广州市市政工程补充综合定额(2019)

合集下载

广东2019定额说明及工程量计算规则

广东2019定额说明及工程量计算规则

广东2019定额说明及工程量计算规则建筑与装饰工程综合定额(说明及工程量计算规则)一类地区:广州、深圳二类地区:珠海、佛山、东莞、中山三类地区:汕头、惠州、江门四类地区:韶关、河源、梅州、汕尾、阳江、湛江、茂名、肇庆、清远、潮州、揭阳、云浮A.1土石方工程----------------------------------------2A.2桩基础工程----------------------------------------6A.3砌筑工程------------------------------------------9A.4 混凝土及钢筋混凝土工程----------------------------12A.5 木结构工程----------------------------------------16A.6 金属工程------------------------------------------18A.7 屋面及防水工程------------------------------------19A.8 保温隔热工程--------------------------------------22A.9 楼地面工程----------------------------------------24A.10 墙柱面工程---------------------------------------26A.11 天棚工程-----------------------------------------28A.12 门窗工程-----------------------------------------30A.13 幕墙工程-----------------------------------------33A.14 细部装饰栏杆工程---------------------------------34A.15 家具工程-----------------------------------------35A.16 油漆涂料裱糊工程---------------------------------36A.17 广告牌工程---------------------------------------42A.18 景观工程-----------------------------------------43A.19 石作工程-----------------------------------------45A.20 其他工程-----------------------------------------46A.21 模板工程-----------------------------------------47A.22 脚手架工程---------------------------------------48A.23 垂直运输工程-------------------------------------52A.24 材料二次运输-------------------------------------54A.1土石方工程说明(欠附表:土壤及岩石普氏分类表)1、工程计量前,应了解以下事项:1) 地下水位标高及排(降)水方法;2) 土方、沟槽、基坑挖(填)起止标高、施工方法及运距;3) 岩石开凿、爆破方法、石碴清运方法及运距;4) 其他需了解的有关事项。

广州市建设工程造价管理站文件

广州市建设工程造价管理站文件

t
4170.61
012901960730090001
Φ15.24 1860Mpa
t
4728.84
012901960750090001
Φ15.24 1860Mpa 全重计价 t
5001.19
012901960760090001
□12--14
t
4075.24
012901960770090001
□16--18
适用的相关定额名称
计价办法
《广东省城市轨道交通工程综合定额(2018)》
《广东省城市地下综合管廊工程综合定额(2018)》 《广东省房屋建筑与装饰工程综合定额(2018)》 《广东省市政工程综合定额(2018)》 1 《广东省通用安装工程综合定额(2018)》 《广东省园林绿化工程综合定额(2018)》 《广东省传统建筑保护修复工程综合定额》(试行)(2018)
4155.58
012901960770120001
75--200×4--20
t
4205.65
012901962010120001
边长﹤100
t
3956.91
012902010600000001
附件: 2019 年 3 月份广州地区建设工程常用材料税前综合 价格
广州市建设工程造价管理站 2019 年 4 月 12 日
—5—
附件:
2019 年 3 月份广州地区建设工程常用材料税前综合价格
说明
一、 本版中的材料价格信息为“税前综合价格”。“税前综合价格”是指符合财税部门规定的税
前价格,该价格不包括材料销售企业的销项税,但包括税前的材料原价、运杂费、运输损
综合工日日 综合工日日
工资价格按 工资价格按

2019-2019年广东定额人工费调整共11页文档

2019-2019年广东定额人工费调整共11页文档

关于2019年第四季度广州市建设工程结算及有关问题的通知2019-1-20 11:32:13 来源:本站穗建造价[2019] 1 号各有关单位:2019年第四季度与2019年第三季度相比,我市建设工程的人工日工资价格没有变化,材料和机械台班价格有所上升。

为了方便广州市建设工程招标投标和工程结算,经过调查测算和征求多方面的意见,现将我市建设工程造价结算有关事项通知如下:一、关于人工日工资价格问题(一)执行《广东省建筑工程综合定额(2019年)》、《广东省装饰装修工程综合定额(2019年)》、《广东省园林建筑绿化工程综合定额(2019年)》、《广东省安装工程综合定额(2019年)》、《广东省市政工程综合定额(2019年)》、《广州市市政工程补充综合定额(2019年)》、《广州地铁工程主要项目综合成本指导价(2019年)》的工程,2019年第四季度人工日工资价格均按65元计算;单独承包的建筑物装饰装修工程人工日工资价格按70元计算。

(二)执行《广州市房屋修缮工程预算定额(2019年)》的工程,2019年第四季度人工日工资价格按47元计算。

(三)执行《广东省建筑与装饰工程综合定额(2019年)》、《广东省安装工程综合定额(2019年)》、《广东省市政工程综合定额(2019年)》和《广东省园林绿化工程综合定额(2019年)》的工程,2019年第四季度综合工日、借工和时工的日工资价格按86元计算,停工和窝工的日工资价格按65元计算。

