零序保护系统试验记录J519

合集下载

inspection form list(检查表格汇总表)

inspection form list(检查表格汇总表)
29
Extra 228
Cover-ups Inspection and Acceptance Record of Drilled Cast-in Place Concrete Pile
钻孔灌注桩隐蔽工程检查验收记录表
30
Extra 229
Concrete Pouring Record of Drilled Cast-in Place Concrete Pile
39
Extra 238J
Underwater Concrete Pouring Record
水下砼灌注记录表
40
Extra 239J
Concealed work inspection record
隐蔽工程验收记录
41
Extra 240J
Drilling Record
钻孔记录表
42
Extra 241J
J207
Tolerance Re-Survey Record of Spheric Tank Foundation
球罐基础允许偏差项目复测记录
13
J208
Survey Record of Foundation Settlement
基础沉降观测记录
14
J209
Hoisting Acceptance Record of Reinforced Concrete Component
地下管道检查记录
17
Extra 417
Above Ground Pipe Inspection Record
地上管道检查记录
18
Extra 418
Visual Inspection of Flanges, Gaskets and Bolting

中石化A-SH3503交工表格

中石化A-SH3503交工表格

建设单位(公章) 监理单位(公章) 施工单位(公章)
项目经理:
项目总监:
项目经理:
审 核 人:
审 核 人:
审 核 人:
年月日
年月日
年月日
.
.
工程名称:
SH3503- J103
交工技术文件目录 单元名称:
第2页共2页
序号 编 码
资料名称
31
J606
32
J610
33
J620
34
J622
35
J624
36
J624
37
38
物位仪表调校记录 就地指示仪(直读式压力计、温度计)调校记录
电缆(线)敷设及绝缘电阻测量记录 主电缆安装检查记录 仪表安装检查记录 就地仪表安装检查记录 产品合格证 施工方案
页次 138 139 143 147 149 156 160 164-175
.
SH3503- J103
序号 1 2 3 4 5 6 7 8 9
.
编号 J201 J202 J203 J204 J205 J206-1 J206-2 J207 J208 J209 J210 J211 J212 J213 J214 J215 J216 J217 J218 J219
编号 J301 J302 J303 J304 J305 J306 J307 J308 J309 J310-1 J310-2 J311 J312
13 绝缘油试验记录
14 电流(压)继电器试验记录
15 GL型电流继电器试验记录
16 时间继电器试验记录
17 中间、信号继电器试验记录
18 电测量指示仪表检验记录
19 零序保护系统试验记录
20 接地电阻测量记录

中石化A-SH3503交工表格

中石化A-SH3503交工表格
《现场设备、工业管道焊接工程施工及验收规范》(GB50236-97)
《工业设备及管道绝热工程、施工及验收规范》(GB50236-97)
《石油化工仪表工程施工技术规范》(GBJ126-89)
《电气装置安装工程电缆线路施工及验收规范》(GB50236-97)
《石油化工施工安全技术规程》(SH3505-99)
SH3503- J105
开工报告
工程名称:
合同号
设计单 位
计划开工日 期



计划竣工日 期



工 程 内 容
开 工 条 件
审 查 结 果 建设单位 (公章)
监理单位 (公章)
施工承包单位 (公章)
项目经理:
项目总监:
项目经理:
年月日 年月日
年月日
SH3503- J106
工程中间交接证书
工程名称: 单元名称:
序 未完工程项目内容 号
工程量 未完原因
处理意见
建设单位
监理单位
施工承包单位
14
DCS基本功能检测记录
J614
15
报警、联锁系统及可编程序控制器(PLC) J615
调试记录
16
检测、调节系统及DCS调试记录
J616
17
DCS机柜、仪表盘、操作台安装检查记录 J617
18
仪表管路强度、泄漏性、真空度试验、脱脂、 J618
酸洗记录
19
节流装置安装检查记录
J619
20
电缆(线)敷设及绝缘电阻测量记录
审 核 人:
审 核 人:
审 核 人:
年月日
年月日
年月日
SH3503- J103

SH3503表格

SH3503表格

35 电缆敷设及绝缘检测记录
36 电气照明安装检查记录
37 火灾报警系统安装检查记录
38
电气安装检查记录
A.6 仪表工程
序号 1 2 3 4
名称 变送器、转换器调校记录 调节器调校记录 调节阀、执行器、开关阀调校记录 指示、记录仪调校记录
J507 J508 J509 J510 J511 J512 J513 J514 J515 J516 J517 J518 J519 J520 J521 J531 J532 J533 J534 J535 J536 J537 J538 J539 J540 J541 J542-1 J542—2 J543 J544 J545 J546
A.2 建筑工程
序号 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
名称 地基验槽(坑)记录 工程定位测量记录 基础复测记录 块体式设备基础允许偏差项目复测记录 整体框架式设备基础允许偏差项目复测记录 储罐基础允许偏差项目复测记录(一) 储罐基础允许偏差项目复测记录(二) 球罐基础允许偏差项目复测记录 基础沉降观测记录 钢筋混凝土构件吊装验收记录 水池满水试验记录 钢结构安装记录 钢吊车梁安装记录 钢桁架安装记录 钢网架安装记录 塔架及管筒安装记录 高强螺栓连接检查记录 建筑工程防腐蚀施工检查记录 防水工程试水检查记录 防火层施工检查记录
年月日
年月日
年月日
工程名称:
SH3503- J102
交工技术文件总目录
第 页共 页
卷号 册号
资料名称
页数
工程名称:
SH3503- J103
交工技术文件目录 单元名称:
第 页共 页
序号

