H1

Energy Recovery, Inc.

Pressure Exchanger (PX®)

energy recovery device

Ultra High Efficiency

Technical Presentation

Jan.4,2008

AGENDA

Energy Recovery, Inc.

Desalination Systems

The Pressure Exchanger

SWRO Engineering Design

SWRO Process Simulator

Commissioning, Operation and Service PX Hands-on Demonstration

Headquarters Office in San Leandro (San Francisco),

California USA

Regional Offices in Spain, China, Florida, UAE

The PX transfers pressure from high-pressure SWRO concentrate to low-pressure filtered seawater with an efficiency up to 98%.

Dhekelia, Cyprus -40,000 m3/day (10.6 MGD) SWRO

1998 Start-up

Francis Turbine Retrofit –Energy Savings of 40% per Month

UAE -13,650 m3/day (3.6 MGD) SWROs (I)

2005 Start-up

Energy Recovery, Inc.

YuHuan, China –36,000 m3/day (9.5 MGD) SWRO

2006 Start-up

Largest SWRO Plant in China (+ Several more)

Los Cabos, Mexico –17,000 m3/day (4.5 MGD) SWRO

2006 Start-up

6 PX-220 array -(4 RO Trains) 24 PX units

Perth, Australia –144,000 m3/day (38 MGD) SWRO 2006 Start-up

Largest SWRO Plant in Asia Pacific

16 PX-220 array -(12 RO Trains) 192 PX units

Energy Consumption

•High-pressure pump (trains 1 & 2): 2499 kW

•Booster pump (train 1): 42 kW

•Booster pump (train 2): 45 kW

•Permeate production (train 1): 552 m 3/hr

•Permeate production (train 2): 560 m 3/hr

•SWRO energy consumption: 2.32 kWh/m 3*

•Overall plant energy consumption: 3.2 -3.5 kWh/m 3

including energy to pump to reservoir

* specific energy consumption reported in paper neglected 0.91 power factor

Evolution of SWRO –2007

Perth (Kwinana) Desalination Plant

GWI Award: Perth Perth –Desalination Plant of the Year (2007)

GWI Award: PX –Environmental Contribution of the Year (2007)

Hamma, Algeria, SWRO –200,000 m3/day (52.8 MGD) 32 PX-220 array

8+1 trains (288 units)

Commissioning:

Nov/Dec 07

Skikda, Algeria –100,000 m3/day (26 MGD) SWRO

2007 Start-up

22 PX-220 array –(5 RO Trains) 110 PX units

BeniSaf, Algeria –200,000 m3/day (52 MGD) SWRO

2008 Start-up

22 PX-220 array -(10 RO Trains) 220 PX units

Alicante II, Spain 2007 –65,000 m3/day (17 MGD) ACUAMED

Arrays of 12 PX-220 units

7 trains (84 PX units)

Train of 9,500 m3/day

Escombreras, Spain –63,000 m3/day (16.6 MGD) SWRO

2007 Start-up

11 PX-220 array

6 trains (66 units)