供应商质量控制计划审核表
供应商质量审核检查表

16 Do the personnel responsible for quality have the authority to stop
production to correct quality problems? 对横跨所有班次的组织生产作业是否指定了负责确保产品品质的人员?
17 Do the production operations across all shifts have been staffed with personnel in charge of,or delegated responsibility for,ensuring product
quality? 5.2.2管理者代表Management representative
management system?
组织是否编制文件化的程序,以规定以下方面所需的控制:
Does the organization establish documental procedure to prescribe the
following?
a)文件发布前得到适宜的批准?
To approve the documents for adequacy prior to issue?
identified?
5 d)确保在使用的处所可获得适用文件的有关版本? To ensure that relevant versions of applicable documents are available at
points of use?
e)确保文件保持清晰、易于识别?
To ensure that documents remain legible and readily identifiable?
供应商质量审核检查表

Chec供给商名称 /supplier name产品型号/part no.1、平面部署图和过程流程图/Plant Layout and Process Flow Diagram NO.文件要求/document questions可否有最新版平面部署图?is there a dated copy of the current floor plan readily available?平面部署图上可否有全部装置、生产和检测岗位、原资料、半成品、成品的地域划分?does the floor plan identify the following :all required assembly, process and inspection stations? locations for all raw material, work in process(WIP) and finished product?流程图是否是最新版本的并注明有日期?are process flowcharts dated and current?操作要求/implementation/process questions 生产过程中,资料和产品流动可否与过程流程图一致?does the actual material and production flow follow the process flowchart?2、设计和过程 FMEA/design and process FMEA审察日期 /audit date议论记录 /comments evaluateNO.文件要求/document questions议论记录 /comments DFMEA 〔含有设计职责〕/DFMEA(if supplier is design responsible)2.1 DFMEA 的部件编号、校正版本、原始日期和判定日期可否正确?evaluateChec供给商名称 /supplier name产品型号/part no.审察日期/audit date does the DFMEA have the correct Part#, Revision Level, Orig. Date and Rev. Date?2.2 DFMEA 可否包括了顾客的全部性能要求、外观标准、特别特点和安全要求?does the DFMEA include all functional specifications, appearance specifications, SCsand Safety Requirements as defined by customer drawings?可否对每个无效模式的RPN都进行了计算,并对RPN值高的采用了建议措施?are there RPN calculations for each failure mode and recommended actions for high RPNs ?PFMEAPFMEA 可否按图纸的规定包括了全部顾客和内部要求的特别特点和安全要求?does the PFMEA include all customer and interal Scs and Safety Requirements as defined bycustomer drawings and interal requirements?可否对每个无效模式的RPN都进行了计算,并对RPN值高的采用了建议措施?are there RPN calculations for each failure mode and recommended actions for high RPNs ?PFMEA 可否与流程图一致?Does the PFMEA follow the process flow?3、控制方案 /Control PlanNO.文件要求 /document questions议论记录 /comments evaluate控制方案可否有正确的产品编号、校正号、原始日期和校正日期?Does the Control Plan have the correct Part #, Revision Level, Orig. Date and Rev. Date?Chec供给商名称 /supplier name产品型号/part no.审察日期 /audit date 控制方案是不可否与流程图一致?Does the control plan follow the process flowchart?控制方案内可否包括了:进料检验、过程检验和控制、出厂检验以及返工/返修要求?Does the Control Plan include the following: Incoming Inspection, In-process Inspection& Controls, Final inspection and rework/repair Requirements?控制方案可否按顾客图纸的要求包括了全部顾客的特别特点和产品安全要求?Does the Control Plan include all the customer SCs and Safety Requirements as definedby customer drawings?3.5 PFMEA 中视其余潜藏无效模式可否经过控制方案进行获取控制?Are appropriate potential failure modes, as identified in the PFMEA, addressed throughthe control plan?控制方案中可否包括了检验和试验的要求?〔包括数量、频次、以及标准要求〕Does Control Plan include both gage and test requirements?(including quantity, frequency, and required specifications?)操作要求 /implementation/process questions全部控制方案中要求的控制〔包括SPC〕可否在生产过程中获取推行?Are all controls (including SPC), identified on the Control Plan, being used in theproduction process?全部控制可否获取按期考据以保证到达预期的结果?Chec供给商名称 /supplier name产品型号/part no.审察日期/audit date Are all controls verified on a periodic basis to ensure desired results?4、检验和试验 /Inspection and TestingNO.文件要求 /document questions议论记录 /comments evaluate接受准那么不是零弊端的计数数据,供方可否将接受准那么形成文件并由顾客赞同?for attribute data with acceptance criteria other than zero defects, does the supplier document acceptance criteria and have customer approval?可否只有被检查和考据过的产品才能够被投入生产?how does the supplier assure that incoming product has been inspected or otherwise verified to meet requirements, prior to release for production?没有考据而用于生产的的原资料可否被明确表记并作好记录?is positive identification provided and recorded for material used in production but not verified?检验指导书中可否包括抽样方案、检验频次以及检测内容和标准要求〔包括进料、过程、最后〕does the inspection instructions include samling quantity, frequency, inspection itemsand required specifications(incoming\process\out-going).来料接受方案必定包括以下一种或多种方法:1、进行统计数据接收与议论;2、进货检验和/或试验〔依照性能的抽样〕;3、当有可接收质量性能的记录时,由第二方或第三方评审或审察。
IATF16949质量管理体系供应商审核表