中石化ASH交工表格

中石化ASH交工表格

编制。
2. 本册为设备安装、管道安装包括交工技术文件和竣工图两大部分,其中交工技
术文件一式 3 份,正本 1 份,副本 2 份;竣工图 1 式 2 份,正本 1 份,副本 1
份。
3. 验收规范:
《石油化工有毒、可燃介质管道工程施工及验收规范》(SH3501-97)
《工业金属管道工程施工及验收规范》(GB50235-97)
编号 J201 J202 J203 J204 J205 J206-1 J206-2 J207 J208 J209 J210 J211 J212 J213 J214 J215 J216 J217 J218 J219
编号 J301 J302 J303 J304 J305 J306 J307 J308 J309
J115 J116 J118 J123-1
J201 J202 J301 J302 J303 J311 J313 J317-B J407 J409 J531 J543 J544 J603
工程名称:苯汽体部分改造 单元名称:06.07 单元精致车间
交工技术文件目录
第1页共2页
资料名称
页次
交工技术文件说明
A.3 设备安装工程 名称 设备开箱检验记录 立式设备安装记录 卧式设备安装记录 塔盘安装记录 设备填充记录 现场设备组焊记录 催化反应(沉降)器附件安装记录 催化再生器附件安装记录 衬里施工质量检查记录 空冷器构架安装记录 空冷器风机安装记录 机器安装记录 机器拆检及组装记录 联轴器对中记录 机器单机试车记录(一) 机器单机试车记录(二)通用类
1
开工报告
2
工程交工证书
3
设计变更一览表
4
设计变更通知单
5
隐蔽工程记录

继保综合实验

继保综合实验

华北电力大学继电保护与自动化综合实验报告院系电气与电子工程学院班级姓名学号同组人姓名日期2014 年 1 月15 日教师肖仕武成绩Ⅰ。

微机线路保护简单故障实验一、实验目的通过微机线路保护简单故障实验,掌握微机保护的接线、动作特性和动作报文.二、实验项目1、三相短路实验投入距离保护、零序电流保护,记录保护装置的动作报文。

2、单相接地短路实验投入距离保护、零序电流保护,记录保护装置的动作报文.三、实验方法1、实验设备序号型号名称数量1 MRT 继电保护测试仪1台2 CSL161微机线路保护装置1台2、三相短路实验1)实验接线2)实验中短路故障参数设置I=5。

0A,X=1。

8(ohm),R=5。

0(ohm),a=03) 保护动作情况记录第一次跳闸时间/s 重合闸时间/s 第二次跳闸时间/s A相 3.333 未动作未动作B相 3.333 未动作未动作4)报文及保护动作结果分析报文:三相故障电流5A,PT断线后过电流,I段出口5。

15故障电流为三相5A,过电流故障,电流1段动作。

3、单相接地短路实验1)实验接线2)实验中短路故障参数设置I=5.0A,X=1.8(ohm),R=5。

0(ohm),a=03) 保护动作情况记录第一次跳闸时间/s 重合闸时间/s 第二次跳闸时间/sA相3。

449 未动作未动作B相 3.449 未动作未动作C相 3.449 未动作未动作4) 报文及保护动作结果分析报文:单相,故障电流5A,PT断线后过流,一段出口5。

03单相电流故障,故障电流为1A,电流一段动作.四、思考题1、微机线路保护装置161B包括哪些功能?每个功能的工作原理是什么?与每个功能相关的整定值有哪些?2、做一个区内三相短路实验,投入距离保护、零序保护,记录保护装置的动作报文,并1.功能:距离保护,零序保护,高频保护,重合闸距离保护是反应保护安装处到故障点的距离,并根据这一距离远近而确定动作时限的一种动作距离保护三段1段:Z1set=(0.8~0。

