高架桥施工工艺流程

合集下载

高架桥墩柱施工工艺流程

高架桥墩柱施工工艺流程

高架桥墩柱施工工艺流程英文回答:The construction process of a high-rise bridge pier involves several steps. Here is a general outline of the process:1. Site preparation: Before starting the construction, the site needs to be prepared. This includes clearing the area, leveling the ground, and setting up temporary facilities such as construction offices and storage areas.2. Foundation construction: The first step in buildinga high-rise bridge pier is to construct the foundation. This typically involves excavating a pit and pouring concrete to create a stable base for the pier. The depth and size of the foundation depend on the design requirements and the soil conditions.3. Formwork installation: Once the foundation iscomplete, formwork is installed to create the shape of the pier. Formwork is usually made of wood, steel, or aluminum and is used to hold the concrete in place until it hardens. The formwork needs to be properly aligned and secured to ensure the structural integrity of the pier.4. Reinforcement placement: After the formwork is in place, steel reinforcement bars are installed. These bars provide additional strength to the pier and help it withstand the forces exerted by the bridge and traffic. The reinforcement bars are placed according to the design specifications and are tied together to form a sturdy framework.5. Concrete pouring: Once the reinforcement is in place, concrete is poured into the formwork. The concrete needs to be of the right consistency and quality to ensure the strength and durability of the pier. Special attention is given to the pouring process to avoid air pockets andensure proper compaction.6. Curing and finishing: After the concrete is poured,it needs to be cured properly to gain strength. Thisinvolves keeping the concrete moist and at the right temperature for a specified period of time. Once the curing is complete, the formwork is removed, and any necessary finishing touches, such as surface smoothing or painting, are done.7. Pier inspection: Before the pier can be deemed safe for use, it undergoes a thorough inspection to ensure thatit meets all the necessary standards and requirements. This includes checking for any cracks, defects, or structural issues that may compromise the integrity of the pier.8. Pier protection: To protect the pier from environmental factors such as corrosion and erosion,various protective measures may be implemented. This can include applying coatings or installing protective barriers.中文回答:高架桥墩柱施工的工艺流程包括以下几个步骤:1. 场地准备,在开始施工之前,需要对场地进行准备。

最新城市高架桥施工技术(附图详解)

最新城市高架桥施工技术(附图详解)
桥面宽度
600× 200 200× 200
箱梁标准截面
5. 工程案例
5.1.3主线混凝土箱梁方案
5.1.3.1箱梁概况 箱梁截面采用扁平的鱼腹式断面,根据桥面宽度,箱梁 分别采用单箱四室、单箱五室、单箱七室和单箱九室结 构。梁高为2.0m,混凝土标号为C50。
5. 工程案例
5.1.3.2排架支撑方案 1)体系选择 本工程采用扣件式钢管脚手支撑体系 2)地基处理 由于立柱周边及地下管线等地基开挖,对回填土进行压实后 ,上铺100mm道渣,再浇筑100mm厚C25混凝土垫层。垫层混 凝土强度达到70%后,方可排架搭设,混凝土强度达到100%后
T梁斜吊上盖梁
4.专项施工技术
4.6 采用挂篮悬臂浇注现浇箱梁技术
1)该技术适用于城市内跨越河流、铁路等的高架桥施工
2)该技术优点: 支架不落地,对交 通影响小。 3)挂篮系统组成: 主纵桁架、行走系统 、底篮、后锚系统
4.专项施工技术
4)施工工艺:
利用悬臂挂篮施工现浇混凝土箱梁,待混凝土到强度后前 移纵桁架及挂篮,施工下一节箱梁
顶高支腿换撑A 顶高支腿A
起吊天车1 1
起吊天车2 A 顶高支腿B 2
架桥机主梁
顶高支腿及换撑C
低支腿
中支腿
高支腿
A 起吊天车1
架桥机主梁 中支腿
图14 架桥机构造图
A-A剖面
4.专项施工技术
4.5 采用架桥机吊装预制梁技术
4.专项施工技术
2)该技术优点: 支架不落地,吊装速度快,对交通影响小,特别适用于交叉路口作 业。
,方可进行混凝土箱梁浇筑。
5. 工程案例
5.1.3.2排架支撑方案
3)支架搭设 根据对主线、匝道箱梁的荷载计算及支架计算,采用

