2020 年软考高级信息系统项目管理师考试英语练习题及答案多套汇总1. Project Quality Management must address the management of the project and the () of the project. While Project Quality Management applies to all projects, regardless of the nature of their product, product quality measures and techniques are specific to the particular type of product produced by the project.A.performanceB.processC.productD.object【答案】C【解析】项目质量管理必须解决项目的管理和项目的管理问题。

尽管项目质量管理适用于所有项目,无论其()的性质如何,但产品质量措施和技术是针对项目生产的特定类型产品的。

A、性能B、过程C、产品D、对象2.() is the budgeted amount for the work actually completedon the schedule activity or WBS component during a given time per i od.A.Planned valueB.Earned valueC.Actual costD.Cost variance【答案】B【解析】()是给定时间段内计划活动或WBS 组件实际完成的工作的预算金额。

A、计划值B、挣值C、实际成本D、成本差异3.() involves comparing actual or planned project practices to those of other projects to generate ideas for improvement and to provide a basis by which to measure performance. These other projects can be within the performing or gani za t i on or outside of it, and can be within the same or in another application area.A.MetricsB.MeasurementC.BenchmarkingD.Baseline【答案】C【解析】()将实际或计划的项目实践与其他项目的实践进行比较,以产生改进意见,并提供衡量绩效的依据。

信息系统项目管理师历年英语试题及模拟试题

信息系统项目管理师历年英语试题及模拟试题

信息系统项目管理师历年英语试题汇总2005年上半年●(66)is a method of constructing a project schedule network diagram that uses boxes or rectangles ,referred to as nodes, to represent activites and connects them with arrows that as ow the dependencies. This method includes following types of dependcies orprecedence relationships:(67)the initiation of the successor activity, depends upon the completion of the predecessor activity(68)the initiation of the successor activity,depends upon the initiation of the predecessor activity(66)A.PDM B.CPM C.PERT D.AOA(67)A.F-S B.F-F C.S-F D.S-S(68)A.F-S B.F-F C.S-F D.S-S●estimating schedule activity costs involves developing an(69)of the cost of the resources needed to complete each schedule activity. Cost estimating includes identifying and considering various costing alternatives. for example, in mostapplication areas, additional work during a design phase is widely held to have the potential for reducing the cost of the execution phase and product oprations. the cost estimating process considers whether the expected savings can offset the cost of the additional design work. cost estmates are generally expressed in units of(70)to facilitate comparisons both within and across projects. the(71)describes important information about prject requirement that is considered duing cost estimating.(69)A.accuracy B.approxination C.specification D.summary(70)A.activity B.work C.currency D.time(71)A.project scope statement B.statement of workC.project management plan D.project policy●The (72)technique involves using projecet characteristics in a mathematical model to predict total project cost.models can be simple or complex.(72) A.cost aggregation B.reserve analysisC.parametric estimating D.funding limit reconciliarion●(73)is a measurable, verifiable work product such as specification. feasibility study report, detail document, or working prototype(73) A.milestone B.deliverable C.etc D.BAC●(74)are individuals and organizations that are actively involved in the project, or whose interests may be affected as a result of project execution or project completion; they may also exert influence over the project and its results.(74) A.controls B.baselinesC.project stakeholders D.project managers●(75)is the process of obtaining the stakeholdrs’formal acceptance of the completed projectscope .verifying the scope includes reviewing deliverables and work results to ensure that all were completed satisfactorily.(75) A.project acceptance B.scope verificationC.scope definition D.WBS Creation2005年下半年●__(66)__ means that every project has a definite beginning and a definite end.(66)A. Project phase B. Unique C. Temporary D. Closure●The __(67)__ defines the phases that connect the beginning of a project to its end.(67)A. schedule B. project life cycle C. temporary D. milestone●__(68)__ are individuals and organizations that are actively involved in the project, or whose interests may be affected as a result of project execution or project completion.(68)A. Project managers B. Project team membersC. SponsorsD. Project stakeholders●The __(69)__ Process Group consists of the processes used to complete the work defined in the project management plan to accomplish the project’s requirements.(69)A. Planning B. Executing?? ???????????C. Monitoring and ControllingD. Closing●The __(70)__ provides the project manager with the authority to apply organizational resources to project activities.(70)A. project management plan B. contractC. project human resource planD. project charter●The __(71)__ describes, in detail, the project’s deliverables and the work required to create those deliverables.(71)A. project scope statement B. project requirementC. project charterD. product specification●The process of __(72)__ schedule activity durations uses information on schedule activity scope of work, required resource types, estimated resource quantities, and resource calendars with resource availabilities.(72)A. estimating B. defining C. planning D. sequencing●PDM includes four types of dependencies or precedence relationships:...__(73)__. The completion of the successor activity depends upon the initiation of the predecessor activity.(73)A. Finish-to-Start B. Finish-to-FinishC. Start-to-StartD. Start-to-Finish●__(74)__ is the budgeted amount for the work actually completed on the schedule activity or WBS component during a given time period.(74)A. Planned value B. Earned valueC. Actual costD. Cost variance●__(75)__ involves comparing actual or planned project practices to those of other projects to generate ideas for improvement and to provide a basis by which to measure performance. These other projects can be within the performing organization or outside of it, and can be within the same or in another application area.(75)A. Metrics B. Measurement C. Benchmarking D. Baseline2006年下半年●(66)from one phase are usually reviewed for completeness and accuracy and approved before work starts on the next phase.(66)A.Process B.Milestone C.Work D.Deliverables●Organizations perform work to achieve a set of objectives.Generally, work can be categorized as either projects or operations, although the two sometimes are (67).(67)A.confused B.same C.overlap D.dissever●In the project management context,(68)includes characteristics of unification, consolidation, articulation, and integrative actions that are crucial to project completion, successfully meeting customer and other stakeholder requirements,and managing expectations.(68)A.integration B.scope C.process D.charter●Project (69)Management includes the processes required to ensure that the project includes all the work required, and only the work required,to complete the project successfully.(69)A.Integration B.Scope C.Configuration D.Requirement●On some projects,especially ones of smaller scope,activity sequencing, activity resource estimating, activity duration estimating, and (70)are so linked that they are viewed as a single process that can be performed by a person over a relatively short period of time.(70)A.time estimating B.cost estimatingC.project planning D.schedule development●In approximating costs,the estimator considers the possible causes ofvariation of the cost estimates,including (71)。

IT项目管理选择题英文版

IT项目管理选择题英文版

IT选择题第一章①Approximately what percentage of the world's gross domestic product is spent on projects?【25percent】②Which of the following is a not a potential advantage of using good project management?【lower cost of capital】③A【project】is a temporary endeavor undertaken to create...④Which of the following is not an attribute of a project?【projects involve little uncertainly】⑤Which of the following is not part of the triple constraint of project management?【meeting communications】⑥【Project management】is the application of knowledge.skills....⑦Project portfolio management addresses【strategic】goals of an organization,while project management addresses【tactical】goals.⑧Several application development projects done for the same functional group might best be managed as part of a【program】⑨Which of the following is not one of the top ten skills or competencies of an effective project manager?【technical skills】⑩What is the certification program called that the Project Management Institute provides?【PMP】第二章11Which of the following is not part of the three-sphere model for systems management 【information】12Which of the four frames of organizations addresses how meetings are run,employee dress codes,and expected works hours【symbolic】13Project in a 【matrix】organizational structure often report to two or more bosses.14Project work is most successful in an organizational culture where all of the following characteristic are high except【control】15A【deliverable】is a product or service...16Which of the following is not a phase of the traditional project life cycle【system analysis】17What is the term used to describe a framework of the phases involved in developing information systems【system development life cycle】18Another name for a phase exit is a【kill】point19The nature of information technology project is different from projects in many other industry because they are very【diverse】20What term is used to describe when an organization acquires good and source from an outside source in another county【offshoring】第三章21 A 【process】is a series of actions directed toward a particular result22【Executing】processes include coordinating people23Which process group normally requires the most resources and time?【Executing】24What methodology was developed in the U.K,defines 45 separate subprocesses,and organizes These into eight process groups?【PRINCE2】25 A work breakdown structure,project schedule,and cost estimates are outputs of【planning】26Which of the following outputs is often complete before initiating a project【business】27Initiating involved develop a project charter,which is part of the project【intergration】28【monitoring and controlling】involves measuring29What type of report do project teams create to reflect on what went right and what went wrong with the project?【lesson-learned report】30Many people use 【templates】第四章:31Which of the following processes is not part of project integration management 【develop the project business case】32What is the last step in the four-stage planning【resource allocation】33Which of the following is not a best practice for new product development projects?【select projects that will take less than two years to provide payback】34 A new government law requires an organization to report data in a new way【directive】35If estimates for total discounted benefits for a project are $120000 and total discounted costs are $10000,what is the estimated return on investment(ROI)?【20 percent】36 A 【project charter】is a document that37Which of the following item is not normally included in a project charter?【a Gantt chart】38【configuration management】ensure that the description39Which of the following is not a suggestion for performing 【minimize change】40What tool and technique is used for all of the other project integration 【expert judgment】第五章41【scope】refers to all the work involved in creating42Which tool or technique for collecting requirements is often the most expensive【interviews】43A【WBS】is a deliverable-oriented grouping of the work44What approach to developing a WBS involves writing down or drawing 【mind mapping】45Assume you have a project with major categories called planning,analysis【2】46Which of the following is not a best practice that can help in avoiding 【don't involve too many users in scope management】47What major restaurant chain terminated a large after spending $170 million【Mcdonald's】48Scope【verification】is often achieved by49Which of following is not a suggestion for improving user 【only have meeting as need】50Project management software helps you develop a【WBS】第六章51What is the first process in planning a project schedule【defining activities】52Predecessors,successors【activity attributes】53As the project management for a software【discretionary】54You cannot start editing a technical report until【finish-to-finish】55Which of the following statements is false?【duration and effort are synonymous terms】56What symbol on a Gantt【a white diamond】57What type of diagram shows planned and actual project schedule 【a Tracking Gantt chart】58【PERT】is a network59Which of the following statement is false【Fast tracking is a technique】60【critical chain scheduling】is a method of scheduling第七章61【cost】is a resource sacrificed or foregone62What is the main goal of project cost management【to complete a project within an approved】63Which of the following is not a key output of project 【a cost management plan】64If a company loses $5 for every $100 in revenue for a certain product【-5 percent】65【Management】reserves allow for future66You are preparing a cost estimate for【parametric】67【project cost budgeting】involves allocating the project68【Earned value analysis】is a project performance measurement technique69If the actual cost for a WBS item is $1500 【the cost variance is $500,which is under budget】70If a project is halfway【it is ahead of schedule and over budget】第八章71【Quality】is the degree to which a set of inherent72What is the purpose of project quality management【to ensure that the project】73【benchmarking】generates74What tool could you use to see if【a scatter diagram】75What tool can you use to determine whether 【a control chart】76Six Sigma's target【3.4】77The seven run rule states【non-random】78What is the preferred order for performing【unit testing,integration testing,system testing】79【Deming】is known for his work on quality control80PMI's OPM3【maturity】。