有,环保协议
3.是否实施供应商及外包商之绩效考核.
是、供应商评核记录
4.来料是否有建立相应的检验规定和标准.
是、《来料检验规范》
5.来料是否有实施批核的规定和记录.
来料检验报告
6.来料是否通过检验合格才会被放行.供应商来料异常如何处 理.
是、供应商异常联络8D报告
处理
8
供应商管 7.财务稳定性(例如主要客户源). 理过程
4.是否有维护保养实施的记录.
《设备维修保养记录》
1.是否有管理客户对产品的相关要求(如标准、特殊特性、交 期要求以及客户的特殊要求等)
《客户特殊要求识别表》
2.在产品量产前是否已与客户确认产品的批核与标准的批核. 《客户承认书》
3.客户的订单和合同是否有进行评审来满足需求.
有、《订单评审表》
4.对于合同或订单达不到要求时,是否有与客户进行沟通.
CPK大于1.67
13.工程变更的管控过程.
有工程变更流程
14.业务连续性规划(如防灾准备、应急计划).
有《应急计划程序》
1.各作业岗位是否有作业指示(WI).
有,《押出机操作规范》、工艺卡、 等
5.是否经由第三方审核通过IATF16949认证.
上海NQA认证公司审核通过
6.各部门分工、负责人和职责是否明确,分工表、架构图. 在SENKIN-QM-01《质量手册中》明确
1.文件资料是否有明确的制定、审核、批准、发放、变更的 管理制度.
在SENKIN-QP-01《文件控制程序》明确
2
文件控制 2.是否定期或及时评审文件的适宜性和有效性 过程 3.工作现场所使用的文件是否为合法有效文件
《可靠性验证报告》
5.变更是否有明确的评审、验证和确认流程与记录.
供应商审核计划及评分表(模板)

供应商审核计划编制:
审核:
批准:
年月
供应商审核计划
1、通过此次审核,证实供应商在质量管理体系的运行是否符合我公司的要求;
2、针对此次审核中暴露出来的供应商在体系、过程和产品存在的缺陷和问题,要求其制定有效的纠正预防措施并予以执行,提高供应商的质量管理体系运行有效性和效率,为产品质量的稳定和提升提供有力的质量管理体系保证。
江苏双菊汽车配件有限公司供方现场审核标准及其评分法则。
(见附件1)
审核组长:
审核组成员:
审核时间: 年月日
首次会议,审核开始
末次会议,审核结束
六、审核记录和报告
审核组成员在审核过程中应做好记录,审核完毕作出审核结论并形成报告.
七、附加说明
1,本计划由江苏双菊汽车配件有限公司质量部负责编制.
2,本计划如有变动,将通过适当方式通知受审核方和审核组成员.
附件1,
供应商现场审核评价评分表
评审人员签字:
签名:。
完整版供应商质量审核检查评分表(供应商审核表)

3
1.14
是否有记录控制程序,以规定记录的标识、贮存、保护、检索、保存期限和处置所需的控制?必要时供应商要能提供有关的质量记录。
1.有记录管理作业程序. 2.记录填写,审核,分类整理标识,保存记录,保存期限,销毁等.
3
3
1.15
是否具有并可随时得到识别文件修订状态的控制清单(或等效文件)?是否对保留的作废文件进行标识和管理,以防止非预期误用?
有在公司体系文件中明确显示有效文书中心盖“ 章”骗号/日期,版次,纸张等
3
3
1.21
是否有定期的培训计划以持续提升人员素质?培训记录是否得到保存?培训效果是否得到验证?
有制定培训计划,受訓申請.審核,讲师确认,上课现场管理,考 核 ,培训记得整理存档等
3
3
1.22
上岗培训要求是明确?人员上岗前资格是
有更改作業程序/实施細则管理流程图.
3
3
1.18
若指定其他部门审批文件时,该部门是否获得了审批文件所需依据的有关背景资料?
依照公司定议程序标准文件审批
3
3Hale Waihona Puke 1.19所有的文件更改是否都在文件或相应的
附件上注明?
有定议, 由需求者向文书中心申請后再加盖“版次更改” 章.
3
3
1.20
是否在质量体系有效运行重要作用的各个场所,都能得到相应文件的有效版本?
3
2
2.2
有无有害物质管理体系文件和组织架构,
该标准是否能够满足领胜的要求?
1有害物料管理委员组织架构. 2. 送样确认: 样品及规格书必须注明符合“RoHS和SONY”环保要求,并有第三方机构(如SGS )的检测报告;测试报告有效期为1年,如过期测试报告需提前1个月更新。
供应商审核检查表-质量

供方名称:评估产品:企业地址:评估人员:主要产品:评估日期:评估项目总分评估内容一、配套情况(总分:5分)51、当前主机厂配套情况(5分)(3分)(1分)52、体系证书(5分)(4分)(3分)(2分)(2分)63、质量管理体系运行(1分)(2分)(2分)(1分)64、质量目标管理(1分)(1分)(2分)(2分)56、员工技能及培训(1分)(1分)(1分)(1分)(1分)47、项目管理(1分)(1分)(1分)(1分)58、变更管理(1分)(1分)(1分)(1分)(1分)二、质量管理体系(总分:29分)三、开发及流程管理(总分:14分)1、是否有完整的项目开发管理流程2、是否按开发管理流程实施3、相关项目管理的实施记录4、开发文件满足顾客节点要求,项目开发问题在量产前100%关闭1、建立变更管理流程2、在实施变更前,对变更效果进行了充分的验证3、对相关联的作业要求和文件进行了同步更新4、对变更前后的产品批次进行了有效断点5、4M管理看板为最新状态1、合资或外资主机厂配套2、普通主机厂配套3、汽车行业配套零部件供应商1、有IATF16949质量体系认证证书、ISO14000认证证书、ISO18001认证证书2、有IATF16949质量体系认证证书、ISO14000认证证书3、有IATF16949质量体系认证证书4、有ISO9001质量体系认证证书5、有质量体系文件,有认证计划6、3C证书(专用3C件:必须有3C证书,如没有,本大项0分)1、内审人员经体系认证培训,并获得内审员证书2、有产品、过程、体系、管理评审审核计划,并实施输出报告3、对于审核输出项持续改善的4、1~4级质量管理体系文件清单齐全1、有质量方针和目标并且按过程分解2、定期对分解目标进行监控的3、并对未达标项目进行分析整改及有效测量最终效果4、质量方针和质量目标被员工100%所理解1、内外部年度培训计划2、培训计划有效实施,记录齐全3、员工技能矩阵表、顶岗计划表4、关键岗位清单及资格证书5、入职培训和转岗培训记录评分标准供应商自评得分评估人评估得分供应商评估表-质量评估基本信息59、过程流程图/FMEA/特殊特性清单/CP/SOP评审(1分)(1分)(1分)(1分)(1分)610、分供方管理(1分)(1分)(1分)(1分)(1分)(1分)611、进货质量控制(2分)(2分)(2分)五、检测设备/测量系统管理(总分:10)1012、检测设备/测量系统管理(2分)(2分)(2分)(2分)(2分)613、可追溯性管理(2分)(2分)(2分)1414、生产过程管理(2分)(2分)(2分)(2分)(2分)(2分)(2分)315、现场管理(1分)(1分)(1分)四、二级供应商控制(总分:12分)六、过程能力展现(总分:23)1、有年度MSA分析计划,并且按计划实施2、有量检具台账、校准计划、维护计划,并有实施记录3、量检具状态标签是否齐全(合格、待修、停用、校验标签)4、现场确认检具完好且有效,检验报告与实测一致,人员按照作业指导书操作5、自有或者有合作单位进行功能性和耐久性试验1、建立了批次管理程序2、实施部件,原料、产品的批次管理,从入库材料到出厂产品,是否能追溯3、能够保证先进先出原则1、设备先进(进口自动化设备、数控设备等)2、生产设备、工装、模具合理性,有维护保养计划,并按照计划执行,且记录完整规范3、员工生产过程严格执行了各项作业指导书4、对关键产品特性和过程特性进行了特别控制5、自互专、首中末检验按照标准执行,检验记录完善,首中末件进行管理6、对不合格品和可疑品进行了标识、隔离、判断和处置7、按照规定实施了出厂检验和试验1、现场5S很好:干净整洁,划线清晰,工具、产品、物料摆放规范2、生产场所是否布置有序、照明、空气流通、物流是否适宜3、5S评价结果激励、不符合事项改善、目视化管理1、过程流程图/FMEA/特殊特性清单/CP/作业指导文件是否齐全2、过程流程图/FMEA/特殊特性清单/CP/作业指导文件是否及时更新3、过程流程图、FMEA、生产现场的控制计划、作业指导文件等一致性相符4、特殊特性在FMEA、CP、流程图、特殊特性清单、操作指导书体现并且一致5、现场是否按照CP、作业指导文件进行控制1、新供应商有准入流程,且按照要求执行2、有分供方APQP/PPAP管理流程3、分供方参与APQP,且满足项目时间节点要求4、分供方绩效评估包含且不限于开发、质量、交付、售后等,分供方绩效评估记录详细5、有分供方质量问题处理流程,按类似8D工具解决6、分供方反馈的8D报告完整。
供应商审核表

