The significance of control construction costs manages on entire
process
First, The necessary of control construction costs manages on entire process Talk about the management and the control on construction costs, that the field we are just accustomed to is thought of is a project advance in final account. Indeed , right away at present system and reality,what the job of that the management and the control on construction costs is advance in final account. Be that in advance, the people who work on final account according that already be ascertaied of the working drawing to calculate project amounts,apply a quota mechanically, the meter mechanically fetching cost, or designing that according to the drawing sheet and construction organization after construction is over as well as the scene construction visa takes notes weaves the final account being completed. This is necessary , useful no doubt. But we must see that when pre-final accounts personnel weave working drawing budget or the final account being completed, the construction plan and the design paper already determined. But construction being to take according to picture as principle, so then in advance, job done by final account personnel is only the change secretly scheming against cost produced by design alteration and prevents upvaluation from calculating boldly. But suppose the project is unreasonable on economy, there is a fault in decision-making; suppose designing a scheme feasible or be not optimum on the technology; the final account
personnel can do nothing for sb then in advance. Job of final account personnel does accounts in advance only under just saying system currently in effect, after the event , can only reflect already complete project amounts inactively , can only reflect design and be under construction passively. This evidently is single-faceted , insufficient , we must carry out the entire proceeding supervisory control on the construction costs of building a project.
Concrete conditions of union our country, cost of construction manages have problems as follows:
1、Be not enough to take investment decision into the stage of construction costs seriously charge indeed.
Investment decision is to produce the construction costs headstream, This one stage blow the expense at take up the total investment forehead about %~3%,but that can have an effect to raise the project benefit of investment. That the project carries out rational choice on construction is that resource carries out direct , the most important optimization deploy means on economy , project benefit of investment affects efficiency and beneficial result to entire national economy. The developed country charges attach importance to control on investment decision stage construction costs,and costs not stinting big capital of money making the studies on the stage of carrying out investment decision energetically, make relatively comparatively accurate construction costs , go along the control
For a long time, there is the grave phenomenon investing in swelling in engineering construction of our country,bring the limit for a project feeling longer and longer, construction costs is higher and higher. The cause of that is short of the effective basis of the building of earlier stage ascertaining construction costs, only basis the already completed according to the expert , decision-makers draw lessons to estimate the project construction costs. Because a lot of factor effects, the“three surpass " phenomenon very common, there are main cause as follows:
(1) personal factor brings about rough estimate lessening
(2) equipment composes in reply material price's not working out according to market quotations.
(3) construction units bring forward the too high for exceeding a design criterion 2、The design stage of construction costs is not under the control of strict
The design stage is the faucet in that project construction costs controls. After the investment decision is be made rationally , that is the process of plan the technology and organic together economly . Effective control the cost of construction requires strictly and all-round in the enginee designing . Engineering design of current our country also puts move bidding system , fair competition into practice , cost of construction looks on control engineering effective to design stage as one of the standard choosing main part being hit by the bid unit , cost of construction carries out the administration controlling on the entire proceeding .Our country major part design that the unit carries out thorough analysis lack on construction project technology and economy , big multiple technologies make light of economy in design but at present , design that the personnel is responsible seemingly only to design project mass , are concerned with the construction costs height not very.