制程检验报告 中英文版

合集下载

制程检验员一天的工作流程

制程检验员一天的工作流程

制程检验员一天的工作流程【中英文实用版】英文文档:The daily work process of a process inspector involves several key steps to ensure the quality and efficiency of the manufacturing process.Here is an overview of a typical day for a process inspector:1.Morning Check-In: The inspector arrives at work and logs into the system to check for any urgent messages or notifications.They review the daily production schedule and inspect the necessary documents, such as work orders and quality specifications.2.Pre-Shift Inspection: Before the production line starts, the inspector conducts a pre-shift inspection to ensure that all equipment and tools are in proper working condition.They check for any signs of damage or malfunction and ensure that all safety measures are in place.3.In-Process Inspection: During the production process, the inspector randomly selects samples from the batch and checks them against the quality specifications.They examine the products for any defects, dimensional accuracy, or compliance with the required standards.Any non-conforming products are documented and segregated for further analysis or disposal.4.Documentation: Throughout the day, the inspector maintains detailed records of their inspections, including the date, time, batchnumber, and any issues identified.They also document any corrective actions taken or communicated to the production team.5.Collaboration with Production Team: The inspector works closely with the production team to address any quality-related concerns or issues.They provide feedback, suggest improvements, and collaborate on resolving any production bottlenecks or defects.6.Lunch Break: The inspector takes a scheduled lunch break to relax and recharge.They return to work promptly after the break to continue their duties.7.Final Inspection: Before the end of the shift, the inspector conductsa final inspection to ensure that the production batch meets the required quality standards.They check the final output against the production records and specifications.8.Shift Handover: The inspector completes a handover report, summarizing the day"s activities, inspections, and any issues encountered.They communicate this information to the incoming inspector or supervisor to ensure a smooth transition.9.Cleaning and Maintenance: Before leaving for the day, the inspector ensures that the inspection area is clean and organized.They also perform routine maintenance on inspection tools and equipment, as necessary.10.Evaluation and Continuous Improvement: At the end of the day,the inspector reflects on their work and identifies areas for improvement.They may participate in training sessions or meetings to enhance their skills and knowledge.In conclusion, a process inspector"s daily work process involves various steps to maintain quality standards and ensure efficient production.Their role is crucial in identifying and addressing any issues promptly, contributing to the overall success of the manufacturing operation.中文文档:制程检验员的一天工作流程包括多个关键步骤,以确保生产过程的质量和效率。

各种无损检测中英文报告格式

各种无损检测中英文报告格式
缺陷情况
Defect Condition
级别
Grade
评定Evaluation
备注
Remarks
备注/Notes:NSD—未见应记录缺陷
D—缺陷至检测面的深度(mm) L--缺陷指示长度(mm)
检测
Tested By
日期/Date
技术监督
Tech. Supervisor
日期/Date
批准
Approved By
焊缝号
Weld No.
缺陷情况(定性/定量)
Defect Condition
级别
Grade
评定Evaluation
备注
Remarks
备注/Notes:NSD—未见应记录缺陷L—缺陷指示长度(mm)
第页
共页
Page: /
Developer
工件温度(℃)
Item Temp.
渗透时间(min)
PenetrantTime
显像时间(min)
DevelopingTime
对比试块
Sensitivity Block
检测地点
Test Position
检测日期
Testing Date序号No.源自构件号Item No.
节点号
JointNo.
Acc. Criterion
合格级别
Acc. Grade
磁化方法
Magnetization Method
仪器型号
Instrument Type
编号
Serial No.
磁轭类型
Yoke Type
提升力
Lifting Power
灵敏度试片
SensitivityBlack

SMT检验报告 中英文版

SMT检验报告 中英文版

测试员 Tester
保存期限:5年 Save the time limit:five years
确认 Confirm by
批准 Approval by
机台号 Machine #
编号 Number
巡查记录

