project planningD:Project execution答案:A2.Risk mitigation and risk transfer are examples of()A:Risk expectationB:Risk analysisC:Risk responseD:Risk control答案:C3.Which of the following are the process of project risk management ()A:Risk controlB:Risk trackingC:Risk responseD:Risk identification答案:ACD4.Risk factors commonly exist in project design phase, which may lead toreduced economic benefits and even project failure. ()A:错B:对答案:A5.Risk analysis is the second process of project risk management. ()A:错B:对答案:B。

生产再生柴油审批流程

生产再生柴油审批流程

生产再生柴油审批流程英文回答:Production of Biodiesel: Approval Process.Steps:1. Feasibility study: Conduct a feasibility study to determine the technical, environmental, and economic viability of the project.2. Site selection: Identify a suitable site for the production facility that meets environmental and regulatory requirements.3. Environmental impact assessment (EIA): Prepare an EIA to assess the potential environmental impacts of the project and develop mitigation measures.4. Permit application: Submit a permit application tothe relevant regulatory authority (e.g., Environmental Protection Agency) for review and approval.5. Public hearing: Hold a public hearing to receive input from the community and address any concerns.6. Permit issuance: Obtain a permit from the regulatory authority that authorizes the construction and operation of the facility.7. Construction: Construct the production facility in accordance with the permit specifications and environmental regulations.8. Commissioning: Test and optimize the production equipment to ensure it meets performance requirements.9. Operation: Commence production of biodiesel and adhere to all applicable environmental and safety regulations.Documentation:Feasibility study report.Site selection report.Environmental impact assessment.Permit application.Public hearing summary.Construction plans and specifications.Commissioning report.Operation and maintenance manual.Timeline:The approval process can take several months to years, depending on the complexity of the project and the efficiency of the regulatory process.Additional Considerations:Compliance with local zoning laws.Access to raw materials and transportation infrastructure.Market demand for biodiesel.Government incentives and support.中文回答:生物柴油生产审批流程。

可行性研究报告内容英语

可行性研究报告内容英语

可行性研究报告内容英语1. IntroductionThe purpose of this feasibility study is to assess the potential of a new business idea or project. This study will examine the technical, financial, and operational aspects of the proposed venture to determine if it is feasible and sustainable.2. Executive SummaryThe executive summary provides a quick overview of the feasibility study, including the purpose, scope, and key findings. It should highlight the main points of the study and provide a brief conclusion.3. Background and ObjectivesThis section provides a detailed overview of the project, including its background, objectives, and significance. It also outlines the specific questions and issues that the feasibility study aims to address.4. Market AnalysisThe market analysis assesses the potential demand for the product or service in the target market. This includes an analysis of the industry, target customers, competition, and market trends. The study should also assess the potential market size and growth prospects.5. Technical FeasibilityThe technical feasibility analysis examines the technical requirements, resources, and capabilities needed to implement the project. This includes assessing the availability of technology, infrastructure, and skilled labor, as well as any potential technical challenges or risks.6. Financial FeasibilityThe financial feasibility analysis evaluates the project's financial viability and potential return on investment. This includes preparing financial projections, conducting a cost-benefit analysis, and assessing the project's funding requirements and sources of financing.7. Operational FeasibilityThe operational feasibility analysis assesses the project's operational requirements, processes, and capabilities. This includes evaluating the project's organizational structure, staffing needs, management systems, and operational risks.8. Risk AssessmentThe risk assessment identifies and evaluates the potential risks and challenges associated with the project. This includes analyzing the project's external and internal risks, such as market, financial, technical, operational, and regulatory risks.9. Legal and Regulatory ConsiderationsThis section examines the legal and regulatory requirements and implications of the proposed project. This includes assessing the project's compliance with laws, regulations, permits, and licenses, as well as any potential legal or regulatory barriers.10. Conclusion and RecommendationsThe conclusion summarizes the key findings of the feasibility study and provides a final assessment of the project's feasibility and viability. This section also includes specific recommendations for the project, such as whether to proceed with the project, modify the project, or abandon the project.11. AppendicesThe appendices provide additional details, data, and analysis that support the findings and recommendations of the feasibility study. This may include supplementary research, financial projections, market data, and other relevant information.12. ReferencesThe references section lists all the sources and references cited in the feasibility study, to provide transparency and credibility to the findings and recommendations.In conclusion, the feasibility study is a comprehensive assessment of the new business idea or project, covering the technical, financial, operational, market, and legal aspects. It provides a thorough analysis of the project's feasibility and viability, and offers recommendations for the next steps. This study is an essential tool for decision-making and investment evaluation, and it helps to ensure the success and sustainability of the proposed venture.。

林地转园地报批手续流程

林地转园地报批手续流程

林地转园地报批手续流程英文回答:The process of converting forest land into agricultural land involves several steps and requires various approvals. Here, I will outline the general procedure for obtainingthe necessary permits and licenses.Firstly, it is essential to conduct a feasibility study to determine if the land is suitable for agricultural use. This study includes assessing the soil quality, water availability, and the potential impact on the environment.Once the feasibility study is completed and the land is deemed suitable for agricultural purposes, the next step is to apply for a land use change permit. This permit isusually obtained from the local government or relevant authorities responsible for land management. Theapplication typically includes detailed information aboutthe land, such as its location, size, and proposed land use.After submitting the application, a thorough review process takes place. This involves evaluating the potential impact of the land conversion on the surrounding environment, including any potential effects on wildlife habitats or water sources. The authorities may also consider factors such as the availability of infrastructure and the compatibility of the proposed land use with the surrounding area.If the application passes the review process, the next step is to obtain an environmental impact assessment (EIA). The EIA evaluates the potential environmental consequences of the land conversion and proposes measures to mitigate any adverse effects. This assessment is crucial in ensuring sustainable land use practices and minimizing environmental damage.Once the EIA is completed and approved, the applicant can proceed with obtaining the necessary permits and licenses for land conversion. These may include permits for land clearing, water usage, and the construction ofnecessary infrastructure such as irrigation systems or access roads.After obtaining all the required permits and licenses, the landowner can begin the process of converting theforest land into agricultural land. This may involve activities such as clearing vegetation, preparing the soil, and planting crops or establishing livestock operations.In conclusion, the process of converting forest land into agricultural land involves conducting a feasibility study, applying for a land use change permit, undergoing a review process, obtaining an environmental impact assessment, and acquiring the necessary permits and licenses. This process ensures that land conversion is carried out in a sustainable and environmentally responsible manner.中文回答:将林地转为农业用地涉及多个步骤,并需要获得各种批准。

