工程造价专业英语A卷

合集下载

2019年工程造价工程师资格考试建筑工程专业英语历年真题解析

2019年工程造价工程师资格考试建筑工程专业英语历年真题解析

2019年工程造价工程师资格考试建筑工程专业英语历年真题解析Part I: 选择题解析1. A解析: 根据题干中的"what is 'budget cost'?",定位到第一段最后一句"In construction, this cost is typically referred to as the 'budget cost'.",因此答案为A。

2. C解析: 根据题干中的"what is an 'addenda'?",定位到第三段第一句"The addenda are additional drawings, specifications, or instructions that are issued by the architect or engineer during the bidding process.",因此答案为C。

3. B解析: 根据题干中的"how are bid bonds used in the bidding process?",定位到第五段第一句"Bid bonds are used to ensure that the selected contractor will enter into a contract and provide the required performanceand payment bonds.",因此答案为B。

4. D解析: 根据题干中的"What is the purpose of the construction schedule?",定位到第八段第一句"The construction schedule outlines the timeline and sequence of activities for the construction project.",因此答案为D。

造价专业英语答案

造价专业英语答案

project manager Management of construction field project cost and time control technical complexity construction methods design stage material substitute/alternatives regulatory agency material and equipment suppliers
18
10. 材料和设备的运输时间 the delivery times of materials and project equipment
16
Unit twelve
1. New Words and Expressions 2. Text Study 3. Exercises
1. 总承包商 2. 业主 3. 影响费用 4. 间接损失 5. 项目总进度计划 6. 项目网络图 7. 变更条款 8. 备忘录 9. 延迟提交索赔 10. 提出索赔
10
Unit eight
1. New Words and Expressions 2. Text Study 3. Exercises
1. 投标明细或价值明细表 2. 污水处理厂 3. 地下管线 4. 道路改建 5. 开挖与回填 6. 筑堤 7. 延长英尺 8. 平方英尺 9. 延期罚款条款 10. 工程造价 11. 管理费和利润 12. 合同管理
2
Ⅴ. Put the following Chinese into English
1. 2. 3. 4. 5. 6. 7. 8.
卷入诉讼-----公共工程-----承包商的注册-某此因素-----合同工期-----相对重要性---担保能力-----现有工作任务--

工程造价专业英语考试答案

工程造价专业英语考试答案

⏹(一)1.政府机构governmental agency2.承包商contractor3.分包商subcontractor4.建筑师architect5.保险公司insurance company6.担保公司surety company7.材料商material dealer/supplier8.施工现场construction site⏹(二)项目规划设计和施工project planning, design and construction临时设施temporary job facilities项目预算project budget投资和合同授予过程b idding and contract award process质量控制quality control项目的监督project supervision进度款progress payment合同变更contract change满足业主要求suit the individual owner's requirements以业主的名义in the name of the owner◆(三)卷入诉讼------ be involved in litigation公共工程------ public work承包商的注册-- contractors’ register某此因素------ certain factors合同工期------ duration of contract相对重要性---- relative importance担保能力------ bonding capacity现有工作任务-- current workload⏹(四)投标公告notice to bidders招标邀请函invitation to bidders标书格式bid forms标书分析bid analysis主要供应商major supplier投标保函bid bonds未预见情况unforeseen circumstances质量保证期quality guarantee period标书接收的地点和时间the time and place for the receipt of bids警察,消防和街道代表police, fire, and street department representatives●(五)材料价格material price 分包商的报价subcontractor's quotation机具设备租赁费equipment hire rates向供应商询价enquire supplier工程量清单bill of quantitie s墙砖wall tiles / brick防潮层damp-proof courses水泥cement粗骨料coarse aggregates回扣discount◆(六)平面布置图和立面图schematic layouts and elevations 规划许可planning permission建筑业管理许可building regulations approval工程质量project quality装修工程的造价the cost of decoration projects合同文本contract documents合同图纸contract drawings承包人义务contractor's obligations指定供应商和分包商specified suppliers and subcontractors开工和竣工时期the start and completion dates中期付款interim payments缺陷责任期the defects liability period⏹(七)法律框架legal framework相关各方parties concerned标准文本standard forms标准条款standard clauses特殊条款special clauses业主姓名the name of the employer工料测量师quantity surveyor公共机构public bodys签名和印章signature and seal印花税stamp duty●(八)投标明细或价值明细表bid breakdown or schedule of values污水处理厂wastewater treatment plant地下管线underground utility lines道路改建roads improvements开挖与回填excavation and backfill筑堤embankment延长英尺linear feet平方英尺square feet延期罚款条款liquidated damages clauses for delay工程造价construction pricing /cost of construction管理费和利润overhead and profit合同管理contract administration(九)造价师/工料测量师quantity surveyor建筑设计阶段building design stage可行性分析阶段feasible analysis stage概算approximate estimate施工图设计阶段construction drawing design stage建筑面积floor spac e成本效益分析cost and profit analysis养护费maintenance cost◆(十一)项目经理project manager现场管理Management of construction field项目成本和时间控制project cost and time control 技术复杂性technical complexity施工方法construction methods设计阶段design stage材料替代material substitute/alternatives管理机构regulatory agency材料和设备供应商material and equipmentsuppliers材料和设备的运输时间the delivery times ofmaterials and project equipment(十二)总承包商the general contractor业主the owner影响费用impact costs间接损失consequential damages项目总进度计划overall project schedule项目网络图project network变更条款change clauses备忘录memoranda延迟提交索赔defer claims submission提出索赔file a claim(十三)确保及时付款ensure timely payment提出和批准变更initiate and approve change主持现场会议support at the meeting谈判变更令negotiation to change加快验收和批准to speed up the acceptance andapproval评估索赔evaluate claim深化图和样品deepening figure and samples管理机电分包arrange for agency inspection控制临时设施contiol temporary facility执行施工计划construction plan of implementation 确认竣工图confirm completion figure drawing解释合同文件explain contract document仲裁争端arbitrates disputs监督试验程序supervition and experimental procedure 项目的实施project initiation竣工验收completion acceptance approval工程量表bill of quantity实际完成工程量actual finish of engineening工期索赔time claim费用索赔cost claim合同价格的变动the contract price fluctuation证明材料substantiation material。

工程造价专业英语

工程造价专业英语
工程成本术语
工程成本分析和控制相关的专业术语包括成本分析、成本控制、成本预测等方面的词汇,如"Cost Analysis"(成本分析)、"Cost Control"(成本控制)、"Cost Forecasting"(成本预测)等。
成本分析和控制
Terminology related to engineering cost
Organized Presentation
Writing skills
Reading and Writing of English Tendering Documents
Understanding Tender Documents: The ability to read and understand tender documents, including tender requirements, evaluation criteria, and other relevant information.
Definition and characteristics
The Importance of Engineering Cost Professional English
Communication: Engineering Cost Professional English is essential for effective communication within the engineering cost estimation, management, and control community. It enables professionals to share information, exchange ideas, and collaborate on projects with colleagues, clients, and suppliers.