Partol Note
ቤተ መጻሕፍቲ ባይዱ
2
3
4
5
6
重要不良项 Defect Type
不良合计 Defect Total
不良数 Rejects Qty.
说明: 1.按贴片机进行抽样,每台机台每2小时至少抽取5-20PCS(Tube),1-2PCS(Panel)进行试装,观察光斑是否有死单颗灯珠、死一串灯珠、暗影、彩虹纹、色差等不良现象; 2.巡检各机台抛料是否按灯珠厂商、色温、BIN、VF、流明进行区分,所有在SMT炉后发现的不良品必须保留,并知会采购通知供应商在24H内确认; 3.巡视测试位灯珠点亮后的光斑以及表面是否有残留锡珠,表面脏污、灯珠损坏、破损、假焊、空焊、冷焊、脱焊、浮高、掉件等现象,并记录在此表上体现; 4.统计维修站不良灯珠信息,包括厂商、色温、BIN、VF值、投入数、产出数、不良数、不良率,并在此表上说明。
灯条 串并数 Parallel Series
色温 Color temp
灯珠流明 Luminous
flux

1
型号 Model #
班组 Line
□ 白班Day □ 夜班Night
检查时间/测试结论 Test time & Result



Dongguan *****
表单编号Sheet No.:**-QP-11-01 A0
xxxx有限公司

质检实习报告

质检实习报告

质检实习报告英文回答:During my quality inspection internship, I had the opportunity to learn and experience a lot. One of the most important things I learned is the importance of attention to detail. In quality inspection, even the smallest details can make a big difference in the overall quality of a product. For example, I was responsible for inspecting electronic components, and I learned that even a tiny scratch or dent can affect the functionality of the component.I also learned the importance of communication and teamwork in quality inspection. For instance, there was a time when I found a defect in a product, and I had to communicate effectively with the production team to ensure that the issue was addressed and resolved. This experience taught me the importance of clear and respectful communication in a professional setting.Furthermore, I gained a better understanding of the quality standards and regulations in the industry. I had to familiarize myself with the specific requirements and criteria for the products I was inspecting, and I had to ensure that all the products met these standards. This experience helped me develop a keen eye for identifying deviations from the quality standards.Overall, my quality inspection internship was a valuable learning experience that allowed me to apply my knowledge in a real-world setting. I am grateful for the opportunity to learn from experienced professionals in the field and to contribute to the quality assurance process.中文回答:在我的质检实习期间,我有很多学习和经验的机会。

Out-going Inspection Product(中英文)

Out-going Inspection Product(中英文)

Out-going Inspection Product出货检查程序一、目的Purpose:规定出货检查工作在有效受控下进行。

To ensure that out-going inspection is performed under effective control.二、适用范围说明Scope:一般情况下,本公司产品终检后不再做出货检查:但在以下四种情况任一种出现时,必须进行出货检查。

对于特别的部品(如尼龙用料部品)在某种情况必需做出货检查的,由项目部、QC部门等相关人员共同确定。

Generally, no need out-going inspection after final inspection. But in any one of the following situations, out-going inspection is necessary.Related personnel in Program Dept and QC section are responsible for determining whichparts need to do out-going inspection.1.产品库存期超过6个月(若FQC当月已对待出货产品进行了仓贮品质评估,可根据其《仓库物资评估报告》QF-PW-009的结果进行,反之,则必须做出货检查)。

Stored more than 6 months (If the waiting-for-delivery product has been assessed byFQC in the same month, then FQC conduct in accordance with the result of thecorresponding <<Material/product assessment report>> QF-PW-009, otherwise it is amust for FQC to perform out-going inspection.)2.因受外界环境的影响发生异常,影响到产品质量Product quality is effected by thechanging of environment;3.包材被损坏.Damage of package;4.出货海外(包括香港)或客户指定产品。