施工交工文件的编写中英文

施工交工文件的编写中英文

施工交工文件的格式及编号Format and Number of Technical Document for ConstructionCompletion of ProjectA.1 综合与通用A.1 Comprehensive and General序号S/No. 名称Title编号No.1封面Front coverJ101A 2封面Front coverJ101B3 交工技术文件总目录General contents of Technical Document for Construction Completion ofProjectJ1024交工技术文件目录Contents of Technical Document for Construction Completion of ProjectJ1035 交工技术文件说明Explanation to Technical Document for Construction Completion ofProjectJ1046开工报告(work commencement report)Work Commencement ReportJ105 7工程中间交接证书Interim Project Handover CertificateJ106 8联动试运行合格证书Joint Commissioning Conformity CertificationJ107 9工程交工证书Project Handover CertificateJ108 10 交工技术文件移交证书J109Handover Certificate of Technical Document for Construction Completionof Project未完工程项目明细表J110 11List of Uncompleted Items重大质量事故处理鉴定报告12J111 Appraisal Report on Severe Quality Failure工程联络单J112 13Work Liaison Form设计变更一览表J113 14List of Design Alteration工程联络单一览表15J114 List of Work Liaison Form隐蔽工程记录16J115 Record of Concealed Works合格焊工登记表J116 17Registration Form of Qualified Welder防腐工程施工质量检查记录J117 18Record of Workmanship Inspection of Anti-corrosion Works隔热工程施工质量检查记录19J118 Record of Workmanship Inspection of Heat Shielding Works防腐绝缘层电火花检测报告J119 20Test Report on Electric Spark in Anti-corrosive Insulation安全阀调整试验记录21J120 Record Of Safety Valve Tune-up Test安全附件安装检查记录J121 22Inspection Record of Installation of Relieving Attachment热处理报告23J122 Thermal Treatment Report24射线检测报告(一)Radiographic Test Report (I)J123-1 25射线检测报告(二)Radiographic Test Report (II)J123-2 26超声波检测报告Ultrasonic Wave Test ReportJ124 27超声波检测报告(续表)Ultrasonic Wave Test Report (Continued)J124-F 28超声波测厚报告Ultrasonic Thickness Test ReportJ125 29磁粉检测报告Magnetic Particle Test ReportJ126 30磁粉检测报告(续表)Magnetic Particle Test Report (Continued)J126-F 31渗透检测报告Permeation Test ReportJ127 32渗透检测报告(续表)Permeation Test Report (Continued)J127-F33安装检查记录Inspection Record of Installation ofJ128A.2 建筑工程A.2 Construction Works序号S/No. 名称Title编号No.1地基验槽(坑)记录Record of Inspection of Foundation Subsoil (Pit)J201 2工程定位测量记录Record of Engineering Positioning SurveyJ202 3基础复测记录Record for Repetition Measurement of FoundationJ2034 块体式设备基础允许偏差项目复测记录Repetition Measurement Record for Allowable Deviation in Block-type Equipment FoundationJ2045 整体框架式设备基础允许偏差项目复测记录Repetition Measurement Record for Allowable Deviation in Integral Framing Equipment FoundationJ2056 储罐基础允许偏差项目复测记录(一)Repetition Measurement Record for Allowable Deviation in Tank Foundation (I)J206-17 储罐基础允许偏差项目复测记录(二)Repetition Measurement Record for Allowable Deviation in Tank Foundation (II)J206-28 储罐基础允许偏差项目复测记录Repetition Measurement Record for Allowable Deviation in Tank FoundationJ2079基础沉降观测记录Observational Record of Foundation SettlementJ208 10钢筋混凝土构件吊装验收记录Record of Acceptance for Vertical Loading of Reinforced ConcreteJ209Member11水池蓄水试验记录Water Tank Conservation Test Data SheetJ210 12钢结构安装记录Steel Structure Erection RecordJ211 13钢吊车梁安装记录Steel Crane Beam Erection RecordJ212 14钢桁架安装记录Steel Truss Erection RecordJ213 15钢网架安装记录Steel Net Rack Erection RecordJ214 16塔架及管筒安装记录Tower Mast And Pipe Barrel Erection RecordJ215 17高强螺栓连接检查记录Inspection Record of High-tensile Bolt ConnectionJ21618 建筑工程防腐蚀施工检查记录Inspection Record of Corrosion Protection Construction in ConstructionWorksJ21719防水工程试水检查记录Inspection record of Water tightness of Waterproofing WorksJ21820 防火层施工检查记录Inspection Record of Construction of Fire-resisting LayerJ219A.3 设备安装工程A.3 Equipment Installation Works序号S/No. 名称Title编号No.1设备开箱检验记录Equipment Unpacking Inspection RecordJ301 2立式设备安装记录Vertical Equipment Installation RecordJ302 3卧式设备安装记录Horizontal Equipment Installation RecordJ303 4塔盘安装记录Tower Tray Erection RecordJ304 5设备填充记录Equipment Filling RecordJ305 6现场设备组焊记录Welding Record of Field ApparatusJ306 7催化反应(沉降)器附件安装记录Erection Record of Accessory to Catalytic (settlement) ReactorJ307 8催化再生器附件安装记录Erection Record of Accessory to Catalytic RegeneratorJ308 9衬里施工质量检查记录Inspection Record of Lining WorkmanshipJ309 10空冷器构架安装记录Record Of Erection of Framing to Aerial CoolerJ310-1 11 空冷器风机安装记录J310-2S/No. Title No.Record Of Erection of Fan to Aerial Cooler12机器安装记录Machine Erection RecordJ311 13机器拆检及组装记录Record for Overhaul Inspection and Assembly of MachineJ312 14联轴器对中记录Shaft Coupling Alignment RecordJ313 15机器单机试车记录(一)Record of Single Machine Test Run (I)J314-1 16机器单机试车记录(二)通用类Record of Single Machine Test Run (I) for General TypeJ314-2A17 机器单机试车记录(二)往复式压缩机(2页)Record of Single Machine Test Run (II) for Reciprocating Compressor (2pages)J314-2B18 机器单机试车记录(二)离心式压缩机(2页)Record of Single Machine Test Run (II) for Centrifugal Compressor (2pages)J314-2C19 机器单机试车记录(二)汽轮机(燃气轮机)(2页)Record of Single Machine Test Run (II) for Steam Turbine(GasTurbine)(2 pages)J314-2D20湿式气柜几何尺寸检查记录Inspection Record of Physical Dimension of Wet Storage HolderJ315 21储罐总体试验记录Record of Integrated Test on Storage TankJ316 22设备强度和严密性试验记录Equipment Strength and Leak Test RecordJ317-AS/No. Title No.23 换热设备强度和严密性试验记录Heat-exchange Equipment Strength and Leak Test RecordJ317-B24 工业炉管板、管架安装检查记录Inspection Record of Erection of Pipe Sheet and Pipe Support for IndustrialFurnaceJ31825 工业炉砖架安装检查记录Inspection Record of Erection of Brick Rack for Industrial FurnaceJ31926工业炉筑炉施工质量检查记录Inspection Record of Construction Workmanship of Industrial FurnaceJ320 27工业炉安装质量检查记录Quality Inspection Record of Erection of Industrial FurnaceJ32128 烘炉记录Drying Furnace RecordJ32229火炬安装质量检查记录Quality Inspection Record of Erection of TorchJ323A.4 Piping installation Works序号S/No. 