高架桥上部结构施工方案10.6

高架桥上部结构施工方案10.6

高架桥上部结构施工方案10.6在高速公路及城市道路建设中,高架桥广泛应用于跨越障碍物、优化交通流等方面。

在高架桥的建设中,上部结构的施工方案尤为重要。

本文将就高架桥上部结构施工方案进行探讨。

1. 施工准备在进行高架桥上部结构施工前,首先要进行充分的施工准备工作。

这包括确定施工时间、制定施工计划、组织施工人员、选定施工机械设备等。

同时,还需进行现场勘测、测量、勘探等工作,确保施工前的准备工作有序进行。

2. 施工工艺高架桥上部结构的施工工艺通常包括以下几个主要步骤:2.1 模板安装在进行高架桥上部结构的浇筑前,需要先安装好模板。

模板的安装质量直接影响到后续混凝土的浇筑效果,因此要求模板的安装必须精准、牢固。

2.2 钢筋加工及安装在模板安装完成后,需要进行钢筋的预埋安装工作。

钢筋的加工及安装要符合设计要求,保证结构的稳定性和承载能力。

2.3 混凝土浇筑在完成钢筋安装后,进行混凝土的浇筑工作。

混凝土浇筑需要严格控制浇筑质量,确保混凝土的均匀性和密实性。

2.4 养护混凝土浇筑完成后,需要进行养护工作。

养护工作对混凝土的强度、耐久性等方面影响较大,因此养护工作不能忽视。

3. 安全管理在高架桥上部结构施工过程中,安全管理是至关重要的。

施工现场要严格按照相关安全规定组织施工,做好安全防护工作,确保施工人员和施工设备的安全。

4. 施工质量监控高架桥上部结构施工过程中,需要进行质量监控工作。

监控工作包括对模板、钢筋、混凝土等进行质量检查,及时发现和解决质量问题,确保施工质量达标。

5. 环境保护在高架桥上部结构的施工过程中,要注意环境保护。

施工现场产生的污染物要进行及时处理,做好环境保护工作,保护周围生态环境。

综上所述,高架桥上部结构施工方案的设计和实施是一个综合性工程,需要做好施工准备、严格控制施工工艺、重视安全管理、保证施工质量、注重环境保护等方面的工作。

只有全面做好这些工作,才能确保高架桥上部结构的施工顺利进行,最终建成安全可靠的高架桥。

高架工程施工总体流程和注意事项

高架工程施工总体流程和注意事项
CISMCCEC
[2] 现浇箱梁施工外观质量的 CSCEC 控制 CSICMECC
2、现场调查:模板安装
底板本身质量:局部打磨
CSICMECC
2、现场调查:模板安装
底板上带有油污:须清理
CSICMECC
2、现场调查:底板安装
支座预留冲洗洞口
CSICMECC
2、现场调查:错缝
底板拼缝不平,有错台
主要流程
A. 桩基施工 B. 承台施工 C. 墩身和垫石施工 D. 箱梁施工
CISMCCEC
A.桩基施工
1 施工准备
场地平整、 水、电、机械及人员进场等。
CSIMCECC
CISMCCEC
A.桩基施工
施工步骤
5.成孔验收(孔深、孔径, 泥浆浓度,含沙率 )
6.下放钢筋笼 7.下导管(二次清孔) 8.灌注
4)、增加振动棒数量,并在现场安排2台备用。 开盘前,安排人员对砼工厂设备进行检查,确保在生产混凝土期间机 器不出现故障,减少现场等待混凝土的时间。
CSICMECC
4、整改措施
5)、召开现场技术交底会,对现场振捣操作 人员进行技术培训。
6)、混凝土振捣时,设专人进行指挥和监督 。混凝土振捣应定人、定点、分区振捣。责任 落实到个人。
支架顶托,将所有顶托调整到位。 CSIMCECC
铺底模
CISMCCEC
翼缘板处调整
CSIMCECC
箱梁钢筋绑扎
注意点: ⑴钢筋绑扎时需要注意边腹板加工时需
要适当的放小点,否则会造成箱梁偏厚, 桥面铺装时需要凿除。
⑵波纹管安装定位时需1m一个点,保 证线型的顺畅。
⑶钢筋焊接时,要注意切勿烫伤波纹管 。
CSICMECC