工程项目管理专业英语

工程项目管理专业英语

Engineering projects are complex endeavors that require meticulous planning, execution, and control to ensure successful completion. As the world becomes increasingly globalized, the need for professionals whocan effectively communicate and manage engineering projects in Englishis paramount. This article aims to provide an overview of key terms, concepts, and practices in engineering project management, translatedinto professional English, to help professionals navigate this fieldwith confidence.Key Terms and Definitions:1. Project Management (PM): The application of knowledge, skills, tools, and techniques to project activities to meet the project requirements.It involves the integration of all project elements to achieve theproject objectives within the agreed constraints.2. Project Manager (PM): The individual responsible for leading the project team and ensuring the successful completion of the projectwithin the defined scope, schedule, and budget.3. Project Scope: The defined and documented deliverables of the project, including the work to be performed and the results to be achieved.4. Project Schedule: A document that defines the project's timeline, including start and end dates for activities, milestones, and thecritical path.5. Project Budget: The financial resources allocated to the project, including costs for labor, materials, equipment, and other expenses.Key Concepts and Practices:1. Project Planning: The process of defining the project's objectives, scope, and deliverables, and developing a detailed plan to achieve them. This includes identifying project stakeholders, defining project tasks, estimating resources, and establishing a project schedule.2. Risk Management: The process of identifying, analyzing, and responding to risks that may affect the project. This involvesidentifying potential risks, assessing their impact and likelihood, and developing strategies to mitigate or avoid them.3. Quality Management: The process of ensuring that the project deliverables meet the required quality standards. This includes establishing quality policies, planning quality activities, and implementing quality control measures.4. Change Management: The process of managing changes to the project scope, schedule, or budget. This involves assessing the impact of changes, obtaining approval for changes, and updating project documentation accordingly.5. Configuration Management (CM): The process of identifying, organizing, and controlling modifications made to the project deliverables. CM ensures that the project's configuration items are properly documented, tracked, and managed throughout the project lifecycle.Practical Examples:1. Project Change Request (PCR): A formal document submitted by aproject stakeholder requesting a change to the project scope, schedule, or budget. The project manager must assess the impact of the change and obtain approval from relevant stakeholders before implementing it.2. Feasibility Analysis: A study conducted to determine whether aproject is technically, economically, and operationally feasible. This analysis helps project managers make informed decisions about whether to proceed with the project.3. Project Management Office (PMO): A centralized office within an organization responsible for overseeing the management of projects. The PMO provides support to project managers and ensures that projects are aligned with the organization's strategic objectives.In conclusion, engineering project management is a dynamic and challenging field that requires a strong command of professional English. By understanding key terms, concepts, and practices, professionals caneffectively communicate and manage engineering projects, contributing to their success and the success of their organizations.。

专外习题答案-第一部分

专外习题答案-第一部分

第一部分Unit 1I. Fill in the blanks with the information given in the text.1. A resume is a summary of your experiences and skills relevant to the field ofwork you are entering.2.All employers value certain qualities: team player; good communication skills;leadership abilities.3.Recruiters often must look through stacks of resumes in search of a particularone.4.Focus on what you have to offer rather than on what the job can offer you.5.As a graduating senior, your GPA should always be mentioned, as long as it isabove 3.0.II. Translate the following terms or phrases from English into Chinese and vice versa.软件software,硬件hardware,操作系统operating system,数据库database,计算机网络computer networkProgramming Language 编程语言, device driver 设备驱动程序, compiler 编译程序, user interface 用户界面, embedded system 嵌入式系统III. Please try to write a resume of yourself.Unit 2I. Fill in the blanks with the information given in the text.1.In an interview situation, the employer is more interested in knowing what youcan do for their organization and how you can fill the role they have available. 2.Analyze how your strengths, personal and academic experiences, as well as yourinterests can be transferred to the position for which you are applying.3.Every employer would like to hire people who can prove that they can do the job,and the best proof is prior experience.4.Write down dates, names, quantities or measurements of success and other detailsthat will convey the situation to the interviewer.5.Think deeply about the various elements of the job description. Make a list of themain skills and personal characteristics that this job seems to require.II. Translate the following terms or phrases from English into Chinese and vice versa.面试,实习,求职,interviewer, interviewee, employer , undergraduate, career field III. Please write a summary of all the action steps during an interview.Unit 3I. Fill in the blanks with the information given in the text.puter programmers write, update, repair, modify and expand softwareprograms.puter software engineers and systems analysts provide computerprogrammers with the design overview and program requirements, which the programmers translate into coded instructions that a computer can follow.II. Translate the following terms or phrases from English into Chinese and vice versa.程序员,软件工程师,系统分析员,application, procedure, retrieveIII. Please write down what you should study to be a good software engineer.Unit 4I. Fill in the blanks with the information given in the text.1. A feasibility study is an analysis of a problem to determine if it can be solvedeffectively given the budgetary, operational, technical and schedule constraints in place.2.The aim of the feasibility study is to identify the best solution under thecircumstances by identifying the effects of this solution on the organization.3.The difference between an average report and a good report is often simplyorganization: present the information in a clear and engaging format and your information will be easier to find and use.II. Translate the following terms or phrases from English into Chinese and vice versa.可行性报告,用户需求文档,CTO,progress report,word processing document III. Think of an idea you would like to see implemented on your compus or on you job. Write a short feasibility report, persuading your audiece that your audience that your idea is worthwhile.Unit 5I. Fill in the blanks with the information given in the text.1.Electronic mail, also known as email or e-mail, is a method of exchanging digitalmessages from an author to one or more recipients.2.Email systems are based on a store-and-forward model.3.An Internet email message consists of three components, the message envelope,the message header, and the message body.II. Translate the following terms or phrases from English into Chinese and vice versa.用户账号,密码,邮件主题,垃圾邮件,RFC,phishing,unsubscribeIII. Imagine you are writing an e-mail to your partner to discuss an issue he/she raised. He/she thought the project schedule was a little too tight for the systems engineering group, and that it might be better to remove a week from the implementation phase and add it to the design& analysis phase. Your want to tell him/her:1.You agree that the design& analysis phase should be given more time.2.However, as a member of the software engineering group, your are fullyaware of the expected intensity during the implementation phase , and you contend that cutting out a week from that phase would be impossible. Maybe the schedule for the testing group is more flexible, and he/she may discuss with them about being allotted some of their time.Unit 6I. Fill in the blanks with the information given in the text.1.Research information has limited value unless it is collected and published in ausable form and presented to those who may apply it.2.It is also your responsibility as an engineer or scientist to show promptly thatyour results are worthwhile and that you have reason to believe the field will be advanced by your efforts.3.In most cases you should be able to prepare a preliminary report outline at thebeginning of the program.4.Trying to organize and write a report without knowing the conclusions is likestarting an automobile trip without knowing the destination.5.In the sorting stage concentration is on what results should be presented in areport. In the outlining stage attention is directed to how these results should be presented.II. Translate the following terms or phrases from English into Chinese and vice versa.报告,图解,表格,data-gathering,illustration,modification,headingIII. Please write a sumarry about how to write a research report.第二部分。

