连续梁桥预应力施工技术问题论文

连续梁桥预应力施工技术问题论文
连续梁桥预应力施工技术问题论文

浅谈连续梁桥预应力施工技术问题摘要:目前,随着我国经济的增长,桥梁工程建设工作日益壮大。而在桥梁施工技术方面也得到了不断的创新,新工艺也得到了很好的发展。文章主要介绍了连续梁桥预应力施工前的试验,从而分析了连续梁桥预应力施工技术的要点,从中不断地改善工程的施工技术,提高工程的质量与安全。

关键词:预应力施工技术连续桥梁实验阶段

abstract: at present, with china’s economic growth, bridge engineering construction work growing. and in bridge construction technology also get the constant innovation and new process also had a good development. this paper mainly introduces the continuous girder bridge construction of prestressed before test, and analysis of the continuous girder bridge prestressed construction technology, the main points of constantly improve from the project construction technology, improve the quality of the construction and security.

keywords: prestressed construction technology continuous bridge the experimental stage

中图分类号:tu74 文献标识码:a文章编号:

1 施工前的试验阶段

关于装配式桥梁的施工技术的全面讲解

关于装配式桥梁的施工技术的全面讲解 装配式桥梁对于我们很多路桥老炮儿来说都是熟悉的不能 再熟悉了,但是如何与年轻一辈说明装配式桥梁的相关知识呢?比如它是如何施工的?它的施工工序都有哪些?在施 工过程中我们都需要注意哪些问题?下面就让我们一起再 次回顾一下让我们十分熟悉的装配式桥梁的施工技术吧。1、装配式墩台施工装配式墩台是将高大的墩台沿垂直方向、按一定模数、水平分成若干构件,在桥址周围的预制场地上进行浇筑,通过车船运输至现场,起吊拼装。装配式墩台的主要特点是:可以在预制场预制构件,受周围外界干扰少,但相对来说,对运输、起重机械设备要求较高。装配式柱式墩系将桥墩分解成若干构件,如承台、柱、盖梁(墩帽)等,在工厂或现场集中预制,再运送到现场装配成桥墩。其施工工序主要为预制构件、安装连接与混凝土填缝。其中拼装接头是关键工序,既要牢固、安全,又要结构简单便于施工。(1)采用有粘结后张预应力筋连接构造有粘结后张预应力筋连接构造往往配合砂浆垫层或环氧胶接缝构造实现节段 预制桥墩的建造,方案中的预应力筋可采用钢绞线或精轧螺纹钢等高强钢筋。该构造特点是预应力筋通过接缝,实际工程应用较多,设计理论和计算分析以及施工技术经验成熟。不足是墩身造价相对传统现浇混凝土桥墩要高许多,同时现场施工需对预应力筋进行张拉、灌浆等操作,施工工艺复杂,

施工时间较长。(2)灌浆套筒连接预制墩身节段通过灌浆连接套筒连接伸出的钢筋,墩身与盖梁或承台之间的接触面往往采用砂浆垫层,墩身节段之间采用环氧胶接缝构造。构造特点是施工精度要求较高,现场施工所需时间短,同时也不需要张拉预应力筋,现场工作量显著减小,其正常使用条件下的力学性能与传统现浇混凝土桥墩类似,因此具有一定的经济优越性。从国外应用经验看,低地震危险区已开始广泛应用,高地震危险区域的应用和科学研究还在进行中。(3)灌浆金属波纹管连接该连接构造常用于墩身与承台或墩身 与盖梁的连接,预制墩身通过预埋于盖梁或承台内的灌浆金属波纹管连接墩身内伸出的钢筋,在墩身与盖梁或承台之间的接触面往往采用砂浆垫层,墩身节段之间采用环氧胶接缝构造,见图5所示。该构造现场施工时间短,但需要满足纵筋足够的锚固长度,其力学性能与传统现浇混凝土桥墩类似。目前国外已有少数桥梁使用这种连接构造进行施工,高地震危险区域内应用较少,其抗震性能如何目前仍在研究中。(4)插槽式连接插槽式连接构造如图6所示,已在一些桥梁工程中得到应用,主要用于墩身与盖梁、桩与承台处的连接,与灌浆套筒、金属波纹管等相比,优点是所需施工公差可以大一些,现场需要浇筑一定的混凝土。(5)钢筋焊接或搭接并采用湿接缝预制拼装桥墩预先伸出一定数量的钢筋以便与 相邻构件预留钢筋搭接,需设临时支撑,钢筋连接部位需通

大跨度预应力混凝土梁桥施工技术

大跨度预应力混凝土梁桥施工技术 一、我国预应力混凝土梁桥的现状与发展 1、预应力混凝土梁式桥的结构特点 各种形式的预应力混凝土梁式桥在桥梁建设中占有主导地位,而且有着广阔的发展前景。 按结构体系划分一般有:简支梁、连续梁、T形刚构、连续刚构、刚构连续组合梁以及V型墩刚构等。按截面形式划分有:I形梁、T形梁、 形梁、槽形梁、箱形梁等,大跨度超静定梁桥绝大多数采用箱形截面。 预应力混凝土简支梁桥由于结构简单、受力明确、施工方便,仍将是我国量大面广的中小跨径桥梁的首选结构。一般认为,简支梁桥的合理跨径在50m以下,超出这一范围,梁高会急剧加大,失去其经济合理性。 与简支梁相比,其它超静定梁则具有较大的跨越能力,那就是预应力混凝土连续梁与连续刚构。预应力混凝土连续刚构桥对地形、地质和通航要求适应性强、施工方便、较经济,已成为国内大跨径桥梁的首选桥型。 预应力混凝土连续梁与连续刚构同为大跨度梁式桥,但受力上存在着一定的差异。与连续梁相比,连续刚构由于在墩顶处的墩梁固结,对梁跨形成附加约束,因而能够增加顺桥向的抗弯刚度和横桥向的抗扭刚度,从而提高桥梁的跨越能力;同时由于墩柱的约束,温度变化、收缩徐变等对连续刚构造成的内力影响,也比连续梁大得多;尽管在高墩桥