高架桥首件工程施工方案

高架桥首件工程施工方案

高架桥首件工程施工方案一、工程简介x高架桥全长1232.64m上部结构设计采用49×25m预应力钢筋砼T梁,共计588片。

根据本桥施工现场实际情况,在K36+818.04桥台路基位置设预制场,预制梁均在预制场集中预制,炮拖运梁,双导梁安装就位施工。

混凝土在混凝土拌合站集中拌制。

二、进度计划安排x高架桥第x#T梁计划于2019年10月25日开工,2019年10月30日完工。

三、施工技术方案及施工工艺施工前准备工作1、预制场地平面布置梁板预制场地布置在x49#桥台路基上,现场浇筑56个底座(包括铁河大桥),见后附预制场平面布置图。

2、施工技术准备(1)、认真复核施工设计图纸,编制详细完整施工详图。

(2)、认真阅读技术规范,拟订技术标准和制订实施性施工技术细则。

(3)、按质量管理标准,制定质量管理程序。

(4)、配备好技术工作所需要的设备和工、器具。

(5)、施工配合比配制、审定。

(6)、管理、技术人员和特殊工种的开工前培训和技术交底。

(7)、对支座高程、桥梁跨径进行测量复核,若超出误差范围及时在预制梁板时采取措施。

3、施工现场准备a工地实验室对每批预应力钢筋、钢丝、钢绞线和锚具进行抽样试验,然后向监理工程师出具质检证书。

b预制场坪地面碾压密实,划定底座范围,基础采用C30砼,预制台座长25m,宽0.48m,高0.5m,两端设置2m的工作长度,台座顶面两角沿台座纵向设置5号等边角钢,角钢侧面用环氧树脂粘贴5mm厚的止浆垫,防止浇筑砼时漏浆。

c场地平整完成后,随即进行C20场地硬化(厚20cm),按预制场平面布置图放样,开挖30cm预制台座基坑槽。

T梁端部2m范围内开挖100cm,钢筋布置详见《张拉端端部加固钢筋布置图》,台座混凝土为C30,严格按尺寸装模浇注,横向按80cm间距布置φ3cmPVC管,用以穿底层对拉螺杆。