管理信息系统(英文版第7版)题库chapter extension 02

管理信息系统(英文版第7版)题库chapter extension 02

Experiencing MIS, 7e (Kroenke)Chapter Extension 2 Collaborative Information Systems for Student Projects1) ________ are useful when a team needs to meet on some topic but everyone cannot meet at the same time.A) BlogsB) Discussion forumsC) WikisD) SurveysAnswer: BAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.1: What are the IS requirements for student project collaborations? Classification: Concept2) Discussion forums are one of the nice-to-have features in a collaboration tool.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.1: What are the IS requirements for student project collaborations? Classification: Concept3) Why should a team choose to use a collaboration information system?Answer: Collaboration is critical in business, and numerous software vendors and open source developers have created computer programs to facilitate various collaborative tasks. Once a team learns how to use the tools and has developed procedures for using them, teamwork will be easier. The team will no longer need to get everyone together face-to-face. It will no longer lose documents; it will be able to determine who is contributing and who is not. Another reason for using collaboration tools is that it will create better results. Such systems facilitate feedback and iteration. Each team member can produce documents, and others can comment and make revisions to them.AACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.1: What are the IS requirements for student project collaborations? Classification: Concept4) Synchronous communication is said to occur if ________.A) communication occurs between people in different time zonesB) there is a flow of communication according to the hierarchical structureC) members of various teams work on the same taskD) all members of a team meet at the same timeAnswer: DAACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.2: How can you use collaboration tools to improve team communication? Classification: Concept5) VOICE is a marketing and media firm. One of its corporate policies is the sole use of synchronous communication within the organization. VOICE is expanding its customer base in the coming year and needs to prepare a plan of action. Given its corporate policy regarding communication, which of the following modes are its team members most likely to use?A) emailB) team surveyC) multiparty text chatD) discussion forumAnswer: CAACSB: Reflective ThinkingDifficulty: 3: ChallengingCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.2: How can you use collaboration tools to improve team communication? Classification: Application6) ________ occurs when team members do not meet at the same time.A) Asynchronous communicationB) Synchronous communicationC) Procedural communicationD) Nonprocedural communicationAnswer: AAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.2: How can you use collaboration tools to improve team communication? Classification: Concept7) AKAI One, a multinational company, has centers in four different countries. The heads of the four centers set performance targets every month and work toward achieving them. Given that each center works in a different time zone, which of the following modes of communication should the center heads choose to discuss their monthly targets?A) multiparty text chatB) videoconferencingC) emailD) webinarAnswer: CAACSB: Reflective ThinkingDifficulty: 3: ChallengingCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.2: How can you use collaboration tools to improve team communication? Classification: Application8) Morgan's company has outsourced its accounting process to a small firm in India. Morgan needs to discuss some quality control measures with the firm's managers. He conducts the meeting via videoconference. Given the nature of the meeting, it can also be called a(n)________ meeting.A) concurrentB) parallelC) asynchronousD) virtualAnswer: DAACSB: Reflective ThinkingDifficulty: 2: ModerateCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.2: How can you use collaboration tools to improve team communication? Classification: Application9) If a virtual meeting is synchronous, participants can interact with each other through________.A) discussion forumsB) videoconferencingC) emailD) team surveysAnswer: BAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.2: How can you use collaboration tools to improve team communication? Classification: Concept10) ________ are virtual meetings in which attendees view one of the attendees' computer screens for formal and organized presentations.A) Discussion forumsB) Screen-sharing applicationsC) Conference callsD) WebinarsAnswer: DAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.2: How can you use collaboration tools to improve team communication? Classification: Concept11) ________ is a type of asynchronous communication in which a group member can post an entry, an idea, a comment, or a question, and other group members respond to it later, at their convenience.A) Multiparty text chatB) VideoconferencingC) WebinarD) Discussion forumAnswer: DAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.2: How can you use collaboration tools to improve team communication? Classification: Concept12) ________ is a type of asynchronous communication where one person creates a list of questions to which other users respond.A) Multiparty text chatB) Team surveyC) WebinarD) WhiteboardAnswer: BAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.2: How can you use collaboration tools to improve team communication? Classification: Concept13) Asynchronous communication occurs when team members do not meet at the same time. Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.2: How can you use collaboration tools to improve team communication? Classification: Concept14) A face-to-face meeting is an example of asynchronous communication.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.2: How can you use collaboration tools to improve team communication? Classification: Concept15) Virtual meetings can be synchronous or asynchronous.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.2: How can you use collaboration tools to improve team communication? Classification: Concept16) Wikis are a virtual meeting in which attendees view one of the attendees' computer screens for a more formal and organized presentation.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.2: How can you use collaboration tools to improve team communication? Classification: Concept17) Videoconferencing is likely to be less intrusive than text chat.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.2: How can you use collaboration tools to improve team communication? Classification: Concept18) Email is a tool used for synchronous communication.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.2: How can you use collaboration tools to improve team communication? Classification: Concept19) In team surveys, one team member creates a list of questions and the other team members respond.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.2: How can you use collaboration tools to improve team communication? Classification: Concept20) Explain synchronous and asynchronous communications in organizations with examples. Answer: Synchronous communication occurs when all team members meet at the same time. Face-to-face meetings and conference calls are examples of synchronous communication. Asynchronous communication occurs when team members do not meet at the same time. Email, discussion forums, and team surveys are examples of asynchronous communication. Virtual meetings in which participants do not meet in the same place and possibly not at the same time can be both synchronous and asynchronous. If the virtual meeting is synchronous (all meet at the same time), participants can use conference calls, webinars, or multiparty text chat. A webinar is a virtual meeting in which attendees view one of the attendees' computer screens for a more formal and organized presentation. Videoconferencing is another synchronous method. When a team must meet asynchronously, most members try to communicate via email.AACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.2: How can you use collaboration tools to improve team communication? Classification: Concept21) Which of the following is a content sharing technique which is least effective for collaborations in which there are many document versions or for which there is a desire for content control?A) email with attachmentsB) Microsoft SharePointC) Google DocsD) file serverAnswer: AAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.3: How can you use collaboration tools to share content? Classification: Concept22) Which of the following statements is true of shared content with version management?A) Content sharing methods that provide version management cannot accommodate concurrent work.B) Version management systems provide version control.C) Version management makes it impossible to know when and by whom the document was changed.D) Content sharing systems that provide version management can track changes to documents. Answer: DAACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.3: How can you use collaboration tools to share content? Classification: Concept23) Which of the following tools helps share content with version management features?A) SkypeB) Google DocsC) emails with attachmentsD) file serverAnswer: BAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.3: How can you use collaboration tools to share content? Classification: Concept24) Which of the following statements is true of Google Drive?A) Users receive an email when a document is made available to them.B) Documents are stored on the Google Drive server.C) Document revisions are tracked with extensive details of changes made.D) Microsoft Excel documents cannot be uploaded to Google Drive.Answer: AAACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.3: How can you use collaboration tools to share content? Classification: Concept25) Which of the following systems provides version control while sharing content?A) Microsoft SharePointB) LinkedInC) emails with attachmentsD) locked files hard disksAnswer: AAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork. Learning Obj: LO 14.3: How can you use collaboration tools to share content? Classification: Concept26) In version control systems, shared documents are placed into shared directories called ________.A) vaultsB) librariesC) workspacesD) recordsAnswer: BAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork. Learning Obj: LO 14.3: How can you use collaboration tools to share content? Classification: Concept27) Which of the following statements is true of Microsoft SharePoint?A) It does not facilitate permission-limited activity.B) It converts shared documents to the Google Docs format.C) It facilitates the continuation of workflow defined for a document even when any of its members disapproves the document.D) It does not allow users to edit a document if it has been checked out by another user. Answer: DAACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Explain how IS can enhance systems of collaboration and teamwork. Learning Obj: LO 14.3: How can you use collaboration tools to share content? Classification: Concept28) The degree of version management is very high in email with attachments. Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork. Learning Obj: LO 14.3: How can you use collaboration tools to share content? Classification: Concept29) Storing documents on servers is better than using email attachments because documents havea single storage location.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.3: How can you use collaboration tools to share content? Classification: Concept30) Version management systems facilitate tracking changes to documents and provide features and functions to accommodate concurrent work.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.3: How can you use collaboration tools to share content? Classification: Concept31) Natalie needs to access Google Drive for a project. She does not need to have a Gmail account for that.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.3: How can you use collaboration tools to share content? Classification: Concept32) Version management systems provide version control.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.3: How can you use collaboration tools to share content? Classification: Concept33) In version control systems, shared documents are placed in shared directories, sometimes called libraries.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.3: How can you use collaboration tools to share content? Classification: Concept34) The document checkout feature in SharePoint allows users to simultaneously edit documents. Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.3: How can you use collaboration tools to share content? Classification: Concept35) Workflows cannot be defined on Microsoft SharePoint for multistage business processes. Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.3: How can you use collaboration tools to share content? Classification: Concept36) What is version management and why is it important?Answer: Every collaborative project involves sharing of content. Although email is simple, easy, and readily available, it will not suffice for collaborations in which there are many document versions or for which there is a desire for content control. Storing documents on servers is better than using email attachments because documents have a single storage location. They are not scattered in different team members' email boxes. However, without any version management it will be impossible to know who changed the document and when. Version management is a technique used for sharing electronic content. Systems that provide version management track changes to documents and provide features and functions to accommodate concurrent work. Google Drive and Microsoft One Drive are examples of systems that provide version management.AACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.3: How can you use collaboration tools to share content? Classification: Concept37) Explain version control with a simple example.Answer: Version control is the process of limiting the actions that can be taken by a particular user on shared documents. Version management systems improve the tracking of shared content and potentially eliminate problems caused by concurrent document access. They do not, however, provide version control. With version control systems, each team member is given an account with a set of permissions. Shared documents are placed into shared directories, which are sometimes called libraries. Furthermore, document directories can be set up so that users are required to check out documents before they can modify them. When a document is checked out, no other user can obtain it for the purpose of editing it. Once the document has been checked in, other users can obtain it for editing. Microsoft SharePoint is the most popular version control application for general business.AACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.3: How can you use collaboration tools to share content? Classification: Concept38) Which of the following statements is true of collaboration tools?A) Team members cannot request SharePoint to send emails when certain events occur.B) Google Drive permits only the uploader to make changes to a task list and does not allow simultaneous edits.C) The standard task list in SharePoint can readily be modified to include user-customized columns using SharePoint.D) Google Drive allows only one user to edit a document at a time.Answer: CAACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.4: How can you use collaboration tools to manage tasks? Classification: Concept39) Ashley is part of an interdepartmental project in which members from different departments work on the project and upload their files on Google Drive. Which of the following characteristics should Ashley keep in mind while working on this project?A) Google Drive restricts the edit permission on documents to the creator of tasks.B) Google Drive does not allow simultaneous edits.C) Google Drive deals with video and audio files.D) Google Drive provides version history showing the changes made by users to task lists. Answer: DAACSB: Reflective ThinkingDifficulty: 2: ModerateCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.4: How can you use collaboration tools to manage tasks? Classification: Application40) The alerts feature in SharePoint ________.A) sends a team member an email whenever a task is assigned to him or herB) requires team members to check the task list for new tasks every hourC) does not support customization of email requestsD) can send emails only when an existing task is deletedAnswer: AAACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.4: How can you use collaboration tools to manage tasks? Classification: Concept41) SharePoint can be configured to send email alerts when certain events occur.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.4: How can you use collaboration tools to manage tasks? Classification: Concept42) SharePoint includes a built-in content type for managing task lists that provides robust and powerful features.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.4: How can you use collaboration tools to manage tasks? Classification: Concept43) Explain the importance of Microsoft SharePoint in task management.Answer: Microsoft SharePoint has a robust task management capability. It contains a built-in content type for managing task lists that provides powerful features. The standard task list stores data such as title, assigned to, due date, status, predecessors, and other useful task data. Users can also add their own data to the default format of the task list. With SharePoint, it is possible to filter task lists to show only incomplete tasks, or only tasks that have been completed. Alerts are a feature in SharePoint task lists that can send emails to a team member when certain events occur. If a task is assigned to a person, alerts can send an email. This feature means that team members need not continually check the task list for new tasks.AACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.4: How can you use collaboration tools to manage tasks? Classification: Concept44) With the ________ collaboration tool set, a participant should be able to collaborate with his or her team, though he or she will get little support from the software.A) MinimalB) OptimalC) GoodD) ComprehensiveAnswer: AAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.5: Which collaboration information system is right for your team? Classification: Concept45) With the ________ collaboration tool set, participants have the ability to conduct multiparty audio and video virtual meetings and the support for concurrent access to document, spreadsheet, and presentation files, but they will have to rely on third-party tools to use surveys, wikis, and blogs.A) MinimalB) OptimalC) GoodD) ComprehensiveAnswer: CAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.5: Which collaboration information system is right for your team? Classification: Concept46) The ________ collaboration tool set has a large set of features, including content management and control, workflow control, online meetings in which participants can view shared whiteboards, applications, and monitors.A) MinimalB) BasicC) GoodD) ComprehensiveAnswer: DAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.5: Which collaboration information system is right for your team? Classification: Concept47) Which of the following statements is true of collaboration tool sets?A) The Good collaboration tool set has built-in discussion boards.B) The Comprehensive collaboration tool set takes the longest time to learn.C) The Good collaboration tool set includes workflow control as an inbuilt feature.D) The Minimal collaboration tool set allows sharing of video files.Answer: BAACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.5: Which collaboration information system is right for your team? Classification: Concept48) Which of the following statements is true of a product power curve for collaborative tool sets?A) A flat line on a power curve means the user is increasing the utility gained from the product.B) At time zero, the ideal power curve is at zero.C) The power curve of a Minimal collaboration tool set rises steadily with time.D) The power curve of a Comprehensive collaboration tool set has a longer flat spot in the beginning.Answer: DAACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.5: Which collaboration information system is right for your team? Classification: Concept49) With the Minimal collaboration tool set, a participant should be able to collaborate with his or her team, though he or she will get little support from the software.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.5: Which collaboration information system is right for your team? Classification: Concept50) The Good collaboration tool set includes content management and control, workflow control, online meetings in which participants can view shared whiteboards, applications, and monitors. Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.5: Which collaboration information system is right for your team? Classification: Concept51) In the product power curve, the Minimal product set has some power at time zero. Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.5: Which collaboration information system is right for your team? Classification: Concept52) While using the Minimal collaboration tool set, it must be ensured that one user's work does not conflict with another's.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.5: Which collaboration information system is right for your team? Classification: Concept53) What are the three sets of collaboration tools?Answer: The three sets of collaboration tools are the Minimal, Good, and Comprehensive tool sets. Their features are as follows:1. The Minimal collaboration tool set has the minimum possible set of tools. With this set, a participant should be able to collaborate with his or her team, though he or she will get little support from the software.2. With the Good collaboration tool set, a participant will have the ability to conduct multiparty audio and video virtual meetings, and he or she will also have support for concurrent access to document, spreadsheet, and presentation files.3. The Comprehensive collaboration tool set has a full set of features, including content management and control, workflow control, online meetings in which participants can view shared whiteboards, applications, and monitors.AACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.5: Which collaboration information system is right for your team? Classification: Concept。

信息系统项目管理师习题库(附参考答案)

信息系统项目管理师习题库(附参考答案)

信息系统项目管理师习题库(附参考答案)一、单选题(共100题,每题1分,共100分)1、Before a project schedule can be created,the schedule maker should have a(),an effort estimate for each task,and a resource list with availability for each resourceA、planB、software requirements specificatioC、work breakdown structureD、baseline正确答案:C2、()算法采用模拟生物进化的三个基本过程“繁殖(选择)→交叉(重组)→变异(突变)”。

A、蚁群B、人工神经网络C、遗传D、粒子群正确答案:C3、在演示文稿中,插入超级链接时,所链接的目标不能是()。

A、某张幻灯片中的某个对象B、其他应用程序的文档C、另一个演示文稿D、同一演示文稿的某一张幻灯片正确答案:A4、回收的问卷调查表中,很多表都有一些没有填写的项。

处理缺失值的办法有多种,需要根据实际情况选择使用。

对于一般性的缺值项,最常用的有效方法是()A、将缺失的数值以该项己填诸值的平均值代替B、删除含有缺失值的调查表C、填入特殊标志,凡涉及该项的统计则排除这些项值D、用某种统计模型的计算值来代替正确答案:C5、对高级语言源程序进行编译或翻译的过程可以分为多个阶段,解释方式不包含()阶段。

A、语义分析B、词法分析C、语法分析D、目标代码生成正确答案:D6、宏病毒可以感染后缀为()的文件。

A、pdfB、txtC、exeD、xls正确答案:D7、()不属于知识产权保护之列。

A、定理和公式B、专利C、商标D、著作和论文正确答案:A8、因时间紧、任务急、经过评估,某智能监控软件涉及的图像传输速度与精度指标难以满足客户需求,故项目团队欲将该软件开发分包给技术实力很强的企业完成。

项目管理(全英文)试题

项目管理(全英文)试题

一、名词解释(5*2=10)PMI, Project Management Institute, 美国项目管理学会PMP, Project Management Professional, 项目管理专业人员认证PMBOK, Project Management Body of Knowledge, 项目管理知识体系PLC, project life cycle, 项目生命周期RFP, Request for proposal, 需求建议书WBS, Work Breakdown Structure, 工作分解结构CPM, Critical path method, 关键路径法PERT, Project Evaluation and Review Technique, 计划评审技术AOA, Activity-On-Arrow, 双代号网络图法AON, Activity-on-node, 单代号网络图CPI, Cost Performance Index, 成本绩效指数 (挣值(EV)/实际成本(AC)) RAM, Responsibility Assignment Matrix, 职责分配矩阵P&L, Profit and loss损益VAT, value-added tax, 加值税、增值税QA, Quality Assurance, 质量保障二、填空题(5*2=10)。

1. A project is an endeavour to accomplish a specific objective through a unique set of interrelated tasks and the effective utilization of resources.2. A project manager is responsible for planning the work and then work the plan.3. The project life cycle has four phases: initiating, planning, performing, and closing the project.4. Project selection involves evaluating potential projects and then deciding which should move forward to be implemented.5. WBS facilitates evaluation of cost, time, and technical performance of the organization on a project.6. The project network is developed from the information collected for the WBS and is a graphic flow chart of the project job plan.7. In the context of projects, risk is an uncertain event and condition that, if it occurs, has a positive and negative effect on project objectives.8. Milestones are significant project events that mark major accomplishments.9. Two important factors affecting recruitment are the importance of the project and the management structure being used to complete the project.10. The most common method for shortening project time is to assign additional staff and equipment to activities.三.选择题(15*2=30)1. Communications is best described as:A. an exchange of information.B. providing written or oral directions.C. consists of senders and receiversD. effective listening.E. All of the aboveANS: E2. The following types of costs are relevant to making a financial decision except:A. opportunity costsB. direct costsC. sunk costD. unavoidable costsE. None of the aboveANS: C3. Time management is the allocation of time in a project's life cycle through the process of:A. PlanningB. Estimating.C. Scheduling.D. ControllingE. All of the above.ANS: E4. A project element which lies between two events is called:A. An activity.B. A critical path method.C. A slack milestone.D. A timing slot.E. A calendar completion point.ANS: A5. A comprehensive definition of scope management would be:A. Managing a project in terms of its objective through the concept, development, implementation, and termination phases of a project.B. Approval of the scope baseline.C. Approval of the detailed project charter.D. Configuration control.E. Approved detailed planning including budgets, resource allocation,linear responsibility charts and management sponsorship.ANS: A6. Pure Risk differs from Business Risks because Pure Risk's _____ .A. include chances of both profit or loss associated with the business.B. include chances of loss and no chances for profit associated with the business.C. must incur personal loss with business liability.D. must incur business liability associated with loss of pure profit.E. B and CANS: BANS: D7. The most common types of schedules are Gantt charts, milestone charts, line of balance, and:A. Networks.B. Time phased events.C. Calendar integrated activities.D. A and C only.E. B and C only.ANS: A8. In preparing a good project definition, experienced project managers will:A. Concentrate mainly on the end product rather than costs or benefits. These come later.B. Realize that only the "tip of the iceberg" may be showing. As a project manager, you must get beneath it.C. Understand that a project definition/plan is a dynamic rather than static tool, and thus subject to change.D. Try to convert objectives into quantifiable terms.E. All of the aboveANS: E9. Since risk is associated with most projects, the best course of action is to:A. cover all project risks by buying appropriate insuranceB. ignore the risks, since nothing can be done about them and move forward with the project in an expeditious manner.C. avoid projects with clear and present risksD. eliminate all known risks prior to the execution phase of the projectE. identify various risks and implement actions to mitigate their potential impactANS: E10. Risk management allows the project manager and the project team to:A. eliminate most risks during the planning phase of the projectB. identify project risksC. identify impacts of various risksD. plan suitable responsesE. B, C and D onlyANS: E11. Which of the following types of cost are relevant to making financial decisions:A. sunk costB. opportunity costC. material costD. A and C onlyE. B and C onlyANS: E12. Which of the following is often overlooked in achieving effective communication?A. speaking clearlyB. listeningC. interpretingD. maintaining eye contactE. manipulating the conversationANS: B13. The highest degrees of project risk and uncertainty are associated with the following phase of the project:A. conceptualB. executionC. cut-overD. post project evaluationE. A and D onlyANS: A14. The auditing function that provides feedback about the quality of output is referred to as:A. quality control.B. quality planning.C. quality assurance.D. quality improvementE. All of the above.ANS: C15. The sending or conveying of information from one place to another is the process ofA. NetworkingB. TransmittingC. InteractingD. PromotingE. InterfacingANS: B16. Project life cycles provide a better means of measurement of progress and control. The four phases of a project are conceptual development,_____, _____, and _____.A. Preliminary planning, detail planning, closeoutB. Implementation, reporting, terminationC. Development, implementation, terminationD. Execution, reporting, finishingE. Implementation, termination, post-audit reviewANS: C17. All of the following are categories of a milestone in a schedule except:A. End date.B. Contract dates.C. Key events scheduled.D. Imposed dates.E. Task duration.ANS: E18. Uncertainty refers to a situation where:A. the outcomes are known but their probabilities are highB. the outcomes and their probabilities are knownC. neither the outcomes nor their probabilities are knownD. states of nature can change at any timeE. probabilities of various states of nature can change at any timeANS: C19. Excessive flexibility in specifying requirements will _____ the likelihood of time overruns.A. Reduce.B. Eliminate.C. DoubleD. IncreaseE. Not affectANS: D20. Which of the following is closet to Deming's definition of Quality:A. conformance to requirements.B. fitness for use.C. continuous improvement of products and services.D. customer focus.E. All of the above.ANS: C21. The key purpose of project control is to:A. Plan ahead for uncertainties.B. Generate status reports.C. Keep the project on track.D. Develop the project road map.E. All of the above.ANS: C22. Which of the following constitute Juran's "quality trilogy":A. planning, inspection, control.B. planning, improvement, control.C. planning, organization, control.D. product, price, customer.E. design, build, deliver.ANS: B23. Most project (and non-project) managers prefer _____ communications.A. OralB. WrittenC. UpwardD. DownwardE. LateralANS: A24. On a precedence diagram, the arrow between two boxes is called:A. An activity.B. A constraint.C. An event.D. The critical path.E. None of above.ANS: B25. Quality control charts show a characteristic of the product or service against:A. the specification limits.B. customer requirements.C. control limits based on three standard deviations in each direction.D. control limits based on six standard deviations in each direction.E. A and D onlyANS: C26. In the arrow diagramming method (ADM), _____ do not consume time or resources.A. Events.B. Dummy ActivitiesC. Slack elements.D. B and C only.E. All of the above.ANS: A27. Activities with zero time duration are referred to as:A. Critical path activites.B. Noncritical path activities.C. Slack time activities.D. DummiesE. None of above.ANS: D28. In the PDM, common constraints include:A. Start-to-startB. Finish-to-startC. Finish-to-finishD. B and C onlyE. A, B, and C.ANS: E29. Non-verbal communication includes:A. Body movementB. GesturesC. Facial expressionsD. The way we move our handsE. All of the aboveANS: E30. Which one of the following is not an acquisition method?A. advertisingB. invitationC. negotiationD. purchaseE. all are acquisition methodsANS: A31. For communication to occur, there must be:A. Two or more people involvedB. the transmittal of informationC. a communication processD. All of the aboveE. B and C onlyANS: D32. Job continuity would be an example of _____ in Maslow's hierarchy of needs.A. Self-actualizationB. EsteemC. PhysiologicalD. BelongingE. SafetyANS: E四、简单题(2*10=20)。