位,经常采用柔性墩结构,但桥墩的材料用量、设计难度要比连续梁大得多。 与连续刚构相比,连续梁桥在支座处仅提供竖向约束。所以,在正常“恒载+活载”作用下的跨中截面弯矩要比连续刚构大,但由温度变化所产生的各种内力要比连续刚构小很多;大跨度连续梁对支座的承载能力要求很高,甚至需要特别设计(如南京长江大桥二桥北汊桥连续梁的支座吨位达到65000KN)。但它要求桥墩只承受竖向反力,在深水基础的情况下允许采用高桩承台,能够大大简化基础及桥墩的设计与施工。 刚构、连续组合梁桥的受力特点则介于连续梁桥和连续刚构之间;V 型墩刚构则具有增加桥梁刚度的特点。总之,在大跨度桥梁的桥式方案中,应当结合具体的技术经济条件,权衡选择。 2、我国预应力混凝土桥梁的现状与发展 桥梁跨越能力,也就是常说的跨径大小,是桥梁建设水平的一个重要指标,在一定程度上反映一个国家的工业、交通、桥梁设计和施工各方面的成就。 近二十年来,随着我国交通运输业的蓬勃发展,预应力混凝土桥梁的建设取得了很大的成就,其技术进步主要表现在: 在结构材料方面,高强、早强混凝土,又发展到高性能混凝土,以及在特殊使用要求下的特种混凝土正在得到推广应用,商品混凝土和泵送混凝土正在取代传统的施工方法;在预应力技术上,高强钢绞线、大吨位群锚技术日益普及,目前1860MPa级的高强低松驰钢绞线,几乎包揽了新建大跨度预应力混凝土桥梁天下(已研制出2000MPa的钢绞

连续梁论文

跨薛店收费站(60+100+60 )m 预应力混凝土 连续梁线型控制技术措施 中铁四局一公司张杰 摘要:大跨度预应力混凝土连续梁通常采用悬臂浇筑法施工。施工过程中连续梁线型控制是非常重要的工序,直接影响连续梁的美观和桥梁的使用。本文结合薛店特大桥工程实例,重点对悬连续梁线型控制进行了阐述。 目的:尽管在设计时已经考虑了施工中可能出现的情况,但是由于施工中出现的诸多因素,事先难以精确估计,而且在实际施工过程中由于施工误差,会使实际结构与原设计不符。所以在施工中对桥梁结构进行实时监测,并根据监测结果对施工过程中的控制参数进行相应调整是十分重要的。 一、概述 薛店特大桥跨薛店收费站(60+100+60)m 预应力混凝土连续梁全长为221.5m(含两侧梁端至边支座中心各0.75m),采用单箱单室变高度连续梁,箱梁梁底曲线按二次抛物线变化。连续梁的边跨直线段采用支架现浇施工, 0号节段采用墩旁搭设临时支架现浇施工,合拢段采用悬吊支架浇筑施工, 其余节段采用挂篮悬浇对称施工。梁体采用三向预应力体系。 二、连续梁线形控制程序 连续梁的线性控制流程如下:(1)计算立模标高,进行复核;(2)根据立模标高对挂篮进行定位;(3)根据施工图绑扎钢筋,立模,浇筑混凝土;(4)混凝土浇筑后,对梁顶和梁底的高程进行测量,并进行复测;(5)根据设计院提供的张拉控制应力和超张拉系数等参数进行预应力张拉;(6)预应力张拉后的高程观测,并进行复测;(7)挂篮前移;(8)挂篮前移后的高程观测,并进行复测;(9)对混凝土浇筑后、预应力束张拉后和挂篮前移后这三种工况的高程观测数据进行分析,与理论值进行对比, 总结其中的规律,以调整下一阶段的立模标高。再回到流程(1_,由此循环下去。 测量控制程序如图所示:

简述大跨度连续梁转体施工的关键技术问题

简述大跨度连续梁转体施工的关键技术问题 王世学助理工程师 中铁九局集团第七工程有限公司辽宁沈阳 【摘要】结合盘营客专盘锦特大桥跨沟海铁路128m连续梁成功转体的实践,简述大跨度连续梁在转体施工中的相关技术问题,为同类转体施工提供技术支持,将我国大跨度转体连续梁的设计、施工水平推向更新的高度。 【关键词】连续梁平转法转动体系称重配重线形监控转体施工 一、转体工程概况 盘营客专盘锦特大桥(80+128+80)m现浇连续梁跨既有沟海铁路,与其交角为167°10′,该梁平面位于半径5500m的圆曲线上,纵面位于半径25000m 的竖曲线上,线路纵坡由3.072‰变为-12.7‰。由于施工工期及施工条件制约,采用常规挂篮悬浇施工方法,对既有线运营存在重大安全风险,因此该桥采用平衡转体的施工方法。即先在铁路一侧浇筑梁体,然后通过转体使主梁就位、调整梁体线形、封固球铰转动体系的上、下转盘,最后进行合拢段施工,使全桥贯通。转体段T构梁长63m+63m,转体重量达12000t。 二、转体理论依据 转体的基本原理是箱梁重量通过墩柱传递于上球铰,上球铰通过球铰间的四氟乙烯滑片传递至下球铰和承台。待箱梁主体施工完毕以后,脱空砂箱将梁体的全部重量转移于球铰,然后进行称重和配重,利用埋设在上转盘的牵引索、转体连续作用千斤顶,克服上下球铰之间及撑脚与下滑道之间的动摩擦力矩,使梁体转动到位。 三、转体施工关键技术及难点 平转法的转动体系主要有转动支承、牵引系统和平衡系统。本转体工程特点具有转动球铰承重大、牵引制动力大、曲线连续梁施工存在纵横向不平衡弯矩等特点。难点在于该梁平面位于小曲线半径和竖曲线上,难以控制梁体线形。因此在施工过程中,必须严格控制要求,进行转动支承、牵引系统及平衡系统的试验研究,并加强线形监控及模型分析,确保转体施工的顺利实施。 1、转动支承 转动支承是平转法施工的关键设备,由上转盘和下转盘构成。上转盘支承整个转动结构,下转盘与基础相联。通过上转盘与下转盘的相对转动,达到转体目

