QC常用英文简写术语

合集下载

品质系统常见英文缩写简介

品质系统常见英文缩写简介

品质系统常见英文缩写简介1.QC : quality control 品质管制2. IQC : incoming quality control 进料品质管制3. OQC: output quality control 出货品质管制4. AQL: acceptable quality level 允收标准5.PQC: process quality control 制程品质管制也称IPQC : in process quality control .6.CQA: customer quality assurance 客户品质保证7. MI: minor defeat 次要缺点8.MA : major defeat 主要缺点9. CR: critical defeat 关键缺点10. SMT: surface mounting technology 表面粘贴技术16. BOM: bill of material 材料清单11. SMD: surface mounting device 表面粘贴设备SMC: surface mounting component 表面粘贴元件12. ECN: engineering change notice 工程变更通知13. DCN: design change notice 设计变更通知14. PCB: printed circuit board 印刷电路板15. PCBA: printed circuit board assembly装配印刷电路板17. BIOS: basically input and output system 基本输入输出系统18. MIL-STD-105E: 美国陆军标准, 也称单次抽样计划.19. ISO: international standard organization 国际标准化组织22 . Icicles : 锡尖20. DRAM: 内存条21. Polarity : 电性23 . Non-wetting : 空焊24. Short circuit: 短路25. Missing component : 缺件26 . Wrong component : 错件27. Excess component: 多件28. Insufficient solder : 锡少29. Excessive solder: 锡多30. Solder residue: 锡渣31. Solder ball: 锡球32. Tombstone : 墓碑33 . Sideward : 侧立34. Component damage: 零件破损35. Gold finger : 金手指36. SOP: standard operation process 标准操作流程37. SIP : standard inspection process 标准检验流程38. The good and not good segregation: 良品和不良品区分39. OBW: on board writer 熸录BIOS40. Simple random sampling: 简单随机抽样41. Histogram: 直方图42. Standard deviation : 标准差43. CIP: Continuous improvement program 44. SPC: Statistical process control 45. Sub-contractors: 分包商46. SQE: Supplier quality engineering 47. Sampling sample: 抽样计划48. Loader: 治具49. QTS: Quality tracking system 品质追查系统50. Debug: 调试51. Spare parts :备用品52 . Inventory report for : 库存表53. Manpower/Tact estimation 工时预算54. Calibration : 校验55. S/N: serial number 序号56. Corrugated pad: 波纹垫57. Takeout tray : 内包装盒58 . Outer box : 外包装箱59 . Vericode : 检验码60 . Sum of square : 平方和61 . Range : 全距62. Conductive bag: 保护袋63. Preventive maintenance :预防性维护64 . Base unit : 基体65. Fixture: 制具66. Probe: 探针67. Host probe : 主探针68 . Golden card : 样本卡69. Diagnostics program: 诊断程序70. Frame : 屏面71 . Lint-free gloves : 静电手套72 .Wrist wrap : 静电手环73 . Target value : 目标值74. Related department : 相关部门75. Lifted solder 浮焊76.plug hole孔塞77. Wrong direction 极性反ponent damage or broken 零件破损79.Unmeleted solder熔锡不良80.flux residue松香未拭81.wrong label or upside down label贴反82.mixed parts机种混装83. Poor solder mask绿漆不良84. oxidize 零件氧化85.stand off height浮高86. IC reverse IC反向87.supervisor课长88. Forman组长89. WI=work instruction作业指导非擦除状态91. Internal notification:内部联络单92. QP: Quality policy品质政策93.QT: Quality target 品质目标94. Trend:推移图95.Pareto:柏拉图96. UCL: Upper control limit管制上限97.LCL:Lower control limit管制下限98. CL: Center line中心线Rolled throughout yield直通率100. PPM: Parts per million 不良率101.DPU: Defects per unit 单位不良率102.Resistor: 电阻103.Capacitor:电容104. Resistor array : 排阻105. Capacitor array: 排容106. DIODE: 二极管107.SOT: 三极管108. Crystal: 震荡器109. Fuse:保险丝110.Bead: 电感111.Connector:联结器112.ADM: Administration Department行政单位113. CE: Component Engineering零件工程114. CSD: Customer Service Department客户服务部115. ID: Industrial Design工业设计116.IE: Industrial Engineering工业工程117. IR: Industrial Relationship工业关系118. ME: Mechanical Engineering机构工程119. MIS :Management Information System资讯部120. MM: Material Management资材121. PCC: Project Coordination/Control专案协调控制122. PD: Production Department生产部123. PE: Product Engineering产品工程124. PM: Product Manager产品经理125. PMC: Production Material Control生产物料管理126. PSC: Project Support & Control产品协调127.Magnesium Alloy:镁合金128. Metal Shearing: 裁剪129.CEM: Contract Electronics Manufacturing 又称电子制造服务企业EMS: Electronics Manufacturing Services130. ERP: Enterprise Resource Planning 企业资源规划SCM+CRM+ERP+EAI=Network direct TM links procurement, production, Logistics and sales采购, 生产, 后勤管理及市场行销的融合EAI: Enterprise application Integrations 企业应用系统整合CRM: Customer Relationship Planning 客户服务规划SCM : Supply chain management 供应链管理131. OJT: On job training 在职培训132.Access Time: 光碟搜寻时间133. B2CEC: Business to consumer electronic commerce 企业对消费者的电子商务B2BEC:Business to business electronic Commerce 企业间的电子商务L:Copper Clad Laminate 铜箔基板135. Intranet: 企业内部通讯网路136. ISP: Internet Service Provider网络服务提供者ICP: Internet Content Provider网络内容提供者137. GSM: Global System for Mobile Communication 泛欧数位式行动电话系统GPS: 全球卫星定位系统138. Home Page: 网路首页139.Video Clip: 影像档140.HTML: 超文标记语言141.Domainname: 网域名称142.IP: 网络网域通讯协定地址143.Notebook:笔记型电脑144.VR:Virtual Reality虚拟实境145.WAP:Wireless Application Protocol 无线应用软体协定146. LAN: Local area network区域网路WWW: World Wide Web世域网WAN: Wide Area Network 广域网路147.3C: Computer, Communication , Consumer electronic 电脑, 通讯, 消费性电子三大产品的整合rmation Supplier Highway:信息高速公路149.UPS:Uninterrupted power system不断电系统150.Processed material: 流程性材料151.Entity/Item:实体152.Quality loop:质量环153.Quality losses: 质量损失154.Corrective action:纠正措施155. Preventive action: 预防措施156.PDCA: Plan/Do/Check/Action计划/实施/检查/处理157. Integrated circuits(IC):集成电路158.Application program:应用程序159.Utilities:实用程序160.Auxiliary storage/Second storage:;辅助存储器161.Silicon chip:硅片162Diskette drive:软驱163.Display screen/Monitor:显示器164.Foreground:前面165.Montherboard:母板166.Mermory board:内存板167.Slot:插槽168.Bus:Data-bus/address-bus/Control bus:总线/数据总线/地址总线/控制总线169.Plotter:绘图170.MPC:Multimedia personal computer多媒体171.Oscillator:振荡器172.Automatic teller terminal:自动终端(出纳)机173.Joystick port:控制端口174.VGA: Video Graphics Array显示卡175.Resolution:分辨率176.Register:寄存器177.ISA: Industry Standard Architecture:工业标准结构178.EISA:Extended Industry Architecture 179.Adapter: 适配器180.Peripheral:外部设备181.Faxmodem:调制解调器181.NIC:Network interface card网络接口卡182.SCSI: Small computer system interface 183.VESA: Video Electronic Standards Association184.SIMM:Single in-line memory module单排座存储器模块(内存条)185.Casing:外箱186.Aluminum:铝质187.Ceramic: 陶瓷的188.Platter:圆盘片189.Actuator:调节器190.Spindle:轴心191.Actuation arm: 存取臂192.Default code: 缺省代码193.Auxiliary port:辅助端口194. Carriage return: 回车195.Linefeed: 换行196.ASCII: American Standard Code for Information Interchange197.Video analog: 视频模拟198.TTL:Transistor- Transistor logic晶体管-晶体管逻辑电路199.Three-prong plug:三芯电插头200.Female connector:连接插座。

QC术语(中英对照)

QC术语(中英对照)

常用品管术语大全QC: Quality control 品质控制IQC: Incomming quality control 来料品质控制IPQC: In process quality control 制程品质控制FQC: Final quality control 最终品质控制OQC: Outgoing quality control 出货品质控制QA: Quality assurance 品质保证QA: Quality audit 品质稽核QE: Quality engineering 品质工程LQC:Line quality control 生产线品质控制SQA: Source (supplier) quality assurance 供应商品质保证SQC: Statistical quality control 统计品质控制TQC:Total quality control 全面品管DCC: Document control center 文控中心PQA: Process quality assurance 制程品质控制FQA: Final quality assurance 最终品质控制CS: Customer service 客户服务DAS: Defects analysis system 缺陷分析系统FA: Failure analysis 坏品分析CPI:Continuous process improvement 连续工序改善SIP:Standard inspection procedure 检验指导书SOP: Standard operation procedure 作业指导书QCC: Quality control circle 品管圈4M1E: Man\Machine\Material\Method\Environment人/机/料/法/环QCDS: Quality\Cost\Delivery\Service 品质/价格/交期/服务AQL: Acceptable quality level 允收水准QC 七大手法 IL :Inspection level 检验水平AC: Accept 允收 RE: Reject 拒收CR :Critical 致命的 MA:Major 主要的 MI:Minor 次要的 ISO :International organization for standardization 国际标准组织 SPC: Statistical Process Control 统计过程控制 QSR: Quality system requirements 质量体系要求 APQP: Advanced product quality planning and control plan先期产品质量策划与控制计划FMEA: Potential failure mode and effects analysis潜在失效模式与后果分析MSA: Measurement systems analysis 量测系统分析 PPAP: Production part approval process 生产件批准程序 QSA: Quality system assessment 质量体系评审 TPM :Total prevent maintain 全员预防设备维护层别法Check Sheet 查检表Characteristic Diafram 特性要因图Pareto Diafram 柏拉图Seatter Diagram 散布图Histogram 直方图Chart 管制图QS七大手册。

