木结构建筑避雷针及人工接地极方法防雷接地专项施工方案

合集下载

避雷针施工方案

避雷针施工方案

避雷针施工方案避雷针是一种用来保护建筑物和人员免受雷击伤害的重要设备。

正确的避雷针施工方案可以确保建筑物的安全,同时也可以保护人员的生命财产安全。

本文将从设计、选材、安装、维护和检测等方面介绍避雷针的施工方案。

一、设计方案1.1 确定避雷针的位置:避雷针应该安装在建筑物的最高点,以便吸引雷电。

1.2 确定避雷针的高度:避雷针的高度应该超过建筑物周围的其他物体,以确保雷电被吸引到避雷针上。

1.3 确定避雷针的数量:根据建筑物的大小和形状确定需要安装的避雷针数量,以确保全面覆盖。

二、选材方案2.1 选用耐腐蚀材料:避雷针应该选用耐腐蚀材料,以确保长期使用不受影响。

2.2 选用导电性能好的材料:避雷针的主要作用是引导雷电,因此应选用导电性能好的材料。

2.3 选用耐高温材料:避雷针在雷击时会受到高温影响,因此应选用耐高温材料,以确保安全使用。

三、安装方案3.1 确保避雷针与建筑物接地系统连接:避雷针必须与建筑物的接地系统连接,以确保雷电被安全引导到地面。

3.2 确保避雷针安装牢固:避雷针的安装必须牢固可靠,以确保在恶劣天气条件下不会受到破坏。

3.3 确保避雷针与其他构件连接紧密:避雷针与建筑物的其他构件连接必须紧密,以确保整体结构的稳固性。

四、维护方案4.1 定期检查避雷针的状态:定期检查避雷针的状态,包括表面是否有损坏、连接是否松动等。

4.2 定期清洁避雷针表面:定期清洁避雷针表面,以确保导电性能不受影响。

4.3 定期维护避雷针的周围环境:定期维护避雷针周围的环境,确保没有影响避雷针正常工作的因素存在。

五、检测方案5.1 定期进行避雷针的雷电击穿测试:定期进行避雷针的雷电击穿测试,以确保避雷针的导电性能符合要求。

5.2 定期进行避雷针的接地测试:定期进行避雷针的接地测试,以确保避雷针与接地系统连接良好。

5.3 定期进行避雷针的整体性能测试:定期进行避雷针的整体性能测试,以确保避雷针在雷电袭击时能够正常工作。

防雷工程专项施工方案范本

防雷工程专项施工方案范本

防雷工程专项施工方案范本一、施工概述本工程是针对某某建筑物进行的防雷工程,施工内容包括安装避雷针、避雷带、接地装置等,旨在保护建筑物和人员免受雷击危害。

具体施工方案如下:二、施工前准备1.搜集相关资料:对建筑物进行勘察,确定避雷设备的安装位置和数量;了解当地气象情况,确定避雷设备的尺寸和材质。

2.制定施工计划:根据勘察结果制定施工计划,确定施工的时间节点和主要工序。

3.采购材料和设备:根据施工计划,采购所需的避雷设备、接地装置、安全防护用品等。

三、施工工艺1.安装避雷针:根据设计要求,在建筑物的高处安装避雷针,确保避雷针与建筑物之间的接地良好,并做好相应的防护。

2.安装避雷带:沿着建筑物的周边安装避雷带,保证与避雷针的连接牢固,并确保接地良好。

3.接地装置:在建筑物周围挖掘深度适当的接地孔,安装接地装置,确保接地装置的接地电阻符合要求。

4.检测和调试:安装完避雷设备后,对每个部位进行检测和调试,确保避雷设备和接地装置的正常运行。

四、施工注意事项1.安全防护:施工过程中,要严格遵守安全操作规程,做好防护工作,确保施工人员的安全。

2.遵守标准:施工过程中,要严格遵守相关标准和规范,确保防雷设备的安装和使用符合要求。

3.保护环境:施工过程中,要保护好周围环境,避免对周边建筑和植被造成损害。

4.质量控制:施工过程中,要严格控制材料和设备的质量,确保施工质量符合要求。

五、施工验收1.安全验收:对施工现场进行安全验收,确认施工过程中的安全问题已经得到解决。

2.质量验收:对施工质量进行验收,确保防雷设备的安装和使用符合相关标准和规范。

3.环境验收:对施工现场周边环境进行验收,确保施工过程中对周边环境没有造成损害。

六、施工总结1.总结经验:对施工过程中的经验和不足进行总结,为今后类似工程的施工提供借鉴。

2.汇报结果:将施工情况及验收结果向相关部门进行汇报,确认工程的顺利完成并交付使用。

七、维护保养1.定期检查:定期对防雷设备进行检查和维护,确保其正常运行。

防雷接地施工方案

防雷接地施工方案

防雷接地施工方案工程采用TN-S 接地系统。

防雷接地、电气保护接地、工作接地、重复接地以及弱电系统接地共用同一接地体。

同时将各种进出建筑物的金属管道进行连接作为中等电位。

卫生间内做局部等电位联结。

接地体利用桩基钢筋、基础粱底两主钢筋、以及防雷引下线所在结构柱内两对角柱筋焊通作自然接地体,接地电阻不大于1欧姆。

1、工艺流程:2、施工准备:(1)作业条件:土建桩基超长部分已经做砍桩处理,并将各承台砌筑完毕,桩基钢筋笼绑扎完成。

(2)材料准备:接地装置的导体截面应符合热稳定和机械强度的要求,钢材(扁钢、圆钢等)均应为热镀锌材料,其型号、规格应符合设计要求,并应有产品质量合格证和试验报告。

