土木工程毕业论文外文翻译---建筑施工混凝土裂缝的预防与处理

合集下载

土木工程毕业设计外文翻译原文+翻译

土木工程毕业设计外文翻译原文+翻译

The bridge crack produced the reason to simply analyseIn recent years, the traffic capital construction of our province gets swift and violent development, all parts have built a large number of concrete bridges. In the course of building and using in the bridge, relevant to influence project quality lead of common occurrence report that bridge collapse even because the crack appears The concrete can be said to " often have illness coming on " while fracturing and " frequently-occurring disease ", often perplex bridge engineers and technicians. In fact , if take certain design and construction measure, a lot of cracks can be overcome and controlled. For strengthen understanding of concrete bridge crack further, is it prevent project from endanger larger crack to try one's best, this text make an more overall analysis , summary to concrete kind and reason of production , bridge of crack as much as possible, in order to design , construct and find out the feasible method which control the crack , get the result of taking precautions against Yu WeiRan.Concrete bridge crack kind, origin cause of formation In fact, the origin cause of formation of the concrete structure crack is complicated and various, even many kinds of factors influence each other , but every crack has its one or several kinds of main reasons produced . The kind of the concrete bridge crack, on its reason to produce, can roughly divide several kinds as follows :(1) load the crack caused Concrete in routine quiet .Is it load to move and crack that produce claim to load the crack under the times of stress bridge, summing up has direct stress cracks , two kinds stress crack onces mainly. Direct stress crack refer to outside load direct crack that stress produce that cause. The reason why the crack produces is as follows, 1, Design the stage of calculating , does not calculate or leaks and calculates partly while calculating in structure; Calculate the model is unreasonable; The structure is supposed and accorded with by strength actually by strength ; Load and calculate or leak and calculate few; Internal force and matching the mistake in computation of muscle; Safety coefficient of structure is not enough. Do not consider the possibility that construct at the time of the structural design; It is insufficientto design the section; It is simply little and assigning the mistake for reinforcing bar to set up; Structure rigidity is insufficient; Construct and deal with improperly; The design drawing can not be explained clearly etc.. 2, Construction stage, does not pile up and construct the machines , material limiting ; Is it prefabricate structure structure receive strength characteristic , stand up , is it hang , transport , install to get up at will to understand; Construct not according to the design drawing, alter the construction order of the structure without authorization , change the structure and receive the strength mode; Do not do the tired intensity checking computations under machine vibration and wait to the structure . 3, Using stage, the heavy-duty vehicle which goes beyond the design load passes the bridge; Receive the contact , striking of the vehicle , shipping; Strong wind , heavy snow , earthquake happen , explode etc.. Stress crack once means the stress of secondary caused by loading outside produces the crack. The reason why the crack produces is as follows, 1, In design outside load function , because actual working state and routine , structure of thing calculate have discrepancy or is it consider to calculate, thus cause stress once to cause the structure to fracture in some position. Two is it join bridge arch foot is it is it assign " X " shape reinforcing bar , cut down this place way , section of size design and cut with scissors at the same time to adopt often to design to cut with scissors, theory calculate place this can store curved square in , but reality should is it can resist curved still to cut with scissors, so that present the crack and cause the reinforcing bar corrosion. 2, Bridge structure is it dig trough , turn on hole , set up ox leg ,etc. to need often, difficult to use a accurate one diagrammatic to is it is it calculate to imitate to go on in calculating in routine, set up and receive the strength reinforcing bar in general foundation experience. Studies have shown , after being dug the hole by the strength component , it will produce the diffraction phenomenon that strength flows, intensive near the hole in a utensil, produced the enormous stress to concentrate. In long to step prestressing force of the continuous roof beam , often block the steel bunch according to the needs of section internal force in stepping, set up the anchor head, but can often see the crack in the anchor firm section adjacent place. So if deal with improper, in corner or component form sudden change office , block place to be easy to appear crack strengthreinforcing