公司项目策划部海外工程英语五百句范本

合集下载

500 of english sentences

500 of english  sentences

工程建设现场英语五百句目录1、问候和介绍(36句)GREETINGS AND INTRODUCTIONS2、交谈语言(24名)TALKING ABOUT LANGUAGES3、日期和时间(20句)DATES AND TIMES4、天气和环境(20句)WEA THER AND ENVIRONMENT5、在会议上(34句)A T THE MEETING6、工程项目(20句)ENGINEERING PROJECT7、计划与进度(20句)PLANNING AND SCHEDULING8、技术资料与图纸(34句)TECHNICAL DOCUMENTS AND DRAWINGS 9、公用工程(20句)UTILITY10、施工现场(44句)A T THE JOB SITE11、设备检验(30句)INSPECTION OF THE EQUIPMENT12、土建工程(18句)CIVIL ENGINEERING13、施工机械(18句)CONSTRUCTION MACHINERY14、常用工具(22句)COMMON TOOLS15、工程材料(18句)ENGINEERING MATERIALS16、设备安装(24句)ERECTION OF THE EQUIPMENT17、工艺管道(22句)PROCESS PIPING18、质量管理(20句)QUALITY CONTROL19、试车和开工(30句)TEST RUN AND START-UP20、在宴会上(26句)A T THE BANQUET附录一、基数和序数、分数、倍数、百分数附录二、常见各国标准代号附录三、常见外国学会和协会机构附录四、度量衡表1一、问候和介绍(36句)GREETINGS AND INTRODUCTIONS1 How do you do? 你好吗?(初次见面)2 How are you? 你好吗?(日常见面)3 Fine, thanks. 很好,谢谢。

海外施工实用英语手册(工程师工地英语)

海外施工实用英语手册(工程师工地英语)

