钢结构彩钢瓦立面安装工艺流程
English Answer:
Steel Structure Color Steel Tile Facade Installation Process.
1. Preparation.
Material inspection and acceptance.
Site survey and layout.
Equipment and tools preparation.
2. Substructure Installation.
Main and secondary beams installation.
Purlin installation.
Bracing installation.
3. Color Steel Tile Installation.
Laying the starting sheet.
Uncoiling and positioning the color steel tile. Fixing the color steel tile to the purlins.
Overlapping the color steel tile and sealing. 4. Accessories Installation.
Ridge caps and eaves troughs installation.
Downpipes and gutters installation.
Flashings and trims installation.
5. Quality Inspection and Acceptance.
Visual inspection for any defects. Flatness and alignment check.
Waterproofing and sealing test.
Chinese Answer:
钢结构彩钢瓦立面安装工艺流程。

1. 准备工作。

材料检验验收。

现场勘察放线。

设备工器具准备。

2. 次结构安装。

主次梁安装。

檩条安装。

支撑安装。

3. 彩钢瓦安装。

起始板铺设。

彩钢瓦放样定位。

彩钢瓦固定于檩条。

彩钢瓦搭接封严。

4. 附属件安装。

脊瓦、檐沟安装。

落水管、天沟安装。

泛水、收边安装。

5. 质量检验验收。

外观检查有无缺陷。

平整度、直线度检查。

防水、密封性试验。