购售电合同协议书范本 通用版
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
编号:_____________购售电合同
购电人:________________________________________________
售电人:___________________________
签订日期:_______年______月______日
购电人:
售电人:
鉴于In view of:
(1)售电人在拥有/兴建并/并将经营管理总装机容量为兆瓦(MW)的电厂(以下简称电厂)。
Electricity sales in Owners / building and / and the total installed capacity of management Megawatts (MW) of Power Plant (hereinafter referred to as power plants)
(2)电厂已/将并入购电人经营管理的电网运行。
Power has been / will be incorporated into the purchase of people's power grid management 双方根据《中华人民共和国合同法》、《中华人民共和国电力法》、《电网调度管理条例》以及国家其他有关法律法规,本着平等、自愿、诚实信用的原则,经协商一致,签订本合同。
The two sides under the "Contract Law","People Power Law ","dispatching Management Regulations " and other relevant laws and regulations, the principles of equality, voluntary, good faith, by consensus, signing of this contract
1定义和解释Definitions and interpretation
1.1本合同所用术语,除上下文另有要求外,定义如下:
The terms used in the contract, unless the context otherwise requires, defined as follows 1.1.1电厂:指位于由售电人拥有/兴建并/并将经营管理的一座总装机容量为
兆瓦(单机容量为兆瓦,装机台数为台,分别
为、、、、号机组)的发电设施以及延伸至产权分界点的全部辅助设施。
Power Plant : refers to in From the sale of electricity-owned / built and / and management of a total installed capacity of 4MW (unit capacity 0.500 MW, Number of
installed units 08 units, were Unit) of power generation facilities, and extending to the property rights of all ancillary facilities demarcation point.
1.1.2年实际上网电量:指售电人每年在计量点输送给购电人的电量。电量的计量单位为千瓦·时(kWh)。
The actual grid electricity : that the sale of electricity in the measurement of each year to buy electricity from one point of delivery of electricity. KW power unit of measurement • Time (kWh).
1.1.3年合同上网电量:指本合同第4.1条约定的每年的上网电量。
Grid connection power-year contract : means the contract agreed in Article 4.1 of the grid electricity per year
1.1.4年(月)累计购电量:指本合同第4.4.1款规定的购电量。
Year (months) cumulative share power : that paragraph 4.4.1 of the Contract of share power.
1.1.5调试运行期上网电量:指电厂不同机组首次并网开始,到正式交付商业运营前为止的上网电量。
Commissioning of grid electricity : refers to the power grid with different units for the first time began commercial operation before the official delivery date of the grid electricity.
1.1.6计划停运:指电厂机组处于计划检修期内的状态,包括机组的大修、小修、公用系统计划检修及购电人(电力调度机构)要求的节假日检修、低谷消缺等。电厂每台机组每年允许的计划停运小时详见附件三。
Planned outage : refers to the power plant unit at the scheduled maintenance period, the state, including the overhaul of units, minor repairs, maintenance and utility system plans purchase one (power operator) maintenance requirements of holidays, lack of such low consumption. Power plan to allow each unit outage hours per year are listed in Annex III.
1.1.7非计划停运:指电厂机组处于不可用而又不是计划停运的状态。根据需要停运的紧急程