英语实用手册内部资料仅供参考常用动词:走:沟 go来:卡木 come上:阿普 up记录:瑞考特 record洗:沃西 wash修理:瑞派啊 repair加速:引克瑞斯 increase固定:菲克斯 fix扔:斯肉俄为 throw away问;阿斯克 ask回家:钩后母go home搬家(换工地):侵及赛的change site挖坑:迪格皮特 dig pit放下:普特荡put down拿:特A克/不润 Take下:荡down错:如昂 wrong对:如埃特 right停止:斯到浦 stop水平:来我哦 level继续:肯体牛 continue弯:办的 bend告诉我:泰尔米 tell me搅拌:米克斯 mix测量:埋设 measure加:阿特 add减:瑞丢死 reduce开始,启动:四大特 start清理:克里恩 clear夯实:肯派克特 compact振捣:外不瑞特 vibrate开:昂 on完成:非内是finish常用工具材料:钉子:内欧 nail锄: 厚 hoe绳子:如扑 rope直尺:如乐 ruler卷尺:泰普 tape小货车:皮卡普 pick up手推车:为白楼 wheelbarrow钢锯:哈克索 hack saw锯:索 saw锯条:布泪特 blade锤头:哈马 hammer管子:派谱 pipe滤管:斯克润搅拌机:康克瑞弥撒concrete mixer抽水机:怕木破 pump水泥:斯A门特 cement碎石:格如爱瓦 gravel砂:散的 sand木料:五的 wood尺寸:塞自 size模板:佛摸沃克 formwork梯子:拉大 ladder木桩:派克 peg镐:皮克 pick刀:乃夫 knife剪刀:丝热日scissors螺帽:闹特 nut机油滤清器:奥要菲特 oil filter 柴油滤清器:迪塞尔菲特diesel filter风扇:饭 fan 皮带:百尔特belt螺丝:包尔特 bolt锤子:哈马 hammer水准仪:色非有螺丝刀:丝库拽瓦 screwdriver六角扳手:爱琳K十字螺丝刀:斯塔(前加)star-平口螺丝刀:弗拉特(前加)套筒扳手:索K特平扳手:福拉特斯班活动扳:是飞艇四班纳扳子:斯班纳,spanner工具:图斯tool钳子:布赖亚pliers钻井:锥另 drilling井:薄厚 borehole货车:戳可 truck自卸车:吹普钻杆:锥另派普 drilling pipe减,变径:瑞丢死 reduce钻头:比特长:狼 long宽:外得 wide高:嗨 high深:地铺 deep直:斯吹特 straight圆:软的 round压力:普若爱社 pressure钩子:胡克 hook铁锨:傻娃 shovel铁皮:阿杨谁特 iron sheet顶锅:海的盘桶:巴给特 bucket水:沃特 water软管:候四泥抹子:丑娃快:亏克里 quickly快:哈瑞 hurry慢:斯楼里 slowly钢筋:阿杨巴 iron bar图纸:桌恩 drawing大:比格 big小:斯毛 small多:土马吃 too much装车:路的 load卸车:奥夫路的 off load工地:塞特 site树:锤 treeI I草:格如阿斯 grass开关:斯韦吃 switch速度:斯皮的 speed平整:来瓦 level挖:迪格dig垫层:不烂腚基础:房地深 foundation混凝土:康克瑞特 concrete起钉锤:卡本特哈马汽车常用油料等发动机:引擎 engine发动:斯达特 start关掉:奥夫 off汽油:派丑 petrol柴油:迪塞尔 disel煤油:开弱心 kerosene机油:引擎奥要 engine oil 油:奥要 oil离合器:可老赤 clutch刹车:不瑞克 brake刹车油:可老赤奥要clutch oil 黄油:格瑞斯黄油枪:格瑞斯干废机油:不拉克奥要 black oil 电池,电瓶:百特瑞 battery灯泡:包布 bulb抹布:喂死刷子:不如瓦是 brush钢丝刷:阿扬不如瓦是iron brush液压油:海卓里克奥要hydraulic oil压风机油:爱饿肯不如爱沙奥要Air Compressor oil红油:如爱得奥要 red oil开阀门:欧盆娃屋关阀门:克娄死娃屋一半:哈夫泥浆泵;马地怕木破岩石:如若克rock更换(找零钱):侵及垫片:瓦沙确认孔位:康夫木博后检查:切克 check我跟着你:艾否楼有I follow you工作时间:沃克泰姆 work time流量:夫楼 float加班:度欧瓦态木do overtime必须:马斯塔 must看工地:沃吃赛特小心:比开夫 be careful检查机油:切克引擎欧要check engine oil前:夫如昂特 front后:败可back充电器:恰及 charger开始:比根 begin监理:康萨叹consultant齿轮:给亚 gear齿轮油:给亚奥要gear oil齿轮箱:给亚包克斯gear box换档:侵及给亚change gear看:路克 look左:来福特 left右:如爱特 right拐弯:特恩 turn油漆: 喷特paint调头:特恩白克 turn back什么:沃特 what谁:户 who下一个:耐克斯特 next以后:啊夫得 after等一会:喂特莫门特wait a moment时间:泰姆 time开始工作:斯达特沃克 start work下班:可楼丝 close工作:沃克 work距离:迪斯坦斯 distance生活词汇饼干:必斯克A特 biscuit 早饭:不如爱得佛斯特breakfast中饭:烂棋 lunch晚饭:萨破俄 supper衣服:可老死 clothes鞋:瘦 shoe包:拜哥 bag行李:拜哥给鸡 baggage果汁:夫如特居丝 fruit juice 面包:不如爱得 bread红酒:如爱得外恩 red wine 米:如爱斯 rice 面条:路抖尔 noodle今天:它得A today明天:它莫如 tomorrow昨天:叶斯它得A yesterday汤:素朴soup茶:替 tea钱:莫尼 money票:特A克特 ticket火柴:马其丝 match打火机:赖特light吃:一特 eat喝:均可 drink食品:夫得 food肉:蜜特 meat鱼:费是fish鸡肉:岂肯 chicken牛肉:毕夫 beef蔬菜:外几特堡 vegetable手电筒:套吃 torch食用油:库肯奥要 cookoil锅:泡特 pot碗:博沃 bowl盘:普雷特 plate勺子:斯普恩 spoon筷子:乔波司特A克斯chopsticks啤酒:毕尔bear厕所:涛类特 toilet打针:因捷克深 injection药店:伐莫丝A pharmacy休息:如爱斯特 rest考勤得A类马克 daily mark开水包宁沃特 boil water签字斯A格尼车 signature登机保定 boarding文件抚爱file报告瑞泡特 report迟类特 late进来卡姆因 come早俄类 early一些萨姆 some相同丝A木 same喜欢来克 like发生嗨喷 happen摸塔气 touch身体保地 body坏了丝破恩 spoil知道安德斯坦 understand麻烦出阿博 troubleI V非常外瑞 very其他阿热other剩余瑞门 remain旅店豪台尔 hotel医院好丝皮特hospital 医生刀克特doctor先生米斯特,色 sir ,Mr. 顾客该死的 gust淋浴沙娃shower客车巴士 bus短信麦赛季 message纸呸破 paper笔喷 pen写入埃特 write有病丝A克 sick市场马克A特 market购败 buy这个热A丝完 this one 太贵靠丝累costly包装怕肯 package房间如姆 room软索夫特soft硬哈得 hard走路:沃克 walk 没问题:挠啪不乐恩药:麦德森 medicine飞机场:艾俄泡特 airport逛商店:度烧品do shopping多少钱:好玛棋how much美元:刀了丝 dolars排骨 : 瑞不 rib1:万 2:吐 3:斯瑞4:佛欧 5:夫爱五6:斯A克斯 7:塞文8:A特 9:南 10:特恩11:一来文 12:特外尔无13:色听 14:佛欧听15:菲夫听 16:斯A克斯听20:团特A 21:团特A万22:团特A吐30:色特A 100:万韩追 31:色特A万星期一:忙得A星期二:特又四得A星期三:文斯得A星期四:涩丝得A星期五:夫如爱得A星期六:塞特得A星期天:伞得A日期:得A特年:叶月:杧四日:得A小时:奥沃分:米利茨早上:毛宁中午:浓下午:阿夫特浓晚上:一文宁夜间:耐特白天:得A元月:间安又饿热二月:夫埃博若瑞三月:马妻四月:A普若五月:没六月:觉恩七月:就来八月:奥高斯特九月:塞伯特恩伯十月:奥可投伯十一月:那晚伯十二月:迪森伯。

工程建设现场英语五百句(1)

工程建设现场英语五百句(1)