信息系统项目管理师历年英文考题(2005年上半年-2011年上半年)

信息系统项目管理师历年英文考题(2005年上半年-2011年上半年)

信息系统项目管理师历年英文考题(2005年上半年-2011年上半年)信息系统项目管理师2005年上半年● ___(66)___ is a method of constructing a project schedule network diagram that uses boxes or rectangles, referred to as nodes, to represent activities and connects them with arrows that show the dependencies. This method includes following types of dependencies or precedence relationships: ___(67)___the initiation of the successor activity, depends upon the completion of the predecessor activity. ___(68)___the initiation of the successor activity, depends upon the initiation of the predecessor activity. (66) A.PDM B.CPM C.PERT D.AOA (67) A.F-S B.F-F C.S-F D.S-S (68) A.F-S B.F-F C.S-F D.S-S _(69)___ of the cost of the resources ● estimating schedule activity costs involves developing an __needed to complete each schedule activity. Cost estimating includes identifying and considering various costing alternatives. for example, in most application areas, additional work during a design phase is widely held to have the potential for reducing the cost of the execution phase and product operations. th cost estimating process considers whether the expected savings can offset the cost of the additional design work. cost estimates are generally expressed in units of ___(70)___ to facilitate comparisons both within and across projects. the ___(71)___ describes important information about project requirement that is considered during cost estimating. (69) A.accuracy B.approximation C.specification D.summary (70) A.activity B.work C.currency D.time (71) A.project scope statement B.statement of work C.project management plan D.project policy ● The ___(72)___ technique involves using project characteristics in a mathematical model to predict total project cost. Models can be simple or complex. (72) A.cost aggregation B.reserve analysis C.parametric estimating D.funding limit reconciliation ● ___(73)___ is a measurable, verifiable work product such as specification. feasibility study report, detail document, or working prototype (73) A.milestone B.deliverable C.etc D.BAC olved in the project, or whose ● ___(74)___ are individuals and organizations that are actively invinterests may be affected as a result of project execution or project completion; they may also exert influence over the project and its results. (74) A.controls B.baselines C.project stakeholders D.project managers ● ___(75)___ is the process of obtaining the stakeholders' formal acceptance of the completed project scope .verifying the scope includes reviewing deliverables and work results to ensure that all were completed satisfactorily. (75) A.project acceptance B.scope verification C.scope definition D.WBS Creation 信息系统项目管理师2005年下半年● __(66)__ means that every project has a definite beginning and a definite end. (66)A.Project phase B.Unique C.Temporary D.Closure ● The __(67)__ defines the phases that connect the beginning of a project to its end.  (67)A.schedule B.project life cycle C.temporary estone ● __(68)__ are individuals and organizations that are actively involved in the project, or whose interests may be affected as a result of project execution or project completion.  (68) A.Project managers B.Project team members C.SponsorsD.Project stakeholders  in ● The __(69)__ Process Group consists of the processes used to complete the work definedthe project management plan to accomplish the project's requirements.  (69)A.Planning B.Executing C.Monitoring and Controlling D.Closing ● The __(70)__ provides the project manager with the authority to apply organizational resources to project activities.  (70) A.project management plan B.contract  C.project human resource plan D.project charter ● The __(71)__ describes, in detail, the project's deliverables and the work required to create those deliverables.  (71) A.project scope statement B.project requirement  C.project charter D.product specification ● The process of __(72)__ schedule activity durations uses information on schedule activity scope of work, required resource types, estimated resource quantities, and resource calendars with resource availabilities.  (72)A.estimating B.defining C.planning D.sequencing ● PDM includes four types of dependencies or precedence relationships: ... __(73)__. The completion of the successor activity depends upon the initiation of the predecessor activity. (73) A.Finish-to-Start B.Finish-to-Finish C.Start-to-Start D.Start-to-Finish C.Start-to-Start ● __(74)__ is the budgeted amount for the work actually completed on the schedule activity or WBS component during a giving time period. (74)A.Planned value B.Earned value C.Actual cost D.Cost variance ● __(75)__ involves comparing actual or planned project practices to those of other projects to generate ideas for improvement and to provide a basis by which to measure performance. These other projects can be within the performing organization or outside of it, and can be within the same or in another application area. (75)A.Metrics B.Measurement C.Benchmarking D.Baseline 信息系统项目管理师2006年下半年● (66) from one phas e are usually reviewed for completeness and accuracy and approved before work starts on the next phase. (66)A.Process estone C.Work D .Deliverables ● Organizations perform work to achieve a set of objectives objectives. . Generally, work can be categorized as either projects or operations, although the two sometimes are (67) . (67)A.confused B.same C.overlap D.dissever ● In the project management context, (68) includes characteristics of unification, consolidation, articulation, and integrative actions that are crucial to project completion, successfully meeting customer and other other stakeholder stakeholder requirements, and managing expectations. (68)A.integration B.scope C.process D.charter ● Project (69) Management includes the processes required to ensure that the project includes all the work required, and only the work required, to complete the project successfully. (69)A.Integration B.Scope C.Configuration D.Requirement ● ● On On On some some some projects, projects, projects, especially especially especially ones ones ones of of of smaller smaller smaller scope, scope, scope, activity activity activity sequencing, sequencing, sequencing, activity activity resource estimating, activity duration estimating, and (70) are so so tightly tightly linked that they are viewed as a single process that can be performed performed by by a person over a relatively short period of time. (70)A.time estimating B.cost estimating C.project planning D.schedule development● In approximating costs, the estimator considers the po possible ssible causes of of variation variation of the cost estimates, including (71) 。

信息系统项目管理师专业英语汇编

信息系统项目管理师专业英语汇编

1、活动Activity2、活动定义Activity Definition3、活动描述/说明AD=Activity Description4、活动历时估算Activity Duration Estimating5、箭线网络图(双代号网络图)AOA=Activity-On-Arrow6、节点式网络图(单代号网络图)AON=Activity-on-Node7、已执行工作实际成本ACWP=Actual Cost of Work Performed8、实际完成日期AF=Actual Finish Date9、实际开始日期AS=Actual Start Date10、行政收尾Administrative Closure11、箭线Arrow12、箭线图示法ADM=Arrow Diagramming Method13、逆推计算法Backward Pass14、横道图Bar Chart15、基准计划Baseline16、完工预算BAC=Budget At Completion17、概算Budget Estimate18、已执行预算成本BCWP=Budgeted Cost of Work Performed19、计划执行预算成本BCWS= Budgeted Cost of Scheduled20、日历单位Calendar Unit21、变更控制委员会CCB=Chang Control Board22、沟通规划Communications Planning23、并行工程Concurrent Engineering24、意外费用Contingencies25、意外准备金Contingency Allowance26、意外规划Contingency Planning27、意外储备Contingency Reserve28、合同Contrac t29、合同管理Contract Administration30、合同收尾Contract Close-out31、控制Control32、控制图Control Chart33、纠正措施Corrective Action34、费用预算Cost Budgeting35、费用控制Cost Control36、费用估算Cost Estimating37、质量成本Cost of Quality38、费用绩效指数CPI=Cost Performance Index39、费用偏差CV=Cost Variance40、赶工Crashing41、关键工序Critical Activity42、关键路线Critical Path43、关键路线法CPM=Critical Path Method44、当前完成日期Current Finish Date45、当前开始日期Current Start Date46、数据日期DD=Data Date47、交付物Deliverable48、依赖关系Dependency49、虚活动Dummy Activity50、延续时间DU=Duration51、延续时间压缩Duration Compression52、最早完工日期EF=Early Finish Date53、最早开始日期ES=Early Start Date54、挣值法EV=Earned Value55、挣值分析Earned Value Analysis56、人工量Effort57、估算概算Estimate58、在完成时的费用估算EAC=Estimate At Completion59、到完成时的估算ETC=Estimate To Complete60、单节点事件图Event-on-Node61、例外报告Exception Report62、完成日期Finish Date63、完成到完成关系FF=Finish-to-Finish64、完成到开始关系FS=Finish-to-Start65、时差机动时间浮动时间Float66、顺推计算法Forward Pass67、自由时差FF=Free Float68、职能经理Functional Manager69、职能组织Functional Organization70、甘特图Gantt Chart71、图解评审技术GERT=Graphical Evaluation and Review Technique72、集合工作Hammock73、悬摆Hanger74、信息分发Information Distribution75、立项Initiation76、成本/进度综合报告Integrated Cost/Schedule Reporting77、邀标IFB= Invitation for Bid78、关键事件进度计划Key Event Schedule79、滞后量Lag80、最晚完成日期LF=Late Finish Date81、最晚开始日期LS=Late Start Date82、提前量Lead83、全生命期成本估算Life-cycle Costing84、产品经理Line Manager85、逻辑图Logic Diagram86、逻辑关系Logical Relationship87、回路Loop88、管理储备量Management Reserve89、主进度计划Master Schedule90、矩阵型组织Matrix Organization91、里程碑Milestone92、里程碑进度计划Milestone Schedule93、现代项目管理MPM=Modern Project Management94、监控Monitoring95、蒙托卡罗分析Monte Carlo Analysis96、次关键工作Near-Critical Activity97、网络Network98、网络分析Network Analysis99、网络逻辑Network Logic100、网络路线Network Path101、节点Node102、组织分解结构OBS=Organizational Breakdown Structure 103、组织规划Organizational Planning104、整体变更控制Overall Change Control105、重叠Overlap106、参数估算法Parametric Estimating107、线路Path108、线路时差Path Float109、完成百分比PC=Percent Complete110、执行报告Performance Reporting111、执行机构Performing organization112、计划评审技术图PERT Chart113、计划的完成日期PF=Planned Finish Date114、计划的开始日期PS=Planned Start Date115、优先图示法PDM=Precedence Diagramming Method116、优先关系Precedence Relationship117、紧前工作Predecessor Activity118、采购规划Procurement Planning119、工程Program120、计划评审技术PERT=Program Evaluation and Review Technique 121、项目Project122、项目许可证Project Charter123、项目沟通管理Project Communication Management124、项目费用管理Project Cost Management125、项目人力资源管理Project Human Resource Management126、项目综合管理Project Integration Management127、项目生命周期Project Life Cycle128、项目管理PM=Project Management129、项目管理知识体系PMBOK=Project Management Body of Knowledge 130、项目管理软件Project Management Software131、项目管理团队Project Management Team132、项目经理PM=Project Manager133、项目网络图Project Network Diagram134、项目阶段Project Phase135、项目计划Project Plan136、项目计划开发Project Plan Development137、项目计划实施Project Plan Execution138、项目规划Project Planning139、项目采购管理Project Procurement Management140、项目质量管理Project Quality Management141、项目风险管理Project Risk Management142、项目进度计划Project Schedule143、项目范围管理Project Scope Management144、项目团队成员Project Team Member145、项目时间管理Project Time Management146、项目型组织Project Organization147、质量保证QA=Quality Assurance148、质量控制QC=Quality Control149、质量规划Quality Planning150、剩余持续时间RDU=Remaining Duration151、请求建议书RFP=Request for Proposal152、请求报价单RFQ=Request for Quotation153、储备量Reserve154、资源平衡Resource Leveling155、资源约束进度计划Resource-Limited Schedule156、资源规划Resource Planning157、责任分配矩阵RAM=Responsibility Assignment Matrix 158、责任图Responsibility Chart159、责任矩阵Responsibility Matrix160、保留金Retain age161、突发事件Risk Event162、风险识别Risk Identification163、风险应对控制Risk Response Control164、风险应对开发Risk Response Development165、S曲线S-Curve166、进度计划Schedule167、进度计划分析Schedule Analysis168、进度计划压缩Schedule Compression169、进度计划控制Schedule Control170、进度执行指数SPI=Schedule Performance Index171、进度偏差SV=Schedule Variance172、计划完成日期SF=Scheduled Finish Date 173、计划开始日期SS=Scheduled Start Date 174、范围Scope175、范围基准计划Scope Baseline176、范围变更Scope Change177、范围变更控制Scope Change Control 178、范围定义Scope Definition179、范围规划Scope Planning180、范围验证Scope Verification181、时差Slack182、询价Solicitation183、询价规划Solicitation184、工作人员招募Staff Acquisition185、项目相关者Stakeholder186、开始日期Start Date187、开始到完成关系Start-to-Finish188、开始到开始关系Start-to-Start189、工作说明SOW=Statement of Work 190、子网Subnet191、子网络Subnet Work192、后续工作Successor Activity193、目标完成日期TC=Target Completion Date 194、目标时度计划Target Schedule195、任务Task196、团队建设Team Development197、团队成员Team members198、时标网络图Time-Scaled Network Diagram 199、目标完成日期TF=Target Finish Date200、目标开始日期Ts=Target Start Date201、总时差TF=Total Float202、全面质量管理TQM=Total Quality Management203、权变措施Workaround204、工作分解结构WBS=Work Breakdown Structure 205、工作包Work Package。

信息系统项目管理师章节题目 高级英语题集锦

信息系统项目管理师章节题目 高级英语题集锦

2013年上试题71-命-技-N.ZJ.00.p000-9.00-(71) is the process of documenting, analyzing, tracing, prioritizing and agreeing on requirements and then controlling change and communicating to relevant stakeholders. It is a continuous process throughout a project.A. Integrated managementB. Configuration managementC. Scope managementD. Requirements management分析:(71)是一个过程,该过程用来对需求进行记录、分析、跟踪、优先级排序并确认、然后进行变更控制并与干系人联系。

它是一个贯穿于项目始终的连续过程。

A. 整体管理B. 配置管理C. 范围管理D. 需求管理参考答案:D试题72-命-技-N.ZJ.00.p000-9.00-(72) is a collection of data sets, which is so large and complex that it becomes difficult to process using on-hand database management tools or traditional data processing applications.A. Big dataB. ClusterC. Parallel computingD. Data warehouse分析:(72)是一个数据集合,它是如此庞大和复杂,使得很难使用一般的数据库管理工具或传统的数据处理应用程序中对它进行处理。

A. 大数据B. 集群C. 并行计算D. 数据仓库参考答案:A试题73-命-技-N.ZJ.00.p000-9.00-In requirements engineering, requirements elicitation is the practice of collecting the requirements of a system from users, customers and other stakeholders. In the following practices, (73) is rarely used in requirements elicitation.A. brain stormingB. interviewC. questionnaireD. Monte Carlo analysis分析:在需求工程中,需求获取是从用户、客户和其他干系人中选择系统需求的过程。

2022年上半年《信息系统项目管理师》真题_8

2022年上半年《信息系统项目管理师》真题_8

2022年上半年《信息系统项目管理师》真题2022年上半年《信息系统项目管理师》真题单选题(共71题,共71分)1.In requirements engineering,requirements elicitation is the practice of collecting the requirements of a system from users,customers and other stakeholders,In the following practices. ()is rarely used in requirements elicitation.A.brain stormingB.interviewC.questionnaireD.Monte Carlo analysis2.Software configuration management(SCM)is the task of tracking and controlling changes in the software. Configuration management practices include configuration identification,change control, ()and configuration audit.estones markingB.status reportingC.stakeholder managementD.quality audit3.()is the process of documenting. Analyzing,tracing,prioritizing and agreeing on requirements and then controlling change andcommunicating to relevant stakeholders. It is a continuous process throughout a project.A.Integrated managementB.Configuration managementC.Scope managementD.Requirements management4.()的目的是提供关于软件产品及过程的可应用的规则、标准、指南、计划和流程的遵从性的独立评价。