供应商审核表
审核项目和评分
1.质量管理部门及体系
1.1 管理部门明确并制定了关于质量的方针、目标和有效政策。
1.2 管理部门规定支援质量方针、质量目标和质量体系的组织机构。
1.3 有不断衡量和改进自身能力而制定的系统:
1.4 把质量策划作为制定和落实质量体系的重要基础。
1.5 对故障成本进行评估是改进质量工艺水平的重要手段
1.6 有合适和充分的培训来保证质量管理工作的有效性
2.纠正与预防控制2.1 测量设备的控制
2.2 在生产的所有阶段,正确处理不合格产品,并采取纠正措施:
2.3 生产过程对生产材料和产品按质量状况进行标识:
2.4 供应商用适当的统计控制工艺以推动工艺改进并增加一次通过产品:
2.5 进行最终检验和包装审核以确定产品可以发出
3.设计控制
3.1 建立了对所有图纸、规范、程序和工作说明的更改与修订进行控制
3.2 新产品更新系统
3.3 新产品研发控制
4.工艺控制
4.1 供应商用控制计划和流程图详细说明为保证达到质量要求:
4.2 供应商有书面作业指导书,在涉及关键特性的所有操作中得到贯彻:
4.3 制定并落实了有效的预防性设备维修保养系统
5.产品实现过程控制
5.1 存在一个系统来确保原始合同和合同修改能按用户要求执行
5.2 进行采购材料控制以确保采购材料符合要求
5.3 供应商有系统的产能分析来确保有能力满足顾客对生产和保有能力的要求
5.4 生产现场有利于生产组织,有利于降低生产者劳动强度。
5.5 搬运、存储、包装和交货
6.风险控制
6.1 环境风险控制
6.2 职业健康安全控制
6.3财务风险控制。
PCPA审核表格