3、桩基接地极焊接:本工程利用引下线处承台的所有桩基钢筋笼焊接联通并与承台外侧六根结构钢筋焊接联通做接地体:引下线处承台的钢筋笼绑扎完成或大承台底筋敷设完成后电气操作人员即可对钢筋笼、承台钢筋焊避雷针 带制安接地电 阻测试 桩基接 地焊接 引下线焊接均压环焊接 防侧击雷焊接 卫生间LEB 联结 水平接地 体焊接 总等电 位焊接 工作/保护/重复接地焊接 接地电 阻测试接联通,并与承台外侧六根结构钢筋焊接联通。

当承台板底面钢筋布置完成后进行环形接地连接线焊接。

各承台之间用40×4镀锌扁钢梁底周圈焊接联通环形接地连接线采用40×4镀锌扁钢沿梁底周圈焊接联通做环形敷设,环形接地连接必须与所经过引下线处承台接地联结钢筋焊接联通。

4、水平接地体焊接:本工程设计利用40×4镀锌扁钢梁底周圈焊接联通作为水平接地体,该水平接地体与经过的防雷引下线、桩基接地联结钢筋可靠焊通作接地跨接。

当土建主筋采用搭接连接时,应对搭接处进行双面焊接,焊接长度为主筋长度6倍。

要求沿着主筋通长焊接形成完整的电气通路。

钢钢筋搭接长度为主筋长度6倍,双面施焊。

根据设计图纸标明位置,将利用作为防雷引下线的结构柱内两根不小于φ16对角主筋与水平接地体的40×4镀锌扁钢用φ12圆钢跨接焊通。

建筑工程防雷工程施工方案

建筑工程防雷工程施工方案

建筑工程防雷工程施工方案一、前期准备工作在进行防雷工程施工之前,需对施工现场进行认真的勘查和测量,了解建筑结构、周围环境、用电情况等情况,综合考虑确定防雷系统的布设方案。

同时要提前准备好所需材料和设备,确保施工中不会因为缺少材料而影响进度。

二、防雷系统设计根据建筑的特点和需求,确定适合的防雷系统设计方案。

常见的防雷系统包括避雷带、避雷针、接地装置等。

要根据建筑的高度和形状,选择合适的避雷针和避雷带,确保其可以有效地引导雷电流入地。

三、施工方案1. 避雷带的铺设首先需在建筑的周围挖掘一条深度达到要求的基坑,然后在基坑内铺设避雷带,注意避雷带的接地装置的布置需要符合要求。

避雷带的接地装置一般需要埋设在地下1米深的地下,确保可以有效地将雷电流引入地下。

2. 避雷针的安装避雷针的布置一般需要根据建筑的高度和形状进行合理的安排,确保可以有效地引导雷电流。

避雷针的安装需要在建筑的顶部或者高处固定,同时要确保与避雷带的连接牢固可靠。

3. 接地装置的设置接地装置是防雷系统中非常重要的一部分,其设置需要遵循相关的规范和标准。

接地装置的埋设深度一般需要达到1米,确保可以有效地将雷电流引入地下。

同时要保证接地装置与避雷带和避雷针的连接牢固可靠。

4. 施工过程中的安全措施在施工过程中,需严格遵守相关的安全规定,提前制定详细的安全方案,确保施工人员的安全。

同时要加强现场管理,保证所有操作符合相关的规范和标准。

综上所述,建筑工程防雷工程施工方案需要综合考虑建筑结构、雷电保护设备以及施工过程中的安全措施等多个方面。

只有在各个环节都得到严格的控制和管理,才能确保防雷系统的安全可靠。

希望以上内容对您有所帮助。

防雷与接地工程做法

防雷与接地工程做法

防雷与接地工程一、施工准备(一)作业条件1、接地体安装:(1)人工接地体:设计位置的场地没被占用,且已经清理好。

(2)自然接地极:利用底板钢盘或深基础做接地体:底板盘与柱筋连接处已绑扎完。

2、接地干线安装:(1)支架安装完毕。

(2)土建抹灰已完成。

(3)穿墙保护管已预埋。

3、支架安装:(1)各种支架已运到现场。

(2)结构工作已经完成。

(3)室外必须有脚手架或爬梯。

4、防雷引下线暗敷设:(1)建筑物有有脚手架或爬梯,达到能上人操作的条件。

(2)利用主筋作引下线时,钢筋绑扎完毕。

5、避雷引下线明敷设(1)支架安装完毕。

(2)建筑物有脚手架或爬梯,达到能上人操作的条件。

(3)土建外装修完毕。

6、避雷网安装:(1)支架安装完毕。

(2)具备调直场地和垂直运输条件。

(3)接地体与引下线必须做完。

7、避雷针安装:(1)接地体及引下线必须安装完毕。

(2)需要脚手架处,脚手架搭设完毕。

(3)土建结构工程已完成,并随结构施工做完预埋件。

(二)材料要求1、防雷及接地装置所有部件均应采用镀锌材料,并有出厂合格证和镀锌质量证明书。

在施工过程中应注意保护镀锌层。

其主要镀锌材料有:扁钢、角钢、圆钢、钢管、铅丝、螺栓、垫圈、弹簧垫圈、U 形螺栓、元宝螺栓、支架等。

2、电焊条、氧气、乙炔、沥青油、混凝土支座、预埋铁件、小线、防腐油、银粉、黑色油漆等。

(三)主要机具1、常用电工工具:手锤、钢据、压力案子、大锤等。

2、线坠、卷尺、大绳、粉线袋、绞磨(或倒链)、紧线器、电锤、冲击钻、电焊机、气焊工具等。

二、质量要求质量要求符合《建筑电气工程施工质量验收规范》(GB50303-2002 )的规定。

项序检查项目允许偏差或允许差三、工艺流程接地体→接地干线→支架→引下线明敷→避雷针→避雷网→避雷带或均压环四、操作工艺(一)接地体的安装1、接地体的安装有关规定:(1)接地体顶面埋设深度应符合设计要求。