台座顶面铺设δ6mm钢板,端部1m范围内铺设δ20mm钢板。

台座边缘镶L4角钢,端部预留断口上搁一块δ20钢板作为活动底模。

小型高架桥工程施工方案

小型高架桥工程施工方案

小型高架桥工程施工方案1. 项目背景本项目是为了解决道路交通拥堵问题而进行的小型高架桥建设工程。

将建设一条连接A路和B路的高架桥,以提高交通流畅度和道路容量。

2. 工程概述本工程施工方案旨在确保高架桥的安全、稳定和高效建设。

下面是具体的施工步骤:2.1 前期准备工作在施工前,需要进行以下准备工作:- 调查研究:对工程区域进行勘测,确定设计方案,并进行环境评估。

- 安全规划:评估施工过程中可能发生的安全风险,制定相应的安全预防措施和应急预案。

- 材料采购:根据设计需要,采购所需的钢材、混凝土等建材。

- 人员培训:对施工人员进行培训,确保其熟悉工程要求和施工流程。

2.2 桥墩基础施工桥墩是高架桥的支撑结构,其基础施工分为以下步骤:1. 地基处理:对桥墩基础设置的地基进行处理,确保其承载力和稳定性。

2. 基础浇筑:按照设计要求,在地基上浇筑桥墩的基础。

3. 桥墩施工:在基础上进行桥墩的组装和施工。

2.3 主梁制作和安装主梁是高架桥的承重结构,其制作和安装分为以下步骤:1. 主梁制作:根据设计要求,对主梁进行制作。

2. 主梁运输:使用适当的运输工具将主梁运输至施工现场。

3. 主梁安装:在桥墩上进行主梁的安装,并进行必要的调整和固定。

2.4 桥面铺装和边坡处理完成桥墩和主梁的施工后,需进行以下工作:1. 桥面铺装:在主梁上铺设道路面层材料,确保其平整度和耐久性。

2. 边坡处理:对高架桥两侧的边坡进行处理,确保其稳定性和美观性。

3. 施工管理措施为确保施工顺利进行,需要采取以下管理措施:- 安全管理:设立安全监控系统,对施工现场进行实时监测,确保安全规范执行。

- 质量管理:建立质量检查体系,对施工过程和成果进行定期检查,保证质量合格。

- 进度管理:制定详细的施工计划,对施工进展进行跟踪和控制,确保按时完成。

- 成本控制:制定合理的施工预算,对工程费用进行严格控制。

4. 总结本小型高架桥工程施工方案旨在实现高架桥的安全、稳定和高效建设。

高架桥梁工程施工方案

高架桥梁工程施工方案

一、工程概况本项目位于XX市,是一座跨越XX河的高架桥梁工程。

桥梁全长XX米,主桥跨径XX米,桥面宽度XX米,包括主桥、引桥、匝道和附属设施。

本工程属于城市快速路系统的重要组成部分,对于缓解城市交通压力、完善城市路网结构具有重要意义。

二、施工组织设计1. 施工总体安排(1)施工顺序:先进行基础施工,再进行桥墩、桥台施工,最后进行梁体施工。

(2)施工进度:根据工程实际情况,制定合理的施工进度计划,确保工程按期完成。

2. 施工队伍组织(1)成立项目领导小组,负责施工过程中的重大决策。

(2)设立施工、技术、质量、安全、物资、财务等管理部门,确保各项工作有序进行。

(3)招聘具有丰富经验的技术人员和管理人员,组建专业的施工队伍。

三、施工工艺及措施1. 基础施工(1)采用钻孔灌注桩基础,桩径XX米,桩长XX米。

(2)桩位放样:利用全站仪进行桩位放样,确保桩位准确。

(3)钻孔:采用旋挖钻机进行钻孔,严格控制钻孔垂直度。

(4)成孔后,进行清孔、钢筋笼制作、混凝土浇筑等工作。

2. 桥墩、桥台施工(1)采用预制混凝土桥墩,现场组装。

(2)桥台采用现浇混凝土结构,分节浇筑。

(3)模板采用钢模板,确保混凝土成型质量。

(4)钢筋绑扎:严格按照设计要求进行钢筋绑扎,确保钢筋间距、位置准确。

3. 梁体施工(1)梁体采用预制混凝土结构,现场组装。

(2)预制梁体在工厂进行生产,确保质量。

(3)梁体运输:采用平板车运输,确保梁体在运输过程中不受损伤。

(4)梁体安装:采用吊车进行安装,确保安装精度。

四、质量控制措施1. 严格按设计图纸进行施工,确保工程质量。

2. 选用优质原材料,严格控制原材料质量。

3. 施工过程中,加强质量检验,确保各工序质量合格。

4. 建立健全质量管理体系,定期进行质量检查和评定。

五、安全措施1. 施工现场设置安全警示标志,确保施工人员安全。

2. 定期对施工人员进行安全教育培训,提高安全意识。

3. 严格执行安全生产规章制度,确保施工安全。

高架桥工程施工方案

高架桥工程施工方案

目录第一章高架桥工程 2第1节主要施工方法及技术措施 2 1.1 高架桥施工程序 21.2 道路工程工艺流程图 21.3 施工测量 41.4 基坑开挖工程 51.5 钢筋制作安装工程 51.6 模板及支架工程 61.7 砼浇筑工程 91.8 后张拉预应力工程 101.9 桥台施工 141.10 桥面防水砼 141.11 挡土墙施工 141.12 伸缩缝施工 151.13 防撞墙施工 151.14 桥头搭板 151.15 道路工程 16第2节地下管线及地上、地下设施的加固措施 17 第3节编制说明 18第4节工程概况 19第5节技术质量保证措施 20第6节安全文明施工措施 22第7节文明施工 23第8节冬、雨季施工措施 24第9节机械设备供应计划 26第10节材料供应计划 26第一章高架桥工程第1节主要施工方法及技术措施1.1 高架桥施工程序1.2 道路工程工艺流程图道路工程工艺流程图挖方路拌固化土土浇筑安装余土调运调配碾压碾压整形填方运土拌和碾压混合料摊铺路缘石道路土石方工程路槽床固化土基层水泥稳定砂砾基层摊铺粗粒式沥青砼面层彩砖铺砌水泥砂浆垫层碾压摊铺彩砖铺砌水泥稳定砂砾基层竣工工程移交竣工资料审核竣工验收实测实量外观质量核定清理现场竣工自检扫尾路床碾压彩砖步道碾压摊铺细粒式沥青砼碾碾压1.3 施工测量施工测量4.2.1 根据规化院所提供的等级地形控制点及施工图设计,采用二级附合导线对桥区内的桥墩中心,桥梁中轴线及地面道路中心线进行合理的控制。