预应力混凝土桥梁工程施工方案

预应力混凝土桥梁工程 本标段内桥梁为石院子中桥长67米,上部为预应力混凝土T梁,下部采用柱式墩,U 型桥台,钻孔灌注桩基础。 1、基础施工 1、1桩基施工方法 钻机施工工艺见钻孔灌注桩施工工艺框图。 1.1.1施工准备: 开钻前根据地层岩性等地质条件、技术要求确定钻进方法和选用合适的钻具;规划施工场地,合理布置临时设施;开孔前,测量班放出桩位中心后将钢护筒埋入土中正确对位。开孔时,采用短钻具、低钻速、轻压慢进。 1.1.2钢护筒的制作: 桩基护筒用δ=10mm的A3钢板卷制,护筒焊接采用开坡口双面焊,要求焊逢连续,保证不漏水。护筒埋置深度须符合下列规定:黏性土不小于1m,砂类土不小于2m,当表层土松软时将护筒埋置到较坚硬密实的土层中至少0.5m;岸滩上埋设护筒,在护筒四周回填黏土并分层夯实;护筒顶面中心与设计桩位偏差不大于5cm,倾斜度不大于1%。 1.1.3钻进施工:

钻孔灌注桩施工工艺框图 钻进施工时,再次将钻头、钻杆、钢丝绳等进行全面检查;钻进时,钻头对准设计桩位中心,匀速下放至作业面,液压装置加压,旋转钻进,钻进过程中,应根据地质资料掌握土层变化,及时捞取钻碴取样,判断土层,记入钻孔记录表,并与地质资料进行核对。根据核对判定的土层调整钻机的转速和钻孔进尺。 1.1.4护壁: 钻孔护壁采用泥浆护壁的形式。选用成品膨润土配制优质泥浆,其具有相对密度低、粘度低、含砂量少、失水量少、泥皮薄、稳定性强、固壁能力高等优点。根据不同的地质情况选择不同的泥浆比重。根据地层情况及时调整泥浆性能,参照<公路桥梁施工规范>(JTG/T F50-2011)泥浆性能指标。 1.1.5第一次清孔: 钻孔至设计高程,经过检查,孔深符合要求后,开始进行清空。清孔采用换浆法,在钻进至设计深度后,稍稍提起钻头,同时保持原有的泥浆比重进行循环浮碴,随着 终 孔 清 孔 测 孔 安放钢筋笼 安放导管 测孔深、孔径、倾斜度 测泥浆性能指标 监理工程师签字认可 监理工程师签字认可 水密性试验 测孔深、孔径 钢筋笼及检测管制作 凿桩头 二次清孔 灌注混凝土 检查泥浆指标及沉渣厚度 制作混凝土试件

现浇混凝土梁(板)桥施工

现浇混凝土梁(板)桥施工 一、支架类型与构造 1、满布式木支架 满布式木支架主要适用于跨度和高度都不大的工程量较小的引桥、通道、立交桥。高度大于6m,跨度大于16m,桥位处水位深的桥梁,很少采用木支架施工。由于我国木材资源日趋匮乏,使用木支架费工多,安全可靠性差,重复利用率低,成本高,因此,木支架在桥梁建设中已逐步被品种繁多的钢支架所代替。但在我国南方山区的桥梁施工中满布木支架尚有使用。 2、钢木混合支架 为加大支架跨径、减少排架数量,支架的纵梁可采用工字钢,其跨径可达10m。但在这种情况下,支架多改用木框架结构,以加强支架的承载力及稳定性。 3、万能杆件拼装支架 用万能杆件可拼装成各种跨度和高度的支架,其跨度须与杆件本身长度成倍数。 用万能杆件拼装的桁架的高度,可分为2m、4m、6m或6m以上。当高度为2m时,腹杆拼为三角形;高度为4m时,腹杆拼为菱形;高度超过6m时,则拼成多斜杆的形式。 用万能杆件拼装墩架时,柱与柱之间的距离应与桁架之间的距离相同。柱高除柱头及柱脚外应为2m的倍数。 用万能杆件拼装的支架,在荷载作用下的变形较大,而且难以预计其数值,因此,必要时需考虑预加压重。预压质量相当于浇注的混凝土及其模板和支架上机具、人员的质量。 4、装配式公路钢桥桁架节拼装支架 用装配式公路钢桥桁架节,可拼装成桁架梁和支架。为加大桁架梁孔径和利用墩台作支承,也可拼成八字斜撑以支撑桁架梁。桁架梁与桁架梁之间,应用抗风拉杆和木斜撑等进行横向联结,以保证桁架梁的稳定。 5、轻型钢支架 桥下地面较平坦、有一定承载力的梁桥,为节省木料, 宜采用轻型钢支架。轻型钢支架的梁和柱,以工字钢、槽钢 为主要材料,斜撑、联结系等可采用角钢。构件应制成统一 规格和标准;排架应预先拼装成片或成组,并以混凝土、钢 筋混凝土枕木或木枕木作支承基底。为了防止冲刷,支承基 底需埋入地面以下适当的深度。为适应桥下高度,排架下应 垫以一定厚度的枕木或木楔等。 为便于支架和模板的拆卸,纵梁支点处应设置木楔。

连续梁桥预应力施工技术问题论文

浅谈连续梁桥预应力施工技术问题摘要:目前,随着我国经济的增长,桥梁工程建设工作日益壮大。而在桥梁施工技术方面也得到了不断的创新,新工艺也得到了很好的发展。文章主要介绍了连续梁桥预应力施工前的试验,从而分析了连续梁桥预应力施工技术的要点,从中不断地改善工程的施工技术,提高工程的质量与安全。 关键词:预应力施工技术连续桥梁实验阶段 abstract: at present, with china’s economic growth, bridge engineering construction work growing. and in bridge construction technology also get the constant innovation and new process also had a good development. this paper mainly introduces the continuous girder bridge construction of prestressed before test, and analysis of the continuous girder bridge prestressed construction technology, the main points of constantly improve from the project construction technology, improve the quality of the construction and security. keywords: prestressed construction technology continuous bridge the experimental stage 中图分类号:tu74 文献标识码:a文章编号: 1 施工前的试验阶段

装配式梁桥梁体预制及安装施工工艺方法要求(优秀工程范文)