安哥拉探矿权流程

安哥拉探矿权流程

安哥拉探矿权流程(中英文版)英文文档内容:The mining license application process in Angola involves several steps.Here is an overview of the process:1.Feasibility Study: Before applying for a mining license, a prospector must conduct a feasibility study to determine the economic viability of the mining project.2.Application Submission: The prospector must submit a formal application to the Ministry of Mineral Resources and Petroleum.The application should include detailed information about the project, such as the type of mineral being extracted, the area of the mining site, and the expected duration of the mining operation.3.Environmental Impact Assessment: The Angolan government requires an environmental impact assessment to be conducted before a mining license is granted.This assessment must demonstrate that the mining project will have minimal negative impact on the local environment and communities.4.Public Consultation: The mining company must hold public consultations to inform local communities about the proposed mining project and to address any concerns they may have.5.License Approval: If the application is approved, the Ministry ofMineral Resources and Petroleum will issue a mining license.The license will specify the terms and conditions of the mining operation, including the duration of the license, the area of the mining site, and the type of mineral being extracted.mencement of Mining Operations: Once the mining license is obtained, the mining company can begin extraction activities.However, the company must comply with all applicable regulations and environmental protection measures.中文文档内容:安哥拉的探矿权申请流程包括几个步骤。

prompt engineering 示例

prompt engineering 示例

prompt engineering 示例Engineering is the process of designing, creating, and improving systems, structures, machines, and materials to solve specific problems or meet particular needs. This interdisciplinary field combines knowledge from various scientific and mathematical principles to plan and execute projects.For example, let's consider the construction of a suspension bridge. Initially, an engineer conducts a feasibility study to determine if the bridge is technically possible and economically viable. This involves analyzing factors such as location, traffic volume, soil conditions, and environmental impacts.Once the study confirms the project's feasibility, the engineer proceeds with the design phase. This includes developing detailed architectural drawings, calculating load capacities, and choosing appropriate construction materials. In the case of a suspension bridge, the engineer should consider factors like the span length, tower height, cable materials, and foundations.After completing the design, the engineer works closely with construction teams to ensure its successful execution. They oversee the construction process, inspect materials, and ensure compliance with safety regulations. This may involve conducting site visits, reviewing progress reports, and making any necessary adjustments to the plans.Throughout the project, the engineer also conducts extensive testing, analysis, and simulations to evaluate the bridge's structural integrity, load-bearing capacity, and durability. They utilizemathematical models and computer-aided design software to assess potential risks and make necessary design changes or reinforcements.Additionally, engineering projects often require collaboration with various stakeholders, including architects, contractors, suppliers, and government agencies. Effective communication and project management skills are crucial to ensure the project progresses smoothly and meets all the necessary requirements.Overall, engineering encompasses a wide range of disciplines and applications, including civil, mechanical, electrical, chemical, and aerospace engineering. Each field has its own specificities and challenges, but they all contribute to the advancement of society by providing innovative solutions to complex problems.。

办理电力入网手续流程

办理电力入网手续流程

办理电力入网手续流程英文回答:To apply for electricity connection, there are several steps you need to follow. Firstly, you should gather all the necessary documents and information required by the power company. This may include your identification documents, proof of property ownership or tenancy, and any other relevant permits or licenses. Once you have all the required documents, you can proceed to the next step.The next step is to submit your application to the power company. You can do this either online or by visiting their office in person. Make sure to fill out the application form accurately and provide all the necessary details. In some cases, you may also need to pay an application fee.After submitting your application, the power company will review it and conduct a feasibility study to determineif it is possible to connect your property to theelectricity grid. This may involve assessing the capacity of the existing infrastructure and evaluating any potential technical or safety issues. The power company will also consider the estimated electricity load and consumption of your property.Once the feasibility study is completed and your application is approved, the power company will provide you with a quotation for the connection costs. This will include the charges for the installation of the necessary equipment, such as meters and transformers, as well as any additional fees or deposits. It is important to review the quotation carefully and clarify any doubts or concerns before proceeding.If you agree with the quotation, you can proceed to pay the connection fees and any other charges as specified by the power company. Once the payment is made, the power company will schedule the installation of the necessary equipment and make the necessary arrangements to connect your property to the electricity grid.Once the installation is completed, a representative from the power company will visit your property to conduct a final inspection and ensure that everything is in order. If everything meets the required standards and regulations, the power company will provide you with a certificate of compliance and activate your electricity connection.It is important to note that the process and requirements may vary depending on the country or region you are in. Therefore, it is recommended to contact the local power company or consult their website for specific information and guidelines.中文回答:办理电力入网手续需要按照一定的步骤进行。

feasibility 六级词汇选择

feasibility 六级词汇选择

feasibility 六级词汇选择1. We are conducting a feasibility study to determine if the project is viable. 我们正在进行可行性研究,以确定该项目是否可行。

2. Before making a decision, we need to assess the feasibility of each option. 在做出决定之前,我们需要评估每个选项的可行性。

3. The feasibility of the new technology depends on its cost and efficiency. 新技术的可行性取决于其成本和效率。

4. The company is exploring the feasibility of expanding its business into international markets. 该公司正在探索将业务扩展到国际市场的可行性。

5. Our team has completed a feasibility report outlining the potential risks and benefits of the proposed initiative. 我们的团队已经完成了一份可行性报告,概述了拟议倡议的潜在风险和收益。

6. The feasibility study will help us determine if the project is financially viable and sustainable in the long term. 可行性研究将帮助我们确定该项目在财务上是否可行且长期可持续。

7. Before investing in the new venture, it is essential to conduct a thorough feasibility analysis. 在投资新企业之前,进行彻底的可行性分析至关重要。

加装电梯的步骤流程

加装电梯的步骤流程

加装电梯的步骤流程英文回答:The process of installing an elevator can be complex and involves several steps. Here is a step-by-step guide on how to install an elevator:1. Planning and Design:Conduct a feasibility study to determine ifinstalling an elevator is possible in the building.Hire an architect or engineer to create a design plan for the elevator installation.Obtain necessary permits and approvals from local authorities.2. Structural Modifications:Assess the building's structural integrity and make any necessary modifications to support the elevator.Create a shaft or hoistway for the elevator, ensuring it meets safety codes and regulations.Install a pit at the bottom of the shaft to accommodate the elevator machinery.3. Electrical and Mechanical Work:Hire a licensed electrician to handle the electrical wiring for the elevator.Install an elevator controller, motor, and other mechanical components.Connect the elevator to the building's power supply.4. Installation of Elevator Car and Doors:Install the elevator car into the shaft, ensuring itis level and properly aligned.Attach the elevator doors and ensure they open and close smoothly.Install safety features such as emergency stop buttons and interlocks.5. Testing and Inspection:Conduct thorough testing of the elevator's operation, including load capacity and safety features.Schedule inspections by relevant authorities to ensure compliance with regulations.Make any necessary adjustments or repairs based on the inspection results.6. Finalization and Maintenance:Obtain the necessary certifications and permits forthe elevator to be put into service.Provide training to building occupants on how to use the elevator safely.Establish a maintenance schedule and contract with an elevator maintenance company to ensure regular inspections and repairs.中文回答:电梯加装的过程可能会比较复杂,需要经过几个步骤。

