文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如工作总结、报告大全、合同协议、演讲致辞、规章制度、应急预案、心得体会、教学资料、作文大全、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, our store provides various types of classic sample essays, such as work summaries, report summaries, contract agreements, speeches, rules and regulations, emergency plans, experiences, teaching materials, essay summaries, and other sample essays. If you want to learn about different sample formats and writing methods, please pay attention!竣工工作总结7篇通过工作总结,可以发现自己工作中的不足和改进的空间,我们可以在工作总结里面回忆自己这段时间以来的工作收获和成长,本店铺今天就为您带来了竣工工作总结7篇,相信一定会对你有所帮助。

完成竣工总结(汇总7篇)

完成竣工总结(汇总7篇)

完成竣工总结第1篇各位领导、工程师:今天为xxxx工程项目竣工验收,我在此仅代表深圳市xx建筑工程公司对参加会议的各位领导、工程师表示热烈的欢迎。

同时,对各有关单位一直以来对xxxx项目的支持与指导表示衷心的感谢!xxxx项目由深圳市宝安区xxxx发展有限公司开发,深圳市xxx投资有限公司投资兴建,设计单位为深圳市xxx建筑设计有限公司,监理单位为xx建设监理有限公司。

工程位于深圳市龙华镇东环二路与工业路东北角,占地面积为,为1栋七层商住楼,设置二次伸缩缝,分为三个区。

采用天然地基、独立基础,主体结构为框架剪力墙,设计抗震烈度为7度,防火类别为二类,加气砼砌体,外墙涂料面层。

xxxx项目于20xx年10月25日开工,20xx年6月25日通过有关单位的初验,同时,对各位领导、工程师提出的问题已积极整改完毕,工程资料经过质检站的检查并反馈下来的问题也已全部整理完成,资料齐全。

施工过程中,在抓质量管理的同时,我项目部也不放松安全与文明管理,整个施工过程中无发生工伤事故;参加施工人员均服从指挥,听取建设、监理、安监等各部门的意见,树立文明施工队伍。

我们将xxx贵的施工经验,不断完善和努力提高自身的质量及安全管理水平,以业主的利益为重,为追求施工高质量服务作不懈努力。

一、工程概况xxxxx工程位于福田区农科中心,总用地面积55831m2,总建筑面积122087m2,其中xx 建筑面积为,由一层地下室、12~15栋商住楼组成,建筑面积分别为,地下室5889m2,12栋(6~8层),13栋(11~12层),14栋(15层),5栋(12层),均为坡屋面。

本工程结构形式为框支抗震墙,转换层以上为短肢抗震墙结构,基础为预应力高强管桩钢筋砼承台。

抗震等级:框架抗震墙为二级,短肢抗震墙为三级。

抗震设防为七度,建筑物耐火等级为Ⅰ级。

二、主体结构钢筋砼部分本工程主体砼均为商品砼。

采用钢筋转换层xxx主筋为Φ32Ⅲ级钢筋,其余为Ⅱ级钢,φ8以下为Ⅰ级钢。

施工单位工程竣工总结6篇

施工单位工程竣工总结6篇

施工单位工程竣工总结6篇施工单位工程竣工总结6篇总结在一个时期、一个年度、一个阶段对学习和工作生活等情况加以回顾和分析的一种书面材料,它是增长才干的一种好办法,不如立即行动起来写一份总结吧。

我们该怎么写总结呢?下面是小编收集整理的施工单位工程竣工总结,仅供参考,希望能够帮助到大家。

施工单位工程竣工总结1我代表北京蓝天建设有限公司大兴分公司向参加本次竣工会议的领导及各方代表表示诚挚的感谢!并做以下汇报:一、工程概况1、工程项目名称:长子营镇农民抗震节能住房改造工程。

2、开竣工日期:于20xx年8月19日开工,于20xx年10月25日竣工。

3、建设单位:长子营镇政府4、监理单位:北京东方通国际工程监理有限公司5、总包单位:北京蓝天建设有限公司6、作业内容:对长子营镇下33个自然村房屋进行外墙保温及门窗改造;其中外墙保温改造共3808户,合计;门窗改造共2827户,合计。

二、施工主要依据1、施工图纸与建设方有关指令。

2、现行国家有关法律法规以及建筑工程质量验收规范。

3、公司的质量管理体系与项目部的相关质量制度。

4、建筑工程资料管理规程等有关文件。

三、管理方法、项目管理目标情况我公司精心编制了施工实施方案,以工程项目部的模式进行管理。

在安全管理和文明施工方面大力推行标准化管理,实行定期检查和定量评分,结合经济奖罚制度,实现文明施工和无事故安全生产的目标。

质量是企业的生命,我们项目部对该工程项目确定的质量目标为:合格率100%,争取一次验收成功。

为实现这一目标,在质量计划中,项目部将特殊过程和关键工序作为重点进行控制,重点防范关键工序质量问题的产生;坚持以预防为主的原则,制订消除质量通病计划,将消除质量通病工作放在重要的地位;对主体分部工程和装饰分部工程制订出更高的质量标准(内控标准),大幅提高分项工程质量和建筑观感得分。

并对文件资料、产品标识和可追溯性、检验和试验、不合格品控制、贮存和防护、培训等要素的实施制订了详尽和易操作性的方案。

工程竣工报告总结【优秀4篇】

工程竣工报告总结【优秀4篇】

工程竣工报告总结【优秀4篇】(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。

文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如工作总结、计划大全、策划方案、报告大全、心得体会、演讲致辞、条据文书、作文大全、教案资料、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, this store provides various types of classic sample essays for everyone, such as work summaries, plan summaries, planning plans, report summaries, insights, speeches, written documents, essay summaries, lesson plan materials, and other sample essays. If you want to learn about different formats and writing methods of sample essays, please stay tuned!工程竣工报告总结【优秀4篇】在现在社会,报告的用途越来越大,要注意报告在写作时具有一定的格式。

