工业厂房课程设计

合集下载
  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

=1.4×50KN×=VT

p1max

p1min

=VT

i

×=C·=2.406

·

·=1.780 ·

·=1.954 ·

C5163

A111

3.3.2 右吹风时:

=749.57KN×0.25m=187.39 =138.81KN×0.75m=104.11

/11.0=-14.99 =104.11×1.177

0.25m=34.70

0.75m=562.18

/11.0=-2.780(←) R=562.18

0.75m=417.64

0.35m=52.68

=-417.6444.69(←) =52.68

0.75m=112.88

0.35m=194.90

12.08 =194.90

,n=0.083.

max

(←)

反时,弯矩图和剪力只改变符号,方向不变。

=

=1+()

=1.15-0.01

()²

379.84mm=473.22mm>0.3

=227.48mm

=取=1.15-0.01

(=1.358

247.48mm=336.13mm>0.3

e’=η-

=764.89

As=942ρ==942/

A+0.95

=1.808>1.0

(=1.066

524.41mm=558.98mm>0.3

=3.369>1.0 =1.0

(=1.038

916.5mm=951.33mm>0.3

=1.568>1.0 =1.0

(=1.510

=4.708>1.0 =1.0=1.0

(=1.027

1272mm=1306.344mm>0.3

=1.901>1.0 =1.0

(=1.180

192.2mm=226.796mm<0.3

=3.70>1.0 =1.0且取

(=1.103

335.9mm=370.47mm>0.3

=1.636>1.0 =1.0

(=1.302

=5.38>1.0 =1.0=1.0

(=1.094

356.5mm=391.08mm>0.3

-h/2+

=

=50.43mm

1.0( =1+()

=1.1-0.65

(1.9c+0.08)

1-0.5

-

x-=R

=25.57KN×2.56m-ψ(1.9c+0.08

相关文档
最新文档