高程控制点采用四等水准测量的方式在桥区内每100m左右设一个临时水准点,并保证相邻水准点的闭合差精度满足工程测量闭合差要求,以保证相邻结构高程的统一性。

4.2.2 桩位复查:由于本工程桩基础已施工完毕,在进行上部桥礅施工前需要对已浇筑完毕的灌注桩点进行复查。

复查的依据采用快速干道指挥部统一给定的控制点,复查每个桩位的钢筋及砼的标高。

复查时,应有本段的监理工程师参加,确认复查结果,误差在允许范围内,可以进行上部结构的施工。

高架道路施工工艺流程

高架道路施工工艺流程

高架道路施工工艺流程英文回答:Constructing an elevated highway involves several steps and processes. The first step is to conduct a feasibility study and design the layout of the highway. This includes determining the route, the number of lanes, and the required support structures.Once the design is finalized, the construction site is prepared. This involves clearing the land, leveling the ground, and setting up temporary facilities such as offices and storage areas. The construction site is also secured to ensure the safety of workers and the public.Next, the foundation for the elevated highway is constructed. This typically involves driving piles into the ground to provide support for the columns or piers thatwill hold up the highway. The piles are driven deep into the ground to ensure stability and strength. Concrete isthen poured into the piles to further strengthen the foundation.After the foundation is completed, the columns or piers are constructed. These vertical structures are built on top of the foundation and serve as the support for the elevated highway. The columns are typically made of reinforced concrete and are spaced at regular intervals along the route of the highway.Once the columns are in place, the next step is to construct the beams or girders that will support the highway deck. These beams are typically made of steel or prestressed concrete and are placed on top of the columns. The beams are then connected and reinforced to ensure the stability and strength of the elevated highway.After the beams are in place, the highway deck is constructed. This involves pouring concrete onto the beams and smoothing it out to create a flat and even surface. The deck is typically reinforced with steel bars or mesh to provide additional strength.Finally, the finishing touches are added to the elevated highway. This includes installing guardrails, lighting, and signage. The highway is then inspected for quality and safety before being opened to the public.中文回答:修建高架道路涉及多个步骤和工艺流程。

义北路高架桥的施工工艺流程与注意事项

义北路高架桥的施工工艺流程与注意事项

义北路高架桥的施工工艺流程与注意事项下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。

文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!本店铺为大家提供各种类型的实用资料,如教育随笔、日记赏析、句子摘抄、古诗大全、经典美文、话题作文、工作总结、词语解析、文案摘录、其他资料等等,想了解不同资料格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you! In addition, this shop provides you with various types of practical materials, such as educational essays, diary appreciation, sentence excerpts, ancient poems, classic articles, topic composition, work summary, word parsing, copy excerpts, other materials and so on, want to know different data formats and writing methods, please pay attention!义北路高架桥的施工工艺流程与注意事项1. 引言义北路高架桥的建设是当地交通基础设施建设的重要项目之一。

高架路桥墩施工流程

高架路桥墩施工流程

高架路桥墩施工流程
今天咱们来讲讲高架路桥墩是怎么建起来的呀。

先得找个合适的地方,就像我们搭积木得找个平坦的桌面一样。

这个地方要经过叔叔们仔细测量,确定在这儿建桥墩稳稳当当的。

比如说,要看看地下有没有大石头或者软乎乎的泥巴太多的地方。

接着呢,要把这个地方清理干净,把杂草、小石子啥的都弄走,就像我们打扫自己的小房间一样,要整得干干净净的。

然后开始挖大坑,这个坑可深啦,就像一个超级深的小山谷。

挖好坑之后,要在坑的四周用木板或者铁板把它围起来,这样坑就不会塌啦,就像给小山谷加上了围栏。

再往坑里放钢筋,钢筋就像小树枝一样,但是很结实。

一根一根地放进去,交叉着放,就像我们编小篮子一样,这样能让桥墩更牢固。

之后把混凝土倒进去,混凝土就像特别稠的泥巴。

倒进去之后,要把它弄平,等它慢慢变硬,就像我们做小泥人,等泥巴干了就变得硬硬的。

这样,一个高架路桥墩就慢慢建起来啦。

是不是很有趣呢?。

高架桥施工方案

高架桥施工方案

高架桥施工方案1.概述本标段高架桥由25+27+25m和40.5+50+40.5m两联三跨连续预应力箱梁、24跨预应力预制工型梁和2跨普通钢筋混凝土工型梁组成,总长845.14m。

