水电项目工程超概问题剖析
朱玉方;宋兴
【期刊名称】《红水河》
【年(卷),期】2013(000)005
【摘要】In the process of development, China has formed a set of cost management mechanism for hydropower pro-jects,which plays a positive role in hydropower construction management. However,the problems of cost beyond budget are found frequently in hydropower projects due to the adjustments on state policies,the long upsurge in labor and commodity prices and other factors. During the development of hydropower projects,the investment enterprises shall clearly understand
the policies on hydropower projects,invest and control rationally,properly deal with the re-lationships of all parties,and actively strive for preferential on-grid tariff and taxes policies so as to win long term and stable investment return s.%∶在长期的发展过程中,我国对水电项目建设形成了一套工程造价管理机制,对水电建设管理起到了积极的作用,但随着国家对水电开发进行了一些政策性调整,以及人工、物价长期上涨等原因,造成水电项目建设出现了普遍的超概问题。
只有对此有清晰的认识,把握当前和今后我国水电项目建设的实质,才能保证企业科学的决策、理性实施项目投资和控制,恰当处理项目建设相关部门及各参建方的关系;在水电项目的推进过程中,正确领会、积极争取电价及税收等优惠政策,保证水电投资企业赢得长期稳定的投资回报。
【总页数】6页(P118-122,134)
【作者】朱玉方;宋兴
【作者单位】广西桂冠电力股份有限公司,广西南宁530022;广西桂冠电力股份有限公司,广西南宁530022
【正文语种】中文
【中图分类】F407.61
【相关文献】
1.恩施州水电站项目超概主要原因分析 [J], 刘春荣
2.剖析水利工程建设项目投资“超概”主要原因及对策 [J], 张蕾
3.水电项目工程施工中安全生产突出问题剖析及对策 [J], 杨学谦
4.部分政府性投资建设项目超概(预)算原因剖析 [J], 王贞坤
5.建设工程项目“超概”剖析及对策探讨 [J], 何江兰
因版权原因,仅展示原文概要,查看原文内容请购买。