商业体光伏电站申请流程

商业体光伏电站申请流程

商业体光伏电站申请流程Applying for a commercial solar power station can be a complex process, but it is definitely worth exploring for businesses looking to reduce energy costs and shrink their carbon footprint. The first step in the application process is to conduct a feasibility study to determine if a solar power station is a viable option for the business. This study will take into account factors such as the amount of sunlight the location receives, the available space for solar panels, and the financial implications of installing and maintaining a solar power station. 申请商业光伏电站可能是一个复杂的过程,但对于希望降低能源成本并减少碳足迹的企业来说,绝对值得探讨。

申请流程的第一步是进行可行性研究,以确定光伏电站对企业是否可行。

这项研究将考虑诸如所在地的阳光照射量、用于太阳能电池板的可用空间以及安装和维护光伏电站的财务影响等因素。

Once the feasibility study is complete and it is determined that a commercial solar power station is a viable option, the next step is to secure the necessary permits and approvals. This process can vary depending on the location of the business and the specific regulations governing solar power installations in that area. It isimportant to work closely with local authorities and utility companies to ensure that all necessary permits are obtained and that the installation meets all safety and environmental standards. 一旦可行性研究完成并确定商业光伏电站是可行选择,下一步是获得必要的许可和批准。

天然气管输气供应服务流程

天然气管输气供应服务流程

天然气管输气供应服务流程英文回答:Natural gas pipeline transportation and supply services involve several steps and processes. Here is a step-by-step explanation of the service flow:1. Customer Inquiry: The process begins when a customer expresses interest in receiving natural gas supply through a pipeline. This can be done by contacting the gas utility company or filling out an online application.2. Feasibility Study: Once the customer inquiry is received, the gas utility company conducts a feasibility study to determine if the customer's location is within the pipeline network coverage area. This involves assessing the distance, infrastructure, and technical requirements.3. Contract Negotiation: If the feasibility study is positive, the gas utility company proceeds with contractnegotiation. The terms and conditions of the gas supply agreement, including pricing, volume, and duration, are discussed and agreed upon by both parties.4. Pipeline Connection: After the contract is signed,the gas utility company initiates the process of connecting the customer's premises to the natural gas pipeline network. This involves laying the necessary pipelines and installing the required infrastructure.5. Meter Installation: Once the pipeline connection is completed, the gas utility company installs a gas meter at the customer's premises. The meter measures the volume of gas consumed and is used for billing purposes.6. Gas Supply Commencement: With the meter installed,the customer can now start receiving natural gas supply through the pipeline. The gas utility company ensures that the supply is uninterrupted and meets the customer's demand.7. Billing and Payment: The gas utility company generates monthly bills based on the gas consumptionrecorded by the meter. The customer is responsible for paying the bills within the specified payment terms.8. Maintenance and Support: The gas utility company is responsible for the maintenance and upkeep of the pipeline network and infrastructure. They also provide customer support in case of any issues or emergencies.中文回答:天然气管输气供应服务涉及多个步骤和流程。

办公用房改扩建审批流程

办公用房改扩建审批流程

办公用房改扩建审批流程英文回答:Office Building Expansion and Renovation Approval Process.The approval process for expanding or renovating an office building typically involves the following steps:1. Feasibility Study: Conduct a feasibility study to determine the need, scope, and budget for the project.2. Site Selection: If necessary, select a site that is suitable for the proposed expansion or renovation.3. Design Development: Develop architectural and engineering plans that conform to applicable building codes and zoning regulations.4. Permit Application: Submit a permit application tothe local building department or zoning authority. The application should include the plans, specifications, and supporting documentation.5. Permit Review: The building department or zoning authority will review the application for completeness and compliance with regulations.6. Public Hearing: In some cases, a public hearing may be required to obtain community input on the project.7. Permit Approval: Once the application has been reviewed and approved, the building department or zoning authority will issue a building permit.8. Construction: Commence construction in accordance with the approved plans and specifications.9. Inspection and Approval: The building department or zoning authority will inspect the completed project to ensure compliance with the permit and building codes.10. Certificate of Occupancy: Upon completion of the inspection, the building department or zoning authority will issue a certificate of occupancy, which allows the building to be legally occupied.中文回答:办公用房改扩建审批流程。

分散式风电的申请流程

分散式风电的申请流程

分散式风电的申请流程Applying for distributed wind power can be a complex process that requires careful consideration and planning. The first step in the application process is to conduct a feasibility study to determine if your site is suitable for a wind turbine. This study will assess factors such as wind speed, terrain, and proximity to power lines. If the feasibility study shows that your site is suitable for a wind turbine, the next step is to obtain the necessary permits and approvals. These permits may include zoning approvals, environmental permits, and building permits.申请分散式风电可能是一个复杂的过程,需要仔细考虑和规划。

申请过程的第一步是进行可行性研究,以确定您的场地是否适合安装风力发电机。

这项研究将评估诸如风速、地形和距离电力线的因素。

如果可行性研究显示您的场地适合安装风力发电机,下一步是获得必要的许可和批准。

这些许可可能包括区划批准、环境许可和建筑许可。

In addition to these permits, you may also need to secure financing for your wind project. This could involve applying for grants, loans, or other financial incentives. It is important to carefully consider yourfinancing options and choose the option that best fits your needs. Once you have obtained all necessary permits and financing, you can begin the process of selecting a wind turbine and completing the installation.除了这些许可外,您可能还需要为您的风电项目融资。

新品开发流程英文

新品开发流程英文

新品开发流程英文The process of developing a new product involves several key steps.Firstly, it begins with the ideation phase, where the product concept is conceived. This involves brainstorming sessions, market research, and identifying consumer needs and preferences. The goal is to come up with a unique and innovative product idea that addresses a specific market need.Next, the concept is evaluated for its feasibility. This involves assessing the technical, financial, and market viability of the product. A feasibility study is conducted to determine if the product can be developed within the constraints of time, budget, and resources. This step helps to weed out ideas that are not practical or sustainable.Once the concept is deemed feasible, the product development team moves on to the design phase. This involves creating detailed specifications for the product, including its features, functionality, and appearance. Designers and engineers work together to create prototypesand conduct testing to ensure that the product meetsquality and performance standards.After the design phase, the focus shifts to manufacturing. The product development team works with suppliers and manufacturers to create a production plan and establish quality control measures. This phase alsoinvolves sourcing materials, setting up productionfacilities, and testing the manufacturing process to ensure efficiency and consistency.Once the product is manufactured, it is ready for launch. This involves creating a marketing strategy, developing packaging and branding, and planning a launch event. The goal is to create awareness and generate excitement for the new product, driving consumer interest and sales.After the product is launched, the development process continues with ongoing evaluation and improvement. Feedback from customers and market performance data are used to make enhancements and updates to the product. This iterative process ensures that the product remains competitive and meets the evolving needs of consumers.新品开发流程涉及几个关键步骤。