QC常用单词_中英对照

QC常用单词_中英对照

品質系統常見英文簡介1.QC : quality control 品質管制2.IQC : incoming quality control 進料品質管制 3.OQC : output quality control 出貨品質管制4.PQC : process quality control 製程品質管制也稱IPQC : in process quality control .5 . AQL : acceptable quality level 允收標準 6.CQA: customer quality assurance 客戶品質保証7.MA : major defeat 主要缺點8. MI : minor defeat 次要缺點9. CR :critical defeat 關鍵缺點10. SMT : surface mounting technology 表面粘貼技術11 . SMD : surface mounting device SMC : surface mounting component 表面粘貼元件12 . ECN : engineering change notice 工程變更通知13 . DCN : design change notice 設計變更通知14 . PCB : printed circuit board 印刷電路板15 . PCBA : printed circuit board assembly裝配印刷電路板16 . BOM : bill of material 材料清單17. BIOS : basically input and output system 基本輸入輸出系統18. MIL-STD-105E : 美國陸軍標準,也稱單次抽樣計劃.19 . ISO : international standard organization 國際標準化組織20 . DRAM: 內存條21 . Polarity : 電性22 . Icicles : 錫尖23 .Non-wetting : 空焊24 . Short circuit : 短路25 . Missing component : 缺件26 . Wrong component : 錯件27 . Excess component : 多件28 . Insufficient solder : 錫少29 . Excessive solder : 錫多30 . Solder residue : 錫渣31 . Solder ball : 錫球32 . Tombstone : 墓碑33 . Sideward : 側立34 . Component damage : 零件破損35 . Gold finger : 金手指36 . SOP : standard operation process 標準操作流程37 . SIP : standard inspection process 標準檢驗流程38 . The good and not good segregation :良品和不良品區分39 . OBW : on board writer 熸錄BIOS 40 . Simple random sampling : 簡單隨機抽樣41 . Histogram : 直方圖42 . Standard deviation : 標準差43 . CIP : Continuous improvement program 44 . SPC : Statistical process control45 . Sub-contractors : 分包商46 . SQE : Supplier quality engineering47 . Sampling sample :抽樣計劃48 . Loader : 治具49 . QTS: Quality tracking system 品質追查系統50 . Debug : 調試51 . Spare parts :備用品52 . Inventory report for : 庫存表53 . Manpower/Tact estimation 工時預算54 . Calibration : 校驗55 . S/N :serial number 序號56 . Corrugated pad : 波紋墊57 .Takeout tray : 內包裝盒58 . Outerbox : 外包裝箱59 . Vericode : 檢驗碼60 . Sum of square : 平方和61 . Range : 全距62 . Conductive bag : 保護袋63 . Preventive maintenance :預防性維護64 . Base unit : 基體65 . Fixture : 制具66 . Probe : 探針67 . Host probe : 主探針68 . Golden card : 樣本卡69 . Diagnostics program : 診斷程序70 . Frame : 屏面71 . Lint-free gloves : 靜電手套72 .Wrist wrap : 靜電手環73 . Target value : 目標值74. Related department : 相關部門75. lifted solder 浮焊76.plug hole孔塞77. Wrong direction 极性反ponent damage or broken 零件破損79.Unmeleted solder熔錫不良80.flux residue松香未拭81.wrong label or upside down label貼反82.mixed parts機種混裝83. poor solder mask綠漆不良84. oxidize 零件氧化85.stand off height浮高86. IC reverse IC反向87.supervisor課長88. Forman組長89. WI=work instruction作業指導90. B.P.V:非擦除狀態91. Internal notification:內部聯絡單92. QP :Quality policy品質政策93.QT: Quality target 品質目標94. Trend:推移圖95.Pareto:柏拉圖96. UCL: Upper control limit管制上限97.LCL:Lower control limit管制下限98. CL: Center line中心線99.R.T.Y: Rolled throughout yield直通率100. PPM: Parts per million 不良率101.DPU: Defects per unit 單位不良率102.Resistor: 電阻103.Capacitor:電容104. Resistor array : 排阻105. Capacitor array: 排容106. DIODE: 二極管107.SOT: 三極管108. Crystal:震盪器109. Fuse:保險絲110.Bead: 電感111.Connector:聯結器112.ADM: Administration Department行政單位113. CE: Component Engineering 零件工程114. CSD :Customer Service Department客戶服務部115. ID: Industrial Design工業設計116.IE: Industrial Engineering工業工程117. IR: Industrial Relationship工業關係118. ME: Mechanical Engineering機構工程119. MIS :Management Information System資訊部120. MM: Material Management資材121. PCC: Project Coordination/Control 專案協調控制122. PD: Production Department生產部123. PE: Product Engineering產品工程124. PM: Product Manager產品經理125. PMC: Production Material Control生產物料管理126. PSC: Project Support & Control產品協調127.Magnesium Alloy:鎂合金128. Metal Shearing:裁剪129.CEM: Contract Electronics Manufacturing 又稱電子製造服務企業EMS: Electronics Manufacturing Services130. ERP: Enterprise Resource Planning 企業資源規劃SCM+CRM+ERP+EAI=Network direct TM links procurement , production ,Logistics and sales採購,生產,后勤管理及市場行銷的融合EAI: Enterprise application Intergration 企業應用系統整合CRM: Customer Relationship Planning 客戶服務規劃SCM : Supply chain management 供應鏈管理131. OJT: On job training 在職培訓132.Access Time: 光碟搜尋時間133. B2CEC:Business to consumer electronic commerce 企業對消費者的電子商務B2BEC:Business to business electronic Commerce 企業間的電子商務L:Copper Clad Laminate 銅箔基板135. Intranet: 企業內部通訊網路136. ISP: Internet Service Provider網絡服務提供者ICP: Internet Content Provider網絡內容提供者137. GSM: Global System for Mobile Communication 泛歐數位式行動電話系統GPS: 全球衛星定位系統138. Home Page: 網路首頁139.Video Clip:影像檔140.HTML:超文標記語言141.Domainname: 網域名稱142.IP: 網絡網域通訊協定地址143.Notebook:筆記型電腦144.VR:Virtual Reality虛擬實境145.WAP:Wireless Application Protocol 無線應用軟體協定146. LAN : Local area network區域網路WWW: World Wide Web世域網WAN: Wide Area Network 廣域網路147.3C: Computer, Communication , Consumer electronic 電腦, 通訊, 消費性電子三大產品的整合rmation Supplier Highway:信息高速公路149.UPS:Uninterrupted power system不斷電系統150.Processed material: 流程性材料151.Entity/Item:實體152.Quality loop:質量環153.Quality losses: 質量損失154.Corrective action:糾正措施155. Preventive action:預防措施156.PDCA:Plan/Do/Check/Action計劃/實施/檢查/處理157. Integrated circuits(IC):集成電路158.Application program:應用程序159.Utilities:實用程序160.Auxiliary storage/Second storage:;輔助存儲器161.Silicon chip:硅片162Diskette drive:軟驅163.Display screen/Monitor:顯示器164.Foreground:前面165.Montherboard:母板166.Mermory board:內存板167.Slot:插槽168.Bus:Data-bus/address-bus/Control bus:總線/數據總線/地址總線/控制總線169.Plotter:繪圖170.MPC:Multimedia personal computer多媒體171.Oscillator:振盪器172.Automatic teller terminal:自動終端(出納)機173.Joystick port:控制端口174.VGA: Video Graphics Array顯示卡175.Resolution:分辨率176.Register:寄存器177.ISA: Industry Standard Architecture:工業標準結構178.EISA:Extended Industry Architecture 179.Adapter: 适配器180.Peripheral:外部設備181.Faxmodem:調制解調器181.NIC:Network interface card網絡接口卡182.SCSI:Small computer system interface183.VESA:Video Electronic Standards Association184.SIMM:Single in-line memory module單排座存儲器模塊(內存條) 185.Casing:外箱186.Aluminum:鋁質187.Ceramic: 陶瓷的188.Platter:圓盤片189.Actuator:調節器190.Spindle:軸心191.Actuation arm: 存取臂192.Default code: 缺省代碼193.Auxiliary port:輔助端口194. Carriage return : 回車195.Linefeed:換行196.ASCII:American Standard Code for Information Interchange197.Video analog: 視頻模擬198.TTL:Transistor- Transistor logic晶體管-晶體管邏輯電路199.Three-prong plug:三芯電插頭200.Female connector:連接插座201.Floppy disk:軟盤202.Output level:輸出電平203.Vertical/Horizontal synchronization:場/行同步204.H(Horizontal)-Phase:行相位patible:兼容機206.Hardware Expansion Card: 硬件擴充卡207.Buffer:緩沖208.CRM:Customer relationship Management 客戶關係管理209.WIP: Work in process半成品210.Waiver:特別採用211.CXO系列—CEO: Chief Executive Office首COO :Chief Operating Office CFO: Chief Finance Officer CBO: Chief Business OfficerCTO: Chief Technology Officer CIO: Chief Information Officer CGO: Chief Government Officer212.NASDAQ: 納斯達克證券市場NASDAQ Automated Quotation system213.VC:Venture Capital 風險投資214.PDA:Personal Date Assistant個人數字助理PLA: Personal Information Assistant個人信息助理215.PPAP:Advanced Product Quality Planning and Control Plan 生產性零組件核准程序216.FMEA:Protentical Failure Mode and Effects Analysis失效模式與效應分析217.MSA: Measurement Systems Analysis 量測系統分析218.QAS:Quality System Assessment 品質系統評鑑219.Cusum: 累計總合圖220.Overall Equipment Effectiveness設備移動率221.Benchmarking:競爭標竿Analysis of motion/Ergonomics動作分析/人體工程學222.Roka Yoke 防錯法MCR: machine capability ratio 機器利用率223.Mistake Proofing 防呆法Taguchi methods田口式方法224,Vertical integration垂直整合Surveillance定期追蹤審查225.EMS: Electronics Manufacturing Supply-chain226.Cause&Effects charts特性要因圖227.Scattle: 散佈圖Fool-Proof System防呆系統228.VE:Value Engineering 價值工程QFP:Quality Function Development 品質機能展開229.Arrow Chart 箭頭圖法Affiliate Chart親和圖法230.PDPC:Process Decision Program Chart System Chart系統圖法231.Relation Chart 關邊圖法Matrix Chart矩陣圖法232.Matrix Data Analysis矩陣數據分析法234.Brain-storm 腦風暴法JIT: Just In Time:及時性生產模擬235.Deming Prize: 戴明獎Prototype技術試作236 BPM:Business Process Management .業務流程管理MBO:目標管理237. MBP:方針管理FTA:故障樹分析QSCV: 服務品質238.IPPB:Information 情況Planning策劃Programming規劃Budget預算239.EQ:Emotion Quotient:情商IQ: Intelligence Quotient:智商240.Implied Needs:隱含要求Specified Requirement:規定要求241.Probation:觀察期Incoming Product released for urgent production 緊急放行242.Advanced quality planning 先進的質量策劃243. AOQ: Average Outgoing Quality 平均檢出質量AOQL: Average Outgoing Quality Limit 平均檢出質量界限244.Approved Supplier List 經核准認可的供應商名單245.Attribute date 特征Benchmarking 基準點Calibration 校準246.Capable process 工序能力Capability Index 工序能力指數Capability ratio 工序能力率247.CHANGE CYCLE TIME 修改的時間周期Continuous improvement 持續改進248.Control plans 控制策劃Cost of quality 質量成本249.Cycle time reduction 減少周期時間250.Design of experiments 實驗設計Deviation / Substitution 偏差/ 置換251.ESD: Electrostatic discharge 靜電釋放252.EH&S: Environmental, Health, and Safely 環境,健康.安全253.ESS: Environmental Stress Screening 環境應力篩選254.FMEA: Failure Mode Effect Analysis 失誤模式效應分析255.First Article approval 產品的首次論證First pass yield 一次性通過的成品率256.First sample inspection 第一次樣品檢驗257.FMECA: Failure mode effect and critically analysis 失誤模式,效應及後果分析258.Gauge control 測量儀器控制GR&R: Gauge repeatability and reproducibility 測量儀器重復性和再現性259.HALT: Highly Accelerated Life Test 高加速壽命試驗HAST: Highly Accelerated Stress Test 高加速應力試驗260.IN-CONTROL PROCESS 受控制工序261.INDUSTRIAL AVERAGE 工業平均數262.JIT (just in time) manufacturing (即時)制程263.Key characteristic 關健特征Key component 關健構件264.Life Testing 壽命試驗Lot traceability 批量可追溯性265.Material review board 原材料審查部門MCR: machine capability ratio 機械能力率266.NONCONFORMANCE 不符合267.OUT-OF-CONTROL PROCESS 失控工序268.Pilot Application 試產(試用)269.PPM: Parts per million 百万分之一270.Preventive vs detection 預防與探測Preventive maintenance 預防維護271.Process capability index 工序能力指數272.Process control 工序控制Process improvement 工序改進Process simplification 過程簡化273.Quality Clinic Process Chart (QCPC) 質量診斷過程圖274.Quality information system 質量資料體系275.Quality manual 質量手冊Quality plan 質量計劃Quality planning 質量策劃276.Quality policy 質量方針Quality system 質量體系277.Reliability 可靠性RUN Chart 趨勢表Skill Matrix 技能表278.Statistical quality control (SQC) 統計質量控制279.Teamwork 團隊工作280.Total quality management 全面質量管理281.Variable data 變量數據Variation 影響變量282.Value Analysis 價值分析Visual Factory 形象化工厂283.Survey Instructions 調查指引284.Profile 概況285.Improvement Plan 改進計劃286.Evaluation 評估Implementation 實施Compliance 符合287.Supplier Audit Report 供方審核報告288.Site Audit 現場審核289.Typical agenda 典型的議事日程290.Internal and external failure costs 內部和外部的失誤成本291.Failure rate percentage 失誤百分率292.Productivity (output / input) 生產率(產出/投入)293.Customer complaints 客戶投訴Customer satisfaction indices 客戶滿意度指數294.Root cause analysis of failures 失誤根原分析Nominal:名目的295.Enumeration:列舉Screening stage:篩選階段296.Screening materials:屏蔽材料Nonparametric comparative experimental:非參數實驗297.Pitfall:缺陷Fractional factorial experiments:部份隨機實驗298.Management by communication:溝通管理技術Management by objective:目標管理技術299.Management by result:績效管理技術Human relationship skill:人際技術300.Conceptial skill:理念性技術Safety stock:安全庫存301.lead time:訂購前置時間EOQ: Economic order Quantity 經濟訂購量302.Run at rate:節拍生產Early production containment : 早期生產管制程序303.Accreditation Body:認可機構Active part在用零件304.Aftermarket part售后零件Analysis of Motion/Ergonomics:運動/人機工程學分析305.Finite Element analysis:有限元分析306.Geometric Dimensioning & Tolerancing:幾何尺寸與公差Match check匹配檢查st off part comparison:末件比較Simulation Techniques:倣真技術308.Solid Modeling:實體造型Layout Inspection:全尺寸檢驗309.Service Parts:維修零件Remote location:外部場所310.Overall Equipment effectiveness:設備總效率PPAP: production part approval process生產件批准程序311.Bulk material:散裝材料Perishable Tools:易損工裝312.Growth Projections:企業營運成長企劃Projected Sales figures:行銷企劃藍圖313.Human resource development:人力資源開發Feasibility Reviews:可行性審查314.Pre-launch:量產前Unscheduled machine downtime:非計劃排定的停機時間315.Excessive cycle time:作業周期時間過多Non value-added use of floor space:工廠內的無附加價值事項316.New Target values to Optimized customer process:將顧客作業程序管理到最好的新目標值317.Misshipments:耽誤出貨Incomplete orders:交貨不足318.Inventory turns over time:存貨周轉時間Stock rotation :存貨周轉319.Inventory levels:最低庫存量Order-drive:訂單導向320.Interim action:臨時措施321.Permanent action:永久措施322.Integrators:組合體。