二、关于材料价格问题(一)2019年第四季度我市钢材、水泥、混凝土、干混砂浆、砂石、燃料和电线电缆的价格有所上升,沥青混凝土的价格有所下降。

主要材料价格按附表一《2019年第四季度广州地区建设工程常用材料综合价格》计算。

(二)执行《广东省安装工程综合定额(2019年)》、《广东省市政工程综合定额(2019年)》、《广州市房屋修缮工程预算定额(2019年)》的工程,2019年第四季度其它材料(辅助材料)价差调整系数按附表二《2019年第四季度各专业工程其它材料(辅助材料)价差调整系数表》计算。

2019广东省建筑与装饰工程综合定额章说明及工程量计算规则76页word文档

2019广东省建筑与装饰工程综合定额章说明及工程量计算规则76页word文档

广东省建筑与装饰工程综合定额2019(章说明及工程量计算规则)目录一、(上册) (1)A.1 土石方工程 (1)A.2 桩基础工程 (5)A.3 砌筑工程 (9)A.4 混凝土及钢筋混凝土工程 (13)A.5 木结构工程 (19)A.6 金属结构工程 (22)A.7 屋面及防水工程 (23)A.8 保温隔热工程 (28)二、(中册) (30)A.9 楼地面工程 (30)A.10 墙柱面工程 (33)A.11 天棚工程 (37)A.12 门窗工程 (40)A.13 幕墙工程 (45)A.14 细部装饰栏杆工程 (46)A.15 家具工程 (47)A.16 油漆涂料裱糊工程 (48)A.17 广告牌工程 (55)A.18 景观工程 (56)A.19 石作工程 (58)A.20 其他工程 (60)三、(下册) (61)A.21 模板工程 (61)A.22 脚手架工程 (64)A.23 垂直运输工程 (70)A.24 材料二次运输 (72)A.25 成品保护工程 (73)A.26 混凝土泵送增加费 (73)一、(上册)A.1 土石方工程章说明一、一般规定1、工程计量前,应了解以下事项:1) 地下水位标高及排(降)水方法;2) 土方、沟槽、基坑挖(填)起止标高、施工方法及运距;3) 岩石开凿、爆破方法、石碴清运方法及运距;4) 其他需了解的有关事项。

2、本章的土石方工程量除定额注明外,挖、运土石方按天然密实度体积考虑,填方按压(夯)实后的体积考虑。

如需体积折算按下表:土方体积折算系数表3、土石方工程土壤及岩石类别的划分,依照工程勘测资料与"土壤及岩石(普氏)分类表"(详见附表)对照后确定。

4、平整场地、沟槽、基坑和一般土石方划分规定:1) 建筑场地就地挖、填、运、找平土方厚度在±30cm以内的为平整场地;2) 图示底宽在3m以内,且长大于宽3倍以上的为沟槽;3) 图示底长小于底宽3倍以内,且底面积在20m2以内的为基坑;4) 超过上述范围的,按一般土石方计算。

2019年市政工程消耗量定额道路工程

2019年市政工程消耗量定额道路工程
·1·
·2·
目 录
第一章 路基处理
说明 ……………………………………………………… (3) 工程量计算规则 ………………………………………… (4) 一、预压地基 ……………………………………………… (5)
1.堆载预压 ………………………………………… (5) 2.真空预压 ………………………………………… (6)
四、掺砂石 ……………………………………………… (11)
1.掺配砂 …………………………………………… (11) 2.掺配砾石 ………………………………………… (11)
五、抛石挤淤 …………………………………………… (12) 六、袋装砂井 …………………………………………… (12) 七、塑料排水板 ………………………………………… (13) 八、振冲桩( 填料) ……………………………………… (13) 九、振动砂石桩 ………………………………………… (14) 十、水泥粉煤灰碎石桩( CFG) ………………………… (14) 十一、水泥搅拌桩 ……………………………………… (15)
确定。 2.本定额的机械台班消耗量是按正常机械施工工效并考虑机械幅度差综合取定的。 3.凡单位价值 2000 元以内、使用年限在一年以内的不构成固定资产的施工机械,不列入机械台班消耗
量,作为工具用具在建筑安装工程费中的企业管理费考虑,其消耗的燃料动力等列入材料。 十一、本定额中的工作内容已说明了主要的施工工序,次要工序虽未说明,但已包括在内。 十二、施工与生产同时进行、在有害身体健康的环境中施工时的降效增加费,本定额未考虑,发生时另
第三章 道路面层
说明 ……………………………………………………… (41) 工程量计算规则 ………………………………………… (42) 一、沥青表面处治 ……………………………………… (43) 二、沥青贯入式路面 …………………………………… (44) 三、透层、黏层 …………………………………………… (44)

