年产40万吨合成氨脱碳工段的设计[摘要]脱碳工段是合成氨工程中必不可少的工段之一,二氧化碳吸收塔和溶液再生塔是脱碳过程中不可缺少的塔设备。
合成氨厂无论使用何种原料制成原料气,经变换后,都含有大量的二氧化碳。
这些二氧化碳如果不在合成氨工序前及时除净,氨的合成就无法进行下去;另一方面,二氧化碳本身是制取尿素、碳酸氢铵等产品的原料,也可加工成干冰、食品级二氧化碳。
二氧化碳吸收塔的设计具有回收二氧化碳的功能。
本文权衡众多合成氨脱碳方法之利弊,最终选择碳酸丙烯酯脱碳法。
首先进行工艺流程分析并根据工艺参数及有关标准进行二氧化碳吸收塔和解析塔内的物、热量衡算;其次就二氧化碳吸收塔、溶液再生塔等设备利用物理吸收机理、传质传热方程、溶液物性数据等方面的知识进行塔体的总体结构设计和计算;然后对二氧化碳吸收和解析塔进行了必要的强度校核;最后对脱碳工段车间结构布置进行合理的设计。
本设计作为理论上的准备工作,为分析工艺流程、设备设计上存在的问题、确定问题的根源、提出解决问题的合理方案准备了充分的理论依据。
[关键词] 碳酸丙烯酯法;脱碳工艺;工程设计The Design of the Decarbonization Section in the Production of the 40 thousand tons Synthetic Ammoniaper yearLiu Lang-lang(Grade06,Class1,Major chemical engineering and technology,chemistry Dept.,Shaanxi University ofTechnology,Hanzhong 723001,Shaanxi)Tutor:Li Zhi-zhouAbstract:Decarbonizing section is one of the absolutely necessary sections in the Synthetic Ammonia, and the Carbon dioxide absorption tower and the solution regeneration tower are indispensable tower equipment in the Synthetic Ammonia. Whether the ammonia plant use what raw materials to make feed gas, it contains large amount Carbon dioxide after transformation. The ammonia can not be synthesized if these Carbon dioxide are not removable in time. the other hand, the Carbon dioxide is the raw material of the urea and ammonium bicarbonate etc,it can be processed carbon dioxide ice, food grade Carbon dioxide. Designing Carbon dioxide absorption tower is function to recovery Carbon dioxide.This paper tradeoff advantages and disadvantages of much approach to decarbonization, propylene carbonate (PC) decarboniza-tion is selected finally. The technological process was analyzed, and the material and heat was balanced according to parameters and relevant standards firstly. The tower body general structure was designed calculation by using physical absorption Mechanism, mass transfer and heat transfer equation, solution -physical data stc secondly. And then the strength of the Carbon dioxide absorption tower and the solution regeneration tower are checked. The decarbonizing section structural arrangement was reasonable design finally. As the theoretical preparation work, this designing prepare sufficient theoretical basis for people to analysis the problems of technological process, equipment design, determined root of problems, posing reasonable plan to solve problems.Keywords:Decarbonization process;Carbon dioxide removal with PC method;Proeess design毕业设计(论文)原创性声明和使用授权说明原创性声明本人郑重承诺:所呈交的毕业设计(论文),是我个人在指导教师的指导下进行的研究工作及取得的成果。
CO2吸收塔设计
CO2吸收塔设计摘要塔设备是化⼯、炼油⽣产中最重要的设备之⼀,是⼀种重要的单元操作设备。
它可使⽓(或汽)液或液液两相之间进⾏充分接触,达到相际传质及传热的⽬的。
常见的、可在塔设备中完成的单元操作有:蒸馏、吸收、解收、萃取、⽓体的洗涤等。
此外,⼯业⽓体的冷却与回收、⽓体的湿法制作和⼲燥,以及兼有⽓液两相传质和传热的增湿和减湿等也可在塔设备中完成。
塔设备按其结构特点可以分为板式塔、填料塔和复合塔3类。
本次设计选⽤填料塔作为吸收塔,主要考虑填料塔的以下优点:填料塔结构简单、压⼒降⼩,传热效率⾼,便于采⽤耐腐蚀的材料制造等,对于热敏性及容易起泡的物料更显出优越性。
本次设计内容包括:发展概况及应⽤的了解,塔体的选型,填料的选择,⼯艺计算(包括物料衡算,模拟计算,⼯艺尺⼨计算,⾼度计算,压降计算,分布装置设计,⽀撑装置设计);机械计算(包括塔釜设计,上部筒体机械设计,开孔与开孔补强计算,强度设计和稳定设计,⽀座的选型和设计,接管的选⽤,法兰的选取),设备的制造及安装等,最后利⽤CAD将其装配图和部分零件图分别绘制出。
关键词:填料塔;⼆氧化碳;⽓液传质;逆相混合AbstractTower is one of the most important equipment in chemical industry and oil production, it is also an important handling equipment. It will enable gas(or steam) liquid or liquid-liquid connnecting fully and reaching the purposes of transfering media and heat . Commonly, operation can be completed in tower are: distillation, absorption, of the admission, extraction, washing of the gases. In addition, recycling and cooling of gas in industrial , the gas production of wet and dry, and both two-phase of gas-liquid mass transfering and heat transfering by the humidification and wet,could also be done in the tower. The struction of tower can be divided into plate tower, packed tower and the tower due to its characteristics . The packed tower is choosen as the absorber in the design, Given to the following advantages of the tower: the structure of the tower is simple, the pressure is small , the efficiency of heat conveying is high , and it could be made by corrosion-resistant materials easily, such as manufacturing, thermosensitive and sparkling materials more easily Demonstrate superiority.The design includes: Development and application of knowledge of the tower, and the selection of the structer about the tower, the choice of packing terms and caculating(including the caculating about material balance, simulation caculating, process size, height, the pressure drop, the distribution of design, Design Support Unit); mechanical calculations (including the reactor design of the tower, the design of the upper shell, the opening and the opening reinforcement, the strength of the design and stability of the design, the selection and design of the bearing ,the choice to take over, the selection of flange ), The manufacture the map of assemble and parts with the help of CAD.Key words:Packed tower;Carbon dioxide;Gas-liquid mass transfer;Reverse mixed⽬录第1章填料塔技术的现状与发展趋势 (1)1.1填料塔技术 (1)1.1.1 塔填料的现状和发展趋势 (1)1.1.2 塔内件的现状和发展趋势 (2)1.1.3 ⼯艺流程的现状和发展趋势 (3)1.2 塔板-填料复合塔板 (3)1.3 填料塔发展趋势 (4)第2章原理及⽅案的确定 (5)2.1 CO2吸收塔⼯作原理及⼯艺流程简介 (5)2.2 设计⽅案及论证 (5)第3章⼯艺计算 (7)3.1 主要⼯艺参数的确定 (7)3.1.1 吸收温度 (7)3.1.2 吸收压⼒ (7)3.2 物料衡算 (7)3.2.1 进塔物料 (7)3.2.2 吸收液量计算 (8)3.2.3 原料液的平均分⼦量 (10)3.2.4 出⽓量 (10)3.3 吸收塔直径的确定 (11)3.3.1 塔径 (11)3.3.2 每⽶填料层的压降 (15)3.4 填料选择 (16)3.4.1 填料结构选择 (16)3.4.2 填料特性数据 (16)3.5 填料层⾼度确定 (17)3.5.1 吸收模型分析 (17)3.5.2 吸收系数 (17)3.5.3 填料层⾼度计算 (19)3.5.4 填料分层⾼度 (21)3.6 填料层⾼度确定 (21)3.7 顶盖死区 (22)3.8 塔底容积计算 (22)3.9 吸收塔总体结构尺⼨ (23)第4章塔内零部件结构设计 (24)4.1 丝⽹除沫器 (24)4.1.1 操作⽓速 (24)4.1.2 丝⽹的使⽤⾯积 (25)4.1.3 丝⽹除沫器的效率 (25)4.1.4 丝⽹除沫器的结构 (25)4.2 直管排列式喷淋器 (26)4.3 液体分布器 (27)4.4 直管排列式⽓体分布器 (28)4.5 填料保持栅板 (29)4.6 ⽓体喷射—填料⽀承板—液体再分配器 (29)第5章塔外零部件结构设计 (32)5.1 吊⽿ (32)5.2 裙座 (32)5.2.1 裙座的材料 (32)5.2.2 裙座的结构 (32)5.3 ⼈孔 (33)5.4 吊柱 (34)5.5 操作平台与梯⼦ (35)5.5.1 操作平台的设置及尺⼨ (35) 5.5.2 梯⼦; (35)5.6 ⼯艺接管 (36)第6章塔外零部件结构设计 (37) 6.1 材料选择 (37)6.2 设计参数 (37)6.3 壳体壁厚计算 (37)6.3.1 筒体壁厚计算 (37)6.3.2 封头壁厚 (38)6.4 载荷计算 (39)6.4.1 不等直径塔的固有周期 (39) 6.4.2 临界风速 (43)6.4.3 风载荷和风弯矩的计算 (44) 6.4.4 地震载荷和地震弯矩计算 (47) 6.5 强度校核 (49)6.5.1 容器强度校核 (49)6.5.2 裙座的强度计算及校核 (53) 6.6 开孔补强计算 (58)6.6.1 不另⾏补强最⼤开孔直径 (58) 6.6.2 最⼤开孔直径的限制 (58) 6.6.3 开孔补强设计准则 (58)6.6.4 等⾯积补强计算 (59)第7章设备制造技术要求 (60)7.1 制造上的要求 (60)7.2 制造与安装 (60)7.3 焊接 (61)第8章结论 (62)参考⽂献 (63)致谢 (64)附录 (65)第1章填料塔技术的现状与发展趋势填料塔是化⼯类企业中最常⽤的⽓、液传质设备之⼀,在塔体内设置填料使⽓液两相能够达到良好传质所需的接触状况。