工程造价专业英语题库1

工程造价专业英语题库1

专业词组:Unit 1governmental agency 政府机构contractor 承包商subcontractor 分包商architect 建筑师insurance company 保险公司surety company 担保公司material dealer 材料供应商construction site 施工现场financial organization 金融机构engineer 工程师labor condition 劳动力状况Unit 2field staff=construction staff 施工人员project manager 项目经理project management 项目管理owner 业主construction manager 施工经理insure prompt payment 确保及时付款initiate and approves changes 提出和批准变更chair job meetings 主持现场会议facilitate inspection and approval 加快验收和批准evaluate claims 评估索赔control temporary facilities 控制临时设施enforce construction schedule 执行施工计划Unit 3involve in litigation 卷入诉讼public work 公共工程contractor’s register 承包商的注册duration of contract 合同工期bonding capacity 担保能力current workload 现有工作量prequalification 资格预审on-site resource survey 现场资源勘查material/labor balance of contract 材料和劳动力平衡interest in project 工程利润Unit 4notice to bidders 投标公告invitation to bidders 招标邀请函bid analysis 标书分析bid bonds 投标保函unforeseen circumstances 未预见情况quality guarantee period 质量保证期prebid meeting 标前会议a certified check 保付支票performance bonds 履约保函the time and place for the receipt of bids 标书接收的地点和时间Unit 5form of tender 投标书written offer 书面报价conditions of contract 合同条件minimum amount 最低限额bill of quantities 工程量清单the tender documents 投标文件instruction to tenders 投标说明time for completion 竣工时间the time allowed for tendering 投标时限Unit 6planning permission 规划许可building regulations approval 建筑业管理许可project quality 工程质量decoration projects estimate 装修工程的造价contract documents 合同文本contract drawings 合同图纸contractor's obligations 承包人义务specified suppliers and subcontractors 指定供应商和分包商start and completion dates 开工和竣工时期interim payment 中期付款defect obligation period 缺陷责任期the quality of work required 工程质量的要求the contractual conditions 合同条款the construction programme 施工计划Unit 7legal framework 法律框架standard forms 标准文本standard clauses 标准条款special clauses 特殊条款the names of the employer 业主姓名quantity surveyor 工料测量师public body 公共机构signature and seal 签名和印章Stamp duty 印花税articles of agreement 协议条款Unit 8bid breakdown or schedule of values 投标明细或价值明细表wastewater treatment plant 污水处理厂underground utility lines 地下管线roads or street improvements 道路改建project estimate 工程造价administration costs and profits 管理费和利润contract administration 合同管理lump sum contract 总价合同unit price contract 单价合同civil engineering 土木工程cost-plus contract 成本加酬金合同incentive contract 激励合同Unit 9floor area 建筑面积sketch plan 初步设计detail design 施工图设计parapet wall 女儿墙post-contract stage 合同运作阶段cost analysis 成本分析similar buildings 类似工程outline plan 规划方案concrete 混凝土cost planning 成本计划cost comparison 成本比较cost checking 成本核查cost monitoring 成本控制Umbrella term 总称Unit 10project planning、design and construction 项目规划、设计和施工temporary facilities 临时设施project budget 项目预算bidding and contract award process 投标和合同授予过程quality control 质量控制progress payment 进度款contract change 合同变更suit the owner's requirement 满足业主要求in the name of the owner 以业主的名义fast tracking 快速路径法,边设计边施工(方法)separate contractor 分包商shop drawing 施工图acceptance testing 验收检验construction supervision 工程监理Unit 11project manager 项目经理on-site management 现场管理project cost and time control 项目成本和时间控制technical complexity 技术复杂性construction methods 施工方法design stage 设计阶段material substitute 材料替代material and equipment suppliers 材料和设备供应商the delivery times of materials and equipment 材料和设备的运输时间total life-cycle cost 全寿命周期成本句子段落翻译:Unit 11.In its specifics ,each structure is tailed to suit its environment ,arranged to perform its own particular function ,and designed to reflect personal tastes and preferences.❖具体地说,每一个建筑物都要适应它周围的环境,发挥它特有的功能,反映设计者的品味和喜好。

工程造价专业英语第四版答案

工程造价专业英语第四版答案

工程造价专业英语第四版答案1、Obviously they didn’t see the significance of the plan. That is()the problem lies. [单选题] *A. where(正确答案)B. whyC. /D. how2、30.I want to find ______ and make much money. [单选题] *A.worksB.jobC.a job(正确答案)D.a work3、The news is?_______. We are all _______ at it. [单选题] *A. exciting;?excited(正确答案)B. excited;?excitingC. exciting;?excitingD. excited;?excited4、There is something wrong with my teeth. I’ve had?a _______. [单选题] *A. toothache(正确答案)B. headacheC. stomachacheD. heartache5、Seldom _____ in such a rude way. [单选题] *A.we have been treatedB. we have treatedC. have we been treated(正确答案)D. have treated6、You cannot see the doctor _____ you have made an appointment with him. [单选题] *A. exceptB.evenC. howeverD.unless(正确答案)7、I _______ no idea of where the zoo is. [单选题] *A. thinkB. getC. have(正确答案)D. take8、—Where did you get the book?—From my friend. I ______ it three days ago. ()[单选题] *A. lentB. borrowed(正确答案)C. keptD. returned9、--What are you going to be in the future?--I want to be _______ actor. [单选题] *A. aB. an(正确答案)C. theD. /10、I do not have my own room,_____. [单选题] *A. neither does Tom(正确答案)B. neither has TomC. so does TomD. so has Tom11、Leave your key with a neighbor ___ you lock yourself out one day [单选题] *A. ever sinceB. even ifC. soon afterD. in case(正确答案)12、I don’t know how to improve my English. Can I ask you for some _______? [单选题] *A. answersB. advice(正确答案)C. questionsD. words13、Nobody noticed the thief slip into the shop, because the lights happened to _______. [单选题] *A. put outB. turn outC. give outD. go out(正确答案)14、What’s the price and what sort of _______ do you offer? [单选题] *A. advantageB. accountC. displayD. discount(正确答案)15、The young man had decided to give up the chance of studying abroad, _____ surprised his parents a lot. [单选题] *A. whenB. whereC. which(正确答案)D. that16、—The weather in Shanghai is cool now, ______ it? —No, not exactly. ()[单选题] *A. doesn’tB. isC. isn’t(正确答案)D. does17、My brother will come to see me tomorrow. I’ll meet?_______ at the airport. [单选题] *A. herB. youC. him(正确答案)D. them18、1——May I help you? You seem to be having some problems.——_______ , thanks. Ithink I can manage. [单选题] *A. All rightB. No problemC. It’s all right(正确答案)D. There’s no way19、46.The pants look cool.You can ________. [单选题] *A.try it onB.try on itC.try them on(正确答案)D.try on them20、Is there going to ______ a football match in the stadium next month?()[单选题] *A. beingB. haveC. be(正确答案)D. having21、We have _______ a double room with a bath for you in the hotel. [单选题] *A. boughtB. reserved(正确答案)C. madeD. taken22、There ______ a football match and a concert this weekend.()[单选题] *A. isB. haveC. will be(正确答案)D. will have23、56.Sam is in a hurry. Maybe he has got ________ important to do. [单选题] * A.everythingB.nothingC.anythingD.something(正确答案)24、--Mom, I will not eat fast food this year. Believe me.--If you make a _______, you must keep it. [单选题] *A. jokeB. noiseC. mistakeD. promise(正确答案)25、In 2019 we moved to Boston,()my grandparents are living. [单选题] *A. whoB. whenC. where(正确答案)D. for which26、How I wish I()to repair the watch! I only made it worse. [单选题] *A. had triedB. hadn't tried(正确答案)C. have triedD.didn't try27、--Henry treats his secretary badly.--Yes. He seems to think that she is the _______ important person in the office. [单选题] *B. least(正确答案)C. lessD. most28、He kept walking up and down, which was a sure()that he was very worried. [单选题] *A. sign(正确答案)B. characterC. natureD. end29、Customers see location as the first factor when_____a decision about buying a house. [单选题] *A.makeB.to makeC.making(正确答案)D.made30、27.Will it ______ warm in the room? [单选题] *A.areB.be(正确答案)D.going to be。

职业院校造价专业英语试卷

职业院校造价专业英语试卷

班级:姓名:学号:一、单项填空(共10小题;每小题2分,满分20分)1. Don't be afraid of asking for help ____ it is needed.A. unlessB. sinceC. althoughD. when2. A cook will be immediately fired if he is found ___ in the kitchen.A. smokeB. smokingC. tosmokeD. smoked3. Allen had to call at taxi because the box was ____ to carry all the way home.A. much too heavyB. too much heavyC. heavy too muchD. too heavy much4.-Sorry,Joe,I didn't mean to...-Don't call me"Joe",I'm MrParker to you,and ____ you forget it!A.doB.didn'tC.didD.don't5. If anybody calls, tell them I'm out and ask them to___their name and address.A.passB.writeC.takeD.leave6. The sign reads "In case of____fire,break the glass and push___red button."A.不填;aB.不填;theC.the;theD.a;a7. All morning she waited for the medical report from the doctor , her nervousness__.A.has grownB.is growingC.grewD.had grown8. A left luggage office is a place where bags__be left for a short time,especially at a railway station.A.shouldB.canC.mustD.will9. We're going to the book store in John's car. Y ou can come with us___you can meet us there later.A.butB.andC.orD.then10. Why don't you put the meat in the fridge?It will___fresh for several days.A.be stayedB.stayC.be stayingD.have stayed二、阅读理解(共8小题;每小题5分,满分40分)阅读下列短文,从每题所给的四个选项(A、B、C和D)中,选出最佳选项。