信息系统项目管理师英语题

信息系统项目管理师英语题

信息系统项目管理师英语题-CAL-FENGHAI.-(YICAI)-Company One1信息系统项目管理师英语模拟题Sample Professional Responsibility exam questions1. While working on an external project your customer asks you to perform some additional tasks that are not included in the formal contract. You should:a. Honor the customer's request as sign of cooperation to ensure future business.b. Refuse the request and report the customer to your sponsorc. Acknowledge the request and advise the customer to submit a formal change requestd. Convene a meeting of the project team and rewrite the scope statement.2. You are managing an internal R&D project. The initial test results are very poor. You are afraid your management might cancel the project, and this could reflect poorly upon you. Verification testing could be done quickly and inexpensively. You should:a. Be the first to recommend canceling the projectb. Inform management about the results and wait for a responsec. Inform management immediately and recommend retesting for verificationd. Withhold the information from management until you perform additional tests to verify the initial results3. During an informal meeting with your project client you are offered a substantial monetary incentive to alter the configuration of the product to meet the client's personal need. This change may result in additional project costs and schedule delays. The appropriate action to take would be:a. Refrain from accepting the offer and advise the customer to submit a request to the change control board.b. Accept the offer and issue an internal configuration change request to the design groupc. Obtain additional information about the request and the customer's personal need before accepting the offer.d. Delay acceptance of the offer until you can ensure that you can protect yourself from any legal liabilities.4. As the project manager for a very large and highly visible project you receive a preliminary press release for your approval before distribution. You are expected to approve the release without comment. Your review identifies a major discrepancy regarding some key project financial estimates that may mislead the intended recipients. As the project manager it is your responsibility to:a. Inform the project sponsor of the discrepancy and refuse to approve the releaseb. Approve the release but send a memo to the sponsor advising that you are aware of the discrepancy and will refer any questions your receive to the sponsorc. Completely rewrite the press release and include the correct informationd. Approve the release as requested5. Your project is running out of cash and significant work remains. You are directed by senior management to instruct your people to use another project's charge numbers while working on your project. You should:a. Follow instructionsb. Inform the corporate auditorsc. Understand the background of management's instructions before taking any actiond. Shut down the project, if possible6. While reviewing the estimates from the functional managers assigned to your project you discover that one cost estimate is clearly higher than those submitted for previous projects. You should:a. Reject the estimate and remove the functional manager from the projectb. Request the supporting details for the estimate to ensure it has been properly prepared.c. Accept the estimate and plan to use the additional funding as a reserve.d. Question each functional manager for information about this estimate.7. You are working in a country where it is customary to exchange gifts between contractor and customer. Your company code of conduct clearly states that you cannot accept gifts from any client. Failure to accept the gift from this client may result in termination of the contract. The action to take in this case would be:a. Provide the customer with a copy of your company code of conduct and refuse the gifts.b. Exchange gifts with the customer and keep the exchange confidentialc. Contact your project sponsor and /or your legal or public relations group for assistance.d. Ask the project sponsor or project executive to exchange gifts.8. During your assignment as project manager you add a new member to your project team. This new team member was recently hired from a competitor and offers to share a substantial amount of proprietary information from his previous company. This information could put you and your team in a very strong position for future business. You are aware of a non compete clause in the new hire's condition of employment. You should:a. Accept the information and agree to keep it confidential between you and the new hire.b. Review the condition of employment with the new hire and advise her to reconsider the offer.c. Review the information and only accept only what may have a direct impact on the project's financial status.d. Ignore the offer to share and move forward with the project9. You are asked to write a paper for your sponsor so that he/she can present it at a technical meeting. You are informed that his/her name will be the only name on the paper. You should:a. Follow instructionsb. Follow instructions but demand that your name also appearsc. Refuse to follow the instructionsd. Go over the head of your sponsor seeking advice10. An example of a conflict of interest would be:a. As a public official you make a decision about a contract award that will benefit you personallyb. You and a functional manager disagree with a task cost estimatec. Your sponsor decides to cancel your project because it no longer supports the company strategyd. Your personality conflicts with that of a key member of your project team.11. Each of the following describes the use of an ethical approach except:a. Attempting to understand the religious and cultural sensitivities of the country in which you have been assigned.b. Ensuring that personal interest does not interfere with your decision making process.c. Accepting gifts in exchange for favoring one contractor over anotherd. Maintaining confidentiality of sensitive information obtained during the project life cycle.12. To maintain the customer's schedule, massive overtime will be required between Christmas and New Years. Many of your team members have put in for vacation during this time. You should:a. Let the schedule slip and inform the customerb. First give the employees the choice of working overtimec. Make the employees cancel their vacation plans and work overtimed. Hire temporary employees for the overtime13. Which of the following situations describes a violation of the PMPProfessional Code of Conducta. Accepting a gift that is within the customary guidelines of the country or province you are currently working in.b. Use of confidential information to advance your position or influence a critical decision.c. Complying with laws and regulations of the state or province in which project management services are providedd. Disclosing information to a customer about a situation that may have an appearance of impropriety.14. In order to balance the needs of the many stakeholders involved in your project the most desirable method to achieve resolution of conflicts would be:a. Compromiseb. Forcingc. Controllingd. Confrontation15. You receive a contract to perform testing for an external client. After contract award, the customer provides you with the test matrix to use for your 16 tests. The vice president for engineering says that the customer's test matrix is wrong, and she will use a different test matrix, which should give better results. This is a violation to the SOW. Suppose your sponsor is also the vice president for engineering. You should:a. Use the customer's test matrixb. Use the engineering test matrix without telling the customerc. Use the engineering test matrix and inform the customerd. Tell your sponsor that you want to set up a meeting with the customer to resolve the conflict16. In order for the project manager to fully and effectively understand a stake holder's personal concerns or grievances it may necessary to:a. Ask for a written description of the problem and submit it through the project officeb. Schedule a project review session with the entire project teamc. Attempt to empathize with the stakeholderd. Involve the project sponsor as an arbitrator17. As the leader of a project team, the project manager may be required to assess the competencies of his or her team members. Occasionally, some weaknesses or areas for improvement will be identified. The project manager should:a. Remove any team members who have demonstrated weaknesses in critical knowledge areasb. Communicate those weaknesses and establish a performance improvement programc. Hire additional resources to compensate for weak areasd. Wait for the team members to fail in an assignment to justify termination.18. You have just changed jobs and discovered that your new employer routinely violatesOSHA/EPA and affirmative action requirements on projects. You should:a. Do nothing; it's not your problemb. Start by asking management if they are aware that regulations are being violatedc. Talk to the corporate legal departmentd. Inform the appropriate government agencies about the violations19. The project manager must be an effective communicator to ensure that project stakeholders receive and understand project related information and status. Prior to delivering information to the stakeholders the project manager should attempt to:a. Research and understand the region of experience of the stakeholder before transmitting informationb. Identify only those stakeholders that have a the same background experience as the project managerc. Filter the information to remove any detailsd. Restrict information to specific technical details20. As part of your project plan you must develop an effective method of communication for your multinational team of stakeholders. You have several choices of media available. The appropriate action to take in the development of the communication plans would be to:a. Discuss the available options with the stakeholders and obtain their inputb. Use the standard media that has been in effect for your previous projectsc. Use multiple forms of media to ensure that everyone receives the informationd. Obtain additional funding from the project sponsor and develop a project specific communications infrastructure.21. One of your employees is up for promotion. If the promotion is granted, the employee will be reassigned elsewhere causing a problem for you on your project. You can delay the promotion until your project is completed. You should:a. Support the promotion but work with the employee and the employee's new management to develop a good transition planb. Ask the employee to refuse the promotion until your project is completed.c. Arrange to delay the promotion until the project is completedd. Tell the employee that it is his responsibility to find a suitable replacement so that the project will not suffer.22. The integrity of the project manager is often challenged by stakeholders who attempt to use personal power or influence to change the scope of an agreed upon deliverable. In these situations the project manager's most appropriate response would be:a. Refer the stakeholder to the process for change documented in the approved contract.b. Agree to the change because customer satisfaction is the goal regardless of cost.c. Contact the legal department and suspend all further project workd. Determine the risks and rewards for implementing the change before taking any action.23. During project implementation the client interprets a clause in the contract to mean the he is entitled to a substantial refund for work recently completed. You review the clause and disagree with the client's conclusion. As the project manager which of the following actions should be takena. Disregard the customer's conclusion and continue to process invoicesb. Document the dispute and refer to the provisions of the contract that address interpretations and disputesc. Advise the customer that ambiguous information in contracts is always interpreted in favor ofthe contractord. Immediately correct the clause to remove any possible misinterpretation by the customer24. Your executives, in appreciation for the success of your project, have given you a $10,000 bonus to be disbursed among your five-team members. One of the five, who is a substandard worker and accomplished very little on your project, is in your car pool. You should:a. Provide everyone with an equal shareb. Provide everyone a share based upon their performancec. Ask the workers to decide among themselves how the bonus should be subdividedd. Ask the sponsor to make the decision25. Before reporting a perceived violation of an established rule or policy the project manager shoulda. Determine the risks associated with the violationb. Ensure there is a reasonably clear and factual basis for reporting the violationc. Ignore the violation until it actually affects the project resultsd. Convene a committee to review the violation and determine the appropriate response26. Project Managers can contribute to their organization's knowledge base and to the profession of project management most effectively by:a. Developing and implementing a project review and lessons learned processb. Establishing strict guidelines for protecting intellectual propertyc. Promote the use of ad hoc project managementd. Ensuring that all project plans are developed before the project team is formed27. You have been assigned two concurrent projects. Because of the nature of the projects, you have a conflict of interest. You should:a. Do the best you can and tell no oneb. Ask to be removed from one of the projectsc. Ask to be removed from both of the projectsd. Inform your sponsor and ask for his advice28. You receive a contract to perform testing for an external client. After contract award, the customer provides you with the test matrix to use for your 16 tests. The vice president for engineering says that the customer's test matrix is wrong, and she will use a different test matrix, which should give better results. This is a violation to the SOW. You should:a. Use the customer's test matrixb. Use the engineering test matrix without telling the customerc. Use the engineering test matrix and discuss the reasons with the customerd. Ask your sponsor for clarification, assuming that the vice president is not your sponsor29. An effective method for improving an organization's project management knowledge base is through:a. Coaching and mentoringb. Referent powerc. A weak Matrix organizational structured. Fast TrackingAnswer Key1=c 2=d 3=a 4=a 5=c 6=b 7=c 8=b 9=b 10=a 11=c12=b 13=b 14=d 15=d 16=c 17=b 18=b 19=a 20=a 21=a 22=a23=b 24=c 25=b 26=a 27=d 28=d 29=aDisclaimer: These questions are intended for study purposes only. Success on these questions is not indicative of success on the Project Management Professional Certification Examination. This download of the Sample Exam Questions is for your personal use and NOT FOR commercial use. Any unauthorized use or duplication of this document is prohibited!1. A narrative description of products or services to be supplied under contract is called:a. The project plan. B. A statement of work.C. An exception report.D. A Pareto analysis.2. An example of scope verification is:a. Reviewing the performance of an installed software module.B. Managing changes to the project schedule.C. Decomposing the WBS to a work package level.D. Performing a benefit/cost analysis to determine if we should proceed with the pro3. Which of the following is not an example of a source of scope change?A. A variation in government regulations.B. Failure to include a required feature in the design of a telecommunication system.C. A need to engage in bottom-up cost estimating.D. Introducing technology that was not available when scope was originally defined.4. The subdivision of major project deliverables, as identified in the scope statement, into smaller, more manageable components is called:a. Parametric estimation .B. Scope definition.C. Feasibility analysis.D. Benefit-cost analysis.5. The process of establishing clear and achievable objectives, measuring their achievement, and adjusting performance in accordance with the results of the measurement is called:a. Strategic planning. B. Alternative objectives inventory.C. Management by objectives.D. Contingency planning.6. Configuration management is:a. Used to ensure that the description of the project product is correct and complete.B. The creation of the work breakdown structure.C. The set of procedures developed to assure that project design criteria are met.D. A mechanism to track budget and schedule variances.7. A fundamental tenet of modern quality management holds that quality is most likely to be achieved by:a. Planning it into the project. B. Developing careful mechanisms to inspect for quality.C. Striving to do the best job possible.D. Conducting quality circle activities.8. Your most recent project status report contains the following information: BCWP = 3,000, ACWP = 3,500, and BCWS = 4,000. The schedule variance is:a. + 1,000. B. + 500. C. - 500. D. - 1,000.9. Learning curve theory emphasizes that in producing many goods:a. Cost decreases as production rates increase.B. Average unit cost decreases as more units are produced.C. Materials become cheaper when they are purchased in bulk.D. Laborers become more productive because of technological advances.10. Rearranging resources so that constant resource levels are maintained is called:a. Floating. B. Leveling. C. Restructuring. D. Crashing.11. The _________ is a time-phased budget that will be used to measure and monitor cost performance in the project.A. Work breakdown structure b. Project schedule c. Cost baselined. Cost budget12. To transfer most of the cost risk to the contractor, the client may use a ___________ contract.A. Cost plus award b. Cost plus incentive fee c. Cost plus fixed fee d. Fixed price13. An appropriate sequence for risk management activities is:a. Risk identification, risk quantification, and risk response development and control.B. Risk identification, risk assessment, and risk planning.C. Risk identification, risk mitigation, and risk management.D. Risk identification, risk elimination, and risk mitigation.14. Theory X holds that:a. Quality improvements lie in the hands of quality circles.B. Profits are tied to meeting schedule deadlines.C. Absenteeism is tied to poor working conditions.D. Workers are inherently unmotivated and need strong guidance.15. All of the following are characteristics of parametric estimating except:a. Historical information. B. Quantifiable. C. Scalable. D. Activity lists.16. Inputs to cost budgeting include all of the following except:a. Cost baselineb. Cost estimatec. Work breakdown structured. Project schedule17. Inputs used during scope planning include all of the following except:a. Constraints. B. Project charter. C. Budget/cost analysis. D. Product description.18. Cost control outputs include all of the following except:a. Estimate at completion. B. Budget updates.C. Revised cost estimates.D. Cost baseline.19. Risk identification outputs include the following except:a. Decision trees. B. Inputs to other processes.C. Risk symptoms.D. Potential risk events.20. Puts into overall change control include all of the following except:a. Project plan. B. Change requests. C. Change control system. D. Performance reports21. Activity duration estimate inputs include all of the following except:a. Resource requirements. B. Basis of estimates. C. Activity lists. D. Constraints.22. All of the following are contract types except:a. Unit-price. B. Make-or-buy. C. Cost reimbursable. D. Lump sum.23. Initiation inputs for a project include all of the following except:a. Product description. B. Strategic plan. C. Project charter. D.Selection criteria.24. Responses to risk threats include all of the following except:a. Avoidance. B. Acceptance. C. Mitigation. D. Rejection.25. The process of performance reporting includes all of the following except _____________.A. Status reporting.B. Progress reporting.C. Forecasting.D. Product analysis26. Constrained optimization methods of project selection include:a. Scoring models. B. Benefit-cost ratios. C. Multi-objective programming algorithms.D. Subjective analyses.27. Which of the following statements concerning contract type is correct?A. A fixed price contract contains the most risk for the buyer.B. Cost reimbursable contracts offer sellers the highest profit potential.C. Lump sum contracts offer sellers the greatest profit potential.D. Unit price contracts are illegal in many jurisdictions.28. A Work Breakdown Structure (WBS) numbering system should allow project staff to:a. Identify the level at which individual WBS elements are found.B. Identify configuration management milestones.C. Estimate the costs of WBS elements.D. Provide project justification.29. All of the following are true quality statements except:a. Quality improvement depends upon better definition and increased awareness of the requirements/specifications.B. Project quality management must address both management of the project and the product of the project.C. Recognition of key actions required of each team member is necessary to meet quality objectives.D. Computer-aided design systems can improve quality, but only at the expense of an increase in the cost of design.30. All of the following are examples of tools often used in cost estimating except:a. Parametric modeling. B. Analogous estimating.C. Bottom-up estimating.D. Activity duration estimates.31. At XYZ Inc., the hourly wage for semi-skilled workers is $14.00. The annual audit shows that fringe benefits cost 30% of basic wages, and that overhead costs are 60% of wages plus fringe benefits. What is the loaded” hourly wage for a semi-skilled worker at XYZ Inc.A. $27.14.B. $28.96.C. $30.03.D. $29.12.32. Of the following estimates, which most accurately reflect the actual cost of the project?A. Conceptual estimates.B. Order of magnitude estimates.C. Preliminary estimates.D. Bottom-up estimates.33. The most crucial time for project risk assessment is:a. When a problem surfaces. B. During the planning phase.C. During the close-out phase.D. After the project schedule has been published.34. When there is uncertainty associated with one or more aspects of the project, one of the first steps to take is to:a. Revise project plan. B. Conduct a risk-benefit analysis.C. Conduct a needs analysis.D. Increase the estimated cost of the project.35. Including a contingency reserve in the project budget is intended to:a. Reduce the probability of scope changes. B. Increase the probability of scope changes.C. Reduce the probability of a cost overrun.D. Increase the probability of a cost overrun.36. Given the information in the following table, what is the expected value from this risk event?Probability Resulta. -10,000. B. - 7,500. C. + 2,500. D. -7,000.37. A contractor is working on a fixed price contract that calls for a single, lump sum payment upon satisfactory completion of the contract. About halfway through the contract, the contractor project manager informs their contract administrator that financial problems are making it difficult for them to pay their employees and subcontractors. The contractor asks for a partial payment for work accomplished. Which of the following actions by the buyer is most likely to cause problems for the project?A. Starting partial payments for work accomplished.B. Making no payments because it would violate the conditions of the contract.C. Paying for work accomplished to date.D. Negotiating a change to the payment conditions in the contract.38. A precise description of a physical item, procedure, or service for implementation of an item or service is called :a. Work package. B. Baseline.C. Product description.D. Work breakdown structure (WBS) element.39. A project should be terminated for all of the following reasons except:a. Lack of team synergy. B. The project no longer meets the company's objectives.C. The resources are not available to complete project activities.D. Project funding has been significantly reduced.40. One common way to compute estimated at completion (EAC) is to take the project budgeted-at-completion and:a. Divide it by the schedule performance index. B. Multiply it by the schedule performance index.C. Multiply it by the cost performance.D. Divide it by the cost performance index.答案:1.B2.A3.C4.B5.C6.A7.A8.D9.B.10.B 11.C 12.D 13.A 14.D 15.D 16.A 17.C 18.D 19.A 20.C21.B 22.B 23.C 24.D 25.D 26.C 27.C 28.A 29.D 30.D 31.D 32.D 33.B 34.B 35.C 36.D 37.B 38.C 39.A 40.D。