20万吨合成氨工厂毕业设计
年产20万吨合成氨厂工艺设计摘要氨的工业生产主要是利用氮气和氢气通过催化剂的催化而得到。
本设计是年产20万吨合成氨厂的工艺设计,但由于合成氨的整个生产工艺较长,细节问题较多,鉴于设计时间的紧迫,本设计主要对合成氨的主要工段——合成工段进行了工艺计算、设备选型,并绘制了全厂平面布置图、合成氨工艺流程示意图、合成工段带控制点工艺流程图、合成工段物料流程图、合成车间的立面图和平面图。
关键词:氨,催化剂,工艺,图Ammonia Plant Process of The Technological Designof 200,000 t Ammonia Per YearABSTRACTThe industrial production of ammonia is used mainly nitrogen and hydrogen through the catalyst to be obtained. The design of the annual output of 200,000 tons of synthetic ammonia plant process design, but because of the ammonia production process is longer, more details, in view of the urgency of the design time. The main design of the main section of ammonia-synthesis section of the technology, equipment selection, and the mapping of the entire plant layout map Ammonia Process Chart, Synthesis Process control point with the process flow chart Synthesis Process flowchart materials, synthetic workshop elevation and floor plans.KEY WORDS:ammonia ,catalyst ,technology ,chart目录摘要 (I)ABSTRACT (II)1 工程设计背景与发展状况 (1)1.1工程设计的背景 (1)1.2我国合成氨产业概况 (1)1.3我国合成氨需求现状及设计规模 (1)2 工程设计条件与总平面布置 (3)2.1工程设计条件 (3)2.1.1 原材料及辅助物料的资源条件 (3)2.1.2 公用工程概述 (3)2.1.3 劳动力资源条件 (3)2.2总平面布置 (3)2.2.1 总平面布置的基本原则 (3)2.2.2 总平面布置概述 (4)3 化工工艺设计 (7)3.1车间组成概述 (7)3.2车间生产综合叙述 (7)3.2.1 合成工段的概况及特点 (7)3.2.2 工作制度 (7)3.2.3 产品的主要技术规格及标准 (8)3.2.4 工艺流程叙述 (8)4 合成工段的工艺计算及设备选型 (10)4.1合成工段设计要求 (10)4.2合成工段物料衡算图 (10)4.3.1 物料衡算 (11)4.3.2 热量衡算 (24)4.3.3 主要设备的计算 (31)4.3.4 主要设备型号一览表 (45)5 安全生产及环境保护 (46)5.1环境保护与综合利用 (46)IV5.2劳动安全卫生 (46)致谢 (48)参考文献 (49)年产20万吨合成氨工厂工艺设计 11工程设计背景与发展状况1.1 工程设计的背景合成氨是化学工业中的一种重要的基础原料。
(完整版)年产30万吨合成氨原料气脱碳工段工艺设计毕业论文
本科毕业设计年产30万吨合成氨原料气脱碳工段工艺设计Decarbonization Process design on synthetic ammonia目录摘要 ............................................................................................................................................................ Abstract ........................................................................................................................ 错误!未定义书引言 ............................................................................................................................................................第一章总论 ....................................................................................................................................1.1 概述..........................................................................................................................1.1.1 氨的性质...................................................................................................................1.1.2 氨的用途及在化工生产中的地位 ..........................................................................1.2 合成氨的发展历史......................................................................................................1.2.1 氨气的发现...............................................................................................................1.2.2 合成氨的发现及其发展 ..........................................................................................1.2.3 世界合成氨工业发展 ..............................................................................................1.3 文献综述......................................................................................................................1.3.1合成氨脱碳................................................................................................................1.3.2合成氨脱碳的方法概述 ...........................................................................................1.4 设计的依据..................................................................................................................第二章流程方案的确定 ...............................................................................................................2.1各脱碳方法对比...........................................................................................................2.1.1化学吸收法................................................................................................................2.1.2物理吸收法................................................................................................................2.1.3物理化学吸收法........................................................................................................2.2碳酸丙烯酯(PC)法脱碳工艺基本原理 .................................................................2.2.1 PC法脱碳技术国内外现状 .....................................................................................2.2.2发展过程....................................................................................................................2.2.3技术经济....................................................................................................................