可行性报告范文 英文

可行性报告范文 英文

Feasibility Report SampleIn the realm of business and project management, conducting feasibility studies is a crucial step in determining the viability of a proposed project or initiative. A feasibility report serves as a comprehensive assessment that evaluates various aspects of the project to determine if it is feasible and worth pursuing. This report outlines the key components of a typical feasibility study and provides insight into the process of assessing the feasibility of a project. IntroductionThe purpose of this feasibility report is to assess the viability of implementing a new marketing strategy for a multinational corporation looking to expand its market share in the Asia-Pacific region. The objective of the proposed project is to increase brand awareness, customer engagement, and ultimately drive sales in the target market.Market AnalysisA thorough market analysis is essential in determining the feasibility of the proposed marketing strategy. This includes an evaluation of the target market, competitive landscape, consumer behavior, and market trends. The Asia-Pacific region offers significant growth opportunities for the company, with a large and diverse consumer base. However, intense competition and cultural differences must be taken into consideration when developing the marketing strategy. Technical FeasibilityThe technical feasibility of the project involves assessing the resources, technology, and infrastructure required to implement the new marketing strategy. This includes evaluating the company's existing marketing capabilities, the availability of skilled personnel, and the need for any additional technology or tools to support the initiative. A thorough analysis of the technical aspects is crucial to ensure the successful implementation of the project.Financial AnalysisA comprehensive financial analysis is a critical component of the feasibility report. This involves estimating the costs associated with implementing the new marketing strategy, including advertising, promotional activities, personnel expenses, and technology investments. Additionally, revenue projections and return on investment (ROI) calculations are essential in determining the financial viability of the project. A detailed financial analysis helps in assessing the potential risks and rewards of the proposed initiative.Risk AssessmentIdentifying and evaluating potential risks is essential in assessing the feasibility of the project. Risks may arise from various sources, including market volatility, regulatory changes, competitive pressures, and internal challenges. Conducting a thorough risk assessment enables the project team to develop mitigation strategies and contingency plans to address potential challenges that may impact the success of the project.ConclusionIn conclusion, the feasibility report provides a comprehensive assessment of the proposed marketing strategy for the multinational corporation in the Asia-Pacific region. The analysis of market dynamics, technical requirements, financial implications, and risk factors suggests that the project is feasible and has the potential to yield positive results for the company. However, it is essential to address the identified risks and challenges effectively to ensure the successful implementation of the new marketing strategy.Overall, the feasibility report serves as a valuable tool for decision-makers to evaluate the potential of a project and make informed choices regarding its implementation. Conducting a thorough feasibility study helps in minimizing risks, maximizing opportunities, and ultimately achieving the desired outcomes.。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