工程造价专业英语课后答案

工程造价专业英语课后答案

⏹(一)➢ 1.政府机构governmental agency➢ 2.承包商contractor➢ 3.分包商subcontractor➢ 4.建筑师architect➢ 5.保险公司insurance company➢ 6.担保公司surety company➢7.材料商material dealer/supplier➢8.施工现场construction site⏹(二)➢项目规划设计和施工project planning,➢designand construction临时设施temporary job facilities项目预算project budget投资和合同授予过程bidding and contractaward process质量控制quality control项目的监督project supervision7.进度款progress payment合同变更contract change满足业主要求suit the individual owner'srequirements以业主的名义in the name of the owner(三)卷入诉讼------ be involved in litigation公共工程------ public work承包商的注册-- contractors’ register某此因素------ certain factors合同工期------ duration of contract相对重要性---- relative importance担保能力------ bonding capacity现有工作任务-- current workload(四)➢投标公告notice to bidders招标邀请函invitation to bidders➢标书格式bid forms➢标书分析bid analysis➢主要供应商major supplier➢投标保函bid bonds➢未预见情况unforeseen circumstances➢质量保证期quality guarantee period➢标书接收的地点和时间the time and place➢for the receipt of bids➢警察,消防和街道代表police, fire,➢and street department representatives●(五)➢材料价格material price➢分包商的报价subcontractor's quotation➢机具设备租赁费equipment hire rates➢向供应商询价enquire supplier➢工程量清单bill of quantitie s➢墙砖wall tiles / brick➢防潮层damp-proof courses➢水泥cement➢粗骨料coarse aggregates➢回扣discount◆(六)➢平面布置图和立面图schematic layouts and elevations ➢规划许可planning permission➢建筑业管理许可building regulations approval➢工程质量project quality➢装修工程的造价the cost of decoration projects➢合同文本contract documents➢合同图纸contract drawings➢承包人义务contractor's obligations➢指定供应商和分包商specified suppliers and➢subcontractors➢开工和竣工时期the start and completion dates➢中期付款interim payments➢缺陷责任期the defects liability period➢⏹(七)➢法律框架legal framework➢相关各方parties concerned➢标准文本standard forms ➢标准条款standard clauses➢特殊条款special clauses➢业主姓名the name of the employer➢工料测量师quantity surveyor➢公共机构public bodys➢签名和印章signature and seal➢印花税stamp duty➢●(八)➢投标明细或价值明细表bid breakdown➢or schedule of values➢污水处理厂wastewater treatment plant➢地下管线underground utility lines➢道路改建roads improvements➢开挖与回填excavation and backfill➢筑堤embankment➢延长英尺linear feet➢平方英尺square feet➢延期罚款条款liquidated damages clauses➢for delay➢工程造价construction pricing /cost of➢construction➢管理费和利润overhead and profit➢合同管理contract administration➢(九)➢造价师/工料测量师quantity surveyor➢建筑设计阶段building design stage➢可行性分析阶段feasible analysis stage➢概算approximate estimate➢施工图设计阶段construction drawing➢design stage➢建筑面积floor spac e➢成本效益分析cost and profit analysis➢养护费maintenance cost◆(十一)➢项目经理project manager➢现场管理Management of construction field ➢项目成本和时间控制project cost and time➢control➢技术复杂性technical complexity➢施工方法construction methods➢设计阶段design stage➢材料替代material substitute/alternatives➢管理机构regulatory agency➢材料和设备供应商material and equipment➢suppliers➢材料和设备的运输时间the delivery times➢ f materials and project equipment➢Twelve➢总承包商the general contractor➢业主the owner影响费用impact costs➢间接损失consequential damages➢项目总进度计划overall project schedule➢项目网络图project network➢变更条款change clauses➢备忘录memoranda➢延迟提交索赔defer claims submission➢提出索赔file a claim《十三》总进度计划Master schedule项目的实施The implementation of the project竣工验收Final acceptance工程量表Engineering scale实际完成工程量The actual completion of engineering quantity《十四》工期索赔Claim for extension of time费用索赔Cost claim合同价格的变动Contract price费用的估价The cost estimate证明材料Materials of proof。

设计造价考研英语真题答案

设计造价考研英语真题答案

设计造价考研英语真题答案Introduction:In recent years, the field of architecture and design has witnessed a significant increase in popularity and demand. As a result, the competition in the industry has become increasingly fierce, leading many aspiring designers to pursue higher education to enhance their skills and knowledge. One important aspect of this journey is the Design and Cost Evaluation postgraduate entrance examination, commonly known as the Design Cost Exam. In this article, we will provide answers and explanations to some of the questions from the Design Cost Exam in order to assist aspiring candidates in their preparation for this challenging test.Section 1: Listening ComprehensionQuestion 1:According to the conversation, why is the man consulting the woman?Answer: To improve the environmental performance of his design project.Explanation: The man seeks advice from the woman in order to enhance the sustainability and environmental impact of his design project.Question 2:What is the main topic of the news report?Answer: The completion of a large-scale architectural project.Explanation: The news report focuses on the successful completion of a significant architectural project, highlighting its scale and importance.Section 2: Vocabulary and StructureQuestion 3:Choose the correct form of the verb to complete the sentence:The architect ________ the design to the clients last week.a) presentsb) will presentc) presentedd) has presentedAnswer: c) presentedExplanation: The past simple tense is used in this sentence to indicate that the architect completed the action of presenting the design to the clients in the past.Question 4:Choose the word or phrase that best completes the sentence:The design team worked ________ to meet the project deadline.a) hardlyb) hardc) heavilyd) hardyAnswer: b) hardExplanation: The word "hard" is the correct adverb to describe the intensity or effort put in by the design team to meet the project deadline.Section 3: Reading ComprehensionPassage 1:Question 5:According to the passage, what is the main challenge faced by architects and designers in the construction industry?Answer: Balancing design aesthetics with cost efficiency.Explanation: The passage discusses the difficulty of achieving a balance between aesthetic design and cost-effectiveness, suggesting that this is the primary challenge faced by professionals in the field.Question 6:Which of the following statements can be inferred from the passage?Answer: The use of advanced technologies can help streamline the design process.Explanation: The passage mentions the benefits of utilizing advanced technologies, implying that their implementation can contribute to the streamlining of the design process.Passage 2:Question 7:According to the passage, what is the purpose of a cost estimate in the design process?Answer: To determine the budget and feasibility of a project.Explanation: The passage explains the role of cost estimates in the design process, emphasizing their significance in determining project budget and feasibility.Question 8:What is the advantage of using parametric cost estimating methods mentioned in the passage?Answer: It allows for more accurate cost projections and risk assessments.Explanation: The passage highlights the advantages of using parametric cost estimating methods, specifically mentioning their ability to provide accurate cost projections and risk assessments.Conclusion:In this article, we have explored and provided accurate answers to various questions from the Design and Cost Evaluation postgraduate entrance examination. By understanding the content and structure of the exam, aspiring candidates can better prepare themselves for this critical evaluation. Remember, success in the field of design and architecture goes beyond theoretical knowledge and requires a deep understanding of practical applications, cost considerations, and sustainable practices. Good luck withyour Design Cost Exam preparation, and may your passion for design guide you on a successful career path.。

工程造价专业英语课后习题答案

工程造价专业英语课后习题答案

工程造价专业英语课后习题答案一、句子翻译1.in its specifics ,each structure is tailed to suit its environment ,arranged to perform its own particular function ,and designed to reflect personal tastes and preferences . 具体来说,每一个建筑物都要适应它周围的环境,发挥它特有的功能,反映设计者的品味和喜好。

2.To some degree ,each construction project is unique ,and no two jobs are ever quite alike .从某种程度上来说,每一个建筑项目都是独一无二的,并且没有两个相同的项目。

3.It is unlikely ,that field construction will ever be able to adapt itself completely to the standardized methods and product uniformity of assembly-line production .建筑不可能完全适应标准化的方法和装配线生产的产品。

4.The objective of this approach is to treat project planning ,design ,and construction as integrated tasks within a construction system.该团队的目标是使工程规划、设计、建设成为工程项目系统之内的整合性的工作。

5.Adherence to construction schedules and budget constraints is the CM’s prime responsibility .确保在进度和成本约束下完成工程是项目经理的主要责任。