基础为直径1.0m的钻孔灌注桩,承台、墩柱、盖梁均为钢筋混凝土结构。

具体施工工艺流程见下图:2. 材料加工钢筋、钢绞线进场后按不同的钢种、等级、牌号、规格及厂家分批验收、分别堆放保存,并立牌以便识别。

堆放时下面铺方木垫高,上面以盖布遮盖,防止锈蚀和污染。

钢筋进场后进行抽样检验并报请监理工程师审批,检验合格后进行加工。

2.1. 钢筋加工钢筋使用前若有锈蚀、污染,将表面漆皮、鳞锈、油渍等清除干净。

盘条和弯曲的钢筋进行调直。

认真熟悉图纸,计算各种型号钢筋的下料长度,根据下料长度及库存钢筋情况进行配筋、下料,下料时执行下料单制度。

加工制作严格按照图纸设计要求和施工规范进行,加工过程中严格控制各种加工误差(钢筋加工的允许误差见下表)。

制作完成后按照钢筋编号、使用部位等分别保存并挂牌标识。

钢筋加工允许误差接头除设计特殊要求外均采用双面搭接焊,电焊工持证上岗,正式施焊前进行试焊,合格后正式施焊。

焊接时两钢筋搭接端部向一侧弯折,弯折角度不大于4°。

保证两接合钢筋轴线在同一直线上,偏差不超过0.1d。

接头双面焊缝长度≥5d(d为钢筋直径)。

焊渣随焊随敲,以便出现气孔、夹渣等不良情况时予以补焊。

所用焊条性能符合有关规范要求。

(各类钢筋焊接所用焊条见下表)2.2. 钢绞线加工预应力钢绞线的下料长度,计算时考虑构件、锚夹具长度、千斤顶长度、张拉伸长值和外露长度等因素,以确保张拉工作正常进行。

钢绞线用切割机切断。

编束时梳理顺直、绑扎牢固,防止互相缠绞。

3.桩基工程本工程桩基范围内表层为人工填土层,下部处在第四纪沉积层,大部分为粉质粘土、粘土层,有少量的圆砾层、砂层。

根据这种地质情况,桩基工程拟采用回转钻机钻进。

钻孔灌注桩施工工艺流程图3.1 测量定位根据建设单位所交导线点、水准点利用全站仪放出桩中心位置及其护桩。

城市高架桥分节段盖梁预制、拼装施工工法

城市高架桥分节段盖梁预制、拼装施工工法

城市高架桥分节段盖梁预制、拼装施工工法一、前言随着城市交通的发展,城市高架桥也越来越多地出现在我们身边。

城市高架桥是城市交通建设中不可或缺的重要组成部分,但是它的施工过程却比较复杂,需要考虑的因素也较多。

城市高架桥分节段盖梁预制、拼装施工工法是一种新的施工方式,它可以大大缩短施工周期,提高施工效率,同时还能够保证高质量的施工和施工安全。

本文将介绍该工法的特点、适应范围、工艺原理、施工工艺、劳动组织、机具设备、质量控制、安全措施、经济技术分析和工程实例等内容。

二、工法特点城市高架桥分节段盖梁预制、拼装施工工法具有以下特点:1. 预制节段和盖梁,工期短:该工法采用预制好的节段和盖梁进行施工,大大缩短了施工周期,提高了施工效率。

2. 可重复使用,经济环保:采用钢模具生产节段和盖梁,可重复使用,节约了生产成本,同时也起到了环境保护的作用。

3. 施工便捷,拼接速度快:预制好的节段和盖梁可以直接进行拼接施工,施工便捷,拼接速度快。

4. 质量可控,施工安全:预制好的节段和盖梁采用钢模具进行生产,质量可控,同时也保证了施工安全。

5. 适用范围广:该工法适用于不同类型的城市高架桥,如高架公路、地铁等。

三、适应范围城市高架桥分节段盖梁预制、拼装施工工法适用于以下场合:1. 高架公路:高架公路施工周期较长,交通拥堵、施工危险因素较多,采用该工法能够大大降低施工周期,减轻交通拥堵、保证施工安全。