广东省市政工程综合定额2018宣贯文稿定额区别

广东省市政工程综合定额2018宣贯文稿定额区别

一、编制概况
本综合定额由通用工程、道路工程、桥涵 工程、给水工程、排水工程、燃气工程、 隧道工程共七册组成,子目基价及其组项 价格均不包含增值税可抵扣进项税额。在 实际应用中,缺项定额应执行现行广东省 建设工程计价依据及其相关规定。
一、编制概况
1. 定额水平和造价水平更加贴近市场。客观反映市场是本次编制的基本原则之一,2018综合定额 充分考虑绿色施工标准,以市场的实际情况作为调整是否合理的评判标准,调整后的人工水平、管 理费用和造价水平基本都能体现市场的实际情况。按照优化建筑业发展和向管理中要利润的思路, 适当提高了管理费水平,符合工程造价构成规律。 2. 符合节能环保绿色施工标准要求,倡导绿色施工和文明施工,提高了文明施工增加费。 3. 增加了很多缺失的新工艺,更适合广东复杂地质条件。 4. 计量规则更加完善。2018综合定额对现行定额执行过程中发现的问题进行了修订,进一步简化 了计算方法,使得计算规则更加完善。 5. 根据实际情况调整了相关费用规定,措施其他项目费用中取消中交通干扰费,增加交通疏解员增 加费;其他项目费用中增加概算幅度差等。
2019/12/13
17
八、管理费、利润
二、利润取定情况 《广东省市政工程综合定额》(2010)以人 工费为基数,费率取18%,利润占仅总造价 2%左右,偏离国家费用文件规定及市场较大。 本综合定额以人工费与施工机具费之和为基 础计算工程利润,费率取15%,增幅76.79%, 调整后的利润占总造价4%左右,数据回归合 理市场水平。
2019/12/13
7
四、编制依据
《市政工程工程量清单计算规范》GB 50861-2013;《市政工程消耗量标准》ZYA 1-31-2015;《关于建筑 工程绿色施工的管理办法(暂行)》(粤建质〔2016〕242号)等。 除了以上规范标准文件之外,本次综合定额的编制工作的主要标准、规范及相关资料还包括以下内容:

广州市市政工程补充综合定额

广州市市政工程补充综合定额

《广州市市政工程补充综合定额(2011)》创新颁布执行为了配合《广东省市政工程综合定额(2010)》(以下简称《2010省市政综合定额》)在广州市的贯彻执行,广州市建设工程造价管理站结合2010年省定额缺项内容和本市市政工程的具体特点,在《广州市市政工程主要项目补充综合定额(2006)》(以下简称《2006市政补充综合定额》)的基础上组织编制了2011年《广州市市政工程补充综合定额》(以下简称《2011市市政补充综合定额》),并于2011年7月1日颁布执行,与省市政工程综合定额配套使用。

据了解,除深圳市是使用本市编制的定额外,全省目前只有广州市是有技术力量编制补充定额,其他城市多借鉴参考我市编制的补充定额。

《2011市市政补充综合定额》的编制工作于2010年10启动,经市造价站工程技术人员与有关行内专家反复测算、核对、修改,于2011年5月定稿,并经市城乡建设委员会批准于2011年7月1日正式颁布执行。

《2011市市政补充综合定额》包括通用工程、道路工程、给水工程、排水工程及市政维修工程共五章421个子目。

市造价站本着“定额水平与《2010省市政综合定额》的水平一致,尽量与建筑市场贴近”的编制原则,从三个方面着手编制工作:一是根据《2010省市政综合定额》的修编情况和市场发展变化,对《2006市政补充综合定额》的项目进行修编,使得定额水平与《2010省市政综合定额》基本保持一致,尽量贴近市场实际;二是对近年来广州市政工程中出现的新材料、新工艺和新设计标准,及时补充相关的定额子目,满足广州地区建设工程的使用;三是补充《2010省市政综合定额》缺项的内容,如市政维修工程、道路石屑、中砂底层等。

值得一提的是,市造价站创新了2011年《广州市市政工程补充综合定额》的发行模式——在全国造价行业内首次采用免费网上发布!为了方便各有关单位和从业人员使用补充综合定额,加强与同业交流,基于资源共享、环保节约的理念,体现服务行业、指导行业的宗旨,该补充7月1日起在广州造价网()上同步公开发布。