A feasibility study to determine if minimally trained medical students can identify markers of chronic parasitic infection using bedside ultrasound in rural TanzaniaMaria Barsky, Lauren Kushner, MeganAnsbro, Kate Bowman, Michael Sassounian, Kevin Gustafson, Shadi Lahham, Linda Joseph, John C FoxUC Irvine Health, Department of Emergency Medicine, Orange, California 92868, USA Corresponding Author: Shadi Lahham, Email: slahham8@© 2015 World Journal of Emergency MedicineINTRODUCTIONParasitic infections pose a significant health risk in developing nations and are a major cause of morbidity and mortality worldwide.[1,2] The World Health Organization (WHO) estimates that 1.5 billion people worldwide are infected with soil-transmitted helminth infections.[3] In the Republic of Tanzania, the CDC estimates that 51.5% of the population is infected with one or more intestinal parasites including entamoeba,giardia, hookworms, and ascaris.[4] Poor hygienic conditions, lack of access to clean water and poor public health program infrastructure greatly exacerbate this problem.[5] If diagnosed early and appropriately treated, the negative consequences of chronic parasitic infection, including impaired cognitive development, poor nutritional status and stunted physical growth can potentially be avoided.[2]Historically, most parasitic infections are diagnosedby microscopic detection of parasites and eggs in urine and stool samples.[6] While serologic and immunologic testing is also possible, it is not feasible or cost-effective in endemic, rural settings with limited resources. Thus, both urine and stool for detecting ova and parasites remain the gold standard for diagnosing schistosomiasis infections in these regions.[7] Computed tomography (CT) and magnetic resonance imaging (MRI) are excellent diagnostic imaging modalities but are not available in rural hospitals. Liver biopsy for detection of schistosomiasis-related fibrosis and granulomas is invasive and requires a high level of training and expertise.[8] These limitations pose signifi cant diffi culties in monitoring disease progression and preventing adverse outcomes in these patients.Previous studies have shown that ultrasound can be useful in evaluating the liver, bladder, spleen, and kidneys for monitoring of the long-term effects of schistosomiasis infection.[9–12] In these studies, schistosomiasis infection was associated with hepatomegaly, splenomegaly, periportal fibrosis, portal vein dilation, portal hypertension, and calcifi cation of the bladder. These studies demonstrated that ultrasound is useful for monitoring long-term pathological changes in chronically infected individuals and may also be useful in detecting both acute pathology and chronic effects from high parasite burden.[9–12] However, there is little value of using ultrasound for screening for schistosomiasis since stool sample analysis is more economical and has a high specificity.[13] We believe that these scans can be easily taught and performed in rural and underserved settings with transportable ultrasound machines.We sought to qualitatively describe the value of ultrasound examination in evaluating patients who are chronically exposed to schistosomiasis. A secondary objective is to determine if fi rst year medical students with basic ultrasound training can effectively perform scans to screen the effects of chronic parasitic infections in rural Tanzania. The study did not attempt to validate the WHO ultrasound protocol as a screening tool for schistosomiasis infection, but rather determine if minimally trained operators can perform the protocol. This study is the first step in determining the feasibility of using ultrasound to monitor parasite-induced morbidity by minimally trained individuals, such as local nurses and clinical offi cers. METHODSEthics statement and study designThe study was approved by the University of California Institutional Review Board. Written informed consent in both English and Kiswahili was obtained from all patients recruited for the study. We recruited a convenience sample of patients from Mwananichi Hospital, a local hospital in the city of Mwanza, Tanzania and Nansio District Hospital, a rural hospital on Ukerewe Island, Tanzania. Study participants completed a health data sheet in the presence of a Tanzanian medical student, physician, or translator and provided health information on age, alcohol consumption, viral infections, known parasitic infections, and other known chronic diseases. We excluded patients who reported hepatitis B, hepatitis C, or HIV infection, current malaria infection, or a history of liver, kidney, or bladder disease. Pregnant women and children under 5 years old were also excluded from the study.This was a prospective, observational study utilizing a convenience sample where six first year medical students enrolled at UC Irvine School of Medicine were recruited via announcements and fl yers for the study. All of the six students had completed an entire first year of medical education which included human physiology, human anatomy, cardiac anatomy and basic ultrasound education. Their ultrasound education required ten hours of supervised hands-on training in addition to pre-session podcast on eight separate organ systems of medical ultrasound. This included basic cardiac, hepatobiliary, renal, and pulmonary ultrasound.In addition to their training outlined above, we then trained this subset of six medical students on the "Ultrasound in Schistosomiasis" protocol of the World Health Organization. We adapted the published grading scales and assessed for pathology in each patient's liver, bladder, kidneys, and spleen (Table 1). Because of the length of the protocol and the lack of clinical application of some scans as determined by UCI ultrasound technicians, several measurements from the original protocol were excluded. Excluded measurements included liver surface irregularities, left parasternal longitudinal view for liver shape and size of left liver lobe, right mid-clavicular view, portal vein score, and measurement of collateral veins. However, students were trained on the most clinically applicable scans described in the protocol, and all other measurements were completed.To ensure a full bladder, as necessary for protocol, each patient was given a 503 mL bottle of water to drink while completing the consent process and health data form. The students performed a total of eleven scans using the Sonosite Nanomaxx (FUJIFILM Sonosite Inc) with a curvilinear probe. Images were captured for each scan in the protocol. Each subject's visit lasted approximately35 minutes including 20 minutes for consent and history taking and 15 minutes for ultrasound imaging. Data collection was done over the span of three weeks.Subjects for scanning were recruited through community announcements by the hospital doctors or other hospital staff both at Mwananichi and Nansio hospitals. Subjects were ambulatory, but most were interested in the study because of chronic and vague abdominal symptoms. Although the subjects were not compensated monetarily, parasitic testing was covered by the study and subjects were referred to medical specialists for follow up.During the scanning process, the medical students completed the WHO grading form and saved all scanning images under a de-identified patient number assigned during the consent process. Following the ultrasound, patients were sent to the hospital lab to provide stool and urine samples for ova and parasite assessment. All scanning images from each de-identified patient were later assessed by a board-certified physician and a licensed ultrasonographer who was blinded to the medical students' grading assessment and completed a separate analysis of the images. Since the protocol was simplified and not used for schistosomiasis screening, specificity and sensitivity were not relevant. Analysis focused on the accurate assessment and capture of the ultrasound images by the medical students.Data collection and statisticsData collected from the grading forms included the following markers: bladder shape, bladder wall lesions, bladder masses, bladder pseudopolyps, bladder calcifications, post-void residual volume, right ureter dilation, left ureter dilation, right kidney renal pelvis dilation or hydronephrosis, left kidney renal pelvis dilation or hydronephrosis, right kidney renal pelvis fi brosis, left kidney renal pelvis fi brosis, right liver lobe size, portal hypertension, and ascites.Patients that presented to the free clinics were eligible for enrollment in the study and patients were enrolled utilizing a convenience sample. Ultrasound grading scores were compared between the medical students and ultrasound trained physician to determine the accuracy of medical students' ability to correctly assess markers of pathology with ultrasound. The number of markers correctly identified by the medical students was tallied and a total score for the medical student was assigned for each patient for determining their accuracy. RESULTSThe six medical students enrolled a total of 59 patients (28 men and 31 women). The average age of the patients was 36 years and seven patients had knowni) Transverse view of the bladder – The probe was placed in transverse orientation above the pubic symphysis to visualize the bladder. Each bladder was assessed for shape, lesions, masses, pseudopolyps, and calcifi cations of the bladder wall. Per the WHO grading system, a score of 0 was assigned for bladders that were in a rectangular shape, while 