质量部英文专业术语

质量部英文专业术语

质量部英文专业术语
以下是质量部常用的英文专业术语:
1. Quality Assurance (QA) -量保证
2. Quality Control (QC) 质量控制
3. Defect -缺陷
4. Nonconformance -不合格
5. Inspection -检查、验收
6. Audit -审计
7. Corrective Action -纠正措施
8. Preventive Action -预防措施
9. Root Cause Analysis -根本原因分析
10. Continuous Improvement -持续改进
11. Six Sigma -六西格玛(一种追求减少变异和提高质量的管理方法)
12. Lean Manufacturing -精益生产(通过消除浪费和提高价值流来提高效率和质量)
13. Statistical Process Control (SPC) -统计过程控制
14. Failure Mode and Effects Analysis (FMEA) -失效模式与影响分析
15. Quality Management System (QMS) -质量管理体系
这些术语是质量管理和质量控制领域中常见的英文专业术语,用于描述和讨论质量相关的概念、方法和工作流程。

常用质量术语缩写

常用质量术语缩写

常用质量术语缩写QA~ Q uality A ssurance质量保证QM~ Q uality M anagement质量管理QC~ Q uality C ontrol质量控制TQC~ T otal Q uality C ontrol全面质量管理IQC~ I ncoming Q uality C ontrolReceiving Inspection进货质量检验PQC~ P rocess Q uality C ontrol过程质量检验FQC ~F inished P roduct Q uality C ontrol成品质量检验ISIR ~I nitial S ample I nspection R eport初始样品检验报告FMEA~F ailure M ode And E ffects A nalysis失效模式及后果分析SOP~ Standard Operation Procedure标准操作程序AOD~ Accepted On Deviation让步接受(偏离使用)PPAP– Production Part Approval Process 生产件批准程序SCAR–Supplier Corrective Action Request供应商纠正改善要求LRR– Lot Rejected Rate批次退货率PUR– Purchasing采购PSR–Product Sample Report样品生产报告SER– Sample Evaluation Report 样品评估报告SQA–Supplier Quality Assurance供应商品质保证SQE– Supplier Quality Engineer供应商质量工程师SCR– Supplier Change Request供应商变更请求NPI– New Product Introduction新产品导入SPC–Statistical Process Control统计过程控制AVL–Approved Vendor List合格供应商清单MSA– Master Supply Agreement供应商协议COC- Certificate OfConformance产品一致性证书using tools such as 6-sigma scorecard-6σ记录卡Process FMEA-Failure Model & Effect Analyse 故障模式和影响分析Process Control Plan–控制计划Receiving Inspection–进货检验End-of-Line Audit (EOLA)–完工审计Part Qualification (PQP)–零件规范supplier DPMO - DPMO(defects per million opportunities,百万机会的缺陷数) Pre-shipment -First Piece Inspection (FPI)–样品首件检测GRR–量具重复性研究Process Capability Study (CP/Cpk)–工序能力研究世上没有一件工作不辛苦,没有一处人事不复杂。

常用质量术语缩写

常用质量术语缩写

常用质量术语缩写QA~ Q uality A ssurance质量保证QM~ Q uality M anagement质量管理QC~ Q uality C ontrol质量控制TQC ~ T otal Q uality C ontrol全面质量管理IQC~ I ncoming Q uality C ontrolReceiving Inspection进货质量检验PQC~ P rocess Q uality C ontrol过程质量检验FQC ~ F inished P roduct Q uality C ontrol成品质量检验ISIR ~ I nitial S ample I nspection R eport初始样品检验报告FMEA ~ F ailure M ode And E ffects A nalysis失效模式及后果分析SOP~ Standard Operation Procedure标准操作程序AOD~ Accepted On Deviation让步接受(偏离使用)PPAP– Production Part Approval Process生产件批准程序SCAR– Supplier Corrective Action Request供应商纠正改善要求LRR– Lot Rejected Rate 批次退货率PUR– Purchasing 采购PSR– Product Sample Report 样品生产报告SER– Sample Evaluation Report 样品评估报告SQA– Supplier Quality Assurance 供应商品质保证SQE– Supplier Quality Engineer 供应商质量工程师SCR– Supplier Change Request 供应商变更请求NPI– New Product Introduction 新产品导入SPC– Statistical Process Control 统计过程控制A VL– Approved Vendor List 合格供应商清单MSA– Master Supply Agreement 供应商协议COC - Certificate Of Conformance 产品一致性证书using tools such as 6-sigma scorecard- 6σ记录卡Process FMEA-Failure Model & Effect Analyse 故障模式和影响分析Process Control Plan –控制计划Receiving Inspection –进货检验End-of-Line Audit (EOLA) –完工审计Part Qualification (PQP) –零件规范supplier DPMO - DPMO(defects per million opportunities,百万机会的缺陷数)Pre-shipment -First Piece Inspection (FPI) –样品首件检测GRR–量具重复性研究Process Capability Study (CP/Cpk) –工序能力研究。

英文质量术语

英文质量术语

英文质量术语从事质量多年,但在交流的时候仍会对一些术语(英文简称)搞不清楚,现普及一下部门名称的专有名词QS:Quality system品质系统CS:Coutomer Sevice 客户服务QC:Quality control品质管理IQC:Incoming quality control 进料检验LQC:Line Quality Control 生产线品质控制IPQC:In process quality control 制程检验FQC:Final quality control 最终检验OQC:Outgoing quality control 出货检验QA:Quality assurance 品质保证SQA:Source(supplier) Quality Assurance 供应商品质保证(VQA)CQA:Customer Quality Assurance客户质量保证PQA rocess Quality Assurance 制程品质保证QE:Quality engineer 品质工程CE:component engineering零件工程EE:equipment engineering设备工程ME:manufacturing engineering制造工程TE:testing engineering测试工程PPE roduct Engineer 产品工程IE:Industrial engineer 工业工程ADM: Administration Department行政部RMA:客户退回维修CSDI:检修PC:producing control生管MC:mater control物管GAD: General Affairs Dept总务部A/D: Accountant /Finance Dept会计LAB: Laboratory实验室DOE:实验设计HR:人资PMC:企划RD:研发W/H:仓库SI:客验PD: Product Department生产部PA:采购(PUR: Purchaing Dept)SMT:Surface mount technology 表面粘着技术MFG:Manufacturing 制造MIS:Management information system 资迅管理系统DCC:document control center 文件管制中心厂内作业中的专有名词QT:Quality target品质目标QP:Quality policy目标方针QI:Quality improvement品质改善CRITICAL DEFECT:严重缺点(CR)MAJOR DEFECT:主要缺点(MA)MINOR DEFECT:次要缺点(MI)MAX:Maximum最大值MIN:Minimum最小值DIA iameter直径DIM imension尺寸LCL:Lower control limit管制下限UCL:Upper control limit管制上限EMI:电磁干扰ESD:静电防护EPA:静电保护区域ECN:工程变更ECO:Engineering change order工程改动要求(客户)ECR:工程变更需求单CPI:Continuous Process Improvement 连续工序改善Compatibility:兼容性Marking:标记DWG rawing图面Standardization:标准化Consensus:一致Code:代码ZD:Zero defect零缺点Tolerance:公差Subject matter:主要事项Auditor:审核员BOM:Bill of material物料清单Rework:重工ID:identification识别,鉴别,证明PILOT RUN: (试投产)FAI:首件检查FPIR:First Piece Inspection Report首件检查报告FAA:首件确认SPC:统计制程管制CP: capability index(准确度)CPK: capability index of process(制程能力)PMP:制程管理计划(生产管制计划)MPI:制程分析DAS efects Analysis System 缺陷分析系统PPB:十亿分之一Flux:助焊剂P/N:料号L/N:Lot Number批号Version:版本Quantity:数量Valid date:有效日期MIL-STD:Military-Standard军用标准ICT: In Circuit Test (线路测试)ATE:Automatic Test Equipment自动测试设备MO: Manafacture Order生产单T/U: Touch Up (锡面修补)I/N:手插件P/T:初测F/T: Function Test (功能测试-终测)AS 组立P/K:包装TQM:Total quality control全面品质管理MDA:manufacturing defect analysis制程不良分析(ICT) RUN-IN:老化实验HI-pot:高压测试FMI:Frequency Modulation Inspect高频测试DPPM: Defect Part Per Million(不良率的一种表达方式:百万分之一) 1000PPM即为0.1% Corrective Action: (CAR改善对策)ACC:允收REJ:拒收S/S:Sample size抽样检验样本大小SI-SIV:Special I-Special IV特殊抽样水平等级CON:Concession / Waive特采ISO:国际标准化组织ISA:Industry Standard Architecture工业标准体制结构OBA:开箱稽核FIFO:先进先出PDCA:管理循环Plan do check action计划,执行,检查,总结WIP:在制品(半成品)S/O: Sales Order (业务订单)P/O: Purchase Order (采购订单)P/R: Purchase Request (请购单)AQL:acceptable quality level允收品质水准LQL;Limiting quality level最低品质水准QVL:qualified vendor list合格供应商名册AVL :认可的供货商清单(Approved Vendor List) QCD: Quality cost delivery(品质,交期,成本)MPM:Manufacturing project management制造专案管理KPI:Key performance indicate重要绩效指标MVT:Manufacturing Verification Test制造验证试产Q/R/S:Quality/Reliability/Service质量/可靠度/服务STL:ship to line(料到上线)NTF:No trouble found误判CIP:capacity improvement plan(产能改善计划)MRB:material review board(物料审核小组)MRB:Material reject bill退货单JIT:just in time(即时管理)5S:seiri seiton seiso seiketsu shitsuke(整理,整顿,清扫,清洁,修养)SOP:standard operation process(标准作业程序)SIP:Specification inspection process制程检验规格TOP: Test Operation Process (测试作业流程)WI: working instruction(作业指导书)SMD:surface mounting device(表面粘着原件)FAR:failure aualysis report故障分析报告CAR:Corrective action report改善报告BPR:企业流程再造(Business Process Reengineering)ISAR :首批样品认可(Initial Sample Approval Request)-JIT:实时管理(Just In Time)QCC :品管圈(Quality Control Circle)Engineering Department (工程部)TQEM: Total Quality Environment Management(全面品质环境管理)PD: Production Department (制造)LOG: Logistics (后勤支持)Shipping: (进出口)AOQ:Average Output Quality平均出货质量AOQL:Average Output Quality Level平均出货质量水平FMEA:failure model effectiveness analysis失效模式分析CRB: Change Review Board (工程变更会议)CSA:Customer Simulate Analysis客户模拟分析SQMS:Supplier Quality Management System供应商品质管理系统QIT: Quality Improvement Team 品质改善小组QIP:Quality Improvement Plan品质改善计划CIP:Continual Improvement Plan持续改善计划M.Q.F.S: Material Quality Feedback Sheet (来料品质回馈单) SCAR: Supplier Corrective Action Report (供货商改善对策报告)8D Sheet: 8 Disciplines sheet ( 8D单)PDCA:PDCA (Plan-Do-Check-Action) (管理循环)MPQ: Material Packing Quantity (物料最小包装量)DSCN: Delivery Schedule Change Notice (交期变更通知) QAPS: Quality Assurance Process Sheet (品质工程表)DRP :运销资源计划(Distribution Resource Planning)DSS:决策支持系统(Decision Support System)EC :电子商务(Electronic Commerce)EDI :电子资料交换(Electronic Data Interchange)EIS :主管决策系统(Excutive Information System)ERP:企业资源规划(Enterprise Resource Planning) FMS :弹性制造系统(Flexible Manufacture System)KM :知识管理(Knowledge Management)4L :逐批订购法(Lot-for-Lot)LTC :最小总成本法(Least Total Cost)LUC :最小单位成本(Least Unit Cost)MES :制造执行系统(Manufacturing Execution System) MPS :主生产排程(Master Production Schedule)MRP :物料需求规划(Material Requirement Planning) MRPⅡ:制造资源计划(Manufacturing Resource Planning) OEM :委托代工(Original Equipment Manufacture) ODM :委托设计与制造(Original Design & Manufacture) OLAP:线上分析处理(On-Line Analytical Processing) OLTP:线上交易处理(On-Line Transaction Processing) OPT :最佳生产技术(Optimized Production Technology) PDCA:PDCA管理循环(Plan-Do-Check-Action)PDM:产品数据管理系统(Product Data Management)) RCCP:粗略产能规划(Rough Cut Capacity Planning) SCM :供应链管理(Supply Chain Management)SFC :现场控制(Shop Floor Control)TOC:限制理论(Theory of Constraints)TQC :全面品质管制(Total Quality Control)FYI/R:for your information/reference仅供参考ASAP:尽快S/T:Standard time标准时间TPM:total production maintenance:全面生产保养ESD Wrist strap:静电环IT:information technology信息技术,资讯科学CEO:Chief Executive Officer执行总裁COO:Chief Operaring Officer首席业务总裁SWOT:Strength,Weakness,Opportunity,Threat优势﹐弱点﹐机会﹐威胁Competence:专业能力Communication:有效沟通Cooperation:统御融合Vibration Testing:振动测试IDP:Individual Development Plan个人发展计划MRP:Material Requirement Planning物料需求计划MAT'S:Material材料LRR:Lot Rejeet Rate批退率ATIN:Attention知会3C:Computer ,Communication , Consumer electronic消费性电子5W1H:When , Where , Who , What , Why , Ho5M: Man , Machine , Material , Method , Measurement人,机器,材料,方法,测量4MIE: Man,Material,Machine,Method,Environment人力,物力,财务,技术,时间(资源)7M1I: Manpower , Machine , Material , Method, Market , Management , Money , Information人力,机器,材料,方法, 市场,管理,资金,资讯1 Accuracy 准确度2 Action 行动3 Activity 活动4 Analysis Covariance 协方差分析5 Analysis of Variance 方差分析6 Approved 承认7 Attribute 计数值8 Average 平均数9 Balance sheet 资产负债对照表10 Binomial 二项分配11 Brainstorming Techniques 脑力风暴法12 Cause and Effect Matrix 因果图(鱼骨图)13 CL:Center Line 中心线14 Check Sheets 检查表15 Complaint 投诉16 Conformity 合格(符合)17 Control 控制18 Control chart 控制(管制)图19 Correction 纠正20 Correlation Methods 相关分析法21 CPI: continuouse Process Improvement 连续工序改善22 Cross Tabulation Tables 交叉表23 CS: Customer Sevice 客(户)服(务)中心24 DSA: Defects Analysis System 缺陷分析系统25 Data 数据Description:品名26 DCC: Document Control Center 文控中心27 Decision 决策、判定28 Defects per unit 单位缺点数29 Description 描述30 Device 装置31 Do 执行32 DOE: Design of Experiments 实验设计33 Element 元素34 Engineering recbnology 工程技35 Environmental 环境36 Equipment 设备37 Estimated accumulative frequency 计算估计累计数38 E Equipment Variation 设备变异39 External Failure 外部失效,外部缺陷40 FA: Failure Analysis 失效分析41 Fact control 事实管理42 Fatigue 疲劳43 FMEA: Failure Mode and Effect Analysis失效模式与效果分析44 FP First-Pass Yield (第一次通过)合格率45 FQA: Final Quality Assurance 最终品质保证46 FQC: Final Quality control 最终品质控制47 Gauge system 测量系统48 Grade 等级49 Histogram 直方图50 Improvement 改善51 Initial review 先期审查52 Inspection 检验53 Internal Failure 内部失效、内部缺陷54 IPQC: In Process Quality Control 制程品质控制55 IQC: Incomming Quality Control 来料品质控制56 IS International Organization for Standardization 国际标准化组织57 LCL: Lower Control limit 管制下限58 LQC: Line Quality Control 生产线品质控制59 LSL: Lower Size Limit 规格下限60 Machine 机械61 Manage 管理62 Materials 物料63 Measurement 测量64 Median 中位数65 MSA: Measurement System Analysis 测量系统分析66 Occurrence 发生率67 Operation Instruction 作业指导书68 Organization 组织69 Parto 柏拉图70 PPM arts per Million (百万分之)不良率71 Plan 计划72 Policy 方针73 Population 群体74 PQA: Process Quality Assurance 制程品质保证75 Practice 实务(践)76 Prevention 预防77 Probability 机率78 Probability density function 机率密度函数79 Procedure 流程80 Process 过程81 Process capability analysis 制程能力分析(图)82 Process control and Process capability制程管制与制程能力83 Product 产品84 Production 生产85 Projects 项目86 QA: Quality Assurance 品质保证87 QC: Quality Control 品质控制88 QE: Quality Engineering 品质工程89 QFD: Quality Function Desgin 品质机能展开(法)90 Quality 质量91 Quality manual 品质手册92 Quality policy 品质政策(质量方针)93 Random experiment 随机试验94 Random numbers 随机数95 R:Range 全距(极差)96 Reject 拒收97 Repair 返修98 Repeatusility 再现性99 Reproducibility 再生性100 Requirement 要求101 Responsibilities 职责102 Review 评审103 Reword 返工104 Rolled yield 直通率105 RPN: Risk Priority Number 风险系数106 Sample 抽样,样本107 Sample space 样本空间108 Sampling with replacement 放回抽样109 Sampling without replacement 不放回抽样110 Scatter diagram 散布图分析111 Scrap 报废112 Simple random sampling 简单随机取样113 Size 规格114 SL: Size Line 规格中心线115 Stratified random sampling 分层随机抽样116 SOP: Standard Operation Procedure 标准作业书117 SPC: Statistical Process Control 统计制程管制118 Specification 规范119 SQA: Source(Supplier) Quality Assurance 供货商品质保证120 Stage sampling 分段随机抽样121 Standard Deviation 标准差122 Sum of squares 平方和。