广东省2019年定额与2019定额对比情况

广东省2019年定额与2019定额对比情况
人工挖孔桩桩芯移入桩基础章,原来在混凝土章 节;
(二)、混凝土及钢筋:补充钢筋冷挤压 接头子目,补充预埋锚栓项目
(三)、金属结构构件制作的工作内容: 金属结构工程。1、本章内容与钢结构的划 分标准为:非承重、非结构的纳入金属结 构工程,其它纳入钢结构工程;除钢结构 工程外,一般性建筑工程需适用的项目, 纳入金属结构工程;金属结构构取消除锈 一遍;钢结构构件单独编制一册,晚点出。
(3)、工程量计算规则:
1、天棚吸音层按实铺面积计算。原来有子目没 有计算规则。
2、天棚检修道按设计图示长度以米计算。补充 子目增加规则
3、井口天花按设计图示水平投影面积以面积计 算。补充子目增加规则
(七)、油漆裱糊工程。1、金属面补充油 漆子目,按照安装定额、四川定额确定, 没有的其人工仍要根据国家定额平衡;2、 防火涂料分厚、薄两种类型,按安装定额; 乳胶漆子目取消了刮腻子的内容,单独编 制刮腻子子目
(2)墙柱面工程。1、普通抹灰、装饰抹灰工程人工消耗量 乘以1.1;2、镶贴大理石、花岗石及其他人工消耗量乘以 0.9;3、镶贴陶瓷块料人工
消耗量乘以0.85;4、干挂大理石、花岗石、陶瓷块料人 工消耗量乘以0.8;
(3)天棚工程。1、抹灰工程人工消耗量乘以1.1;2、其 他的人工消耗量乘以0.9;
(五)、砂浆:商品砂浆以含量的方式出 现,扣减定额子目中砂浆制作的人工和搅 拌机的消耗量等;增加“砂浆制作”一节, 并与“混凝土制作”并为一章,涉及到砂 浆的项目的工作内容统一增加“砂浆(制作) 运输”的内容,含量改为:XXX(砂浆)制 作;
二、部分章节变化的情况
(一)、桩基础的变化:CFG桩(水泥粉煤灰碎 石桩)作为成孔灌注混凝土桩的一类,设置长螺 杆钻机成孔、沉管成孔两类子目,调整结算桩长 的说明2、所有桩的长度,除另有规定外,预算按 设计长度;结算按实际入土桩的长度(单独制作 的桩尖除外)计算, 超出地面的桩头长度不得计 算,成孔灌注混凝土桩的桩长以成孔长度为准”; 灌注类的桩包括沉管、CFG桩实际灌注量不同时, 可调整混凝土量,原来只说钻冲孔桩。

2018年版《广东省市政定额说明及计算规则》D.4 给水工程

2018年版《广东省市政定额说明及计算规则》D.4 给水工程
1 粘接··················································································································123 2 胶圈连接············································································································125
广东省建设工程计价依据
广东省 市政工程综合定额
2018
第四册 给水工程
主编单位:广东省建设工程标准定额站 广东省工程造价协会
批准部门:广东省住房和城乡建设厅 执行日期:2019 年 3 月 1 日
目录
总说明························································································································· 1 册说明························································································································· 7
D.4.2.7 承插式预应力混凝土管转换件安装(胶圈接口)············································· 127 D.4.2.8 阀门安装····································································································· 131

广东省市政工程综合定额

广东省市政工程综合定额

广东省市政工程综合定额2021-12-31 下午 03:37:42 来源:点击数:11241第一册通用项目一、概况本册定额包括土石方工程、护坡、挡土墙工程、打桩工程、拆除工程、围堰工程、脚手架及其他工程共七章738个子目。

其中D.1.1土石方工程定额包括挖运土方、挖运石方、土(石)方回填、挡土板、软基处理及支护加固工程等内容共五节215个子目;D.1.2护坡工程定额包括砂石滤层、滤沟、砌护坡、台阶、压顶、挡土墙、勾缝、地沟、明沟、电缆沟、水平定向钻牵引钻孔等内容共七节73个子目;D.1.3打桩工程定额包括打拔工具桩、打基础桩工程等内容共二节 170个子目;D.1.4拆除工程定额包括拆除旧路、拆除人行道、拆除侧缘石、拆除管道、拆除砖石构筑物、拆除混凝土障碍物、伐树、挖树蔸、路面凿毛、路面铣刨机铣刨路面工程等内容共十二节95个子目;D.1.5围堰工程定额包括土、纤维袋围堰、土石混合围堰、圆木桩围堰、钢桩围堰、钢板桩围堰、双层竹笼围堰以及筑岛填心等内容共七节22个子目;D.1.6脚手架工程定额包括综合脚手架、单排脚手架、满堂脚手架、混凝土用仓面脚手架、靠脚手架安全防护挡板、独立安全防护挡板以及围尼龙编织布等内容共七节26个子目;D.1.7其他工程定额包括包括材料二次运输、排运铸铁管、钢筋混凝土管、小型构件运输、汽车运水、机动翻斗车运输混凝土、井点降水以及施工护栏等内容共七节137个子目。

二、适用范围本册定额适用于全省行政区域内新建、扩建和改建的市政工程通用项目(除具体专业册说明不适应外)的计价。

三、编制原则1、定额结构内容符合08规范的要求,满足工程量清单计价的需要。

2、采用“量价合一”的表现形式,消耗量体现全省的统一性,保证施工和安全生产的需要。

3、项目划分、计量单位和计算规则三者必须有机统一,简洁明了,便于投标报价、工程价款结算以及单位内部核算与管理。

4、项目的工、料、机消耗量在《全国统一市政工程预算定额》(第一~七册)(GYD-301-1999~GYD-307-1999)和《广东省市政工程综合定额(2021)》的基础上,结合现行设计规范、施工验收规范、质量评定标准和安全操作规程下实际施工发生的社会平均水平来调整取定,科学理顺量价关系,贴近市场实际。