2. 地铁:地铁建设规模较大,采用该工法能够大大提高施工效率,减少施工周期,保证了地铁的运营时间。

3. 其他:该工法同样适用于其他类型的城市高架桥,如铁路、桥梁等。

四、工艺原理城市高架桥分节段盖梁预制、拼装施工工法的施工原理是:在设计好的高架桥上,通过预制好的节段和盖梁进行拼接施工,最终形成完整的高架桥。

为了满足实际工程需要,该工法采取了一系列技术措施,如:1. 钢模具生产:采用钢模具生产节段和盖梁,提高了质量可控性和生产效率。

高架桥施工工艺流程

高架桥施工工艺流程

高架桥施工工艺流程一、前期准备工作1.市场调研和项目规划在开始高架桥施工工艺流程之前,首先要进行市场调研,了解项目需求和市场情况。

然后进行项目规划,确定施工范围、时间和预算等。

2.环境评估和土地准备在确定项目后,需要进行环境评估,了解项目所在地的环境状况,包括土地的承载能力、地质条件等。

然后进行土地准备,如清理、平整等工作。

3.施工图设计和审批根据项目需求,进行高架桥施工图设计,并按照相关法规和标准进行审批,确保设计方案的科学性和合规性。

二、桩基施工1.地面钻孔首先进行地面钻孔,根据设计要求和地质条件确定钻孔位置和孔径。

通过钻孔来获取地下土壤和岩层的情况,为后续桩基施工提供依据。

2.注入灌浆材料在地面钻孔完成后,需要将灌浆材料注入钻孔中,加强地下土层的稳定性,增强桩基的承载力和抗震能力。

3.打桩接下来进行打桩工作,即在地面钻孔的基础上,使用打桩机将桩材穿过地下土层,直至达到设计要求的深度。

4.桩顶修整桩基打完后,需要对桩顶进行修整,确保桩顶的平整度和稳定性,为后续的梁、墩施工提供良好的支撑。

三、梁、墩施工1.模板安装在开始梁、墩施工前,需要先安装模板。

模板的质量和安装精度直接影响到后续混凝土的浇筑质量。

2.钢筋布置根据设计要求,进行钢筋的布置工作。

钢筋的种类、规格和数量均按照设计图纸进行设置,确保梁、墩的承载力和抗震能力。

3.混凝土浇筑在完成模板和钢筋布置后,进行混凝土的浇筑工作。

混凝土的配比、浇筑顺序和振捣工艺等均需要按照设计要求进行。

同时,要确保混凝土的质量,防止出现裂缝和空洞等质量问题。

4.养护混凝土浇筑完成后,需要进行养护工作,包括及时覆盖和喷水等措施,以确保混凝土的均匀干燥和强度的提高。

四、桥面铺装和防护1.路面铺装在进行桥面铺装前,需要进行路面的设计和铺装方案的确定。

然后进行路面铺装工作,根据设计方案进行材料的选择和铺装的施工工艺。

2.防护层施工在桥面铺装完成后,需要进行防护层的施工。

地铁高架桥标准化施工流程

地铁高架桥标准化施工流程

拔出仍用履带式液压拔桩机,拔出时拔桩机尽量少振 动,减少对周围土体的扰动。桩拔出后留下的空隙用 黄砂回填密实,防止日后周围土体位移。
4
基坑 混凝土达到设计强度后进行基坑回填,用挖机分层回 回填 填,回填厚度不超过 30cm,每层用振动夯机进行夯实。
①现场设置临边防护、醒目的安全警示标志、安全标
安全 语。②设置人员上下通道。坑边荷载(积土、料具堆放,
115
混凝土浇筑采用分层连续浇筑,可利用混凝土层面散
2
浇筑 方式
热,同时便于振捣,分层厚度为 30cm。层内从承台短 边开始,由两边向中间浇筑。并在前层混凝土初凝之前, 将次层混凝土浇完毕,保证无层间冷缝发生。
振捣采用插入式振动器,振捣时严禁碰撞钢筋和模板。
3
振捣
振动时要快插慢拔,不断上下移动振动棒,以便捣实均 匀。对每一个振动部位,振动到该部位混凝土密实为止,
5
第四章 钢筋混凝土高架桥
4.1 基础
4.1.1 桩基础(钻孔桩基工艺详见第一章——1.2 节)
4.1.2 承台 主要施工工序: 1.基坑防护及开挖、回填、2.桩头凿除、 垫层施工及桩基检测、3.钢筋绑扎、4.模板安装、5.混 凝土浇筑及养护。
基坑防护
集水井法抽水
挖掘机开挖 桩头凿除 桩基检测
钢板桩整 理
钢板桩围堰施工工艺流程图
(2)作业要点
序号 1 2 3
工序
作业要点
钢板桩 打入
用液压振动锤打设钢板桩,打设时注意锁口有效、上端 平齐、高出地面 1m、防止基坑外雨水流入基坑,内侧 平直。
基坑 采用人工配合挖掘机进行,距离基底 20cm 人工开挖清 开挖 底,严禁使用挖掘机,平整度不大于 2cm。