工程竣工总结三篇

工程竣工总结三篇

工程竣工总结三篇当某项工程竣工之后,回想工程的整个施工过程,你一定有很多感慨,这时候就需要写一份总结记录下来。

以下是职场和大家分享的工程竣工总结三篇的参考资料,提供参考,欢迎你的参阅。

工程竣工总结1 一、工程基本情况概述(一)工程概况xx县杜曲道路改造工程项目,位于xx县县城西郊,属于城市规划次干道,本工程北起老襄逍路(K0+002),南止杜曲镇社区南院墙(K0+560),施工段长558米,规划红线宽度20米属旧路改造工程。

该项目总投资300万元。

(二)承包单位基本情况承包单位:xxx有限责任公司承包单位在现场项目经理部全面负责该项目工程的施工任务,各管理层人员配备齐全,资质符合要求,施工人员各专业人员岗位证书齐全,符合要求,劳务人员数量满足施工工期要求,施工各类设备规格、型号、数量满足施工要求。

工程原材料、构配件、设备能力按使用计划落实。

根据对施工单位的综合考察确定,承包单位有能力完成本工程项目施工。

二、评估依据1、《中华人民共和国合同法》2、《工程建设监理规范》xx县杜曲镇道路改造工程3、《城镇道路施工与质量验收规范》(CJJ1-20xx)4、《给水排水管道工程施工及验收规范》(GB50268-20xx)5、施工图纸、设计说明和设计指定的标准图集三、工程施工阶段质量控制情况(一)审查施工单位质量管理体系、技术管理体系、质量保证体系承包单位在现场项目部各管理层人员配备齐全,资料符合要求;施工人员各专业人员岗位证书齐全,符合要求;施工各设备规格、型号、数量满足要求。

工程原材料、构配件、设备能按使用计划落实;各项管理制度基本齐全;(二)、工程质量状况1、沟槽:沟槽开挖高程、宽度符合设计要求,槽底排水,坡比正确。

2、垫层:砂石垫层符合设计及规范要求。

3、安管:安管质量符合设计及规范要求,高程正确,中心偏差符合规范标准,承插到位,管材复试合格。

4、砂回填:符合设计及规范要求,密实度检测合格。

5、土回填:在绿化带内,按规范施工,未检测压实度,现场控制回填质量,抽检部分井段压实度符合要求。

工程竣工总结15篇

工程竣工总结15篇

工程竣工总结工程竣工总结15篇总结是指对某一阶段的工作、学习或思想中的经验或情况进行分析研究,做出带有规律性结论的书面材料,它可以有效锻炼我们的语言组织能力,因此我们要做好归纳,写好总结。

那么我们该怎么去写总结呢?以下是小编整理的工程竣工总结,仅供参考,希望能够帮助到大家。

工程竣工总结1广东移动通信有限责任公司xx分公司:贵公司办公楼首期装修工程,在贵公司的大力支持和积极配合下,经过各施工单位的努力协作,目前已竣工交付使用,并于XX年2月11日通过市建委质监站验收,初评为优良工程。

为提高我公司自身的工程管理水平,我公司有关人员对工程作了总结和分析,涉及其他施工单位所属工作的一些实际情况及相关影响,一起在此向贵公司汇报。

一、关于设计:我公司设计人员根据贵公司领导提出的“装修效果达到现代感强、开放舒适、体现企业形象、中高档次”的要求对设计进行了较大改进,但平面布局不变,天花基本不变,只改动对装修效果影响较大的大堂天花,故对其他工程的施工基本不造成影响。

多功能会议厅天花因涉及消防,电气照明,空调等设计,原来不作修改,但基本完工时发现效果确实欠佳,压迫感严重,最后不得不作作废更改;乒乓球室原设计不符合运动要求而将天花高度升高到最大限度。

装饰设计只改动立面,几乎所有的立面和饰面均重新设计,共重新出图66张,因设计修改是与工地开工同时进行,我公司共安排了4名设计师参予此项设计,在以设计质量至上的前提下加班工作;设计过程中一个立面效果往往经多次讨论修改才能成稿,最后总体设计方案,如今完工后已可以验证,总的来说体现了贵公司提出的装修宗旨和设计主题。

但由于本装饰设计工作量大,要求高,以至98年12月初才能全面完成本装饰设计修改。

而其他工程的设计,电气照明、门禁、消防、监控、空调工程设计由于与施工现场实际情况差异以及图纸会审后发现错漏,开工后均由原设计单位作了一定修改、电气照明修改最大。

而综合布线、背景音乐则开工后才边设计边施工。

工程设计竣工总结(实用11篇)

工程设计竣工总结(实用11篇)

工程设计竣工总结第1篇xxx市克孜加尔水库工程建设征地移民安置点生活区基础设施项目,总投资额602万元,棚圈、伙房为砖木结构;水泥砂浆抹面;方木檩条;草泥屋面;塑钢窗;木门。

伙房为防盗门;室内砼水泥地面;墙面内外涂刷乳胶漆;屋面3+3SBS防水层。

大房外墙涂刷乳胶漆;室外砼水泥地面。

自20xx年8月13日开工,至20xx年9月11日竣工,交付使用,共30天(日历天)。

项目监理xxxxx工程管理咨询公司受xxxxx市克孜加水库工程建设管理处的委托,承接了xxxx市克孜加尔水库工程建设征地移民安置点生活区基础设施项目的监理工作,对该工程的施工阶段进行监理。

项目监理合同签订后,我公司立即组建了监理组进驻用户现场,在总监理工程师的统一组织和安排下,按照监理程序开展监理工作。

在项目建设施工阶段,依据信息系统过程监理有关的国家政策、法律、法规、标准、规范,信息技术国家标准,建设单位与承建单位签订的项目建设合同、相关资料,建设单位与监理单位签订的监理合同对工程的质量、进度、投资进行控制,对项目的合同和信息文档资料进行管理。