装配式梁桥梁体预制及安装施工工艺方法要求 9、梁体预制 本标段有25米、35米、40米三种形式后张预应力T梁,施工工艺流程如下: 工艺方法要求如下: ①台座设置:对原地面进行清理、整平,碾压密实达到路基基底处理的要求.为保证梁平面位置的准确性,模板支立和混凝土振捣时,梁的横向不发生移位,采用混凝土底座.台座主要由3米米厚钢板6厘米厚木板、混凝土支墩、混凝土底座及混凝土基础构成.钢板和木板作为制梁底模;混凝土支墩用来加固木底模;间隙用来穿法兰、螺栓,以加固两侧底侧模.台座顶面按设计要求设置预拱度,预拱度值按二次抛物线进行布设. ②龙门吊设置:龙门吊走行轮采用双轮对电力牵引,可用作移梁、混凝土吊装和支立、拆除模板;上部用4片单层六四式军用梁,两片一组,中间拉开80厘米,在六四梁跨中用加强型三角及弦杆以提高抗弯能力;立柱采用八三轻墩杆件,结构形式为2×4式;吊梁滑轮组起吊能力设计为50吨、70吨、80吨三种形式龙门吊. ③钢筋、钢绞线加工安装:采用钢筋切割机切断、弯筋机弯制成型,就地在梁台座处进行绑扎.在台座上精确放样,设置梁底预埋钢板,并放置与梁体同标号的砼垫块,以使钢筋与台座隔离.先绑扎马蹄部分纵向主筋和箍筋,后绑扎竖向和纵向腹筋. 在绑扎时为提高骨架的稳定性和刚度,用钢管或Φ28钢筋作三角支撑,用Φ12钢筋加强腹板刚度. 钢绞线采用冷切割机械按照设计图纸下料,人工编束、穿束. ④预应力孔道:制孔采用金属波纹管,在使用前进行仔细检查,确保波纹管没

有锈包裹、油污、泥土、撞击、压痕、裂口等影响使用的问题.波纹管的安装以底模为基准,按预应力钢绞线曲线坐标直接量出相应点的高度,标在钢筋上,定出波纹管位置,将钢筋托架焊牢定位在箍筋上,用铁丝扎牢波纹管,直线段75厘米一道定位筋,曲线段加密,以防止在施工过程中发生位置改变. 当波纹管的安装与钢筋发生妨碍时,调整钢筋位置,以保证预应力管道位置的准确.特别应注意使锚下垫板与预应力孔道中心保持垂直.在波纹管接头部位及其与锚垫板喇叭接头处,采取有效措施,保证其密封,严防漏浆.锚垫板,喇叭管及螺旋筋采用厂家供应的定型产品. ⑤模板制作与安装:预制梁底模采用3米米钢模板,外模根据梁体外形尺寸和经计算所需要的刚度与强度,用钢材在标准加工厂制作. 模板安装采用龙门吊完成,自中间向两端进行,调模时,由于模板比较规则,吊线垂靠模板底角的三角形木楔逐块调整竖直,模内尺寸由两端模板调整好后,中间模板依次对齐. 立模顺序:涂脱模剂——粘接缝止浆海绵条——安装侧模——安装端模 ⑥砼的灌注:浇注混凝土前,对模板进行全面检查,确保波纹管,锚垫板,喇叭管,螺旋筋等位置准确,定位牢固.同时检查伸缩缝、护栏、支座等预埋件及预留泄水孔的位置和数量.砼在拌合站内集中拌制,运输车运输,输送泵或龙门吊提升灌注,平板式、插入式及附着式振捣器振捣.砼浇筑时采用从两端向中间同时对称、倾斜分层、一次到顶连续灌注的方法.砼经1:1斜坡向前推进做到斜向分层,分层厚度不大于30厘米,由于两端波纹管弯起,混凝土不宜下落,塌落度要控制在6~8厘米左右.另外应加强振动锚垫板部位使之密实,而且波纹管下面混凝土应加强振动,以免出现隔离缝. 浇注顺序:马蹄部位——马蹄至最上层波纹管范围——腹板——桥面板.上面四部砼的浇筑均由两端向梁中部浇注,马蹄至波纹管范围的砼浇注完成后,即可拆除附着式振动器向梁中间移动以节约振动器.混凝土的振捣,以振动棒与附着式振动器相配合,在梁的两端布置在马蹄与弯起孔道部位,梁的中部振动器布置在马蹄,腹板以插入式振动棒为主. 砼浇筑过程中应注意以下事项: a.下料要均匀、连续,不宜集中猛投而造成挤塞.在钢筋、孔道密集部位可短时间开动插入式振捣器辅助下料.

浅谈转体施工工艺及计算

浅谈连续梁转体施工工艺及转体计算 摘要:桥梁转体施工是上世纪40年代以后发展起来的一种架桥工艺,现在很多跨铁路及跨公路桥中都用到了桥梁转体施工技术。本文简单介绍了长株潭城际铁路214#-217#墩跨越湘潭东车站连续梁转体施工工艺及转体计算。 关键词:连续梁转体牵引力助推力制动距离 一、工程概况 新建长株潭城际铁路CZTZH-Ⅲ标湘潭特大桥在214#~217#墩(75.5+125+75.5)m预应力混凝土连续梁跨越湘潭东车站,起始里程为:XDK44+306.525~XDK44+582.925。考虑到常规施工连续梁梁体对既有线的影响大,该连续梁采用转体施工方案,先在既有线两侧将两个T构预制好后,通过转体球铰结构及连续千斤顶转体施工使两个T构转体到位并合拢成桥。 二、转体施工工艺及注意事项 (一)转体结构简述 本桥转体部分悬臂长度为61.5m,于215#、216#墩中心对称。转体重量为11000吨,通过转体牵引系统转动上转盘使梁体轴线与设计位置重合。下转盘中心设钢转轴,上转盘中心设定位轴套管,使上下转盘中心重合。 转体过程按“中心承重”的思路来进行,不考虑支撑脚的支撑作用。 (二)主要技术参数 1.转动角度:215#墩为逆时钟36°,216#墩为逆时钟26°; 2.梁端转动弧长:215#墩为19.31m,216#墩为1 3.95m; 3.转体重量:11000吨; 4.转体几何尺寸:悬臂长度为61.5m,桥面宽12.2m,0#块高9.036m; (三)转体牵引体系及转体所需设备 1.转体牵引体系 本桥的牵引体系由千斤顶、牵引索、反力架、锚固端组成。千斤顶采用连续顶进千斤顶,牵引索共2束,反力架采用预埋型钢浇筑混凝土成反力墩,锚固端采用OVM体系。 2.转体设备 (1)同步连续牵引系统 350吨连续千斤顶2台,泵站2台,主控台2套。 (2)助推系统 50吨千斤顶4台,电动油泵4台。