工程建设现场英语五百句目录1、问候和介绍(36句)GREETINGS AND INTRODUCTIONS2、交谈语言(24名)TALKING ABOUT LANGUAGES3、日期和时间(20句)DATES AND TIMES4、天气和环境(20句)WEATHER AND ENVIRONMENT5、在会议上(34句)AT THE MEETING6、工程项目(20句)ENGINEERING PROJECT7、计划与进度(20句)PLANNING AND SCHEDULING8、技术资料与图纸(34句)TECHNICAL DOCUMENTS AND DRAWINGS 9、公用工程(20句)UTILITY10、施工现场(44句)AT THE JOB SITE11、设备检验(30句)INSPECTION OF THE EQUIPMENT12、土建工程(18句)CIVIL ENGINEERING13、施工机械(18句)CONSTRUCTION MACHINERY 14、常用工具(22句)COMMON TOOLS15、工程材料(18句)ENGINEERING MATERIALS 16、设备安装(24句)ERECTION OF THE EQUIPMENT 17、工艺管道(22句)PROCESS PIPING18、质量治理(20句)QUALITY CONTROL19、试车和开工(30句)TEST RUN AND START-UP20、在宴会上(26句)AT THE BANQUET附录一、基数和序数、分数、倍数、百分数附录二、常见各国标准代号附录三、常见外国学会和协会机构附录四、度量衡表一、问候和介绍(36句)GREETINGS AND INTRODUCTIONS1 How do you do? 你好吗?(初次见面)2 How are you? 你好吗?(日常见面)3 Fine, thanks. 很好,谢谢。

4 I an very well, thank you. 我很好,谢谢你。

公司项目计划英语

公司项目计划英语

公司项目计划英语Project Plan for CompanyIntroduction:The project plan outlines the proposed project for the company, including the objectives, scope, deliverables, timelines, and resources required. The project aims to achieve [insert objectives here] and is expected to be completed within [insert timeline here]. The project team will consist of [insert team members here] who will be responsible for the successful execution of the project.Project Objectives:The primary objectives of the project are to [insert objectives here]. These objectives align with the company's strategic goals and are intended to [insert intended impact here]. The project will also aim to [insert additional objectives here], in order to fully meet the needs of the company and its stakeholders.Scope:The project will encompass [insert scope here],including [insert specific deliverables here]. The scope of the project is defined by [insert boundaries here] and is intended to address [insert key issues here]. It is important to note that the project scope is subject to change based on [insert potential changes here].Deliverables:The key deliverables of the project include [insert deliverables here]. These deliverables are essential for achieving the project objectives and will be completed within the specified timelines. The quality of the deliverables will be ensured through [insert quality assurance processes here].Timeline:The project is scheduled to commence on [insert start date here] and is expected to be completed by [insert end date here]. The timeline is divided into various phases, each with its own set of deliverables and milestones. A detailed timeline is provided in the project schedule, which will be regularly updated and monitored throughout the project.Resources:The project will require the following resources:- Human resources: [insert team members here]- Financial resources: [insert budget details here]- Physical resources: [insert equipment and materials here]- External resources: [insert any external support or expertise required here]Risks and Mitigation:The project may face certain risks, including [insert potential risks here]. These risks will be mitigated through [insert risk mitigation strategies here], whichwill be implemented by the project team. Regular risk assessments will be conducted to identify and address any new risks that may arise during the project.Communication and Reporting:Effective communication is critical to the success of the project. The project team will maintain regular communication through [insert communication channels here],and will provide regular updates to stakeholders through [insert reporting mechanisms here]. Any issues or concerns will be addressed promptly to ensure the smooth progress of the project.Conclusion:The project plan outlines the key details of the proposed project for the company. It is intended to provide a clear roadmap for the successful execution of the project, and to ensure that all stakeholders are aligned on the objectives, scope, and timelines. The project team is committed to delivering the project in a timely manner andto the highest standards of quality.公司项目计划项目简介:该项目计划概述了公司的拟议项目,包括目标、范围、可交付成果、时间表和所需资源。

工程英语500句

工程英语500句

Part 1 GREETINGS AND INTRODUCTION1.How do you do?你好吗?(初次见面)2.How are you?你好吗?(初次见面)3.Fine, thanks.很好,谢谢。

4.I am very well, thank you.我很好,谢谢你。

5.Good morning, Mr. Jack.早安,杰克先生。

6.Good afternoon,Miss Mary.午安,玛利小姐。

7.Good evening,Dr. John.晚安,约翰博士。

8.Very pleased to meet you, you are welcome.见到你很高兴,欢迎你。

9.I am very glad to see you.我很高兴见到你。

10.Welcome to China. 欢迎你到中国来!11.Welcome to our job site.欢迎你到我们工地来。

12.For our friendship and cooperation, I wish we shall have a friendly cooperation in coming days.祝愿友谊与合作,希望今后友好共事。

13.Let us work together for our common job. 让我们为共同的事业一起工作吧!14.Happy New Year!新年快乐!15.Happy Spring Festival.春节快乐!16.Merry Christmas! 圣诞节快乐!17.Congratulations to your National Day! 祝贺你们的国庆节!18.Happy birthday to you!祝你生日快乐!19.Allow me to introduce myself,my name is Li Han.,请允许我介绍我自己,我的名字叫李汉。

20.Please allow me to introduce a fellow of mine, Mr.请允许我给你介绍一位我的同事,某先生。

外企项目工程师常用英语

外企项目工程师常用英语

外企项目工程师常用英语about screw:关于罗纹的那个产品。

I have cut the thin zone.客人已经减掉了薄的区域。

the zone undercut is not enough important you can work without modifications倒扣的区域不是很重要。