定期召开监理例会,检查各项工作的完成情况,协调解决存在的问题;不定期的向用户提交阶段总结;及时把握项目存在的问题并提出监理建议;公平公正地协调处理项目实施中遇到的问题,确保了工程建设的质量和顺利进行。

项目监理部全面履行了监理委托合同赋予的义务和责任,圆满完成了本工程的监理任务,监理工作控制目标达到合同要求。

(一)基本做法在依据建筑工程监理规范及有关规定和本公司监理经验的基础上,结合本工程的实际情况,确立了对本工程进行监理的基本做法:1、统一思想、理顺关系、确立统一的管理与监理体制。

2、建立监理组织机构。

3、监理组内部建立岗位责任制,并建立了例会和月度报告制度。

(二)质量控制质量控制的体系为:(1)承包人自检;(2)监理人员抽验;(3)监理公司检查组定期组织检查。

质量控制是从原材料的质量抓起,对每道施工工序严密把关,监理人员旁站监督,使工程质量较以往有显著提高。

工程竣工施工完成总结(3篇)

工程竣工施工完成总结(3篇)

第1篇一、前言随着我国经济的快速发展,基础设施建设已成为推动经济增长的重要动力。

本次工程自开工以来,在各级领导的关心和支持下,经过全体施工人员的共同努力,现已圆满完成施工任务,达到竣工验收条件。

现将工程竣工施工完成情况进行总结,以便为今后的工程建设提供借鉴。

二、工程概况1. 工程名称:XX道路工程2. 工程地点:XX市XX区3. 工程规模:全长XX公里,宽XX米,双向XX车道4. 工程投资:XX亿元5. 施工单位:XX建设集团有限公司6. 设计单位:XX设计研究院三、施工完成情况1. 工程进度:本工程自201X年X月X日开工,至201X年X月X日竣工,历时XX 个月,按计划完成施工任务。

2. 施工质量:严格按照国家有关施工规范和标准进行施工,工程质量符合设计要求。

经检测,路基、路面、桥梁、隧道等主要工程部位质量合格率均达到100%。

3. 安全生产:施工过程中,严格执行安全生产责任制,加强安全管理,确保了安全生产。

全年未发生重大安全事故,安全生产形势稳定。

4. 环境保护:在施工过程中,高度重视环境保护工作,采取有效措施,减少对周边环境的影响。

如:合理规划施工场地,降低扬尘污染;采用低噪声施工设备,减少噪音污染;对施工废弃物进行分类处理,实现资源化利用。

5. 节能减排:在工程设计、施工过程中,充分考虑节能环保要求,采用节能材料和技术,降低能源消耗。

如:道路照明采用节能路灯,桥梁设计采用轻质高强材料等。

6. 服务质量:加强与当地政府、居民的沟通,及时解决施工过程中出现的问题,确保工程顺利进行。

同时,积极开展文明施工,提高施工环境质量。

四、经验与不足1. 经验:(1)加强项目管理,确保工程进度和质量;(2)严格执行安全生产责任制,保障安全生产;(3)注重环境保护,减少对周边环境的影响;(4)加强沟通协调,提高施工效率。

2. 不足:(1)施工过程中,部分施工设备老化,影响施工效率;(2)施工人员技能水平参差不齐,需进一步加强培训;(3)施工过程中,部分地方存在安全隐患,需加强安全管理。

2024年工程竣工验收总结(3篇)

2024年工程竣工验收总结(3篇)

2024年工程竣工验收总结随着科技的不断进步和社会的不断发展,各种工程项目在不同领域中不断涌现,为社会发展做出了巨大的贡献。

2024年,我们公司承接了多个大型工程项目,经过一年的精心筹备和紧张施工,这些项目相继竣工并进行了验收。

在这里,我将对公司参与的几个工程项目进行总结和回顾,以期总结经验教训,并为今后的工程项目提供参考。

首先,就是我公司参与的某高速公路建设项目。

该项目于2024年年初正式动工,计划建设一条连接两个城市的高速公路,全长200公里。

该工程的竣工验收工作既考验了我司的施工能力,也对我们的组织能力和协调能力提出了很高的要求。

整个工程的施工过程中,我们突出了“质量第一、安全第一”的原则,严格按照工程设计要求和安全操作规程进行施工。

通过实施项目管理和施工监督,有效地控制了工程进度和质量。

我们对各个施工工序进行了详细的计划,确保了施工进度的合理安排,并制定了应急预案以应对突发情况的发生。

在工程过程中,我们充分发挥了团队合作的重要性。

我们与设计单位、监理单位和业主单位密切合作,及时解决了工程中的各种问题和矛盾。

通过有效的沟通和协调,我们保证了工程在合理的时间内竣工。

在工程竣工验收中,我们重视了对工程质量的检测和监督。

我们安排专门的验收小组对工程进行了全面的验收,包括工程结构的安全可靠性、施工质量的符合性等方面的检查。

同时,我们还注重了工程环境的保护和生态恢复,确保了工程建设对周边环境的影响最小化。

通过对该项目的总结,我们认识到了在工程竣工验收中的几个关键要素。

首先,必须注重工程质量和安全,坚持科学严谨的施工方法和操作规程。

其次,要重视团队合作,加强与各方的沟通和协调,形成合力。

最后,要注重工程环境的保护,减少对周边环境的损害,实现环境可持续发展。

除了高速公路建设项目,我们公司还参与了几个其他领域的工程项目,如电力工程和水利工程等。

在这些项目中,我们也遇到了一些问题和困难,但通过总结经验,我们不断改进和完善工程管理和施工流程,并取得了较好的验收结果。

工程竣工设计总结

工程竣工设计总结

工程竣工设计总结工程竣工设计总结「篇一」一、工程概况该工程地处常德市洞庭大道南段东侧新四村入口处,需修复损坏沥青路面169平方米,需对6米D800承插式污水压力管进行修复,需对已软弹路基进行山砾石换填处理。