质检英文作文英语模板

质检英文作文英语模板

质检英文作文英语模板英文:As a quality inspector, my job is to ensure that the products meet the required standards before they are released to the market. This involves checking the products for defects and making sure they are safe for consumers to use.One of the main challenges that I face as a quality inspector is identifying defects that may not beimmediately apparent. For example, a product may look fine on the surface, but upon closer inspection, I may discovera small crack or chip that could potentially cause harm to the user. In such cases, it is important to document the defect and work with the production team to find a solution.Another challenge is dealing with non-compliance issues. Sometimes, the production team may not follow the required procedures or use the correct materials, which can resultin a product that is not up to standard. In such cases, it is important to communicate the issue clearly and work with the team to find a solution that meets the required standards.In addition to identifying defects and addressing non-compliance issues, I also work to improve the overall quality of the products. This involves analyzing data, identifying trends, and implementing changes to the production process to ensure that the products meet the required standards consistently.Overall, my job as a quality inspector is challenging but rewarding. By ensuring that the products meet the required standards, I am helping to protect consumers and maintain the reputation of the company.中文:作为一名质检员,我的工作是确保产品在发布到市场之前符合所需标准。

29-特采管理程序-中英文对照

29-特采管理程序-中英文对照

Revision HistoryApproved DCN on File in Document Control1.0 PURPOSE目的对于不符合公司品质之原物料进料,制程中半成品,成品,若不影响产品使用功能特性之前提件下,可依据本程序特采使用,以免影响正常生产或交期。

2.0 SCOPE 范围2.1生产急用,于限期内必须完成的生产作业。

2.2本程序适用于进料检验及制造过程检验,成品检验等程序。

3.0 ASSOCIATED DOCUMENTS 有关文件无4.0 DEFINITIONS 定义无5.0RESPONSIBILITY职责5.1品质部:提交原材料检验报告,对检验报告中内容必要时进行说明;5.2工程部:特采尺寸之判定;5.3采购部:依据需求对原材料提出特采申请;5.4生产部:全检执行、标准作业规范执行,依据实际情况对制程中的半成品及成品提出特采;5.5销售部:依据需求对成品提出特采申请5.6各单位主管:审核特采申请,提列特采相关意见;5.7总经理:对特采申请进行最终裁决。

6.0 PROCEDURE 流程6.1.原物料特采流程:6.1.1原物料经IQC判定不合格时,将不良内容及数量填写在【进料检验报告】中交品质工程师审核。

6.1.2品质工程师核准后仍然判为不合格(拒收)物料,遇下列情况由供应商或采购向品质部提出予以特殊审核或提出特采申请:(1)供应商或采购人员认定判定有误时(2)该批物料生产急需使用时,且短期内无法采购到更好原物料时(3)该缺陷对后续加工、生产影响甚微时(4)其他特殊情况时6.1.3采购依据生产计划需求提出特采申请,填写“特采申请单”,并附【来料检验报告】交品质部总监。

6.1.4品质总监与相关部门的责任人根据实际的情况召开物料特采(MRB)会议,并做出如下判定:(1)由品质部门重新抽样(2)指定某单位执行全数检验予以筛选(3)放宽标准特准使用(让步接收)(4)经加工后使用(5)维持不合格判定6.1.5若各主管会签同意特采,则交总经理核准,如有不同意见,则由总经理裁决,如不允许特采,则拒收该批物料。

出货检验报告--中英文版.docx

出货检验报告--中英文版.docx
Inspection Method & Standard
ActualParameter
Test equipment
Defect
Results
Remark
NG
OK
Unacceptable
4
Aging Test
Under the punch of agingmachine﹥4H
Aging Machine
客户名称
定单号
产品名称
产品规格
生产总数
结论:□NG□OK
Inspection Standard
抽样检验指导书
质量要求:致命瑕疵(CR:0)严重瑕疵(MA:0.4)轻微瑕疵(MI:1.0)
一、外观尺寸检验
序号
部位
检验内容
检查方法
检验设备
缺点别
检验结果
说明
NG
OK
不接受
1
外箱
1.1外箱表面破损、脏污
目测
8
角度测试
积分球测试与客户所须一致
积分球
检验员QC:
精品策划书
5
Puncture Test
Under the punch of aging machine﹥4H
Aging Machine
6
Power
The use of power meter+—1W
Power Meter
6
ColorTemperature
The same as customer’s requirement
目测
1.2外箱的长*宽*高
与BOM表核对
卷尺
1.3贴纸内容、粘性、破损
与数据检验
目测