我们可以不用修改。

cover lyo:关于cover lyoi add the draft angle necessaty..在必要的位置客人增加了拔模。

shell lyo:关于shell lyo.I have cut a zone to reduce the thickness to delete more possible the sinkmark客人已经减少了胶厚来避免缩水。

I have add radius in the head zone where you have sign THIN STELL to delete cutting edge客人已经在顶部增加了R角,在那里我们标记了尖钢位,已经删除了刃的边缘。

I have add radius in the zone of you have sign RADIUS HERE客人在我们标有需要有R角的位置增加了R角。

In the zone where you have sign UNDERCUT i though a different clamp line客人在我们标记有倒扣的地方,客人通过不同的夹线(红色的字体我不知道怎样翻译,请结合图片看下。

)please see picture where i sign modifcations.请看附件客人标有修改的图片,,thank you for inform me about posiible zone with sinkmarks,i know about this,and i ask to you to only reduce in the better way during the stamping.!关于缩水的地方。

海外施工900句

海外施工900句

CNPC海外操作人员英语日常用语900句一、Greetings 问候语1. Hello! / Hi! 你好!2. Good morning / afternoon / evening! 早晨(下午/晚上)好!3. I’m Kathy King. 我是凯西•金。

4. Are you Peter Smith? 你是彼得•史密斯吗?5. Yes, I am. / No, I’m not. 是,我是。

/ 不,我不是。

6. How are you? 你好吗?7. Fine, thanks. And you? 很好,谢谢,你呢?8. I’m fine, too. 我也很好。

9. How is Amy / your wife / your husband? 爱米好吗?/你妻子好吗?/你丈夫好吗?10. She is very well, thank you. 她很好,谢谢。

11. Good night, Jane. 晚安,简。

12. Good-bye, Mike. 再见,迈克。

13. See you tomorrow. 明天见。

14. See you later. 待会儿见。

15. I have to go now. 我必须走了。

二、Expression In Class 课堂用语16. May I come in? 我能进来吗?17. Come in, please. 请进。

18. Sit down, please. 请坐。

19. It’s time for class. 上课时间到了。

20. Open your books and turn to page 20. 打开书,翻到第20页。

21. I’ll call the roll before class. 课前我要点名。

22. Here! 到!23. Has everybody got a sheet? 每个人都拿到材料了吗?24. Any different opinion? 有不同意见吗?25. Are you with me? 你们跟上我讲的了吗?26. Have I made myself clear? 我讲明白了吗?27. Could you say it again? 你能再说一遍吗?28. Any questions? 有什么问题吗?29. That’s all for today. 今天就讲到这里。

国外项目常用英语

国外项目常用英语

国外工程常用英语短句撷录1、Don’t be rude/cheeky to me! 不要对我无礼!(有一定的杀伤力)2、After you. 你先请。

(这是一句很常用的客套话,在进/出门/用餐、上车等场合很实用.)3、I just couldn't help it. 我就是忍不住。

eg. I was deeply moved by the film and I cried and cried. I just couldn't help it. 我深深地被这部电影打动了,我哭啊哭。

我就是忍不住。

urgent4、Don't take it to heart. 别往心里去/别为此而忧虑伤神。

eg. This proof isn't that important. Don't take it to heart. 这个试验不是那么重要。

别担心了。

5、We'd better be off. 我们该走/出发了。

eg. It's getting late. we'd better be off . 太晚了,我们最好该离开了。

6、let's face it./ let’s face the music. 面对现实吧。

eg. I know it's a difficult situation. let's face it, ok? 我明白这是一个困难的情势。

让我们面对它吧,好吗?7、let's get started.咱们开始干吧。

(最烦躁黑人的磨蹭!)eg:don't just talk. let's get started.or: let's get started./let's start./let's do it right now.8、I'm really dead.我真要累死了。