名称Title编号No.1阀门试验记录Valve Test Data SheetJ401 2管道补偿器安装记录Erection Record for Pipeline CompensatorJ402 3管道组成件校验性检查记录Verification Inspection Record for Pipeline ComponentsJ403 4SHA级管道管螺纹、密封面加工记录Processing Record of Class SHA Conduit Pipe Thread and Sealing SurfaceJ404 5高压、SHA级管道弯管加工记录Processing Record of Class SHA High Pressure Pipeline ElbowJ405 6管道静电接地测试记录Test Record of Pipeline Electrostatic GroundingJ406 7管道系统安装检查与压力试验记录Record for Installation, Inspection and Pressure Test of Piping SystemJ407 8管道系统泄漏性/真空试验记录Piping System Leak/Vacuum Test RecordJ408 9管道吹洗、清洗(脱脂)记录Pipeline Purging and Washout(Degreasing) RecordJ40910 给排水压力管道强度及严密性试验记录Strength and Leak Test Record for Water Supply and Drainage PressurePipelineJ41011给排水无压力管道严密性试验记录Leak Test Record for Water Supply and Drainage Non-pressure PipelineJ411A.5 Electrical Installation Works序号S/No. 名称Title编号No.1电气设备交接试验记录首页Head Page of Record for Acceptance Trial Test of Electric InstallationJ501 2交流电动机试验记录Test Data Sheet of AC MotorJ502 3直流电机试验记录Test Data Sheet of DC MotorJ503 4电力变压器试验记录Test Data Sheet of Power TransformerJ504 5电压互感器试验记录Test Data Sheet of Voltage TransformerJ505 6电流互感器试验记录Test Data Sheet of Current TransformerJ506 7断路器试验记录Test Data Sheet of Circuit BreakerJ507 8电力电缆试验记录Test Data Sheet of Power CableJ508 9并联电容器试验记录Test Data Sheet of Shunted CondenserJ509 10阀式避雷器试验记录Test Data Sheet of Valve Type ArresterJ510 11氧化锌避雷器试验记录Test Data Sheet of Zinc Oxide Lightning ArresterJ511 12交流耐压试验记录AC Voltage Withstand Test Data SheetJ512S/No. Title No.绝缘油试验记录J513 13Insulating Oil Test Data Sheet电流(压)继电器试验记录J514 14Electric Current (Voltage) Relay Test Data SheetGL型电流继电器试验记录15J515 GL Current Relay Test Data Sheet时间继电器试验记录16J516 Time Relay Test Data Sheet中间、信号继电器试验记录17J517 Intermediate and Signal Relay Test Data Sheet电测量指示仪表检验记录J518 18Inspection Record of Electrical Measurement Indicating Instrument零序保护系统试验记录J519 19Zero-sequence Protection System Test Data Sheet接地电阻测量记录20J520 Earthing Resistance Measurement Record试验记录J521 21Test Data Sheet of __________________________交流电动机安装检查及空载运行记录J531 22Record for Installation, Inspection and No-load Operation of AC Motor电机抽芯检查记录23J532 Inspection Record for Loose Core of Electrical Motor电机干燥记录J533 24Electrical Motor Drying Record25 变压器安装检查记录J534S/No. Title No.Inspection Record of Installation of Transformer26变压器器身检查记录Transformer Body Inspection RecordJ535 27变压器干燥记录Transformer Drying RecordJ536 28断路器安装调整记录Breaker Installation and Adjustment RecordJ53729 隔离开关、负荷开关安装调整记录Installation and Adjustment Record for Disconnector Switch and LoadSwitchJ53830高、低压开关柜安装检查记录Installation and Inspection Record for LV & HV PanelJ539 31保护、控制盘(屏)安装检查记录Installation and Inspection Record for Protection & Control PanelJ540 32直流系统、不间断电源(UPS)安装检查记录Installation and Inspection Record for DC System and UPSJ541 33蓄电池充放电记录(一)Battery Charging & Discharging Record (I)J542-1 34蓄电池充放电记录(二)Battery Charging & Discharging Record (II)J542-2 35电缆敷设及绝缘检测记录Cable Laying and Insulation Test RecordJ543 36电气照明安装检查记录Installation and Inspection Record for Electric LightingJ544 37火灾报警系统安装检查记录Installation and Inspection Record for Fire Alarm SystemJ545S/No. Title No.安装检查记录38J546 Installation and Inspection Record for ________________________A.6 仪表安装工程A.6 Instrument Installation Works序号S/No. 名称Title编号No.1变送器、转换器调校记录Adjustment and Verification Record for Transducer And TransformerJ601 2调节器调校记录Adjustment and Verification Record for GovernorJ6023 调节阀、执行器、开关阀调校记录Adjustment and Verification Record for Regulator Valve, Actuator andSwitch ValveJ6034 指示、记录仪调校记录Adjustment and Verification Record for Indicating and Recording InstrumentJ6045热电偶、热电阻调校记录Calibration records for Thermocouple and ThermistorJ605 6物位仪表调校记录Adjustment and Verification Record for Potential InstrumentJ606 7计算器调校记录Adjustment and Verification Record for CalculatorJ607 8积算器调校记录Adjustment and Verification Record for IntegratorJ6089 安全栅、分配器、选择器调校记录Adjustment and Verification Record for Safety Fence, Distributor andSelectorJ60910 就地指示仪(直读式压力计、温度计)调校记录Adjustment and Verification Record for Local Indicating Instrument(Direct-reading Manometer and Thermometer)J61011 工艺开关调校记录J611S/No. Title No.Adjustment and Verification Record for Process Switch12分析仪调校记录Adjustment and Verification Record for AnalyzerJ612 13调校记录Adjustment and Verification Record for ____________________J613 14DCS基本功能检测记录Record of Detection of DCS Basic FunctionsJ61415 报警、联锁系统及可编程序控制器(PLC)调试记录Commissioning Record of Alarming, Interlocking System and Programmable Controller (PLC)J61516检测、调节系统及DCS调试记录Commissioning Record of Detecting, Regulating and DCSJ61617 DCS机柜、仪表盘、操作台安装检查记录Installation and Inspection Record for DCS Cabinet, Instrument Panel andConsoleJ61718管路强度、泄漏性、真空度试验、脱脂、酸洗记录Record for Pipeline Strength, Leak, Vacuum Test, Deoiling and Acid WashJ618 19节流装置安装检查记录Installation and Inspection Record for Throttling DeviceJ619 20电缆(线)敷设及绝缘电阻测量记录Record For Cable (Wire) Laying and Insulation MeasurementJ62021 接地极、接地电阻安装测量记录Installation and Measuring Record of Grounding Electrode and Earthing ResistanceJ62122主电缆安装检查记录Installation and Inspection Record for Main CableJ622S/No. Title No.23 主汇线槽、主桥架安装检查记录Installation and Inspection Record for Main Wire Duct and Main Framework of BridgeJ62324就地仪表安装检查记录Installation and Inspection Record for Local InstrumentJ624。