预应力混凝土桥梁转体施工技术

浅谈预应力混凝土桥梁转体施工技术【摘要】近年来随着我国经济高速发展的需要,国家不断扩大对运输部门的投资,并高度重视桥梁的修建工作,同时预应力技术也得到了突破发展,预应力混凝土桥梁的转体施工技术也得到越来越广泛的应用。本文从桥梁施工的特点、流程、方法等方面对预应力混凝土桥梁施工技术进行介绍和探讨。 【关键词】预应力混凝土桥; 转体施工; 转盘制作 【 abstract 】 in recent years as china’s rapid economic development needs, the state of the transportation sector continues to expand the investment, and pay close attention to the construction of the bridge, while prestressed technique also get the breakthrough, prestressed concrete bridge construction technology also swivel get applied more and more. this article from the characteristics of the bridge construction, process and method of bridge construction of prestressed concrete technology are introduced and discussed. 【 keywords 】 prestressed concrete bridge; swivel construction; turntable production 中图分类号:tu37文献标识码:a 文章编号: 随着我国经济建设的发展,交通事业的建设也取得了重大进展,而在交通线的扩展方面桥梁的修筑有着重要地位和作用,但是在桥

谈悬浇连续梁合龙段劲性骨架施工技术

第44卷第8期 山西建筑Vol.44No.8 2 0 1 8 年 3 月SHANXI ARCHITECTURE Mar.2018 ?193 ?文章编号:1009-6825 (2018)08-0193-02 谈悬浇连续梁合龙段劲性骨架施工技术 王世民 (准朔铁路有限责任公司,山西太原030013) 摘要:混凝土连续梁挂篮法施工中合龙段临时连接是普通采用的形式,合龙段劲性骨架的形式选择和计算直接影响到合龙施工 过程及成桥后的质量和安全。为保证悬浇连续梁合龙施工安全及质量,选用了安全可靠简单易行的劲性骨架进行临时连接,并通 过严格的受力计算,确保了合龙施工安全,保证了成桥质量符合要求,为类似工程施工提供了借鉴意义。 关键词:连续梁,劲性骨架,合龙段,施工技术 中图分类号:U445 文献标识码:A 1工程概况 朔山联络线跨桑干总渠大桥1号~4号墩台为单线(32 +48 + 32)m后张法预应力钢筋混凝土箱型连续梁,该连续梁位于直线 上,为跨越桑干总渠而设。梁体边支座中心至梁端0.6 m,全长113.2 m,梁高沿纵向按二次抛物变化,中支点梁高3.5 m,边支点 及跨中梁高2.5 m,中跨跨中直线段长8.4 m,边跨直线段长12.8m。梁体截面采用单箱单室直腹板形式,顶板厚度除梁端附 近外均为32 c m,腹板厚45 cm ~ 60 cm ~ 70 c m,底板由跨中的 40 c m按二次抛物线变化至根部的60 c m。顶板宽度7. 2 m,底板 宽度3. 8 m。 跨桑干总渠(32 + 48 + 32)m连续梁,采用挂篮施工,合龙段 长1.5 m,合龙段临时钢支撑劲性骨架主要由主型钢支撑2 I40a,牛腿及梁体预埋件组成。主型钢支撑焊接在梁体预埋件上,并与 牛腿共同抵抗水平力。合龙时产生的荷载效应通过主型钢支撑 的焊缝传给主型钢骨架,然后推动整个梁体移动,合龙段新浇筑 的混凝土不参与受力计算跨中合龙段施工工况。 2劲性骨架施工方案 合龙段采用临时锁定钢支撑劲性骨架方案。在箱梁顶板和 箱室底板上分别焊接两组主型钢支撑,每组主型钢支撑架由两个 I4〇a的工字钢焊接成整体,并焊接于预埋件与混凝土连接成整 体,达到合龙段锁定的目的。梁体沿纵向产生微小移动,由此产生纵向摩擦力,中跨合龙段劲 性骨架需要能完全承受该摩擦力。 将跨中合龙段向边跨一侧所有梁段重量累加可得到半桥总 自重为:疋=9 992.55 k N,为偏于安全计算,桥上机械荷载、人群 荷载、挂篮荷载可按1 800 k N考虑,并考虑1.1超载系数,则半桥 总荷载为: C= l.l x (9 992.55 +1 800) =12 971.8 k N0摩擦系数按/=〇.08考虑,则因温升或温降产生的水平摩擦 力为: F= 0.08 x l2 971.8 =1 037.7 k N。 4主型钢支撑的强度计算 1)2 I40a热扎普通工字钢的截面特性: 截面面积= 17 214 m m2,惯性矩/ = 434 280 000 m m4,截面 模量妒=2 171 400 m m3,回转半径 ^ = 158. 8 m m。 2) 劲性骨架受温度变化伸缩产生的轴力为=1 037.7 k N,单组主型钢支撑所受最大荷载值为1 037.7/4 = 259.4 k N,长度以 3.0 m计,A =仍=3 000/158. 8 = 18. 9,史=0.983。 故有〇■= N (p xA259. 4 = 0.983 x17 214 = 15.33 M Pa<180 M Pa满足 要求。 5牛腿与主型钢支撑间钢板的焊缝检算 3合龙后温升或温降产生的摩擦力计算 计算因温升或温降产生的摩擦力。 1) 边跨合龙时,主墩为固定墩,主墩上梁体随气温升高或降 低将导致梁体的伸长和缩短,并使梁体沿纵向产生微小移动,通 过合龙段钢支撑劲性骨架带动边跨直线段移动,直线段一部分作 用于墩顶托架,边墩墩顶处作用于支座,墩顶托架及墩顶支座处 产生的纵向摩擦力即为钢支撑的受力。 边墩现浇段重量为1 136.5 k N,桥上机械荷载、人群荷载可按 250 k N考虑,并考虑1.1超载系数,墩顶处总荷载为: G= l.l x(1 136.5 +250) =1 525.15 k N。 考虑模板与混凝土之间的摩擦系数按/=〇.5考虑,则因温升 或温降产生的水平摩擦力为: F= 0.5 x l 525.15 =762.6 k N0 边跨合龙段钢支撑劲性骨架受轴力为F= 762.6 k N。 2)中跨合龙段混凝土浇筑时边跨已完成合龙,临时支墩已拆 除,中跨合龙段钢支撑劲性骨架焊接后混凝土浇筑时全桥即形成 完整的连续梁,气温升高或降低将导致梁体的伸长和缩短,并使焊脚尺寸为10 m m。每根工字钢骨架焊缝长度按四面围焊 考虑=142 x2 + (400 - 16. 5 x2)x2 + (142 - 10. 5)x 2 = 1 281 m m,焊缝计算长度L= 1 281 m m- 8?=1 201 m m。单个主 型钢支撑端头共1个连接钢板,每个连接钢板含2根工字钢骨架。 单组/V= 259.4 k N。 N_259 400x1.35 = 0.7x10x1 201 x2 = 20.83 M Pa<< =160 M P a。 6牛腿计算 主型钢支撑底部翼缘与预埋钢板焊接,焊缝高度10 m m,焊 缝长度250 m m,焊缝计算长度250 - 2?= 230。牛腿锚固钢板焊 缝高度10 m m,焊缝长度为230 m m,焊缝计算长度1=23〇111111- 2?= 210 m m。单个主型钢端头共4条工字钢骨架焊缝,8条牛腿 锚固钢板焊缝。#= 259.4 k N,考虑工字钢骨架焊缝及锚固钢板 焊缝共同承担水平力/V,则锚固钢板焊缝所受弯矩为: 由于259.4 x1.35 -0.7 x10 x230 x160 x4/1 000 k N .m<0, 故主型钢支撑底部翼缘与预埋钢板焊缝已满足受力要求要求。 牛腿焊缝可作为安全储备。 收稿日期:2018-01-04 作者简介:王世民(1972-),男,工程师