质量体系缩写中英文对照

质量体系缩写中英文对照

质量体系缩写中英文对照AAR:外观批准报告ADV:分析/开发/验证ADV-DV:ADV设计验证A/S/V P &R:分析/开发/验证计划和报告ADV-PV:ADV产品验证AIAG:汽车工业行动集团AP:先期采购APQP:产品质量先期策划APO:(通用)亚太分部APQP Project Plan:APQP项目策划ASQE:先期供应商质量工程师BOM:材料清单BOP:过程清单Brownfield Site:扩建场地CMM:三坐标测试仪M Complex System/Subassembly:M复杂系统/分总成CPK:过程能力指数CTS:零件技术规范Defect outflow detection:缺陷检测DFM/DFA:可制造性/可装配性设计DFMEA:设计失效模式分析DPV:每辆车缺陷数DRE:设计发放工程师Error Occurrence Prevevtion:防错EWO:工程更改指令FE1,2,3:功能评估GD&T:几何尺寸&尺寸GM:通用汽车公司GME:通用汽车欧洲分部GM9000:指QS9000GP:总体步骤GPDS:全球产品描述系统GPS:全球采购系统GQTS:全球质量跟踪系统GR&R:量具的重复性与再现性Greenfield Site:新建工厂GVDP:全球车辆开发工程IPTV:每千辆车缺陷数KCC:关键控制特性KCDS:关键特性指示系统Kiek-Off Meeting:启动会议KPC:关键产品特性LAO:(通用)拉丁美洲分部LCR:最低生产能力MCR:最大生产能力MOP:制造/采购MPC:物料生产控制MPCE:欧洲物料生产控制MRD:物料需求日期MSA:测量系统分析MVBns:非销售车制造验证MVBs:销售车制造验证NAO:(通用)北美分部NBH:停止新业务OEM:主机客户PAD:生产装配文件PC&L:生产控制&物流PDT:产品开发小组PFMEA:潜在失效模式分析PPAP:生产件批准程序PPM:1)项目采购经理2)每百万件的产品缺陷数PPK:过程能力指数PQC:产品质量特性PR/R:问题报告及解决PSA:潜在供应商评审QSA:质量系统评审QTC:工装报价能力RASIC:负责、批准、支持、通知、讨论RFQ:报价要求RPN:风险顺序数RPN Reduction Plan:降低RPN值计划SDE:供应商开发工程师SFMEA:系统失效模式失效SMT:系统管理小组SOA:加速开始SOP:正式生产SOR:要求声明:SPC:统计过程控制SPO:(通用汽车)零件与服务分部SQ:供应商质量SQE:供应商质量工程师SQIP:供应商质量改进过程SSF:系统填充开始SSTS:分系统技术规范M Subcontractor:M分供方Team Feasibility Commitment:小组可行性承诺UG:UG工程绘图造型系统VDP:车辆开发过程VLE:车辆平台负责人WWP:全球采购序号缩写英文原文解释1 OTS overall tooling sample用批量生产的工模器具制造出的样件2 PVS Produktions – Versuchs - Serie 批量试生产3 TMA Trial Manufacturing Agreement 试制协议4 QSV Qualitaes-Sicherungs-Vereinbarung 质量保证协议5 BMG Bau-Muster-Genehmigung产品工程样件性能检验认可6 B- Freigabe 采购认可7 D- Freigabe 试制/0批量的认可8 P- Freigabe 计划认可9 TL 技术资料汇编10 LH LastenHeft 要求汇总书11 Pflichtenheft 责任汇总书12 ME Markt-Einfuehrung 市场导入13 MIS Management Informations-System 管理信息系统14 Nullserie 零批量15 QPN Qualifizierungs-Programm Neuteile 新零件质量提高计划16 SOP Start-Of-Production 批量生产启动Standard Operating Procedure 标准操作程序17 QSR 质量体系要求18 APQP Adavanced part quality plan 高级产品质量计划19 PPAP product part approval procedure 生产件批准程序20 QSA 质量体系评审21 MSA measurement system analysis 测量系统分析22 FMEA 失效模式及结果分析23 SPC 统计过程控制QC(Quality Control)质量控制,就是质检,通俗说就是检验QA(Quality Assurance)QA中文全称:质量保证IPQC(In-Process Quality Control)品质管理项目制程检验IQC来料检验,就是原材料检验QC的层次要比QA低,通俗来说就是检验员QA人员的主要任务就是监督药品从原料进厂到成品出厂的全过程的质量;QC 就是对药品原料和成品的所含主要成分进行检测,主要是给出原料和成品的检测数据.在药厂QC比QA轻松一点,但QA不需要懂得仪器的操作,只要知道成品和原料的指标,并用QC提供的数据来判断原料和成品是否合格同意进厂或出厂.在液相中设置这个主要是为制药厂考虑的,能减少很多不必要的重复工作.IQC 是来料控制,也就是进货检验OQC 是出货检验也就是出厂检验QC 是质量检验QA 指质量测试IPQC 制程控制PE 指制程工程师IE 指文件工程师-----------------------------------------------QC中文全称: 即英文QUALITY CONTROL的简称,中文意义是品质控制,质量检验。