广东省市政工程综合定额2018宣贯文稿定额区别

广东省市政工程综合定额2018宣贯文稿定额区别

技术支持单位:广州易达建信科技开发有限公司
2019/3/22
3
一、编制概况
1. 定额水平和造价水平更加贴近市场。客观反映市场是本次编制的基本原则之一,2018综合定额 充分考虑绿色施工标准,以市场的实际情况作为调整是否合理的评判标准,调整后的人工水平、管 理费用和造价水平基本都能体现市场的实际情况。按照优化建筑业发展和向管理中要利润的思路,
技术支持单位:广州易达建信科技开发有限公司
2019/3/22
6
三、编制原则
四、依据广东省地方标准《建筑工程绿色施工评价标准》DBJ/T 15-97-2013,删减因工艺材料落后等因素 需要淘汰的项目,提升绿色环保施工管理标准。 五、局部调整各专业册定额子目水平偏差和不合理部分,对措施项目、其他项目、税金、附录等进行了审 查梳理,修改相关内容、计费基数、计费标准等。 六、根据2013国家标准《市政工程工程量清单计算规范》完善定额子目设置、结构、内容,结合广东省实 际情况的要求,满足工程量清单计价和定额计价的需要。
审设计概算、施工图预算、招标控制价、竣工结算的依据,是处理工程造价纠纷、鉴定工程造价的
依据,也作为企业投标报价、加强内部管理和核算的参考。 三、本综合定额是完成单位工程量所需的人工费用,材料,机具等消耗量以及管理费标准。该消耗 量及费用标准是按正常的施工条件,以我省建筑企业的施工机械装备程度、合理的施工工期、采用 绿色施工标准的施工工艺、劳动组织为基础综合确定的,反映了社会平均水平。 四、本综合定额各专业册以专业工种划分,按章、节、项目、子目排列,各册均有总说明、册说明、 章说明、工程量计算规则、分部分项工程项目、措施项目、其他项目、税金、附录,项目由工作内 容和定额表格组成,有的加上必要的附注。工作内容简单扼要地说明主要施工工序,次要施工工序 虽未具体说明,但均已考虑在内。

广州市市政工程补充综合定额(2019)

广州市市政工程补充综合定额(2019)
D2.4 车止石安装········································································································ 34
D3 给水工程
说明··························································································································· 37 工程量计算规则·········································································································· 39 D3.1 标准水表井········································································································ 41 D3.2 标准阀门井········································································································ 42
D2 道路工程
说明··························································································································· 23 工程量计算规则·········································································································· 25 D2.1 铲草···················································································································27 D2.2 道路基层············································································································28

2019-2019年广东定额人工费调整共11页文档

2019-2019年广东定额人工费调整共11页文档

关于2019年第四季度广州市建设工程结算及有关问题的通知2019-1-20 11:32:13 来源:本站穗建造价[2019] 1 号各有关单位:2019年第四季度与2019年第三季度相比,我市建设工程的人工日工资价格没有变化,材料和机械台班价格有所上升。

为了方便广州市建设工程招标投标和工程结算,经过调查测算和征求多方面的意见,现将我市建设工程造价结算有关事项通知如下:一、关于人工日工资价格问题(一)执行《广东省建筑工程综合定额(2019年)》、《广东省装饰装修工程综合定额(2019年)》、《广东省园林建筑绿化工程综合定额(2019年)》、《广东省安装工程综合定额(2019年)》、《广东省市政工程综合定额(2019年)》、《广州市市政工程补充综合定额(2019年)》、《广州地铁工程主要项目综合成本指导价(2019年)》的工程,2019年第四季度人工日工资价格均按65元计算;单独承包的建筑物装饰装修工程人工日工资价格按70元计算。

(二)执行《广州市房屋修缮工程预算定额(2019年)》的工程,2019年第四季度人工日工资价格按47元计算。

(三)执行《广东省建筑与装饰工程综合定额(2019年)》、《广东省安装工程综合定额(2019年)》、《广东省市政工程综合定额(2019年)》和《广东省园林绿化工程综合定额(2019年)》的工程,2019年第四季度综合工日、借工和时工的日工资价格按86元计算,停工和窝工的日工资价格按65元计算。

二、关于材料价格问题(一)2019年第四季度我市钢材、水泥、混凝土、干混砂浆、砂石、燃料和电线电缆的价格有所上升,沥青混凝土的价格有所下降。

主要材料价格按附表一《2019年第四季度广州地区建设工程常用材料综合价格》计算。

(二)执行《广东省安装工程综合定额(2019年)》、《广东省市政工程综合定额(2019年)》、《广州市房屋修缮工程预算定额(2019年)》的工程,2019年第四季度其它材料(辅助材料)价差调整系数按附表二《2019年第四季度各专业工程其它材料(辅助材料)价差调整系数表》计算。