当无要求时,不应小于0.6m。

角钢及钢管接地体应垂直配置。

防雷接地施工方法

防雷接地施工方法

首先看一下建筑防雷接地工程工艺流程:接地体→接地干线→引下线暗敷→避雷带或均压环→支架→避雷网→避雷针1、防雷接地系统由接闪器、引下线、接地体三个部分组成。

2、接闪器有避雷针、避雷网、避雷带等。

3、引下线敷设方式分为明设和暗设。

4、接地装置分为人工接地体和自然接地体。

下面结合实例全面解析防雷施工的工艺做法,分享给盟友参考。

室外接地线必须为热镀锌材料,接地扁铁厚度不得小于4mm,截面积不得小于100mm2。

扁钢与扁钢搭接为扁钢宽度的2倍,不少于三面施焊;圆钢与圆钢搭接为圆钢直径的6倍,双面施焊;圆钢与扁钢搭接为圆钢直径的6倍,双面施焊;扁钢与钢管,扁钢与角钢焊接,紧贴角钢外侧两面,或紧贴3/4钢管表面,上下双侧施焊。

利用底板钢筋网作接地连接线时,接地跨接钢筋应采用不小于Φ12的热镀锌圆钢;焊缝应饱满并有足够的机械强度,不得有夹渣、咬肉、裂纹、虚焊、气孔等缺陷,焊接处的药皮要敲净。

螺纹连接的跨接利用柱主筋作防雷引下线时,当主筋采用螺纹连接时,螺纹连接的两端应作跨接处理。

焊接平滑、无加渣、咬肉、虚焊总等电位箱,必须做明显的接地标识标注文字性的说明接地扁铁敷设前应调直,敷设时应立放,不得平放,因为立放时散流电阻较小;焊接长度应为扁铁宽度的2倍,并3面施焊,焊好后清除药皮,素土内敷设的扁铁必须刷沥青做防腐处理。

接地扁铁交叉连接接地扁铁丁字连接利用结构柱柱主筋(直径不小于Φ12mm)作防雷引下线时,在每层钢筋绑扎时,按设计图纸要求,找出全部所需主筋位置,用油漆做好标记。

避雷线弯曲处不得小于90o,弯曲半径不得小于圆钢直径的10倍,转弯部分支架应不大于0.3m。

焊缝应饱满并有足够的机械强度,焊接处的药皮要敲净,焊接后必刷防锈漆两道,面漆(银粉漆)两道。

焊接不得有夹渣、咬肉、裂纹、虚焊、气孔等缺陷屋顶接闪器如果采用混凝土支座,应将混凝土支座分档摆放,在两端支架间拉直线,然后将其它支座用水泥砂浆找平直,间距不得大于1.5米;当屋面为纯防水层时,支座下面应放置一层厚度不小于3mm的橡胶垫,以防伤害防水层。

防雷接地怎么施工方案

防雷接地怎么施工方案

防雷接地怎么施工方案一、工程概况与目标本防雷接地工程旨在确保建筑物的防雷安全,预防雷电灾害的发生,保护建筑及其内部设备免遭雷电侵害。

工程将严格按照国家相关防雷规范进行设计和施工,确保接地系统的有效性。

二、施工准备与条件技术准备:施工前需对施工图纸进行熟悉,了解接地系统的设计要求;编制详细的施工方案,明确施工步骤和注意事项。

材料准备:准备符合设计要求的接地材料,如接地极、接地线、连接器等。

人员准备:组织专业施工队伍,确保施工人员熟悉接地系统施工工艺和注意事项。

现场准备:清理施工现场,确保施工区域无障碍;根据设计要求确定接地极的埋设位置。

三、材料设备选择接地极材料:选用耐腐蚀、导电性能好的材料,如铜包钢、热镀锌钢等。

接地线材料:选择电阻小、耐磨损、柔软性好的材料,如多股铜绞线或镀锡铜线。

连接器:选用导电性能良好、结构可靠的连接器,确保接地系统的稳定性和可靠性。

四、接地系统设计根据建筑物的重要性、雷电活动的频度等因素,确定接地电阻的目标值;合理布置接地极的位置和数量,确保接地系统的有效性。

五、施工工艺流程测量定位:根据设计要求,确定接地极的埋设位置。

挖沟埋设:按照测量定位,挖掘接地沟,埋设接地极。

连接接地线:将接地线连接到接地极上,确保连接牢固可靠。

回填夯实:对接地沟进行回填,夯实土壤,确保接地极的稳定性和接地效果。

六、安全技术措施施工人员必须佩戴安全帽、绝缘手套等个人防护用品。

施工现场应设置明显的安全警示标志。

施工期间应避免雷雨天气。

七、质量控制与检验对进场材料进行质量检验,确保符合设计要求。

施工过程中应进行隐蔽工程验收。

施工完成后,应对接地电阻进行测试,确保达到设计要求的目标值。

八、工程验收与交付提交完整的竣工资料和施工记录。

组织专业人员进行工程验收。

验收合格后,办理工程交付手续。

通过以上方案的实施,本防雷接地工程将有效确保建筑物的防雷安全,保障人员和财产安全。

在施工过程中,应严格遵守国家相关规范和标准,确保工程质量和安全。

防雷接地专项施工方案

防雷接地专项施工方案

防雷接地专项施工方案目录第一章、编制依据与防雷、接地工程概况 (1)第二章、施工准备及施工部署 (2)第三章、施工工艺 (4)第四章、质量保证措施 (8)第五章、安全保证措施 (10)第六章、文明环保施工及保障措施 (11)第一章编制依据与防雷、接地工程概况一、编制依据防雷及接地方案参照:汉口北FⅡ区基础接地平面图、《建筑物防雷设施安装》99D501-1,99(03)D501-1、《利用建筑物金属做防雷及接地装置安装》03D501-3、施工图集《建筑物防雷设计规范》GB50057-2010进行编制。

相关法律法规二、防雷系统概况1、本工程防雷等级为二类。

2、接闪器:在屋顶采用Φ10镀锌圆钢设置避雷带做接闪器,在屋面做不小于10m ×10m或12m×8m的避雷网格。

并将凸出屋面所有的金属构件和构筑物与避雷带可靠连接。

3、引下线:利用建筑物钢筋混凝土柱子内两根不小于Φ16主筋通长焊接作为引下线,间隔不大于18m。

引下线上端与避雷带可靠焊接,下端与建筑物基础底盘钢筋焊接为一体。

并在首层室外高出地面0.5m处,预留接地引出板,以便测量接地电阻或增补接地装置用。

4、接地极:利用建筑物桩基础钢筋做接地装置。

通过建筑物基础梁钢筋连接成接地网(在没有基础梁的基础之间用-40×4镀锌扁钢焊接),并与所有引下线可靠焊接。

三、接地系统概况1、本工程防雷接地、电气设备的保护接地等的接地共用统一接地极,要求接地电阻不大于1欧姆,实测不满足要求时,增设人工接地极。

2、本工程采用总等电位联结,总等电位端子箱通过结构柱上预留接地端子与基础接地装置连接。

3、所有强、弱电竖井内均垂直敷设一条40×4热镀锌扁钢作为接地干线。

接地干线由变配电所MEB箱引出,经过地下一层由变配电所至各区域电管井的干线电缆桥架分别至各区域(强、弱)电间。

电缆桥架及其支架全长应不少于两处与接地干线连接。

竖井内的接地干线其下端就近与基础接地网可靠连接。

建筑物防雷工程施工方案及措施

建筑物防雷工程施工方案及措施

建筑物防雷工程施工方案及措施1、避雷针的设置(1)正在施工建造的建筑物,当高度在20m以上应装设避雷针。

施工现场内的塔式起重机、塔吊及脚手架机械设备,若在相邻建筑物、构筑物的防雷设置的保护范围以外,且在规定范围内,则应安装避雷针。

若最高机械设备上的避雷针,且应保证最后退出现场,则其他设备可不设避雷针。

(2)避雷针的接闪器一般选用ф16mm圆钢,长度为1~2m,其顶端应车制成锥尖。

接闪器须热镀锌。

机械设备上的避雷针的防雷引下线可利用该设备的金属结构体,但应保证设备联接。

机械设备所有的动力、控制、照明、信号及通信等线路,应采用钢管敷设。

钢管与机械设备的金属结构体作焊接以保证其接地通道的设备连接。

2、接地装置(1)避雷装置是由接闪器(或避雷器)、引下线的接地装置组成。

而接地装置由接地极和接地线组成。

独立避雷针的接地装置应单独安装,与其他保护的接地装置的安装分开,且保持有3m以上的安全距离。

(2)除独立避雷针外,在接地电阻满足要求的前提下,防雷接地装置可以和其他接地装置共用。

接地极宜选用角钢,其规格为40mm×40mm×4mm及以上;若选用钢管,直径应不小于50mm,其壁厚不应小于3.5mm。

垂直接地极的长度应为2.5m;接地极间的距离为5m;接地极埋入地下深度,接地极顶端要在地下0.8m以下。

接地极之间的连接是通过规格为40mm×4mm的扁钢焊接。

焊接位置距接地极顶端50mm。

焊接采用搭接焊。

扁钢搭接长度为宽度的2倍,且至少有3个棱边焊接。

扁钢与角钢(或钢管)焊接时,为了保证连接可靠,应事先在接触部位将扁钢弯成直角形(或弧形),再与角钢(或钢管)焊接。

(3)接地极与接地线宜选用镀锌钢材,其将埋于地下的焊接处应涂沥青防腐。

建筑施工现场内所有施工用的设备、装置的防雷装置的工频接地电阻值不得大于30Ω。

3、施工现场人员防雷措施(1)遇有雷雨天气,特别是听到雷声后,安全管理人员应到现场进行巡查,发现问题立即纠正,同时提醒操作人员注意防雷,必要时停止可能有危险的作业,将施工人员撤离到安全区内。

避雷针施工方案

避雷针施工方案

避雷针施工方案避雷针是一种用于保护建筑物和人员免受雷击伤害的重要设施。

在施工避雷针时,需要根据具体情况制定合理的方案,以确保其有效性和安全性。

本文将从设计、选材、安装、维护和检测等五个方面介绍避雷针的施工方案。

一、设计1.1 确定避雷针的位置:避雷针应安装在建筑物最高点,如屋顶或烟囱等。

1.2 考虑建筑物结构:设计时需考虑建筑物的结构特点,确保避雷针与建筑物结构相适应。

1.3 考虑周围环境:周围环境如树木、电线等也会影响避雷针的效果,需要综合考虑。

二、选材2.1 选择合适的导电材料:避雷针主要由导电材料构成,如铜、铝等,需选择质量好、导电性能强的材料。

2.2 考虑耐腐蚀性能:避雷针长期暴露在室外,需选择具有良好耐腐蚀性能的材料。

2.3 考虑成本和可靠性:在选材时需综合考虑成本和可靠性,确保避雷针的质量和寿命。

三、安装3.1 确保安全施工:避雷针施工需要在高空进行,施工人员需具备相关技能和经验,确保施工安全。

3.2 保证安装质量:避雷针的安装质量直接影响其效果,需按照相关标准和规范进行安装。

3.3 考虑接地方式:避雷针的接地方式也很重要,需确保接地良好,以确保避雷针的导电性能。

四、维护4.1 定期检查避雷针:避雷针需要定期检查,确保其状态良好,没有受损或腐蚀。

4.2 清理避雷针周围环境:避雷针周围环境如树木、杂草等会影响其效果,需定期清理。

4.3 及时修复损坏:如果避雷针出现损坏或故障,需要及时修复或更换,以确保其正常运行。

五、检测5.1 定期检测避雷针效果:定期对避雷针进行检测,确保其效果符合要求。

5.2 使用专业设备检测:检测避雷针需要使用专业设备,如雷电击检测仪等。

5.3 备案检测报告:检测完成后需备案检测报告,以备日后查阅。

综上所述,避雷针的施工方案需要从设计、选材、安装、维护和检测等多个方面综合考虑,确保其有效性和安全性。

只有科学合理地进行避雷针施工,才能有效保护建筑物和人员免受雷击危害。

防雷接地施工方法

防雷接地施工方法

首先看一下建筑防雷接地工程工艺流程:接地体→接地干线→引下线暗敷→避雷带或均压环→支架→避雷网→避雷针1、防雷接地系统由接闪器、引下线、接地体三个部分组成。

2、接闪器有避雷针、避雷网、避雷带等。

3、引下线敷设方式分为明设和暗设。

4、接地装置分为人工接地体和自然接地体。

下面结合实例全面解析防雷施工的工艺做法,分享给盟友参考。

室外接地线必须为热镀锌材料,接地扁铁厚度不得小于4mm,截面积不得小于100mm2。

扁钢与扁钢搭接为扁钢宽度的2倍,不少于三面施焊;圆钢与圆钢搭接为圆钢直径的6倍,双面施焊;圆钢与扁钢搭接为圆钢直径的6倍,双面施焊;扁钢与钢管,扁钢与角钢焊接,紧贴角钢外侧两面,或紧贴3/4钢管表面,上下双侧施焊。

利用底板钢筋网作接地连接线时,接地跨接钢筋应采用不小于Φ12的热镀锌圆钢;焊缝应饱满并有足够的机械强度,不得有夹渣、咬肉、裂纹、虚焊、气孔等缺陷,焊接处的药皮要敲净。

螺纹连接的跨接利用柱主筋作防雷引下线时,当主筋采用螺纹连接时,螺纹连接的两端应作跨接处理。

焊接平滑、无加渣、咬肉、虚焊总等电位箱,必须做明显的接地标识标注文字性的说明接地扁铁敷设前应调直,敷设时应立放,不得平放,因为立放时散流电阻较小;焊接长度应为扁铁宽度的2倍,并3面施焊,焊好后清除药皮,素土内敷设的扁铁必须刷沥青做防腐处理。

接地扁铁交叉连接接地扁铁丁字连接利用结构柱柱主筋(直径不小于Φ12mm)作防雷引下线时,在每层钢筋绑扎时,按设计图纸要求,找出全部所需主筋位置,用油漆做好标记。

避雷线弯曲处不得小于90o,弯曲半径不得小于圆钢直径的10倍,转弯部分支架应不大于0.3m。

焊缝应饱满并有足够的机械强度,焊接处的药皮要敲净,焊接后必刷防锈漆两道,面漆(银粉漆)两道。

焊接不得有夹渣、咬肉、裂纹、虚焊、气孔等缺陷屋顶接闪器如果采用混凝土支座,应将混凝土支座分档摆放,在两端支架间拉直线,然后将其它支座用水泥砂浆找平直,间距不得大于1.5米;当屋面为纯防水层时,支座下面应放置一层厚度不小于3mm的橡胶垫,以防伤害防水层。

木结构建筑避雷针及人工接地极方法防雷接地专项施工方案

木结构建筑避雷针及人工接地极方法防雷接地专项施工方案

木结构建筑避雷针及人工接地极方法防雷接地专项施工方案XXXX五星级水疗度假酒店XXXX五星级水疗度假酒店项目防雷接地专项施工方案编制人:审核人:审批人:XXXX集团XXXX有限公司XXXX五星级水疗度假酒店项目部2016年12月XXXX五星级水疗度假酒店目录第一章工程概况································································································· 3 第一节基本概况······························································································ 3 第二节防雷接地概况························································································ 3 第二章编制依据································································································· 3 第三章施工准备································································································· 4 第一节技术准备······························································································ 4 第二节材料准备······························································································ 4 第三节工器具································································································· 4 第四章施工工艺································································································· 5 第一节屋面防雷施工工艺·················································································· 5 1、避雷针施工要点························································································································5 2、避雷针安装示意图····················································································································5 第二节引下线施工工艺·····················································································7 1、引线线施工要点························································································································7 2、引下线连接示意图····················································································································7 第三节等电位连接施工工艺················································································9 1、总等电位连接示意图················································································································9 2、卫生间等电位连接··················································································································10 3、泳池等电位连接 (11)第四节基础接地施工工艺·················································································12 1、基础接地施工要点··················································································································12 2、基础接地示意图···························································· (12)第五章质量保证措施..........................................................................................14 第一节质量标准.............................................................................................14 第二节应注意的质量问题.................................................................................14 第三节质量记录.............................................................................................15 第六章安全保证措施..........................................................................................16 第七章现场文明体系及施工措施...........................................................................17 第一节绿色施工环境管理方针、目标及工程环境管理体系........................................17 第二节文明施工.............................................................................................17 第三节施工现场垃圾清除安排............................................................................18 第四节环境保护 (18)XXXX五星级水疗度假酒店第一章工程概况第一节基本概况本工程建筑包括总服务区一个,建筑面积3150m2;海滩烧烤活动区一处,房屋面积136 m2;水疗中心一处,房屋面积720 m2;海滩别墅33座,房屋面积2084 m2;环礁湖群柱架空式套房47座,房屋面积2746 m2;花园群柱架控式套房15套,房屋面积836 m2;帝王别墅一座,房屋面积1012m2;皇家别墅2座,房屋面积1060 m2。

建筑防雷施工规范避雷针与接地装置施工指南

建筑防雷施工规范避雷针与接地装置施工指南

建筑防雷施工规范避雷针与接地装置施工指南一、引言建筑防雷是保护建筑物及其内部设备免受雷电侵害的重要工作。

其中,避雷针和接地装置是建筑防雷系统中的核心组成部分。

本文将介绍建筑防雷施工规范下,避雷针与接地装置的施工指南。

二、避雷针的施工指南1. 材料准备避雷针的制作材料通常为优质不锈钢,具有良好的导电性能和耐腐蚀性。

施工前需准备好符合规范要求的不锈钢材料,包括避雷针支架、导线、尖头等。

2. 安装位置选择避雷针的安装位置应该是建筑物最高点,确保避雷针能够有效地吸引雷电,减少雷电危害。

在选择位置时,需要充分考虑建筑物的结构和周边环境。

3. 安装过程首先,根据设计要求确定避雷针的安装数量和布局。

然后,安装避雷针支架,确保其牢固可靠。

接着,安装导线,将导线与避雷针支架连接,并保证导线的拉力适当。

最后,安装避雷针的尖头,确保其与导线连接良好。

4. 施工质量控制在避雷针的施工过程中,需要严格按照规范要求进行操作,确保施工质量。

应该注意避雷针安装的稳固性、导线与支架的连接良好性、导线的拉力合适等方面。

三、接地装置的施工指南1. 地线埋设接地装置的施工首先要进行地线的埋设。

地线的选材应该是质量可靠的铜材或铜包钢材料,长度至少应满足规范要求。

地线应深埋在地下,以确保良好的接地效果。

2. 接地极的安装接地极的安装位置应远离建筑物,通常选择在建筑物周围的开放空地上。

在安装接地极时,需要保证其与地线之间的连接牢固可靠,并且接地极要尽可能深入地下。

3. 施工质量控制接地装置的施工质量对于建筑防雷的效果至关重要。

施工过程中要注意地线的质量,包括导线质量和埋设深度;接地极的安装质量,包括连接牢固性和深入程度等。

四、施工后的检测与验收施工完成后,需要进行防雷系统的检测与验收。

主要包括对避雷针和接地装置的电阻进行测试,以判断其是否符合规范要求。

同时,还需要进行现场的外观检查,确保施工质量。

五、总结本文介绍了建筑防雷施工规范下,避雷针与接地装置的施工指南。

防雷施工技术方案(一)

防雷施工技术方案(一)