第七章 装配式简支梁桥的构造

第七章装配式简支梁桥的构造 第一节装配式简支梁桥的类型 一、装配式简支梁桥的截面形式: (一)截面形式——Π形、T形、箱形; 1. Π形梁适用l=6~12m的小跨经桥;构件制造复杂,截面性状稳定,横向抗弯刚度大,块件堆放、装卸、安装方便。 2. T形梁制造简单,整体性好,接头方便,截面性状不稳定,运输和安装复杂。 装配式钢筋混凝土T形梁常用跨径为7.5~20m,装配式预应力混凝土T形梁常用跨经为20~40m。 3. T形梁为满足预应力集中配筋及预应力受压需要,下部呈马蹄布臵。马蹄高度从跨中到支点逐渐升高。 4. 箱形梁一般不用于钢筋混凝土;纵横向的抗弯抗扭能力大,预施应力、运输、安装阶段单梁稳定性比T形梁好;箱梁薄壁施工复杂,安装质量也较T梁大。 箱梁可少设横隔梁,但端横隔梁必需。 二、块件的划分方式 (一)划分原则: 起吊能力、接缝在应力最小处、接头少、施工方便、便于安装、标准化。 (二)块件划分: 纵向竖缝、纵向水平缝、纵横向竖缝; 第二节装配式钢筋混凝土简支T梁桥 一、构造布臵: 常用跨径——8.0~20m之间;我国标准设计为10,13,16,20m等四种 主梁梁距——1.5~2.2m之间; 横梁布臵——端横梁、中横梁(布臵在跨中及四分点处)。 横隔梁在装配式T形梁中起着保证各根主梁相互连成整体的作用;它的刚度愈大,桥梁的整体性愈好,在荷载作用下各主梁就能更好地协同工作。然而,设臵横隔梁使主梁模板工作稍趋复杂,横隔梁的焊接接头又往往要在设于桥下专门的工作架上进行,施工比较麻烦。

实践证明,对于简支梁桥,一般在跨中,四分点,支点处各设一道横隔梁就可满足要求。 二、主要尺寸: 主梁——高跨比1/11~1/18;肋厚16~24cm; 横梁——中横梁3/4h,端横梁与主梁同高,宽12~20cm,可挖空; 翼板——不小于1/12h,一般为变厚度。 (一)主梁 1.梁高: 装配式钢筋混凝土简支梁的常用跨径8.0~20m。我国标准设计为10,13,16,20m等四种,其梁高分别为0.8~0.9,0.9~1.0,1.0~1.1,1.1~1.3m。经分析比较,表明高跨比(梁高与跨径之比)的经济范围约在1/11~1/18,跨径大取用偏小的值。主梁高度如不受建筑高度限制,高跨比宜取偏大值。增大梁高,只增加腹板高度,混凝土数量增加不多,但可以节省钢筋用量,往往比较经济。 2.肋厚: 满足主拉应力强度和抗剪强度需要的前提下,主梁梁肋的厚度,一般都做得较薄,以减轻构件的重量,但还要注意满足梁肋的屈曲稳定性和不致使浇筑混凝土发生困难。以往常用的装配式钢筋混凝土简支梁梁肋厚度为150~180mm,其上、下限的取法,取决于主钢筋的直径和钢筋骨架的片数。目前,焊接钢筋骨架已较少采用,其次,为了提高结构的耐久性,适当增加保护层的厚度,梁肋厚度已增至160~240m m。 (二)横梁: 横隔梁的高度可取为主梁高度的四分之三左右。在支点处可与主梁同高,以利于梁体在运输和安装中的稳定性。但如果端横隔梁高度比主梁略小一些,则对安装和维修支座是有利的。 横隔梁的肋宽常用12~20cm。预制时做成上宽下窄和内宽外窄的楔形,以便脱模。 (三)翼板: T梁翼板的厚度,钢筋混凝土梁中,主要满足于桥面板承受的车辆局部荷载要求。根据受力特点,翼缘板一般都做成变厚度的,即端部较薄,至根部(与梁肋衔接处)加厚,并不小于主梁高度的1/12。翼缘板厚度的具体尺寸,有两种处理方法:一种是考虑翼缘板承担全部桥面上的恒载与活载,板的受力钢筋设在翼缘板内,在铺装层内只有局部的加强钢筋网,这时翼缘板做得较厚一些,端部一般取80mm;另一种是翼缘板只承担桥面铺装层的荷载、施工临时荷载以及自重,活载则由翼缘板和布臵有受力钢筋的钢筋混凝土铺装层共同承担(例