海外工程英文方案

海外工程英文方案

海外工程英文方案1. IntroductionThe purpose of this proposal is to outline a comprehensive plan for an overseas engineering project. The project aims to provide engineering solutions for a specific construction project in a foreign country, addressing the technical and logistical challenges associated with working in a new environment.2. Project OverviewThe overseas engineering project involves the construction of a new hospital in a developing country. The project is a collaboration between an international development organization and the local government, with the goal of improving healthcare infrastructure in the region. The hospital will provide critical medical services to the local population, addressing the healthcare needs of a community that lacks adequate access to medical facilities.3. Project ObjectivesThe primary objective of the overseas engineering project is to design and build a modern, high-quality hospital facility that meets international standards for healthcare infrastructure. The project will focus on the following key objectives:- Conducting a comprehensive site assessment to evaluate the local environmental and geological conditions, as well as the existing infrastructure and resources available for the construction project.- Designing a hospital facility that meets the functional requirements of a modern healthcare facility, while also taking into account the cultural and social context of the local community.- Developing a detailed construction plan that addresses the technical and logistical challenges associated with building in a remote and challenging environment, including sourcing materials and equipment locally wherever possible.- Implementing strict quality control measures to ensure that the construction project adheres to international standards for safety, sustainability, and overall quality.4. Project ScopeThe scope of the overseas engineering project encompasses the following key components: - Site Assessment: Conduct a thorough evaluation of the proposed construction site to identify any potential challenges or constraints that may impact the design and construction process. This will include an assessment of the local climate, geology, and environmentalconditions, as well as an analysis of the existing infrastructure and resources available for the project.- Design and Planning: Develop a comprehensive design for the hospital facility that meets the functional requirements of a modern healthcare facility, while also addressing the unique needs and cultural context of the local community. This will involve collaborating with local stakeholders, healthcare professionals, and government authorities to ensure that the design reflects the specific healthcare needs of the region.- Construction Management: Implement a detailed construction plan that addresses the technical and logistical challenges associated with working in a remote and challenging environment. This will include sourcing materials and equipment locally wherever possible, as well as coordinating with local contractors and labor forces to ensure that the construction project proceeds according to schedule and budget.5. Technical ApproachThe technical approach for the overseas engineering project will involve the following key strategies:- Environmental and Geological Assessment: Engage with local environmental and geological experts to conduct a comprehensive assessment of the proposed construction site, including an analysis of the local climate, geology, and environmental conditions. This will help to identify any potential challenges or constraints that may impact the design and construction process, allowing us to develop appropriate mitigation measures to address these issues.- Sustainable Design: Implement sustainable design principles to minimize the environmental impact of the construction project, while also maximizing the long-term operational efficiency of the hospital facility. This will include incorporating energy-efficient building materials, as well as designing the facility to optimize natural lighting, ventilation, and overall resource utilization.- Local Sourcing and Collaboration: Work closely with local suppliers, contractors, and labor forces to source materials and equipment locally wherever possible, while also leveraging local expertise and resources to ensure the successful completion of the construction project. This will involve establishing partnerships with local organizations and businesses, as well as providing training and capacity-building opportunities for local workers to enhance their skills and knowledge in construction and engineering.6. Logistical ConsiderationsThe overseas engineering project will require careful logistical planning to address the challenges associated with working in a remote and challenging environment. Key logistical considerations include:- Transportation: Develop a comprehensive transportation plan to facilitate the delivery of materials and equipment to the construction site, taking into account the local infrastructure and road network, as well as any potential obstacles or barriers that may impact the transportation process.- Material Sourcing: Identify local suppliers and manufacturers to source construction materials and equipment, with a focus on leveraging local resources and expertise to reduce reliance on imported materials and minimize transportation costs.- Workforce Management: Coordinate with local labor forces and contractors to ensure the availability of skilled workers and resources for the construction project, while also providing training and capacity-building opportunities to enhance local skills and knowledge in construction and engineering.7. Quality ControlThe overseas engineering project will implement strict quality control measures to ensure that the construction project adheres to international standards for safety, sustainability, and overall quality. Key quality control strategies include:- Quality Assurance: Develop a comprehensive quality assurance plan to monitor and evaluate the construction process, including regular inspections and assessments to ensure that the project meets the specified technical requirements and performance standards.- Safety Compliance: Implement strict safety protocols and procedures to protect workers and minimize the risk of accidents or injuries during the construction project, in compliance with international safety standards and regulations.- Sustainability Monitoring: Monitor and evaluate the environmental impact of the construction project, implementing sustainable practices and measures to minimize waste, conserve resources, and improve overall environmental performance.8. ConclusionThe overseas engineering project represents a significant opportunity to contribute to the development of critical healthcare infrastructure in a developing country, addressing the healthcare needs of a local population that lacks access to adequate medical facilities. By implementing a comprehensive technical approach, careful logistical planning, and strict quality control measures, the project aims to build a modern, high-quality hospital facility that meets international standards for healthcare infrastructure, while also respecting the cultural and social context of the local community. With a focus on collaboration, sustainability, and excellence, the project will make a lasting positive impact on the lives of the people it serves.。

工程施工计划安排文案英文

工程施工计划安排文案英文

工程施工计划安排文案英文1. IntroductionThe construction project schedule arrangement is a comprehensive plan that outlines the timeline, milestones, resources, and responsibilities for the successful execution of a construction project. It is a critical tool for project management and ensures that the project is completed on time and within budget. This document will outline the key components of a construction project schedule arrangement and provide a detailed plan for its implementation.2. Key Components of Construction Project Schedule Arrangement2.1 TimelineThe timeline is a critical component of the construction project schedule arrangement. It outlines the key milestones and deadlines for the project, including the start and end dates for various phases of the project. A detailed timeline will ensure that all tasks are completed in a timely manner and will help to identify any potential delays or bottlenecks in the project.2.2 ResourcesThe resources required for the project, including materials, equipment, and labor, must be carefully managed and allocated in the construction project schedule arrangement. A detailed plan for the procurement and allocation of resources will ensure that the project is completed within budget and that the necessary resources are available when they are needed.2.3 ResponsibilitiesThe construction project schedule arrangement should clearly outline the responsibilities of all parties involved in the project, including the project manager, contractors, and subcontractors. This will ensure that everyone understands their role and is accountable for their work, which will help to prevent delays and ensure that the project runs smoothly.3. Implementation Plan for Construction Project Schedule Arrangement3.1 Project Initiation PhaseThe project initiation phase is the first stage of the construction project schedule arrangement and involves the development of the project plan, including the timeline, resources, and responsibilities. During this phase, the project manager will work with the project team to develop a detailed plan that outlines the key milestones and deadlines for the project, as well as the resources and responsibilities required for its successful implementation.3.2 Project Planning PhaseThe project planning phase is the second stage of the construction project schedule arrangement and involves the detailed planning of the project, including the procurement and allocation of resources, as well as the establishment of key performance indicators and monitoring mechanisms. During this phase, the project manager will work with the project team to develop a detailed plan for the procurement and allocation of resources, ensuring that the necessary materials, equipment, and labor are available when they are needed.3.3 Project Execution PhaseThe project execution phase is the third stage of the construction project schedule arrangement and involves the actual implementation of the project plan. During this phase, the project manager will work with the project team to ensure that all tasks are completed in a timely manner and that the project stays on track. The project manager will also monitor the progress of the project and address any potential delays or bottlenecks to ensure that the project is completed on time and within budget.3.4 Project Closure PhaseThe project closure phase is the final stage of the construction project schedule arrangement and involves the closeout of the project, including the final inspection, acceptance, and handover of the completed project to the client. During this phase, the project manager will work with the project team to ensure that all tasks are completed and that the project is delivered to the client according to the agreed-upon specifications and timeline.4. ConclusionThe construction project schedule arrangement is a critical tool for project management and ensures that the project is completed on time and within budget. By carefully planning the timeline, resources, and responsibilities for the project, the project manager can ensure that the project runs smoothly and that potential delays and bottlenecks are addressed. The implementation plan outlined in this document provides a detailed plan for the successful execution of a construction project schedule arrangement, ensuring that the project is completed to the satisfaction of all stakeholders.。