零线、保护(防雷)接地电阻的检验测试记录

零线、保护(防雷)接地电阻的检验测试记录
市政基础设施工程
零线、保护(防雷)接地电阻的检验测试记录
市政验·照-5-2
第页,共页
工程名称
单位工程名称
施工单位
分包单位
项目负责人
项目技术负责人
分部(子分部)
工程名称
分项工程名称
验收部位/区段
检验批容量
施工及验收依据
《城市道路照明工程施工及验收规程》CJJ89
柜(箱)、Leabharlann 号Ro(Ω)柜(箱)、杆号
Ro(Ω)
柜(箱)、杆号
Ro(Ω)
配电柜(箱)
高(中)杆灯
其它路灯
测试结论
配电柜(箱)
合格:点
不合格:点
合格率:%
高(中)杆灯
合格:点
不合格:点
合格率:%
其他路灯
合格:点
不合格:点
合格率:%
施工
单位
检查
结果
专业工长:(签名)项目专业质量检查员:(签名)年月日
监理
单位
验收
结论
专业监理工程师:(签名)年月日
说明:1、配电柜(箱)、高杆灯、中杆灯应全部测试,其它路灯的测试比例应不小于30%。
2、检测仪器应有有关计量部门认可的有效合格证。

接零和接地保护质量验收记录(最新版)

接零和接地保护质量验收记录(最新版)

专业工长(施工员)
施工班组长
施工单位检查 评定结果
ห้องสมุดไป่ตู้
主控项目全部合格,一般项目满足规范规定要求;检查评定合格
项目专业质量检查员: 项目专业技术负责人:
年月日 年月日
监理(建设)单位 验收结论
专业监理工程师:
(建设单位项目专业技术负责人):
年月日
接零和接地保护质量验收记录
单位工程名称
市政
施工单位
项目经理
分包单位
/
分包项目经理
/
施工执行标准名称及编号
城市道路照明工程施工及验收规程(CJJ89-2012)
施工质量验收规范的规定
在保护接零系统中,采用熔断器 1 作保护装置和采用自动开关座保
护装置的要求 采用接零保护时,单相开关应装 2 在相线上,零线上严禁装设开关 或熔断器
7.2.1 7.2.2
施工单位检查评定记录 符合要求 符合要求
监理(建设) 单位验收记录
3 道路照明配电系统
7.2.3
符合要求
4
TT接地制式中工作接地和保护接 地分开独立设置
道路照明配电系统中,采用TN或 TT系统接零和接地保护,PE线与 5 灯杆、配电箱等金属设备连接成 网,在任一地点的接地电阻不应 大于4Ω
6
在配电线路的分支、末端及中间 适当位置做重复接地并形成联网
采用TT系统接地保护,没有采用 7 PE线连接成网的灯杆、配电箱等
其独立接地电阻不应大于4Ω
8
道路照明配电系统的变压器中性 点(N)的接地电阻不应大于4Ω
7.2.4 7.2.5 7.2.6 7.2.7 7.2.8
符合要求 符合要求 符合要求 符合要求 符合要求

中石化A-SH3503交工表格..

中石化A-SH3503交工表格..
中石化 A-SH3503 交工表格..
9 基础沉降观测记录
J208
10 钢筋混凝土构件吊装验收记录 J209
11 水池满水试验记录
J210
12 钢结构安装记录
J211
13 钢吊车梁安装记录
J212
14 钢桁架安装记录
J213
15 钢网架安装记录
J214
16 塔架及管筒安装记录
J215
17 高强螺栓连接检查记录
29 火炬安装质量检查记录
J323
A.4 管道安装工程
序号
名称
编号
1 阀门试验记录
J401
2 管道补偿器安装记录
J402
3 管道组成件校验性检查记录 J403
4 SHA级管道管螺纹、密封面加 J404
工记录
5 高压、SHA级管道弯管加工记 J405

6 管道静电接地测试记录
J406
7 管道系统安装检查与压力试验 J407
记录
8 管道系统泄漏性/真空试验记 J408

9 管道吹洗、清洗(脱脂)记录 J409
10 给排水压力管道强度及严密性 J410
试验记录
11 给排水无压力管道严密性试验 J411
记录
A.5 电气工程
序号
名称
1 电气设备交接试验记录首页
2 交流电动机试验记录
3 直流电机试验记录
编号 J501 J502 J503
J624
SH3503- J101A

案卷号:

第/卷
第/册
石油化工工程建设交工技术文件
工程名称:
建设单位(公章) 监理单位(公章) 施工承包单位(公章)