20XX年4、广东省市政工程综合定额(20XX)说明及工程量计算规则.doc

20XX年4、广东省市政工程综合定额(20XX)说明及工程量计算规则.doc

2019年4、广东省市政工程综合定额(2006)说明及工程量计算规则1广东省市政工程综合定额(2006)说明及工程量计算规则目录第一册通用项目(3)总说明(3)册说明(6)工程量计算规则(6)第一部分分部分项工程项目(15)D.1.1 土石方工程说明(15)D.1.2 护坡、挡土墙说明(17)D.1.3 打拔工具桩及挡土板工程说明(17)D.1.4 装饰工程说明(18)D.1.5 拆除工程说明(18)第二部分措施项目(19)D.1.6 安全防护、文明施工措施费(19)D.1.7 围堰工程说明(22)D.1.8 脚手架及其他工程说明(24) D.1.9 措施其他项目(25)第三部分其他项目(26)说明(26)其他项目费用标准(26)第四部分规费(27)说明(27)规费标准(27)第五部分税金(28)说明(28)税金(28)附录1利润标准(28)说明(28)利润标准(29)附录2土方放坡系数表(29)附录3材料周转及摊销(29)附录4混凝土及砂浆配合比(30)说明(30)附录5管理费分摊费率表(31)第二册道路工程(31)总说明(31)工程量计算规则(34)第一部分分部分项工程项目(36)D.2.1 路床(槽)整形说明(36)D.2.2 道路基层说明(36)D.2.3 道路面层说明(37)D.2.4 人行道侧缘石及其它说明(37) D.2.5 补充现浇混凝土(38)第三册桥涵工程(38)总说明(38)册说明(40)第一部分分部分项工程项目(41)D.3.1 打桩工程说明(41)D.3.2 钻(冲)孔灌注桩工程说明(42)D.3.3 砌筑工程说明(42)D.3.4 钢筋工程说明(42)D.3.5 现浇混凝土工程说明(43) D.3.6 预制混凝土工程说明(43) D.3.7 立交箱涵工程说明(44) D.3.8 安装工程说明(44)D.3.9 临时工程说明(45)第四册给水工程(46)总说明(46)册说明(48)第一部分分部分项工程项目(49) D.4.1 管道安装说明(49)D.4.2 管件安装说明(49)D.4.3 管道附属构筑物说明(50) D.4.4 取水工程说明(51)第五册排水工程(52)总说明(52)册说明(54)第一部分分部分项工程项目(55)D.5.1 定型混凝土管道基础及铺设说明(55) D.5.2 定型井说明(57)D.5.3 非定型井、渠、管道基础及砌筑说明(57) D.5.4 顶管工程说明(58)D.5.5 给排水构筑物说明(60)D.5.6 给排水机械设备安装说明(63)D.5.7 模板、钢筋、井字架工程说明(66)第六册燃气工程(67)册说明(69)第一部分分部分项工程项目(71)D.6.1 管道安装说明(71)D.6.2 管件制作、安装说明(71)D.6.3 法兰阀门安装说明(71)D.6.4 燃气用设备安装说明(73)D.6.5 管道试验检验工程说明(73)D.6.6 管道除锈防腐蚀工程说明(74) 第七册路灯工程(75)总说明(75)册说明(77)第一部分分部分项工程项目(78)D.7.1 变配电设备工程说明(78)D.7.2 架空线路工程说明(79)D.7.3 电缆工程说明(79)D.7.4 配管配线工程说明(80)D.7.5 照明器具安装工程说明(81) D.7.6 防雷接地装置工程说明(81) D.7.7 路灯灯架制作安装工程说明(82) D.7.8 刷油防腐工程说明(82)第八册隧道工程(82)总说明(82)册说明(85)第一部分分部分项工程项目(86)D.8.1 隧道开挖与出渣说明(86)D.8.2 隧道内衬说明(87)D.8.3 盾构法掘进说明(88)D.8.4 垂直顶升说明(90)D.8.5 地下连续墙说明(90)D.8.6 地下混凝土结构说明(91)D.8.7 地基加固、监测说明(91)D.8.8 金属构件制作说明(92)D.8.9 临时工程说明(93)第一册通用项目总说明一、《广东省市政工程综合定额》(2006年) (以下简称本定额)是在国家标准《建设工程工程量清单计价规范》(GB50500-2003)和《全国统一市政工程预算定额》(GYD-301-1999~GYD-308-1999)及《广东省市政工程综合定额》(2002年)基础上,结合我省设计、施工、招投标的实际情况,根据现行国家产品标准、设计规范和施工验收规范、质量评定标准、安全操作规程编制的。

广东市政2002定额计价办法

广东市政2002定额计价办法

广东省市政工程预算定额2002(03计价办法)通用项目作者:admin 来源:本站原创点击数:获取中... 更新时间:2008-12-10一、《广东省市政工程综合定额》第一册“通用项目”(以下简称本定额),包括土石方工程、护坡挡土墙工程、打拔工具桩及挡土板工程、装饰工程、围堰工程、拆除工程、脚手架及其他工程。