日期Date:供应商名称:Supplier Name:制造邓氏代码:Mfg. DUNS:审核员:(SQE,SQI)Auditor: (SQE, SQI)审核员电邮地址:Auditor: E-Mail:零件编号:Part Number (s):图纸日期:Drawing Date:项目:Program创造性团队:Creativity Team: Future Launch CurrentPartialOtherInitial Follow UpAPQP ConfirmationCPIP/WarranTop Focus CSL-1Shutdown/StPart /Assembly批准ApprovedNo N/A 1.2. 3.4.5.6.7.8.9.10.11.12.审核原因Reason For Audit:审核类型:Type of Audit:审核目的Driver of Audit:审核重点:Focus of Audit: 是否完成产品验证: Product Validation/Qualification Complete:是否安全件?Safety Related Part ?PFD 是否包括有物料接收、生产过程、成品及发运区域的标识和零件识别?Does the Process Flow Diagram include labeling and Part ID at receiving, WHIP,finished good and shipping areas?过程流程图包括报废吗?Does the Process Flow Diagram include scrap?过程流程图包括测量和检验吗?Does the Process Flow Diagram include gauging/inspection?过程流程图包括发运吗?Does the Process Flow Diagram include shipping?质量体系文件 QUALITY SYSTEM DOCUMENTATION 有可供使用的过程流程图吗?Is a Process Flow Diagram available?过程流程图包括物料接收吗?Does the Process Flow Diagram include receiving?过程流程图包括返工操作吗?Does the Process Flow Diagram include rework?图纸是否完整 (公差, GD&T, 正确基准, KPCs 等)?Is the print complete (Tolerances, GD&T, Correct Datums, KPCs, etc.)?是否具有全部的技术规范/零部件技术规范/子系统技术规范?Are all technical regulations/CTS/SSTS available?如果供应商有设计责任,是否使用DFMEA 来编制PFMEA ?If supplier is design responsible, has DFMEA been used to develop the PFMEA?技术信息有效性 TECHNICAL INFORMATION AVAILABILITYYes 备注 Comments在生产工厂是否具有最新更改等级的图纸?Are actual drawings availabe at production facilty with the latest change level?供应商图纸是否获得最终顾客批准?Does the supplier have the final customer approved drawing? OtherLine /CellOperation / Machine Complete Mfg. System Quality System - Ongoing Documentation批准,但是需要整理文件Approved, but need Documentation 没有批准Not Approved 跟踪审核日期:Follow-Up Audit Date:Run @ Rate CSL-2Major DisruptionComponent Check PlanD/PFMEADD&W产品:Commodity:Run at Rate (GP9 Attachement B)Mgmt. RequestPlant RequestEWO #: / ODM #工程更改等级:Eng. Change Level:PPAP 状态:PPAP/Interim/Benestare 批准年度车型:Model Year:SGMW 部门:SGMW Division:零件名称:Part Name:工厂地址和所在国家:Plant Location & Country:审核员电话:Auditor Phone:GM 1960-BGM 1927-162013.6.27供应商电话:Supplier Phone:全球采购 供应商质量 过程控制计划审核总结表(新版)WWP Supplier QualityProcess Control Plan Audit Summary Sheet新产品投产现有产品部分审核其他初次审核跟踪审核按节拍生产(GP9附件B)APQP 确认管理层要求工厂要求按节拍生产重点关注一级受控发运二级受控发运重大中断钻深钻横零部件检查计划Critical Fastner (D02)设计/产品失效模式及后果分析停/启审核现有产品改进流程/售后三包其他零件/装配生产线/单元操作/机器完整的制造系统质量体系-使用中的文件Yes No Yes No N/AN/A13.14.15.16.17.18.19.20.21.22.PCP中是否列出KPC/PQC/KCC?Are KPCs/PQCs/KCCs called out on the PCP?图纸要求调整螺塞回转50°±5°,控制计划为25°±5每个操作的抽样数量和检查频次是否合理?Are sample sizes and check frequency for each operation reasonable?PFMEA中列出的“现有控制方法”是否在控制计划中详细列出?Are all "Current Controls" listed on the PFMEA detailed on the Control Plan?控制计划中缺少工序50发运PCP 中有过程控制方法对PFMEA 中高RPN 值进行识别吗? Are process controls inplace in the PCP to address the high PFMEA Risk Priority Numbers?是否有风险降低的持续改进程序/流程?Is there a procedure/process for Continuous Improvement for Risk Reduction?是否有记录表明PFMEA是最新的更新状态?Is there any evidence that it is kept up to date?是否有过程控制计划(PCP)?Is there a Process Control Plan (PCP) available?PCP可接受吗(编号与PFMEA和流程图一致, 包括KPCs/PQCs/ KCCs, GP-12 如适用和最新的EWO/ODM)? Is the Process Control Plan (PCP) acceptable(numbers match PFMEA and Process Flow, including KPCs/PQCs/KCCs, GP-12if applicable and latest EWO/ODM included)?PFMEA与流程图编号一样,不能区分有可供使用的PFMEA吗?Is there a PFMEA available?PFMEA可接受吗(RPNs, 编号与PFD一致,并包括 KPCs/PQCs/KCCs)?Is the PFMEA acceptable (RPNs, numbers match Process flow and includeKPCs/PQCs/KCCs)?PFMEA与流程图编号一样,不能区分23.24.25.26.27.28.29.30.31.32.33.34.35.36.37.有培训,但无员工38.39.40.41.42.43.44.45.46.47.48.49.50.51.52.53.54.55.56.57.58.是否有存档记录并跟踪额外运费的流程?Is there a process for documenting and tracking Premium Freight?是否有存档记录并跟踪工厂问题报告的流程?Is there a process for documenting and tracking Plant Problem Reports?所有零件和零部件是否得到正确标识?Are all parts and components labeled properly?管理层的质量体系实施 QUALITY SYSTEM IMPLEMENTATION BY MANAGEMENT 是否有存档记录并跟踪停线的流程?Is there a process for documenting and tracking Downtime?是否有存档记录并跟踪废品的流程?Is there a process for documenting and tracking Scrap?制造过程证明其必须的产能和表现吗?Does the manufacturing process demonstrate the required capability or performance?包装和物料搬运能够避免零件受损吗?Does packaging and material handling protect parts from damage?齿条周转料架无防护易碰伤齿条生产过程的搬运和经过所有过程再到发运区域的最终产品,包括返修/返工区域,有操作指导书吗?Are instructions for handling Work In Process (WIP) and final product followed throughout the process to shipping area; including repair/rework areas?数据有意义并显示合理的控制限吗?Does the data make sense and are reasonable control limits shown?失控点是否标注有实施的纠正措施?Are out of control points noted with the corrective action taken?产品审核表明最终产品结果是否可以接受?Are product audits showing acceptable results for Final Product?控制计划中有SPC 要求的,SPC 的数据是否进行了有效的记录?Where the Process Control Plan calls for SPC are the data properly recorded?上控制线是否是当前的?Are the Upper Control Limits (ULC) current?下控制线是否是当前的?Are the Lower Control Limits (LCL) current?有工具的预防性维护并得到实施吗?Is there a Preventive Maintenance (PM) plan on tools and is it followed?有设备的预防性维护计划并得到实施吗?Is there a Preventive Maintenance (PM) plan on equipment and is it followed?设备年度计划中未对设备进行分类,无法确定维护周期。
供应商质量体系审核检查表【范本模板】

四、设计控制
4.1
设计人员数量及能力是否满足要求?
A是否有产品设计人员;
B数量能否满足开发要求;
C能否自行开发产品;
D年开发产品数量在10个以上.
4。2
是否进行设计开发管理?
A涉及产品开发、产品更改项目应制定质量控制计划,设计开发进度应满足今世缘公司的要求;
B设计输入应包括产品的功能性能要求、法律法规要求、内外部相关信息(包括市场质量反馈)/质量/成本等目标的要求;
C必要时应具有今世缘公司批准/确认的证据;
4。3
设计输入/输出是否符合规范要求?
A应制定样件控制计划;
B设计更改应评审,并在生产实施前,经今世缘公司的书面批准或声明放弃批准;
C应制定产品的关键重要特性清单并进行动态管理;
D如果涉及,输入/输出需包括国家相关法律法规(如:质量、食品安全、环境、职业健康安全等法规)的具体落实内容.
8.3。7
是否按规定进行作业准备验证?
A应规定作业准备的验证方法;
B作业的开始、材料更改、作业更改、两次作业间隔很长时间等都应进行作业准备验证.
8。4不合格品控制
8。4.1
是否采取措施有效处置不合格品?
A应按规定对不合格品进行标识、记录、评价、隔离和处置;
B应明确对不合格品的评价和处置控制;
C涉及今世缘公司利益不合格品处置应得到今世缘公司认可;
C作业指导书应清楚、详细且受控,应放在操作现场,以便于操作人员按规定操作.
8。3。2
是否按控制计划/作业指导书的要求进行操作?
A作业人员应能够解释他们的工作,理解书面的指导;
B生产过程文件中规定的各个事项应得到遵守(按规定进行作业和检查)。
供应商质量体系审核表