第三章生产流程的简述 ...............................................................................................................3.1 气体流程......................................................................................................................3.1.1 原料气流程...............................................................................................................3.1.2 解吸气体回收流程...................................................................................................3.2液体流程.......................................................................................................................3.2.1 碳酸丙烯酯脱碳流程简述 ......................................................................................3.2.2 稀液流程循环...........................................................................................................3.3存在的问题及解决的办法 ..........................................................................................3.3.1综合分析PC法脱碳存在的主要问题有 ................................................................3.3.2解决办法....................................................................................................................第四章物料衡算和热量衡算 ....................................................................................................4.1工艺参数及指标...........................................................................................................4.1.1计算依据CO2在PC中的溶解度关系 ...................................................................4.1.2 PC的密度与温度的关系 .........................................................................................4.1.3 PC的蒸汽压 .............................................................................................................4.1.4 PC的黏度 .................................................................................................................4.2物料衡算.......................................................................................................................4.2.1各组分在PC中的溶解量 ........................................................................................4.2.2溶剂夹带量................................................................................................................4.2.3溶液带出的气量........................................................................................................4.2.4出脱碳塔净化气量....................................................................................................4.2.6 入塔液中CO2夹带量..............................................................................................4.2.7 带出气体的质量流量 ..............................................................................................4.2.8 验算吸收液中净化气中CO2的含量 .....................................................................4.2.9出塔气的组成............................................................................................................4.3热量衡算.......................................................................................................................第五章吸收塔的结构设计..........................................................................................................5.1确定吸收塔塔径及相关参数 ......................................................................................5.1.1基础数据....................................................................................................................5.1.2求取塔径....................................................................................................................5.1.3核算数据....................................................................................................................5.1.4填料层高度的计算....................................................................................................5.1.5 气相总传质单元高度 ..............................................................................................5.1.6塔附属高度................................................................................................................第六章塔零部件和辅助设备的设计与选取.....................................................................6.1 吸收塔零部件的选取..................................................................................................6.1.1筒体、封头等部件的尺寸选取 ...............................................................................6.1.2防涡流挡板的选取....................................................................................................6.1.3液体初始分布器........................................................................................................6.1.4 液体再分布器...........................................................................................................6.1.5 填料支撑装置...........................................................................................................6.1.6接管管径的确定........................................................................................................6.2 解吸塔的选取..............................................................................................................6.3贮槽的选择...................................................................................................................结论..........................................................................................................................................................致谢.......................................................................................................................... 错误!未定义书参考文献 ...............................................................................................................................................年产30万吨合成氨原料气脱碳工段工艺设计摘要:本设计为年产30万吨合成氨原料气脱碳工段工艺设计,是由指导老师指定的产量和生产规模,结合生产实习中收集的各类生产技术指标以及参考文献所提供的数据为依据而设计的。
合成氨毕业设计doc
合成氨毕业设计doc合成氨毕业设计篇一:合成氨本科毕业设计摘要合成氨生产任务设计决定了生产合成氨的规模,设备的要求以及工艺流程的状况。
本设计所采用的方法是半水煤气合成法,其主要原料是煤和氮气,利用煤来生成氢气,第一步是造气,即制备含有氢、氮的原料气;第二步是净化,不论选择什么原料,用什么方法造气,都必须对原料气进行净化处理,以除去氢、氮以外的杂质;第三步是压缩和合成,将纯净的氢、氮混合压缩到高压,在铁催化剂与高温条件下合成为氨。
目前氨合成的方法,由于采用的压力、温度和催化剂种类的不同,一般可分为低压法、中压法和高压法三种。