高速铁路连续梁转体施工工艺

高速铁路连续梁转体施工 1.转体结构施工工艺 转体结构由钢球铰及其撑脚、上转盘、下转盘、转体牵引系统、助推系统、轴线微调系统、顶梁系统、临时辅助平衡系统组成。 1.1.下转盘施工工艺 下转盘(承台)为支承转体结构全部重量的基础,转体完成后,与上转盘共同形成桥梁基础。下盘采用高标号混凝土,下转盘设臵转动系统的下球铰、撑脚的不锈钢环形滑道、转体牵引系统的反力座、助推系统、轴线微调系统、顶梁系统等。根据要求控制球铰及下滑道的安装精度要求,下转盘(承台)的浇注分两次完成。 施工步骤如下: ⑴第一步绑扎承台底和侧面四周钢筋,进行第一次混凝土浇注,并在设计位臵预埋转体下球铰骨架预埋件。 ⑵安装下球铰骨架,要求骨架顶面的相对高差不大于5mm。骨架中心和球铰中心重合,与理论中心偏差不大于1mm。 ⑶安装下球铰时,球铰安装顶口务必水平,其顶面任两点误差不大于1mm。球铰转动中心务必位于设计位臵,其误差:顺桥向±1mm,横桥向±1.5mm。安装下滑道钢板时,下滑道钢板要求顶面局部平整度不大于0.5mm,相对高差不大于2mm。安装下球铰及下滑道钢板时,采取调整骨架上的螺母和调整滑道预留槽内砂浆使其水平。 1.2.转动球铰施工工艺 本联连续梁转动体系采用钢球铰,分上下两片,采用厂家成套产

品。球铰是转动体系的核心,是转体施工的关键结构,制作及安装精度要求很高,必须精心制作,精心安装,严格按厂家安装要求实施。 ⑴球铰制作工艺 本桥使用的球铰在专业厂家制作,钢球铰在工厂加工完成后,经对转盘进行探伤检测,并进行试磨合,各项指标满足要求后整体运至工地安装。球铰在专业厂家制作过程如图2-6-31所示。 ①上球铰围板接焊:围板按图纸下料后拼焊,拼焊周期5天。 ②球面板与筋板、围板的组焊及热处理:肋板按图纸下料后,将肋板和围 图2-6-31 精确制作上、下球铰 板检测球面的加工精度,球面加工周期20天。对组焊好的上、下球铰进行退火处理,热处理时间6天。 ③球面加工:加工转体球铰的上下球面,加工是使用模板检测球面的加工精度,球面加工周期20天。 ④球面聚四氟乙烯滑板凹坑的加工:下球面板镶嵌填充聚四氟乙烯复合夹层滑片的凹坑加工,加工周期10天。 ⑤销轴的加工:销轴采用锻钢制造,销轴从锻造到机加工的周期

桥梁混凝土施工施工技术

桥梁混凝上施工 1 适用范围 适用于桥梁工程混凝土的施工,不含水下混凝土的灌注、真空脱水混凝土及喷射混凝土等的施工。 2 施工准备 2 . 1 技术准备 1 .进行混凝土配合比设计。 2 .编制分项工程施工方案,并对班组进行培训及交底。 2 . 2 材料要求 配置混凝土的各种原材料品种规格和技术性能应符合国家现行标准规定和设计要求。水泥、外加剂及掺合料等还应进行碱含量检测,砂、石子等应进行碱活性检测,碱含量或碱活性应符合设计要求和有关国家现行标准的规定。 1 .水泥 ( l )配置混凝土所使用的水泥,一般采用普通硅酸盐水泥、硅酸盐水泥,有特殊要求时可采用其他品种水泥。 ( 2 )水泥进场应有出厂合格证和出厂试验报告,并应按其品种、强度等级、包装或散装仓号、出厂日期等进行检查验收,进场后应进行复试,试验合格后方可使用。 2 .砂 ( l )混凝土用砂,一般采用质地坚硬、级配良好、颗粒洁净、粒径小于5mm的砂。各类砂应按有关标准规定分批检验,各项指标合格方可使用。 ( 2 )普通混凝土所用的砂应以细度模数2.5 ~ 3.5 之间的中、粗砂为宜,其含泥量应小于3 %。 3 .石子 ( l )混凝土用的石子,应采用坚硬的碎石或破碎卵石,并应按产地、类别、加工方法和规格等不同情况,按有关标准规定分批进行检验,确认合格后方可使用。 ( 2 )石子最大粒径应按混凝土结构情况及施工方法选择,但最大粒径不得超过结构物截面最小尺寸的1/4 ,且不得超过钢筋最小净距的l/2 ;泵送混凝土时石子最大粒径除应符合上述规定外,对碎石不宜超过输送管径的1/3 ,对于破碎卵石不宜超过输送管径的1 / 2.5 ;同时应符合混凝土输送泵的使用规定。 4 .外加剂:必须经有关部门检验并附有检验合格证明,使用前应进行复验,确认合格后方可使用,使用方法应符合产品说明书及现行国家有关标准的规定。 5 .掺合料:可采用粉煤灰、矿粉等,进场时应附有产品出厂检验报告,进场后应按有关标准规定进行复试,确认合格后方可使用。 6 .水:宜采用饮用水,当采用其他水源时,应按有关标准对其进行化验,确认合格后方可使用。 2 . 3 机具设备 1 .混凝土搅拌设备:混凝土搅拌机、装载机、计量设备、手推车等。 2 .混凝土运输设备:混凝土运输车、机动翻斗车等。 3 .混凝土浇筑设备:混凝土输送泵、汽车吊及吊斗、混凝土振捣器等。 4 .其他设备:空压机、风镐、发电机、水泵、水车等。 5 .工具:抹子、铁锹、串筒、漏斗、溜槽、锤子、铁茎等。 2 . 4 作业条件 1 .配制混凝土的各组成材料进场并经检验合格,数量或补给速度满足施工要求。

双线铁路连续梁桥施工技术论文

双线铁路连续梁桥施工技术 摘要:连续梁桥施工技术在我国已经日趋成熟,其下部结构一般采用常规施工方法,上部结构多采用挂篮悬臂浇筑法。本文结合贵广南广铁路双线跨西环高速(65+116+65)m连续梁,针对梁体挂篮悬浇施工及预应力体系阐述其施工技术措施,关键控制要点及注意事项包含其中。 关键词:连续梁;挂篮悬浇;预应力;施工技术 abstract: the continuous girder bridge for construction technology in our country has become more mature, the lower part structure with conventional construction method commonly, the upper structure used more hanging basket cantilever method. this paper according to your wide wide across the south railway double-high speed (65 + 116 + 65) m continuous beam, in view of the beam hanging basket body for water and elaborates the system construction of prestressed construction technical measures, the key control key points and matters needing attention include among them. keywords: continuous beam; for water hanging basket; prestressed; construction technology 中图分类号:u415.6 文献标识码:a 文章编号: 1.引言