工程造价英语专业英语期末考试必备答案

工程造价英语专业英语期末考试必备答案

Unit11.政府机构-governmental agency2.承包商-contractor3.分包商-sub-contractor4.建筑师-architect5.保险公司-insurance company6.担保公司-surety company7.材料商-material dealer 8.施工现场-construction site9.合同承包contract letting 9.各行各业walks of life10.全靠胆量by sheer courage 11.土木工程civil engineeringUnit21.项目规划、设计和施工-project planing,design,and construction2.临时设施-temporary job facilities3.项目预算-project budget4.投标合同授予过程-bidding and contract award5.质量控制-quality control6.项目的监督-project supervision7.进度款-progress payments 8.合同变更-contract changes9.满足业主要求-suit the owner’s requirements10.以业主的名义-in the name of ownerUnit31.卷入诉讼-involve someone litigation2.公共工程-public work3.承包商的注册-contractor’s register4.某些因素-certain factor5.合同工期-duration of contract6.相对重要性-relative importance7.担保能力-bonding capacity 8.现有工作任务-current workload Unit41.招标公告-notice to bidder2.投标邀请函- invitation to bidders3.标书格式-bid forms4.标书分析-bid analysis5.主要供应商- major supplier6.投标保函-bid bonds7.未预见情况- unforeseen circumstance8.质量保证期-quality guarantee9.标书接收的地点和时间-the time and place for the receipt of bids10.警察,消防和街道代表-police,fire and street department representatives Unit51.材料价格-material price2.分包商的报价-subcontractor’s quotation3.机具设备租赁费-equipment hire-rates4.向供应商询价enquire suppliers5.工程量清单-the bill of quantities6.墙砖-wall brick7.防潮层-damp-proof course 8.水泥-cement9.粗骨料-coarse aggregates 10.回扣-discountUnit61.平面布置图和里面图-schematic layouts and elevations2.规划许可-planning permission3.建筑业管理许可-building regulation approval4.工程质量-quality of work5.装修工程的造价-the cost of decoration projects6.合同文件-contract document7.合同图纸-contract drawings8.承包人义务-the obligation of contractor9.指定供应商和分包商-specified suppliers and subcontractors10.开工日期和竣工日期-the start and completion dates11.中期付款-interim payment12.缺陷责任期-the defects liability periodUnit71.法律框架-legal framework2.相关各方-the parties concerned3.标准文本-standard forms4.标准条款-standard clauses5.特殊条款-special clauses6.业主姓名-the name of the employer7.工料测量师-quantities surveyor8.公共机构-public bodies9.签名和印章-signature and seal 10.印花税-stamp dutyUnit81.投标明细或价值明细表-bid breakdown or schedule of value2.污水处理厂-waste water treatment plant3.地下管线-underground utility lines4.道路管线-roads improvement5.开挖和回填-excavation and backfill6.筑堤-embankment7.延长英尺-linear feet 8.平方英尺-square feet9.延期罚款条款-liquidated damages clauses for delay10.工程造价-construction pricing /cost of construction11.管理费和利润-overhead and profit12.合同管理-contract administrationUnit91.工程量估算员/工料测量时-quantities surveyor2.建筑设计阶段-building design stage3.可行性分析阶段-feasible analysis stage4.概算-approximate estimate5.施工图阶段-construction drawing design stage6.建筑面积-floor space7.成本效益分析-cost and profit analysis8.养护费-maintenance costUnit101.确保即使付款-insures prompt payment2.提出和批准变更-initiates and approves changes3.主持现场会议-chairs job meetings4.谈判变更令-negotiates change orders5.加快验收和批准-facilitates inspection and approval6.评估索赔-evaluates claims7.深化图和样品-shop s=drawings and samples8.管理机电分包-manages M/E trades subcontractors9.控制临时设施-control temporary facilities10.执行施工计划-execute construction program11.确认竣工图-affirm completed drawings12.解释合同文件-interprets contract document13.仲裁争端-arbitrates disputes14监督实验程序-monitors testing proceduresUnit111.项目经理-project manager2.现场管理-field management3.项目成本和时间控制-project cost and time control4.技术复杂性-technical complexity5.施工方法-construction methods6.设计阶段-design stage7.材料替代-material alternative8.管理机构-management agency9.材料和设备供应商-material and equipment dealer10.材料和设备的运输时间-delivery time of material and equipmentUnit121.总承包商-the general contractor2.业主-the owner3.影响费用-impact costs4.间接损失-consequential damages5.项目总进度计划-overall project schedule6.项目网络图-project network7.变更条款-change clauses8.备忘录-memoranda / memo book 9.延迟提交索赔-defer claims submission 10.提出索赔-file a claimUnit131.总进度计划-master schedule2.项目的实施-the implementation3.竣工验收-final acceptance4.工程量表-engineering scale5.实际完成工程量-the actual completion of engineering quantityUnit141.工期索赔-claim for extension of time2.费用索赔-cost claim3.合同价格的变动-contract price change4.费用的估价-the cost estimate5.证明材料-materials of proof二、翻译1.in its specifics ,each structure is tailed to suit its environment ,arranged to perform its own particular function ,and designed to reflect personal tastes and preferences . 具体来说,每一个建筑物都要适应它周围的环境,发挥它特有的功能,反映设计者的品味和喜好。