管理信息系统(英文版第7版)题库chapter extension 15

管理信息系统(英文版第7版)题库chapter extension 15

Experiencing MIS, 7e (Kroenke)Chapter Extension 15 International MIS1) Which of the following statements is true of the international business scenario?A) After the dot-com bust, optical fiber was extremely scarce and expensive.B) After the fall of the Soviet Union, the economies of Russia and Western Europe closed their markets to the world.C) With the popularity of the Internet, the economies of North America and Europe became less integrated.D) With the popularity of the Internet, the Chinese economy became more open to the world. Answer: DAACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Describe the effects of e-commerce on the modern business world.Learning Obj: LO 27.1: How does the global economy affect organizations and processes? Classification: Concept2) How has the global economy changed the competitive environment?A) Suppliers are not required to reach a wide range of customers.B) Customers now have less access to information about substitutes.C) It has intensified rivalry by increasing product and vendor choices.D) It has made it easier for new market entrants in all fields to penetrate the market. Answer: CAACSB: Analytical ThinkingDifficulty: 2: ModerateCourse LO: Describe the effects of e-commerce on the modern business world.Learning Obj: LO 27.1: How does the global economy affect organizations and processes? Classification: Concept3) In the current age, global economy changes competitive strategies because it ________.A) enables unprecedented product differentiationB) makes communication between a company and its customer one-sidedC) reduces the risk that a company has to bearD) eliminates the need for localizing productsAnswer: AAACSB: Analytical ThinkingDifficulty: 2: ModerateCourse LO: Describe the effects of e-commerce on the modern business world.Learning Obj: LO 27.1: How does the global economy affect organizations and processes? Classification: Concept4) How does the global economy change value chains and business processes?A) World time differences enable global virtual companies to operate 24/7.B) Overseas outsourcing is no longer an attractive option.C) It makes it difficult for an international company to conduct sales and marketing efforts locally.D) It makes it mandatory for the manufacturing activities to be carried out from the home country.Answer: AAACSB: Diverse and Multicultural Work EnvironmentsDifficulty: 2: ModerateCourse LO: Describe the effects of e-commerce on the modern business world.Learning Obj: LO 27.1: How does the global economy affect organizations and processes? Classification: Concept5) With the fall of the Soviet Union, the economies of Russia and Eastern Europe became alienated from the rest of the world market.Answer: FALSEAACSB: Analytical ThinkingDifficulty: 1: EasyCourse LO: Explain how IS can be used to gain and sustain competitive advantage. Learning Obj: LO 27.1: How does the global economy affect organizations and processes? Classification: Concept6) The global economy has intensified rivalry by increasing product and vendor choices and by accelerating the flow of information about price, product, availability, and service.Answer: TRUEAACSB: Analytical ThinkingDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 27.1: How does the global economy affect organizations and processes? Classification: Concept7) The size of the world economy, combined with the Internet, limits product differentiation. Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can be used to gain and sustain competitive advantage. Learning Obj: LO 27.1: How does the global economy affect organizations and processes? Classification: Concept8) Due to information systems, any value chain activity can be performed from anywhere in the world.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can be used to gain and sustain competitive advantage.Learning Obj: LO 27.1: How does the global economy affect organizations and processes? Classification: Concept9) World time differences restrict global virtual companies from operating 24/7.Answer: FALSEAACSB: Analytical ThinkingDifficulty: 1: EasyCourse LO: Discuss the role of information systems in supporting business processes. Learning Obj: LO 27.1: How does the global economy affect organizations and processes? Classification: Concept10) How does the global economy change competitive strategy?Answer: The emerging global economy changes thinking about competitive strategies in two major ways. First, the sheer size and complexity of the global economy means that any organization that chooses a strategy allowing it to compete industry-wide is taking a very big risk. Competing in many different countries, with products localized to the language and culture of those countries, is an enormous and expensive task.The second major way today's world economy changes competitive strategies is that its size, combined with the Internet, enables unprecedented product differentiation.AACSB: Analytical ThinkingDifficulty: 2: ModerateCourse LO: Describe the effects of e-commerce on the modern business world.Learning Obj: LO 27.1: How does the global economy affect organizations and processes? Classification: Concept11) The emergence of ________ technologies has made it easier for companies all over the world to obtain the latest in server technology.A) international cloudB) big dataC) data miningD) distributed databaseAnswer: AAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Describe the effects of e-commerce on the modern business world.Learning Obj: LO 27.2: What are the characteristics of international IS components? Classification: Concept12) Joe's company has set up a new branch in a small town in Spain. He is working on translating Microsoft Outlook into Spanish to help the new recruits from the town learn how to use the program. Joe is involved in the process of ________.A) differentiatingB) stringingC) localizingD) optimizingAnswer: CAACSB: Reflective ThinkingDifficulty: 2: ModerateCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 27.2: What are the characteristics of international IS components? Classification: Application13) Which of the following statements is true about the issues to be addressed when localizing a computer program?A) When translating a user interface for a program, the entire user interface, except the icons, will need to be changed.B) Programming techniques can be used to simplify and reduce the cost of localization.C) Forms and reports should be localized in a manner that does not necessitate redesigning an entire document.D) The help text should always be maintained in English.Answer: BAACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 27.2: What are the characteristics of international IS components? Classification: Concept14) Which of the following statements is true of localizing?A) Translating documents is less expensive, but more time consuming than localizing computer programs.B) Localizing computer programs primarily involves translating documents from one language to another.C) Localization of computer programs should be planned from the beginning.D) Localizing computer programs is easier than translating documents.Answer: CAACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 27.2: What are the characteristics of international IS components? Classification: Concept15) Which of the following is an issue related to global databases?A) Data transmission speeds are often too slow to process data from a single geographic location.B) A single database increases data integrity problems.C) A single database is ideal for companies that use multiple languages.D) With a single database, it is not possible to have an integrated view of a customer or an organization's operations.Answer: AAACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 27.2: What are the characteristics of international IS components? Classification: Concept16) SPZ Imports, a multinational company, has offices located in five countries. Each office processes a single database that resides at each location. Which of the following types of databases does SPZ use?A) clustered databaseB) distributed databaseC) external databaseD) hypermedia databaseAnswer: BAACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 27.2: What are the characteristics of international IS components? Classification: Application17) PL Constructions Inc. uses the distributed database processing system in all its international locations. If the databases in all the locations contain copies of the same data, it can be said that PL Constructions uses a ________.A) mirrored databaseB) redundant databaseC) replicated databaseD) partitioned databaseAnswer: CAACSB: Reflective ThinkingDifficulty: 2: ModerateCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 27.2: What are the characteristics of international IS components? Classification: Application18) If a distributed database divides the database into nonoverlapping segments, it is called a(n) ________ database.A) mirroredB) replicatedC) independentD) partitionedAnswer: DAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 27.2: What are the characteristics of international IS components? Classification: Concept19) Which of the following is an advantage of functional systems?A) They facilitate the integration of data across various business functions.B) Two order-processing functional systems located in two different countries need not accommodate language and culture differences in a single system.C) They ensure that organizations do not suffer from islands of automation.D) They solve the problems of data isolation by integrating data into a database that provides a comprehensive and organization-wide view.Answer: BAACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Discuss the role of information systems in supporting business processes. Learning Obj: LO 27.2: What are the characteristics of international IS components? Classification: Concept20) Which of the following statements is true of inherent processes?A) Creating an accurate as-is international process management model is inexpensive and easy.B) Determining the criteria to be used for evaluating the alternative international processes takes little time.C) Each software product assumes that the software will be used by people filling particular roles and performing their actions in a certain way.D) It is likely that international business processes will be developed more like intra-department business processes.Answer: CAACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Discuss the role of information systems in supporting business processes. Learning Obj: LO 27.2: What are the characteristics of international IS components? Classification: Concept21) The human components, such as procedures and people, are affected by language and culture.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the role of information systems in supporting business processes. Learning Obj: LO 27.2: What are the characteristics of international IS components? Classification: Concept22) Information systems procedures, unlike business processes, need not reflect local cultural values and norms.Answer: FALSEAACSB: Diverse and Multicultural Work EnvironmentsDifficulty: 1: EasyCourse LO: Discuss the role of information systems in supporting business processes. Learning Obj: LO 27.2: What are the characteristics of international IS components? Classification: Concept23) To localize a computer program, all you need to do is hire a translator to convert it from one language to another.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 27.2: What are the characteristics of international IS components? Classification: Concept24) International companies that have a single database must declare a single language for the company.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 27.2: What are the characteristics of international IS components? Classification: Concept25) Cross-functional, integrated systems, such as Enterprise Resource Planning (ERP), add to the problems of data isolation.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 27.2: What are the characteristics of international IS components? Classification: Concept26) Differences in language, culture, norms, and expectations compound the difficulties of international process management.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 27.2: What are the characteristics of international IS components? Classification: Concept27) What are the issues that have to be addressed when localizing a computer program? Answer: The process of making a computer program work in a second language is called localizing.The following issues have to be addressed while localizing a computer program:a. The user interface, including menu bars and commands, has to be translated.b. The labels in forms, reports, and query prompts have to be translated and possibly redesigned.c. All documentation and help text have to be translated.d. All the diagrams and examples in the help text have to be redrawn and translated.e. All the error messages have to be translated.f. The text in all message boxes has to be translated.g. Sorting order for the different character sets has to be adjusted.h. Special problems in Asian character sets and in languages that read and write from right to left have to be fixed.AACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 27.2: What are the characteristics of international IS components? Classification: Concept28) What are the problems of inherent processes?Answer: Each software product assumes that the software will be used by people filling particular roles and performing their actions in a certain way. ERP vendors justify this standardization by saying that their procedures are based on industry-wide best practices and that the organization will benefit by following these standard processes. This statement may be true, but some inherent processes may conflict with cultural norms. If they do, it becomes difficult for the management to convince the employees in such cultures to follow those inherent processes. Differences in language, culture, norms, and expectations compound the difficulties of international process management. Just creating an accurate as-is model is difficult and expensive in itself; developing alternative international processes and evaluating them becomes incredibly challenging. With cultural differences, it becomes difficult to determine what criteria should be used for evaluating the alternatives and also for performing the evaluation. AACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 27.2: What are the characteristics of international IS components? Classification: Concept29) Which of the following was a consequence of Henry Ford's unprecedented move of increasing his workers' pay?A) The workers left Ford's company in search of better standards of living.B) The price of the automobiles increased dramatically.C) The demand for Ford's automobiles increased.D) Ford's company suffered a huge loss due to the increased expenses.Answer: CAACSB: Analytical ThinkingDifficulty: 2: ModerateCourse LO: Discuss the role of information systems in supporting business processes. Learning Obj: LO 27.3: How do inter-enterprise IS facilitate globalization? Classification: Concept30) Because of the ________ effect, a dollar spent will contribute two or three dollars of activity to the economy.A) distributionB) bullwhipC) butterflyD) acceleratorAnswer: DAACSB: Analytical ThinkingDifficulty: 1: EasyCourse LO: Discuss the role of information systems in supporting business processes. Learning Obj: LO 27.3: How do inter-enterprise IS facilitate globalization? Classification: Concept31) Information systems increase inventories.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the role of information systems in supporting business processes. Learning Obj: LO 27.3: How do inter-enterprise IS facilitate globalization? Classification: Concept32) Information systems are used to reduce or eliminate the bullwhip effect, hence, saving costs. Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 27.3: How do inter-enterprise IS facilitate globalization? Classification: Concept33) Information systems support just-in-time (JIT) inventory techniques.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 27.3: How do inter-enterprise IS facilitate globalization? Classification: Concept34) The accelerator effect can increase the demand for a product.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the role of information systems in supporting business processes. Learning Obj: LO 27.3: How do inter-enterprise IS facilitate globalization? Classification: Concept35) How do global information systems affect supply chain profitability?Answer: Global information systems increase supply chain profitability. Supply chain performance is driven by four factors: facilities, inventories, transportation, and information. Every one of these drivers is positively affected by global information systems. Because of global information systems, facilities can be located anywhere in the world.Information systems reduce inventories and hence save costs. They can be used to reduce or eliminate the bullwhip effect. They also support just-in-time (JIT) inventory techniques worldwide. Information systems allow businesses to choose the delivery option that optimizes the value they generate. Finally, global information systems produce comprehensive, accurate, and timely information.AACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 27.3: How do inter-enterprise IS facilitate globalization? Classification: Concept36) Operating information systems (IS) internationally can be problematic because of different physical environments.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the role of information systems in supporting business processes. Learning Obj: LO 27.4: What are the security challenges of international IS? Classification: Concept37) Which of the following is true of the challenges of international information systems (IS) management?A) Standardizing business processes is a good method to overcome the challenges posed by international IS management.B) Running hardware using the cloud in different countries poses a problem.C) The procedures for using a customer relationship management system remain the same irrespective of the country where it is used.D) The purpose and the scope of a system are determined in the requirement analysis stage of the software development life cycle.Answer: AAACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Discuss the role of information systems in supporting business processes. Learning Obj: LO 27.5: What are the challenges of international IS management? Classification: Concept38) The purpose and scope of a system are determined in the systems definition stage of the Systems Development Life Cycle (SDLC).Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the role of information systems in supporting business processes. Learning Obj: LO 27.5: What are the challenges of international IS management? Classification: Concept39) In the context of combatting the challenges of international information systems (IS) management, defining a set of standard business processes requires conversion of the organization to different work processes.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the role of information systems in supporting business processes. Learning Obj: LO 27.5: What are the challenges of international IS management? Classification: Concept40) The development rate of international information systems varies among countries and cultures.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the role of information systems in supporting business processes. Learning Obj: LO 27.5: What are the challenges of international IS management? Classification: Concept41) What are the challenges of international information systems (IS) management?Answer: Managing a global information systems development project is difficult because of project size and complexity.Project integration is difficult because international development projects require the complex integration of results from distributed workgroups. Also, task dependencies can span teams working in different countries, increasing the difficulty of task management.Time management becomes difficult because teams in different cultures and countries work at different rates. Some cultures have a 35-hour work week, and some have a 60-hour work week. Some cultures expect 6-week vacations, and some expect 2 weeks. Some cultures thrive on efficiency of labor, and others thrive on considerate working relationships. Thus, there is no standard rate of development for an international project.In terms of cost, different countries and cultures pay vastly different labor rates. Using critical path analysis, managers may choose to move a task from one team to another. Doing so, however, may substantially increase costs. Thus, management may choose to accept a delay rather than move work to an available but more expensive team. The complex trade-offs that exist between time and cost become even more complex for international projects.Quality and human resources are also more complicated for international projects. Quality standards vary among countries. Thus, the integration of programs of varying quality results in an inconsistent system.Worker expectations vary among cultures and nations. Compensation, rewards, and worker conditions vary, and these differences can lead to misunderstandings, poor morale, and project delays.Because of these factors, effective team communication is exceedingly important for international projects, but because of language and culture differences and geographic separation, such communication is difficult. Effective communication is also more expensive.Finally, project procurement is complicated by the normal challenges of international commerce. AACSB: Information TechnologyDifficulty: 3: ChallengingCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 27.5: What are the challenges of international IS management? Classification: Concept。