本工程于20xx年12月17日开工,20xx年12月20日竣工,工期为4天,质量等级达到合格。

二、工程施工方法本工程所在区域,人口密度很大,施工环境复杂。

该工程是迎检创建紧急工程,施工工期短。

工程施工质量、进度、安全、文明施工的好坏直接影响关系到政府和施工双方的社会声誉,施工中我项目部精心组织,严格管理,以确保质量、工期符合要求。

三、工程管理(一)健全机构、组建工作班子接工程施工通知后我们即按施工组织设计成立了以项目经理为首,下设五个班组组建的项目经理部.此后,我们又进一步完善了管理机制、明确了各自的职责。

做到了人员稳定、责任明确、指挥统一、调度灵活、行动及时、工作到位。

从而保证和推进了各项工作的进展。

(二)确保质量、狠抓质量。

作为项目经理、工程科管理工作的一条主线,我们始终没有放松。

工程一开始,我们就按施工组织设计建立了施工质量保证体系,组建了以项目技术负责人为主的的工程质量自检机构、制订了质量控制程序和相应的保证措施。

从机构、人员、制度、程序上保证了各项质量管理的有效实施。

在施工过程中,我们对所有分部、分项工程始终坚持了按事先制订的施工工艺流程施工、按规程操作、规范把关,使整个施工过程基本走向了程序化、规范化。

在现场技术管理上,我们和驻地监理工程配合得十分密切。

我们想共同之所想、急共同之所急。

我们所想所急的是质量、进度、安全、效益四统一,质量始终是前提。

为了做到这一点,我们的现场技术管理人员协助驻地监理工程师对隐蔽工程、重点项目、关键程序坚持了全过程控制,具体监督指导;对一般项目、关键程序坚持了必要的巡视检查。

不管进度怎么催、效益怎么讲,我们和监理始终坚持了四不放过,即各个分部、分项工程开工之前相关材料及配比试验检查不放过,隐蔽工程覆盖之前检查验收不放过,下道工序开工之前上道工序检查验收不放过,允许范围之内的必要修复不放过。

工程竣工验收总结报告(5篇)

工程竣工验收总结报告(5篇)

工程竣工验收总结报告(5篇)工程竣工验收总结报告(模板)篇11、施工单位质量责任行为情况(如是否依法承揽工程、分包工程签订合同与资质相符;是否建立工程质量保证体系,是否建立各级质量责任制及质量掌握程序);2、本工程是否已按要求完成工程设计和合同商定的各项内容;3、在施工过程中,执行强制标准和强制性条文的`情况;4、施工过程中对监理和监督机构提出的要求整改的质量问题是否确已改正,并得到监理单位的认可;5、工程完工后,企业自查,是否确认工程达到竣工标准,工程质量达到合格质量等级,满意结构平安和使用功能要求;6、工程质量保证资料(包括检)测报告的功能试验资料)基本齐全且已按要求装订成册;7、建筑物沉降观察成果和倾斜率情况;8、其它需说明的情况。

工程竣工验收总结报告(模板)篇2一、工程概况工程名称:工程地点:建设单位:监理单位:设计单位:施工单位:工程质量标准:合格开工日期:20__年6月1日竣工日期:20__年6月30日本项目工程内容有:绿化种植、园林景观构筑物及其他造景、园林铺地、园林给排水和园林用电工程。

二、工程质量验收情况施工单位在工程量大、难度高、交叉作业频繁的情况下,充分发挥自身优势,各专业之间最大限度的协作、合理安排根据合同内质量标准完成各分部分项工作,工程质量达到合格标准。

绿化种植部分因本标段以地下车库顶层回填土为主,种植时采取土壤改良措施,满意植物生长所必需的养分。

苗木规格严格按设计要求进场,栽植过程中留意保证本标段节点景观效果,做到节点四周苗木不短截,只疏剪,保证施工后尽快达到设计效果。

自然式片林在栽植过程中,没有成行成排栽植,体现自然、生态、田园风光,形式自然,高低错落。

重要节点大规格苗木由设计、监理看苗确认后进行栽植。

在材料进场之前,请设计、监理单位进行选样,并严格根据选定样品进场。

园林铺地部分:本标段铺地在道路、广场等硬质景观除设计认样外,做样板段,甲方、设计、监理现场确认后,进行全面施工。

竣工工程总结报告范文(3篇)

竣工工程总结报告范文(3篇)

第1篇一、工程概况1. 工程名称:XX科技园一期工程2. 工程地点:XX市XX区3. 工程规模:占地面积约100亩,总建筑面积约20万平方米4. 工程类别:高新技术产业园区5. 工程投资:总投资约10亿元人民币6. 建设单位:XX市XX区人民政府7. 设计单位:XX建筑设计研究院8. 施工单位:XX建筑工程集团有限公司9. 监理单位:XX建设监理有限公司二、工程前期工作及实施情况1. 项目立项及审批:XX科技园一期工程于XX年XX月立项,经过多次讨论和论证,于XX年XX月获得市、区政府批准。