二、本定额项目适用于《广东省市政工程综合定额》其他专业册(专业册中指明不适用本定额的除外)。

三、本定额中的大型机械是按《全国统一施工机械台班费用定额》中机械的种类、型号、功率等分别考虑的,在执行中应根据企业的机械组合情况及施工组织设计方案分别套定额。

四、定额子目表中的施工机械是按合理的机械进行配合,在执行中不得因机械型号不同而调整。

五、未尽事宜见各章节说明。

一、2002年《广州市市政工程主要项目补充综合定额》(以下简称《市补充综合定额》)是在2002年《广东省市政工程综合定额》的基础上,结合广州市市政工程的实际需要,为方便市政工程招标投标和预结算计价工作,对一些专业工程的主要项目进行了补充和换算,并与2002年《广东省市政工程计价办法》、《广东省市政工程清单项目设置规则》和《广东省市政工程综合定额》同时配套使用。

二、《市补充综合定额》除各章另有说明外,一律按2002年《广东省市政工程综合定额》有关规定和说明执行。

三、凡在广州市执行2002年《广东省市政工程综合定额》和《市补充综合定额》时,人工价差按综合工日工资单价30元,并分别减去相应定额子目中的一、二、三类工日工资单价计算。

材料价差按广州市建设工程造价管理部各时期颁发的《广州地区建设工程材料指导价格》进行调整。

机械价差按《市补充综合定额》附表一所列的机械台班单价进行调整,或按2002年《广东省市政工程综合定额》附录中列出的机械台班费用定额换算(人工日工单价按30元、汽油按3.53元/kg、柴油按3.1元/kg、电按0.955元/kwh)。

《广东省房屋建筑和市政修缮工程综合定额》说明

《广东省房屋建筑和市政修缮工程综合定额》说明

总说明一、为合理确定我省房屋建筑和市政修缮工程的工程造价,根据建筑市场的计价需要和结合我省实际情况,在1995年《全国统一房屋修缮工程预算定额》、2010年《广东省建筑与装饰工程综合定额》、2010年《广东省安装工程综合定额》和2010年《广东省市政工程综合定额》的基础上,编制2012年《广东省房屋建筑和市政修缮工程综合定额》(以下简称本综合定额)。

二、本综合定额共分三册:第一册"建筑与装饰修缮工程"、第二册"安装修缮工程"、第三册"市政修缮工程"。

三、本综合定额是合理确定和有效控制工程造价、衡量工程造价合理性的基础,是编审设计概算、施工图预算、招标控制价、竣工结算的依据,是调解处理工程造价纠纷、鉴定工程造价的依据,也作为企业投标报价、加强内部管理和核算的参考。

四、本综合定额适用于我省行政区域内房屋建筑和市政基础设施的修缮工程,凡属本综合定额适用范围的工程,均以本综合定额为准;本综合定额未包括的修补项目,需套用2010年广东省相应专业综合定额的,除另有说明外,规定如下:1.建筑与装饰工程,人工乘以系数1.15,材料乘以系数1.05。

2.安装工程,人工、机械乘以系数1.20,材料乘以系数1.10。

3.市政工程见各章说明。

五、本综合定额以专业工种划分,按章、节、项目、子目排列,各章均有章说明、工程量计算规则,项目由工作内容和定额表格组成,有的加上必要的附注。

工作内容简单扼要地说明主要的施工工序,次要的工序虽未具体说明,但均己考虑在内。

六、本综合定额采用2010年广东省建设工程计价依据工料机库。

其中,人工工资单价51元/工日按2009年第二季度四类地区工资水平取定,材料价格按2009年第二季度全省综合水平确定,施工机械台班单价按2009年第二季度全省综合水平确定。

七、本综合定额人工有关说明:1.人工不分工种和技术等级,采用综合工日形式,己包括基本用工、辅助用工、人工幅度差、现场运输及清理现场等用工。

广东园林绿化工程综合定额说明及计算规则(2019年版)

广东园林绿化工程综合定额说明及计算规则(2019年版)

广东园林绿化工程综合定额说明及计算规则(2019年版)第一册绿化前期工程说明1.1本章定额适用于园林绿化工程中种植工程之前的前期工程的计价,包括立地条件营造、绿化植物迁移、砍伐、绿化材料运输、绿化植物假植等内容。