质量方面英文缩写-不要密码

质量方面英文缩写-不要密码

从事质量多年,但在交流的时候仍会对一些术语(英文简称)搞不清楚,现普及一下部门名称的专有名词QS:Quality system品质系统CS:Coutomer Sevice 客户服务QC:Quality control品质管理IQC:Incoming quality control 进料检验LQC:Line Quality Control 生产线品质控制IPQC:In process quality control 制程检验FQC:Final quality control 最终检验OQC:Outgoing quality control 出货检验QA:Quality assurance 品质保证SQA:Source(supplier) Quality Assurance 供应商品质保证(VQA)CQA:Customer Quality Assurance客户质量保证PQA rocess Quality Assurance 制程品质保证QE:Quality engineer 品质工程CE:component engineering零件工程EE:equipment engineering设备工程ME:manufacturing engineering制造工程TE:testing engineering测试工程PPE roduct Engineer 产品工程IE:Industrial engineer 工业工程ADM: Administration Department行政部RMA:客户退回维修CSDI:检修PC:producing control生管MC:mater control物管GAD: General Affairs Dept总务部A/D: Accountant /Finance Dept会计LAB: Laboratory实验室DOE:实验设计HR:人资PMC:企划RD:研发W/H:仓库SI:客验PD: Product Department生产部PA:采购(PUR: Purchaing Dept)SMT:Surface mount technology 表面粘着技术MFG:Manufacturing 制造MIS:Management information system 资迅管理系统DCC:document control center 文件管制中心厂内作业中的专有名词QT:Quality target品质目标QP:Quality policy目标方针QI:Quality improvement品质改善CRITICAL DEFECT:严重缺点(CR)MAJOR DEFECT:主要缺点(MA)MINOR DEFECT:次要缺点(MI)MAX:Maximum最大值MIN:Minimum最小值DIA iameter直径DIM imension尺寸LCL:Lower control limit管制下限UCL:Upper control limit管制上限EMI:电磁干扰ESD:静电防护EPA:静电保护区域ECN:工程变更ECO:Engineering change order工程改动要求(客户)ECR:工程变更需求单CPI:Continuous Process Improvement 连续工序改善Compatibility:兼容性Marking:标记DWG rawing图面Standardization:标准化Consensus:一致Code:代码ZD:Zero defect零缺点Tolerance:公差Subject matter:主要事项Auditor:审核员BOM:Bill of material物料清单Rework:重工ID:identification识别,鉴别,证明PILOT RUN: (试投产)FAI:首件检查FPIR:First Piece Inspection Report首件检查报告FAA:首件确认SPC:统计制程管制CP: capability index(准确度)CPK: capability index of process(制程能力)PMP:制程管理计划(生产管制计划)MPI:制程分析DAS efects Analysis System 缺陷分析系统PPB:十亿分之一Flux:助焊剂P/N:料号L/N:Lot Number批号Version:版本Quantity:数量Valid date:有效日期MIL-STD:Military-Standard军用标准ICT: In Circuit Test (线路测试)ATE:Automatic Test Equipment自动测试设备MO: Manafacture Order生产单T/U: Touch Up (锡面修补)I/N:手插件P/T:初测F/T: Function Test (功能测试-终测)AS 组立P/K:包装TQM:Total quality control全面品质管理MDA:manufacturing defect analysis制程不良分析(ICT) RUN-IN:老化实验HI-pot:高压测试FMI:Frequency Modulation Inspect高频测试DPPM: Defect Part Per Million(不良率的一种表达方式:百万分之一) 1000PPM即为0.1% Corrective Action: (CAR改善对策)ACC:允收REJ:拒收S/S:Sample size抽样检验样本大小SI-SIV:Special I-Special IV特殊抽样水平等级CON:Concession / Waive特采ISO:国际标准化组织ISA:Industry Standard Architecture工业标准体制结构OBA:开箱稽核FIFO:先进先出PDCA:管理循环Plan do check action计划,执行,检查,总结WIP:在制品(半成品)S/O: Sales Order (业务订单)P/O: Purchase Order (采购订单)P/R: Purchase Request (请购单)AQL:acceptable quality level允收品质水准LQL;Limiting quality level最低品质水准QVL:qualified vendor list合格供应商名册AVL :认可的供货商清单(Approved Vendor List)QCD: Quality cost delivery(品质,交期,成本)MPM:Manufacturing project management制造专案管理KPI:Key performance indicate重要绩效指标MVT:Manufacturing Verification Test制造验证试产Q/R/S:Quality/Reliability/Service质量/可靠度/服务STL:ship to line(料到上线)NTF:No trouble found误判CIP:capacity improvement plan(产能改善计划)MRB:material review board(物料审核小组)MRB:Material reject bill退货单JIT:just in time(即时管理)5S:seiri seiton seiso seiketsu shitsuke(整理,整顿,清扫,清洁,修养)SOP:standard operation process(标准作业程序)SIP:Specification inspection process制程检验规格TOP: Test Operation Process (测试作业流程)WI: working instruction(作业指导书)SMD:surface mounting device(表面粘着原件)FAR:failure aualysis report故障分析报告CAR:Corrective action report改善报告BPR:企业流程再造(Business Process Reengineering)ISAR :首批样品认可(Initial Sample Approval Request)-JIT:实时管理(Just In Time)QCC :品管圈(Quality Control Circle)Engineering Department (工程部)TQEM: Total Quality Environment Management(全面品质环境管理)PD: Production Department (制造)LOG: Logistics (后勤支持)Shipping: (进出口)AOQ:Average Output Quality平均出货质量AOQL:Average Output Quality Level平均出货质量水平FMEA:failure model effectiveness analysis失效模式分析CRB: Change Review Board (工程变更会议)CSA:Customer Simulate Analysis客户模拟分析SQMS:Supplier Quality Management System供应商品质管理系统QIT: Quality Improvement Team 品质改善小组QIP:Quality Improvement Plan品质改善计划CIP:Continual Improvement Plan持续改善计划M.Q.F.S: Material Quality Feedback Sheet (来料品质回馈单) SCAR: Supplier Corrective Action Report (供货商改善对策报告)8D Sheet: 8 Disciplines sheet ( 8D单)PDCA:PDCA (Plan-Do-Check-Action) (管理循环)MPQ: Material Packing Quantity (物料最小包装量)DSCN: Delivery Schedule Change Notice (交期变更通知)QAPS: Quality Assurance Process Sheet (品质工程表)DRP :运销资源计划(Distribution Resource Planning)DSS:决策支持系统(Decision Support System)EC :电子商务(Electronic Commerce)EDI :电子资料交换(Electronic Data Interchange)EIS :主管决策系统(Excutive Information System)ERP:企业资源规划(Enterprise Resource Planning) FMS :弹性制造系统(Flexible Manufacture System)KM :知识管理(Knowledge Management)4L :逐批订购法(Lot-for-Lot)LTC :最小总成本法(Least Total Cost)LUC :最小单位成本(Least Unit Cost)MES :制造执行系统(Manufacturing Execution System) MPS :主生产排程(Master Production Schedule)MRP :物料需求规划(Material Requirement Planning) MRPⅡ:制造资源计划(Manufacturing Resource Planning) OEM :委托代工(Original Equipment Manufacture) ODM :委托设计与制造(Original Design & Manufacture) OLAP:线上分析处理(On-Line Analytical Processing) OLTP:线上交易处理(On-Line Transaction Processing) OPT :最佳生产技术(Optimized Production Technology) PDCA:PDCA管理循环(Plan-Do-Check-Action)PDM:产品数据管理系统(Product Data Management)) RCCP:粗略产能规划(Rough Cut Capacity Planning)SCM :供应链管理(Supply Chain Management)SFC :现场控制(Shop Floor Control)TOC:限制理论(Theory of Constraints)TQC :全面品质管制(Total Quality Control)FYI/R:for your information/reference仅供参考ASAP:尽快S/T:Standard time标准时间TPM:total production maintenance:全面生产保养ESD Wrist strap:静电环IT:information technology信息技术,资讯科学CEO:Chief Executive Officer执行总裁COO:Chief Operaring Officer首席业务总裁SWOT:Strength,Weakness,Opportunity,Threat优势﹐弱点﹐机会﹐威胁Competence:专业能力Communication:有效沟通Cooperation:统御融合Vibration Testing:振动测试IDP:Individual Development Plan个人发展计划MRP:Material Requirement Planning物料需求计划MAT'S:Material材料LRR:Lot Rejeet Rate批退率ATIN:Attention知会3C:Computer ,Communication , Consumer electronic消费性电子5W1H:When , Where , Who , What , Why , Ho5M: Man , Machine , Material , Method , Measurement人,机器,材料,方法,测量4MIE: Man,Material,Machine,Method,Environment人力,物力,财务,技术,时间(资源)7M1I: Manpower , Machine , Material , Method, Market , Management , Money , Information 人力,机器,材料,方法, 市场,管理,资金,资讯1 Accuracy 准确度2 Action 行动3 Activity 活动4 Analysis Covariance 协方差分析5 Analysis of Variance 方差分析6 Approved 承认7 Attribute 计数值8 Average 平均数9 Balance sheet 资产负债对照表10 Binomial 二项分配11 Brainstorming Techniques 脑力风暴法12 Cause and Effect Matrix 因果图(鱼骨图)13 CL:Center Line 中心线14 Check Sheets 检查表15 Complaint 投诉16 Conformity 合格(符合)17 Control 控制18 Control chart 控制(管制)图19 Correction 纠正20 Correlation Methods 相关分析法21 CPI: continuouse Process Improvement 连续工序改善22 Cross Tabulation Tables 交叉表23 CS: Customer Sevice 客(户)服(务)中心24 DSA: Defects Analysis System 缺陷分析系统25 Data 数据Description:品名26 DCC: Document Control Center 文控中心27 Decision 决策、判定28 Defects per unit 单位缺点数29 Description 描述30 Device 装置31 Do 执行32 DOE: Design of Experiments 实验设计33 Element 元素34 