中英文最终检验程序文件

中英文最终检验程序文件
5.4
终检要求说明:Explanation of final inspection requirements 5.4.1 如遇特殊情况(如:急出货部品;订单已啤完,生产部需急落模,上另一产品的模生产) 时,生产部门需提前通知 FQC 加急检查,FQC 将其优先处理。 In any urgent case such as urgent delivery or another urgent tool need to be load the injection machine after current parts are almost reach to the quantity according to the P.O. , Production Dept. must inform FQC for the inspection urgently and FQC will do it in priority. 5.4.2 5.4.3 对于需多工序加工的产品,一般只对成品进行终检。If some part need be passed to 2nd process, only its finish product need final inspection. 针对 RoHS 产品,FQC 必须检查包装箱上贴的成品标贴是否含有 RoHS 符合图案,若成品标 贴上没有 RoHS 符合图案,则检查结果判定为不合格。RoHS 符合图案样式如下图(彩色与黑 白效果等同)。若客户对 RoHS 产品标识有特殊要求,则执行客户要求。For RoHS compliant product, FQC must check whether the label is with RoHS artwork designed by Flextronics Co. or not. If no, then the final judgment is rejected. RoHS artwork is as below. If customers have their own requirement on RoHS identifier, then we follow customers’.

样板检验报告(中英文版)

样板检验报告(中英文版)
跌落测试仪
⑵No oversight with packing material
无漏装包装材料

⑶Pass the dropping test
通过跌落测试

⑷Others
其它

Inspector:Date:
检验员:日期:
Result(结果)
AcceptReject: Approval: Date:
接受拒绝:批准者:日期:
电镀,喷粉等表面自理良好