2. 设计阶段:设计单位根据项目需求,完成了项目可行性研究报告、初步设计及施工图设计等阶段工作。

3. 施工准备阶段:施工单位按照设计图纸和相关规范要求,完成了施工组织设计、施工方案编制、人员配备、材料设备采购等工作。

4. 施工阶段:工程于XX年XX月正式开工,按照合同约定的时间节点,分阶段、分批次完成各项施工任务。

三、设计、施工、监理等单位情况1. 设计单位:XX建筑设计研究院,具有甲级设计资质,具备丰富的设计经验。

2. 施工单位:XX建筑工程集团有限公司,具有一级施工总承包资质,具有丰富的施工经验。

3. 监理单位:XX建设监理有限公司,具有甲级监理资质,具备较强的监理能力。

四、各单项工程的开工及完工日期1. 土建工程:XX年XX月开工,XX年XX月完工。

2. 安装工程:XX年XX月开工,XX年XX月完工。

3. 装修工程:XX年XX月开工,XX年XX月完工。

4. 道路及管网工程:XX年XX月开工,XX年XX月完工。

五、完成工作量及生产能力1. 完成工作量:土建工程完成15万平方米,安装工程完成2.5万平方米,装修工程完成2.5万平方米,道路及管网工程完成1.5万平方米。

2. 生产能力:一期工程共建设12栋厂房,2栋办公楼,1栋宿舍楼,可容纳企业约50家,预计年产值达5亿元人民币。

六、初验与试运行情况1. 初验时间:XX年XX月。

工程竣工工作总结

工程竣工工作总结

工程竣工工作总结(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。

文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如工作总结、工作计划、演讲致辞、策划方案、合同协议、规章制度、条据文书、诗词鉴赏、教学资料、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, our store provides various types of classic sample essays for everyone, such as work summaries, work plans, speeches, planning plans, contract agreements, rules and regulations, doctrinal documents, poetry appreciation, teaching materials, other sample essays, etc. If you want to learn about different sample formats and writing methods, please stay tuned!工程竣工工作总结工程竣工工作总结(通用17篇)工程竣工工作总结篇1______年______月______日内蒙古德克斯有限公司10kV输配电工程随着变压器”嗡”的一声,标志着这个项目送电成功,所有的付出得到了回报,作为此工程的工程负责人,我的心情是很激动的。

工程竣工总结报告模板6篇

工程竣工总结报告模板6篇

工程竣工总结报告模板1从5月18日至5月31日为期不到半个月的时间里,在园林局的正确领导和各个施工单位的大力配合下,御河西路两侧绿化带施工阶段后期现场整改工作已圆满结束,现简单总结如下:一、工程完成情况:在甲方代表和设计方的协同下,全线工程进展比较顺利,监理方对施工过程进行了全过程、全方位的监控,现场共计增加栽植苗木(如右表)。

二、病虫害防治情况:到目前为止,全线对苗木病虫害进行大力防治,特别是对油松小蠹虫的观察和防治。

油松小蠹虫只在太原开发标段发现存有一株,对其油松苗木进行了焚烧处理,并在全线进行了净虫剂药物喷施。

近期发现山杏、山桃、红瑞木等部分苗木有小介壳虫、蚜虫、瓢虫等虫害出现,要求各单位不同程度地喷施了氧化乐果、除虫净、敌敌畏、3911和氯氰菊酯等药物喷施,并对其树干进行了部分涂白,有的标段在苗木根部打了生根剂。

三、施工过程的监理控制:始终把质量和进度放在首位,对于施工队进行了全过程的监理,特别是有出现延期迹象的施工单位,采取现场口头指令、现场催促、巡视查看、发放整改单等监理措施,并采用召开现场施工协调会议和个别施工单位协调会的方式进行催促,同时注重安全文明施工。

四、今后还要加强注意的几点事宜:(1)对于近期新栽的苗木加大后期养护力度:注意采取遮阴措施,特别是景天、卫毛球等苗木提防日灼。

(2)对于苗木病虫害防治,继续认真观察并及时防治,建议各标段采取联合防治办法,并保持长期性。

(3)注意药物喷施结束后,要做有明显的提示标志。

(4)对于生长势弱的苗木,加强土壤的施肥并注意苗木修剪。

(5)对遗漏项目要求进行快速增补:现场还有许多空缺部分需要栽植或加密,如井盖周围、塌陷地段、花灌木浇水时的隔离土埂、人为践踏后留下的小路、路灯周围等部分地段。

(6)及时清理垃圾杂物,尤其是绿地范围之内的苗木枯枝枯叶等。

(7)加强工程成品保护,要求各标段成立专门的看护人员。

工程竣工总结报告模板2xx国家粮食储备库新建5万吨仓库项目在相关部门的支持、配合和关心下,通过设计、监理、施工和建设单位各方人员的共同努力下,经过半年多紧张的施工建设,已按设计要求全部完成建设任务,并通过验收。

施工单位工程竣工总结报告五篇

施工单位工程竣工总结报告五篇

施工单位工程竣工总结报告五篇工程竣工总结1工程名称:九如溪谷1.3期26#楼建设单位:沈阳zz棕榈园房地产开发有限公司辽宁省建设厅_________ 制建设单位:沈阳zz棕榈园房地产开发有限公司项目法人:__________________(公章)_________年_________ 月_________ 日结论意见该工程已完成合同所约定的土建、水暖、电气、通讯、有线、消防等工程的全部内容,而且各分部分项工程均满足设计要求,符合规范要求。

其工程质量达到合格标准,与工程有关的技术档案资料齐全,工程达到了竣工验收标准。

参建各方能按《条例》的要求履行自己的职责,工程竣工验收程序符合要求。

一、基本情况工程名称九如溪谷1.3期工程地址沈北新区蒲河新城人和街施工单位葫芦岛东北金城建设有限公司监理单位辽宁经纬工程招标投标有限公司勘察单位东煤沈阳岩土工程公司设计单位辽宁省建筑设计研究院建设单位沈阳zz棕榈园房地产开发有限公司联系电话8888建筑面积409.9(m2)地上总高7.812m结构形式砖混层数地上 2 层地下层合同约定等级质评等级合格建筑物安全等级二级抗震设防烈度7度预算造价25.82(万元)竣工期支付工程款额度85(%)报建日期合同工期实际开竣工日期工程简要内容和合同约定完成情况:本工程由葫芦岛东北金城建设有限公司承建,建筑面积409.9m2,砖混结构,基础为;地上2层,给水工程采用塑料管,排水工程塑料管;采暖工程采用塑料管、地热;暖气片型号为国标TZY3-5-6型。