装配式梁桥施工工艺

9、梁体预制 本标段有25米、35米、40米三种形式后张预应力T 梁,施工工艺流程如下: 工艺方法要求如下: ①台座设置:对原地面进行清理、整平,碾压密实达到路基基底处理的要求。为保证梁平面位置的准确性,模板支立和混凝土振捣时,梁的横向不发生移位,采用混凝土底座。台座主要由3mm 厚钢板6cm 厚木板、混凝土支墩、混凝土底座及混凝土基础构成。钢板和木板作为制梁底模;混凝土支墩用来加固木底模;间隙用来穿法兰、螺栓,以加固两侧底侧模。台座顶面按设计要求设置预拱度,预拱度值按二次抛物线进行布设。 ②龙门吊设置:龙门吊走行轮采用双轮对电力牵引,可用作移梁、混凝土吊装和支立、拆除模板;上部用4片单层六四式军用梁,两片一组,中间拉开80cm ,在六四梁跨中用加强型三角及弦杆以提高抗弯能力;立柱采用八三轻墩杆件,结构形式为2×4式;吊梁滑轮组起吊能力设计为50吨、70吨、80吨三种形式龙

门吊。 ③钢筋、钢绞线加工安装:采用钢筋切割机切断、弯筋机弯制成型,就地在梁台座处进行绑扎。在台座上精确放样,设置梁底预埋钢板,并放置与梁体同标号的砼垫块,以使钢筋与台座隔离。先绑扎马蹄部分纵向主筋和箍筋,后绑扎竖向和纵向腹筋。 在绑扎时为提高骨架的稳定性和刚度,用钢管或Φ28钢筋作三角支撑,用Φ12钢筋加强腹板刚度。 钢绞线采用冷切割机械按照设计图纸下料,人工编束、穿束。 ④预应力孔道:制孔采用金属波纹管,在使用前进行仔细检查,确保波纹管没有锈包裹、油污、泥土、撞击、压痕、裂口等影响使用的问题。波纹管的安装以底模为基准,按预应力钢绞线曲线坐标直接量出相应点的高度,标在钢筋上,定出波纹管位置,将钢筋托架焊牢定位在箍筋上,用铁丝扎牢波纹管,直线段75cm一道定位筋,曲线段加密,以防止在施工过程中发生位置改变。 当波纹管的安装与钢筋发生妨碍时,调整钢筋位置,以保证预应力管道位置的准确。特别应注意使锚下垫板与预应力孔道中心保持垂直。在波纹管接头部位及其与锚垫板喇叭接头处,采取有效措施,保证其密封,严防漏浆。锚垫板,喇叭管及螺旋筋采用厂家供应的定型产品。

连续梁转体法施工工艺及方法

2.5. 3.11连续梁转体法施工工艺及方法 2.5. 3.11.1连续梁转体法施工工艺流程图 连续梁转体法施工工艺流程图 2.5. 3.11.2钻孔灌注桩施工 钻孔桩灌注桩施工工艺及方法详见“2.5.3.3钻孔灌注桩基础”。 2.5. 3.11.3下承台及磨心、滑道、环道施工 桥梁转体的中心机构转体球面铰和环道以及滑道设计在下承台上施工时要和下承台一起浇筑,其结构图见“主桥转体体系构造图”。主桥桩基施工完毕并通过检测合格后进行下承台钢筋施工,由于磨心设计在下承台上所以磨心钢筋要个下承台钢筋一起进行安装。磨心钢筋大样图见“主墩磨心一般构造图”,在下承台钢筋绑扎完毕后在顶层钢筋网上预留施工人洞,这样人可以下到承台里面进行磨心钢筋的施工,磨心钢筋在承台内部空设置4层钢筋网片,钢筋网片采用绑扎完毕后用手拉葫芦吊机与承台骨架钢

筋焊接固定。磨心中心设计为直径20cm高度70cm钢柱,钢柱表面镀铬与磨盖中的钢套筒相结合形成转体的中心转动轴。磨心在承台内部钢筋网片安装完毕后进行磨心钢柱的安装,在下承台顶面于钢筋焊接一块40cm× 40cm×2cm钢板,在钢板精确放出主墩中心,按照主墩中心进行钢柱的安装。钢柱的安装偏差顺桥梁和垂直于桥向都要小于5mm。钢柱安装完毕后进行下承台上侧磨心钢筋的安装,磨心钢筋安装完毕后进行滑到和环道以及后座的钢筋的安装。在磨心、滑道、环道钢筋安装过程中要注意以下几点:1)、磨心、环道、滑道钢筋要严格按照图纸进行施工,钢筋安装过程中要严格按照图纸进行施工,滑道、环道钢筋于下承台钢筋存在冲突的位置适当调节间距,钢筋绝对不可以切断。 主桥转体体系构造图 2)、磨心钢筋安装过程中要严格控制钢筋的间距,并且保证每层钢筋之间的钢筋网孔要对应,这样才能保证混凝土浇筑过程中振捣棒可以下放到磨心内部进行振捣,这样才能保证磨心混凝土密实。 3)、在绑扎磨心顶层钢筋时要带磨进行安装,严格控制磨心保护层厚度,保护层厚度偏差只能存在正偏差,这样防止在磨心磨合过程中造成钢筋外露。如果磨心钢筋外露就会造成磨心和磨盖无法磨合,最后造成转体驱动力加大,转体不稳,甚至可以造成箱梁转体段无法转动,转体失败。 磨心模板根据磨心直径制作定型钢模,钢模安装固定在下承台顶面,磨心的球面通过按照设计的球型直径定做的母线器来形成。母线器一侧焊接到与磨心钢柱配套的钢套筒上另一端搭到磨心钢模上,在磨心混凝土浇筑完毕后用母线板以磨心钢柱为中心反复转动来形成磨心的球面。在安装磨心钢模过程中要严格控制模板顶面高程。模板安装完毕后在磨心钢模上