本设计主要是对合成塔工段的设计,故所用原料直接采用氮气和氢气,其以合成塔为主要设备,在氨冷器、水冷器、气—气交换器、循环机、分离器、冷凝塔等辅助设备的作用下,以四氧化三铁为触媒,在485—500℃的高温高压条件下来制得氨气。
本设计要求要掌握合成塔的工作原理,生产的工艺路线,并能根据工艺指标进行操作计算。
在工艺计算过程中,包含物料衡算,热量衡算及设备选型计算等,在合成效率方面也有进一步研究。
关键词:氮气;氢气;四氧化三铁催化剂;氨合成塔AbstractAmmonia production design determines the size of the production of synthetic ammonia, equipment requirements, as well as the status process. The design of the method used was semi-water gas synthesis, the main raw material is coal and nitrogen, the use of coal to generate hydrogen, while the design is a synthesis of the main section of the tower design, it is the direct use of raw materials used in nitrogen and hydrogen, itssynthesis tower as the main equipment, in the ammonia cooler, water coolers, gas - gas exchange, recycling machines, separators, auxiliary equipment, such as condensation of the tower under the four iron oxide catalyst, in the high-temperature conditions of 485-500 ℃ obtained from ammonia. The first step is to build gas,Preparation that contains hydrogen, nitrogen gas; second step is purification, regardless of what materials, what methods of gas must be carried out on the feed gas purification to remove hydrogen and。
醇胺法吸收二氧化碳的吸收塔设计毕业设计论文
毕业设计(论文)醇胺法吸收二氧化碳的吸收塔设计毕业设计(论文)原创性声明和使用授权说明原创性声明本人郑重承诺:所呈交的毕业设计(论文),是我个人在指导教师的指导下进行的研究工作及取得的成果。
尽我所知,除文中特别加以标注和致谢的地方外,不包含其他人或组织已经发表或公布过的研究成果,也不包含我为获得及其它教育机构的学位或学历而使用过的材料。
对本研究提供过帮助和做出过贡献的个人或集体,均已在文中作了明确的说明并表示了谢意。
作者签名:日期:指导教师签名:日期:使用授权说明本人完全了解大学关于收集、保存、使用毕业设计(论文)的规定,即:按照学校要求提交毕业设计(论文)的印刷本和电子版本;学校有权保存毕业设计(论文)的印刷本和电子版,并提供目录检索与阅览服务;学校可以采用影印、缩印、数字化或其它复制手段保存论文;在不以赢利为目的前提下,学校可以公布论文的部分或全部内容。
作者签名:日期:学位论文原创性声明本人郑重声明:所呈交的论文是本人在导师的指导下独立进行研究所取得的研究成果。
除了文中特别加以标注引用的内容外,本论文不包含任何其他个人或集体已经发表或撰写的成果作品。
对本文的研究做出重要贡献的个人和集体,均已在文中以明确方式标明。
本人完全意识到本声明的法律后果由本人承担。
作者签名:日期:年月日学位论文版权使用授权书本学位论文作者完全了解学校有关保留、使用学位论文的规定,同意学校保留并向国家有关部门或机构送交论文的复印件和电子版,允许论文被查阅和借阅。
本人授权大学可以将本学位论文的全部或部分内容编入有关数据库进行检索,可以采用影印、缩印或扫描等复制手段保存和汇编本学位论文。
涉密论文按学校规定处理。
作者签名:日期:年月日导师签名:日期:年月日注意事项1.设计(论文)的内容包括:1)封面(按教务处制定的标准封面格式制作)2)原创性声明3)中文摘要(300字左右)、关键词4)外文摘要、关键词5)目次页(附件不统一编入)6)论文主体部分:引言(或绪论)、正文、结论7)参考文献8)致谢9)附录(对论文支持必要时)2.论文字数要求:理工类设计(论文)正文字数不少于1万字(不包括图纸、程序清单等),文科类论文正文字数不少于1.2万字。
合成氨原料气中CO2吸收塔的设计肖永鹏
安徽大学江淮学院《化工原理》课程设计设计题目:合成氨原料气中2CO吸收塔的设计专业班级:11化学工程与工艺学生姓名:吴雪锋学号:JP114017指导教师:郑争志起止日期:2014.5.22—2014.6.81 引言1.1 合成氨原料气中CO2的脱除工艺发展及现状气体净化是工业上重要的过程之一。
随着各工业过程的要求不同,有的需要对原料气体进行净化处理,有的需要对生产过程中产生的气体进行净化,有的需要对尾气进行净化等。
在合成氨生产中,由于制气原料主要碳和含碳化合物,经制气和一氧化碳变换后,变换气中除含有对氨合成有用的氢气等,同时还含有二氧化碳、一氧化碳、甲烷、硫化氢等对氨合成有害的杂质组分。
在这些杂质组分中又以二氧化碳的含量最高。
如在生产过程中,不及时将二氧化碳从变换气中除去,将会使后续工序无法正常进行。
脱除原料气中大量二氧化碳的方法主要分为三大类:化学吸收法、物理化学法和物理吸收法。
本次设计中主要运用物理吸收法。
则以下主要介绍物理吸收法。
物理吸收法是指吸收剂并不与二氧化碳发生化学反应的一类脱碳方法。
它是基于不同压力下的二氧化碳在吸收剂中有不同的平衡溶解度这种性质而发展起来的。
这类方法中的吸收剂大多为有机溶剂,它们普遍具有溶解二氧化碳量大的特点,尤其是在加压时。
此外吸收剂的再生大多不必加热,仅通过简单的降压或常温气提(惰性气体吹洗)。
碳酸丙烯酯脱除CO到五十年代才有较系统的报导, 它具有许多有趣的性质,2而且原料易得, 目前已广泛应用在石油化学工业中。
六十年代开始, 有专利刊出, 把碳酸丙烯酯用在合成氨工业中的脱除原料气中二氧化碳。
从变换气中脱出二氧化碳在合成氨工业中占有重要的位置, 过去我国较多采用水洗的方法, 由于二氧化碳在水中的溶解度很小, 大量循环水耗费巨大的动力, 水洗法所耗电能约为200瓦/(吨氨)。
若用乙醇胺的水溶液脱除, 溶液再生需耗热, 在燃料紧张, 而且可减压地区,也不可取。
为此希望寻找一种有机溶剂, 既能溶解大量CO2再生, 减少燃气消耗。
合成氨装置毕业设计论文
目录第一章概述 (2)一、精炼工段的任务 (2)二、工艺方法的选择 (3)(1)铜氨液洗涤法 (3)(2)甲烷化法 (3)(3)液氮洗涤法 (3)三、铜氨液洗涤法的吸收原理 (4)1.铜液的组成 (4)2.铜液吸收原理 (4)3.铜液的再生原理 (6)四、铜洗操作和铜液再生工艺条件的选择 (6)(一)铜洗部分 (6)(二)再生部分 (8)五、铜液的制备 (9)六、生产制度: (10)七、原料及产品的主要技术规格 (10)第二章物料衡算和热量衡算 (11)一、工艺计算 (11)二、物料衡算 (12)1.铜洗部分 (12)2. 再生部分 (15)三、热量横算 (18)1、铜洗部分 (18)2. 铜液再生部分 (20)四、消耗定额的计算 (22)第三章工艺流程图 (23)年产5万吨合成氨装置精炼工段的设计摘要:精炼工序是合成氨生产装置中一个非常重要的工序,主要目的是去除合成氨原料气中残存的少量的CO及CO2等杂质,以免氨合成催化剂中毒。
由于本设计是小型合成氨生产装置,而且经过脱硫、变换、脱碳净化后仍然具有较高含量的CO、CO2、H2S及O2和,对合成工序催化剂依然具有毒性,所以必须要进一步净化即精炼。
本设计采用的精炼方法是工艺比较成熟的铜氨液溶液洗涤法。
设计中介绍了铜氨液溶液洗涤法的工艺原理及工艺条件的选择,并通过物料衡算和热量衡算确定了工艺过程中的消耗定额。
关键字:精炼、铜液、吸收、游离氨、CO引言:本设计的依据是以南京化学工业公司合成氨生产装置。
设计的精炼工序是以煤为原料年产5万吨合成氨装置中的一个工序。
采用方法是原料煤通过固定床间歇法制得以H2、CO、N2为主的半水煤气,制得的半水煤气在用ADA法脱出其中的H2S,在通过一氧化碳中温变换,并用碳丙烯酯法脱出其中的大量碳后的一个工序(CO≤3.1% CO2≤ 0.2%)其目的是去除原料气中少量的CO、CO2、H2S及O2。
正文设计说明书第一章概述本设计的依据是以南京化学工业公司合成氨生产装置。
合成氨毕业设计
合成氨过程的集散控制系统设计摘要本设计——“合成氨过程的集散控制系统设计”是针对目前合成氨生产的具体要求及集散控制系统(DCS)发展的现状,进行研究与设计,以实现合成氨生产过程自动控制与管理,最终提高企业经济效益为目的。
本文是以我国中大中型氮肥生产企业为背景,天然气为原料气,在分析了合成氨生产过程基本工艺的基础上,主要对合成氨过程中的合成工段进行研究。
此次设计详细介绍了此工段中的氢氮比控制,几乎所有的合成氨装置对氢氮比的控制都存在一定的问题。
氢氮比系统是一个超大时滞系统,大时滞系统的控制问题是过程控制中的难题,超大时滞系统的控制更为困难。
针对上述情况,本文设计了串级加前馈控制系统用于该过程氢氮比在线控制。
本文基于浙大中控的JX—300X系统进行系统组态、界面组态、操作组态。
在SCKey组态软件的环境下完成了系统组态,并对其控制功能进行分析。
DCS组态试验结果表明对于氨合成工段的集散控制系统较常规(经典)控制有明显的优势,此次设计基本成功。
关键词集散控制系统;合成氨工段;氢氮比控制;Distributed Control System Design of SyntheticAmmonia ProcessAbstractThis design –“D istributed Control System Design of Synthetic Ammonia Process”aims at the present situation which the specific request of the present synthetic ammonia production and development of the distributed control system (DCS), conducts the research and the design, realizes the synthetic ammonia industrial automatic control and the management, finally enhances the enterprise economic efficiency is the goal.This article takes our country in the large and middle scale nitrogenous fertilizers production enterprise as a background, and takes the natural gas as the feed gas, based on analyzing in the synthetic ammonia production process basic craft, mainly conducts the research to synthesis construction section of the synthetic ammonia process. The control scheme of H-N ratio in synthesis construction section is in detail presented in this paper. Some problems of controlling the H-N ratio exist in almost all devices of synthetic ammonia production. The system of H-N ratio is a very-large-scale-time delay system. It is a difficult problem to control a large-scale-time delay system in the field of control process and much more