供应商质量管理体系审核表供应商基本情况1、公司名称:______________________________________________________________________________2、公司地址:____________________________________________________________________________________________________________________________________________________________________3、电话号码:____________________________________传真号码:_________________________________4、网 址:____________________________________电 邮:_________________________________5、生产建筑面积: 平方米 其 它: 平方米6、员工总数: 人,其中工程技术人员 人,品管人员 人,生产人员 人。
7、主要部门负责人:总 经 理 业务部/市场部 开发部/工程部 资财部/物控部 品 管 部 生 产 部8、主要产品:9、主要设备:10、主要的客户和为其提供的产品(列举2-3家)11、公司成立于哪一年: 创始人:12、公司营业额:去年: 今年计划:13、公司有无获得质量管理体系认证?如有,请说明哪一年?获得哪一家认证机构?什么样的证书?: 14、有受过哪些主要客户的审核:审核员:________________ 审核日期: ___________________一、适用范围适用于所有新的和现有的供应商有关质量体系评审。
二、评分标准a) 如果该厂商质量管理体系审核的总评价得分率为70%以上,则判该厂商质量管理体系合格。
b) 如果审核的总评价得分率为60%以上,可判为初步合格,同时要求该厂商回复改善要求报告,并对该厂商进行持续的不定期审核直至其达到a)项要求。
供应商审核表

实际完成 日期
追踪确认
6.5
5
6.6
组织是否拥有详细的能力规划文件? 单件额定生产时间(TAKT)元素是否用于建立和提高能力?
5
查NLK-OP-014[生产运作管理程序]中有试制作工时的计划 表同时形成了相关的记录
6.7 组织是否已建立计划来应对产量紧急增加或更换退回的材料的情况? 先期产品质量策划 组织是否使用横向跨部门工作方式,准备产品实现,包括: a) 开发/完成和监控特殊特性? b) 制定和评审FMEAs ,包括降低潜在风险的措施? c) 制定和评审控制计划? 组织是否确定特殊特性并: a) 将其所有包括在控制计划中? b) 符合客户规范和标识? c) 标识包括图纸、FMEAs、控制计划和操作指导书等工艺文件上标注客 户特殊特性符号或等同的符号/注释? 过程流程图是否显示出过程开始于材料接收,结束于发货? 过程FMEA是否 a) 制定并建立改进措施? b) 在进行投产改进和实施测评时对PFMEA 进行更改。 c) 覆盖所有过去的问题? d) 包括过程流程图中所有阶段? 组织是否 a)组织是否针对供应的产品制订系统,分系统,零部件和/或材料级的控 制计划,包括组织生产的散装材料和采购的产品及材料。 b) PFMEA 是否用于准备控制计划? c) 当发生的变更影响产品、制造过程、测量、物流、供货资源或 FMEA 时,是否评审和更新控制计划? 控制计划中是否包括所有特殊产品/过程特性? 7.6
2 . 0 管理职责 是否有证据表明组织的最高管理层承诺持续改进其质量管理体系的有效 性,行动包括 a) 沟通满足客户、规章和法规要求的重要性? b) 建立质量方针? c) 确保质量目标已建立? d) 实施管理评审? e) 确保资源? · 客户要求 · 质量手册 · 经营计划 · 质量指标 · 客户目标和公司的经营计划与质量方针陈述保持 一致。 · 措施计划和跟踪。
GM供应商质量过程控制计划审核表

Not Approved 没批准 Yes
Follow-Up Audit Date: 复评日期 No N/A Comments
TECHNICAL INFORMATION AVAILABILITY 1. Are actual drawings availabe at production facility with the latest 最后一次设变的生产设备的实际图纸是否为有效版本? 2. Does the supplier have the final customer approved drawing? 供应商是否有最终顾客批准的图纸? 3. Is the print complete (Tolerances, GD&T, Correct Datums, KPCs, 图纸内容是否完整?
Top Focus Mgmt. Request CSL-1 Plant Request CSL-2 D/PFMEA Launch Current
GM 1960-B GM 1927-16
节拍生产标准1
节拍生产标准1
Auditor Phone: 评审员电话 GM Division: 通用分部 Part Name: EWO #: / ODM # Model Year: 车型年份 Commodity: 商品
QUALITY SYSTEM DOCUMENTATION 6. Is a Process Flow Diagram available? 过程流程图是否有效? 7. Does the Process Flow Diagram include receiving? 过程流程是否包括让步接收? 8. Does the Process Flow Diagram include rework? 过程流程是否包括返工返修? 9. Does the Process Flow Diagram include scrap? 过程流程是否包括报废? 10. Does the Process Flow Diagram include gauging/inspection? 过程流程是否包括计量器具? 11. Does the Process Flow Diagram include shipping? 过程流程是否包括交付? 12. Does the Process Flow Diagram include labeling and Part ID at receiving, WHIP, finished good and shipping areas? 过程流程是否包括产品标识和接受零件代码,whip,成 品,发货区域? 13. Is there a PFMEA available? 是否有有效的PFMEA? 14. Is the PFMEA acceptable (RPNs, numbers match Process flow and include KPCs/PQCs/KCCs)? PFMEA是否可接收? 15. Is there any evidence that it is kept up to date? 是否有改进的证据? 16. Is there a Process Control Plan (PCP) available? 是否有有效的过程控制计划? 17. Is the Process Control Plan (PCP) acceptable (numbers match PFMEA and Process Flow, including KPCs/PQCs/KCCs, GP-12 if applicable and latest EWO/ODM included)? 过程控制计划是否可接收(与PFMEA匹配的参数和流程, 包括过程特性/产品特性,如早期生产限制合适,是否包 括最新的EWO/ODM)? 18. Are all "Current Controls" listed on the PFMEA detailed on the 所有PFMEA中标注的当前的控制方法是否具体体现在控 19. Are process controls in place in the PCP to address the high PFMEA Risk Priority Numbers? PFMEA中涉及的高风险控制要求是否体现在控制计划 中? 20. Is there a procedure/process for Continuous Improvement for 是否建立了优先减少风险的持续改进过程? 21. Are KPCs/PQCs/KCCs called out on the PCP? 在控制计划中是否标注了关键控制特性和关键产品特 22. Are sample sizes and check frequency for each operation 是否合理的规定了每个过程的样品尺寸和检验频次? 23. Do your supplier's provide evidance of approved material for all components needed for the assembled part? 供应商是否获得协力厂商提供的零组件材质证明和试验 报告等证据?
供应商质量审计表