高架桥施工方案

高架桥施工方案

高架桥施工方案1. 引言高架桥是一种重要的交通基础设施,可以架设在城市道路、铁路或河道上,为交通提供便利。

在设计和建设高架桥时,需要考虑多个因素,包括施工方法、工期、材料选择等。

本文将介绍一种常见的高架桥施工方案。

2. 施工方法2.1 承台施工高架桥的承台是支撑整个桥身的基础部分。

承台的施工可以采用预制方式或现场浇筑方式。

2.1.1 预制承台预制承台的施工步骤如下:1.搭建模板:根据设计图纸搭建承台的模板,确保模板的水平和垂直度。

2.钢筋制作:根据设计要求,制作好承台的钢筋骨架。

3.预制承台:将预制的混凝土块安装到模板中,同时将钢筋骨架嵌入混凝土中。

4.养护:预制承台施工完成后,需要进行养护,确保混凝土的强度和稳定性。

2.1.2 现场浇筑承台现场浇筑承台的施工步骤如下:1.搭建模板:根据设计图纸搭建承台的模板,确保模板的水平和垂直度。

2.钢筋制作:根据设计要求,制作好承台的钢筋骨架。

3.浇筑混凝土:将混凝土均匀地倒入模板中,并同时将钢筋骨架嵌入混凝土中。

4.养护:混凝土浇筑完成后,需要进行养护,确保混凝土的强度和稳定性。

2.2 桥墩施工桥墩是高架桥上承台和桥面板的连接部分,桥墩的施工可以采用预制方式或现场浇筑方式。

2.2.1 预制桥墩预制桥墩的施工步骤如下:1.搭建模板:根据设计图纸搭建桥墩的模板,确保模板的水平和垂直度。

2.钢筋制作:根据设计要求,制作好桥墩的钢筋骨架。

3.预制桥墩:将预制的混凝土块安装到模板中,同时将钢筋骨架嵌入混凝土中。

4.养护:预制桥墩施工完成后,需要进行养护,确保混凝土的强度和稳定性。

2.2.2 现场浇筑桥墩现场浇筑桥墩的施工步骤如下:1.搭建模板:根据设计图纸搭建桥墩的模板,确保模板的水平和垂直度。

2.钢筋制作:根据设计要求,制作好桥墩的钢筋骨架。

3.浇筑混凝土:将混凝土均匀地倒入模板中,并同时将钢筋骨架嵌入混凝土中。

4.养护:混凝土浇筑完成后,需要进行养护,确保混凝土的强度和稳定性。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

高架桥施工工艺流程
高架桥施工工艺流程
一、前期准备阶段
1. 项目规划:确定高架桥的位置、长度和设计要求,制定施工计划。

2. 土地准备:清理施工现场,确保施工区域的平整和无障碍物。

3. 材料采购:根据设计要求,采购所需的建筑材料和设备。

二、基础施工阶段
1. 基坑开挖:根据设计图纸,在高架桥支撑点附近挖掘深度适当的基坑。

2. 基础浇筑:在基坑中倒入混凝土,并使用钢筋网进行加固,以确保
基础的稳固性。

3. 桩基施工:根据设计要求,在基坑中打入钢筋混凝土或预制桩,并
进行固定。

三、主体结构施工阶段
1. 支撑结构安装:根据设计图纸,在桥墩上安装支撑结构,包括横梁、纵梁和支撑柱等。

2. 桥面铺设:在支撑结构之间铺设预制或浇筑混凝土的桥面板,并进
行养护。

3. 桥墩施工:根据设计要求,在桥墩位置上进行混凝土浇筑和加固,
以支撑桥面结构。

4. 螺栓连接:在桥梁结构的连接处使用螺栓进行固定,以增强结构的
稳定性。

四、辅助设施施工阶段
1. 护栏安装:在高架桥两侧安装护栏,以确保行车安全。

2. 照明设施安装:在高架桥上安装照明灯具,为夜间行车提供光线。

3. 排水系统建设:建设排水系统,包括雨水排放和桥面积水的排除。

五、收尾工作阶段
1. 清理施工现场:清除施工过程中产生的垃圾和废弃物。

2. 道路修复:对施工区域周围的道路进行修复和恢复。

3. 安全检查:对高架桥的各项设施进行安全检查,并确保其符合标准
要求。

六、竣工验收阶段
1. 竣工验收申请:提交竣工验收申请,并提供必要的资料和证明文件。

2. 相关部门验收:由相关部门进行验收,检查高架桥的质量和安全性。

3. 竣工验收合格:如高架桥通过验收,颁发竣工验收证书。

七、后期维护阶段
1. 桥梁养护:定期对高架桥进行检查和养护,确保其正常运行和使用。

2. 维修保养:如发现损坏或破损的部分,及时进行维修和保养。

以上是高架桥施工工艺的详细流程,每个阶段都需要严格按照设计要求和相关规范进行操作,并确保施工质量和安全。

在施工过程中,需要密切配合各个施工单位的工作,并及时解决遇到的问题。

最终竣工后,还需进行竣工验收,并进行后续的养护和维修保养工作,以确保高架桥的长期稳定运行。