管理信息系统(英文版第7版)题库chapter extension 17

管理信息系统(英文版第7版)题库chapter extension 17

Experiencing MIS, 7e (Kroenke)Chapter Extension 17 Agile Development1) According to the systems development life cycle (SDLC), the linear progress from requirements to design to implementation is called the ________ method.A) life cycleB) waterfallC) water cycleD) scrumAnswer: BAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.1: Why is the SDLC losing credibility?Classification: Concept2) Why is the systems development life cycle (SDLC) called the waterfall method?A) It does not return to a development phase that has been completed.B) It uses feedback from team members to schedule tasks.C) It delivers a working version of the product at frequent intervals.D) It can be used only for projects on information systems.Answer: AAACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.1: Why is the SDLC losing credibility?Classification: Concept3) The systems development life cycle (SDLC) gained popularity because it was stipulated that it would be used for all software development contracts by the U.S. Department of ________.A) DefenseB) EducationC) AgricultureD) CommerceAnswer: AAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.1: Why is the SDLC losing credibility?Classification: Concept4) Which of the following statements indicates why the SDLC is falling out of favor?A) The system design is revised frequently.B) It allows the team members to establish the project schedule.C) It is risky, as no value is generated until the end of the project.D) Systems requirements do not change during a project.Answer: CAACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.1: Why is the SDLC losing credibility?Classification: Concept5) The nature of the systems development life cycle (SDLC) denies the fact that system requirements are fuzzy and always changing.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.1: Why is the SDLC losing credibility?Classification: Concept6) According to the systems development life cycle (SDLC), the progress from requirements to implementation is nonlinear.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.1: Why is the SDLC losing credibility?Classification: Concept7) The systems development life cycle (SDLC) gained popularity when the U.S. Department of Commerce stipulated that it would be used for all software development contracts.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.1: Why is the SDLC losing credibility?Classification: Concept8) In software development, where requirements change periodically, the waterfall model works well.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.1: Why is the SDLC losing credibility?Classification: Concept9) The waterfall model used by the systems development life cycle (SDLC) is suitable for building physical things, such as a runway.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.1: Why is the SDLC losing credibility?Classification: Concept10) The systems development life cycle (SDLC) is falling out of favor because it is very risky. Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.1: Why is the SDLC losing credibility?Classification: Concept11) Why is the systems development life cycle (SDLC) losing credibility?Answer: The systems development life cycle (SDLC) process is falling out of favor in the systems development community, primarily for two reasons. First, the nature of the SDLC denies what every experienced developer knows is true: systems requirements are fuzzy and always changing. They change because they need to be corrected, or more is known, or users, once they see a part of the application, change their minds. Other reasons are that business needs change, or technology offers other possibilities. According to the SDLC, however, progress goes in a linear sequence from requirements to design to implementation. Sometimes this is called the waterfall method because the assumption is that once a phase is finished, it is not revisited. Requirements are done. Then design is taken up. Design is completed, and is followed by implementation. However, experience has shown that it just doesn't work that way.The second reason that the SDLC is falling out of favor is that it is very risky. The people for whom the system is being constructed cannot see what they have until the end. At that point, if something is wrong, all the money and time has already been spent. Furthermore, what if the project runs out of money or time before it is completed? The result is a form of management blackmail in which the developers ask for more money or time. If management declines, which it might because the time or money at that point is sunk, they are left not only with the loss but also with the unmet need that caused them to start the process in the first place.AACSB: Information TechnologyDifficulty: 3: ChallengingCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.1: Why is the SDLC losing credibility?Classification: Concept12) The systems development life cycle (SDLC) generates values ________.A) in the beginningB) after the design phaseC) at frequent intervalsD) at the very endAnswer: DAACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.2: What are the principles of agile development methodologies? Classification: Concept13) Designing only the portions of the system that are needed to complete the current work being done is known as ________ design.A) waterfallB) scrumC) just-in-timeD) frequentAnswer: CAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.2: What are the principles of agile development methodologies? Classification: Concept14) Which of the following is an advantage of using agile techniques over the SDLC?A) In projects using agile techniques, customers test only the completed version of the product.B) Changes in systems requirements are incorporated toward the end of the project.C) System design is completed at the beginning of the project.D) A working version of the product is delivered frequently during the project.Answer: DAACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.2: What are the principles of agile development methodologies? Classification: Concept15) "Test as you go" is a principle of the SDLC.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.2: What are the principles of agile development methodologies? Classification: Concept16) Extreme programming is one of the alternatives to the systems development life cycle (SDLC).Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.2: What are the principles of agile development methodologies? Classification: Concept17) Agile development methodologies welcome changes in requirements.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.2: What are the principles of agile development methodologies? Classification: Concept18) The systems development life cycle (SDLC) processes are designed to frequently deliver a working version of a product.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.2: What are the principles of agile development methodologies? Classification: Concept19) Unlike agile techniques, the systems development life cycle (SDLC) delivers benefits early and often.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.2: What are the principles of agile development methodologies? Classification: Concept20) Agile development methodologies advocate the design of the complete system at the beginning.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.2: What are the principles of agile development methodologies? Classification: Concept21) Agile development methodologies discourage interaction between developers and customers. Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.2: What are the principles of agile development methodologies? Classification: Concept22) Just-in-time design may lead to substantial revision of the work product produced previously in the project.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.2: What are the principles of agile development methodologies? Classification: Concept23) According to agile development methodologies, testing never involves business customers. Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.2: What are the principles of agile development methodologies? Classification: Concept24) Agile development techniques assume that the development teams are unaware of their weaknesses.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.2: What are the principles of agile development methodologies? Classification: Concept25) Agile development methodologies are applicable only to team projects on information systems.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.2: What are the principles of agile development methodologies? Classification: Concept26) What are the principles of agile development methodologies?Answer: The following are the principles of agile development:• Expect, even welcome, changes in requirements• Frequently deliver working versio n of the product• Work closely with customer for the duration• Design as you go• Test as you go• Team knows best how it's doing/how to change• Can be used for applications, information systems, and business process development AACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.2: What are the principles of agile development methodologies? Classification: Concept27) Which of the following development methodologies is associated with the scrum process?A) agile developmentB) systems development life cycleC) V-ModelD) rapid application developmentAnswer: AAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.3: What is the scrum process?Classification: Concept28) According to scrum essentials, the first step of each work period is to ________.A) conduct team meetsB) determine tasks to performC) select requirements to considerD) deliver a working versionAnswer: CAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.3: What is the scrum process?Classification: Concept29) Which of the following is true of paired programming?A) Two team members get together and write two separate programs.B) Two members share the same computer and write a program together.C) A team member writes two programs.D) A team member and the customer pair up to write a program.Answer: BAACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.3: What is the scrum process?Classification: Concept30) Diana and her team are working on developing a software to manage accounting processes for a firm. Her team is following the scrum methodology, and Diana is the only person who has the authority to make changes in the requirements and priority of the project. This makes Diana the ________ of the team.A) scrum masterB) product ownerC) database designerD) business analystAnswer: BAACSB: Reflective ThinkingDifficulty: 2: ModerateCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.3: What is the scrum process?Classification: Application31) The function of a scrum master is to ________.A) stop the misuse of meeting timeB) change product requirements and their priorityC) test programs on a regular basisD) develop the database designAnswer: AAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.3: What is the scrum process?Classification: Concept32) Scrum essentials encourage minimal documentation.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.3: What is the scrum process?Classification: Concept33) In the scrum process, a stand-up is a 15-minute team meeting.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.3: What is the scrum process?Classification: Concept34) In paired programming, two computers are used by the same programmer.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.3: What is the scrum process?Classification: Concept35) Briefly outline the scrum essentials.Answer: The following are the scrum essentials:• Requirements list drives process• Each work period (1 to 4−8 weeks):Select requirements to considerDetermine tasks to perform—select requirements to deliverTeam meets daily for 15 min (stand-up)∘ What I did yesterday∘ What I'm going to do today∘ What's blocking meTest frequentlyPaired work possibleMinimal documentationDeliver (something) that worksEvaluate team's work process at end of period (and say thanks)• Rinse and repeat until:Customer says we're doneOut of timeOut of money• Three principal roles:Product Owner (business professional)Scrum MasterTeam Members (7 ± 2 people)AACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.3: What is the scrum process?Classification: Concept36) According to the scrum essentials, when is a project said to be done?Answer: Work continues in a repeating cycle of scrum periods until one of three conditions is met:• The customer is satisfied with the product created and decides to accept the work product, even if some requirements are left unsatisfied.• The project runs out of time.• The project runs out of money.AACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.3: What is the scrum process?Classification: Concept37) In a scrum, who is a product owner?Answer: The product owner is the business professional who provides the requirements and is available for clarification and testing. The product owner is the only person on a scrum team who has the authority to add, delete, or change requirements and their priority.AACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.3: What is the scrum process?Classification: Concept38) In a scrum, who is a scrum master? What are his or her responsibilities?Answer: A scrum master is an expert in scrum processes who helps to keep the process organized and operating. The scrum master is not the boss; he or she is more like a coach or even a referee. The scrum master steps in when meetings go too long, when team members are misusing meeting time, when the product sponsor isn't doing his or her job, and when other situations are not working. The scrum master is also the guardian of team members' time. If distractions occur, the scrum master steps in to eliminate them. If someone other than the product sponsor attempts to change requirements or priorities, the scrum master negates that attempt. AACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.3: What is the scrum process?Classification: Concept39) Who are considered scrum team members?Answer: Team members are the programmers, systems analysts, business analysts, database designers, cloud engineers, PQA testing personnel, and any other staff needed to build the work product. Scrum teams are small; five to nine team members are recommended. If work requires more personnel, then the work is reorganized to be accomplished by multiple scrum teams working in parallel. It's not clear that scrum works well for exceedingly large projects, but then again, it's not clear that any other development process works well for them, either. AACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.3: What is the scrum process?Classification: Concept40) Which of the following statements is true about the points system?A) Points are assigned by the clients at the beginning of the project.B) The most difficult task is assigned a point score of 1.C) Consecutive integers are used to award point scores to tasks.D) Points estimate the relative difficulty, rather than the relative duration of tasks.Answer: DAACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.4: How do requirements drive the scrum process?Classification: Concept41) A team uses its ________ to determine how many requirements it can commit to accomplishing in the next scrum period.A) velocityB) capacityC) momentumD) vectorAnswer: AAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.4: How do requirements drive the scrum process?Classification: Concept42) Which of the following statements is true about velocity?A) The customer sets the velocity of each scrum period.B) When a project begins, the senior team members guess the velocity of the team.C) After a scrum team commits to requirements in a scrum period, it estimates the velocity it can achieve.D) A team approaches the scrum master to change the order of the requirements to which it has committed.Answer: BAACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.4: How do requirements drive the scrum process?Classification: Concept43) Which of the following is a characteristic that makes agile development a valid systems development process?A) Team iteration and feedback are used for scheduling and tasking.B) Process scheduling is performed by the scrum master.C) Through iteration, team members decide when a project is complete.D) Once a phase of development is completed, it is not revisited.Answer: AAACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.4: How do requirements drive the scrum process?Classification: Concept44) Scrum is distinguished from other agile development methodologies, in part, by the way that it uses requirements to drive planning and scheduling.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss the key issues involved in managing the components of IT infrastructure. Learning Obj: LO 29.4: How do requirements drive the scrum process?Classification: Concept。

2023年上半年软考高级信息系统项目管理师《综合知识》英语真题及答案

2023年上半年软考高级信息系统项目管理师《综合知识》英语真题及答案

2023年上半年软考高级信息系统项目管理师《综合知识》英语真题及答案(71-75题)71.When performing projec activity duration estimates,()is not included in the estimation techniques.A.Three-point EstimatingB.Analogous EstimatingC.Parametric EstimatingD.Checklist Estimating【参考答案】D72.Self-driving technologies are important for the research and development in the field of ()。

A.Cloud ComputingB.Digital FinanceC.Artificial IntelligenceD.Intelligent Manufacturing【参考答案】C73.To build a modern logistics system,we should work on the()of its infrastructure,including railways and ports,and promote the integration of cources in the sector.A.digital transformationB.new generation of communication technologyC.block-chain technologyD.VR and AR【参考答案】A74.Information security emphasizes the security attributes of information(data)itself.()is not included in the security attributes.A.ConfidentialityB.ConsistencyC.InterityD.Availability【参考答案】B75.()is enforced in 2021。

信息系统项目管理师-专业英语

信息系统项目管理师-专业英语

信息系统项目管理师-专业英语(总分:47.00,做题时间:90分钟)一、(总题数:31,分数:47.00)(1) is a method of constructing a project schedule network diagram that uses boxes or rectangles, referred to as nodes, to represent activites and connects them with arrows that arrow the dependencies.This method includes following types of dependcies orprecedence relationships:(2) the initiation of the successor activity, depends upon the completion of the predecessor activity.(3) the initiation of the successor activity, depends upon the initiation of the predecessor activity.(分数:3.00)A.PDM √B.CPMC.PERTD.AOA解析:A.F-S √B.F-FC.S-FD.S-S解析:A.F-SB.F-FC.S-FD.S-S √解析:[分析] PDM是以一种方块或矩形(或称为节点)来表示活动,并将它们用表示依存关系的箭线连接起来,以构建项目进度网络图的方法。

这种方法包括了下列依存或前导关系:完成-开始(F-S),后续活动的开始依赖于前置活动的完成。

开始-开始(S-S),后续活动的开始依赖于前置活动的启动。

Estimating schedule activity costs involves developing an (4) of the cost of the resources needed to complete each schedule activity. Cost estimating includes identifying and considering various costing alternatives. For example, in mostapplication areas, additional work during a design phase is widely held to have the potential for reducing the cost of the execution phase and product operations. The cost estimating process considers whether the expected savings can offset the cost of the additional design work. Cost estmates are generally expressed in units of (5) to facilitate comparisions both within and across projects. The (6) describes important information about project requirement that is considered during cost estimating.(分数:3.00)A.accuracyB.approxination √C.specificationD.summary解析:A.activityB.workC.currency √D.time解析:A.project scope statement √B.statement of workC.project management planD.project policy解析:[分析] 估算计划活动的成本涉及估算完成每项计划活动所需资源的近似成本。

下半年系统集成项目管理师英文真题、译文及答案

下半年系统集成项目管理师英文真题、译文及答案

Risk management allows the project manager and the project team not to(71).(71)most risks during the planning phase of the projectproject risksimpacts of various riskssuitable responses参考译文下面不属于风险管理中项目经理和项目团队职责的是(71)。

A.排除大部分项目执行中的风险B.风险识别C.风险分析D.妥善处理参考答案(71)AThe project life-cycle can be described as(72).(72)concept, project planning, project execution, and project close-out planning, work authorization, and project reportingplanning, project control, project definition, WBS development, and project termination concept, project execution, and project reporting参考译文关于项目周期划分正确的是(72)。

A.启动、计划、执行、收尾B.计划、授权、报告C.计划、控制、方案设计、WBS的发展、终止D.启动、执行、报告参考答案(72)A(73)is a method used in Critical Path Methodology for constructing a project schedule network diagram that uses boxes or rectangles, referred to as nodes, to represent activities and connects them with arrows that show the logical relationships that exist between them.(73)参考译文(73)用于关键路径法,是用于编制项目进度网络图的一种方法,它使用方框或者长方形(被称作节点)代表活动,它们之间用箭头连接,显示彼此之间存在的逻辑关系。

