模具检查表(Toolmaker Checklist for shipment)

合集下载
  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

NA
Signoff by Toolmaker 模具厂签认
Check by 检查者: Supervisor 主管:
[ SWI ToolTrax _ Toolmaker Check List _ Rev:01 ]
Date: Date:
Page: 2/2
YES NO
Mold Base steel as specified 模胚钢材符合要求 Parting line interlocks installed, number of interlock = 分型面定位件, 数量 Is there adequate clamp slot area 锁模坑 eyebolt holes per tool prints 吊模孔 Pry bar slots on parting lines and moving plates 橇模槽 Parting line safety straps are installed 锁模板 Cycle Counter 计数器 All screw and dowel holes per tool prints 镙钉及定位销 Mold base stamped with all critical information 模胚打上模具重要资料 All Corners on moldbase are chamfered 模胚周边加倒角 All sharp corners/burrs outside the molding area on moldbase and components has been removed to prevent injury 清理锋口 K.O. paterns is per customer machine spec 顶杆孔位置 Flush Mounting and Thread Size = UNC3/8" 顶出平柱装置, 螺纹尺寸 Locating Ring Diameter = 101.3 定位环直径 Sprue Radius = R0.6 浇口半径 Guided ejection system 导向顶出系统 Spring loaded ejection 弹簧复位 Ejector system operate freely 顶出系统可自由滑动 Ejector pins on contoured surface are keyed 轮廓面顶针管位 All ejector pins are numbered or lettered for location 顶针位置编号 Early Return are installed 提早回顶针板 Water leakage check 检查漏水 All water lines "INs" and "OUTs" properly identified 运水编号 Water Fittings are installed , type and model = NPT1/4" / JPB-2524, JPB-3524 水嘴安装, 标准/型号
[ SWI ToolTrax _ Toolmaker Check List _ Rev:01 ]
NA
Page: 1/2
YES NO
Core and cavity steel as specified 型腔,型芯钢材 Core hardness: 48-52 HRC Cavity hardness: 48-52 HRC 型芯硬度: 型腔硬度: All core and cavity components engraved with mat'l & Rc 型腔,型芯及镶件上钢材及硬度的雕刻 Cavity numbers engraving 型腔编号之雕刻 P/N, resin type, recycle logo engraving 产品编号, 塑料,再循环标志之雕刻 "Date Clock" insert 日期代码 Are surface finishes as specified 光洁度要求 EDM finish is removed 火花表面清除 Texture, Grade = MoldTech #11010 皮纹 Venting is done per tool prints 排气 Is plating as specified and type: ___________ 电镀 All slides are positively retained, stopped and locked 滑块安装妥善 Slide wearplate with grease grooves installed 耐磨板及油沟 Slides move freely 滑块可自由滑动 Horn pins and wedge blocks hit correctly 斜导柱和锲块准确配合 Interlocks, leader pins and bushing mate perfectly 推拔锁套,导柱导套装配 All steel shut-off hit correctly 检查碰穿位 Parting lines shut-off properly 检查模具产品分型面 Support Pillars are installed with preload. (Record Preload = _________) 支撑柱预加负荷 Gate and runner are polished 浇口和流道打光 Gate and runner size are checked and per design 检查浇口和流道的尺寸 Sucker/puller pins and cold slug properly used and sized 拉料杆和冷料井符合设计要求 Manifold is installed, type = _______________ 热流道,类型 Hot runner systems and hot sprues have been brought up to heat to verify the wiring is correct and undamaged 热流道/热嘴加热及检查 Insulator plate is installed 隔热板 Electrical box(for Hot Sprue/Manifold) is installed 接线盒 Note 备注:
Toolmaker Check List
Βιβλιοθήκη Baidu
模具检查表
Customer 客戶名稱: Part Name 产品名稱: Part No. 产品编号: Customer's Mold No.客戶模具编号 : Supplier 模具厂名称: Supplier's Tool No. 模厂模具编号: Type of Mold模具类型: No. of Cavity几个型腔:
相关文档
最新文档