Engineering recbnology 工程技35 Environmental 环境36 Equipment 设备37 Estimated accumulative frequency 计算估计累计数38 E Equipment Variation 设备变异39 External Failure 外部失效,外部缺陷40 FA: Failure Analysis 失效分析41 Fact control 事实管理42 Fatigue 疲劳43 FMEA: Failure Mode and Effect Analysis失效模式与效果分析44 FP First-Pass Yield (第一次通过)合格率45 FQA: Final Quality Assurance 最终品质保证46 FQC: Final Quality control 最终品质控制47 Gauge system 测量系统48 Grade 等级49 Histogram 直方图50 Improvement 改善51 Initial review 先期审查52 Inspection 检验53 Internal Failure 内部失效、内部缺陷54 IPQC: In Process Quality Control 制程品质控制55 IQC: Incomming Quality Control 来料品质控制56 IS International Organization for Standardization 国际标准化组织57 LCL: Lower Control limit 管制下限58 LQC: Line Quality Control 生产线品质控制59 LSL: Lower Size Limit 规格下限60 Machine 机械61 Manage 管理62 Materials 物料63 Measurement 测量64 Median 中位数65 MSA: Measurement System Analysis 测量系统分析66 Occurrence 发生率67 Operation Instruction 作业指导书68 Organization 组织69 Parto 柏拉图70 PPM arts per Million (百万分之)不良率71 Plan 计划72 Policy 方针73 Population 群体74 PQA: Process Quality Assurance 制程品质保证75 Practice 实务(践)76 Prevention 预防77 Probability 机率78 Probability density function 机率密度函数79 Procedure 流程80 Process 过程81 Process capability analysis 制程能力分析(图)82 Process control and Process capability制程管制与制程能力83 Product 产品84 Production 生产85 Projects 项目86 QA: Quality Assurance 品质保证87 QC: Quality Control 品质控制88 QE: Quality Engineering 品质工程89 QFD: Quality Function Desgin 品质机能展开(法)90 Quality 质量91 Quality manual 品质手册92 Quality policy 品质政策(质量方针)93 Random experiment 随机试验94 Random numbers 随机数95 R:Range 全距(极差)96 Reject 拒收97 Repair 返修98 Repeatusility 再现性99 Reproducibility 再生性100 Requirement 要求101 Responsibilities 职责102 Review 评审103 Reword 返工104 Rolled yield 直通率105 RPN: Risk Priority Number 风险系数106 Sample 抽样,样本107 Sample space 样本空间108 Sampling with replacement 放回抽样109 Sampling without replacement 不放回抽样110 Scatter diagram 散布图分析111 Scrap 报废112 Simple random sampling 简单随机取样113 Size 规格114 SL: Size Line 规格中心线115 Stratified random sampling 分层随机抽样116 SOP: Standard Operation Procedure 标准作业书117 SPC: Statistical Process Control 统计制程管制118 Specification 规范119 SQA: Source(Supplier) Quality Assurance 供货商品质保证120 Stage sampling 分段随机抽样121 Standard Deviation 标准差122 Sum of squares 平方和123 Taguchi-method 田口(试验)方法124 Theory 原理125 TQC: Total Quality Control 全面品质控制126 TQM: Total Quality Management 全面品质管理127 Traceablity 追溯128 Training 培训129 UCL: Upper Control Limit 管制(控制)上限130 USL: Upper Size Limit 规格上限131 Validation 确认132 Variable 计量值133 Verification 验证134 Version 版本135 VOC: Voice of Customer 客户需求136 VOE: Voice of Engineer 工程需求137 Inventory stock report:庫存清单报告138 Sales order report:出货报告质量人员名称类QC quality control 品质管理人员FQC final quality control 终点质量管理人员IPQC in process quality control 制程中的质量管理人员OQC output quality control 最终出货质量管理人员IQC incoming quality control 进料质量管理人员TQC total quality control 全面质量管理POC passage quality control 段检人员QA quality assurance 质量保证人员OQA output quality assurance 出货质量保证人员QE quality engineering 质量工程人员质量保证类FAI first article inspection 新品首件检查FAA first article assurance 首件确认CP capability index 能力指数CPK capability process index 模具制程能力参数SSQA standardized supplier quality audit 合格供货商质量评估FMEA failure model effectiveness analysis 失效模式分析FQC运作类AQL Acceptable Quality Level 运作类允收质量水平S/S Sample size 抽样检验样本大小ACC Accept 允收REE Reject 拒收CR Critical 极严重的MAJ Major 主要的MIN Minor 轻微的Q/R/S Quality/Reliability/Service 质量/可靠度/服务P/N Part Number 料号L/N Lot Number 批号AOD Accept On Deviation 特采UAI Use As It 特采FPIR First Piece Inspection Report 首件检查报告PPM Percent Per Million 百万分之一制程统计品管专类SPC Statistical Process Control 统计制程管制SQC Statistical Quality Control 统计质量管理GRR Gauge Reproductiveness & Repeatability 量具之再制性及重测性判断量可靠与否DIM Dimension 尺寸DIA Diameter 直径N Number 样品数其它质量术语类QIT Quality Improvement Team 质量改善小组ZD Zero Defect 零缺点QI Quality Improvement 质量改善QP Quality Policy 目标方针TQM Total Quality Management 全面质量管理RMA Return Material Audit 退料认可7QCTools 7 Quality Control Tools 品管七大手法通用之件类ECN Engineering Change Notice 工程变更通知(供货商)ECO Engineering Change Order 工程改动要求(客户)PCN Process Change Notice 工序改动通知PMP Product Management Plan 生产管制计划SIP Standard Inspection Procedure 制程检验标准程序SOP Standard Operation Procedure 制造作业规范IS Inspection Specification 成品检验规范BOM Bill Of Material 物料清单PS Package Specification 包装规范SPEC Specification 规格DWG Drawing 图面系统文件类ES Engineering Standard 工程标准CGOO China General PCE龙华厂文件IWS International Workman Standard 工艺标准ISO International Standard Organization 国际标准化组织GS General Specification 一般规格部类PMC Production & Material Control 生产和物料控制PCC Product control center 生产管制中心PPC Production Plan Control 生产计划控制MC Material Control 物料控制DC Document Center 资料中心QE Quality Engineering 质量工程(部)QA Quality Assurance 质量保证(处)QC Quality Control 质量管理(课)PD Product Department 生产部LAB Laboratory 实验室IE Industrial Engineering 工业工程R&D Research & Design 设计开发部生产类PCs Pieces 个(根,块等)PRS Pairs 双(对等)CTN Carton 卡通箱PAL Pallet/skid 栈板PO Purchasing Order 采购订单MO Manufacture Order 生产单D/C Date Code 生产日期码ID/C Identification Code (供货商)识别码SWR Special Work Request 特殊工作需求L/N Lot Number 批号P/N Part Number 料号OEM Original Equipment Manufacture 原设备制造PC Personal Computer 个人计算机CPU Central Processing Unit 中央处理器A.S.A.P As Soon As Possible 尽可能快的E-MAIL Electrical-Mail 电子邮件N/A Not Applicable 不适用QTY Quantity 数量I/O input/output 输入/输出NG Not Good 不行,不合格C=0 Critical=0 极严重不允许APP Approve 核准,认可,承认CHK Check 确认ASS'Y Assembly 装配,组装T/P True Position 真位度5WIH When, Where, Who, What, Why, How to6M Man, Machine, Material, Method, Measurement, Message4MTH Man, Material, Money, Method, Time, How 人力,物力,财务,技术,时间(资源) SQA Strategy Quality Assurance 策略质量保证DQA Design Quality Assurance 设计质量保证MQA Manufacture Quality Assurance 制造质量保证SSQA Sales and service Quality Assurance 销售及服务质量保证LRR Lot Reject Rate 批退率SPS Switching power supply 电源箱DT Desk Top 卧式(机箱)MT Mini-Tower 立式(机箱)DVD Digital Video DiskVCD Video Compact DiskLCD Liquid Crystal DisplayCAD Computer Aided DesignCAM Computer Aided ManufacturingCAE Computer Aided EngineeringPCB Printed Circuit Board 印刷电路板CAR Correction Action Report 改善报告NG Not Good 不良WDR Weekly Delivery Requirement 周出货要求PPM Percent Per Million 百万分之一TPM Total Production Maintenance 全面生产保养MRP Material Requirement Planning 物料需计划OS Operation System 操作系统TBA To Be Assured 待定,定缺D/C Drawing ChangeP/P Plans & ProcedureEMI Electrical-Music Industry 电子音乐工业Electrical Magnetic Interference 电子干扰RFI Read Frequency Input 读频输入MMC Maximum Material ConditionMMS Maximum Material SizeLMC Least Material ConditionLMS Least Material SizeLED lighting-emitting diode 发光二极管QBR Quarter Business RecordCIP Continuous improvement processFGI Forecasted Goal InventoryCNC Computerized numeral controllerB2C Business to customerB2B Business to businessAVL Approved vendor listPOP Procedure of packagingEOL End of lifeVDCS Vender defect correcting sheetPDCS Process defect correcting sheet GRN Goods receiving noteA/R Accounting receivableA/P Accounting payable。