1 was assigned for a rounded, distorted bladder. Bladders without lesions, masses, pseudopolyps, and calcifi cations were assigned 0 in each category. If present, each category was graded as follows: bladder wall lesions (focal=1, multifocal=2); masses (single=2, multiple=n+2 where n is the number of masses); pseudopolyps (single=2, multiple=n+2 where n is the number of pseudopolyps); calcifi cations (visible=1). Finally, bladder width and depth were measured with calipers in transverse orientation and recorded for later calculation of post-void residual bladder volumes.ii) Longitudinal view of the bladder – From the transverse view of the bladder, the probe was rotated 90 degrees to capture the longitudinal view of the bladder. As above, the bladder was assessed for lesions, masses, pseudopolyps and calcifi cations. Bladder length was measured with calipers and recorded for later calculation of post-void residual bladder volumes.iii and iv) Right and left coronal for lateral views of the kidneys – The probe was placed in coronal orientation between the mid axillary and posterior axillary lines to visualize the kidney and if visible, the proximal ureter. Dilation of the ureters was graded 0 if absent or not visualized, 3 if visualized at proximal or distal third, and 4 if dilated more than for standard visualization. This was repeated on the left side. While in this orientation, patients were also assessed for presence or absence of fl uid in Morrison's Pouch and the splenorenal recess.v and vi) Right and left kidneys in cross section – From the coronal orientation, the probe was rotated approximately 90 degrees to obtain a cross-section of the kidney. While in this orientation, the kidneys were assessed for hydronephrosis or dilation of the renal pelvis. Grading was as follows: not dilated=0, moderate dilation with conserved parenchyma (renal pelvis to capsule>1 cm)=6, severe dilation with absence of parenchyma=8. In addition, the renal pelvis was also evaluated for fi brosis based on presence or absence of echodense structures along the borders of the pelvis. If absent, a score of 0 was assigned; if present, a score of 1 was assigned.vii) Liver view with probe placement at the right anterior axillary line – Probe was placed vertically at the right anterior axillary line for measurement of the right liver lobe using calipers. Presence or absence of ascites was also noted.viii) Liver view with probe placement between the anterior axillary and midaxillary lines – Liver was scanned between anterior axillary and mid axillary lines to fi nd a portal vein for evaluation of portal fl ow. Color mode was used in two axes to determine if there was reversal of fl ow due to portal hypertension. Red was recorded as normal; blue was recorded as reversal of fl ow. Presence or absence of ascites was also noted.ix)Substernal transverse view – Probe was placed in transverse orientation just below the xiphoid process for visualization of the left liver lobe. x and xi) Post-void transverse and longitudinal view of the bladder – Patient's bladder was rescanned in transverse and longitudinal orientation after voiding. Post-void bladder width and depth were measured with calipers and recorded for later calculation of post-void residual bladder volumes. Table 1. World Health Organization "Ultrasound in Schistosomiasis" protocol with published grading scalespathology of their diseases. Full demographics of thepatients are illustrated in Table 2. The students recorded the presence of dome-shaped bladder, bladder thickening, presence of bladder mass, visualization of ureters, portal hypertension, portal vein distention, presence of ascites, and dilated bowels. The most common pathology noted were as follows: bladder shape, bladder wall thickening and dilated bowel; of those patients with these pathologies, 7 had current schistosomiasis and 8 had a history of schistosomiasis. Since the full WHO protocol was not performed, the full screening score could not be calculated and the results were not compared to stool analysis (gold standard). However, as mentioned before, it is of little practical value in using ultrasound for schistosomiasis screening. The accuracy of the students' ultrasonography is listed in Table 3. The trained physician agreed with the student's assessment up to 100%, with the biggest discordance in visualization of ureters and biggest agreement in presence of ascites, bladder thickening and portal hypertension.DISCUSSIONAccording to the WHO, parasitic infections are a major public health problem in developing countries; however there is no agreed program to help monitor such patients.[14] In our study, most subjects had a history of parasitic infection which occurred for many times. This reality is evident in Tanzania, the largest country in East Africa. Without funding or infrastructure, nearly 2/3 of the population have no access to primary health care.[15] Additionally, due to lack of urbanization, 80% of the population live in rural areas and do not have access to clean running water.[15] This creates an environment favoring both larval skin penetration and fecal-oral transmission. Without access to healthcare providers, these conditions become chronic, causing significant morbidity and mortality of the local population. The chronic infections have been associated with hepatomegaly, splenomegaly, periportal fi brosis, urinary bladder obstructions, and bladdercancer.[16–18]Although being diffi cult to accurately quantify, parasitic infection has been shown to be a causal factor for hepatomegaly and splenomegaly in the region. These morbidities have shown a strong relationship.[19] In this study we determined if minimally trained practitioners can use ultrasound to identify acute pathology of chronic infections in rural Tanzania.Medical imaging is often financially or logistically unavailable and lacking in lower and middle income countries given the low access to sufficient health care.[20] Ultrasound has emerged as a convenient and portable method of imaging in rural communities and austere environments. Ultrasound is becoming a popular choice for imaging in the developing world due to its affordability and transportability in comparison with CT and MRI.[20] In Mwanza, Tanzania, the setting of the current study, the cost of a CT scan was 350 000 shilling and 50 000 shilling for an ultrasound. The greatest barriers to radiology include availability of trained radiologists (1 radiologist to 1.5 million people in Tanzania), maintenance difficulties due to lack of infrastructure, and uneven distribution of resources between the private and public hospitals.[20] Use of portable ultrasound improves accessibility and removes some of the constraints of upkeep. Studies [15–20] have shown that the introduction of ultrasound can significantly alter treatment plan. In 43% of cases in Rwanda, ultrasound changed the initial management plan, involving surgical procedure, medication, clinic referral and others.[20]There are studies [20] on the feasibility of training midwives and other healthcare professionals in usingCharacteristicsMedical student Ultrasound director Concordance(%)Dome shape bladder 2728Sensitivity (96.4)Specifi city (100)Bladder thickening/irregularity 1212Sensitivity (100)Specifi city (100)Presence of bladder mass 0 0Sensitivity (0)Specifi city (100)Visualization of ureters 1 0Sensitivity (0)Specifi city (98.2)Portal hypertension 6 6Sensitivity (100)Specifi city (100)Portal vein distention 911Sensitivity (81.8)Specifi city (100)Presence of ascites 4 4Sensitivity (100)Specifi city (100)Dilated bowel 2016Sensitivity (100)Specifi city (90.7)Table 3. Concordance informationTable 2. Demographics of the patientsParametersSchistosomiasis(n =34)No schistosomiasis (n =25)Gender Female 1318 Male 21 7Age Mean=41.3;range=7–77Mean=30.43;range=9–53Location Mwanza 8 3 Ukerewe 2612Known liver pathology 7 0Praziquantel trials 1.1 STD=1.35 0Concurrent parasites 4 (2 hookworm, 1amoeba, 1 malaria) 7 (1 helminth, 2 ascaris, 2 hookworm, 1 yeast, 1 amoeba)Other pathology35ultrasound, i.e. in an obstetric setting and training programs ranging from 6 months to 1 year. These studies showed a high concordance rate between trainee images and radiologist assessment (>90%).[20–22] Furthermore, ultrasound can be used in numerous medical assessments. In the same study in Rwanda, of the fi rst 345 ultrasounds performed, the majority were performed for obstetrical purposes (102), followed by abdominal (94), cardiac (49), renal (40) and pulmonary (36), along with a few procedural usages, soft tissue and vascular examinations. The present study contributes to the growing literature on ultrasound training for a novel purpose, the assessment of parasitic infection. With this study in mind, we used a medical school based training protocol with 10 hours of formal training, supplemented with podcasts. This type of shortened training program could be easily introduced into rural and urban hospitals in resource poor settings.While ultrasound is emerging for general use, there has been little headway into using ultrasound for identification of parasitic infection despite existence of established protocols. There are established protocols using ultrasound in identifying pathology related to bacterial, viral and parasitic infection.