Utilization of Associated Petroleum Gas at Salym Petroleum Development N.V., Russia Methane Leak capture in gas distribution networks
Projects
Project status
Landfill gas recovery in Moscow Region – landfill site TIMOCHOVO, CHMETIEVO, DMITROVSKIJ Low-pressure associated petroleum gas utilization at Enisei Ltd., Usinsk, Komi Republic, Russia
Expert summary prepared
Expert summary prepared on-going
ongoing
ongoing
3 projects in MERT
ongoing
ongoing
ongoing 5
Legal regulations
Administration measures
leak identification procedures and leak repairs schedule
data recording and keeping provided with graphical description of all revealed leaks at each point
Objective is to be an accredited service provider to all credible GHG emission trading schemes and registries
3
Carbon project cycle
Discussion, CAR/NIR
2
Background
Carbon offset verifications established in 2019 by SGS UK Ltd.
SGS accredited for
• CDM (DOE),
• JI (AIE) as from 04.04.2019
• EU Emissions Trading Scheme (25 countries),
Draft Determination project
Step 1 Project design
Site visit Monitoring meth
Step 2 Determination
Overview Findings
Baseline Additionality Project emissions
13’300 employees in the Americas
21’700 employees in Europe, Middle East & Africa
13’000 employees in Asia/Pacific
With more than 48'000 employees, SGS operates a network of over 1'000 offices and laboratories around the world.
• UK Emissions Trading Scheme,
SGS, Place des Alpes 1, Geneva
• MERT accreditation in Russia as from 14.03.2019 • California Climate Action Registry,

• Chicago Climate Exchange etc.
Collection a copy of the inventory of all pipes, valves, flanges, fittings, open-ended lines, meters and pneumatic controllers covered by the project (database/statistics on network) Actual number of baseline measurements is dependent on numbers&types&network conditions&monitoring system of potential leak sources. In order to provide reliable figures, baseline is continually amended and remains fully auditable Ensuring that High Flow sampler equipment is used following manufacturers procedures and remains fully calibrated Detailed description of how this pre-repair measurements and repair will be organized / Copy of Replacement schedule Data are regularly written down to the computer database
7
Validation pitfalls/issues to be checked by Project:
ability of the local staff to conduct annual re-screening of every leak
leak tagging system is appropriate
9
Features of carbon projects implementation in oil and gas sectors in Russia
Mrs. Elena Krasnova SGS Vostok Ltd. Moscow, 28-29 April,2019
SGS GROUP WORLD-WIDE
EIA, stakeholder comments
publishing
CER ERU VER
Monitoring report
Step 3 Monitoring
Final determination report/opinion
Step 4 Verification
PDD + MP
Verification, Certification
Case Study – 2 Continuation . . .
8
For More Information
Please Visit: sgs/climatechange
Contact Climate Change Programme Division SGS Vostok. Ltd. 10/1 Letnikovskaya Street Moscow, Russia Tel: +7 495 775 44 55
$ $ $ $ $...
4
Sectoral Scope
1-energy
1,4energy& industrial 13 -waste 10 – fugitive emissions
Project Title
Refurbishment of Belgorod CHPP with installation of two Gas Turbine Units of 30 MW each Fuel Switch from Coal and Fuel Oil to Natural Gas at Savinsky Cement Plant CO2 Emission Reduction through Fuel Switch in the Town of Belokurikha Technical re-equipment of Elets CHP plant with installation of Combined-Cycle Unit of 52 MW Waste gas utilization at JSC Shchekinoazot
Financial component
Baseline selection & Current practice
Case Study – 1 APG utilization
6
Case Study – 2 Leak Reduction in Gas Distribution System
Objective of Validation process - to demonstrate that leaks are not invented or exaggerated: