混凝土防腐涂层施工工艺流程英文回答:
Concrete Corrosion Protection Coating Construction Process.
1. Surface Preparation.
Remove all dirt, debris, and contaminants from the concrete surface.
Acid etch or mechanically abrade the surface to create a rough texture for better adhesion.
Rinse the surface thoroughly with clean water to remove any remaining debris.
2. Primer Application.
Apply a primer to the concrete surface to improve
adhesion and protect it from moisture.
Allow the primer to dry completely according to the manufacturer's instructions.
3. Coating Application.
Apply the first coat of the corrosion protection coating to the concrete surface.
Use a brush, roller, or spray to apply the coating evenly.
Allow the first coat to dry completely before applying subsequent coats.
4. Inspection.
Inspect the first coat for any defects or imperfections.
Repair any defects or imperfections before applying
subsequent coats.
5. Second Coat Application.
Apply a second coat of the corrosion protection coating to the concrete surface.
Allow the second coat to dry completely before applying subsequent coats.
6. Final Inspection.
Inspect the final coat for any defects or imperfections.
Repair any defects or imperfections to ensure a complete and durable coating.
7. Curing.
Allow the coating to cure for the recommended time, typically 7-14 days.
Protect the coating from moisture, abrasion, and other damage during the curing period.
中文回答:
混凝土防腐涂层施工工艺流程。

1. 表面处理。

清除混凝土表面的污垢、杂物和污染物。

用酸蚀刻或机械磨损表面以 tạo ra产生粗糙的纹理,提高附着力。

用清水彻底冲洗表面,去除残留的杂物。

2. 底漆涂刷。

在混凝土表面涂刷底漆以改善附着力并防止其免受moisture 侵蚀。

根据制造商的说明让底漆完全干燥。

3. 涂层涂刷。

在混凝土表面上涂刷第一层防腐涂层。

使用刷子、滚筒或喷雾均匀地涂抹涂层。

在涂刷后续涂层之前,让第一层涂层完全干燥。

4. 检查。

检查第一层涂层是否有任何缺陷或不完美之处。

在涂刷后续涂层之前修复任何缺陷或不完美之处。

5. 第二层涂层涂刷。

在混凝土表面上涂刷第二层防腐涂层。

在涂刷后续涂层之前,让第二层涂层完全干燥。

6. 最终检查。

检查最终涂层是否有任何缺陷或不完美之处。

修复任何缺陷或不完美之处,以确保涂层完整耐用。

7. 固化。

让涂层固化推荐的时间,通常为 7-14 天。

在固化期间保护涂层免受 moisture、磨损和其他损坏。