海外工程人员常用英语

海外工程人员常用英语

强弱电词汇工程调度室Project Control Center强、弱电工作间Strong,and weak Power workshop暖通工作间HVAC workshop机修工作间Machine Equipment mend workshop员工专用间Inter-dedicated staff音控室Sound control room强电井Strong electricity well弱电井Weak electricity Well配电重地闲人免进No admittance except on distribution powerhouse机房重地闲人免进No admittance except on business powerhouse engine room正在维修on Maintaining正在维修暂停使用on Maintaining,suspended using强电force electricity strong current弱电weak electricity weak current.工程词汇A安全地线=safe ground wire安全特性security feature安装线=hook-up wire按半周进行的多周期控制=multicycle controlled by half-cycle按键电话机=push-button telephone set常用语及词汇一、问候、介绍、告别--How are you?/How are you doing?你好--Pretty good./Not too bad.不错/挺好的--Long time no see.好久不见【Haven't seen you for ages!、a long time】--How′s everything going?一切都好吗?--How are you getting on with your work?工作情况怎么样?--Hello,my name is----,Nice to meet you!你好,我叫---,很高兴认识你!--Nice to meet you,too.我也很高兴认识你。

国际工程项目英语

国际工程项目英语

国际工程项目英语Embarking on an international engineering project is a journey filled with challenges and opportunities. It requires a deep understanding of cultural nuances, technical expertise, and the ability to communicate effectively across borders.The diversity in languages and customs is a testament to the global nature of these projects. English, being thelingua franca in the engineering world, plays a pivotal rolein bridging the communication gap. It's not just about speaking the language; it's about understanding the technical jargon and being able to convey complex ideas with clarity.Collaboration is key in such projects, and the use of English facilitates this by providing a common platform for discussion. It's the medium through which engineers from different countries can share their insights, negotiate terms, and resolve issues that arise during the project lifecycle.Moreover, English proficiency is often a prerequisite for accessing international funding and for complying with global standards and regulations. It ensures that the project documentation is accessible and understandable to all stakeholders, which is crucial for transparency and accountability.In conclusion, the role of English in international engineering projects is multifaceted. It's not just alanguage; it's a tool that enables professionals to navigate the complexities of global engineering and to contribute to the creation of world-class infrastructures.。

海外工程英语

海外工程英语

Labour工人
Laying of Cables电缆敷设
常用词汇
动力电缆
控制电缆 电缆沟
电缆支架
电缆头
power cable control cable cable trench cable bearer cable head
Check Work检查工作
Overhead Line Installation架空线安装
DCS分散控制系统
Distribute Control System CCS协调控制系统 Coordinate Control System GTAW,SMAW,DCSP,DCRP,TSI,DEH, ETS, ……etc.
电影欣赏
我们有没有发现片段中Great,terrific,nice是同
口音与发音
汽轮机 turbine 透平 “Good Morning, everybody, my name is George, I come from Sichuan, China, glad to see you!”
表达英文:把自己放在英语语境, 并暂时忘记自己的母语
Mouse
老鼠
Mouth
Chinglish中式英语
大厦 mansion
plaza/center
厕所
WC /toilet
Restroom
Men’s Room Women’s Room
火锅
Chafing dish Hot pot
欢迎你到…
welcome to… welcome you to…
永远记住你
remember you forever
常用词汇
螺栓 角铁 槽钢 导线 铜 铁 铝

利比亚项目部海外工程英语1

利比亚项目部海外工程英语1

Eg: 目前最大的障碍是工程款支付问题。 The biggest obstacle now is progress payment.
5.明天早上6点开始浇注砼,所有相关人员 必须按时到场。 It’s going to place the concrete at 6 o’clock tomorrow morning, everybody related has to be on site on time.
Thank you !
工程技术人员希望学习的例句
单词学习: 单词学习: Bulldozer 推土机 Excavator 挖掘机 Tamping machine 夯机 Client 业主 Consultant 监理 Contractor 承包商 Sub-contractor 分包商 Specification 技术规格书 Demolition 拆迁 Obstacle 障碍物 Accelerate 加速 Survey 测量 Surveyor 测量员
1. 项目名称叫什么? What’s the name of the project? 项目名称叫米苏拉塔萨瓦瓦5000套房 建项目 The name is Misuratah Sawawah 5000 unit housing project.
Eg: 这个设备叫什么? 这个设备叫推土机(挖掘机,夯机等) What’s the name of this equipment? The name is bulldozer (excavator, tamping machine)
2. 项目业主是利比亚HIB,监理是德国 MVV, 承包商是中国CCCC。 The Client of the project is HIB from Libya, the Engineer (consultant) is MVV from Germany, and the Contractor is CCCC from China.