江西XX科技有限公司供应商质量调查表JXWL/Q-SMP1-QA022-01-R1供应商名称:地址:供应产品的名称:生产所在地:(请填写完整的生产地址):请细阅本调查表并回复我们。
本调查表应当由质量部门的代表填写并敬请加盖公司盖。
填表人:公司职位:日期:签名:填表指引请填写本调查表,让我们能够评估贵公司的质量体系和管理情况,以及保证贵公司有能力满足江西XX科技有限公司的质量体系要求。
作为本公司质量体系要求的一部分,我们希望对贵公司的质量标准和管理情况作出评估。
我们希望贵公司的质量部门(或同类机构)填写并审定所附的调查表,以真确地反映贵公司有关讨论范围的业务。
我们估计,填写调查表和搜集所需的支持文件大概需要1小时。
调查表分为几个部分,让相关的部门经理提供所需信息的答案会更为有效。
根据以往的经验,填写调查表最有效的方法是按照以下顺序:1.从头至尾通读调查表。
2.如果对本调查表有任何疑问,请与我们联系。
3.根据“支持文件清单”收集所需文件的复印件。
4.回答调查表中的问题,如需提供详细答案,请另行加纸。
5.如需使用附加文件回答问题,或需使用支持文件去辅助回答,即使于没有明确要求的情况下,也请获取并附上此类材料。
可以将所有另附的文件概括在第3页的表格中。
6.填写好调查表,并在首页签名。
7.复印一份填好的调查表以及支持文件,并自行妥善保存。
请在收到之日起的1至2周内,将填写好的《供应商质量调查表》和支持文件寄往:地址:江西鄱阳芦田工业园区江西XX科技有限公司质量管理部收邮编:333133电话:传真:可能有些问题的答案选项不适用于相关的产品、您的场所或情况,如果是这样,最好不要留空,请填入“N/A”以表示该答案选项“不适用”。
最后,我们不需要您使用印刷体回答问题,字迹清楚、容易辨认的手写体更符合我们的要求。
我们将对您的答案和任何附加信息保密。
非常感谢您的合作!现提供以下(部分或全部)文件作为该调查表的证明。
供应商质量体系审核检查表

4.7 对工作环境进行识别并采取控制措施,满足产品质量的要求
10
4.8
在质量策划和管理评审以及纠正和预防措施时,识别和确定需补充和更新的设 施,并实施
10
与顾客有关的过程
5.1
对顾客关于产品的要求能够组织公司相关部门进行评审,以确定是否可以满足 要求
10
5.2
形成了对产品要求确定与评审的规定与程序,包括顾客规定的要求及规定用途 或已知的预期用途必须的要求及相关的法律要求
10
9
9.7 有有效的供方审核调查体系和书面程序
10
9.8 有样品检验和接受检验程序,记录检验结果
10
9.9
供方和用户事前协调合作是显而易见的(例如,研讨会、培训、讲座、设计过程 的参与和不断改进)
10
9.10 运用新的技术不断改进检验技术和检验手段,检验有效果
10
标准 小值 计
120
得分值 9.11 对供货厂家的货品能够进行质量(批次)的追溯
、返工返修后的再次验证记录)
0
10.8 标识产品的检验与试验状态显示合格或不合格
10
共 14 页,第 -4098 页
质 量
序号
项目
条款
内容
满分 评价分
11.1
有表述产品特性的信息(如产品图样),生产现场有作业指导文件(如设备操作 规程/工艺文件/检必须经过培训并有相应资格,关键工序员工变更管理控制流程明确 10
10
11
生产和服务的提供与控制
11.1 0
设备的适当维护已列入计划并执行,确保连续的过程能力
10
11.1 在设计和工艺更改时,对故障模式影响分析(FMEA)进行更新,并经统计技术证实 10
供应商评审表

检验能力
供方检验设备等能否满足产品检验要求?
5
样品/来料质量
样品测试是否合格/ 来料质量是否满足公司质量目标?
20
技术
渠道控制
是生产原厂,或有原厂授权代理、经销证明
5
加工能力
查看供方的生产环境、技术设施、工艺流程、面对的客户群等方面的状况
10
成本
成本
价格在同行业中合理,且能配合我司成本下降要求
5
5
目前
资格
□优秀供应商 □合格供应商□试用供应商
□不合格供应商 □待认证供应商 □其它
总计得分
(共100分)
审核结论:
管理部秘书归档。
□通过,合格供应商 □试用,辅导后再评审 □不合格供应商(□ 辅导后再评审 □ 淘汰)
评审团队
Q A
部门审核
批 准
备注:用于新供方引入时,可参考之前的调查问卷内容进行评分,判定标准为:总计得分T≥75分为合格供应商;60≤T<75分为试用供应商;T<60分为不合格供应商;
财务状况
5分
1、企业良性运转,接受我司付款规则的,可给予满分;
2、付款要求超出我司要求,如要求预付款的,或企业处于衰退期,给予2~4分;
3、其他情况,得0~1分。
交付
交付状况
10分
1、采购提前期在30天内,或按期交付率为99%以上的(以按期交付率为评分标准的,根据达成比率换算评分),给予满分;
2、采购提前期在30~60天的,给予2~4分;
财务状况
银行信誉、财务状况良好
5
交付
交付状况
采购提前期和交期能够满足公司要求
10
紧急需求满足
有完善的机制来应对紧急定单/ 能够满足紧急订单要求
ISO9001供应商审核评分表