电气照明、通讯、有线工程为PVC暗配管,管内穿线,进户门为白钢电子对讲门,窗为塑钢窗,外墙面采用文化石、外墙瓷砖、外墙涂料。

防水层采用SBS卷材,本工程已按合同约定内容全部完成,符合施工验收规范要求。

二、建设单位执行基建程序情况建设单位已按照规定的基本建设程序认真执行具体承办程序事项,基本建设文件,手续齐全。

开工前办理了工程用地批件,计划任务书批件,工程规划许可证,环保批件,勘察设计、监理、施工招标合同,设计文件审查,委托质量监督以及办理施工许可证,竣工后,组织各单位对工程进行总体验收,严格遵守基建程序。

工程完工总结报告范文(3篇)

工程完工总结报告范文(3篇)

第1篇一、工程概况1. 工程名称:XX工程项目2. 工程地点:XX省XX市XX区3. 工程类型:住宅及配套设施工程4. 工程规模:占地面积XX亩,总建筑面积XX万平方米5. 工程总投资:XX亿元人民币6. 施工单位:XX建筑集团有限公司7. 设计单位:XX建筑设计研究院8. 监理单位:XX建设工程监理有限公司二、工程进展情况1. 工程前期准备在工程开工前,施工单位、设计单位、监理单位及相关部门对工程进行了充分的前期准备工作。

包括:编制施工组织设计、施工方案、质量保证体系、安全生产责任制等。

2. 工程施工阶段(1)基础工程:基础工程于XX年XX月XX日开始施工,XX年XX月XX日完成。

基础工程严格按照设计要求,采用混凝土浇筑,确保了基础工程的稳定性和安全性。

(2)主体结构工程:主体结构工程于XX年XX月XX日开始施工,XX年XX月XX日完成。

主体结构工程采用框架剪力墙结构,施工过程中严格按照设计要求,确保了结构的整体性和抗震性能。

(3)装饰装修工程:装饰装修工程于XX年XX月XX日开始施工,XX年XX月XX日完成。

装饰装修工程包括室内外墙面、地面、门窗、水电等配套设施,施工过程中严格把控质量,确保了工程的美观和实用性。

(4)配套设施工程:配套设施工程包括绿化、道路、给排水、供电、供气等,于XX年XX月XX日开始施工,XX年XX月XX日完成。

配套设施工程按照设计要求,确保了工程的功能性和实用性。

3. 工程验收阶段(1)分部工程验收:在工程各个阶段,施工单位、设计单位、监理单位及相关部门对分部工程进行了验收,确保了工程的质量和进度。

(2)单位工程验收:XX年XX月XX日,工程完成了单位工程验收,验收合格。

(3)竣工验收:XX年XX月XX日,工程完成了竣工验收,验收合格。

三、工程质量及安全管理1. 工程质量(1)严格按照国家及行业标准进行施工,确保了工程质量。

(2)施工过程中,对原材料、半成品、成品进行严格检验,确保了工程的质量。

工程项目竣工验收总结报告7篇

工程项目竣工验收总结报告7篇

工程项目竣工验收总结报告7篇(实用版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。

文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的实用范文,如学习资料、英语资料、学生作文、教学资源、求职资料、创业资料、工作范文、条据文书、合同协议、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!In addition, this shop provides various types of practical sample essays, such as learning materials, English materials, student essays, teaching resources, job search materials, entrepreneurial materials, work examples, documents, contracts, agreements, other essays, etc. Please pay attention to the different formats and writing methods of the model essay!工程项目竣工验收总结报告7篇工程项目竣工验收总结报告(7篇)竣工验收报告是工程项目竣工有关部门进行质量评估验收以后形成的书面报告,大家是否接触过该类报告呢?下面是本店铺为大家整理的关于工程项目竣工验收总结报告,欢迎大家来阅读。

工程竣工总结范文(必备10篇)

工程竣工总结范文(必备10篇)

工程竣工总结范文1一、工程概况本工程为xx化工有限公司20万吨/年苯加氢项目。

我方承建xx二十万吨苯加氢工程的a 标段的土建、机电设备安装、电仪安装调试、一二类压力容器安装、部分非标设备制作安装及配套的电气、照明、给排水、工艺管道等所属设备设施安装,负责管道设备的强度试验、气密性试验。

并配合自动化系统的安装、调试、管道设备的清洗1、土建:综合楼建筑面积1885m2建筑层数三层,总高度米,本工程基础形式为独立基础,主体结构为矩形框架填充墙结构。

工艺主装置占地面积,包括压缩机房、蒸发框架、e-3/e轴框架、1-17轴管廊、2-3轴框架、6-8轴框架、12-14轴框架、塔基础、压缩机基础、地坑及其他设备基础等。

装置±标高相当于绝对标高,基础底标高~,自然地面标高。

轴框架基础形式为独立基础,主体为钢结构分别为1 -~3层不等,主体高度~18m不等。

甲醇裂解制氢装置建筑面积为,基础形式为独立基础,主体结构为混凝土框架,高度,框架内外分部设备基础。

共完成土石方6000余方,钢筋330余吨,商品混凝土2500余方,钢结构制作安装700余吨。

2、设备:本装置设备主要由静设备和动设备组成,其中静设备包括7台塔器,5台反应器,46台容器,37台换热器;动设备由50台泵,4台压缩机组成。

3、工艺管道:甲醇裂解制氢装置工艺管线共计84条,总公里数约为公里,共有17多种介质,设计压力范围~,温度范围60℃-~320℃。

工艺主装置工艺管道完成1500余条管线,总公里数约为40公里,共有35多种介质,设计压力范围~。

4、电气:本工程电气主要包括高、低压配电系统、动力配电系统、照明系统、防雷接地系统。

完成接地铜包钢XX余米,电缆敷设10万余米,电缆桥架500余米。

5、仪表:本工程仪表采用emerson公司的delta-vdcs控制系统,重要参数集中在控制室进行监控操作,安全连锁部分在tricon的sis系统上实现。

现场主要完成仪表917套,仪表柜13只、操作台12只、仪表防尘接线箱70只、光缆万余米、仪表接地线2300余米、电缆桥架直线段500余米。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