difficult to control a very-large-scale-time delay system. In this paper, one method to resolve this tough problem is obtained by Model-Free Control Method (MFC) with a pre-feed. The practice shows that this method works well. In view of the above situation, this article designs the cascade with a feed-forward control system to use H-N ratio to the on-line control.This article which based on “Zhe Da Zhong kong JX-300X” system carries on the system configuration, the interface configuration and the operation configuration. After accomplishing the system configuration in the SCKey configuration software environment, carries on the analysis to its control function.The DCS configuration test result indicates: Distributed control system of the ammonia synthesis construction section is more obvious superiority than the convention (classics) control system , and this design is basically success.目录摘要................................................................ⅠAbstract..............................................................Ⅱ第1章前言..........................................................1 1.1问题的提出及研究目的..........................................1 1.2 合成氨过程发展概况............................................1 1.3 存在的问题及最新发展..........................................2 第2章合成氨生产过程简述及控制需求分析..............................3 2.1合成氨生产过程简述............................................3 2.2合成氨工段的工艺流程..........................................4 2.3控制需求分析...................................................4 第3章控制方案设计及论证.............................................6 3.1氢氮比控制.....................................................6 3.1.1控制对象特性分析..........................................6 3.1.2工艺对氢氮比的控制要求...................................7 3.1.3控制方案设计.............................................8 3.2惰性气体含量控制系统..........................................10 3.3合成塔触媒层温度控制..........................................11 3.4循环气氨冷器出口温度和液位控制.................................12 3.5氨分离器及冷交换器液位控制.....................................13 第4章控制系统总体设计...............................................154.1 JX—300X控制系统简介..........................................15 4.1.1 JX—300X系统结构..........................................15 4.1.2 系统的主要特点............................................16 4.2仪表设备选型.................................................17 4.2.1选择原则...................................................17 4.2.2仪表的选型.................................................20 4.3系统硬件构成...................................................30 4.3.1 控制站的配置.............................................31 4.3.2 I/O卡的配置..............................................31 4.3.3 操作站的配置..............................................32 4.3.4 工程师站配置..............................................32 4.4 系统软件构成..................................................33 第5章系统组态及控制功能的实现....................................35 5.1SCKey组态软件简介...........................................35 5.1.1 集散控制系统组态的定义 (35)5.1.2 SCKey组态软件特点 (35)5.2 总体信息组态 (35)5.2.1 主机设置 (35)5.3 控制站组态.....................................................365.3.1系统I/O组态.............................................37 5.3.2 自定义变量...............................................405.3.3系统控制方案组态...........................................41 5.4 操作站组态...................................................45 5.4.1 系统标准画面组态.........................................45 5.5 控制功能分析..................................................48 第6章结论..........................................................49参考文献............................................................50 谢辞................................................................51第1章前言1.1 问题的提出及研究目的在合成氨工业中,特别是近代大型合成厂的出现,生产技术和工艺过程日趋复杂,对过程自动化提出了更高的要求。
过孔二氧化碳吸收塔毕业设计说明书
目录第一章绪论 (8)1.1 合成氨在国民经济中的重要作用 (8)1.2 合成氨生产方法的介绍 (8)1.3 碳化塔在生产方法中的作用 (9)1.4 发展状况 (10)第二章壳体厚度计算 (11)2.1 选材 (11)2.1.1 筒体、封头及支座的选材 (11)2.1.2 换热器选材 (11)2.1.3 分布锥选材 (12)2.1.4 接管选材 (12)2.1.5 除沫器选材 (12)2.1.6 气液分布板选材 (13)2.1.7支承架选材 (13)2.2 选型 (13)2.2.1筒体选型 (13)2.2.2 封头选型 (13)2.2.3支座选型 (14)2.2.4 换热器选型 (14)2.2.5 换热管排列选型 (14)2.2.6 人孔选型 (14)2.2.7除沫器选型 (15)2.3 壁厚计算 (15)2.3.1 工艺条件及参数确定 (15)2.3.2 圆筒壁厚计算 (15)2.3.3 封头厚度计算 (16)2.4 水压试验应力确定 (17)2.4.1 圆筒应力计算 (17)2.4.2 封头应力计算 (17)2.5 应力校核 (17)2.5.1 圆筒应力校核 (17)2.5.2 封头应力校核 (18)第三章换热器结构的设计 (19)3.1 管箱短节及其壁厚的确定 (19)3.1.1 管箱厚度及长度的确定 (19)3.1.2 筒体外伸短节厚度确定 (19)3.1.3 冷却管组封头尺寸的确定 (20)3.1.4 计算球冠形封头厚度 (20)3.2 换热器管子尺寸确定 (20)3.2.1 尺寸确定 (20)3.2.2 管板厚度的确定 (21)3.2.3 法兰选择 (26)3.2.4 垫片选择 (26)3.2.5 支承架结构尺寸的确定 (27)3.2.6 换热管的排列 (27)3.2.7 换热管尺寸确定 (27)3.2.8 碳化塔冷排数的确定 (27)第四章碳化塔构件设计 (28)4.1 汽液分布板结构设计 (28)4.2 液体分布器结构设计 (28)4.3气体分布板结构设计 (29)4.4 球形挡板结构设计 (29)4.5 分布锥的结构设计 (29)4.6 角钢圈及支承梁 (29)4.7 人孔设计 (30)4.7.1 法兰选择 (30)4.7.2 垫片选择 (30)4.8 碳化塔裙座设计 (31)4.8.1 裙座筒体壁厚的确定 (31)4.8.2 裙座与塔体封头的连接 (31)4.8.3 地脚螺栓座计算 (31)4.9 检查孔设计 (34)4.10 通道管设计 (34)4.11 法兰汇总表 (35)第五章碳化塔各项质量计算 (36)5.1 容器壳体质量 (36)5.2 碳化塔内构件质量 (37)5.2.1 角钢圈质量 (37)5.2.2 球形挡板质量 (37)5.2.3 分布锥质量 (37)5.3 碳化塔内各塔板质量 (37)5.4 容器外部附件质量 (38)5.4.1 人孔质量 (38)5.4.2 碳化塔冷排壳程短节质量 (38)5.4.3 塔体接管及接管法兰质量 (38)5.4.4 碳化塔冷排质量 (39)5.5.5 其它附加件质量 (39)第六章碳化塔载荷校核 (40)6.1 塔的自振周期计算 (40)6.2 风载荷计算 (40)6.2.1 水平风力计算 (40)6.2.2 各参数确定 (40)6.2.3 风弯矩的计算 (41)6.3 地震载荷的计算 (42)6.4 地震弯矩的计算 (43)6.5 最大弯矩的计算 (43)6.6 圆筒稳定校核 (44)6.7 圆筒拉应力校核 (44)6.8 塔器压力试验时的应力校核 (44)6.9 应力校核 (45)6.10 裙座的校核 (45)6.10.1 裙座壳底截面组合应力校核 (45)6.10.2 裙座与塔壳对接焊缝校核 (46)结论 (47)参考文献 (48)谢辞 (49)符号说明Di—圆筒或球壳内直径,mmDo—圆筒或球壳外直径,mmPc—计算压力,MPaC—厚度附加量,mmC1—厚度附偏差,mmC2—腐蚀裕量,mmδ—圆筒或球壳的计算厚度,mmδe—圆筒或球壳的有效厚度,mmδn—圆筒或球壳的名义厚度,mmζt—设计温度下圆筒或球壳的计算应力,MPa θ—焊缝系数,局部无损探伤,θ=0.85[Pw]—圆筒或球壳的最大允许工作压力,MPa [ζ]t—设计温度下材料的许用压力,MPaa—一根换热管管壁金属的横截面积, mm2DG—垫片压紧力作用中心圆直径,mmd—换热管外径,mml—换热管与管板胀接长度或焊脚高度,mmA