管理信息系统(英文版第7版)题库chapter extension 16

管理信息系统(英文版第7版)题库chapter extension 16

Experiencing MIS, 7e (Kroenke)Chapter Extension 16 Systems Development Project Management1) Which of the following is a characteristic of large-scale systems development projects?A) short development intervalsB) single development siteC) avoidance of system localizationD) 50-100 development team membersAnswer: DAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.1: Why is formalized project management necessary? Classification: Concept2) Which of the following statements is true of large-scale systems development projects?A) They use simple computer programs to ensure consistency and speed in development.B) They use development teams of less than 20 members to reduce complexity.C) Their development can involve the integration of services from several companies.D) Their development is carried out in a single site to ensure consistency.Answer: CAACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.1: Why is formalized project management necessary? Classification: Concept3) The development of large-scale systems can involve the integration of products and services from different companies.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.1: Why is formalized project management necessary? Classification: Concept4) Large-scale systems development requires extended development intervals as long as five or six years.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.1: Why is formalized project management necessary? Classification: Concept5) What are the characteristics of information systems (IS) in large-scale systems development projects?Answer: Information systems (IS) in large-scale systems development project have many features and functions. They require substantial computer resources and necessitate the creation of multifaceted, complicated computer programs. They process databases with hundreds of tables; dozens, possibly hundreds, of relationships; and terabytes of data. Such large-scale systems affect many business processes and support hundreds, possibly thousands, of concurrent users.Because of their size, such systems require a large development team, often composed of 50 to 100 or more business and systems analysts, programmers, PQA engineers, and managers. To add further complexity, large-scale systems are often simultaneously developed at multiple sites. A project might involve teams in the United States, India, China, and other countries. Additionally, the development of large-scale systems can involve integrating products and services from different companies. In these larger development projects, some companies provide licensed software; others provide particular expertise, such as database design; and others provide development labor. Large-scale systems are frequently localized for different languages. Finally, large-scale systems development requires extended development intervals, sometimes as long as five or six years.AACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.1: Why is formalized project management necessary? Classification: Concept6) Systems development projects require the balancing of three critical drivers: requirements, cost, and ________.A) scopeB) timeC) performanceD) valueAnswer: BAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.2: What are the trade-offs in requirements, cost, and time? Classification: Concept7) Increasing the cost of a project can reduce the time required to complete the project up to a certain point, beyond which, the time required would increase due to ________.A) economies of scaleB) diseconomies of scaleC) economies of scopeD) diseconomies of scopeAnswer: BAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.2: What are the trade-offs in requirements, cost, and time? Classification: Concept8) In the context of a systems development project, which of the following statements is true of the relationships between requirements, cost, and time?A) Increasing the time for the completion of a project always increases the cost of the project.B) Increasing the cost of a project will always reduce the time required to finish the project.C) Reducing the requirements in a project rarely affects the time required to finish the project.D) Reducing the number of requirements in a project reduces the overall cost of the project. Answer: DAACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.2: What are the trade-offs in requirements, cost, and time? Classification: Concept9) Pete, a civil engineer, is appointed to build a state-of-the-art office building. He begins planning the design and construction of the building with his team. He estimates that the building would take six months to build and assigns work and material accordingly to the workers. In this scenario, Pete is specifying the ________.A) baselineB) data modelC) line of codeD) scatter plotAnswer: AAACSB: Reflective ThinkingDifficulty: 2: ModerateCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.2: What are the trade-offs in requirements, cost, and time? Classification: Application10) The time involved in a project can always be reduced by increasing cost.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.2: What are the trade-offs in requirements, cost, and time? Classification: Concept11) Larger projects with longer development intervals will find it easier to meet baseline requirements.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.2: What are the trade-offs in requirements, cost, and time? Classification: Concept12) What are the trade-offs in a systems development project's requirements, cost, and time? Answer: Systems development projects require the balancing of three critical drivers: requirements (scope), cost, and time. The requirements against the time and against the cost of a project can be traded off. If the requirements are reduced, a project would take less time to complete and the cost of the project will also decrease. The relationship between time and cost is more complicated. Normally, the time can be reduced by increasing cost, but only to a point, beyond which, the time to finish the project will actually increase due to diseconomies of scale. Thus, at some point, adding more people creates diseconomies of scale. In some projects, costs can be reduced by increasing time. However, this trade-off is not always true. By extending the project interval, one will need to pay labor and overhead for a longer period of time. Adding more time can, in this way, increase the cost of the project.AACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.2: What are the trade-offs in requirements, cost, and time? Classification: Concept13) Which of the following is a technique that stipulates phases and processes for constructing information systems (IS) but does not address the management of large-scale projects?A) systems development life cycleB) rapid application developmentC) agile software developmentD) structured system analysisAnswer: AAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.3: What are the dimensions of project management?Classification: Concept14) In the Project Management Body of Knowledge (PMBOK®) Guide, the different stages in the life of a project are referred to as ________.A) configuration controlsB) knowledge areasC) process groupsD) resource zonesAnswer: CAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.3: What are the dimensions of project management?Classification: Concept15) ________ is the knowledge area that refers to the management of an entire project and the construction of the final product.A) Project integrationB) Project managementC) Procurement managementD) Quality managementAnswer: AAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.3: What are the dimensions of project management?Classification: Concept16) ________ is a knowledge area that concerns the methods, media, and schedules for exchanging information with the project's sponsors within a team and with others who have an interest in the progress of the project.A) Procurement managementB) Communications managementC) Quality managementD) Project integrationAnswer: BAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.3: What are the dimensions of project management?Classification: Concept17) ________ is a knowledge area that concerns contracts with outside vendors for services, materials, and outsourcing of functions.A) Communications managementB) Quality managementC) Project integrationD) Procurement managementAnswer: DAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.3: What are the dimensions of project management?Classification: Concept18) The Project Management Body of Knowledge (PMBOK®) Guide identifies those practices that are known to be effective for different situations and briefly describes their use.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.3: What are the dimensions of project management?Classification: Concept19) Knowledge areas of the Project Management Body of Knowledge (PMBOK®) Guide refer to the factors in a project that need to be managed throughout the life of the project.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.3: What are the dimensions of project management?Classification: Concept20) What is the Project Management Body of Knowledge (PMBOK®) Guide for project management?Answer: Project Management Body of Knowledge (PMBOK®) Guide, compiled by the Project Management Institute (PMI), contains what many believe are the best project management processes, practices, and techniques. The document does not describe the details of each practice or technique but instead identifies those practices that are known to be effective for different situations and briefly describes their use. Versions of this document are denoted by the year in which they are published. As of 2015, the current version is "A Guide to the Project Management Body of Knowledge (PMBOK®) Guide, Fifth Edition."PMBOK® Guide is organized according to a grid, which shows five process groups and nine knowledge areas. The process groups refer to different stages in the life of a project. The nine knowledge areas refer to factors to be managed throughout the life of the project.AACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.3: What are the dimensions of project management?Classification: Concept21) Each task in a systems development project should culminate in one or more ________.A) deliverablesB) zonesC) segmentsD) designsAnswer: AAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.4: How does a work breakdown structure drive project management? Classification: Concept22) A(n) ________ is a hierarchy of the tasks required to complete a project.A) scatter plotB) work breakdown structureC) encryption algorithmD) virtual modelAnswer: BAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.4: How does a work breakdown structure drive project management? Classification: Concept23) A ________ defines the boundaries of a system in a work breakdown structure (WBS).A) trade-offB) codeC) scopeD) scaleAnswer: CAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.4: How does a work breakdown structure drive project management? Classification: Concept24) Which of the following tools shows the tasks, dates, and dependencies in a project?A) Gantt chartB) exception reportC) push reportD) DPlotAnswer: AAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.4: How does a work breakdown structure drive project management? Classification: Concept25) A(n) ________ is the sequence of activities that determine the earliest date by which a project can be completed.A) Gantt chartB) critical pathC) encryption algorithmD) scatter plotAnswer: BAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.4: How does a work breakdown structure drive project management? Classification: Concept26) Prototypes are examples of deliverables in a systems development project.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.4: How does a work breakdown structure drive project management? Classification: Concept27) The critical path determines the earliest date by considering the shortest path through the network of activities.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.4: How does a work breakdown structure drive project management? Classification: Concept28) In case of task dependencies in a project, all tasks must begin and end at the same time. Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.4: How does a work breakdown structure drive project management? Classification: Concept29) Baseline work breakdown structures can be used for monitoring a project.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.4: How does a work breakdown structure drive project management? Classification: Concept30) What is a critical path? How is a critical path analysis done?Answer: A critical path is a sequence of activities that determine the earliest date by which a project can be completed. The earliest date is the date determined by considering the longest path through the network of activities. Paying attention to task dependencies, a planner can compress tasks as much as possible. Those tasks that cannot be further compressed lie on the critical path. Microsoft Project and other project-planning applications can readily identify critical path tasks. Managers can use the critical path to perform critical path analysis. If a task is on the critical path, and if that task runs late, the project will be late. Hence, tasks on the critical path cannot be allowed to run late if the project is to be delivered on time. Additionally, tasks not on the critical path can run late to the point at which they would become part of the critical path. Hence, up to a point, resources can be taken from noncritical path tasks to shorten tasks on the critical path. Using critical path analysis, managers can move resources among tasks so as to compress the schedule.AACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.4: How does a work breakdown structure drive project management? Classification: Concept31) Odell is the lead software developer for a new security system that needs to be urgently developed for a client. The client is insistent that the software be as infallible as possible, therefore, Odell would have to plan the systems development with precision. Which of the following activities would be Odell's biggest challenge while planning?A) creatingB) schedulingC) analyzingD) testingAnswer: BAACSB: Reflective ThinkingDifficulty: 2: ModerateCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.5: What is the biggest challenge for planning a systems development project?Classification: Application32) Scheduling a large-scale project is more difficult than scheduling individual projects. Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.5: What is the biggest challenge for planning a systems development project?Classification: Concept33) One approach businesses take to address scheduling challenges in large-scale systems is avoiding the development of software in-house.Answer: TRUEAACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.5: What is the biggest challenge for planning a systems development project?Classification: Concept34) A function point is a feature or function of a new program.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.5: What is the biggest challenge for planning a systems development project?Classification: Concept35) The biggest challenge in planning large-scale systems development is scheduling. Describe the three approaches that organizations can take to address this challenge.Answer: The first approach that organizations can take to address the challenge of scheduling large-scale systems development projects is to avoid all major schedule risks by never developing software in-house. Instead, they can license software from vendors. However, if no suitable software exists, companies can take one of two remaining approaches. They can admit the impossibility of systems development scheduling and plan accordingly. They can abandon the systems development life cycle and decide to invest a certain level of resources into a project, manage it as best as they can, and take the schedule that produces results. The third approach is to attempt to schedule the development project in spite of all difficulties. Several different estimation techniques can be used. If the project is similar to a past project, the schedule data from that past project can be used for planning. When such similar past projects exist, this technique can produce quality schedule estimates. If there is no such past project, managers can estimate the number of lines of code that will need to be written. Then they can use industry or company averages to estimate the time required. Another technique is to estimate the function points in a program, use each function point to determine the number of lines of code, and use that number to estimate schedules.AACSB: Information TechnologyDifficulty: 3: ChallengingCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.5: What is the biggest challenge for planning a systems development project?Classification: Concept36) The challenges of managing large-scale systems development projects arise from ________.A) economies of scaleB) economies of scopeC) increase in configuration controlD) lack of coordinationAnswer: DAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.6: What are the biggest challenges for managing a systems development project?Classification: Concept37) ________ refers to a set of management policies, practices, and tools that developers use to maintain control over a project's resources.A) Perceptual mappingB) Coordination controlC) Critical path analysisD) Configuration controlAnswer: DAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.6: What are the biggest challenges for managing a systems development project?Classification: Concept38) A well-managed project will never face problems of diseconomies of scale.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.6: What are the biggest challenges for managing a systems development project?Classification: Concept39) Unexpected events are a minor hurdle and are rarely considered while managing alarge-scale systems development project.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.6: What are the biggest challenges for managing a systems development project?Classification: Concept40) The smaller and shorter a project, the greater the chance of disruption due to unanticipated events.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.6: What are the biggest challenges for managing a systems development project?Classification: Concept41) What are the biggest challenges for managing a large-scale systems development project? Answer: The challenges of managing large-scale systems development projects arise from four different factors: coordination, diseconomies of scale, configuration control, and unexpected events. Large-scale projects are usually organized into a variety of development groups that work independently. Coordinating the work of these independent groups can be difficult, particularly if they reside in different geographic locations or different countries. An accurate and complete work breakdown structure (WBS) facilitates coordination, but no project ever proceeds exactly in accordance with the WBS. The coordination problem is increased because software ispure-thought stuff. Another problem is diseconomies of scale. Adding more people to a project increases coordination requirements. The number of possible interactions among team members rises exponentially with the number of team members. Ultimately, no matter how well managed a project is, diseconomies of scale will set in. Also, as the project proceeds, controlling the configuration of the work product becomes difficult. Problems can occur with designs, program code, database data, and other system components. Configuration control is vital here. The last major challenge to large-scale project management is unexpected events. The larger and longer a project lasts, the greater the chance of disruption due to an unanticipated event.AACSB: Information TechnologyDifficulty: 3: ChallengingCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.6: What are the biggest challenges for managing a systems development project?Classification: Concept42) ________ is the process by which users agree to one set of conditions, then add a bit more, then add a bit more, and so forth.A) Requirements creepB) Diseconomies of scaleC) Configuration controlD) CoordinationAnswer: AAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.7: What is the single most important task for users on a systems development project?Classification: Concept43) Taking responsibility for requirements is the single most important task a user can perform for a large-scale development project.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.7: What is the single most important task for users on a systems development project?Classification: Concept44) Requirements creep is the process by which a project manager reduces his or her responsibilities for requirements through miniscule rollbacks.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Discuss best practices for selecting, evaluating, and managing information systems projects.Learning Obj: LO 28.7: What is the single most important task for users on a systems development project?Classification: Concept。

《信息管理与信息系统》专业外语课后答案

《信息管理与信息系统》专业外语课后答案

《信息管理与信息系统》专业外语课后答案英译汉英文单词解释Unit 11. Management is the attainment of organizational goals in an effective and efficient manner through planning, organizing, leading, and controlling organizational resources.管理是组织目标通过计划、组织、领导、控制组织资源实现的有效方式。

2. Planning defines where the organization wants to be in the future and how to get there.计划决定了组织将来的发展方向和实现方式。

3. Organization failure can occur when managers are not serious about control or lack control information.组织的失败往往在管理人员不认真对待控制或缺乏控制的信息时发生。

4. The ultimate responsibility of managers is to achieve high performance, which is the attainment of organizational goals by using resources in an efficient and effective manner.管理人员的最终责任是获得高业绩,这是组织目标实现的一种有效的利用资源和有效的方式。

5. There are no “peopleless” organizations, so managers must learn how to motivate, lead and communicate; they must also understandinterpersonal relations and the behavior of groups of people.没有任何“peopleless”组织,所以经理们必须学会如何激励、领导和交流,他们也必须理解人际关系和各种人群的行为。

信息管理与信息系统专业英语考试复习题

信息管理与信息系统专业英语考试复习题

信息系统与信息管理专英语复习一、词汇题(英译汉+汉译英以下分栏的是课件上部分红色单词,未分栏的是与专业相关的课件上的词汇,个人感觉比较重要,所以整理了一下,翻译均来自网上在线翻译,可能个别有问题,发现后请及时改正。

不周之处以课件为准。

祝大家考出好成绩!)collar(项圈)Startled(大吃一惊)gasped (气呼呼)project management:项目管理Project initiation and PID Requirements elicitation(获取) & collection Requirements collation(校对) & conflict managementO-O programmingParallel programming Complexity(复杂性)Cabling & Wiring(布电缆和电线)inclusions(加入部分)compatibility(兼容性)interference(干扰)side-effects(副作用)Direct cut-over to new partof systemParallel running of new partwith previous partPilot(试点) cut-over of onedepartmentPiecewise(分段) cut-overPrepare rolling plan(后续计划) for future upgradesPay all outstandingaccounts(未付清的帐)temptation(诱惑)contingency(不测事件)anticipated(期望)deviate(偏离轨道)irresistible(无法抗拒)dictate(要求)trade-offs(权衡)inherent(不可分割)phenomenon(现象)axes(中心)juggle(杂耍)disabled (残疾)handicapped(弱智)availability (可用性)phases(阶段)participate(参与)objective(目标)segments(分块)fixed(固定)size(规模)complexity (复杂程度)Preliminary(初步)investigationcross-life-cycle(横跨生命周期)Fact-finding(事实发现)Presentation(交流讲座)Approximate(大约的,近似的)productivity(工作效率)quality(素质)ongoing(持续不断的)Participants(参与人员)Management(管理人员)analysts(分析员)supervisor(主管)alternative(可选的)Submit(提交)corporate(公司的)charters(章程)paperwork(文书工作)pervasive(蔓延)sense(认识)justify(证明。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