附相关分析记录
制
54
对客户退回产品是否采取纠正、预防措施来消 除真正或潜在的不良原因?
提供相关文件名称、编号
55 当有在线不良品时,是否执行不良分析?
附相关分析记录
56 对在线不良品是否有要求发出改善报告?
提供相关文件名称、编号
57
是否根据保存期限保存在制品和记录客退维修 品相关记录
附相关记录
58 是否有客退品处理程序来保证不良材料的处理?
供应商自查结果
44 是否有判定不合格品的原因?
45 是否决定采取必要的行动来加以改善?
46
是否对纠正措施进行评审来确认不合格品不会
再发生?
附相关处理记录
47 是否记录改善结果?
48 是否有再评审已采用的纠正措施/预防措施?
49
检查不合格品处理是否和文件规定一致?返工 、挑选,判退或特采是否与流程一致?
提出相应的改善措施并实施?
况表
4
品质会议是否定期召开?品质会议的决策是否 有良好的事后管理?
附品质会议会议记录
5 质量体系是否通过ISO 9000认证?
提供ISO 9000体系证书编号
6 体系相关流程是否完备?是否作文件化管理? 附体系文件清单
7 环境体系是否通过ISO 14001认证?
提供ISO 14001体系证书编号
提供相关文件名称、编号
37
是否具有来料检验标准?怎样确定标准被有效执 行?并有相关记录吗?
例举一份来料检验标准名称、编号
38
是否有检验设备或仪器能够检验来料的规格标 准?
例举1-3种来料检验设备名称
39
对不合格产品和材料,是否有不合格品控制程 序文件?
供应商审核检查表