QC常用单词-中英对照

QC常用单词-中英对照

QC常用单词-中英对照介绍这篇文档是为了方便质量控制人员〔Quality Control, QC〕在工作中使用而编写的。

在质量控制的过程中,我们经常会遇到一些常用的单词,这些单词在中英文之间的对照对我们的工作非常有帮助。

本文档将列出一些常用的QC单词,并提供它们的中英对照,希望能对大家有所帮助。

QC常用单词列表及对照下面是一些常用的QC单词及其中英对照:1.产品〔Product〕2.测试〔Test〕3.缺陷〔Defect〕4.报告〔Report〕5.标准〔Specification〕6.标准〔Standard〕7.检查〔Check〕8.方案〔Plan〕9.测试用例〔Test Case〕10.可靠性〔Reliability〕11.准确性〔Accuracy〕12.效率〔Efficiency〕13.可用性〔Usability〕14.可维护性〔Maintainability〕15.平安性〔Security〕16.可重复性〔Repeatability〕17.测试数据〔Test Data〕18.异常〔Exception〕19.验证〔Validation〕20.验收〔Acceptance〕除了以上列出的单词,还有很多其他的单词也非常常用,希望大家在实际工作中能遇到更多的常用单词,并对它们的中英对照有更多的了解。

总结质量控制是软件开发过程中非常重要的一个环节,QC人员需要掌握一些专业的术语和常用单词。

本文档提供了一些常用的QC单词及其中英对照,希望对大家在工作中有所帮助。

同时也希望大家能不断学习和积累,提高自己的专业水平。

如果在实际工作中遇到了其他常用单词,也可以将它们添加到这个列表中,以便与大家共享。

谢谢大家阅读本文档!参考资料无。

QC常用英语名词

QC常用英语名词

人 機器 物料 方法 環境
Plan Do Check Action
計劃 執行 檢查 總結
Failure Model Effectiveness Analysis
失效模式分析
Computer
電腦
Consumer electronics
消費性電子產品
Communication
通訊類電子產品
Classification
整理
Location
整頓
Cleaning
清掃
Conservation
清洁
Convention
教養
5
QC常用英語 ---文件類
ECN Engineering Change Notice PCN Process Change Notice SIP Standard Inspection Procedure SOP Standard Operation Procedure AQL Accept Quality Level AVL Approved Vendor Level PMP Product Management Plan MRP Material Requirement Planning SWR Special Work Request FAI First Article Inspection CAR Corrective Action Request SCAR Supplier Corrective Action Request
人資
CM Cost Management
經管
GSM Global Supply Management 企劃
PUR Purchasing
采購
---其它
10

质量术语英文缩写

质量术语英文缩写

质量术语英文缩写
以下是一些常见的质量术语英文缩写:
1. QA - Quality Assurance(质量保证)
2. QC - Quality Control(质量控制)
3. TQM - Total Quality Management(全面质量管理)
4. TPM - Total Productive Maintenance(全面生产维护)
5. ISO - International Organization for Standardization(国际标准化组织)
6. Six Sigma - 六西格玛(一种用于精益生产和质量改进的方法学)
7. FMEA - Failure Mode and Effects Analysis(故障模式及影响分析)
8. SPC - Statistical Process Control(统计过程控制)
9. 5S - Sort, Set in Order, Shine, Standardize, Sustain(整理、整顿、清扫、清洁、素养)
10. JIT - Just in Time(精益生产中的一种生产方式)
11. Kaizen - 改善(一种基于持续改进的管理理念)
12. PDSA - Plan-Do-Study-Act(计划-执行-研究-行动,一种持续改进的循环流程)。

审核常用的英文缩写

审核常用的英文缩写

审核常用的英文缩写1. QA(Quality Assurance):质量保证。

这是一个确保产品或服务达到预定质量标准的过程。

2. QC(Quality Control):质量控制。

这是在产品或服务生产过程中进行的检查,以确保它们符合质量标准。

3. ISO(International Organization for Standardization):国际标准化组织。

这是一个制定国际标准的全球性非政府组织。

4. GMP(Good Manufacturing Practice):良好生产规范。

这是确保药品生产过程中质量、安全性和有效性的指南。

5. GDP(Good Distribution Practice):良好分销规范。

这是确保药品在分销过程中质量、安全性和有效性的指南。

6. GLP(Good Laboratory Practice):良好实验室规范。

这是确保非临床研究中数据质量、可靠性和有效性的指南。

7. GCP(Good Clinical Practice):良好临床规范。

这是确保临床试验中数据质量、可靠性和有效性的指南。

8. SOP(Standard Operating Procedure):标准操作程序。

这是描述如何执行特定任务或活动的书面指南。

9. NCR(NonConformance Report):不合格报告。

这是记录不符合质量标准的产品或服务的报告。

10. CAR(Corrective Action Report):纠正措施报告。

这是记录为解决不合格问题而采取的措施的报告。

11. PAR(Preventive Action Report):预防措施报告。

这是记录为预防潜在问题而采取的措施的报告。

12. CAPA(Corrective and Preventive Action):纠正和预防措施。

这是解决不合格问题并预防未来问题的过程。

13. RCA(Root Cause Analysis):根本原因分析。

质量术语缩写

质量术语缩写

质量术语缩写在质量管理和质量保证领域中,有许多术语缩写被广泛使用。

这些缩写不仅提供了快捷的方式来描述特定的概念,还可以帮助专业人士更有效地交流和共享信息。

以下是一些常见的质量术语缩写及其含义:1. QA:质量保证(Quality Assurance)- 这是一种系统化的方法,旨在确保产品或服务符合预期的质量标准和要求。

QA的主要目标是预防缺陷和问题的出现。

2. QC:质量控制(Quality Control)- 这是一种过程,用于监测和评估产品或服务是否符合质量标准。

QC通常包括检查、测试和验证产品的特性和性能。

3. QMS:质量管理体系(Quality Management System)- 这是一个组织内部建立和实施的一系列相互关联的质量管理活动、政策、程序和流程。

QMS的目标是提高组织的质量绩效和客户满意度。

4. SOP:标准操作规程(Standard Operating Procedure)- 这是一份详细描述特定工作过程的文件,旨在确保在执行过程中的各个阶段都得到正确执行。

SOP有助于确保一致性、可重复性和质量的一致性。

5. CAPA:纠正和预防措施(Corrective and Preventive Actions)- 这是一种系统化的方法,用于识别和纠正已发生的问题,并预防类似问题的再次发生。

6. NCR:不符合项报告(Non-Conformance Report)- 这是一份记录和跟踪非符合项(即与质量标准不符合的问题)的文件。

NCR通常包括问题的描述、根本原因、纠正措施和预防措施。

7. KPI:关键绩效指标(Key Performance Indicator)- 这是一种衡量组织或特定过程绩效的指标。

KPI通常与质量目标、效率和客户满意度等因素相关。

8. PDCA:计划、执行、检查、行动(Plan, Do, Check, Act)- 这是一个循环的质量管理方法,旨在持续改进过程和系统。

品质管理常用英文术语

品质管理常用英文术语

品质管理常用英文术语在品质管理领域,有许多常用的英文术语,对于从事相关工作的人员来说,熟悉这些术语是至关重要的。

下面就为大家介绍一些常见的品质管理英文术语。

一、品质管理基础术语1、 Quality (质量)这是品质管理中最核心的概念,指产品或服务满足规定或潜在需要的特征和特性的总和。

2、 Quality Control (质量控制)简称 QC,是为达到质量要求所采取的作业技术和活动。

3、 Quality Assurance (质量保证)简称 QA,指为使人们确信产品或服务能满足质量要求,在质量管理体系中实施并根据需要进行证实的全部有计划和有系统的活动。

4、 Inspection (检验)对产品或服务的一种或多种特性进行测量、检查、试验、度量,并将结果与规定的要求进行比较以确定其符合性的活动。

5、 Conformance (符合性)产品或服务符合规定要求的程度。

6、 Nonconformance (不符合性)产品或服务不符合规定要求的程度。

二、统计过程控制术语1、 Statistical Process Control (统计过程控制)简称 SPC,是应用统计技术对过程中的各个阶段进行评估和监控,建立并保持过程处于可接受的且稳定的水平,从而保证产品与服务符合规定的要求的一种质量管理技术。