项目策划方案模板英语

项目策划方案模板英语

项目策划方案模板英语Project planning is the cornerstone of any successful endeavor. It involves setting clear objectives, identifying resources, and establishing a timeline to achieve those goals.To begin, define the scope of the project, outlining its purpose and the expected outcomes. This clarity will guidethe entire planning process and ensure that all stakeholders are on the same page.Next, conduct a thorough analysis of the resources required, including personnel, budget, and equipment. Thisstep is crucial for budgeting and ensuring that the project has the necessary support to proceed.Establish a realistic timeline with milestones and deadlines. This will help in tracking progress and making adjustments as needed. Remember to include buffer time for unforeseen delays.Risk assessment is another critical component of project planning. Identify potential challenges and develop contingency plans to mitigate them. This proactive approach can save time and resources in the long run.Communication is key to the success of any project. Develop a communication plan that outlines how informationwill be shared among team members and stakeholders, ensuringeveryone remains informed and engaged.Finally, create a monitoring and evaluation system to assess the project's performance against its objectives. This will allow for timely adjustments and help in learning from the project's successes and failures.By following these steps, a project planner can create a comprehensive and effective plan that sets the stage for a successful project execution.。

项目工程方案英语

项目工程方案英语

项目工程方案英语1. IntroductionThe purpose of this project engineering proposal is to outline the plan for the implementation of a new construction project. The proposed project is the construction of a new residential complex in a suburban area. This proposal will detail the scope of the project, the timeline for completion, the budget, and the expected outcomes.2. Project ScopeThe scope of the project includes the construction of a multi-story residential complex comprising of condominiums and apartments. The complex will also include amenities such as a gym, swimming pool, and a community center. The project will involve site preparation, construction of the buildings, installation of utilities, and landscaping.3. Project ObjectivesThe objectives of the project include:- To provide modern, high-quality housing for the growing population in the suburban area - To create a sustainable and energy-efficient residential complex- To deliver the project within the allotted timeframe and budget4. Project TimelineThe project will be executed in several phases, with an estimated timeline of 18 months. The timeline is as follows:- Phase 1: Site preparation and clearing (2 months)- Phase 2: Construction of the buildings (12 months)- Phase 3: Installation of utilities and landscaping (4 months)5. Project BudgetThe estimated budget for the project is $20 million. This budget will cover all costs associated with construction, labor, materials, and administration. A detailed breakdown of the budget will be provided in the project plan.6. Project TeamThe project team will include a project manager, construction supervisor, architects, engineers, contractors, and subcontractors. The team will be responsible for overseeing all aspects of the project and ensuring that it is completed on time and within budget.7. Project PlanThe project plan will include detailed schedules, budgets, and milestones for each phase of the project. It will also outline the roles and responsibilities of each team member and the communication and reporting protocols. The plan will be reviewed and updated regularly to ensure that the project is on track.8. Risk ManagementThe project team will identify potential risks and develop mitigation strategies to address them. Risks such as weather delays, labor shortages, and material shortages will be considered and plans put in place to minimize their impact on the project.9. Quality ControlQuality control will be a priority throughout the project. The team will implement measures to ensure that all materials and workmanship meet the highest standards. Inspections will be conducted at various stages of the project to ensure compliance with regulations and specifications.10. Environmental SustainabilityThe project will incorporate sustainable design and construction practices to minimize its environmental impact. This will include the use of energy-efficient materials, water-saving fixtures, and recycling of construction waste. The complex will also be designed to maximize natural light and ventilation to reduce energy consumption.11. ConclusionThe construction of the new residential complex promises to be a significant and exciting project. With careful planning, diligent execution, and a focus on quality and sustainability, the project team is confident that the complex will be a valuable addition to the suburban area. This project engineering proposal outlines the framework for the successful completion of the project and sets the stage for its implementation.。

中交集团利比亚项目部海外工程英语五百句

中交集团利比亚项目部海外工程英语五百句

工程建设现场英语五百句目录1、问候和介绍(36句)GREETINGS AND INTRODUCTIONS2、交谈语言(24句)TALKING ABOUT LANGUAGES3、日期和时间(20句)DATES AND TIMES4、天气和环境(20句)WEATHER AND ENVIRONMENT5、在会议上(34句)AT THE MEETING6、工程项目(20句)ENGINEERING PROJECT7、计划与进度(20句)PLANNING AND SCHEDULING8、技术资料与图纸(34句)TECHNICAL DOCUMENTS AND DRAWINGS9、公用工程(20句)UTILITY10、施工现场(44句)AT THE JOB SITE11、设备检验(30句)INSPECTION OF THE EQUIPMENT12、土建工程(18句)CIVIL ENGINEERING13、施工机械(18句)CONSTRUCTION MACHINERY14、常用工具(22句)COMMON TOOLS15、工程材料(18句)ENGINEERING MATERIALS16、设备安装(24句)ERECTION OF THE EQUIPMENT17、工艺管道(22句)PROCESS PIPING18、质量管理(20句)QUALITY CONTROL19、试车和开工(30句)TEST RUN AND START-UP20、在宴会上(26句)AT THE BANQUET附录一、基数和序数、分数、倍数、百分数附录二、常见各国标准代号附录三、常见外国学会和协会机构附录四、度量衡表一、问候和介绍(36句)GREETINGS AND INTRODUCTIONS1 How do you do?你好吗?(初次见面)2 How are you?你好吗?(日常见面)3 Fine,thanks.很好,谢谢。