工作总结工程竣工总结部门:XX公司XXXX部时间:2018年11月30日XX县XX3000吨技改选矿厂二期项目工程工程竣工报告工程名称:XX县XX3000吨技改选矿厂二期项目工程监理单位:XXXX电力监理工程有限公司监理单位法人:总工程师:项目总监:工程竣工总结一、工程概况:根据施工合同,工程质量要求为合格工程。

实际建筑总面积为8370.61㎡,本工程场地地貌单一,基础持力层是第二层粉质粘土,地基承载力特征值为170kpa,钼磨车间(783.59㎡)是采用第4层中风化花岗岩作为持力层,地基承载力特征值为1200kPa, 总高度21.2 M。

浮选车间(2553.78㎡其中包括:其中地下室:846.30㎡)是第三层粉质粘土,地基承载力特征值为450kpa,地上总高度15.05 M.地下高3.9M。

药剂车间(653.88㎡)基础持力层是第二层风化花岗岩粉质粘土,地基承载力特征值为200kPa,总高度10.08M,新增职工住宅楼建筑面积4186.54㎡,地上五层,建筑基底面积:992.53㎡,总高度19.2 M,抗震设防烈度为6度,耐火等级均为二级。

10kv配电房192.82㎡,总高度4.8 M,场地内均无可液化地层,属建筑抗震地段。

二.严把预控关:本工程是(2011年5月21日开工到7月16日拿到部分主体车间的蓝纸)属于边设计、边施工、边整改的“三边工程”土建施工设计与工艺设计相互间难免有“碰撞”之处,给工程施工和进度均有一定的影响。

工程质量控制是监理工作的一项重要内容。

我们始终以施工及验收规范,质量验收及评审标准为依据,督促承建单位实现合同约定的质量目标。

为确保工程质量,监理人员确立了以预控为主、跟踪监控、监帮结合的方法对工程质量进行控制。

熟悉图纸、技术规范、工程进度、验收标准等,严格审核施工组织方案,特别是质量保证体系,安全保障措施及人、材、机的配置是否满足工程施工的需求,并在施工过程中督促施工组织方案的实施,在符合要求后才允许进入下一工序的施工,在日常监督中,坚持以地基基础、主体结构和影响使用安全及使用功能的关键部位做为监督工作的重点。

例如;在黄晓设计方案的基础上对浮选车间地下室剪力墙、药剂车间柱基础,提出自己的建议,根据实地情况应加大和加密钢筋直径。

施工中有问题及时通知施工单位联系设计方及时解决。

地基与基础工程具有隐蔽性,所以平时经常在工地现场旁站,观查施工现场,对不规范施工人员的操作及时纠正,例如:在地基的初始阶段时,施工方对混凝土凿毛一点概念都没有,就不知道啥叫凿毛。

在实际工作中,我们手把手的教并凿出样品照此做……。

从不知道到有些概念、从有概念啦到凿出的有些像样了、又再这一基础之上再提高要求,使之逐步达到凿毛的标准,提高了工程质量。

在建筑施工需做防水时、积极主动地提出浮选车间地下室D轴的迎水墙最好做防水处理,以防内墙长期受潮影响墙面质量。

在抓好对工程实体质量监督检查的同时,监理还逐步加强对过程中的施工及验收等重要环节,上道工序未检查,下道工序就不能施工。

使用常检查,常劝导,常蹲守,旁站监理及平行检查等多种手段的办法。

在冬季施工时主要是保温。

每天随时了解天气情况,每次浇筑时都抢在雨雪、低温之前浇注,为防止低温的影响,浇注完成后要求施方用棉毡布严密覆盖,注意保温,阻隔外界对混凝土的影响,有效消减了混凝土的收缩应力。

使之在主体工程中的质量得到了一定的提高,并取得一定效果。

三.实施过程监督及检测制度严格检测、试验制度,原材料如水泥、钢筋、及配件、红砖、砂、石等经检测其质量均达到合格要求,结构性能检测砼试件试压、试验结果均满足设计及验收规范的要求。

对于进场的原材料,半成品等,发现有较严重的石子不合格情况时,及时建议业主清除施工场地,虽是业主自己供货,可是为了再现有的条件下尽量提高质量,仍与业主协商,根据当地的实际情况,妥善解决。

除对照标准和设计要求核查相关技术资料外,还对材料进场时进行外观检查,经常督促施工方按规定取样复试。

实行了严格的材料、设备、配件的报验制度,要求施工单位填写《报验单》报监理部审核,不符合要求或不合格的产品坚决不允许使用。

工程初始阶段,监理和施工方与甲方确定了即进场主体材料必须100%见证取样,检测合格的材料才允许使用于工程实体及主体结构等部位、减少了人为判断失误,有效控制了质量通病。

对有不符合要求的缺陷,首先能耐心说服有关人员进行改进,使对方在认识上打成一致:以理服人。

平时对隐蔽部分加强了检查,从点及面的细致验收,有效地保证了工程质量,以达到一次检查合格,确保工程顺利进行。

项目建设监理过程中,监理工程师提出了一系列的合理化建议,比如:在制作皮带廊时,甲方代表与监理达成共识以降低成本为主和根据场地实际情况与设计方协商,提出自己的看法。