1.2立地条件营造中的绿化地整理只适用于新建、扩建绿化地工程,包含地坪正负高差30cm 内、零土方调运的整理捡平。

地坪正负高差30cm外或需调运土方的,按土方处理相应子目计算。

1.3迁移乔木中,只保留主干或连同第一级分枝的,按截干迁移计算;如保留3/5以内树冠的,按半冠迁移计算;保留3/5以外树冠的,按全冠迁移计算。

1.4本章定额的迁移、砍伐乔木,未考虑架空线路和(或)房屋建筑等的妨碍,或目的植物立地条件复杂,如有上述情况,按施工组织方案计算费用。

1.5清运树枝及树尾按5km内考虑,每增加1km内,增加载货汽车台班消耗量乘以系数0.08,其他不变。

1.6苗木运输子目只适用于苗木迁移和发包方供应苗木的情况下使用。

1.7使用绿篱、露地花卉及地被换填土子目时,需扣减原种植定额子目中熟耕土的消耗量。

换土时,熟耕土与通用种植土的体积比例按3:7考虑,比例不同时应予换算。

1.8假植所用的熟耕土可按发包方要求调整。

工程量计算规则1.1绿化地整理按设计图示尺寸以面积计算。

1.2绿化地铲除杂草按实际发生面积计算。

1.3微坡地形土方堆置按设计图示尺寸以体积计算。

1.4屋顶花园基底处理及铺设土工布按设计图示尺寸以面积计算。

1.5屋顶花园填充滤水层及填充屋顶种植土按设计图示尺寸以体积计算。

1.6绿化地排水管安装按设计图示尺寸以长度计算。

1.7换土和铺草前铺沙找平按设计图示尺寸以面积计算。

1.8填土按设计图示尺寸以体积计算。

1.9起挖、砍伐、假植、运输乔木、灌木、棕榈、竹类按设计图示数量计算。

1.10起挖、砍伐、假植绿篱、露地花卉按设计图示尺寸以面积计算。

1.11运输盆苗、袋苗按设计图示数量计算。

1.12运输草皮按设计图示尺寸以面积计算。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
D3.3 汽 20 级车行道制井···························································································· 47 D3.4 蝶阀井··············································································································· 52 D3.5 立式闸阀井········································································································· 54 D3.6 卧式蝶阀井········································································································ 58
-1-
节适用于广州市行政区域内的新建、扩建和改建的房屋建筑、市 政、综合管廊、园林绿化、安装、城市轨道等建设工程, 与 2018 年广东省建设工程各专业综合定额配套使用。
三、从 2019 年 10 月 1 日起,《广州市绿色施工围蔽补充定额 子目》(试行)(穗建造价〔2019〕39 号)停止执行。
D1 通用工程
说明····························································································································· 5 工程量计算规则············································································································9 D1.1 装配式施工围蔽································································································· 11
一、从 2019 年 10 月 1 日起,《广州市市政工程补充综合定 额(2019)》在广州行政区域内执行,并与《广东省市政工程综合 定额(2018)》配套使用。2019 年 10 月 1 日前已发出招标文件或 已签订合同的工程,仍按约定执行。
二、《广州市市政工程补充综合定额(2019)》中通用工程章
刘荣标 周 军
软 件 支 持 : 广州易达建信科技开发有限公司
李绪泽 沈素瑶
目录
总说明························································································································· 1
D1.2 砌筑式施工围蔽································································································· 17
D1.2.1 装配式预制再生混凝土围蔽············································································· 17 D1.2.2 再生砌块围蔽(现代)······················································································ 18 D1.2.2 再生砌块围蔽(传统)······················································································ 19
1
D2.2.1 中砂底层····································································································· 28 D2.2.2 车行道石屑底层···························································································· 29 D2.2.3 车行道混凝土垫层························································································· 30
四、《广州市市政工程补充综合定额(2019)》的发布、解释、 勘误、补充、修订均由我站负责。各单位在执行过程中遇到的问 题,请及时向我站反映。
广州市建设工程造价管理站 2019 年 9 月 3 日
抄送:广东省建设工程标准定额站。 广州市建设工程造价管理站办公室 2019 年 9 月 3 日印发
-2-
广州市建设工程造价管理站文件
穗建造价〔2019〕100 号
广州市建设工程造价管理站关于印发 《广州市市政工程补充综合定额 (2019)》的通知
各有关单位: 为贯彻执行《广东省市政工程综合定额(2018)》,完善我市
市政工程计价依据,我站组织编制了《广州市市政工程补充综合 定额(2019)》,现印发给你们,并将有关事项通知如下:
D1.1.1 方钢结构围蔽一···························································································· 11 D1.1.2 方钢结构围蔽二···························································································· 12 D1.1.3 H 型钢结构围蔽一(传统)·············································································· 13 D1.1.4 H 型钢结构围蔽二(现代)·············································································· 14 D1.1.5 穿孔金属板围蔽···························································································· 15 D1.1.6 临时活动式围蔽···························································································· 16
D2 道路工程
说明··························································································································· 23 工程量计算规则·········································································································· 25 D2.1 铲草···················································································································27 D2.2 道路基层············································································································28
D2.4 车止石安装········································································································ 34
D3 给水工程
说明··························································································································· 37 工程量计算规则·········································································································· 39 D3.1 标准水表井········································································································ 41 D3.2 标准阀门井········································································································ 42