应急计划
10
planning,evasion planning,altemative sourcing
possibilities)?
6.0 生产/Production
6.1
如何保证,及时发现工具磨损并更正 How do you ensure that the tool abrasion is identified and corrected on time?
5.4
optimize your Supply Chain?Do you measure the supplier reliability(deliveries on time )for customers and from
suppliers?
有哪些保存、包装、发货、运输规定? What are your
采用何种统计方法来控制生产?这种方法是否有效?Which
6.2 statistical methods for production control are used?Are
生产绩效趋势图
10
these methods suifficien?
有哪些重要生产参数?公司文件中是否包含这些参数?(如生产计 6.3 划)Which statistical methods for production control are
公司供应商是否完成质量保障程序(审核报告,证明)Have your
4.4 supplier implemented a Quality Assurance Process(Audit
质保书
10
reports.Certificates)?
如何确定和通告客户的要求以及将公司内部要求转达给供应商How 4.5 do you define and communicate requirements and your
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
供应商质量控制计划审核表
1. 供方处是否为最新更改水平的图纸?
2. 供方处图纸是否经最终用户正式批准?
3. 供方处图纸是否完整(耐久性、几何尺寸、外观、测量数据记录、产品关键特性,正确的定
位基准等)
4. 所有相关技术文件、资料、标准及政府法规是否齐全?
是否应用了所有技术标准/零件技术标准/下级零件技术标准
5. 如果由供应商负责设计,使用设计故障模式和后果分析来产生生产流程故障模式和后果
分析么?(解释:该项目是要求项目,如果是供方负责设计,要求供方做DFMEA)
质量体系文件
6. 过程流程图是否可以接受(包括接收,返工,返修,贴标签,废品区,检验/检测/测量和运输)?
7. PFMEA是否可以接受(风险顺序数值, 编号与流程图一致,包括关键产品特性KPC)、和参数
(关键过程参数 KCC), 产品质量特性(PQC),过程监控点(PMP)等);
是否有证据有表明此文件动态更新?
是否有FMEA,令人满意么?(从潜在风险系数、与生产流程相符的数量,及是否包括生产和程序要求的规定等方面考
虑)有证据表明这一文件正在使用么?是否有证据表明该文件是一个变动的文件?(FMEA,无论DFMEA还是PFMEA,
都应该仔细的进行分析,查看每一个步骤,看是否合理,包括潜在失效模式、失效的起因机理、现行控制方法、
严重度等。
其中失效机理以及现行控制方法是关键,直接可以让人了解是否可以真正的解决出现的问题。
FMEA是一个变动的文件,当接到顾客的抱怨或自己发现问题之后,应该进行分析原因,同时更新PFMEA,调整控制计划。
)
8. 有无过程控制计划 (PCP),
是否合格并及时更新(编号与PFMEA和流程图一致,包括KPC/PQC/KCC,GP-12 -
适用时,最新的ODM)? 现行版本如涉及工艺、过程、材料等的更改,是否经富佳的书面确认?
过程控制计划是否有效并可以接受么?(数值与PFMEA和工艺流程相匹配、包括产品关键特性KPC/PQC/KCC、
如果适用的话,以及是否包括最新的工程修改单等方面的考虑。
(FMEA中提到的现行控制方法,看是否在PCP中有体现,着重应该查看KPC\PQC\KCC)
9. 是否PFMEA中所有“现行过程控制”项目在控制计划中具体规定?
10. 控制计划是否针对高PFMEA风险顺序数项目采取适当的过程控制?
11. 控制计划中所有的 KPC/PQC/KCCs 项目是否明确检测方法、频次和样本数?
12. 各工位检验频次和样本数是否合理?
质量体系实施
13. 原材料及零件分供方是否已经批准(与PPAP中的材料清单是否一致, CDF是否一致)?
14. 在生产使用前能否确保使用合格的(原)材料?
15.当零件有追溯性要求时,是否可实现零件到最终产品的追溯?
16. 工作场所布置是否适当并与流程图一致?
17. 所有工装、量具是否可获得并正确标识、标定和验证?
18. 各工位有无适当的操作指导书以确保正确进行操作?
-- 足够正确操作,包括对不合格品的处置?
-- 限度样件(BS)是否有效,操作者在工作中是否使用?
19. 是否所有量具/检具都附有操作指导书并置于明显位置?
20. 操作人员是否正确理解操作指导书,操作人员是否经适当培训?
21.是否有标准样品以确认检验和防错设施是否正常工作?
22. 有无针对设备和工装、辅助设备的预防性维修计划,是否按计划实施?
23. 操作指导书是否与控制计划一致?
24. 是否按照规定实施了相关的检验和试验?(解释:法规、顾客要求符合性的检查)
25. 操作者是否注意到产品的关键特性(KPCs/KCCs)?
外购件的控制和检验
26. 对每一种产品或技术是否都有合格的二级供应商清单?
27. 选择新的二级供应商、取消或限制现有二级供应商的程序是怎样的?
28 对于不受来料检验控制的物料/原材料,对每一批发交:
- 是否有专门的控制和/或检验文件(例如理化分析和/或检验结果报告)或是否有已得到认
可的二级供应商所提供的合格报告?(解释:这是对来料质量控制检查,看供方如何保证产品质量。
)
29 在把外购件或原材料用于被评审产品的制造之前,如何对其进行认可?
(解释:查阅是否有相关文件、控制实施的完整性与有效性;如果该外购件或原材料经过了多付模具、
多腔模,必须对每一付模具、模腔进行认可。
)
30. 如何防止更改后的材料或零部件与更改前的材料或零部件混用?
(解释:物料断点控制的检查,以及FIFO的检查。
)
31 是否确定并执行了不合格品管理办法?(查看一致性)
32 对控制计划中规定使用特性控制检验(如:通规/止规)的物料/零件,供应商是否对首批
交付的产品实施了检验?并对以后的产品定期抽检,实施变量控制和统计分析(至少对重要的
特性而言)?(解释:这是对制造过程的检验)
33 对于待检、已收、退货和待处理的零部件或原材料,是否有隔离制度?
(解释:避免不合格产品的非预期使用。
)
制造
34 是否有产品实现计划(如:APQP),该计划是否考虑、发展和完善了所有的相关要求?
(解释:根据QS9000/TS16949的要求,进行先期产品质量策划,进行APQP可以减少成本,提高产品质量。
)
35 对生产初期或正式生产中发现的问题是否采取了与风险程度相适应的有1效的纠正措施?在
需要时,还要对相应的文件更新(例如:控制计划,作业指导书等)
(解释:控制计划\FMEA\作业指导书,都是变化的,而且是持续改进,查看该文件,不仅可以查看
供方的持续改进情况,更能看出供方是否真正的在积累经验。
)
36 在生产启动前,供应商是否得到了客户的认可?现在采用的工艺是否与顾客批准的一致?
如果是采用组合模具或经过多腔模制造的零件,则应对模具的每腔/每副模具进行认可。
(解释:供方是否真正理解了顾客的要求)。
37 重要特性的检测/试验数据是否记录并存档?(解释:记录的保存)
38 在生产启动/建立初期,是否已经确认产品符合技术规X?所使用的原材料/半成
品与所确认的一致吗?
39 在生产流程中的产品、零件、半成品、原材料都正确地标识了吗(例如:图号/ 件号、版本号、
批次号、ROHS 等)?摆放位置与检验状态对应吗?如果有要求的话能保证其可追溯性吗?
(解释:检查过程控制、产品的追溯性。
)
40. 是否所有的内部的和客户抱怨的质量趋势(报告、索赔、故障等)都被有效的监控、
及时更新并且符合相应的指标?(解释:供方对顾客问题的态度。
)
每点满意为2.5分。
供应商质量控制计划审核表
技术资料获取
1. 供方处是否为最新更改水平的图纸?
2. 供方处图纸是否经最终用户正式批准?
3. 供方处图纸是否完整(耐久性、几何尺寸、外观、测量数据记录、产品关键特性,正确的定
位基准等)
4. 所有相关技术文件、资料、标准及政府法规是否齐全?
是否应用了所有技术标准/零件技术标准/下级零件技术标准
5. 如果由供应商负责设计,使用设计故障模式和后果分析来产生生产流程故障模式和后果分析么?(解释:该项目是要求项目,如果是供方负责设计,要求供方做DFMEA)
质量体系文件
6. 过程流程图是否可以接受(包括接收,返工,返修,贴标签,废品区,检验/检测/测量和运输)?
7. PFMEA是否可以接受(风险顺序数值, 编号与流程图一致,包括关键产品特性KPC)、和参数
(关键过程参数 KCC), 产品质量特性(PQC),过程监控点(PMP)等);
是否有证据有表明此文件动态更新?
是否有FMEA,令人满意么?(从潜在风险系数、与生产流程相符的数量,及是否包括生产和程序要求的规定等方面考
虑)有证据表明这一文件正在使用么?是否有证据表明该文件是一个变动的文件?(FMEA,无论DFMEA还是PFMEA,
都应该仔细的进行分析,查看每一个步骤,看是否合理,包括潜在失效模式、失效的起因机理、现行控制方法、
严重度等。
其中失效机理以及现行控制方法是关键,直接可以让人了解是否可以真正的解决出现的问题。
FMEA是一个变动的文件,当接到顾客的抱怨或自己发现问题之后,应该进行分析原因,同时更新PFMEA,调整控制计划。
)
8. 有无过程控制计划 (PCP),
是否合格并及时更新(编号与PFMEA和流程图一致,包括KPC/PQC/KCC,GP-12 -
适用时,最新的ODM)? 现行版本如涉及工艺、过程、材料等的更改,是否经富佳的书面确认?
过程控制计划是否有效并可以接受么?(数值与PFMEA和工艺流程相匹配、包括产品关键特性KPC/PQC/KCC、
如果适用的话,以及是否包括最新的工程修改单等方面的考虑。
(FMEA中提到的现行控制方法,看是否在PCP中有体现,着重应该查看KPC\PQC\KCC)
9. 是否PFMEA中所有“现行过程控制”项目在控制计划中具体规定?
10. 控制计划是否针对高PFMEA风险顺序数项目采取适当的过程控制?
11. 控制计划中所有的 KPC/PQC/KCCs 项目是否明确检测方法、频次和样本数?
12. 各工位检验频次和样本数是否合理?
质量体系实施
13. 原材料及零件分供方是否已经批准(与PPAP中的材料清单是否一致, CDF是否一致)?
14. 在生产使用前能否确保使用合格的(原)材料?。