防雷施工技术方案(一)引言概述:防雷施工技术方案是指在建筑、通信、电力等行业中,为防范雷击灾害而采取的一系列技术措施和方案。

该方案旨在降低雷击灾害造成的损失,保护设施和人员的安全。

本文将从地面接闪器、接地系统、避雷针、防雷装置和耐雷电设计等五个大点展开阐述防雷施工技术方案。

地面接闪器:1. 选择正确类型的接闪器,如被动接闪器或主动接闪器。

2. 按照规范要求选取合适的安装位置和数量。

3. 考虑设施的高度、形状和功能,确定适当的材料和设计参数。

4. 定期检测和维护地面接闪器,确保其正常运行。

接地系统:1. 设计合适的接地系统,确保接地阻抗符合要求。

2. 选择合适的接地材料和结构,如埋地接地、垂直接地或水平接地。

3. 安装接地系统时,注意应采用良好的接地连接、焊接和接头处理技术。

4. 定期检测接地系统的阻抗,并及时维修和更换损坏的接地材料。

避雷针:1. 确定适当的位置和数量,遵循相关国际、国家或行业标准。

2. 选择合适的避雷针类型,如尖顶避雷针、球冠避雷针或尖顶球冠复合避雷针。

3. 安装避雷针时,需注意避雷针与建筑物的接地系统之间的连接。

4. 建立完善的避雷针检测和维护制度,定期检查避雷针的耐腐蚀性能和功能性能。

防雷装置:1. 了解不同类型的防雷装置,如避雷带、避雷网和避雷分闸器等。

2. 根据设施的特点和要求,确定适合的防雷装置类型和安装位置。

3. 安装防雷装置时,需注意装置之间的连接和与设备的配合。

4. 建立防雷装置的定期检测和维护制度,确保其正常运行和灵敏度。

耐雷电设计:1. 根据不同设施的用途和要求,进行耐雷电设计及选型。

2. 选择符合国家标准和规范的防雷电设备和保护装置。

3. 进行合理的线路设置和接线技术,降低雷电引起的电气故障。

4. 建立完善的耐雷电设计档案和维护计划,定期评估设施的耐雷电能力。

总结:通过地面接闪器、接地系统、避雷针、防雷装置和耐雷电设计五个方面的阐述,本文详细介绍了防雷施工技术方案的具体内容和实施要点。

建筑防雷避雷带施工方案

建筑防雷避雷带施工方案

建筑防雷避雷带施工方案本工程为某高层建筑防雷避雷带施工项目,旨在确保建筑物在雷雨天气中的安全。

施工范围包括建筑物的避雷针、避雷带、接地装置等的设计、材料采购、施工安装及验收。

设计交底:与业主、设计单位进行沟通,明确避雷带施工要求和设计意图。

材料采购:根据设计要求,采购符合规格的避雷带、支架、接地材料等。

施工现场布置:确定施工区域,划定安全范围,准备好施工工具和设备。

安装避雷针:根据设计图纸,确定避雷针安装位置,使用支架固定避雷针,确保垂直、稳固。

安装避雷带:根据设计要求,确定避雷带安装位置,沿建筑物表面敷设避雷带,确保平直、美观。

焊接连接:将避雷针与避雷带通过焊接方式连接起来,形成电气通路。

接地装置安装:在建筑物底部设置接地装置,将避雷带与接地装置连接,确保雷电能量能够顺畅导入大地。

绝缘保护:在避雷带周围加装绝缘保护层,防止雷电反击。

验收测试:在施工完成后进行验收测试,检测避雷带的电气性能和安装质量。

高空作业时,应采取安全措施,佩戴安全带、安全帽等防护用品。

焊接作业时,应注意防火、防电击等安全事项。

施工现场应设置警示牌和围栏,防止无关人员进入。

遇到雷雨天气时,应停止施工,人员撤离现场。

严格按照设计图纸和施工规范进行施工。

随着城市化的快速发展,历史建筑保护和现代建筑的需求之间的矛盾日益突出。

为了保护历史建筑,同时满足现代建筑的需求,建筑平移施工方案应运而生。

这种施工方案能够将建筑物整体平移到指定位置,保护了历史建筑的原貌,同时也满足了现代建筑的需求。

建筑平移施工方案主要包括建筑物整体拆卸、平移和重新组装三个环节。

对建筑物进行整体拆卸,将建筑物所有的结构、装饰和设备等全部拆除。

然后,对拆除的建筑物进行平移,将其移动到指定位置。

对建筑物进行重新组装,完成整个平移施工。

在拆卸环节,需要考虑到建筑物的结构和特点,制定合理的拆卸方案。

对于历史建筑,需要尽可能保留其原貌和特色。

对于现代建筑,需要考虑其结构形式和材料特点。

避雷针施工方案

避雷针施工方案

避雷针施工方案引言:避雷针作为一种常见的防雷设备,广泛应用于建筑物和其他高耸物体的顶部,用于保护建筑物和人员免受雷击的危害。

本文将介绍避雷针施工方案的准确内容,包括施工前的准备工作、避雷针材料的选择、施工过程的步骤、施工后的检测和维护等。

一、施工前的准备工作:1.1 确定施工地点:在选择施工地点时,应考虑建筑物的高度、周围环境和雷电活动的频率等因素。

一般来说,高耸物体的顶部、建筑物的尖顶或者突出部位是避雷针的理想安装位置。

1.2 了解当地法规和标准:在进行避雷针施工前,必须了解当地的法规和标准要求。

这些要求通常包括施工许可证的申请、施工图纸的审批以及相关安全措施的执行等。

1.3 进行现场勘测:在施工前,需要进行现场勘测,确定避雷针的具体位置和安装方式。

勘测过程中应考虑建筑物的结构特点和周围环境的影响,确保避雷针的有效性和安全性。

二、避雷针材料的选择:2.1 避雷针导体材料的选择:避雷针导体通常采用铜、铝或者镀铜铝合金等材料制作。

这些材料具有良好的导电性能和耐腐蚀性,能够有效地引导雷电电流,减少雷击风险。

2.2 避雷针支撑结构的选择:避雷针支撑结构一般采用不锈钢或者镀锌钢材料制作,以确保其耐久性和稳定性。

同时,支撑结构的设计应考虑到建筑物的结构特点和周围环境的影响,确保避雷针的稳固安装。

2.3 避雷针接地装置的选择:避雷针的接地装置是确保避雷针正常工作的关键。

常见的接地装置包括接地线、接地体和接地网等。

在选择接地装置时,应考虑地质条件和接地电阻的要求,以确保避雷针能够有效地将雷电电流引入地下。

三、施工过程的步骤:3.1 安装避雷针导体:首先,根据现场勘测结果确定避雷针导体的具体位置和长度。

然后,将导体固定在建筑物的顶部或者突出部位,并确保导体与建筑物的接触良好。

3.2 安装避雷针支撑结构:根据建筑物的结构特点和避雷针导体的长度,选择合适的支撑结构,并将其固定在建筑物上。

同时,确保支撑结构的稳固性和与导体的连接良好。

防雷接地专项施工方案

防雷接地专项施工方案

1防雷接地专项施工方案一、总则1.1 工程概况本工程地处******生态区, 年雷击次数N=0.0564, 属于人口密集场合, 按三类防雷建筑物设防, 相应采用防直击雷, 雷电波侵入和等电位保护措施, 防雷接地、电气设备的保护接地、电梯机房等接地共用统一的接地极, 接地电阻不大于1Ω, 屋顶四周用φ12镀锌圆钢作不大于20m*20m或24m*16m的避雷网格与引下线焊接, 高出屋面的金属构件、金属管道、金属屋架等均应与避雷装置连接, 在室外地坪距地0.5米处预留100*60*6钢板作为测试点, 当实测不能满足设计规定期应增设人工接地极。

1.2 合用范围本方案合用于***建筑研究设计院设计的重庆市*******项目防雷接地系统工程。

1.3 编制依据的标准及规范****建筑研究设计院设计的重庆市*******项目施工图, 《建筑电气工程施工质量验收规范》 (GB50303-2023)、《建筑物、构筑物防雷设施安装图集》(03D501-1~4)。