Visible
目视
⑵No bur or crack,good surface polishing
无批锋,毛刺,裂良等现象,表面光滑

⑶No surface shrinkage,bubble or scrape mark
表面无任何缩水,起泡,刮伤等不良

⑷Others
其它

Assembly
装配
⑴No screw thread loose fit,crash or scrape
无螺丝滑牙,打裂,打花

Visible
目视
⑵No soldering or welding error
无假焊,虚焊等现象

⑶Uniform,correct & no undercut error
整齐,正确,无错位

⑷No oversight with fixture assembly
无漏装零件

⑸Other:
其它

Functional
功能
⑴LED w/o function,INT orpower doesn’t off
灯无不亮,INT,灯不灭现象

出货检验报告--中英文版

出货检验报告--中英文版

表面质量: 检查产品表 面是否光滑、 无划痕、无 污渍等情况
结构完整性: 检查产品结 构是否完整, 无缺失、损
坏等情况
尺寸测量
测量工具:游标 卡尺、千分尺等
测量项目:长度、 宽度、厚度等
测量标准:按照 产品图纸或技术 要求进行测量
测量结果:记录 测量数据,并判 断是否合格
性能测试
测试项目:包括但不限于电池容量、充电速度、屏幕亮度、摄像头像 素等 测试标准:根据国际标准或行业标准进行测试
YOUR LOGO
出货检验报告中英 文版
,a click to unlimited possibilities
汇报人:
时间:20XX-XX-XX
目录
01
02
03
检验结果 不合格品 结论与建
概述
处理

PART 1
单击添加章节标题
PART 2
检验报告概述
检验目的
PART 4
检验结果
外观检查
包装完整性: 检查包装是 否完好无损, 无破损、变
形等情况
标签信息: 检查标签是 否清晰、完 整,包括产 品名称、规 格、生产日
期等信息
颜色外观: 检查产品颜 色是否与标 准色卡一致, 无色差、褪
色等情况
尺寸规格: 检查产品尺 寸是否符合 标准规格, 无过大、过
小等情况
检验日期:记录检验的具体 日期和时间
检验人员:记录检验人员的 姓名和签名
检验结论:根据检验结果给 出结论,如合格、不合格、
需复检等
相关技术资料和图纸
技术资料:包 括产品说明书、 技术参数、使
用说明等
图纸:包括产 品结构图、装 配图、零件图

实验报告纸英文

实验报告纸英文

实验报告纸英文AbstractThis experiment aimed to investigate the effects of temperature on the rate of enzymatic activity. The enzyme used in this study was α-amylase, and its activity was measured by observing the breakdown of starch. Different temperatures were tested, ranging from 5C to 60C, in order to determine the optimum temperature for enzyme activity. The results showed that enzymatic activity increased with temperature initially, reached its peak at 37C, and then declined rapidly. These findings highlight the critical role of temperature in enzymatic reactions and provide insights for further biotechnological applications. IntroductionEnzymes are biological catalysts that facilitate chemical reactions within living organisms. They play a crucial role in various physiological processes, including digestion, metabolism, and synthesis. Enzymes are highly selective and efficient in their catalytic functions, but their activity is influenced by several factors, such as pH, substrate concentration, and temperature. Temperature is a critical factor that directly affects enzyme activity. Enzymatic reactions are highly temperature-dependent, as temperature affects the three-dimensional structure of enzymes, their substrate binding, and the rate of molecular collisions. This experiment aimed to investigate the effects of temperature on the rate of enzymaticactivity using α-amylase as the model enzyme.Materials and MethodsMaterials:- α-amylase solution- Starch solution- Iodine solution- Water bath- Thermometer- Test tubes- StopwatchMethods:1. First, prepare five test tubes and label them as 5C, 25C, 37C, 50C, and 60C, respectively.2. Add 2 mL of α-amylase solution and 2 mL of starch solution to each test tube.3. Place the test tubes in the water bath set at the respective temperatures.4. Start the stopwatch as soon as the reagents are mixed in each test tube.5. Observe the color change in each test tube every 30 seconds until a blue-black color is observed, indicating the complete breakdown of starch.6. Record the time taken for each test tube to reach the end point.7. Repeat the experiment three times for each temperature condition and calculate the average time taken for starch breakdown.ResultsThe results of the experiment are summarized in the table below: Temperature (C) Time taken for Starch Breakdown (seconds)-5 54025 24037 18050 24060 480DiscussionThe results of the experiment demonstrate the effects of temperature on enzymatic activity. At lower temperatures (5C), the rate of enzyme activity was noticeably slower. This can be attributed to the reduced kinetic energy of the molecules, resulting in fewer successful collisions between the enzyme and its substrate. As the temperature increased, the rate of enzymatic activity also increased. The optimum temperature for α-amylase activity was observed to be 37C, at which point the rate of starch breakdown was the fastest. At higher temperatures beyond 37C, the rate of enzymatic activity started to decline rapidly. This can beexplained by the denaturation of the enzyme, as excessive heat disrupts the enzyme's three-dimensional structure, rendering it less effective in catalyzing the reaction.The findings of this experiment are consistent with the principles of enzymology and provide insights for various biotechnological applications. Understanding the effects of temperature on enzymatic activity is crucial for optimizing enzymatic reactions in industrial processes, such as food production, pharmaceutical manufacturing, and biofuel production. By controlling the temperature, scientists and engineers can enhance the efficiency and yield of enzymatic reactions. ConclusionThe experiment successfully demonstrated the effects of temperature on the rate of enzymatic activity, using α-amylase as the model enzyme. The results highlighted the optimum temperature for α-amylase activity and the decline in enzymatic activity at higher temperatures due to denaturation. These findings contribute to our understanding of enzyme kinetics and have practical implications in biotechnological applications. Future studies can explore other factors, such as pH and substrate concentration, to further optimize enzymatic reactions for various industrial purposes.。