[23] The varying sensitivity and specifi city are dependent on the microbe. For C. Sinensis infection identification, the sensitivity was 52% and the specificity 51%; however for ascaris infection the sensitivity in the biliary tract was 92%. For schistosomiasis the exact sensitivity and specifi city of an ultrasound protocol were different. Although ultrasound has a high specifi city and sensitivity for identifi cation of many tropical infections, ultrasound is still not used as a gold standard in resource poor countries.[24]With the expansion of ultrasound into medical education, it is believed that minimally trained practitioners can identify pathology using point of care ultrasound. To date, physician education in diagnostic sonography was previously withheld until residency and varied widely between specialties.[25] Studies[26–28]showed that pre-clinical medical students can obtain a resident-level understanding of ultrasonography given proper means and methods of training. Specifically in Tanzania, previous studies[24,29] have demonstrated the importance of ultrasound in low-resource settings and the success of training programs in rural Tanzanian hospitals and clinics. It is expected that with expanded resources and continued training, ultrasound can become a standard tool for the identifi cation of pathology in rural populations.In our study, the students demonstrated the understanding of anatomic structures on ultrasonographic images compared with a trained ultrasonogropher. Additionally, medical students were able to understand the technical aspects of ultrasonographic images, including terminology, machine settings, and transducer frequencies. Our data suggested that minimally trained medical students with one-year medical school-based ultrasound training can competently perform ultrasound scans to identify pathological changes indicative of chronic or acute parasitic infections. The students are also able to perform major ultrasound examinations needed to assess schistosomiasis morbidity according to the WHO protocol. Further large scale studies are needed to determine if ultrasound alone can be used to detect pathologic conditions associated with parasitic infections and if a shortened and simpler protocol is adequate for assessment. We hope that the training of local Tanzanian clinical offi cers and health care providers to perform ultrasound scans in this protocol would be feasible to initiate a community-wide screening program for detecting pathological entities from chronic parasitic infections. Ultrasound would also serve as an important diagnostic technology in resource-limited settings and enable providers to tailor care for their patients based on point-of-care ultrasound fi ndings.LimitationsThere are several limitations to this study. We enrolled a small number of patients (n=59). The patients had to provide consent form and answer questions in their native languages. Some lab tests were unable to be done due to lack of resources. Lack of centralized medical records meant that not all patient history could be confi rmed. Hand-held portable ultrasound machines may not be able to produce high quality images.In conclusion, parasitic infections are a significant cause of morbidity and mortality in the developing world. Ultrasound has shown a promise to identify pathological entities of a disease and monitor its progression in rural communities with limited resources such as Tanzania. Our data suggest that minimally trained fi rst year medical students are able to perform basic ultrasound scans and can identify ultrasonographic markers of parasitic infections. These results are promising, suggesting that similar ultrasound training for local Tanzanian health providers enables them to perform scans and monitor long-term disease progression in their patients. Future studies should therefore assess the ability of local health offi cials who have received similar ultrasound training to perform ultrasound scans and similarly to compare their scores with those of licensed ultrasonographers. Given our small enrollment, larger-scale clinical trials are needed to confi rm the promising conclusions.Funding: None.Ethical approval: The study was approved by the University of California Institutional Review Board. Written informed consent provided in both English and Kiswahili was obtained from all patients recruited for the study.Confl icts of interest: The authors declare that there are no confl icts of interest relevant to the content of the article.Contributors: Barsky M analyzed the literature and drafted the manuscript. All authors contributed to the design and interpretation of the study and to further drafts.REFERENCES1 Pullan RL, Smith JL, Jasrasaria R, Brooker SJ. Global numbersof infection and disease burden of soil transmitted helminth infections in 2010. Parasit V ectors 2014; 7: 372 Hotez PJ, Bundy DAP, Beegle K, Brooker S, Drake L, deSilva N, et al. Helminth Infections: Soil-transmitted Helminth Infections and Schistosomiasis. In: Jamison DT, Breman JG, Measham AR, Alleyne G, Claeson M, Evans DB, Jha P, Mills A, Musgrove P, editors. SourceDisease Control Priorities in Developing Countries. 2nd edition. Washington (DC): World Bank; 2006. Chapter 24.3 WHO Fact Sheet N°366: Soil-transmitted helminth infections,April 2014, http://www.who.int/mediacentre/factsheets/fs366/en/ 4 Rollinson D, Knopp S, Levitz S, Stothard JR, Tchuem TchuentéLA, Garba A, et al. Time to set the agenda for schistosomiasis elimination. Acta Trop 2013; 128: 423–440.5 UNICEF. Water, Sanitation and Hygiene Annual Report (2010).:60090/wash/index_3951.html6 WHO. Schistosomiasis. http://www.who.int/mediacentre/factsheets/fs115/en/7 USAID's NTD Program: /target_diseases/schistosomiasis/8 Olveda DU, Olveda RM, McManus DP, Cai P, Chau TN, LamAK, et al. The chronic enteropathogenic disease schistosomiasis.Int J Infect Dis 2014; 28: 193–203.9 Kardorff R, Gabone RM, Mugashe C, Obiga D, RamarokotoCE, Mahlert C, et al. Schistosoma mansoni-related morbidity on Ukerewe Island, Tanzania: clinical, ultrasonographical and biochemical parameters. Trop Med Int Health 1997; 2: 230–239.10 Malenganisho WL, Magnussen P, Friis H, Siza J, Kaatano G,Temu M, et al. Schistosoma mansoni morbidity among adults in two villages along Lake Victoria shores in Mwanza District, Tanzania. Trans R Soc Trop Med Hyg 2008; 102: 532–541.11 Richter J, Hatz C, Campagne G, Bergquist NR, JenkinsJM. Ultrasound in schistosomiasis: A Practical Guide to the Standardized Use of Ultrasonography for the Assessment of Schistosomiasis-related Morbidity. Second International Workshop, October 22–26, 1996; Niamey, Niger.12 WHO 2: Ultrasound in Schistosomiasis: A Practical Guide tothe Standardized Use of Ultrasonography for the Assessment of Schistosomiasis-related Morbidity. UNDP/World Bank/ WHO Special Programme for Research and Training in Tropical Diseases (TDR). Second International Workshop, October 22–26, 1996, Niamey Niger.13 Feldmeier H, Poggensee G. Diagnostic techniques inSchistosomiasis control. A review. Acta Tropica 1993; 52: 205–220.14 WHO. Neglected tropical diseases. http://www.who.int/neglected_diseases/diseases/en/15 Imperial College of London: Schistosomiasis control initiative.2015. /schisto/wherewework/ tanzania.16 Boros DL. Immunopathology of Schistosoma mansoni infection.Clinical Microbiology Reviews 1989; 2: 250–269.17 Guyatt H, Brooker S, Lwambo NJ, Siza JE, Bundy DA. Theperformance of school-based questionnaires of reported blood in urine in diagnosing Schistosoma haematobium infection: patterns by age and sex. Trop Med Int Health 1999; 4: 751–757.18 Haidar NA. Schistosoma mansoni as a cause of bloody stool inchildren. Saudi Med J 2001; 22: 856–859.19 Kardorff R, Gabone RM, Mugashe C, Obiga D, RamarokotoCE, Mahlert C, et al. Schistosoma mansoni-related morbidity on Ukerewe Island, Tanzania: clinical, ultrasonographical and biochemical parameters. Trop Med Int Health 1997; 2: 230–239.20 Sippel S, Muruganandan K, Levine A, Shah S. Use of ultrasoundin the developing world. International Journal of Emergency Medicine 2011; 4: 72.21 Shah SP, Epino H, Bukhman G, Umulisa I, DushimiyimanaJM, Reichman A, et al. Impact of the introduction of ultrasound services in a limited resource setting: rural Rwanda 2008. BMC Int Health Hum Rights 2009; 9: 4.22 Jamison DT, Breman JG, Measham AR, Alleyne G, Claeson M,Evans DB, et al (Eds.). Disease Control Priorities in Developing Countries (2nd ed.), World Bank. Washington, DC 2006; Chapter24.23 Centers for Disease Control. Neglected Tropical Diseases, 2011./globalhealth/ntd/diseases/index.html24 Ferraioli G, Meloni MF. Sonographic training program at districthospital in a developing country: work in progress. AJR Am J Roentgenol 2007; 189: W119–122.25 Arger PH, Schultz SM, Sehgal CM, Cary TW, Aronchick J.Teaching medical students diagnostic sonography. J Ultrasound Med 2005; 24: 1365–1369.26 Collins J, Riebe JD, Albanese MA, Dobos N, Heiserman K,Primack SL, et al. Medical students and radiology residents: can they learn as effectively with the same educational materials?Acad Radiol 1999; 6: 691–695.27 Zaidman CM, Wu JS, Wilder S, Darras BT, Rutkove SB.Minimal training is required to reliably perform quantitative ultrasound of muscle. Muscle Nerve 2014; 50: 124–128.28 Bahner DP, Adkins EJ, Hughes D, Barrie M, Boulger CT, RoyallNA. Integrated medical school ultrasound: development of an ultrasound vertical curriculum. Crit Ultrasound J 2013; 5: 6.29 Adler D, Mgalula K, Price D, Taylor O. Introduction of aportable ultrasound unit into the health services of the Lugufu refugee camp, Kigoma District, Tanzania. International Journal of Emergency Medicine 2008; 1: 261–266.Received April 20, 2015Accepted after revision September 16, 2015。

相关文档
最新文档