二、施工准备2.1 材料规定:2.1.1 主材钢材严格按照设计图纸规定材料, 材质及规格应符合设计规定。

应按设计规定采用热镀锌材料, 产品应有材质检查证明及产品出厂合格证。

2.1.2 辅材有焊条、氧气、乙炔、沥青漆, 混凝土支架, 预埋铁件, 水泥等。

2.2 重要工机具:2.2.1 常用电工工具: 焊机、切割机、磨光机等。

2.2.2 线坠、卷尺、绳、粉线袋、绞磨(或倒链)、紧线器、电锤、冲击钻、电焊机、电焊工具等。

2.3 作业条件:2.3.1 土建专业已具有地下敷设接地装置的条件。

2.3.2 按设计位置清理好场地。

2.3.3 避雷网安装作业条件:2.3.3.1 接地体与引下线必须做完。

2.3.3.2 屋面避雷运用主筋作引下线, 需钢筋绑扎完毕后按照图纸所示位置进行预埋板的焊接。

2.3.3.3 进行屋面避雷网安装时, 建筑物(或构筑物)有脚手架或爬梯达成能上人操作的条件。

防雷接地施工方案

防雷接地施工方案

防雷接地施工方案1.防雷、接地要求:2.工艺流程:基础施工阶段主体结构施工阶段配电设备安装阶段调试阶段利用桩基接地点引上接地引上线连接接地铜引出线敷设避雷针安装基础接地环网焊接连接接地等电位环焊接电气室、机房接地母线敷设接地电阻测试接地验收基础接地电阻测试预留接地引出点接地专用盘安装幕墙接地(幕墙公司完成)变压器中性点接地配电设备外壳接地避雷带焊接3.大底板防雷接地施工方法:将锯桩后预留做为引下线桩基内的两条大于Φ16主筋,与承台及地梁主筋焊通形成可靠的电气通路。

引下线与基础钢筋网以及用做接地体的基础梁板钢筋按要求焊接完成后用黄色油漆标注。

利用底板桩基及基础梁2根钢筋作防雷接地体:按设计图尺寸位置要求,标好位置,将底板基础梁钢筋中两根主筋(底板钢筋十字交接处应可靠焊接)各自搭接焊好贯通,再利用圆钢将基础底梁上下两层钢筋主筋搭接焊形成一个完整的防雷接地体安装防雷接地体安装利用柱内钢筋作防雷接地体与作为防雷引下线的柱钢筋焊接接地电阻测试点100*100*8热镀锌扁钢柱内对角纵向钢筋(做防雷引下线)基础梁低筋2根做防雷接地体基础梁基础梁好标记,色标颜色在同一单位工程中应一致,并与土建工程上用的颜色区分开。

接地体的连接采用焊接。

焊接处焊缝饱满并有足够的机械强度,无夹渣、咬肉、裂纹、虚焊、气孔等现象,焊接处药皮敲干净。

利用结构钢筋作防雷接地导体时,其接头处要用圆钢焊跨。

见下图:4.防雷引下线施工方法:利用主筋作引下线,按设计要求找出主筋位置(如没有Φ16钢筋,可用四根Φ14的钢筋),随钢筋逐层串联焊接至顶层,逐层用色漆做好标记,并用镀锌圆钢焊接出屋面,准备与避雷网连接。

见下图:防雷引下线在有玻璃幕墙需做防雷接地的点位处,此点位与均压环或最近引下线通过4*25mm热镀锌扁钢焊接连通,供玻璃幕墙或外挂石材的预埋件联接。

见下图:玻璃幕墙接地安装5.等电位及接地干线的敷设及安装接地干线穿墙时,应加阻燃塑料套管保护,跨越伸缩缝时,应做煨管补偿;接地干线穿越门口时应加套管保护敷设于地面内(做地面以前埋好);接地干线距地面应不小于300MM,距墙面不小于10MM,,支持件间的水平直线距离不大于1米,垂直部分为1.5米,转弯距离为0.3米;接地干线敷设应平直,水平度及垂直度允许偏差2/1000MM,但全长不得超过10MM。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

木结构建筑避雷针及人工接地极方法防雷接地专项施工方案XXXX五星级水疗度假酒店XXXX五星级水疗度假酒店项目防雷接地专项施工方案编制人:审核人:审批人:XXXX集团XXXX有限公司XXXX五星级水疗度假酒店项目部2016 年12 月XXXX五星级水疗度假酒店目录第一章工程概况································································································· 3 第一节基本概况······························································································ 3 第二节防雷接地概况························································································ 3 第二章编制依据································································································· 3 第三章施工准备································································································· 4 第一节技术准备···························································· ·································· 4 第二节材料准备······························································································ 4 第三节工器具···························································· ····································· 4 第四章施工工艺···························································· ····································· 5 第一节屋面防雷施工工艺···························································· ······················ 5 1、避雷针施工要点···························································· ···························································· 5 2、避雷针安装示意图···························································· ························································ 5 第二节引下线施工工艺···························································· ························· 7 1、引线线施工要点····························································7 2、引下线连接示意图···························································· ························································ 7 第三节等电位连接施工工艺····························································· ··················· 9 1、总等电位连接示意图···························································· ···················································· 9 2、卫生间等电位连接···························································· ······················································ 10 3、泳池等电位连接···························································· ·························································· 11 第四节基础接地施工工艺···························································· ····················· 12 1、基础接地施工要点···························································· ······················································ 12 2、基础接地示意第五章质量保证措施·························································································· 14 第一节质量标准···························································· ································· 14 第二节应注意的质量问题···························································· ····················· 14 第三节质量记录···························································· ·············12.................... 15 第六章安全保证措施............................................................ .............................. 16 第七章现场文明体系及施工措施............................................................ ............... 17 第一节绿色施工环境管理方针、目标及工程环境管理体系........................................ 17 第二节文明施工............................................................ ................................. 17 第三节施工现场垃圾清除安排............................................................. ............... 18 第四节环境保护............................................................ (18)XXXX五星级水疗度假酒店第一章工程概况第一节基本概况本工程建筑包括总服务区一个,建筑面积3150m2;海滩烧烤活动区一处,房屋面积136 m2;水疗中心一处,房屋面积720 m2;海滩别墅33 座,房屋面积2084 m2;环礁湖群柱架空式套房47座,房屋面积2746 m2;花园群柱架控式套房15 套,房屋面积836 m2;帝王别墅一座,房屋面积1012m2;皇家别墅2 座,房屋面积1060 m2。

相关文档
最新文档