(完整word版)含目录整套SH3503交工表格

(完整word版)含目录整套SH3503交工表格
1
A.2 建筑工程
序号 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
名称 地基验槽(坑)记录 工程定位测量记录 基础复测记录 块体式设备基础允许偏差项目复测记录 整体框架式设备基础允许偏差项目复测记录 储罐基础允许偏差项目复测记录(一) 储罐基础允许偏差项目复测记录(二) 球罐基础允许偏差项目复测记录 基础沉降观测记录 钢筋混凝土构件吊装验收记录 水池满水试验记录 钢结构安装记录 钢吊车梁安装记录 钢桁架安装记录 钢网架安装记录 塔架及管筒安装记录 高强螺栓连接检查记录 建筑工程防腐蚀施工检查记录 防水工程试水检查记录 防火层施工检查记录
编号 J201 J202 J203 J204 J205 J206-1 J206-2 J207 J208 J209 J210 J211 J212 J213 J214 J215 J216 J217 J218 J219
编号 J301 J302 J303 J304 J305 J306 J307 J308 J309
A.5 电气工程
编号 J401 J402 J403 J404 J405 J406 J407 J408 J409 J410 J411
序号 1 2 3 4 5 6
名称 电气设备交接试验记录首页 交流电动机试验记录 直流电机试验记录 电力变压器试验记录 电压互感器试验记录 电流互感器试验记录
编号 J501 J502 J503 J504 J505 J506
J310-1 J310-2
J311 J312
2
14 联轴器对中记录
15 机器单机试车记录(一)
16 机器单机试车记录(二)通用类
17
机器单机试车记录(二)往复式压缩机(2页)

SH3503石油化工工程建设交工表格

SH3503石油化工工程建设交工表格

附录A 交工文件格式及编号A.1 综合与通用序号名称编号1 封面J101A2 封面J101B3 交工技术文件总目录J1024 交工技术文件目录J1035 交工技术文件说明J1046 开工报告J1057 工程中间交接证书J1068 联动试运行合格证书J1079 工程交工证书J10810 交工技术文件移交证书J10911 未完工程项目明细表J11012 重大质量事故处理鉴定报告J11113 工程联络单J11214 设计变更一览表J11315 工程联络单一览表J11416 隐蔽工程记录J11517 合格焊工登记表J11618 防腐工程施工质量检查记录J11719 隔热工程施工质量检查记录J11820 防腐绝缘层电火花检测报告J11921 安全阀调整试验记录J12022 安全附件安装检查记录J12123 热处理报告J12224 射线检测报告(一)J123—125 射线检测报告(二)J123—226 超声波检测报告J12427 超声波检测报告(续表)J124-F28 超声波测厚报告J12529 磁粉检测报告J12630 磁粉检测报告(续表)J126-F31 渗透检测报告J12732 渗透检测报告(续表)J127-F33 安装记录J128A.2 建筑工程序号名称编号1 地基验槽(坑)记录J2012 工程定位测量记录J2023 基础复测记录J2034 块体式设备基础允许偏差项目复测记录J2045 整体框架式设备基础允许偏差项目复测记录J2056 储罐基础允许偏差项目复测记录(一)J206-17 储罐基础允许偏差项目复测记录(二)J206-28 球罐基础允许偏差项目复测记录J2079 基础沉降观测记录J20810 钢筋混凝土构件吊装验收记录J20911 水池满水试验记录J21012 钢结构安装记录J21113 钢吊车梁安装记录J21214 钢桁架安装记录J21315 钢网架安装记录J21416 塔架及管筒安装记录J21517 高强螺栓连接检查记录J21618 建筑工程防腐蚀施工检查记录J21719 防水工程试水检查记录J21820 防火层施工检查记录J219A.3 设备安装工程序号名称编号1 设备开箱检验记录J3012 立式设备安装记录J3023 卧式设备安装记录J3034 塔盘安装记录J3045 设备填充记录J3056 现场设备组焊记录J3067 催化反应(沉降)器附件安装记录J3078 催化再生器附件安装记录J3089 衬里施工质量检查记录J30910 空冷器构架安装记录J310-111 空冷器风机安装记录J310-212 机器安装记录J31113 机器拆检及组装记录J31214 联轴器对中记录J31315 机器单机试车记录(一)J314—116 机器单机试车记录(二)通用类J314—2A17 机器单机试车记录(二)往复式压缩机(2页)J314—2B18 机器单机试车记录(二)离心式压缩机(2页)J314—2C19 机器单机试车记录(二)汽轮机(燃气轮机)(2页)J314—2D20 湿式气柜几何尺寸检查记录J31521 储罐总体试验记录J31622 设备强度和严密性试验记录J317-A23 换热设备强度和严密性试验记录J317-B24 工业炉管板、管架安装检查记录J31825 工业炉砖架安装检查记录J31926 工业炉筑炉施工质量检查记录J32027 工业炉安装质量检查记录J32128 烘炉记录J32229 火炬安装质量检查记录J323A.4 管道安装工程序号名称编号1 阀门试验记录J4012 管道补偿器安装记录J4023 管道组成件校验性检查记录J4034 SHA级管道管螺纹、密封面加工记录J4045 高压、SHA级管道弯管加工记录J4056 管道静电接地测试记录J4067 管道系统安装检查与压力试验记录J4078 管道系统泄漏性/真空试验记录J4089 管道吹洗、清洗(脱脂)记录J40910 给排水压力管道强度及严密性试验记录J41011 给排水无压力管道严密性试验记录J411A.5 电气工程序号名称编号1 电气设备交接试验记录首页J5012 交流电动机试验记录J5023 直流电机试验记录J5034 电力变压器试验记录J5045 电压互感器试验记录J5056 电流互感器试验记录J5067 断路器试验记录J5078 电力电缆试验记录J5089 并联电容器试验记录J50910 阀式避雷器试验记录J51011 氧化锌避雷器试验记录J51112 交流耐压试验记录J51213 绝缘油试验记录J51314 电流(压)继电器试验记录J51415 GL型电流继电器试验记录J51516 时间继电器试验记录J51617 中间、信号继电器试验记录J51718 电测量指示仪表检验记录J51819 零序保护系统试验记录J51920 接地电阻测量记录J52021 试验记录J52122 交流电动机安装检查及空载运行记录J53123 电机抽芯检查记录J53224 电机干燥记录J53325 变压器安装检查记录J53426 变压器器身检查记录J53527 变压器干燥记录J53628 断路器安装调整记录J53729 隔离开关、负荷开关安装调整记录J53830 高、低压开关柜安装检查记录J53931 保护、控制盘(屏)安装检查记录J54032 直流系统、不间断电源(UPS)安装检查记录J54133 蓄电池充放电记录(一) J542-134 蓄电池充放电记录(二)J542—235 电缆敷设及绝缘检测记录J54336 电气照明安装检查记录J54437 火灾报警系统安装检查记录J54538 电气安装检查记录J546A.6 仪表工程序号名称编号1 变送器、转换器调校记录J6012 调节器调校记录J6023 调节阀、执行器、开关阀调校记录J6034 指示、记录仪调校记录J6045 热电偶、热电阻调校记录J6056 物位仪表调校记录J6067 计算器调校记录J6078 积算器调校记录J6089 安全栅、分配器、选择器调校记录J60910 就地指示仪(直读式压力计、温度计)调校记录J61011 工艺开关调校记录J61112 分析仪调校记录J61213 调校记录J61314 DCS基本功能检测记录J61415 报警、联锁系统及可编程序控制器(PLC)调试记录J61516 检测、调节系统及DCS调试记录J61617 DCS机柜、仪表盘、操作台安装检查记录J61718 仪表管路强度、泄漏性、真空度试验、脱脂、酸洗记录J61819 节流装置安装检查记录J61920 电缆(线)敷设及绝缘电阻测量记录J62021 接地极、接地电阻、安装测量记录J62122 主电缆安装检查记录J62223 主汇线槽、主桥架安装检查记录J62324 就地仪表安装检查记录J624J101A 封面第 / 卷第 / 册石油化工工程建设交工技术文件工程名称:建设单位(公章)监理单位(公章)施工承包单位(公章)项目经理:项目总监:项目经理:项目总工:项目总工:年月日年月日年月日J101B 封面第 / 卷第 / 册石油化工工程建设交工技术文件工程名称:单元名称:工程类别:建设单位(公章)监理单位(公章)施工单位(公章)项目经理:项目总监:项目经理:审核人:审核人:审核人:年月日年月日年月日交工技术文件总目录J102第页共页卷号册号资料名称页数交工技术文件目录单元名称:J103第页共页序号编码资料名称页次交工技术文件说明单元名称:J104编制人:审核人:日期:J105开工报告合同号设计单位计划开工日期年月日计划竣工日期年月日工程内容开工条件审查结果建设单位监理单位施工承包单位(公章)项目经理:(公章)项目总监:(公章)项目经理:J106工程中间交接证书单元名称:工程编号交接日期年月日工程内容验收意见工程质量鉴定意见:工程质量监督站站长:(公章)年月日建设单位监理单位施工承包单位设计单位(公章)项目经理:(公章)项目总监:(公章)项目经理:(公章)总代表:J107联动试运行合格证书试运行时间年月日时分至年月日时分试运行情况:建设单位监理单位施工承包单位设计单位(公章)项目经理:(公章)项目总监:(公章)项目经理:(公章)总代表:J108工程交工证书工程编号合同号实际开工日期年月日交工日期年月日工程内容:工程接收意见:工程质量评定:工程质量监督站站长:(公章)年月日建设单位监理单位施工承包单位设计单位(公章)项目经理:(公章)项目总监:(公章)项目经理:(公章)总代表:J109交工技术文件移交证书按《石油化工工程建设交工技术文件规定》(SH3503—2000)向办理工程建设交工技术文件资料移交手续,共计卷册。