2、 Control Chart (控制图)一种用于监测过程是否处于统计控制状态的图形工具。

3、 Mean (均值)一组数据的算术平均值。

4、 Median (中位数)将一组数据按大小顺序排列后,位于中间位置的数值。

5、 Mode (众数)一组数据中出现次数最多的数值。

6、 Range (极差)一组数据中最大值与最小值之差。

7、 Standard Deviation (标准差)反映数据离散程度的统计量。

8、 Variance (方差)标准差的平方。

三、六西格玛管理术语1、 Six Sigma (六西格玛)一种旨在通过减少过程变异、提高过程能力和质量水平,以实现顾客满意和企业经济效益最大化的质量管理方法。

QC常用单词-中英对照

QC常用单词-中英对照

品質系統常見英文簡介1.QC : quality control 品質管制2.IQC : incoming quality control 進料品質管制3.OQC : output quality control 出貨品質管制4.PQC : process quality control 製程品質管制也稱IPQC : in process quality control .5 . AQL : acceptable quality level 允收標準 6.CQA: customer quality assurance 客戶品質保証7.MA : major defeat 主要缺點8. MI : minor defeat 次要缺點9. CR :critical defeat 關鍵缺點10. SMT : surface mounting technology 表面粘貼技術11 . SMD : surface mounting device SMC : surface mounting component 表面粘貼元件12 . ECN : engineering change notice 工程變更通知13 . DCN : design change notice 設計變更通知14 . PCB : printed circuit board 印刷電路板15 . PCBA : printed circuit board assembly裝配印刷電路板16 . BOM : bill of material 材料清單17. BIOS : basically input and output system 基本輸入輸出系統18. MIL-STD-105E : 美國陸軍標準,也稱單次抽樣計劃.19 . ISO : international standard organization 國際標準化組織20 . DRAM: 內存條21 . Polarity : 電性22 . Icicles : 錫尖23 . Non-wetting : 空焊24 . Short circuit : 短路25 . Missing component : 缺件26 . Wrong component : 錯件27 . Excess component : 多件28 . Insufficient solder : 錫少29 . Excessive solder : 錫多30 . Solder residue : 錫渣31 . Solder ball : 錫球32 . Tombstone : 墓碑33 . Sideward : 側立34 . Component damage : 零件破損35 . Gold finger : 金手指36 . SOP : standard operation process 標準操作流程37 . SIP : standard inspection process 標準檢驗流程38 . The good and not good segregation :良品和不良品區分39 . OBW : on board writer 熸錄BIOS 40 . Simple random sampling : 簡單隨機抽樣41 . Histogram : 直方圖42 . Standard deviation : 標準差43 . CIP : Continuous improvement program 44 . SPC : Statistical process control45 . Sub-contractors : 分包商46 . SQE : Supplier quality engineering47 . Sampling sample :抽樣計劃48 . Loader : 治具49 . QTS: Quality tracking system 品質追查系統50 . Debug : 調試51 . Spare parts :備用品52 . Inventory report for : 庫存表53 . Manpower/Tact estimation 工時預算54 . Calibration : 校驗55 . S/N :serial number 序號56 . Corrugated pad : 波紋墊57 .Takeout tray : 內包裝盒58 . Outerbox : 外包裝箱59 . Vericode : 檢驗碼60 . Sum of square : 平方和61 . Range : 全距62 . Conductive bag : 保護袋63 . Preventive maintenance :預防性維護64 . Base unit : 基體65 . Fixture : 制具66 . Probe : 探針67 . Host probe : 主探針68 . Golden card : 樣本卡69 . Diagnostics program : 診斷程序70 . Frame : 屏面71 . Lint-free gloves : 靜電手套72 .Wrist wrap : 靜電手環73 . Target value : 目標值74. Related department : 相關部門75. lifted solder 浮焊76.plug hole孔塞77. Wrong direction 极性反ponent damage or broken 零件破損79.Unmeleted solder熔錫不良80.flux residue松香未拭81.wrong label or upside down label貼反82.mixed parts機種混裝83. poor solder mask綠漆不良84. oxidize 零件氧化85.stand off height浮高86. IC reverse IC反向87.supervisor課長88. Forman組長89. WI=work instruction作業指導90. B.P.V:非擦除狀態91. Internal notification:內部聯絡單92. QP :Quality policy品質政策93.QT: Quality target 品質目標94. Trend:推移圖95.Pareto:柏拉圖96. UCL: Upper control limit管制上限97.LCL:Lower control limit管制下限98. CL: Center line中心線99.R.T.Y: Rolled throughout yield直通率100. PPM: Parts per million 不良率101.DPU: Defects per unit 單位不良率102.Resistor: 電阻103.Capacitor:電容104. Resistor array : 排阻105. Capacitor array: 排容106. DIODE: 二極管107.SOT: 三極管108. Crystal:震盪器109. Fuse:保險絲110.Bead: 電感111.Connector:聯結器112.ADM: Administration Department行政單位113. CE: Component Engineering零件工程114. CSD :Customer Service Department客戶服務部115. ID: Industrial Design工業設計116.IE: Industrial Engineering工業工程117. IR: Industrial Relationship工業關係118. ME: Mechanical Engineering機構工程119. MIS :Management Information System資訊部120. MM: Material Management資材121. PCC: Project Coordination/Control專案協調控制122. PD: Production Department生產部123. PE: Product Engineering產品工程124. PM: Product Manager產品經理125. PMC: Production Material Control生產物料管理126. PSC: Project Support & Control產品協調127.Magnesium Alloy:鎂合金128. Metal Shearing:裁剪129.CEM: Contract Electronics Manufacturing 又稱電子製造服務企業EMS: Electronics Manufacturing Services130. ERP: Enterprise Resource Planning 企業資源規劃SCM+CRM+ERP+EAI=Network direct TM links procurement , production ,Logistics and sales採購,生產,后勤管理及市場行銷的融合EAI: Enterprise application Intergration 企業應用系統整合CRM: Customer Relationship Planning 客戶服務規劃SCM : Supply chain management 供應鏈管理131. OJT: On job training 在職培訓132.Access Time: 光碟搜尋時間133. B2CEC:Business to consumer electronic commerce 企業對消費者的電子商務B2BEC:Business to business electronic Commerce 企業間的電子商務L:Copper Clad Laminate 銅箔基板135. Intranet: 企業內部通訊網路136. ISP: Internet Service Provider網絡服務提供者ICP: Internet Content Provider網絡內容提供者137. GSM: Global System for Mobile Communication 泛歐數位式行動電話系統GPS: 全球衛星定位系統138. Home Page: 網路首頁139.Video Clip:影像檔140.HTML:超文標記語言141.Domainname: 網域名稱142.IP: 網絡網域通訊協定地址143.Notebook:筆記型電腦144.VR:Virtual Reality虛擬實境145.WAP:Wireless Application Protocol 無線應用軟體協定146. LAN : Local area network區域網路WWW: World Wide Web世域網WAN: Wide Area Network 廣域網路147.3C: Computer, Communication , Consumer electronic 電腦, 通訊, 消費性電子三大產品的整合rmation Supplier Highway:信息高速公路149.UPS:Uninterrupted power system不斷電系統150.Processed material: 流程性材料151.Entity/Item:實體152.Quality loop:質量環153.Quality losses: 質量損失154.Corrective action:糾正措施155. Preventive action:預防措施156.PDCA:Plan/Do/Check/Action計劃/實施/檢查/處理157. Integrated circuits(IC):集成電路158.Application program:應用程序159.Utilities:實用程序160.Auxiliary storage/Second storage:;輔助存儲器161.Silicon chip:硅片162Diskette drive:軟驅163.Display screen/Monitor:顯示器164.Foreground:前面165.Montherboard:母板166.Mermory board:內存板167.Slot:插槽168.Bus:Data-bus/address-bus/Control bus:總線/數據總線/地址總線/控制總線169.Plotter:繪圖170.MPC:Multimedia personal computer多媒體171.Oscillator:振盪器172.Automatic teller terminal:自動終端(出納)機173.Joystick port:控制端口174.VGA: Video Graphics Array顯示卡175.Resolution:分辨率176.Register:寄存器177.ISA: Industry Standard Architecture:工業標準結構178.EISA:Extended Industry Architecture 179.Adapter: 适配器180.Peripheral:外部設備181.Faxmodem:調制解調器181.NIC:Network interface card網絡接口卡182.SCSI:Small computer system interface183.VESA:Video Electronic Standards Association184.SIMM:Single in-line memory module單排座存儲器模塊(內存條) 185.Casing:外箱186.Aluminum:鋁質187.Ceramic: 陶瓷的188.Platter:圓盤片189.Actuator:調節器190.Spindle:軸心191.Actuation arm: 存取臂192.Default code: 缺省代碼193.Auxiliary port:輔助端口194. Carriage return : 回車195.Linefeed:換行196.ASCII:American Standard Code for Information Interchange197.Video analog: 視頻模擬198.TTL:Transistor- Transistor logic晶體管-晶體管邏輯電路199.Three-prong plug:三芯電插頭200.Female connector:連接插座201.Floppy disk:軟盤202.Output level:輸出電平203.Vertical/Horizontal synchronization:場/行同步204.H(Horizontal)-Phase:行相位patible:兼容機206.Hardware Expansion Card: 硬件擴充卡207.Buffer:緩沖208.CRM:Customer relationship Management 客戶關係管理209.WIP: Work in process半成品210.Waiver:特別採用211.CXO系列—CEO: Chief Executive Office首COO :Chief Operating OfficeCFO: Chief Finance Officer CBO: Chief Business OfficerCTO: Chief Technology Officer CIO: Chief Information OfficerCGO: Chief Government Officer212.NASDAQ: 納斯達克證券市場NASDAQ Automated Quotation system213.VC:Venture Capital 風險投資214.PDA:Personal Date Assistant個人數字助理PLA: Personal Information Assistant個人信息助理215.PPAP:Advanced Product Quality Planning and Control Plan 生產性零組件核准程序216.FMEA:Protentical Failure Mode and Effects Analysis失效模式與效應分析217.MSA: Measurement Systems Analysis 量測系統分析218.QAS:Quality System Assessment 品質系統評鑑219.Cusum: 累計總合圖220.Overall Equipment Effectiveness設備移動率221.Benchmarking:競爭標竿Analysis of motion/Ergonomics動作分析/人體工程學222.Roka Yoke 防錯法MCR: machine capability ratio 機器利用率223.Mistake Proofing 防呆法Taguchi methods田口式方法224,Vertical integration垂直整合Surveillance定期追蹤審查225.EMS: Electronics Manufacturing Supply-chain226.Cause&Effects charts特性要因圖227.Scattle: 散佈圖Fool-Proof System防呆系統228.VE:Value Engineering 價值工程QFP:Quality Function Development 品質機能展開229.Arrow Chart 箭頭圖法Affiliate Chart親和圖法230.PDPC:Process Decision Program Chart System Chart系統圖法231.Relation Chart 關邊圖法Matrix Chart矩陣圖法232.Matrix Data Analysis矩陣數據分析法234.Brain-storm 腦風暴法JIT: Just In Time:及時性生產模擬235.Deming Prize: 戴明獎Prototype技術試作236 BPM:Business Process Management .業務流程管理MBO:目標管理237. MBP:方針管理FTA:故障樹分析QSCV: 服務品質238.IPPB:Information 情況Planning策劃Programming規劃Budget預算239.EQ:Emotion Quotient:情商IQ: Intelligence Quotient:智商240.Implied Needs:隱含要求Specified Requirement:規定要求241.Probation:觀察期Incoming Product released for urgent production 緊急放行242.Advanced quality planning 先進的質量策劃243. AOQ: Average Outgoing Quality 平均檢出質量AOQL: Average Outgoing Quality Limit 平均檢出質量界限244.Approved Supplier List 經核准認可的供應商名單245.Attribute date 特征Benchmarking 基準點Calibration 校準246.Capable process 工序能力Capability Index 工序能力指數Capability ratio 工序能力率247.CHANGE CYCLE TIME 修改的時間周期Continuous improvement 持續改進248.Control plans 控制策劃Cost of quality 質量成本249.Cycle time reduction 減少周期時間250.Design of experiments 實驗設計Deviation / Substitution 偏差/ 置換251.ESD: Electrostatic discharge 靜電釋放252.EH&S: Environmental, Health, and Safely 環境,健康.安全253.ESS: Environmental Stress Screening 環境應力篩選254.FMEA: Failure Mode Effect Analysis 失誤模式效應分析255.First Article approval 產品的首次論證First pass yield 一次性通過的成品率256.First sample inspection 第一次樣品檢驗257.FMECA: Failure mode effect and critically analysis 失誤模式,效應及後果分析258.Gauge control 測量儀器控制GR&R: Gauge repeatability and reproducibility 測量儀器重復性和再現性259.HALT: Highly Accelerated Life Test 高加速壽命試驗HAST: Highly Accelerated Stress Test 高加速應力試驗260.IN-CONTROL PROCESS 受控制工序261.INDUSTRIAL AVERAGE 工業平均數262.JIT (just in time) manufacturing (即時)制程263.Key characteristic 關健特征Key component 關健構件264.Life Testing 壽命試驗Lot traceability 批量可追溯性265.Material review board 原材料審查部門MCR: machine capability ratio 機械能力率266.NONCONFORMANCE 不符合267.OUT-OF-CONTROL PROCESS 失控工序268.Pilot Application 試產(試用)269.PPM: Parts per million 百万分之一270.Preventive vs detection 預防與探測Preventive maintenance 預防維護271.Process capability index 工序能力指數272.Process control 工序控制Process improvement 工序改進Process simplification 過程簡化273.Quality Clinic Process Chart (QCPC) 質量診斷過程圖274.Quality information system 質量資料體系275.Quality manual 質量手冊Quality plan 質量計劃Quality planning 質量策劃276.Quality policy 質量方針Quality system 質量體系277.Reliability 可靠性RUN Chart 趨勢表Skill Matrix 技能表278.Statistical quality control (SQC) 統計質量控制279.Teamwork 團隊工作280.Total quality management 全面質量管理281.Variable data 變量數據Variation 影響變量282.Value Analysis 價值分析Visual Factory 形象化工厂283.Survey Instructions 調查指引284.Profile 概況285.Improvement Plan 改進計劃286.Evaluation 評估Implementation 實施Compliance 符合287.Supplier Audit Report 供方審核報告288.Site Audit 現場審核289.Typical agenda 典型的議事日程290.Internal and external failure costs 內部和外部的失誤成本291.Failure rate percentage 失誤百分率292.Productivity (output / input) 生產率(產出/投入)293.Customer complaints 客戶投訴Customer satisfaction indices 客戶滿意度指數294.Root cause analysis of failures 失誤根原分析Nominal:名目的295.Enumeration:列舉Screening stage:篩選階段296.Screening materials:屏蔽材料Nonparametric comparative experimental:非參數實驗297.Pitfall:缺陷Fractional factorial experiments:部份隨機實驗298.Management by communication:溝通管理技術Management by objective:目標管理技術299.Management by result:績效管理技術Human relationship skill:人際技術300.Conceptial skill:理念性技術Safety stock:安全庫存301.lead time:訂購前置時間EOQ: Economic order Quantity 經濟訂購量302.Run at rate:節拍生產Early production containment : 早期生產管制程序303.Accreditation Body:認可機構Active part在用零件304.Aftermarket part售后零件Analysis of Motion/Ergonomics:運動/人機工程學分析305.Finite Element analysis:有限元分析306.Geometric Dimensioning & Tolerancing:幾何尺寸與公差Match check匹配檢查st off part comparison:末件比較Simulation Techniques:倣真技術308.Solid Modeling:實體造型Layout Inspection:全尺寸檢驗309.Service Parts:維修零件Remote location:外部場所310.Overall Equipment effectiveness:設備總效率PPAP: production part approval process生產件批准程序311.Bulk material:散裝材料Perishable Tools:易損工裝312.Growth Projections:企業營運成長企劃Projected Sales figures:行銷企劃藍圖313.Human resource development:人力資源開發Feasibility Reviews:可行性審查314.Pre-launch:量產前Unscheduled machine downtime:非計劃排定的停機時間315.Excessive cycle time:作業周期時間過多Non value-added use of floor space:工廠內的無附加價值事項316.New Target values to Optimized customer process:將顧客作業程序管理到最好的新目標值317.Misshipments:耽誤出貨Incomplete orders:交貨不足318.Inventory turns over time:存貨周轉時間Stock rotation :存貨周轉319.Inventory levels:最低庫存量Order-drive:訂單導向320.Interim action:臨時措施321.Permanent action:永久措施322.Integrators:組合體323.。