t —管板布管区面积,三角形At=1.732ns2 + AdS—换热管中心距,mmSn—隔板槽相邻两管中心距,mm nˊ—隔板槽一侧的排管根数n—U形管根数Do—管板布管区当量直径,mmPs—壳程设计压力, MPaPt—管程设计压力, MPaδe —圆筒有效厚度, mm δeH —封头有效厚度, mm δes —裙座有效厚度, mmζs —室温下壳体材料的屈服点,MPa [ζ]t —设计温度下壳体材料的许用应力,MPa [ζ]t s —设计温度下裙座材料的许用应力,MPa A t —管板布管区面积,三角形A t = 1.732ns 2 +A d , mm 2 A dt —布管区范围内能被换热管支撑的面积, mm 2 D t —管板布管区当量直径, mmP t —布管区当量直径D t 与直径2R 之比,R=D i /2 b f —法兰宽度, mm δf —壳体法兰厚度, mm D —管板开孔前的抗弯刚度E p —管板材料的弹性模量,MPa ν—管板材料泊松比K f ˊ—壳程圆筒与法兰的旋转刚度参数, MPa E f ˊ—对于f 型连接方式,指E f ˊ=2.1³105 MPa w ˊ—系数,按δs /D i 和δf /D i 计算 δs —壳程圆筒厚度,mmE s —对于f 型,指壳程圆筒材料的弹性模量,E s =2.1³105 MPa K f ˊˊ—管箱圆筒与法兰的旋转刚度参数, MPa E f ˊˊ—对f 型,按管板材料, E f ˊˊ=2.1³105 MPa E h —对f 型,管箱圆筒材料E h =2.1³105 MPa w ˊˊ—系数,按δs /D i 和δf /D i 计算 δh —管箱圆筒厚度,mm K f —板边缘旋转刚度参数 K f —旋转刚度无量纲参数 K f 0—无量纲参数,f 型 εR —管板边缘法兰力矩折减系数 εT —需要的螺栓总截面积, mm 2Am—预紧状态下,需要的最小螺栓总截面积, mm2Aa—操作状态下,需要的螺栓总截面积, mm2Ap—预紧状态下,需要的最小螺栓载荷,Nb—垫片有效密封宽度,mmy—垫片比压力m—垫片系数[δ]b—常温下螺栓材料的许用应力,MPaAp—操作状态下需要的最小螺栓面积, mm2Wp—操作状态下需要的最小螺栓载荷,NLG—螺栓中心至作用位置处的径向距离FD—作用在法兰环内侧封头压力载荷引起的轴向分力,NFT—总轴向力与内径截面上的流体压力引起的轴向力之差,N F—流体压力引起的总轴向力,NFG—窄面法兰垫片压紧力,NAb—实际螺栓面积应不小于需要的螺栓面积, mm2LD—螺栓中心至法兰环内侧的径向距离LT—螺栓中心至作用位置的径向距离A b —基础环面积 Ab=0.785(Dab2-Dib2),mm2A sb —圆筒形裙座底部截面积Asb=3.14Disζs,mm2B—系数,按[1]1.7.5确定,MPab—基础环外伸宽度b=(Dob -Dos),mmCz—结构综合影响系数Di—容器内直径,mmDib—基础环内直径,mmDis—裙座底部截面内直径,mmDob—基础环外直径,mmDos—裙座底部截面的外直径,mmH—容器高度,mmE—设计温度下材料的弹性模量,MPaHi—容器顶部至第i段底部截面的距离,mmhi—容器第i段集中质量距地面的高度,mmh k —计算截面I-I以上集中质量mk距地面高度,mmMEI-I—容器的计算截面I-I 的地震弯矩,N²mMEO-O—容器底部O-O截面的地震弯矩,N²mMmaxI-I—容器计算截面I-I的最大弯矩,N²mMmaxO-O—容器底部O-O截面的最大弯矩,N²mMwI-I—容器计算截面I-I的风弯矩,N²mMwO-O—容器底部截面O-O的风弯矩,N²mm—容器第i段的操作质量,kgmmax—容器的最大质量,kgmmin—容器的最小质量,kgmo—容器的操作质量,kgm I-I—计算截面I-I以上操作时和非操作质量,kg P—设计风压,MPaP—风载荷,NTi—容器第i振型的自振周期,sT1—容器的基本自振周期,sZb—基础环的抗弯截面系数,mm3Zsb—圆筒形或圆锥形裙座底部截面系数,mm3ζb—基础环厚度,mmq—换热管与管板连接的拉脱力,MPaζ—管板计算厚度,mmζt—换热管管壁厚度,mmμ—管板强度削弱系数,一般μ=0.4δt—换热管轴向应力,MPa[ζ]rt—设计温度下管板材料的许用应力,MPa[ζ]tt—设计温度下换热管材料的许用应力,MPa第一章绪论1.1 合成氨在国民经济中的重要作用合成氨是重要的无机化工产品之一,在国民经济中占有重要地位。
年生产20万吨的合成氨生产中CO2解吸塔毕业设计(论文)
年生产20万吨的合成氨生产中CO2解吸塔毕业设计(论文)1 绪论1.1 课题来源、目的、意义枝江化肥厂技术改造年生产20万吨的合成氨生产中CO2解吸塔,特此考察该设备相关企业使用情况,调研查阅文献,收集相关资料进行设计。
课题来源中国石油化工股份有限公司湖北化肥分公司(以下简称湖北化肥分公司)位于长江中上游结合部、江汉平原西缘――湖北省枝江市。
东临古城荆州,西接宜昌三峡,近临三峡国际机场,南濒万里长江,北靠宜黄高速公路。
铁路专用线与全国铁路联网,产品可通过水路、铁路、公路、航空运往全国各地。
区域内资源富集,中国石化川气东送和中国石油西气东输管线直达厂区,有丰富的磷矿资源、卤水资源以及水电资源,可为企业持续发展提供丰富的资源。
湖北化肥分公司是中国石化在湖北省内的唯一一家大型化肥生产企业,也是中南地区规模较大的化肥生产企业之一。
建厂30多年来,累计生产优质尿素1300多万吨,为农业增效、农民增收作出了较大的贡献,付出了巨大的努力。
现有固定资产总值28.7亿元,经过“气代油”、“煤代油”改造,现具备以天然气和煤为原料的两套造气系统,提高了原料路线的适应性,为持续发展打下了坚实的基础,大大提高了企业的抗风险能力和竞争能力;经过扩能改造,上游装置具备年产120万吨合成氨的供气能力,下游装置具备年产33万吨合成氨、56万吨尿素的能力。
公用工程配套完善,现有三台总蒸发量700吨/小时的高压煤锅炉和两台25兆瓦的发电机组,为主装置生产提供动力供应。
除主导产品合成氨、尿素外,还有氮气、氧气、氩气、硫磺、硫胺等附产品。
湖北化肥分公司以“从严、求实、团结、文明、进取”的企业精神,不断创新企业管理,积极推行内控制度、ERP信息化管理、HSE管理体系、全面质量管理等现代化管理手段,同时,坚持“三基”等传统的管理方式。
先后荣获“全国五一劳动奖状”、“全国设备管理优秀单位”、“湖北省守合同重信用企业”等300多项省部级以上荣誉。
合成氨脱碳毕业设计
毕业设计题目:年产6万吨合成氨原料气脱碳工艺设计学院:河南城建学院专业:化学工程与工艺姓名:学号:指导老师:刘伟完成时间:2013年5月设计说明二氧化碳的吸收再生过程主要是由吸收、闪蒸和气提三部分组成。
本次设计选用的脱碳剂是聚乙二醇二甲醚(NHD ),属于物理吸收法。
主要的设备是吸收塔和气提塔。
在计算的过程中,首先根据所给的物料组成和工艺条件进行物料恒算和热量恒算,再进行塔设备的计算、校核及辅助设备的计算或选型。
吸收段的计算结果如下:二氧化碳的脱除量2909.43m /h ,NHD 的用量184.23m /h ;塔底流出的富液带出的热量14269139.99kJ/h ,溶液温度升高了5℃;塔径为1.6m ,填料层高度为13.47m ,塔压降为3002.7Pa 。
解吸段的计算结果如下:闪蒸出的二氧化碳的量2735.73m /h ,二氧化碳的回收率为94%,溶液带出的热量10142141.09kJ/h ,闪蒸的容积为0.263m 。
气提出的二氧化碳的量157.153m /h ,氮气的用量1105.23m /h ;塔底流出的贫液带出的热量6022054.3kJ/h ,溶液温度为26℃;上段塔径1.4m ,下段塔径1.5m ,填料层高度为5.7m ,塔压降为2021.4Pa 。
[关键词] 吸收、闪蒸、气提Design InstructionsThe decarbon and regeneration of carbon dioxide process is primarily composed by three parts: absorption, flash vaporization and gas stripping. This design uses polyethylene glycol dimethl ether (NHD) to decarbon, which is the physical absorption method. The main device is absorption column and stripper. In the process of calculation, firstly make material constant calculation and heat constant calculation, and then is the calculation of tower equipment, checking and ancillary equipment’s calculation or selection.Absorption segment’s results are as follows:The amount of carbon dioxide removel is 2909.4m³/h and the amount of NHD is 1 84.2m³/h; the heat of liquid-rich flow from tower bottom is 14269139.99kJ/h and the temperature of solution rises 5℃; the tower diameter is 1.6m, the height of packing layer is 13.47m and the column pressure dropping is 3002.7Pa.The desorption segment’s results are as follows:The amount of carbon dioxide flashes is 2735.7m³/h, the recovery rate of carbon dioxide is 94%, the heat brought out from solution is 10142141.09kJ/h and the volume of flash trough is 0.26m³.The amount of carbon dioxide stripped out is 157.15m³/h and the amount of nitwgen is 1105.2m³/h; the heat of barren liquor from tower bottom is 6022054.3kJ/h and the temperature of solution is 26℃; the upper column diameter is1.4m, the lower column diameter is 1.5m and the column pressure dropping is 2 021.4Pa.Key Words: absorption,flash,stripping目录设计说明 ............................................................ I I Design Instructions ................................................ I II 目录 .............................................................. I V 主要符号说明 ........................................................ V I 引言 . (1)1 总论 (2)1.1概述 (2)1.2文献综述 (3)1.3设计任务的依据 (4)1.4主要原材料及公用工程情况 (5)2 生产方案的确定 (6)2.1脱碳的方法 (6)2.2 NHD的脱碳原理 (6)2.2.1 NHD溶剂的物理性质 (6)2.2.2 计算的热力学基础 (7)2.2.3计算的动力学基础 (8)2.3 脱碳工艺参数的选定 (8)2.3.1 脱碳流程的选择 (8)2.3.2气提剂的选择 (9)2.3.4 脱碳再生操作温度的选定 (9)2.3.5 脱碳操作压力的选定 (10)2.3.6脱碳塔气液比的确定 (10)2.3.7 冷凝器的位置及选定 (11)2.3.8腐蚀及材料选择 (12)3 脱碳生产流程说明 (13)4 吸收过程的工艺计算 (15)4.1物料恒算 (16)4.2热量恒算 (18)4.2.1原料气带入的热量 (18)4.2.2单位时间内气体的溶解热 (19)4.2.3进塔溶液带入的热量 (19)4.2.4净化气带出的热量 (19)4.2.5塔底富液带出的热量 (20)4.3吸收塔的工艺设计 (20)4.3.1 塔径及气速的计算[]7 (20)4.3.2填料层高度的计算 (22)4.3.3塔厚度的计算 (23)4.3.4塔压降的计算 (24)4.3.5辅助设备的计算和选型[]8 (24)4.3.6塔体的强度校核 (26)5 解吸过程的工艺计算 (30)5.1物料恒算 (30)5.1.1闪蒸过程的物料恒算 (30)5.1.2气提过程的物料恒算[]10 (30)5.2热量恒算 (31)5.2.1闪蒸过程的热量恒算 (31)5.2.2气提过程的热量恒算 (32)5.3气提塔的工艺设计 (32)5.3.1塔径及气速的计算 (32)5.3.2 填料层高度的计算 (34)5.3.3塔厚度的计算 (36)5.3.4塔压降的计算 (36)5.3.5辅助设备的计算和选型 (36)5.3.6塔体的强度校核[]12 (38)设计结果 (42)参考文献 (44)附录 (45)致谢 (46)主要符号说明 序号 符号意义 单位 01 i G气体体积流量 3m /h 02 i L液体体积流量 3m /h 03 S2CO 在NHD 中的溶解度 3m (标) /3m 04 L ρNHD 的密度 3kg /m 05 gi Q气体的热量 k J /h 06 Li Q液体的热量 k J /h 07 S Q气体的溶解热 k J /h 08 gi T气体温度 K 09 Li T液体温度 K 10 2CO q2CO 在NHD 中的溶解度热 kJ /kmol 11 X Q气体的焓值 k J /h 12 m,V q气体的质量流量 k g /h 13 0P气体压力 M P a 14 F u空塔气速 k J /h 15 m相平衡常数 1 16 i D塔径 m 17 Z填料高度 m 18 i P风载荷 2N /m 19 W M风弯矩 N m ⋅ 20 F地震载荷 N 21 I惯性距4mm引言氨是重要的无机化工产品之一,在国民经济中占有重要地位。
年产15万吨合成氨脱碳工段初步工艺毕业设计论文121
摘要本设计是年产十五万吨合成氨脱碳工段的初步工艺设计。
本文从多种合成氨脱碳方法的利弊考虑,最终选择本菲儿热钾碱法和两段吸收两段再生的工艺流程,达到最终脱去合成气中的二氧化碳和吸收液的再生。
脱碳工段是合成氨工程中必不可少的工段之一,因为如果这些二氧化碳不在合成氨工序前及时除净,氨的合成就会受到影响;同时二氧化碳本身是制取尿素、化肥等产品的原料,也可加工成干冰、食品级二氧化碳,并且二氧化碳是氨合成催化剂的毒物,因此必须除去它。
其中二氧化碳吸收塔和溶液再生塔是脱碳过程中不可缺少的塔设备。
设计内容主要包括生产工艺的确定和比较、物料衡算和能量衡算、设备的选型与设计和管道尺寸设计。
附带的图纸有带控制工艺流程图和二氧化碳吸收塔设备结构图。
关键词:热钾碱法;脱碳;工艺设计AbstractThis design is the annual output of one hundred and fifty thousand tons of synthetic ammonia decarbonization section preliminary process design. From considering the pros and cons of a variety of synthetic ammonia decarbonization method, this paper finally choose this Benfica hot alkaline potassium and two regeneration absorb two paragraphs to remove carbon dioxide from the syngas and eventually achieve the regeneration of the solution. Decarbonization section is one of the indispensable section in synthetic ammonia,Because if the carbon dioxide is not remove out in time in the synthetic ammonia process, ammonia synthesis will be affected;At the same time itself is a raw material for preparing urea, fertilizer and other products ,it can also be processed into dry ice, food grade carbon dioxide, and carbon dioxide is the poison of ammonia synthesis catalyst, so you must remove it. carbon dioxide absorption tower and solution regeneration tower is indispensable in the process of decarbonization tower equipment.Finally the design content mainly includes the determination and comparison of production process,material balance and energy balance calculations, the selection and design of the equipment and the design of pipe size. Besides these, it includes the drawing of controllable technological process, the equipment structure drawing of the absorbing tower .Keywords: Hot alkaline potassium; Decarburization;Process design目录1 合成氨脱碳工艺概述 (5)1.1合成氨脱碳方法及工艺的选择 (5)1.1.1脱碳方法概述 (5)1.2 脱碳方法种类 (5)1.2.1化学吸收法 (5)1.2.2物理吸收法 (7)1.3 脱碳方法的确定 (9)1.4脱碳工艺的选择 (12)1.5 本设计工艺流程的确定 (13)2 工艺计算 (15)2.1 工艺计算条件 (15)2.2 物料衡算及热量衡算 (16)2.2.1 变换气再沸器 (16)2.2.2 变换气分离器 (18)2.2.3 二氧化碳吸收塔 (18)2.2.4 净化气冷却器 (22)2.2.5 净化气分离器 (24)2.2.6 二氧化碳再生塔 (24)2.2.7 贫液冷却器 (27)2.2.8 再生气水冷却器 (27)2.2.9 再生气水分离器 (29)3 主要设备的计算 (30)3.1 主要设备的尺寸计算与选型 (30)3.1.1 变换气再沸器 (30)3.1.2 变换气水分离器 (31)3.1.3二氧化碳吸收塔 (31)3.1.4 吸收塔填料层高度计算 (34)3.1.5 净化气水冷却器 (38)3.1.6 净化气水分离器 (40)3.1.7 二氧化碳再生塔 (40)3.1.8 贫液冷却器 (44)3.1.9 再生气水冷却器 (47)3.1.10再生气水分离器 (49)3.2 主要设备一览表 (50)4 工艺管道的计算与选择 (51)4.1 二氧化碳吸收塔各接管的管径计算及选择 (51)4.1.1变换气入口管管径计算 (51)4.1.2 半贫液入口管管径计算 (52)4.1.3 贫液入口管径计算 (53)4.1.4 净化气出口管径计算 (53)4.2 二氧化碳再生塔各接管的管径计算及选择 (55)4.2.1 富液入口管管径计算 (55)4.2.2 半贫液出口管管径计算 (56)4.2.3 贫液出口管管径计算 (56)4.2.4 再生气出口管管径计算 (56)4.2.5 回流水入口管管径计算 (57)4.3 工艺管道一览表 (58)结论 (59)致谢 (60)参考文献 (61)1合成氨脱碳工艺概述合成氨工业是基本无机化工之一。
合成氨 毕业设计
目录1设计任务书 (1)1.1项目 (2)1.2设计内容 (2)1.3设计规模 (4)1.4设计依据 (4)1.5产品方案............................................. 错误!未定义书签。
1.6原料方案............................................. 错误!未定义书签。
1.7生产方式............................................. 错误!未定义书签。
2工艺路线及流程图设计..................................... 错误!未定义书签。
2.1合成车间工艺流程方框图............................... 错误!未定义书签。
2.2合成氨车间工艺流程简述............................... 错误!未定义书签。
3车间生产环境............................................. 错误!未定义书签。
3.1工艺状况(高压高温)................................. 错误!未定义书签。
3.2设备状况(高压、低压并存相通)....................... 错误!未定义书签。
3.3有催化剂存在......................................... 错误!未定义书签。
5设计计算 (6)5.1物料衡算 (6)5.2能量衡算 (9)6主要设备设计及设备一览表 (11)6.1氨合成塔的设计 (11)6.2设备一览表 (12)9安全生产要求........................................... 错误!未定义书签。
致谢.. (16)主要参考文献: (17)附录: (18)1设计任务书1.1生产历史及发展趋势合成氨工业有近100年的历史,氨合成的条件目前国内大型合成氨厂普遍采用高温高压在铁催化剂作用下氢氮气合成为氨的。
【精品】:二氧化碳吸收塔设计
【精品】:二氧化碳吸收塔设计二氧化碳(CO2)吸收塔经常被用于工业过程中的气体净化和能源生产中。
在吸收塔中,CO2从气相被溶解到液相中,从而减少了CO2的排放并产生了可回收的CO2产品。
本文将介绍CO2吸收塔的设计,重点涉及设计参数、设计方案、设计流程和输送系统。
设计参数设计CO2吸收塔需要考虑以下参数:1. 操作参数:塔内的操作温度和压力,与吸收剂(通常为胺)的浓度相关;2. CO2处理能力:以每小时处理的CO2量为衡量标准,需要根据实际需求选择塔的尺寸和产能;3. 填料:塔内填充物的种类和数量,以提供更大的表面积和接触时间;4. 电源消耗:与塔内风扇和泵的功率有关,这些设备会增加工艺费用和环境影响。
设计方案确定了负载需求后,需要选择适当的CO2吸收塔方案。
通常有两种:塔板塔和填料塔。
1. 填料塔(packed column):由于填充物较大的表面积可以提高质量传递效率,目前最常用的方案是填料塔。
填料塔中充满各种不同形状和材料的填料,例如环形或多面角度的板子。
填料之间的空隙可以提供两相之间的质量传递和反应,这是CO2吸收过程中的重要步骤。
一些常用的填料材料包括陶瓷、塑料和金属。
2. 塔板塔(tray column): 塔板塔各有多个分离板,使垂直进入的流体在多个水平层面上经过反应处理。
在每个板上,形状各异的衬垫或孔洞使两相之间形成液滴和气泡。
塔板塔优点在于管路结构比填料塔更简单,可提供一定的可视测量和操纵的便利性。
设计流程根据前面列出的设计参数和选择的设计方案,CO2吸收塔的设计流程如下:1. 确定塔的尺寸和位置,这取决于需要处理的CO2量和设备的完成时间。
2. 选择合适的填料或塔板,并设计塔的内部结构。
根据流体要求,塔板或塔内可以设置淋浴器供液体注入塔。
3. 安装泵、管道、填料、阀和风扇等必要的设备。
4. 进行调试,测试各系统的连接和性能。
输送系统填料塔和塔板塔的输送系统不同。
对于填料塔,输送系统包括主要和辅助风扇,填充物和喷嘴。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
摘要在工业合成氨的生产过程中,粗原料气经过一氧化碳变换以后,变换气中除氢气外,还有二氧化碳和甲烷等成分,其中二氧化碳含量多达15%-35%。
二氧化碳不仅降低氨合成催化剂的活性,又是制造尿素、碳酸氢铵等氮肥的原料,因此要想法除去。
本设计的目的是根据所给技术特性参数,合理设计Ι段二氧化碳吸收塔,用来脱除变换气中的二氧化碳气体。