继电保护试验报告单

继电保护试验报告单
Ib
Ic
3I0
ቤተ መጻሕፍቲ ባይዱUa
Ub
Uc
3U0
Ux
CPU1
CPU2
CPU3
CPU4
b)刻度值检查电流输入5A,电压输入57V
实测值:
CPU
Ia
Ib
Ic
3I0
Ua
Ub
Uc
3U0
Ux
CPU1
CPU2
CPU3
CPU4
四、保护定值检查:
a.距离保护
段别
模拟故障类型
动作情况(正确动作画√,不动作画×)
0.95倍动作阻抗
1.05倍动作阻抗
反方向

A相接地故障
B相接地故障
C相接地故障

A相接地故障
B相接地故障
C相接地故障

A相接地故障
B相接地故障
C相接地故障
b、
段别
模拟故障类型
动作情况(正确动作画√,不动作画×)
0.95倍动作阻抗
1.05倍动作阻抗
反方向

AB相短路故障
BC相短路故障
CA相短路故障

AB相短路故障
BC相短路故障
CA相短路故障
AB永久短路Ⅰ、Ⅱ段
三跳、三合、三跳
BC永久短路Ⅰ、Ⅱ段
三跳、三合、三跳
CA永久短路Ⅰ、Ⅱ段
三跳、三合、三跳

AB相短路故障
BC相短路故障
CA相短路故障
3.零序保护
段别
模拟故障类型
动作情况(正确动作画√,不动作画×)
0.95倍动作电流
1.05倍动作电流
反方向

A相接地故障

微机继电保护测试仪软件系统

微机继电保护测试仪软件系统

零序保护试验-1.程序功能该软件用于零序保护的定值校验。

可以自动测试最多四段零序保护。

分别在定值区内及区外测试,通过调整“区内区外系数”可以输出与定值不同比例系数的零序电流。

-2.参数设置界面上部为参数设置区,在参数设置区左边四列为Ⅰ~Ⅳ段定值参数,其它参数与“距离保护定值校验”程序相似。

故障类型选项有A、B、C三相接地三种类型,短路阻抗角规定为10度,短路电压自动计算,具体可通过“图形显示”栏目查阅各种测试选项下三相电压和电流的幅值、相位及矢量图。