工程造价专升本英语考试试题

工程造价专升本英语考试试题

工程造价专升本英语考试试题I. Vocabulary and structure (40分)1. The professor needs an assistant that he can to take care of problems in his absence.A. count inB. count upC. count onD. count out2.I am not sure whether l can get any profit from the business, so I can't make a(n) decisionabout what to do next.A. exactB. deniedC. sureD. definite3. Because of the cold weather, they through the night in the camp.A. kept the burning fireB. kept the fire burningC. kept the fire burntD. kept burning the fire4. Convenience foods which are already prepared for cooking are in stores.A. readyB. availableC. probableD. approachable5. Many people are reported in the natural disaster.A. being killedB. to be killedC. to have killedD. to have been killed6. If the whole surgery beforehand carefully, there would have been a better result.A. was plannedB. has been plannedC. had been plannedD. were planned7. Jane has said little so far, responding only briefly whenA. spokenB. speaking toC. speakingD. spoken to8. to finish quickly.A. Not every worker wantB. No every workers wantC. Not every worker wantsD. No every workers wants9. The photos on the wall grandma of those happy, old days when a large family lived together.A. recallB. retainC. rememberD. remind10. Y ou’d better tell me beforehand if go with me.A. you’ll rather notB. you won’t ratherC. you’d rather notD. you’d rather not to11. We all hope he’ll soon his disappointment and be happy again.A. get throughB. get awayC. get upD. get down12. The problem of environment protection has been studied .A. extremelyB. intensivelyC. originallyD. violently.13. All games_____because of the rainstorm, many students could do nothing but study in the classroom.A. were canceledB. having been canceled.C. had been canceledD. have been canceled14.“Did you buy anything at the clothing store?”“Yes, I bought three shirts for just$120.”A. fifty-dollarB. fifties-dollarC. fifty-dollarsD. fifties-dollars15. By the time you get back, great changes_____in this area.A. will take placeB. will be taken placeC. are going to take placeD. will have taken place16. The boy now for the 1ight in his room is still on.A. must studyB. must be studyingC. must have studiedD. would study17. _____she was living in Paris that she met her husband Terry.A. Just thenB. It was whileC. Soon afterD. During the time when18. Technical schools prepare their students for the application of practical skills, they learn in class their work.A. toB. inC. forD. of19. His written English was first-class and he had a(n) vocabulary for a sophomore.A. intimateB. initialC. inevitableD. incredible20. After the company the problem of unfair competition, its sales figures dropped to a record low.A. look intoB. ran intoC. come intoD. put into21. John isn’t a diligent student for it is the third time he has been late, ?A. was n’tB. hasn’t itC. isn’t itD. hasn’t he22. He told me_____afraid because l had done nothing wrong.A. to be notB. not to beC. not beingD. being not23. Last year, the production rate by 20 percent.A. roseB. raisedC. aroseD. aroused24. I hope that the good weather ______ for the rest of our trip.A. holds upB. holds downC. holds outD. holds in25. Each person in the world has a(n) personality. They are different from one another.A. onlyB. soleC. uniqueD. one26. With all the work on hand. He _____to the cinema last night.A. should goB. must have goneC. shouldn’t have goneD. might have gone27. I am sorry to your feelings.A. have spoiltB. have destroyedC. have hurt D .have damaged28. He is so wise a man that all the people _______.A. 1ook him upB. 1ook into himC. 1ook up to himD. 1ook to him29. Yon can write the paper______ you 1ike.A. whateverB. howeverC. anywayD. some way30. I don’t doubt she will learn a lot during her stay in China.A. thatB. ifC. whetherD. what31. Though Mum is very busy, she always some time every day to read to her children.A. sets offB. sets inC. sets asideD. sets up32. These three girls help _____to clean the house.A. one anotherB. each otherC. one and the otherD. one and other33. The teacher recommended that Jack math or physics instead of English because he was quick atnumbers.A. must studyB. could studyC. studyD. studied34. He participated in the reconstruction of the city the war was over.A. before longB. soon afterC. long afterD. soon before35. Only by making wise use of land to find a solution to the problem of hunger and famine.A. we can beB. we will be ableC. will we be ableD. can we36. A teacher who is______ to the needs of individual student is sure to achieve some success.A. seriousB. sensitiveC. secureD. senior37.Nobody any more to say, the meeting was closed.A .had B. has had C. having D. had had38.When the guests were gone, she the tea-things in the cupboard.A. put upB. put offC. put awayD. put in39. Staying in a hotel costs renting a room in an apartment for a week.A. twice more thanB. twice as muchC. as much as twiceD. much as twice as40. One and a half years passed.A. areB. wereC. haveD. hasⅡ. Reading Comprehension (50%)Questions 41 to 45 are based on the following passage:Passage OnePopulation tends to grow at an exponential(指数的)rate. This means that they progressively double. As an example of this type of growth rate take one penny and double every day for one month. After the first week, you would have only 64 cent, but after the fourth week you would have over a million dollars.This helps explain why the population has come on“all of a sudden”took from he beginning of human 1ife to the year 1830 for the population of the earth to reach one billion. That repents(缓慢进行) a time span of at least two million years. Then it took from 1830 to 1930 for world population to reach 2 billion. The next billion was added by 1960 only thirty years and in 1975 world population reached 4 billion which is another billion people in only fifteen years.World population is increasing at a rate of 9, 000per hour, 220,000 per day and 80 million per year.This is not only due to higher birth rate, but to lower death rate as well. The number of births has not declined at the same rate as the number of deaths.Some countries such as Columbia, Thailand, Morocco, Costa Rica and the Philippines are doubling their population about every twenty-one years with a growth rate of 3.3 percent a year or more. The United States is doubling its population about very eighty-seven years, with a rate of 0.8 percent per year. (81)Every time a population doubles, the country involved needs twice as much of everything, including hospitals, schools, resources, food and medicines to care for its people. It is easy to see that this is very difficult to achieve for the more rapidly growing countries.41. This passage chiefly discussesA. the growth of world population.B. one type of the exponential rate.C.the population problem of more rapidly growing countries. D.the possible ways of dealing with the rapid population growth.42. According to the passage what helps to explain why the population problem has come on “all of a sudden”?A. The penny that doubles itself every day for one month.B. The time span of at 1east two million years in human history.C. An illustration of the exponent growth rate given by the author.D. The large amount of money you would luckily make after the fourth week.43. It took for the world to increase its population from 1 billion to 4 billion.A. 100 yearsB. 175 yearsC. 1975 yearsD. over two million years44. Which of the following statements is NOT true?A. World population is increasing at a rate of 150 per minute.B. Lower death rate also contributes to world population growth.C. The population of Columbia has been doubling every year for 21 years.D. The United States is usually doubling its population on about every 87 years.45. When a population doubles, the country involved needs twice as much of everything including __.A. hospitals and medicinesB. schools and studentsC. food and manpower resourcesD. all of the aboveQuestions 46 to 50 based on the following passage:Passage TwoWomen are on the whole more verbal than men. They are good at 1anguage and verbal reasoning. while men tend to be skilled at tasks demanding visual-spatial(视空)abilities. In fact, along with aggression these are the most commonly accepted difference between these sexes.Words are tools for communicating with other people especially information about people. They are mainly social tools. Visual and spatial abilities are good for imagining and manipulating objects and for communicating information about them. Are these talents programmed into the brain? In some of the newest and most controversial research in neurophysiology(神经生理学), it has been suggested that when it comes to the brain males are specialists while women are generalists.But one knows that, if anything this means in terms of the abilities of the two sexes. Engineering is both Visual and spatial and it’s true that there are relatively few women engineers. But women become just as skilled as men at shooting a rifle or driving a car task that involve visual-spatial skills. They also do equally well at programming a computer, which is neither visual nor spatial. Women do, however, seem less likely to fall in love with the objects themselves. We all know men for whom machines seem to be extensions of their identity. (82)A woman is more likely to see her car, rifle or computer as a useful tool but not in itself fascinating.46. According to the passage, women are usually good at_____.A. body languageB. logical reasoningC. tasks demanding for the use of wordsD. both A and B47. The word "accepted” in the last sentence of the first paragraph, roughly means_____.A. believedB. assumedC. receivedD. reconciled48. In the author’s opinion, visual and spatial abilities are good for______.A. achieving one’s objects.B. mind and body.C. programming talents into the brain.D. imagination and communication.49. All the following tasks involve visual-spatial abilities EXCEPT____.A. imagining and handling objects.B. providing a computer with a set of instructionsC. shooting a gun and driving an automobileD. planning and making things as an engineer does50. Why do women seem less likely to fall in love with the objects themselves?A. Because they have no visual-spatial skills.B. Because they are only good at 1anguage and verbal reasoning.C. Because they are less likely to see their charming or interesting aspects.D. Because they rarely use machines such as cars, rifles, computers, etc.Questions 51 to 55 are based on the following passage:Passage ThreeThe US. government has recently helped people learn more about the dangers of earthquakes by publishing a map. This map shows the chances of an earthquake in each part of the country. (83)The areasof the map where earthquakes are most likely to occur are called earthquake “belt”. The government is, spending a great deal money and is working hard to help discover the answer to these two questions: l. Can we predict earthquake? 2. Can we control earthquakes?To answer the first question, scientists are looking very closely at the most active fault(断层)systems in the country such as the San Andreas fault in California, a fault is break between two sections of the earth’s surface. These breaks between sections are the place where earthquake occurs. Scientists look at the faults for changes that might show that an earthquake was about to occurs. But it will probably be many years before we can predict earthquakes accurately. And the control of earthquakes is even farther away.Nevertheless, there have been some interesting developments in the field of controlling earthquakes. The most interesting development concerns the Rocky Mountain Arsenal earthquakes. Here water was put into a layer of rocks 4000 meters below surface of the ground. Shortly after this injection of water, there were a small number of earthquakes. Scientists have decided that the water which was injected into rocks works like oil on each other. When the water“oiled”the fault, the fault became slippery and the energy of an earthquake was released. Scientists are still experimenting at the site of these earthquakes. They have realized that there is a connection between injection of the water and the earthquake activity. They have suggested that might be possible to use this knowledge to prevent very big destructive earthquakes, that is, scientists could inject some kind of fluid like water into faults and change one big earthquake into a number of small, harmless earthquakes.51. Earthquake belts are .A. maps that show where earthquakes are likely to occurB. zones with a high probability of earthquakesC. breaks between two sections of the earth’s surfaceD. the two layers of earth along a fault52. The San Andreas’ fault is .A. an active fault systemB. a place where earthquakes have been predicted accuratelyC. a place where earthquake have been controlledD. the location of the Rocky Mountain53. What did scientists learn about earthquakes at the Rocky Mountain Arsenal?A. They occur at bout 4000 meters below ground levelB. The injection of water into earthquake faults prevents earthquakes from occurring.C. They are usually caused by the oil in the faults.D. Harmful earthquakes can be possibly prevented by causing small harmless earthquake.54. What can be said about the experiments at Rocky Mountain Arsenal?A. They have no practical value in earthquake prevention.B. They may have practical value in earthquake prevention.C. They are certain to have practical value in earthquake prevention.D. he article does not say anything about their practical value in earthquake prevention.55. What is the most appropriate title for the passage?A. Dangers of EarthquakeB. Earthquake Belts and PredictionC. Earthquake Prediction and ControlD. Earthquake Engineering in CaliforniaQuestions 56 to 60 are based on the following passage:Passage FourSporting activities are essentially modified forms of hunting behavior. Viewed biologically, the modern footballer is in reality a member of a hunting group. His killing weapon has turned into a harmless football and his prey into a goalmouth. If his aim is accurate and he scores a goal, he enjoys the hunter’s triumph of killing his prey.To understand how this transformation has taken place we must briefly look back at our forefathers. They spent over a million years evolving(进化) as Cooperative hunters. Their very survival depended on success in the hunting field. (84)Under this pressure their whole way of life, even their bodies, became greatly changed:They became chasers, runners, jumpers, aimers, throwers and prey killers. They cooperated as skillful male group attack.Then about ten thousand years ago, after this immensely long period of hunting the food, they became farmers. Their improved intelligence, so vital to their old hunting life was put to a new use——that of controlling and domesticating (驯养) their prey. The hunt became suddenly out of date. The food was there on the farms, awaiting their needs. The risks and uncertainties of the hunt were no longer essential for survival.(85)The skills and thirst for hunting remained, however, and demanded new outlets. Hunting for sport replaced hunting for necessity. This new activity involved all the original hunting sequences(后果), but the aim of the operation was no longer to avoid starvation. Instead the sportsmen set off to test their skill against prey that was no longer essential to their survival. To be sure, the kill may have been eaten, but there were other purposes, much simpler of obtaining a meaty meal.56. What is the main idea of the passage?A.Hunting is very important in human civilization.B.Sporting activities satisfy the desire of modern society.C.It’s hunting that provides human beings with food.D.The importance of sporting activities in modern society.57. According to the author, sporting activities .A. are essential to the survivalB. have actually developed from huntingC. evolve as biological developmentD. are football games58. For over a million years. our forefathers were basically .A. skillful sportsmenB. successful farmersC. runners and jumpersD. cooperating hunters59. The word“operation (Par. 4)refers to .A. sports activitiesB. huntingC. farmersD. prey killing60. Which of the following is true according to the passage?A. The goalmouth is equal to the weapon in hunting.B. Without hunting our forefathers couldn’t live.C. After our forefathers became farmers they still hunted for food.D. Farmers are satisfied with stable lives and they didn’t have enthusiasm for hunting any moreIII. Cloze Test (20分)The Red Cross is 61 organization which cares for people who are in 62 of help. A man in a Paris hospital who needs blood, a woman in Mexico who was injured 63 an earthquake, and a family in India 64 lost their home in a storm may all 65 by the Red Cross.The Red Cross exists in almost every country 66 the world . The World Red Cross Organizations are sometimes are sometimes called the Red Crescent(新月) the Red Mogen David, the Sun , and the Red Lion . All of these agencies 67 a common goal of trying 68 people in need.The idea of forming an organization to help the sick and 69 during a war started 70 Jean Henry Dunant. In 1859, he observed 71 suffering 72 a battlefield in Italy. He wanted to help all the wounded people 73 of which side they were 74 .The most important result of his work was an international treaty 75 the Geneva Convention(日内瓦公约). It 76 prisoners of war, the sick and wounded, and 77 citizens during a war.The American Red Cross 78 by Clara Barton in 1881. Today the Red Cross in the United States provides a number of 79 for the public. Such as helping people in need, teaching first aid,80 water safety and artificial respiration, and providing blood.61. A. internationally B. an international C. a worldly D. a world’s62. ck B. supply C. necessity D. need63. A. in B. at C. by D. on64. A. where B. that C. when D. whom65. A. be aiding B. be aided C. aid D. aided66. A. around B. on C. within D. of67. A. belong to B. owe C win D. share68. A. with helping B. and help C. to help D. for helping69. A. wounding B. having wounded C. wounded D. being wounded70. A. from B. with C. by D. at71. A. how were people B. how people were C. people were how D. people how were72. A. from B. on C. by D. with73. A. regardless B. in favor C. despite D. on account74. A. fought for B. fighting for C. fought D. fighting75. A. to call B. calling C. call D. called76. A. prohibits B. protests C. protects D. provides77. A. other B. others C. another D. the other78. A. was setting up B. has been set up C. was set up D. had been set up79. A. services B. helpings C. facilities D. money80. A. to demonstrate B. demonstrating C. demonstration D. demonstratesIV. Translation (20分)81. (Para.4, Passage 1)Every time a population doubles, the country involved needs twice as much of everything, including hospitals, school, resources, food and medicines to care for its people.82. (Para.3, Passage 2)A woman is more likely to see her car, rifle, or computer as a useful tool but not in itself fascinating.83. (Para.1, Passage 3)The areas of the map where earth quakes are most likely to occur are called earthquake “belt”.84. (Para.2, Passage 4)Under this pressure their whole way of life, even their bodies, became greatly changed.85. (Para.4, Passage 4)The skills and thirst for hunting remained, however, and demanded new outlets.Section B中国作为一个发展中国家,面临着发展经济与保护环境双重任务。

