Technical data

Demag FDR-Bas rope hoist

FDR-Bas 3 - 5 - 10 foot-mounted hoist

121211 en CN203 735 44714 IS 813

2

20373544_e n _121211 © D e m a g C r a n e s & C o m p o n e n t s

Contents

Design overview

3Explanation of size designations/type assignment 3Selection criteria 4Selection table 5

FDR-Bas 3

- 2/1, H12, H20, H30 foot-mounted hoist, m ounting p osition A 6- 4/1, H12, H20 foot-mounted hoist, m ounting p osition A 7- 4/1, H30 foot-mounted hoist, mounting position A

8- 4/1, H12, H20, H30 foot-mounted hoist, m ounting p osition B 9

FDR-Bas 5

- 2/1, H12, H20, H30 foot-mounted hoist, m ounting p osition A 10- 4/1, H12, H20 foot-mounted hoist, m ounting p osition A 11- 4/1, H30 foot-mounted hoist, mounting position A

12- 4/1, H12, H20, H30 foot-mounted hoist, m ounting p osition B 13

FDR-Bas 10

- 2/1, H12, H20, H30 foot-mounted hoist, m ounting p osition A 14- 4/1, H12, H20 foot-mounted hoist, m ounting p osition A 15- 4/1, H30 foot-mounted hoist, mounting position A

16- 4/1, H12, H20, H30 foot-mounted hoist, m ounting p osition B 17DR 3 - 5 - 10 motor data with pole-changing hoist drives

18

3

20373544_e n _121211

© D e m a g C r a n e s & C o m p o n e n t s

Design overview

Explanation of size designations/type assignment

1) Code CC - with contactor control

NC - without contactor control

4

20373544_e n _121211

© D e m a g C r a n e s & C o m p o n e n t s Selection criteria

Example

Load capacity 5 t Load spectrum “Medium” from table Lifting speed 6 m/min Creep lifting speed 1 m/min Reeving 4/1Average hook path 3 m No. of cycles/hour 20Working time/day 8 hours

The average operating time per working day is estimated or calculated as follows:

The size of the hoist is determined by the load

spectrum, average operating time per working day, load capacity and reeving.

L o a d c a p a c i t y

Operating time L o a d c a p a c i t y

Operating time

L o a d c a p a c i t y

Operating time Operating time

Very heavy dead load

Small partial load Small dead load

Large partial load Medium partial load Medium dead load

Heavy dead load

L o a d c a p a c i t y

4 Very heavy

Hoist units which are usually subject to maximum or almost maximum loads.

3 Heavy

Hoist units which are usually subject to medium loads but frequently to maximum loads.

2 Medium

Hoist units which are usually subject to small loads but rather often to maximum loads.The load spectrum

(in most cases estimated) can be evaluated ac-cording to the definitions below:

1 Light

Hoist units which are usually subject to very small loads and in exceptional cases only to maximum loads. 1. What are the operating conditions?2. What is the specified safe working load?3. To what height must the load be lifted?4. What is the required lifting speed?

5. Do the loads need to be lifted and lowered with

great accuracy?6. Is horizontal load travel necessary?7.

How is the hoist to be controlled?

For the medium load spectrum and an average daily operating time of 2,66 hours, the table above shows group 2m. For a load capacity of 5 t and 4/1 rope reeving, the following table indicates hoist size DR-Bas 5 - 5.

Operating time/day = 2 · average hook path · no. of cycles/hour · working time/day

=

60 · hoist speed

Operating time/day =

2 ·

3 · 20 · 8= 2,66 hours

60 · 6

The group is determined by the load spectrum and operating time.Load spectrum Average operating time per working day in hours 1Light 2-44-88-16more than 16

3Heavy 0,5-11-22-44-84

Very heavy

0,25-0,50,5-11-22-4Group of mechanisms to

FEM

1Am 2m 3m 4m ISO

M4

M5

M6

M7

1) Gearbox service life 20 % higher than the FEM full-load service life