工频交直流源-1.程序功能本程序能输出三相交流电流,A、B、C、U0四相交流电压,以及一相直流电压U=。

交流电流的输出范围为0~40A/相,四相电压0~120V/相,直流电压(U=)输出范围为0~250V。

每相交流电流、电压的相位,幅值可以独自任意在线调节,交流量的频率可以在15.5~100HZ内任意在线改变,交直流可以同时输出。

当交流电流或电压设置成同相位,电流源可并联输出最大120A电流,电压源串联可输出最高480V电压。

此程序模拟传统三相升压、升流试验设备,可用键盘或鼠标代替传统的手工调压、升流操作。

对电压、电流、中间、时间、频率、差动及功率方向等继电器进行手工静态测试。

灵活使用本程序,可以对大多数继电器进行静态测试。

-2.程序参数设置介绍进入本程序界面后,光标位于电压、电流输出值设置区,可以对三相电流、四相电压的幅值、相位、频率进行设置,设置操作可参见界面下端提示窗。

其中“输出电流相”参数为所选择要输出的电流相别,可以选择A、B或C任意一相、二相或同时输出。

当不需要输出电流时,也可以选择关闭电流输出。

“输出信号功能”参数决定在测试过程中,接收到继电器动作信号以后,电流电压的输出怎样变化。

可选择“动作停止”,“动作返回”,“关闭”。

“动作停止”──收到输入信号,停止输出。

“动作返回”──收到输入信号后,继续输出一直等到信号返回原来状态才停止输出。

RCS-915

RCS-915

江苏省继电保护专业技能竞赛RCS-915 (一)(裁判用)1、母线运行方式:支路L3(2203)合于Ⅰ母,支路L2(2202)、L4(2204)合于Ⅱ母,母联(2230)开关合环运行。

L2支路的TA变比为600/5,其余支路的变比为1200/5。

I、II母电压正常,各相电压57.7V。

屏上无任何告警、动作信号。

技能操作评分表江苏省继电保护工技能竞赛基本操作题(RCS-915)(一)(选手用)1、母线运行方式:支路L3(2203)合于Ⅰ母,支路L2(2202)、L4(2204)合于Ⅱ母,母联(2230)开关合环运行。

L2支路的TA变比为600/5,其余支路的变比为1200/5。

I、II母电压正常,各相电压57.7V。

屏上无任何告警、动作信号。

3、注意事项:本考试设置故障点8个;装置内部未设置故障;工作前压板在运行位置;控制电源、保护电源、信号电源均在投入状态;每发现一个故障点,通知裁判后方可处理;可向裁判申请放弃,每次放弃一个,可多次申请。

故障排除与分析:江苏省继电保护专业技能竞赛RCS-915 (二)(裁判用)1、母线运行方式:支路L4(2203)合于Ⅰ母,支路L5(2202)、L6(2204)合于Ⅱ母,母联(2230)开关分列运行。

L5支路的TA变比为600/5,其余支路的变比为1200/5。

I、II母电压正常,各相电压57.7V。

屏上无任何告警、动作信号。

江苏省继电保护工技能竞赛基本操作题(RCS-915)(二)(选手用)1、母线运行方式:支路L4(2203)合于Ⅰ母,支路L5(2202)、L6(2204)合于Ⅱ母,母联(2230)开关分列运行。

L5支路的TA变比为600/5,其余支路的变比为1200/5。

I、II母电压正常,各相电压57.7V。

屏上无任何告警、动作信号。

3、注意事项:本考试设置故障点8个;装置内部未设置故障;工作前压板在运行位置;控制电源、保护电源、信号电源均在投入状态;每发现一个故障点,通知裁判后方可处理;可向裁判申请放弃,每次放弃一个,可多次申请。

建筑安装工程各专业质量验收

建筑安装工程各专业质量验收
P(A.2)表格 建筑工程
7 2021/12/28
(A.2)建筑工程
“统一规定”P(A.2)建筑工程 •同济大学
序号 1 2 3 4 5 6 7 8 9 10
名称 地基验槽(坑)记录 工程定位测量记录 基础复测记录 块体式设备基础允许偏差项目复测记录 整体框架式设备基础允许偏差项目复测记录 储罐基础允许偏差项目复测记录(一) 储罐基础允许偏差项目复测记录(二) 球罐基础允许偏差项目复测记录 基础沉降观测记录 钢筋混凝土构件吊装验收记录
5
建筑工程验收规范标准
2021/12/28
GB50209-95建筑地面工程施工及验收规范 GBJ242-82采暖与卫生工程施•同工济大及学 验收规范 GBJ243-82通风与空调工程施工及验收规范 GB50254-96电气装置安装工程 低压电气施工及验收规范 GB50255-96电气装置安装工程 电力变流设备施工及验收规范 GB50256-96电气装置安装工程 起重机电气装置施工及验收规范 GB50257-96电气装置安装工程 爆炸和火灾危险环境电气装置施
建筑安装工程各专业质量验收
2 2021/12/28
建筑工程质量验收
按照GB50300-2001建筑工程施•同工济质大学量验收统一标准要求: 1.建筑工程施工质量应符合本标准和相关专业验收规范的规定。 2.建筑工程施工应符合工程勘察、设计文件的要求。 3.参加工程施工质量验收的各方人员应具备规定的资格。 4.工程质量的验收均应在施工单位自行检查评定的基础上进行。 5.隐蔽工程在隐蔽前应由施工单位通知有关单位进行验收,并应
形成验收文件。
6.涉及结构安全的试块、试件以及有关材料,应按规定进行见证 取样检测。
7.检验批的质量应按主控项目和一般项目验收。 8.对涉及结构安全和使用功能的重要分部工程应进行抽样检测。 9.承担见证取样检测及有关结构安全检测的单位应具有相应资质。 10.工程的观感质量应由验收人员通过现场检查,并应共同确认。
  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
相关文档
最新文档