工程造价专业英语A卷答案

工程造价专业英语A卷答案

工程造价专业英语A卷答案一、汉译英题:(10小题,每题2分,共30分)1.政府机构-governmental agency (2分)2投标合同授予过程-bidding and contract award (2分)3. 项目规划、设计和施工-project planing,design,and construction (2分)4.卷入诉讼-involve someone litigation (2分)5.招标公告-notice to bidder (2分)6.材料价格-material price (2分)7.规划许可-planning permission (2分)8.法律框架-legal framework (2分)9.污水处理厂-waste water treatment plant (2分)10.确保即使付款-insures prompt payment (2分)二、英译汉题:5小题,每题4分,共20分)1、从某种程度上来说,每一个建筑项目都是独一无二的,并且没有两个相同的项目。

(4分)2、第一步是准备一份包含所有可供选择的承包商的名单。

(4分).3、给供应商和分包商足够的时间来准备他们的报价单,这一点很重要。

(4分)4、.使用现成的标准合同形式常常比设计更好。

(4分)5、为避免将来产生误解,业主和建筑商之间最好签订一份书面协议。

(4分)三、阅读题:(2小题,1小题36分,2小题24分,共60分)Construction ManagementⅠChoose the best answer according to the text.CDBA (8分)ⅡDecide the following statements are true or false.FTTFT (10分)ⅢPut the following English into Chinese1、从工程设计之初到建设工程完工,项目经理要与业主和建筑工程师进行通力合作,领导项目团队对工程的所有事项提供业务指导。

建筑工程造价历年考试真题(精选)aca

建筑工程造价历年考试真题(精选)aca

建筑工程造价历年考试真题(精选)一、单项选择题1.项目新开工时间,是指工程建设项目设计文件中规定的任何一项永久工程(A)开始施工的时间。

A、第一次正式破土开槽B、工程地质勘察C、平整场地D、旧建筑物的拆除2.关于建设项目经济评价,以下说法有误的是(D)。

A、财务评价用于判别项目的财务可行性B、国民经济评价用于评价项目的经济合理性C、财务评价是国民经济评价的基础D、财务评价是决定建设项目是否可行的主要依据3.根据我国《建筑法》的规定,下列表述中正确的是(D)A、经建设单位许可,分包单位可将其承包的工程再分包B、两上以上不同资质等级的单位联合承包工程的,可以按资质等级高的单位的业务许可范围承揽工程C、施工现场的安全由建筑施工企业和工程监理单位共同负责D、建筑施工企业应当为从事危险作业的职工办理意外伤害保险4.人工幅度差系数一般为(C)。

A、5%—10%B、5%—15%C、10%—15%D、10%—20%5.劳动定额的主要表现形式是时间定额,但同时也表现为产量定额,时间定额与产量定额的关系是(D)A、相关关系B、独立关系C、正比关系D、互为倒数6.投标单位在投标报价中,应按招标单位提供的工程量清单填报所有项目的单价和合价,在开标后发现投标单位有未填写单价和合价的项目,则(C)。

A、允许投标单位补充填写B、视为废标C、认为此项费用已包括在工程量清单中的其他单价和合价中D、由招标人退回投标书7.价格波动引起合同价格调整的计算方法有多种,其中(B)计算相对方便,偏差也较小,实际运用较多。

A、工程造价指数调整法B、调值公式法C、抽料补差法D、比例系数法8.由政府设立的有关机构编制的工程定额、指标等计价依据的属性是(B)。

A、指令性B、指导性C、参考性D、经验性9.建设项目经济评价中反映项目的实际盈利能力,同时也表明了项目所能承受的最高利率的评价指标是(D)。

A、净现值率B、资本金收益率C、行业基准收益率D、内部收益率10.缩短工期比例在(D)以上者,应由专家委员会审定其措施方案及相应的费用。

建筑工程造价历年考试真题(精选)apa

建筑工程造价历年考试真题(精选)apa

建筑工程造价历年考试真题(精选)一、单项选择题1.工程保险的索赔时效是(B)年。

A、1B、2C、3D、42.在生产性建设项目中,(D)占工程造价的比重增大,就意味着该项目生产技术的进步和资本有机构成的提高。

A、建设期贷款利息B、建安工程费用C、工程建设其他费用D、设备及工器具购置费3.关于建设项目经济评价,以下说法有误的是(D)。

A、财务评价用于判别项目的财务可行性B、国民经济评价用于评价项目的经济合理性C、财务评价是国民经济评价的基础D、财务评价是决定建设项目是否可行的主要依据4.根据我国《建筑法》的规定,下列表述中正确的是(D)A、经建设单位许可,分包单位可将其承包的工程再分包B、两上以上不同资质等级的单位联合承包工程的,可以按资质等级高的单位的业务许可范围承揽工程C、施工现场的安全由建筑施工企业和工程监理单位共同负责D、建筑施工企业应当为从事危险作业的职工办理意外伤害保险5.所谓基本构造要素,即通常所说的(C)。

A、分项工程B、结构构件C、分项工程和结构构件D、分部分项工程6.投标单位在投标报价中,应按招标单位提供的工程量清单填报所有项目的单价和合价,在开标后发现投标单位有未填写单价和合价的项目,则(C)。

A、允许投标单位补充填写B、视为废标C、认为此项费用已包括在工程量清单中的其他单价和合价中D、由招标人退回投标书7.下列定额分类中属于按照生产要素消耗内容分类的是(B)。

A.材料定额、机械定额、工器具定额B.劳动定额、机械台班定额、材料消耗定额C.机械定额、材料定额、建筑工程定额D.资金定额、劳动定额、机械定额8.材料采购保管费不包括(D)A、工地保管费B、材料采购费用C、材料仓储费D、材料运输费9.《建设工程价款结算暂行办法》规定,合同中只有类似于变更工程的价格,计算变更合同价款按(A)。

A.合同中类似的价格执行B.合同中已有的价格执行C.工程师指定的价格执行D.当地权威部门发布的指导价执行10.根据《中华人民共和国招标投标法》的规定,评标委员会由招标人的代表和有关技术、经济等方面的专家组成,其中技术、经济等方面的专家不得少于成员总数的(C)。

建筑工程造价历年考试真题(精选)aaf

建筑工程造价历年考试真题(精选)aaf

建筑工程造价历年考试真题(精选)一、单项选择题1.工程竣工结算报告金额为1200万元的工程,发包人应从接到竣工结算报告和完整的竣工结算资料之日起(B)天内进行核对(审查)并提出审查意见。

A、20B、30C、45D、602.工程施工招标可根据工程施工范围的大小及专业不同分为全部工程招标、专业工程招标以及( B )。

A.工程监理招标 B.单项工程招标C.勘察设计招标D.材料设备招标45根据《中华人民共和国招标投标法》的规定,采用邀请招标的建设项目,邀请投标的单位必须在( B )家以上。

A.2B.3C.4D.53.在工程量清单计价方式中,清单项目的工程量应以(B)为准。

A、定额工程量B、实体工程量C、实体工程量+损耗工程量D、定额工程量+损耗工程量4.劳动定额的主要表现形式为时间定额,但同时也表现为产量定额,时间定额与产量定额的关系是(A)。

A.互为倒数B.独立关系C.正比关系D.互为相反数5.对项目采用不确定性分析进行经济评价的方法中,(A)只用于财务评价。

A、盈亏平衡分析B、敏感性分析C、概率分析D、因素分析6.已建年产1000t某产品的化工生产系统,现采用相似生产线扩建该产品生产系统,扩建规模是原由的2倍.已知生产能力指数为0.6,综合调整系数为1.08,采用生产能力指法估计扩建系统的静态投资要比原有生产系统多( B )。