bar of structure the. In the actual project, stress crack once produced the most common reason which loads the crack. Stress crack once belong to one more piece of nature of drawing , splitting off , shearing. Stress crack once is loaded and caused, only seldom calculate according to the routine too, but with modern to calculate constant perfection of means, times of stress crack to can accomplish reasonable checking computations too. For example to such stresses 2 times of producing as prestressing force , creeping ,etc., department's finite element procedure calculates levels pole correctly now, but more difficult 40 years ago. In the design, should pay attention to avoiding structure sudden change (or section sudden change), when it is unable to avoid , should do part deal with , corner for instance, make round horn , sudden change office make into the gradation zone transition, is it is it mix muscle to construct to strengthen at the same time, corner mix again oblique to reinforcing bar , as to large hole in a utensil can set up protecting in the perimeter at the terms of having angle steel. Load the crack characteristic in accordance with loading differently and presenting different characteristics differently. The crack appear person who draw more, the cutting area or the serious position of vibration. Must point out , is it get up cover or have along keep into short crack of direction to appear person who press, often the structure reaches the sign of bearing the weight of strength limit, it is an omen that the structure is destroyed, its reason is often that sectional size is partial and small. Receive the strength way differently according to the structure, the crack characteristic produced is as follows: 1, The centre is drawn. The crack runs through the component cross section , the interval is equal on the whole , and is perpendicular to receiving the strength direction. While adopting the whorl reinforcing bar , lie in the second-class crack near the reinforcing bar between the cracks. 2, The centre is pressed. It is parallel on the short and dense parallel crack which receive the strength direction to appear along the component. 3, Receive curved. Most near the large section from border is it appear and draw into direction vertical crack to begin person who draw curved square, and develop toward neutralization axle gradually. While adopting the whorl reinforcing bar , can see shorter second-class crack among the cracks. When the structure matches muscles less, there are few but wide cracks, fragility destruction may take place in thestructure 4, Pressed big and partial. Heavy to press and mix person who draw muscle a less one light to pigeonhole into the component while being partial while being partial, similar to receiving the curved component. 5, Pressed small and partial. Small to press and mix person who draw muscle a more one heavy to pigeonhole into the component while being partial while being partial, similar to the centre and pressed the component. 6, Cut. Press obliquly when the hoop muscle is too dense and destroy, the oblique crack which is greater than 45?? direction appears along the belly of roof beam end; Is it is it is it destroy to press to cut to happen when the hoop muscle is proper, underpart is it invite 45?? direction parallel oblique crack each other to appear along roof beam end. 7, Sprained. Component one side belly appear many direction oblique crack, 45?? of treaty, first, and to launch with spiral direction being adjoint. 8, Washed and cut. 4 side is it invite 45?? direction inclined plane draw and split to take place along column cap board, form the tangent plane of washing. 9, Some and is pressed. Some to appear person who press direction roughly parallel large short cracks with pressure.(2) crack caused in temperature changeThe concrete has nature of expanding with heat and contract with cold, look on as the external environment condition or the structure temperature changes, concrete take place out of shape, if out of shape to restrain from, produce the stress in the structure, produce the temperature crack promptly when exceeding concrete tensile strength in stress. In some being heavy to step foot-path among the bridge , temperature stress can is it go beyond living year stress even to reach. The temperature crack distinguishes the main characteristic of other cracks will be varied with temperature and expanded or closed up. The main factor is as follows, to cause temperature and change 1, Annual difference in temperature. Temperature is changing constantly in four seasons in one year, but change relatively slowly, the impact on structure of the bridge is mainly the vertical displacement which causes the bridge, can prop up seat move or set up flexible mound ,etc. not to construct measure coordinate , through bridge floor expansion joint generally, can cause temperature crack only when the displacement of the structure is limited, for example arched bridge , just bridge etc. The annual difference in temperature of our country generally changes therange with the conduct of the average temperature in the moon of January and July. Considering the creep characteristic of the concrete, the elastic mould amount of concrete should be considered rolling over and reducing when the internal force of the annual difference in temperature is calculated. 