根据《GB150-1998钢制压力容器》、《JBT4710-2005钢制塔式容器》等标准,通过常规设计方法步骤进行设计,包括塔体的筒体和封头壁厚计算和水压试验,接管、接管法兰、人孔法兰和塔内件的选取,裙座的计算和设计,开孔补强计算,风载荷和地震载荷的计算和校核,以及筒体和裙座的应力分析等。
强度校核时,大部分情况下将受压元件的应力限制在材料的需用应力以内,用来确保设计的安全性和经济性。
关键词:二氧化碳合成塔;填料塔;合成氨引言塔设备又称塔器,塔设备有许多种类型,塔设备是化工、石油化工和炼油生产中最重要的设备之一。
用以使气体与液体、气体与固体、液体与液体或液体与固体密切接触,并促进其相互作用,以完成化学工业中热量传递和质量传递过程。
二氧化碳吸收塔,是利用碳酸钾溶液来脱去变换气中的二氧化碳气体,要保证较高的脱碳效率和设备的安全性能,必须对吸收塔系统进行合理的设计,包括吸收塔的尺寸设计,吸收塔材料的选择以及塔部件的选取。
吸收塔的主要部件有外壳、填料、填料支承、液体分布器、中间支承和再分布器、气体、液体进出口接管等。
填料塔是以塔内的填料作为气液两相间接触构件的传质设备。
填料塔的塔身是一直立式圆筒,底部装有填料支承板,填料以乱堆或整砌的方式放置在支承板上。
填料的上方安装填料压板,以防被上升气流吹动。
液体从塔顶经液体分布器喷淋到填料上,并沿填料表面流下。
气体从塔底送入,经气体分布装置后,与液体呈逆流连续通过填料层的空隙,在填料表面上,气液两相密切接触进行传质。
填料塔属于连续接触式气液传质设备,两相组成沿塔高连续变化,在正常操作状态下,气相为连续相,液相为分散相。
当液体沿填料层向下流动时,有逐渐向塔壁集中的趋势,使得塔壁附近的液流量逐渐增大,这种现象称为壁流。
壁流效应造成气液两相在填料层中分布不均,从而使传质效率下降。
因此,当填料层较高时,需要进行分段,中间设置再分布装置。
液体再分布装置包括液体收集器和液体再分布器两部分,上层填料流下的液体经液体收集器收集后,送到液体再分布器,经重新分布后喷淋到下层填料上。
填料塔具有生产能力大,分离效率高,压降小,持液量小,操作弹性大等优点。
填料塔也有一些不足之处,如填料造价高;当液体负荷较小时不能有效地润湿填料表面,使传质效率降低;不能直接用于有悬浮物或容易聚合的物料;对侧线进料和出料等复杂精馏不太适合等。
塔内件是填料塔的组成部分,它与填料及塔体共同构成一个完整的填料塔。
塔内件的作用是使气液在塔内更好地接触,以便发挥填料塔的最大效率和最大生产能力,因此塔内件设计的好坏直接影响填料性能的发挥和整个填料塔的性能。
另外,填料塔的“放大效应”除填料本身因素外,塔内件对它的影响也很大。
填料塔的内件主要有:填料支撑装置、填料压紧装置、液体分布装置、液体收集再分布装置。
合理地选择和设计塔内件,对保证填料塔的正常操作及优良的传质性能十分重要。
本设计的目的及意义旨在培养我们理论联系实际的能力,把本科所学的专业知识综合地应用到本设计中去,为我们今后参加相关的设计工作打好基础。
符号说明δ——计算厚度,mm ; d δ——设计厚度,mm ;n δ——名义厚度,mm ;b δ——有筋板时基础环的厚度,mm ;e δ——有效厚度,mm ;ei δ——第i 计算段容器的有效壁厚,mm ; g δ——筋板厚度,mm ;b δ——有筋板时基础环的厚度,mm ;nt δ——接管名义厚度,mm ; t δ——接管计算厚度,mm ;δ'——补强圈厚度,mm ; et δ——接管有效厚度,mm ;s δ——裙座的厚度,mm ;[]σ——试验温度下材料的许用应力,MPa ;[]tσ——材料在设计温度下的许用应力,MPa ;t σ——水压试验时的许用应力,MPa ;s σ——材料的屈服强度,MPa ;1σ——内压计算压力在筒体内引起的轴向压力,MPa ;2i iσ-——操作物料时质量载荷在筒体内引起的轴向力,MPa ; 3i i σ-——最大弯矩在筒体内引起的轴向力,MPa ;maxi iσ-——最大组合轴向压应力,MPa ;[]sσ——裙座材料在设计温度下的许用应力,MPa;tg——重力加速度,kgN/;φ——焊接接头系数;A——开孔削弱所需的补强面积,mm2;A——多余金属面积,mm2;1A——接管多余金属面积,mm2;2A——接管处焊缝面积,mm2;3A——所需另行补强面积,mm24A——裙座底部截面积,mm2;sbA——有效补强面积,mm2;eA——裙座开孔设人孔处的截面积,mm2;smA——基础环的面积,mm2;bC——厚度附加强,mm;C——钢板负偏差,mm;1C——腐蚀裕量,mm;2E——材料的弹性模量;DN——公称直径,mm;d——开孔直径,mm;d——垫板上地脚螺栓孔直径,mm;2d——人孔直径mm;iD——筒体的内径,mm;iD——塔设备第i段迎风面的有效直径,mm;eiD——设备各计算段的外径,mm;oiD——基础环的外径,mm;obib D ——基础环的内径,mm ;P ——设计压力,MPa ; L P ——液柱静压力,MPa ;C P ——计算压力,MPa ; T P ——水压试验压力,MPa ; i P ——第i 段风载荷N ;01m ——塔体圆筒、封头、裙座质量,kg ; 02m ——塔内件如塔盘或填料的质量,kg ;03m ——保温材料的质量,kg ; 04m ——扶梯与平台的质量,kg ; 05m ——操作时物料的质量,kg ; w m ——水压试验时充水的质量,kg ;e m ——偏心载荷,kg ;0m ——设备在正常操作时的最大质量,kg ;max m ——塔设备在水压试验时的最大质量,kg ;min m ——塔设备在停工检修时的最小质量,kg ;k m ——距地面高度k h 处的集中质量,kg ;eq m ——设备的当量质量,kg ;i f ——风压高度变化系数;0q ——各地区的基本风压,Pa ;K —载荷组合系数;1K ——塔的体型系数;zi K ——塔设备各计算段的风振系数; 3K ——笼式扶梯的当量宽度,m ;4K ——操作平台的当量宽度,m ; ε——脉动增大系数; i ν——第i 段的脉动影响系数; zi φ——第i 段的体型系数; 0d ——塔顶管线外径; 1T ——塔的自震周期,s ; g T ——各类产地的自震周期,s ; α——地震影响系数;1α——第一振型的地震影响系数;z C ——综合影响系数;1k η——基本阵型参与系数; max α——地震影响系数α的最大值; i h ——计算截面i i -距地面的距离,mm ;i F ——在截面i-i 处的基本振型水平地震力,N ;i i v F -——塔任意质点i 处得垂直地震力,N ; max v α——垂直地震影响系数的最大值; β——裙座半锥角;I IEIM -——截面i-i 处地震弯矩,N mm ⋅; I IWM -——设备任意截面I-I 的风弯矩,N mm ⋅; e M ——偏心弯矩,N mm ⋅;max M ——设备最大弯矩,N mm ⋅;11maxM -——容器任意截面I-I 最大弯矩,N mm ⋅; sb Z ——裙座底部截面的截面系数,3m m ; sm Z ——裙座开孔设人孔处得截面系数,3m m ;b Z ——基础环的截面系数,3m m ; a R ——混凝土基础的许用应力,MPa ;n —一地脚螺栓个数;1d ——地脚螺栓螺纹根径mm ; r f ——强度削弱系数; 1h ——外侧有效高度,mm ; 2h ——内侧有效高度,mm ;第一章 填料塔的选型和结构设计1.1 设计目的设计二氧化碳吸收塔,用来脱除变换器气中的二氧化碳气体,得到合成氨的原料气体氮气和氢气。
1.2 设备技术特性表1-1 封头结构尺寸工作压力MPa工作温度 ℃ 主要介质 填料体积3m设计风压MPa地震设防强度1.8 120碳酸钾溶液 94 5008级1.3 填料塔的选型和结构设计1.31 筒体和封头的选型本设计采用标准椭圆形封头,易于冲压和成型,是目前中、低压力容器中应用较多的封头之一。
常见设备筒体大都是圆柱形结构,所以采用单层式圆柱形筒体,结构简单、易于操作,易于气体的吸收和内部部件的布置。
图1-1 封头结构示意图查压力容器设计手册表,封头各参数如下:表1-2 封头结构尺寸公称直径DN 总高度H直边高度h内表面积2/mFi容积3/mV质量Kg2200 590 40 5.52 1.55 683.2 1.3.2 裙座的选型因为1DN m>、且/30H DN<,采用圆筒形裙座就可以满足较少地脚螺栓的合理布置,因采用圆筒形裙座。
查阅《塔设备》表8-9,裙座筒体上端至封头切线的距离h=95mm,裙座高度为2100mm,其厚度与筒体相等Gδ=16mm。
裙座筒体与塔体采用对接焊接。
1.3.4 人孔的选取由《化工容器及设备简明设计手册》标准号HG21514~21534-2005,及设计压力选择回转盖带劲对焊法兰人孔,凸面,材料为Q345R。
人孔尺寸由《化工容器及设备简明设计手册》表23-1-13得所选人孔结构表如下:表1-3 人孔结构表密封面型式公称压力PN公称压力DNwd s⨯d D1D1H2H b凸面RF(A)型2.5 500 530×12 506 730 660 280 128 441b 2bAB L0d螺柱数量 螺母数量 螺柱尺寸 总质量kg 46 48 405200300302040M33×2×170303人孔的型式:图1-2 人孔的形式1.3.5 接管的选取根据介质特性,接管材料选用20号钢, []MPa t 140=σ.查《压力容器设计常用标准》Ⅱ系列表4.3.1接管尺寸如下表:表1-4 接管尺寸项目公称直径DN/mm 从长度mm总质量Kg内径mm外径mm壁厚mm液面计接口管15 300 0.33 15 18 3自动液面计借口管40 300 1.07 41.5 45 3.5排污口80 2128 17.83 85 89 4通气孔80进液口200 2300 55.10 213 219 6出液口200 1900 59.77 213 219 6进气口250 2350 122.85 265 273 8出气口250 300 15.68 265 273 8引出管通道250 300 13.07 265 273 8卸料口500 1200 138.75 521 530 9 人孔500检查孔500 150 17.34 521 530 9 1.3.6 接管法兰的选取查钢《制管法兰、垫片和紧固件》HGT20595-2009表4-3,本设计采用凸面带颈对焊法兰,其结构和尺寸如下:图1-3带颈对焊法兰结构表1-5 接管法兰尺寸公称尺寸DN 钢管外径法兰焊端外径1AA类连接尺寸法兰外径D螺栓孔中心圆直径K螺栓孔直径L螺栓孔数量n螺栓Th15 18 95 65 14 4 12M40 45 150 110 18 4 M 16 80 89 200 160 18 8 16M 200 219 360 310 26 12 M24 250 273 425 370 30 12 M27 500 530 730 660 36 20 M33×2公称尺寸DN 法兰质量Kg法兰高度法兰厚度C法兰颈NA类S1HR15 0.75 38 14 32 3.2 6 340 2.37 45 18 64 3.6 7 5 80 5.03 58 24 110 5.6 12 6 200 17.4 80 30 244 6.3 16 8 250 24.4 88 32 296 6.3 18 10 500 92.5 125 44 580 11 20 12表1-6密封面结构尺寸公称尺寸DN 密封面公称尺寸d15 4640 8480 132200 284250 340500 6151.3.7 选择管法兰垫片根据HG/T20635-2009表3.0.2选用垫片形式表1-7 垫片型式选用表垫片型式公称压力PN公称尺寸DN最高使用温度密封面型式密封面的表面粗糙度aR()mμ法兰型式非石棉纤维橡胶板40≤102000290凹面/凸面3.212.5带颈对焊法兰由HG/T 20606-2009表4.0.2-3得垫片尺寸:表1-8 垫片尺寸mm公称尺寸 DN 垫片内径1D 垫片外径2D 垫片厚度T包边宽度b15 22 51 1.5340 49 92 80 89 142 200 220 284 250 273 340 50053062431.3.7 管法兰紧固件选取表1-9 螺母和螺栓(螺柱)参数螺母类型DN规格螺栓螺柱类型数量22l质量/1000件 螺栓 螺母I 型六角螺母 (GB6170)15 12M 六角头螺栓A 级(GB5782)4 70 49.9 11.93 40 M 164 85 111 29 80 16M8100 131 29 200M 24双头螺柱B 级(GB901)12 125 369 88.8 250M 2712135 515 132.4 六角螺母(HG20613) 500M 33×2 双头螺柱B 级(HG20613)20165947242.81.4 填料的选择参考由《塔设备》本设计选用陶塑料鲍尔环和塑料矩鞍环,塑料材质质量轻,鲍尔环为较为普通的填料形式,价格便宜,矩鞍环为最高效的填料之一,不易迭合,处置效率高,但价格较高,所以只用少部分放在填料的最底层,可避免鲍尔环的阻塞,两者都采用乱堆排列。