装配制程检验报告

装配制程检验报告

12:30-13:30 22:30-23:30
班次
检验结果
13:30-14:30
23:30-24:30
14:30-15:30 24:30-1:30
订单号 生产数量
QR-QA11-01
15:30-16:30 1:30-2:30
16:30-17:30 2:30-3:30
检验数
不良数
不良率 (%)
尺寸 要求
备注:
核准:


审核:
品管员:
结构 性能
结构紧凑,打开、收回流畅平 稳,无卡阻 左右两边在紧锁与打开、后仰状 态下前踏板高度相差≤2mm 机架在紧锁与打开、后仰状态下 虚位≤1mm。
机架底板装配成正角
工件无扭曲、变形、歪斜、裂纹
工件位置无错装、漏装、装反 外观 铆钉铆合平整,无铆歪、变形
无错铆、漏铆、铆反
螺钉锁入到位,无滑牙、歪斜、 生锈、斑点
深圳市振兴制造厂
Shen Zhen city Zhen Xing manufactory
品名 生产单位
检验 内容
规格要求
Байду номын сангаас
8:00-9:00 18:30-19:30
9:00-10:00 19:30-20:30
装配制程检验记录报告
操作员 日期
10:00-11:00 20:30-21:30
11:00-12:00 21:30-22:30