信息系统项目管理师英语模拟题Sample Professional Responsibility exam questions1. While working on an external project your customer asks you to perform some additional tasks that are not included in the formal contract. You should:a. Honor the customer's request as sign of cooperation to ensure future business.b. Refuse the request and report the customer to your sponsorc. Acknowledge the request and advise the customer to submit a formal change requestd. Convene a meeting of the project team and rewrite the scope statement.2.You are managing an internal R&D project. The initial test results are very poor. You are afraid your management might cancel the project, and this could reflect poorly upon you. Verification testing could be done quickly and inexpensively. You should:a. Be the first to recommend canceling the projectb. Inform management about the results and wait for a responsec. Inform management immediately and recommend retesting for verificationd. Withhold the information from management until you perform additional tests to verify the initial results3. During an informal meeting with your project client you are offered a substantial monetary incentive to alter the configuration of the product to meet the client's personal need. This change may result in additional project costs and schedule delays. The appropriate action to take would be:a. Refrain from accepting the offer and advise the customer to submit a request to the change control board.b. Accept the offer and issue an internal configuration change request to the design groupc. Obtain additional information about the request and the customer's personal need before accepting the offer.d. Delay acceptance of the offer until you can ensure that you can protect yourself from any legal liabilities.4. As the project manager for a very large and highly visible project you receive a preliminary press release for your approval before distribution. You are expected to approve the release without comment. Your review identifies a major discrepancy regarding some key project financial estimates that may mislead the intended recipients. As the project manager it is your responsibility to:a. Inform the project sponsor of the discrepancy and refuse to approve the releaseb. Approve the release but send a memo to the sponsor advising that you are aware of the discrepancy and will refer any questions your receive to the sponsorc. Completely rewrite the press release and include the correct informationd. Approve the release as requested5. Your project is running out of cash and significant work remains. You are directed by senior management to instruct your people to use another project's charge numbers while working on your project. You should:a. Follow instructionsb. Inform the corporate auditorsc. Understand the background of management's instructions before taking any actiond. Shut down the project, if possible6. While reviewing the estimates from the functional managers assigned to your project you discover that one cost estimate is clearly higher than those submitted for previous projects. You should:a. Reject the estimate and remove the functional manager from the projectb. Request the supporting details for the estimate to ensure it has been properly prepared.c. Accept the estimate and plan to use the additional funding as a reserve.d. Question each functional manager for information about this estimate.7. You are working in a country where it is customary to exchange gifts between contractor and customer. Your company code of conduct clearly states that you cannot accept gifts from any client. Failure to accept the gift from this client may result in termination of the contract. The action to take in this case would be:a. Provide the customer with a copy of your company code of conduct and refuse the gifts.b. Exchange gifts with the customer and keep the exchange confidentialc. Contact your project sponsor and /or your legal or public relations group for assistance.d. Ask the project sponsor or project executive to exchange gifts.8.During your assignment as project manager you add a new member to your project team. This new teammember was recently hired from a competitor and offers to share a substantial amount of proprietary information from his previous company. This information could put you and your team in a very strong position for future business. You are aware of a non compete clause in the new hire's condition of employment. You should:a. Accept the information and agree to keep it confidential between you and the new hire.b. Review the condition of employment with the new hire and advise her to reconsider the offer.c. Review the information and only accept only what may have a direct impact on the project's financial status.d. Ignore the offer to share and move forward with the project9. You are asked to write a paper for your sponsor so that he/she can present it at a technical meeting. You are informed that his/her name will be the only name on the paper. You should:a. Follow instructionsb. Follow instructions but demand that your name also appearsc. Refuse to follow the instructionsd. Go over the head of your sponsor seeking advice10. An example of a conflict of interest would be:a. As a public official you make a decision about a contract award that will benefit you personallyb. You and a functional manager disagree with a task cost estimatec. Your sponsor decides to cancel your project because it no longer supports the company strategyd. Your personality conflicts with that of a key member of your project team.11. Each of the following describes the use of an ethical approach except:a. Attempting to understand the religious and cultural sensitivities of the country in which you have been assigned.b. Ensuring that personal interest does not interfere with your decision making process.c. Accepting gifts in exchange for favoring one contractor over anotherd. Maintaining confidentiality of sensitive information obtained during the project life cycle.12. To maintain the customer's schedule, massive overtime will be required between Christmas and New Years. Many of your team members have put in for vacation during this time. You should:a. Let the schedule slip and inform the customerb. First give the employees the choice of working overtimec. Make the employees cancel their vacation plans and work overtimed. Hire temporary employees for the overtime13. Which of the following situations describes a violation of the PMP?Professional Code of Conduct?a. Accepting a gift that is within the customary guidelines of the country or province you are currently working in.b. Use of confidential information to advance your position or influence a critical decision.c. Complying with laws and regulations of the state or province in which project management services are providedd. Disclosing information to a customer about a situation that may have an appearance of impropriety.14. In order to balance the needs of the many stakeholders involved in your project the most desirable method to achieve resolution of conflicts would be:a. Compromiseb. Forcingc. Controllingd. Confrontation15. You receive a contract to perform testing for an external client. After contract award, the customer provides you with the test matrix to use for your 16 tests. The vice president for engineering says that the customer's test matrix is wrong, and she will use a different test matrix, which should give better results. This is a violation to the SOW. Suppose your sponsor is also the vice president for engineering. You should:a. Use the customer's test matrixb. Use the engineering test matrix without telling the customerc. Use the engineering test matrix and inform the customerd. Tell your sponsor that you want to set up a meeting with the customer to resolve the conflict16.In order for the project manager to fully and effectively understand a stake holder's personal concerns or grievances it may necessary to:a. Ask for a written description of the problem and submit it through the project officeb. Schedule a project review session with the entire project teamc. Attempt to empathize with the stakeholderd. Involve the project sponsor as an arbitrator17. As the leader of a project team, the project manager may be required to assess the competencies of his or her team members. Occasionally, some weaknesses or areas for improvement will be identified. The project manager should:a. Remove any team members who have demonstrated weaknesses in critical knowledge areasb. Communicate those weaknesses and establish a performance improvement programc. Hire additional resources to compensate for weak areasd. Wait for the team members to fail in an assignment to justify termination.18.You have just changed jobs and discovered that your new employer routinely violates OSHA/EPA and affirmative action requirements on projects. You should:a. Do nothing; it's not your problemb. Start by asking management if they are aware that regulations are being violatedc. Talk to the corporate legal departmentd. Inform the appropriate government agencies about the violations19. The project manager must be an effective communicator to ensure that project stakeholders receive and understand project related information and status. Prior to delivering information to the stakeholders the project manager should attempt to:a. Research and understand the region of experience of the stakeholder before transmitting informationb. Identify only those stakeholders that have a the same background experience as the project managerc. Filter the information to remove any detailsd. Restrict information to specific technical details20. As part of your project plan you must develop an effective method of communication for your multinational team of stakeholders. You have several choices of media available. The appropriate action to take in the development of the communication plans would be to:a. Discuss the available options with the stakeholders and obtain their inputb. Use the standard media that has been in effect for your previous projectsc. Use multiple forms of media to ensure that everyone receives the informationd. Obtain additional funding from the project sponsor and develop a project specific communications infrastructure.21.One of your employees is up for promotion. If the promotion is granted, the employee will be reassigned elsewhere causing a problem for you on your project. You can delay the promotion until your project is completed. You should:a. Support the promotion but work with the employee and the employee's new management to develop a good transition planb. Ask the employee to refuse the promotion until your project is completed.c. Arrange to delay the promotion until the project is completedd. Tell the employee that it is his responsibility to find a suitable replacement so that the project will not suffer.22. The integrity of the project manager is often challenged by stakeholders who attempt to use personal power or influence to change the scope of an agreed upon deliverable. In these situations the project manager's most appropriate response would be:a. Refer the stakeholder to the process for change documented in the approved contract.b. Agree to the change because customer satisfaction is the goal regardless of cost.c. Contact the legal department and suspend all further project workd. Determine the risks and rewards for implementing the change before taking any action.23.During project implementation the client interprets a clause in the contract to mean the he is entitled to a substantial refund for work recently completed. You review the clause and disagree with the client's conclusion. As the project manager which of the following actions should be takena. Disregard the customer's conclusion and continue to process invoicesb. Document the dispute and refer to the provisions of the contract that address interpretations and disputesc. Advise the customer that ambiguous information in contracts is always interpreted in favor of the contractord. Immediately correct the clause to remove any possible misinterpretation by the customer24.Your executives, in appreciation for the success of your project, have given you a $10,000 bonus to belittle on your project, is in your car pool. You should:a. Provide everyone with an equal shareb. Provide everyone a share based upon their performancec. Ask the workers to decide among themselves how the bonus should be subdividedd. Ask the sponsor to make the decision25. Before reporting a perceived violation of an established rule or policy the project manager shoulda. Determine the risks associated with the violationb. Ensure there is a reasonably clear and factual basis for reporting the violationc. Ignore the violation until it actually affects the project resultsd. Convene a committee to review the violation and determine the appropriate response26. Project Managers can contribute to their organization's knowledge base and to the profession of project management most effectively by:a. Developing and implementing a project review and lessons learned processb. Establishing strict guidelines for protecting intellectual propertyc. Promote the use of ad hoc project managementd. Ensuring that all project plans are developed before the project team is formed27. You have been assigned two concurrent projects. Because of the nature of the projects, you have a conflict of interest. You should:a. Do the best you can and tell no oneb. Ask to be removed from one of the projectsc. Ask to be removed from both of the projectsd. Inform your sponsor and ask for his advice28. You receive a contract to perform testing for an external client. After contract award, the customer provides you with the test matrix to use for your 16 tests. The vice president for engineering says that the customer's test matrix is wrong, and she will use a different test matrix, which should give better results. This is a violation to the SOW. You should:a. Use the customer's test matrixb. Use the engineering test matrix without telling the customerc. Use the engineering test matrix and discuss the reasons with the customerd. Ask your sponsor for clarification, assuming that the vice president is not your sponsor29. An effective method for improving an organization's project management knowledge base is through:a. Coaching and mentoringb. Referent powerc. A weak Matrix organizational structured. Fast TrackingAnswer Key1=c 2=d 3=a 4=a 5=c 6=b 7=c 8=b 9=b 10=a 11=c12=b 13=b 14=d 15=d 16=c 17=b 18=b 19=a 20=a 21=a 22=a23=b 24=c 25=b 26=a 27=d 28=d 29=aDisclaimer: These questions are intended for study purposes only. Success on these questions is not indicative of success on the Project Management Professional Certification Examination. This download of the Sample Exam Questions is for your personal use and NOT FOR commercial use. Any unauthorized use or duplication of this document is prohibited!1. A narrative description of products or services to be supplied under contract is called:a. The project plan. B. A statement of work.C. An exception report.D. A Pareto analysis.2. An example of scope verification is:a. Reviewing the performance of an installed software module.B. Managing changes to the project schedule.C. Decomposing the WBS to a work package level.D. Performing a benefit/cost analysis to determine if we should proceed with the pro3. Which of the following is not an example of a source of scope change?A. A variation in government regulations.C. A need to engage in bottom-up cost estimating.D. Introducing technology that was not available when scope was originally defined.4.The subdivision of major project deliverables, as identified in the scope statement, into smaller, more manageable components is called:a. Parametric estimation .B. Scope definition.C. Feasibility analysis.D. Benefit-cost analysis.5. The process of establishing clear and achievable objectives, measuring their achievement, and adjusting performance in accordance with the results of the measurement is called:a. Strategic planning. B. Alternative objectives inventory.C. Management by objectives.D. Contingency planning.6. Configuration management is:a. Used to ensure that the description of the project product is correct and complete.B. The creation of the work breakdown structure.C. The set of procedures developed to assure that project design criteria are met.D. A mechanism to track budget and schedule variances.7. A fundamental tenet of modern quality management holds that quality is most likely to be achieved by:a. Planning it into the project. B. Developing careful mechanisms to inspect for quality.C. Striving to do the best job possible.D. Conducting quality circle activities.8. Your most recent project status report contains the following information: BCWP = 3,000, ACWP = 3,500, and BCWS = 4,000. The schedule variance is:a. + 1,000. B. + 500. C. - 500. D. - 1,000.9. Learning curve theory emphasizes that in producing many goods:a. Cost decreases as production rates increase.B. Average unit cost decreases as more units are produced.C. Materials become cheaper when they are purchased in bulk.D. Laborers become more productive because of technological advances.10. Rearranging resources so that constant resource levels are maintained is called:a. Floating. B. Leveling. C. Restructuring. D. Crashing.11. The _________ is a time-phased budget that will be used to measure and monitor cost performance in the project.A. Work breakdown structure b. Project schedule c. Cost baseline d. Cost budget12. To transfer most of the cost risk to the contractor, the client may use a ___________ contract.A. Cost plus award b. Cost plus incentive fee c. Cost plus fixed fee d. Fixed price13. An appropriate sequence for risk management activities is:a. Risk identification, risk quantification, and risk response development and control.B. Risk identification, risk assessment, and risk planning.C. Risk identification, risk mitigation, and risk management.D. Risk identification, risk elimination, and risk mitigation.14. Theory X holds that:a. Quality improvements lie in the hands of quality circles.B. Profits are tied to meeting schedule deadlines.C. Absenteeism is tied to poor working conditions.D. Workers are inherently unmotivated and need strong guidance.15. All of the following are characteristics of parametric estimating except:a. Historical information. B. Quantifiable. C. Scalable. D. Activity lists.16. Inputs to cost budgeting include all of the following except:a. Cost baselineb. Cost estimatec. Work breakdown structured. Project schedule17. Inputs used during scope planning include all of the following except:a. Constraints. B. Project charter. C. Budget/cost analysis. D. Product description.18. Cost control outputs include all of the following except:a. Estimate at completion. B. Budget updates.C. Revised cost estimates.D. Cost baseline.19. Risk identification outputs include the following except:a. Decision trees. B. Inputs to other processes.C. Risk symptoms.D. Potential risk events.20. Puts into overall change control include all of the following except:a. Project plan.B. Change requests.C. Change control system. D. Performance reports21. Activity duration estimate inputs include all of the following except:a. Resource requirements. B. Basis of estimates. C. Activity lists. D. Constraints.22. All of the following are contract types except:a. Unit-price. B. Make-or-buy. C. Cost reimbursable. D. Lump sum.23. Initiation inputs for a project include all of the following except:a. Product description. B. Strategic plan. C. Project charter. D. Selection criteria.24. Responses to risk threats include all of the following except:a. Avoidance. B. Acceptance. C. Mitigation. D. Rejection.25. The process of performance reporting includes all of the following except _____________.A. Status reporting.B. Progress reporting.C. Forecasting.D. Product analysis26. Constrained optimization methods of project selection include:a. Scoring models. B. Benefit-cost ratios. C. Multi-objective programming algorithms.D. Subjective analyses.27. Which of the following statements concerning contract type is correct?A. A fixed price contract contains the most risk for the buyer.B. Cost reimbursable contracts offer sellers the highest profit potential.C. Lump sum contracts offer sellers the greatest profit potential.D. Unit price contracts are illegal in many jurisdictions.28. A Work Breakdown Structure (WBS) numbering system should allow project staff to:a. Identify the level at which individual WBS elements are found.B. Identify configuration management milestones.C. Estimate the costs of WBS elements.D. Provide project justification.29. All of the following are true quality statements except:a. Quality improvement depends upon better definition and increased awareness of the requirements/specifications.B. Project quality management must address both management of the project and the product of the project.C. Recognition of key actions required of each team member is necessary to meet quality objectives.D. Computer-aided design systems can improve quality, but only at the expense of an increase in the cost of design.30. All of the following are examples of tools often used in cost estimating except:a. Parametric modeling. B. Analogous estimating.C. Bottom-up estimating.D. Activity duration estimates.31. At XYZ Inc., the hourly wage for semi-skilled workers is $14.00. The annual audit shows that fringe benefits cost 30% of basic wages, and that overhead costs ar e 60% of wages plus fringe benefits. What is the loaded” hourly wage for a semi-skilled worker at XYZ Inc.?A. $27.14.B. $28.96.C. $30.03.D. $29.12.32. Of the following estimates, which most accurately reflect the actual cost of the project?A. Conceptual estimates.B. Order of magnitude estimates.C. Preliminary estimates.D. Bottom-up estimates.33. The most crucial time for project risk assessment is:a. When a problem surfaces. B. During the planning phase.C. During the close-out phase.D. After the project schedule has been published.34. When there is uncertainty associated with one or more aspects of the project, one of the first steps to take is to:a. Revise project plan. B. Conduct a risk-benefit analysis.C. Conduct a needs analysis.D. Increase the estimated cost of the project.35. Including a contingency reserve in the project budget is intended to:a. Reduce the probability of scope changes. B. Increase the probability of scope changes.C. Reduce the probability of a cost overrun.D. Increase the probability of a cost overrun.36. Given the information in the following table, what is the expected value from this risk event?Probability Resulta. -10,000. B. - 7,500. C. + 2,500. D. -7,000.37. A contractor is working on a fixed price contract that calls for a single, lump sum payment upon satisfactory completion of the contract. About halfway through the contract, the contractor project manager informs their contract administrator that financial problems are making it difficult for them to pay their employees and subcontractors. The contractor asks for a partial payment for work accomplished. Which of the following actions by the buyer is most likely to cause problems for the project?A. Starting partial payments for work accomplished.B. Making no payments because it would violate the conditions of the contract.C. Paying for work accomplished to date.D. Negotiating a change to the payment conditions in the contract.38. A precise description of a physical item, procedure, or service for implementation of an item or service is called :a. Work package. B. Baseline.C. Product description.D. Work breakdown structure (WBS) element.39. A project should be terminated for all of the following reasons except:a. Lack of team synergy. B. The project no longer meets the company's objectives.C. The resources are not available to complete project activities.D. Project funding has been significantly reduced.40. One common way to compute estimated at completion (EAC) is to take the project budgeted-at-completion and:a. Divide it by the schedule performance index. B. Multiply it by the schedule performance index.C. Multiply it by the cost performance.D. Divide it by the cost performance index.答案:1.B2.A3.C4.B5.C6.A7.A8.D9.B.10.B 11.C 12.D 13.A 14.D 15.D 16.A 17.C 18.D 19.A 20.C21.B 22.B 23.C 24.D 25.D 26.C 27.C 28.A 29.D 30.D 31.D 32.D 33.B 34.B 35.C 36.D 37.B 38.C 39.A 40.D。

相关文档
最新文档