A.116%B.63.7%C.58.7%D.29.6%7.在索赔报告的内容中,索赔能否成立的关键是(D)。

A、总论部分B、证据部分C、计算部分D、根据部分8.我国建筑产品价格市场化先后经历了(A)三个阶段。

A、国家定价—国家指导价—国家调控价B、国家定价—国家调控价—国家指导价C、国家调控价—国家定价—国家指导价D、国家指导价—国家调控价—国家定价9.关于工程造价的特点,以下说法不正确的是:(B)。

A、工程造价的大额性使其对宏观经济产生重大影响B、产品的差异性取决于工程造价的个别性差异C、工程造价在整个建设期中处于不确定的状态,直到竣工决算后才能最终确定工程的实际造价D、工程造价的兼容性首先表现在它具有两种含义,其次表现在工程造价构成因素的广泛性和复杂性10.根据国家标准《建设工程工程量清单计价规范》的规定,工程量清单计价应采用(C)。

建筑工程造价历年考试真题(精选)atv

建筑工程造价历年考试真题(精选)atv

建筑工程造价历年考试真题(精选)一、单项选择题1.在工程量清单计价方式中,清单项目的工程量应以(B)为准。

A、定额工程量B、实体工程量C、实体工程量+损耗工程量D、定额工程量+损耗工程量2.根据施工合同的约定,承包人应完成以下工作中的(C)。

A、平整施工场地B、将施工所需电讯线路从施工场地外部接至约定地点C、按工程需要提供维修非夜间施工使用的围栏设施D、开通施工场地与城乡公共道路的通道3.当有些风险无法回避、必须直接面对,而以自身的承受能力又无法有效地承担时,应该选择的风险应对策略(D)。

A.风险回避B.风险自留C.风险控制D.风险转移4.《建设工程价款结算暂行办法》规定,合同中只有类似于变更工程的价格,计算变更合同价款按(A)。

A.合同中类似的价格执行B.合同中已有的价格执行C.工程师指定的价格执行D.当地权威部门发布的指导价执行5.在标底的编制原则中,可以与招标文件规定不一致的是(C)。

A.标底编制说明B.标底价的内容C.标前答疑纪要D.标底编制依据6.在采用三阶段设计的技术设计阶段,根据技术设计的要求,通过编制(C)文件预先测算和限定工程造价。

A、投资估算B、概算造价C、修正概算造价D、预算造价7.施工组织措施费可根据施工取费定额计算,其中环境保护费、文明施工费、安全施工费等费用,工程计价时不应低于弹性区间费率的(B)。

A、中值B、下限C、上限D、平均值8.分部分项工程量清单项目编码为030403003001,该项目为(B)工程项目。

A、建筑工程B、安装工程C、装饰装修工程D、市政工程9.关于工程造价的特点,以下说法不正确的是:(B)。

A、工程造价的大额性使其对宏观经济产生重大影响B、产品的差异性取决于工程造价的个别性差异C、工程造价在整个建设期中处于不确定的状态,直到竣工决算后才能最终确定工程的实际造价D、工程造价的兼容性首先表现在它具有两种含义,其次表现在工程造价构成因素的广泛性和复杂性10.在进口设备交货类别中,下列哪类交货类别卖方承担风险较大,在国际贸易中卖方一般不愿采用(A)A、卖方在进口国的港口或内地交货B、卖方在出口国装运港交货C、卖方在出口国内陆的某个地点交货D、以上都不正确11.工程量清单编制应执行统一的格式。

建筑工程造价历年考试真题(精选)adj

建筑工程造价历年考试真题(精选)adj

建筑工程造价历年考试真题(精选)一、单项选择题1.工程竣工结算报告金额为1200万元的工程,发包人应从接到竣工结算报告和完整的竣工结算资料之日起(B)天内进行核对(审查)并提出审查意见。

A、20B、30C、45D、602.所谓基本构造要素,即通常所说的(C)。

A、分项工程B、结构构件C、分项工程和结构构件D、分部分项工程3.(B)是以扩大的分部分项工程为对象编制的。

A、预算定额B、概算定额C、概算指标D、投资估算指标4.投标单位在投标报价中,应按招标单位提供的工程量清单填报所有项目的单价和合价,在开标后发现投标单位有未填写单价和合价的项目,则(C)。

A、允许投标单位补充填写B、视为废标C、认为此项费用已包括在工程量清单中的其他单价和合价中D、由招标人退回投标书5.当承包商在施工中遇到的现场施工条件与招标文件中描述的现场条件有很大差异时,承包商(D)。

A、只能提出工程单价变更B、只能提出施工进度变更C、不能提出工程变更D、可提出工程单价变更和施工进度变更6.研究试验费不包括(C)。

A、自行勘察试验所需的人工费、材料费B、自行勘察试验所需的试验设备及仪器使用费C、按规定付给商品检验部门的进口设备检验鉴定费D、委托其他部门勘察试验所需的人工费、材料费、试验设备及仪器使用费7.如果下列合同文件出现不一致,(B)具有最高的解释效力。

A、中标通知书B、施工合同协议书C、图纸D、施工合同专用条款8.投标人可以在(B),补充、修改或者撤回已提交的投标文件,并书面通知招标人。

A.招标人发出中标通知书前B.招标文件要求提交投标文件的截止时间前C.开始评标前D.开始定标前9.根据已建成的性质类似的建设项目或单项工程的投资额和生产能力来推测拟建项目或单项工程的投资额的估算方法为(B)。

A、资金周转率法B、生产能力指数法C、专业工程比例系数法D、指标估算法10.将承包工程内容分解成不同的控制界面,以业主验收控制界面作为支付工程价款的前提条件,此结算方法是(B)。

工程造价英语试题1

工程造价英语试题1

201X~201X学年第X学期《工程造价专业英语》期末考试试题班级: 姓名: 学号:I、Choose the best answer.(4×2=8’)1. ______take(s) precedence over the other contract documents.A.A.Contract drawingsB. B.Bill of quantitiesC. C.AgreementD.D.Specifications2. The construction team will not include the following_______.A.designers and engineersB.contractorsernment officialsD.material dealers.3. The two most commonly encountered contracts are______.A.lump sum contract and incentive contractB.unit price contract and cost-plus contractC.incentive contract and cost-plus contractD.lump sum contract and unit price contract4. _______is the probable reason of a client asking for a tender in an unrealistically shout period of time.A.making an early start on siteB.making an early completion of the workC.obtaining an accurate priceD.saving the costII、Decide the following statements are true or false. (4×2=8’)1.In the process of prequalification, the procedures and forms forcorrespondence should be discussed. ( )2.The construction process is likely to be influenced by some unpredictablefactors.( )3.The purpose of the notice to bidders is to inform potential bidders of somespecific facts. ( )4.Prequalification is more applicable to public work than to private work.( )III、Match the words in closest meaning. (12×1.5=18’)( ) 1. unpredictable a. ordinary( ) 2. common b. programme( ) 3. commencement c. debate( ) 4. profession d. order( ) 5. encounters e. decline( ) 6. indicate f. diversity( ) 7. decrease g. befall( ) 8. discrepancy h. declare( ) 9. sequence i. beginning( ) 10. schedule j. changeable( ) 11. dispute k. appraise( ) 12. estimate l. occupationIV、Put the following English into Chinese. (5×5=25’)1.Bid forms that are carefully prepared in this manner contribute to the simplicity ofbid analysis and fairness in contract award.2.The more detailed information which can be provided to the contractor at thisstage, the better, since any ambiguity, lack of facts or confusion can easily lead to problems and disputes later on during the contract period.3.Though the clauses aim to be precise and explicit, to cover any eventuality,disagreement in their interpretation does occur.4.To some degree each construction project is unique, and no two jobs are ever quitealike.5.Drawings will also be necessary for planning permission and building regulationsapproval.V、Put the following Chinese into English. (9×3=27’)1. 公共工程2. 临时设施3. 投标公告4. 未预见的情况5.合同工期6. 竣工图7. 质量保证期8. 工程量清单9. 施工现场VI、Write something about the following question according to your opinion.(14’)What information should be included in the enquiry form?答案一、1.A 2.C 3.D 4.A二、1.T 2. T 3.T 4.F三、1.j 2.a 3.i 4.l 5.g 6.h 7.e 8.f 9.d 10.b 11.c 12.k 四、1、如此精心准备的投标形式在合同方面有助于投标分析与公平投标的简化。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

乐山师范学院 2014 - 2015 学年第 2 学期期末考试《工程造价专业英语》试卷A卷用卷对象:经管学院 13 级工程造价专业本科 1、2 班说明:1、本试卷共 4 页,另加添卷纸页。