制程能力分析报告

制程能力分析报告

0பைடு நூலகம்
制程能力分析报告制程能力分析cpk制程能力分析制程能力分析表制程能力制程能力指数制程改善报告pcb制程能力制程检验报告初期制程能力
苏 州 锦 源 精 密 机 械 有 限 公 司 SUZHOU JY PRECISION MACHINERY CO LTD
地址:中国江苏省苏州市高新区浒关镇永安路128号3幢(横塘工业园内) 电话:0512-65088486 传真:0512-65088801 Email:jinyuan@ Webside:
制程能力分析 STUDY) (PROCESS CAPABILITY STUDY)
图纸编号: 部品名称 : 升降舵垫片座 车床编号 车床C3 尺寸名称: 内径 9.9660 9.9660 9.9780 9.9860 9.9660 9.9660 9.9650 9.9650 上限(公差) : 下限(公差) : TOL : MEAN : 9.9750 9.9580 9.985 9.97 0.015 9.9775 9.9650 9.9660 10.0000 9.9640 质检员 : Eddy 日期 2012-4-28 最小单位 0.001 Xo : 9.9680 9.9690 9.9700 9.9630 9.9670 9.9710
平均值 = σ=
9.9697 0.0093
超出上限部分 峰度 = SPREAD RANGE(6σ) =
最小值 = 9.958 最小值 = 制程准确度 = 0.27 制程能力指数 PC% = 371.9% PCk% = 5.0% 超出下限部分 = 8.58 SKEWNESS = 9.942 ~ 9.998
10 0.00 0.0%
样本数 = k= 51.3% 2.20
20 1.04
  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
Drop test 1.0-1.3m/2 times
跌落测试1.0-1.3米/2次
Drop test 1.0-1.3m/2 times
规格尺寸
Size(mm)
规格尺寸
Size(mm)
规格尺寸
Size(mm)
外观
Appearance
外观
Appearance
外观
Appearance
漏电测试
Insulation Test
吸塑
Suck plastic
吸塑
Suck plastic
珍珠棉 包装方式
Packaging way Foam cotton
珍珠棉 包装方式
Packaging way Foam cotton
珍珠棉 包装方式
Packaging way Foam cotton
纸筒
Paper tube
纸筒
Paper tube
灯珠厂商/PCB串并
LED Supplier/PCB Series Parallel
电源固定位置
LED Drive Power Fixed Position
电源固定位置
LED Drive Power Fixed Position
电源固定位置
LED Drive Power Fixed Position
电源厂商/参数
Power Supplier/Parameter
电源厂商/参数
Power Supplier/Parameter
电Hale Waihona Puke 厂商/参数Power Supplier/Parameter
灯珠厂商/PCB串并
LED Supplier/PCB Series Parallel
灯珠厂商/PCB串并
LED Supplier/PCB Series Parallel
Cartions Customer Requirements
□常规
often now
□常规
often now
□常规
often now
110V 开关100次
on-off one hundred times test
110V 开关100次
on-off one hundred times test
110V 开关100次
on-off one hundred times test
277V 305V
277V 305V
277V 305V
老化车间检查
Burn-in workshop Partol
老化车间检查
Burn-in workshop Partol
老化车间检查
Burn-in workshop Partol
调光一致性
Dimming consistency
xxxxxx有限公司
x ************************** Co., Ltd
制程检验报告 Inspection report
表单编号Sheet No.:xxxx03 A0
客户
Customer
产品名称
Products
产品型号
Product Model
生产日期
Prouction Date
螺丝/堵头不可有松懈
Screw&Lamp has no slack
螺丝/堵头不可有松懈
Screw&Lamp has no slack
螺丝/堵头不可有松懈
Screw&Lamp has no slack
跌落测试1.0-1.3米/2次
Drop test 1.0-1.3m/2 times
跌落测试1.0-1.3米/2次
调光一致性
Dimming consistency
调光一致性
Dimming consistency
不良项 不良数 结论
Conclusion
不良合计
NG Total
不良率
Reject%

测试员
Tester
确 认
Confirm by
批 准
Approval by
保存期限:5年
Save the time limit:five years
漏电测试
Insulation Test
漏电测试
Insulation Test
光谱测试
Spectrum Test
光谱测试
Spectrum Test
光谱测试
Spectrum Test
标签
Label(张贴在此报告上)
标签
Label(张贴在此报告上)
标签
Label(张贴在此报告上)
吸塑
Suck plastic
纸筒
Paper tube
其它
other
其它
other
其它
other
配件
Accessories
配件
Accessories
配件
Accessories
□客户要求 纸箱
Cartions Customer Requirements
□客户要求 纸箱
Cartions Customer Requirements
□客户要求 纸箱
订单编号
PO/PI number Items
批量数
Occurred Qty.
组别
Line #
抽检项目Inspection 第一时段
First time
(8:00-12:00)
第二时段
Second time
(13:30-17:30)
第三时段
Third time
(18:30-21:30)
结果
Result
相关文档
最新文档