品质类术语英文缩写

品质类术语英文缩写

QA=Quality Assurance品保,QC=Quality Control品管,IPQC=In Process Quality Control制程品质管制,IQA=Incoming Quality Assurance来料品保,OQA/OQC=Outgoing Quality Assurance出货品保/品管,FQA=Final Quality Control品质终检,SQA=Supplier Quality Assurance供应商品保,QE=Quality Engineering品质工程,QCC=Quality Control Circle品管圈,QCFC=Quality control Flow Chart品管流程图,SCM=Supplier Chain Management供应链管理,简单实用的品质工作英文术语1、品质人员名称类[/b]QC quality control 品质管理人员FQC final quality control 终点品质管制人员IPQC in process quality control 制程中的品质管制人员OQC output quality control 最终出货品质管制人员IQC incoming quality control 进料品质管制人员TQC total quality control 全面质量管理POC passage quality control 段检人员QA quality assurance 质量保证人员OQA output quality assurance 出货质量保证人员QE quality engineering 品质工程人员[b]2、品质保证类[/b]FAI first article inspection 新品首件检查FAA first article assurance 首件确认TVR tool verification report 模具确认报告3B 3B 模具正式投产前确认CP capability index 能力指数CPK capability index of process 模具制程能力参数SSQA standardized supplier quality 合格供应商品质评估OOBA out of box audit 开箱检查QFD quality function deployment 品质机能展开FMEA failure model effectiveness analysis 失效模式分析8 disciplines 8项回复内容FA final audit 最后一次稽核CAR corrective action request 改正行动要求corrective action report 改正行动报告[b]3、FQC运作类[/b]AQL Acceptable Quality Level 运作类允收品质水准S/S Sample size 抽样检验样本大小ACC Accept 允收REE Reject 拒收CR Critical 极严重的MAJ Major 主要的MIN Minor 轻微的AOQ Average Output Quality 平均出厂品质AOQL Average Output Quality Level 平均出厂品质Q/R/S Quality/Reliability/Service 品质/可靠度服务MIL-STD Military-Standard 军用标准S I-S IV Special I-Special IV 特殊抽样水准等级P/N Part Number 料号L/N Lot Number 特采AOD Accept On Deviation 特采UAI Use As It 首件检查报告FPIR First Piece Inspection Report 百万分之一PPM Percent Per Million 批号制程统计品管专类SPC Statistical Process Control 统计制程管制SQC Statistical Quality Control 统计品质管制R Range 全距AR Averary Range 全距平均值UCL Upper Central Limit 管制上限LCL Lower Central Limit 管制下限MAX Maximum 最大值MIN Minimum 最小值GRR Gauge Reproducibility&Repeatability 量具之再制性及重测性判断量可靠与否DIM Dimension 尺寸DIA Diameter 直径FREQ Frequency 频率N Number 样品数[b]4、其它品质术语类[/b]QCC Quality Control Circle 品质圈QIT Quality Improvement Team 品质改善小组PDCA Plan Do Check Action 计划执行检查总结ZD Zero Defect 零缺点QI Quality Improvement 品质改善QP Quality Policy 目标方针TQM Total Quality Management 全面品质管理MRB Material Reject Bill 退货单LQL Limiting Quality Level 最低品质水准RMA Return Material Audit 退料认可QAN Quality Amelionrate Notice 品质改善活动ADM Absolute Dimension Measuremat 全尺寸测量QT Quality Target 品质目标7QCTools 7 Quality Controll Tools 品管七大手法[b]5、通用之件类[/b]ECN Engineering Change Notes 工程变更通知(供应商) ECO Engineering Change Order 工程改动要求(客户) PCN Process Change Notice 工序改动通知PMP Product Management Plan 生产管制计划SIP Specification In Process 制程检验规格SOP Standard Operation Procedure 制造作业规范IS Inspection Specification 成品检验规范BOM Bill Of Material 物料清单PS Package Specification 包装规范SPEC Specification 规格DWG Drawing 图面[/size]。

品管术语中英对照表

品管术语中英对照表

品管术语中英对照表1、QC:Quality Control 品质管制(中);品质管理(日)2、QP:Quality Policy 品质政策3、IQC:Incoming Quality Control 进料品管4、PMI:Purchasing Meterial Inspeciton 采购物料检验,即美商公司对进料品管所采用统一的称呼。

5、IPQC:In-Process Quality Control 制程品管英文IPQC亦可缩写为PQC。

6、QE:Quality Engineering 品质工程为品管部门最高技术单位,亦为品质管辖统一技术中心。

7、QA:Quality Assurance 品质保证为品管部门组织编制的一部分,由于时代演进变迁,消费者对品质意识的提升,追求产品使用性能之可靠性及满意度日趋明朗化,故品管部门顺应时代之需求趋势,许多企业公司将其改为品管保证部门,以强调品质保证从IQA、IPQA、OQA、QE均需达到可靠性保证RQA需求。

8、IQA:Incoming Quality Assurance 进料品质保证9、IPQA:In-process Quality Assurance 制程品质保证10、OQA:Outgoing Quality Assurance 出厂品质保证11、RQA:Reliability Quality Assurance 信赖性品质保证12、TQC:Total Quality Control 全面品质管制13、CWQC:Company Wide Quality Control 全公司品质管制14、TQA:Total Quality Assurance 全面品质保证15、TQM:Total Quality Management 全面品质管理16、AQL:Acceptable Quality Level 品质允收水准17、PPM:Parts per Million 零件百万分之一的不良率18、PPH:Production Per Hour 每小时生产量19、ECR:Engineering Change Reguirement 工程变更需求20、ECN:Engineering Change Notice 工程变更通知21、R&D:Reserch &Development 研发22、PE:Process Engineering 生技23、IE:Industrial Engineering 工业工程24、PC:Production Control 生管25、MC:Meterial Control 仓管26、MFG:Manufacturing 制造27、PDCA:Plan计划,Do执行,Check查核,Action矫正28、MRP:Meterial Reguirement Planning 物料需求计划29、PR:Purchasing Requirement 采购需求30、PO:Purchading Order 采购订单31、MO:Manufacturing Order 制造命令32、Specification of Quality 品质规格33、Inspection Specification 检验规格34、CR defect:Critical defect 严重缺点35、MAJ defct:major defect 主要缺点36、MI defect:Minor defect 次要缺点37、Normal inspection:正常检验38、Tigtened Inspection:加严检验39、Reduced Inspection:减量检验40、Yield:良品率41、Defective Percentage:不良率42、Lot Rejected Percentage:批退率43、SPC:Statistical Process Control 统计制程管制44、QFD:Quality Function Deployment 品质机能展开是一种有系统的手法,从掌握顾客需求,将需求转换成代用特性,来订定产品或服务的设计品质标准,然后再将设计品质有系统的展开到各个机能零件或服务的项目的品质、以及制造工程各要素,或服务过程各要素的关系上,使产品或服务在事前,就能完成品质保证,符合顾客的要求。

品质类术语英文缩写

品质类术语英文缩写

QA=Quality Assurance 品保,QC=Quality Control 品管,IPQC=In Process Quality Control 制程品质管制,IQA=Incoming Quality Assurance 来料品保,OQA/OQC=Outgoing Quality Assurance 出货品保/品管,FQA=Final Quality Control 品质终检,SQA=Supplier Quality Assurance 供应商品保,QE=Quality Engineering 品质工程,QCC=Quality Control Circle 品管圈,QCFC=Quality control Flow Chart 品管流程图,SCM=Supplier Chain Management 供应链管理,简单实用的品质工作英文术语1、品质人员名称类[/b]QC quality control 品质管理人员FQC final quality control 终点品质管制人员IPQC in process quality control 制程中的品质管制人员OQC output quality control 最终出货品质管制人员IQC incoming quality control 进料品质管制人员TQC total quality control 全面质量管理POC passage quality control 段检人员QA quality assurance 质量保证人员OQA output quality assurance 出货质量保证人员QE quality engineering 品质工程人员[b]2 、品质保证类[/b]FAI first article inspection 新品首件检查FAA first article assurance 首件确认TVR tool verification report 模具确认报告3B 3B 模具正式投产前确认CP capability index 能力指数CPK capability index of process 模具制程能力参数SSQA standardized supplier quality 合格供应商品质评估OOBA out of box audit 开箱检查QFD quality function deployment 品质机能展开FMEA failure model effectiveness analysis 失效模式分析8 disciplines 8 项回复内容FA final audit 最后一次稽核CAR corrective action request 改正行动要求corrective action report 改正行动报告[b]3、FQC 运作类[/b]AQL Acceptable Quality Level 运作类允收品质水准S/S Sample size 抽样检验样本大小ACC Accept 允收REE Reject 拒收CR Critical 极严重的MAJ Major 主要的MIN Minor 轻微的AOQ Average Output Quality 平均出厂品质AOQL Average Output Quality Level 平均出厂品质Q/R/S Quality/Reliability/Service 品质/可靠度服务MIL-STDMilitary-Standard 军用标准S I-S IV Special I-Special IV 特殊抽样水准等级P/N Part Number 料号L/N Lot Number 特采AOD Accept On Deviation 特采UAI Use As It 首件检查报告FPIR First Piece Inspection Report 百万分之一PPM Percent Per Million 批号制程统计品管专类SPC Statistical Process Control 统计制程管制SQC Statistical Quality Control 统计品质管制R Range 全距AR Averary Range 全距平均值UCL Upper Central Limit 管制上限管制下限LCL Lower Central LimitMAX Maximum 最大值MIN Minimum 最小值GRR Gauge Reproducibility&Repeatability 量具之再制性及重测性判断量可靠与否DIM Dimension 尺寸DIA Diameter 直径FREQ Frequency 频率N Number 样品数[b]4 、其它品质术语类[/b]QCC Quality Control Circle 品质圈QIT Quality Improvement Team 品质改善小组PDCA Plan Do Check Action 计划执行检查总结ZD Zero Defect 零缺点QI Quality Improvement 品质改善QP Quality Policy 目标方针TQM Total Quality Management 全面品质管理MRB Material Reject Bill 退货单LQL Limiting Quality Level 最低品质水准RMA Return Material Audit 退料认可QAN Quality Amelionrate Notice 品质改善活动ADM Absolute Dimension Measuremat 全尺寸测量QT Quality Target 品质目标7QCTools 7 Quality Controll Tools 品管七大手法[b]5 、通用之件类[/b]ECN Engineering Change Notes 工程变更通知(供应商)ECO Engineering Change Order 工程改动要求(客户)PCN Process Change Notice 工序改动通知PMP Product Management Plan 生产管制计划SIP Specification In Process 制程检验规格SOP Standard Operation Procedure 制造作业规范IS Inspection Specification 成品检验规范BOM Bill Of Material 物料清单PS Package Specification 包装规范SPEC Specification 规格DWG Drawing 图面[/size]。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

QC;品质控制
FQC;终点品质控制OQC;最终出货品质控制IQC;进料品质控制PQC;段检控制
TQC;全面品质控制IPQC;制程品质控制QA;质量保证
OQA;出货质量保证QE;品质工程师
CP;能力指数
CPK;模具能力指数
8D;8项回复内容CAR;纠正措施报告AQL允收品质水准ACC;允收
REJ;拒收
NG;不良
PASS;通过
QMS;质量管理体系
S/S;抽样检验样本大小CR;极严重的(致命)MAJ;主要的
MIN;轻微的(微小的)MIL—STD--;军用标准SⅠ—SⅣ;特殊
PPM;百万分之一BOM;物料清单
ISO:国际标准化组织DT;日期
FM;来自
TO;到、达
UCL;上控制线
LCL;下控制线
CL;中心线
ME;设备工程师
PE;制程工程师
QCC;品质管理圈
WI;作业指导书MRB;物料评审委员会FAI;新品首件检查FAA;首件确认
ECR;工程变更申请书TVR;模具确认报告FMEA;失效模式分析
SSQA;合格供应商品质评

FA;最后一次稽核
SOP;制程作业规范
SIP;制程检验规格
QIP;品质改进计划
SPC统计制程管制
ECN;工程变更通知书
ATTN;知会
CC;副本复印给相关人员
RE;关于、、、、、
P/N;料号
L/N;批号
AOD;特采
IC;集成电路
LED;发光二极管
COB;邦定
PCB;印刷电路扳
SMT;贴片元件
QM;品质手册
WEEE;电子、电气备废弃
物之法规
ROHS;电气、电子设备中
限制使用的某些有害物质
IE;工业工程
DCC;文件控制中心
SQC;品质统计
TQM;全员品管
REVISION;版本
UNIT;单位
MATERIAL;材质
PART NAME;零件名称
ANGULAR;角度
MODEL;型号
PROJECTION;投影
TOLERANCE;公差
DO NOT SCALE
DRAWING;未按比例绘制
CHK BY;审核
DRN BY;绘图员
APPD BY;核准
TVPE;典型
DESCRIPTONS;描述
PART;局部
SAMPLE;样品
MOULD;模具
PLASTIN;塑胶
STANDARD;标准
DIMENSION;尺寸
MEASURE;测量
QUALITY;品质
FINISH;表面处理
PART NO;零件编号
QTY;数量
COLOUR;颜色
MODEL;产品名称
GA TE;水口
SECTION;截面
DETAIL;细节、详述
EJECTOR PIN;推顶针
SCAR:协力商矫正与预防
措施报告
SQM:稽核供货商
A VL:合格厂商名称。

相关文档
最新文档