既为建设单位节省投资,又体现了监理的服务宗旨,为建设监理事业树立了良好的形象。

四、安全文明施工控制:上工地必须戴安全帽;是文明施工的先驱,是体现一个单位安全重视与否的一面镜子,是体现个人素质高低的标尺。

在钼磨车间钢构件安装和行车吊装时有三个施工单位同时作业,面积小、空间少,交叉作业现象十分严重,对个别不戴安全帽的施工人员全部清除工地。

做好工地安全管理是一件非常繁重、细致、耐心的工作。

施工单位在各项施工方案中必须有安全文明措施,作为监理安全管理,重点检查,包括对临时电源的使用,以及在施工中的安全问题,极为重视。

工地上的电缆、配电箱等都不符合施工要求,在与甲方领导协商后,根据本厂实际情况及时进行了整改。

随时在现场发现隐患随时与甲方、施工方协商解决,始终把安全隐患消灭在萌芽状态,确保施工正常进行,同时对施工方的资质证书、安全生产许可证及特触人员操作证进行了审核。

做到严格控制,道道把关。

项目施工期间,做到事前控制,实现了安全生产和文明施工,至竣工没有发生施工安全事故。

五、监理工作体会认真负责热忱服务,监理工作应充分体现其为项目建设提供综合性服务,除"三大控制"目标外,合同管理、工程信息管理、组织协调缺一不可。

监理目标的设置、实施、对比、纠正应贯彻在全过程中,本项目的建设,由于监理人员根据实际工程情况编制了监理规划,设置了质量预控点、安全预控点目标明确、工作积极主动,监理认真负责的工作,赢得了各方的积极支持、配合,使项目建设顺利完成。

六.完成合同约定内容在整个施工过程中我公司认真履行了合同中签订的各项条款,严格执行国家的法律、法规,严格按照施工图纸设计变更组织施工。

七.信息及文档管理在整个项目建设的过程中,产生多种文件或文档,主要包括:(1)合同文件;(2)设计方案、实施方案;(3)产品文档;(4)过程中产生的各类文档;(5)监理方产出的月报、会议纪要、监理通知、监理建议等。

信息及文档管理贯穿整个工程实施的各个阶段。

监理方对合同、设计方案等工程依据性文档及时归档并便查;对各方产出的过程文档进行接收、审查并转发给相关各方,保证了各方的沟通和信息共享;验收时要求整理提交最终的产品性文档;及时编制月报、会议纪要等监理文档,提交用户并进行归档。

总之,监理平时注意各类信息的收集、整理、归档并及时提交用户。

保证信息的完整性,确保了项目建设各项活动的可追溯性。

八.工程质量的评价:本项目宿舍楼主体框架工程到2012年10月14日已全部完成。

各单位工程的分项、分部工程都是按照设计和甲方要求施工,外观查看符合图纸要求,并达到施工及业主的验收标注。

手续基本齐备,数据确实,工程的总体质量合格,总工期基本符合建设单位要求。

让建设单位放心,树立了监理单位的形象,为双方今后的进一步合作打下了坚实的基础。

XXXX电力监理工程有限公司2012.11. 5XX县XX3000吨技改选矿厂二期项目工程质量评价意见报告工程名称:XX县XX3000吨技改选矿厂二期项目工程监理单位:XXXX电力监理工程有限公司监理单位法人:总工程师:项目总监:质量评价意见报告本报告系对XX县XX3000吨技改选矿厂二期项目工程施工质量的评价意见。

受XXXX中天工贸有限公司的委托,XXXX电力监理有限公司项目监理部依据监理委托合同,对该工程项目进行了全方位、全过程的施工监理,本着为业主服务、为社会负责的精神,监理工程师按监理规范已完成施工过程中的巡查、旁站监督、建筑材料及建筑构配件见证取样送检、跟踪施工记录及资料审核等程序化的监理工作。

本工程所有砂浆试块强度、砼试块强度、钢筋力学性能、检测由施工单位委托“XX县贤达建材质量有限公司”进行检测。

该工程现已施工完毕,在施工单位自检合格的基础上,我项目监理部结合日常掌握的情况对其施工质量作出评价。

一、工程概况:根据施工合同,工程质量要求为合格工程。

实际建筑总面积为8370.61㎡,本工程场地地貌单一,基础持力层是第二层粉质粘土,地基承载力特征值为170kpa,钼磨车间(783.59㎡)是采用第4层中风化花岗岩作为持力层,地基承载力特征值为1200kPa, 总高度21.2 M。

浮选车间(2553.78㎡其中包括:其中地下室:846.30㎡)是第三层粉质粘土,地基承载力特征值为450kpa,地上总高度15.05 M.地下高3.9M。

药剂车间(653.88㎡)基础持力层是第二层风化花岗岩粉质粘土,地基承载力特征值为200kPa,总高度10.08M,新增职工住宅楼建筑面积4186.54㎡,地上五层,建筑基底面积:992.53㎡,总高度19.2 M,抗震设防烈度为6度,耐火等级均为二级。

10kv配电房192.82㎡,总高度4.8 M,场地内均无可液化地层,属建筑抗震地段。

1、工程名称:XX县XX3000吨技改选矿厂二期项目工程2、工程参加单位:建设单位:监理单位:设计单位:勘察单位:施工单位:3、工程规模:总建筑面积:8370.61 ㎡4、工程地点:XX县XX中天工贸有限公司厂区内5、设计主要要求:本工程厂房为钢筋混凝土排架结构,所有墙体均采用240厚非粘土材料烧结砌体。

基础垫层C15级,构造柱、地圈梁C25级,基础排架柱、拉梁为C30级,耐火等级为二级。

职工宿舍楼共为五层框架结构;基础采用独立混凝土人工成孔灌注桩基础承台。

主要材料及技术指标::⑴、±0.00 以下承台、柱、梁、混凝土,强度等级为C30级;±0.00 以上框架、柱、梁、板、混凝土强度均为C30级,建筑层数为地上;钢筋级别φ 为HPB235 级,fy=210N/mm2,,为HPB335 级,fy=300N/mm2,fy=360N/mm2,为HRB400,宿舍楼框架楼主体一层以下为C30级,二层以上框架、柱、梁、板、楼梯均为C25级⑵、装饰装修工程:内墙为一般抹灰,外墙装饰为涂料和面砖。

⑶、建筑给排水:本工程给水系统由本厂自供水。