TheStandard for Checking of a wall drainage Installation

同层排水安装得验收标准

Content:

目录:

1.Generalideas about checking an installation

验收安装得基本概念

2.Necessary documents

必要文档

3.Checking ofthe layout of the pipes

验收管道得走向

4.Checkingofthe HDPE connections

验收HDPE管道得连接

5.Checking ofthe duofix installation and the pre wall

验收杜菲斯水箱得安装以及假墙

6.checking of wall hungfacilities

检查壁挂式卫生洁具得安装

7.Checking report and conclusions

验收报告与小结

8.List of related literature

相关文献清单

1.General ideas about checking:

关于验收得基本概念

There are several phasesof checking in the process of a Wall drainage project、There is the check of the calculation, thetraining on site with standard training schedule, theonsitechecking during installationand the final checking、 After every on site checkingtheremust be made areport(checkingreportform)、This report must be sent to all the relatedpartners tothis project、 It is theregional manager’stask tochoose therelevant parties、This isdifferent for several seizes of projects、

All the materialmust be from Geberit, only if the technical consultant together with theregional manager decides otherwise、

同层排水项目进程当中有几个验收阶段、分为设计计算得确认,按照培训进度表在现场进行培训,现场安装检查与最终检查,在每一次现场检查之后必须写一份报告(验收报告格式)、此报告必须发给所有项目相关人员、项目相关人员有吉博力公司区域经理选择、这就是由由一些项目得不同所决定得、

Allthematerial must befrom Geberit, only if the technicalconsultant together with theregional manager decidesotherwise、

所有材料都必须由吉博力提供,只有吉博力公司技术顾问与区域经理才能决定其它特殊情况、

Thefinal check should alwaysbetogether with thetechnical cons ultant acpanied byour application engineers and the distributor/installa tion pany、

最终检查应该就是由吉博力公司技术顾问由应用工程师与经销商以及安装单位陪同进行、2.Necessary documents forchecking

必要文档得验收

⏹Installation drawingﻩﻩ(1,2,3)

安装图纸

⏹Checking report formﻩﻩ(2,3)

验收报告

⏹Materiallistﻩﻩ(1,2,3)

材料清单

⏹Order list from thedistributorﻩﻩ(1,2,3)

经销商得订单清单

⏹Training scheduleﻩ(1)

培训进度表ﻩﻩ

⏹Copies of installation manual in Chineseﻩ(1)

中文安装手册得复印件

⏹All former reports for the project ﻩ(3)

所有项目相关得报告ﻩ

For training needdocument markedwith 1

培训时需要得文档标注1

For on site checking need documents marked with 2

现场验收检查时需要得文档标注2

Forthe final checkto require the guarantee documents need mar ked with 3

要求质保书得最终检查需要得文档标注3

3.Checking of the layout of the pipes

验收管道得走向

The checking is done by visual check、 We measurethat all the diameters and the dimensions of the installationare the same ason the installation drawings、 All thehorizontal changes of directionmust be done by 2 x45° bends、 The change from horizontalto vertical pipes must be done under 88,5°、 The changefrom vertical pipes to horizontal must bedoneunder45°、

For a drainage installation the slope is important, all the pipes must have slope(at least0、5%towards EN 12056)、 0%slope or negative slope cannot beaccepted、

此验收通过目测进行,所有管道得管径必须与施工图纸上得相同,所有水平方向得变向都必须采用2x 45°弯头连接,从水平管到立管得变向角度必须小于88,5°;从立管到水平管得变向角度必须小于88,5°,对于排水安装坡度就是很重要得,所有横管都必须有坡度(按EN 12056标准至少0、5%)、,无坡度或倒坡就是不被接受得.

4.Checking of the HDPEconnections

验收HDPE管道得连接