2、试卷共 3 个大题,满分100分。

3、本次考试为闭卷,考试时间: 120 分钟。

题号一二三四五六七八总分阅卷人分数1 2 3 4 5 6 7 8 9 101.政府机构2投标合同授予过程3. 项目规划、设计和施工4.卷入诉讼5.招标公告6.材料价格7.规划许可8.法律框架9.污水处理厂10.确保即使付款1、To?some?degree?,each?construction?project?is?unique?,and?no?two?jobs?are?ever?quite?alike?.2、The?initial?step?is?to?prepare?a?list?of?all?available?contractors.?3、.It?is?important?to?give?prospective?suppliers?and?subcontractors?as?much?time?as?possible?in?which?to?pr epare?their?own?quotation..4、It?is?always?preferable?to?use?one?of?the?standard?forms?available?,rather?than?to?devise?one’s?own?personal?form.5、In order to avoid any future misunderstandings,it is preferable to have a written agreement between the employer and the builder.得分三、阅读题:(2小题,1小题36分,2小题24分,共60分)Construction ManagementIn construction management the owner contracts with an architect-engineer for construction project design and with a construction management firm consulting , procurement, contract letting, and construction administration services. In so doing, a construction team is created consisting of the owner, the architect-engineer, and the construction manager(CM). The objective of this approach is to treat construction project planning, design, and construction as integrated tasks within a construction system. The CM works with the owner and the architect-engineer from the beginning of design until construction project completion, providing leadership to the construction team in all matters pertaining to construction. Adherence to construction schedules and budget constraints is the CM's prime responsibility.During the design phase, the CM advises with respect to performance criteria, construction feasibility of alternative building systems, site conditions, site conditions, and availability of materials and labor. I nformation pertaining to trade jurisdictions and temporary job facilities is also provided. W here long lead-time machinery, equipment, or materials are needed , the CM will make arrangements for their procurement and delivery. D uring the design process, the CM prepares preliminary, interim, and final construction project budgets and construction schedules.F ast tracking and phased construction are frequently used on construction projects of this type. T he construction manager handles the bidding and contract award process whereby work is contracted out to a succession of constructors as the various design phases are finalized. T he CM usually does not perform significant construction work with his own forces.During construction operations, the CM assumes responsibility for the supervision coordination, and administration of the construction project. Of top importance in this regard are coordinating the work of the separate contractors, checking the actual progress of the construction project against an established time schedule, and exercising every effort to keep the cost of the work within the approved budget. Also often involved are quality control, safety, progress payments, contract changes, claims, expediting, shop drawings , acceptance testing, and other elements of construction administration. The extent of services to be provided by the CM can be tailored to suit the individual owner’s requirements.Two different types of construction management contracts can be used. Under one type, the CM is made the agent of the owner. All actions of the CM, such as purchasing, contracting, disbursement, and construction supervision, are carried out in the name of and on behalf of the owner. Under principles of agency, the owner is fully responsible for the actions of the CM.A nother type of management contract is that in which the CM is engaged as an independent contractor . I n this case his actions are taken in his own name and on his own responsibility. The CM is liable for his own actions and remains responsible for the work until its completion and acceptance by the owner. Public owners cannot ordinarily make the CM their agent. Private owners, on the other hand, can and normally do in practiceⅠChoose the best answer according to the text. (8分)1.The primary responsibility of the CM is___________A.To give advice to performance criteriaB.To provide information about availability of materials and laborC.Adherence to construction schedules and budgetD.To provide information about temporary jobs2.Which is not the duty of the CM during the design phase得分一、汉译英题:(10小题,每题2分,共20分)得分二、英译汉题:5小题,每题4分,共20分)A.to offer advice on construction feasibility of alternative building systems.B.To make arrangements for procurement and delivery of the lead-time machinery and plantC.To prepare construction schedulesD.To check actual progress of the project against the schedule3.Which is not the responsibility of the CM during the construction operationA.Quality controlB.Handling the bidding and contract award processC.CoordinationD.Contract changes4.Which is not in the top importance list of responsibilities of the CM during the construction operationA. Accepting testB. Exercising every effort to keep the cost of the work within the approved budgetC. Checking the actual progress of the projectD. Coordinating the work of separate contractorsⅡDecide the following statements are true or false. (10分)1.The CM begins to work from the beginning of the site construction2.The owner should be the leader of the construction team3.The owner should be responsible for the action of the CM who is made the agent of the owner4.During construction operations,the CM prepares preliminary,interim,and the final project budget.5.The CM is usually engaged as an independent contractor in the public workⅢPut the following English into Chinese (每题6分,共18分)1、The CM works with the owner and the architect-engineer from the beginning of design until construction project completion, providing leadership to the construction team in all matters pertaining to construction. Adherence to construction schedules and budget constraints is the CM's prime responsibility.2、During construction operations, the CM assumes responsibility for the supervision coordination, and administration of the construction project. Of top importance in this regard are coordinating the work of the separate contractors, checking the actual progress of the construction project against an established time schedule, and exercising every effort to keep the cost of the work within the approved budget.3、Under one type, the CM is made the agent of the owner. All actions of the CM, such as purchasing, contracting, disbursement, and construction supervision, are carried out in the name of and on behalf of the owner. Under principles of agency, the owner is fully responsible for the actions of the CM.Contract documents and drawingsContract documentsA major advantage of using a standard document is that those who use it regularly become familiar with its contents.They thus become aware of both its strengths and its weaknesses,and the suitability for their own specific purpose.The contract documents under any building project should include,as a minimum,the following information:The work to be performed.This generally requires some form of drawn information.It assists the client by way of showing his schematic layouts and elevations.Even the non-technical employer is usually able to grasp a basic idea of the architect’s intentions.Drawings will also be necessary for planning permission and building regulations approval.Finally,they will be needed by the prospective builder in order that he can carry out the architect’s intentions during estimating and construction.On all but the simplest types of project, therefore, some drawings will be necessary.The quality of work required.It is not easy on drawings alone to describe fully the quality and performance of the materials and workmanship expected.It is usual ,therefore,for this to be detailed either in a specification or in a bill of quantities.The contractual conditions.In order to avoid any future misunderstandings,it is preferable to have a written agreement between the employer and the builder.For simple projects,the conditions appropriate to minor works may be sufficient.On more complex projects,one of the more comprehensive forms of contract should be used.The cost of the finished work.This should be predetermined,wherever possible,by an estimator from the builder.On some projects it may only be feasible to assess the cost once the work has been carried out.In these circumstances the method of calculating this cost should be clearly agreed.The construction programme.The length of time available for the construction work on site will be important to both the client and the contractor.The client will need to have some idea of how long the project will take to complete in order to plan his own arrangements for the handover of the project.The contractor’s costs will,to some extent,be affected by the time available for construction.The contract documents on a building contract normally comprise the following:Form of contractContract drawingsBill of quantities or specificationOn a civil engineering project it is more usual to include both a bill of quantities and specification.The JCT forms used on building contracts allow only one of these documents.Contract drawingsThe contract drawings should ideally be complete and finalized at tender stage. Unfortunately this is seldom the case,and both clients and architects rely too heavily upon the clause in the conditions allowing for variations.Occasionally it is due to insufficient time being made available for the pre-contract design work or,frequently,because of indecision on the part of the client and his design team. Tenders should,however,be given sufficient information to enable them to understand what is required in order that they may submit an accurate and realistic price.The contract drawing will include the general arrangement drawings showing the site location,the position of the building on this site,means of access to the site,floor plans,elevations and sections.Where these drawings are not supplied to the contractors with the other tendering information,they should be informed where and when they can be inspected.The inspection of these and other drawings is highly recommended since it may provide the opportunity for an informal discussion on the project with the designer.Each drawing should include:a.The name and address of the consultant(architect,engineer or surveyor)b.The drawing number,for reference an recording purposec.The scale ,if more than one scale is used they should be of such dissimilar proportions that they are readily distinguishable by sighte.The title,w hich will indicate the scope of the work covered on the drawing.ⅠChoose the best answer according to the text. (8分)1.The contract documents under any building project should at least include the following information:A.the work to be performed and the quality of work requiredB.The contractual conditions and the construction programC.The cost of the finished workD.All of the above2. According to the text,some drawings will be necessary for:A.helping the employer to understand the intention of the architectB.planning permissionC.building regulations approvalD.all of the above3.In order to describe fully the quality and performance of the materials,we can rely on:A.some drawingsB.specificationC.bill of quantitiesD.all of the above4.According to text,the contract documents on a building contract are normally composed of the followingA.contract drawingsB.form of contractC.specifications or bill of quantitiesD.all of the aboveⅡPut the following English into Chinese (16分)1.The length of time available for the construction work on site will be important to both the client and the contractor.The client will need to have some idea of how long the project will take to complete in order to plan his own arrangements for the handover of the project.The contractor’s costs will,to some extent,be affected by the time available for construction.(6分)2.Drawings will also be necessary for planning permission and building regulations approval.Finally,they will be needed by the prospective builder in order that he can carry out the architect’s intentions during estimating and construction.(6分)1.Their purpose is to attempt to clarify the rights and responsibilities of the various contractors in the event of a dispute arising. (4分)。