INSTALLATION INSTRUCTIONS ©Panduit Corp.2012
CM589A
For Either a
Net-Access Legacy or Net-Access N-Type Switch Cabinet (CN** OR N**)
INLET DUCT FOR CISCO 9513SWITCH
Part Number:DIBBC2314S21W
COMPONENT GUIDE
(2) Upper Adjustable Brackets
(2) Lower Adjustable Brackets
Lower Inlet
Box
Upper Inlet
Box
Upper Seal Plate
Lower Seal Plate
Side Duct
Rear Duct
Note: Upper RH Bracket Tools Needed:
-Phillips Head Screwdriver -Socket Wrench
-3/8” Socket
Hardware Supplied:
INDEX
Removing Side Panel Bumpers...................................................................................................................................Determine Location of Duct..........................................................................................................................................Upper / Lower Left Hand Bracket Installation...............................................................................................................Upper / Lower Right Hand Bracket Installation.............................................................................................................Attaching Foam Seal to Side Duct (For Net-Access N-Type Cabinet)........................................................................Side Duct Installation - Day 1 (No Side Panel on Cabinet)...........................................................................................Side Duct Installation - Day 2 (With Side Panel on Cabinet)
Separating Side Duct Sections................................................................................................................................. Side Duct Frame Installation.................................................................................................................................... Bump Out Installation...............................................................................................................................................Duct Seal Installation...................................................................................................................................................Upper / Lower Inlet Box Installation..............................................................................................................................Rear Duct Installation...................................................................................................................................................PAGE
345678
9101112131415
Removing Side Panel Bumper
•Unscrew and remove (4) #12-24 screws and (4) # 12 lock washers.•Remove Side Panel Bumper.
Determine Location of Duct
•Ducting requires (20) rack units for installation. Duct components can be installed before or after switch installation and are NOT designed to support the switch.
•The front equipment rails need to be in the full forward position.
•Rear equipment rails need to be located 24.25" to 26.0" from the front rails.
•Due to physical constraints posed by the front-to-back frame beams on the legacy Net-Access Cabinet, the inlet duct can only be installed in one location.
•For new Net-Access switch cabinets (N***), the only restriction is that 3 RU must be left open above and below the switch for inlet duct
24.25"- 26.0" from
Equipment Rail
Equipment Rail
Nuts
Nuts
Upper Left Hand Bracket
Hand Bracket
Rear of Cabinet (Hot Aisle)
•Attach upper adjustable bracket to upper left hand bracket with (2) #10-32 nuts. (Leave nuts loose.)•Attach lower adjustable bracket to lower left hand bracket with (2) #10-32 nuts. (Leave nuts loose.)•Measure distance between front and rear rails.
•Adjust brackets to fit front and rear rail distance. (Tighten nuts on brackets that were left loose.)
•Install (1) upper left hand bracket with (4) #12-24 screws and (4) #12 star washers. (Leave screws loose until Inlet Box is installed.)•
Install (1) lower left hand bracket with (4) #12-24 screws and (4) #12 star washers. (Leave screws loose until Inlet Box is installed.)
Upper Adjustable Upper Right •Attach upper adjustable bracket to upper right hand bracket with (2) #10-32 nuts. (Leave nuts loose.)•Attach lower adjustable bracket to lower right hand bracket with (2) #10-32 nuts. (Leave nuts loose.)•Measure distance between front and rear rails.
•Adjust brackets to fit front and rear rail distance. (Tighten nuts on brackets that were left loose.)
•Install (1) upper right hand bracket with (4) #12-24 screws and (4) #12 star washers. (Leave screws loose until Inlet Box is installed.)•
Install (1) lower right hand bracket with (4) #12-24 screws and (4) #12 star washers. (Leave screws loose until Inlet Box is installed.)
Attaching Foam Seal to Side Duct.(For Net-Access N-Type Only)• Attach one strip of foam seal to flange on front of side duct.
Flange
(No Side Panel on Cabinet) Side Duct Installation
•Slide (4) studs on side duct into (4) slots on right hand side brackets.
•Secure side duct to brackets with (4) #10-32 nuts.
(With Side Panel on Cabinet) Separating Side Duct Sections
•Remove (4) #10-32 nuts from side duct assembly.
•Separate side duct frame from bump out.
Side Duct Frame Installation
•From the rear of the cabinet insert the side duct frame into the cabinet.
•Slide (4) studs on the inside of the side duct frame into the slots on the right side brackets.•Secure side duct frame to right side brackets with (4) #10-32 nuts.
Front of Cabinet
(4) #10-32 Nuts
(4) Slots
Bump Out Installation
•Insert the bump out from the rear of the cabinet.
•Slide the notches on the bump out on to the studs on the top and bottom of the side duct frame.•Secure the bump out to the frame with (4) #10-32 nuts.
Front of Cabinet
Duct Seal Plate Installation
•Slide upper seal plate studs through the holes in the top of the side duct and bracket.
•Secure seal plate to side duct with (2) #10-32 nuts.
•Repeat process for lower seal plate.
Upper Seal
Plate
•Slide upper inlet box into rails on the upper brackets so that studs on the upper brackets pass through the holes on the inlet box flanges.
•Slide lower inlet box into rails on the lower brackets so that studs on the lower brackets pass though the holes on the inlet box flanges.
•Secure the inlet boxes to the brackets with (4) #10-32 nuts.
Box
(4) #10-32 Nuts
Flange.
•Slide the studs on the side of the rear duct into the slots on the sides of the bottom inlet box. Make sure bottom of the rear inlet duct slides into folds on the bottom inlet duct.
•Secure the rear duct in place with (2) #10-32 nuts.
•Tighten all screws that were previously left loose.
(Cold Aisle)
Inlet Box。