4 I am very well, Thank you.我很好,谢谢你。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

工程建设现场英语五百句
目录
1、问候和介绍(36句)GREETINGS AND INTRODUCTIONS
2、交谈语言(24句)
TALKING ABOUT LANGUAGES
3、日期和时刻(20句)
DATES AND TIMES
4、天气和环境(20句)WEATHER AND ENVIRONMENT
5、在会议上(34句)
AT THE MEETING
6、工程项目(20句)ENGINEERING PROJECT
7、打算与进度(20句)PLANNING AND SCHEDULING
8、技术资料与图纸(34句)TECHNICAL DOCUMENTS AND DRAWINGS 9、公用工程(20句)
10、施工现场(44句)
AT THE JOB SITE
11、设备检验(30句)INSPECTION OF THE EQUIPMENT 12、土建工程(18句)
CIVIL ENGINEERING
13、施工机械(18句)CONSTRUCTION MACHINERY
14、常用工具(22句)COMMON TOOLS
15、工程材料(18句)ENGINEERING MATERIALS
16、设备安装(24句)ERECTION OF THE EQUIPMENT 17、工艺管道(22句)PROCESS PIPING
18、质量治理(20句)QUALITY CONTROL
19、试车和开工(30句)
TEST RUN AND START-UP
20、在宴会上(26句)
AT THE BANQUET
附录一、基数和序数、分数、倍数、百分数附录二、常见各国标准代号
附录三、常见外国学会和协会机构
附录四、度量衡表
一、问候和介绍(36句)
GREETINGS AND INTRODUCTIONS
1 How do you do?
你好吗?(初次见面)
2 How are you?
你好吗?(日常见面)
3 Fine,thanks.
专门好,感谢。

4 I am very well, Thank you.
我专门好,感谢你。

5 Good morning Mr.Jack.
早安,贾克先生。

6 Good afternoon Miss Mary.
午安,玛利小姐。

7 Good evening Dr.John.
晚安:约翰博士。

8 Very pleased to meet you, you are welcome.见到你专门快乐,欢迎你。

9 I am very glad to see you.
我专门快乐见到你。

10 Welcome to China.
欢迎你到中国来。

11 Welcome to our job site.
欢迎你到我们工地来。

12 For our friendship and cooperation , I wish we shall have
a friendly cooperation in coming days.
祝福友谊与合作,希望今后友好共事。

13 Let us work together for our common job.
让我们为共同的事业一起工作吧!
14 Happy New year!
新年欢乐!
15 Happy Spring Festival!
春节欢乐!
16 Merry Christmas!
圣诞节愉快!
17 Congratulations to your National Day!
祝贺你们的国庆节!
18 Happy birthday to you!
祝你生日欢乐!
19 Allow me to introduce myself, my name is Li Han.
请同意我介绍自己,我的名字叫李汉。

20 Please allow me to introduce a fellow of mine, Mr.___.
请同意我给你介绍一位我的同事,某先生。

21 I am a manager. (project manager, resident construction manager, construction superintendent, controller staff member, engineer, technician, economist, supervisor, foreman, worker)我是经理。

(项目经理、驻工地总代表、工地主任、治理员、职员、工程师、技术员、经济员、检查员、工长、工人)。

22 I work in the Chemical Engineering Construction Company.(Construction Department, Inspection Section).
我在化工建设公司(施工部、检查科)工作。

23 My technical specialty is civil engineering.(chemical engineering, process, mechanical equipment ,electrical, instrumentation, piping, welding, furnace building, corrosion prevention, thermal-insulation, heating-ven-tilation, quality control).
我的技术专业是土建工程。

(化工工程、工艺、机械设备、电气、仪表、管道、焊接、筑炉、防腐、保温、采暖通风、质量治理)。

24 What is your speciality?
你的专业是什么?
25I am a mechanician.(electrician, Pipelayer,welder, carpenter, turner, blacksmith, builder, erector, riveter,rigger, concrete worker, engine-driver,repair worker).
我是一个机械钳工。

(电工、管工、焊工、木工、车工、铁工、建筑工人、安装工人、铆工、起重工、混凝土工、司机、修理工)。

26 What is your nationality? Are you American?(English, Japanese, German, French, Italian, Romanian).
你是什么国籍的?你是美国人吗?(英国人、日本人、德国人、法国人、意大利人、罗马尼亚人)。

27 What is your name?
你的名字叫什么?
28 Can I have your name, please?
请问你的名字?
29 Which department do you belong to ?
你在那家公司工作?
30 Which department do you belong to ?你属于那个部门?
31 Kindly give us your advice, please. 请多指教。

32 Thanks for your direction.
感谢你的指导。

33 Good-bye .
再见。

34 See you again.
再见。

35 See you later.
回头见。

36 See you tomorrow.
改日见。

二、交谈语言(24句)
TALKING ABOUT LANGUAGES
37 Do you speak English?
你能讲英语吗?
38 Let us talk English?。

相关文档
最新文档