2, Rizhao. After being tanned by the sun by the sun to the side of bridge panel , the girder or the pier, temperature is obviously higher than other position, the temperature gradient is presented and distributed by the line shape . Because of restrain oneself function, cause part draw stress to be relatively heavy, the crack appears. Rizhao and following to is it cause structure common reason most , temperature of crack to lower the temperature suddenly 3, Lower the temperature suddenly. Fall heavy rain , cold air attack , sunset ,etc. can cause structure surface temperature suddenly dropped suddenly, but because inside temperature change relatively slow producing temperature gradient. Rizhao and lower the temperature internal force can adopt design specification or consult real bridge materials go on when calculating suddenly, concrete elastic mould amount does not consider converting into and reducing 4, Heat of hydration. Appear in the course of constructing, the large volume concrete (thickness exceeds 2. 0), after building because cement water send out heat, cause inside very much high temperature, the internal and external difference in temperature is too large, cause the surface to appear in the crack. Should according to actual conditions in constructing, is it choose heat of hydration low cement variety to try one's best, limit cement unit's consumption, reduce the aggregate and enter the temperature of the mould , reduce the internal and external difference in temperature, and lower the temperature slowly , can adopt the circulation cooling system to carry on the inside to dispel the heat in case of necessity, or adopt the thin layer and build it in succession in order to accelerate dispelling the heat. 5, The construction measure is improper at the time of steam maintenance or the winter construction , the concrete is sudden and cold and sudden and hot, internal and external temperature is uneven , apt to appear in the crack. 6, Prefabricate T roof beam horizontal baffle when the installation , prop up seat bury stencil plate with transfer flat stencil plate when welding in advance, if weld measure to be improper, iron pieces of nearby concrete easy to is it fracture to burn. Adopt electric heat piece draw law piece draw prestressing force at the component ,prestressing force steel temperature can rise to 350 degrees Centigrade , the concrete component is apt to fracture. Experimental study indicates , are caused the intensity of concrete that the high temperature burns to obviously reduce with rising of temperature by such reasons as the fire ,etc., glueing forming the decline thereupon of strength of reinforcing bar and concrete, tensile strength drop by 50% after concrete temperature reaches 300 degrees Centigrade, compression strength drops by 60%, glueing the strength of forming to drop by 80% of only round reinforcing bar and concrete; Because heat, concrete body dissociate ink evaporate and can produce and shrink sharply in a large amount(3) shrink the crack causedIn the actual project, it is the most common because concrete shrinks the crack caused. Shrink kind in concrete, plasticity shrink is it it shrinks (is it contract to do ) to be the main reason that the volume of concrete out of shape happens to shrink, shrink spontaneously in addition and the char shrink. Plasticity shrink. About 4 hours after it is built that in the course of constructing , concrete happens, the cement water response is fierce at this moment, the strand takes shape gradually, secrete water and moisture to evaporate sharply, the concrete desiccates and shrinks, it is at the same time conduct oneself with dignity not sinking because aggregate,so when harden concrete yet,it call plasticity shrink. The plasticity shrink producing amount grade is very big, can be up to about 1%. If stopped by the reinforcing bar while the aggregate sinks, form the crack along the reinforcing bar direction. If web , roof beam of T and roof beam of case and carry baseplate hand over office in component vertical to become sectional place, because sink too really to superficial obeying the web direction crack will happen evenly before hardenning. For reducing concrete plasticity shrink,it should control by water dust when being construct than,last long-time mixing, unloading should not too quick, is it is it take closely knit to smash to shake, vertical to become sectional place should divide layer build. Shrink and shrink (do and contract). After the concrete is formed hard , as the top layer moisture is evaporated progressively , the humidity is reduced progressively , the volume of concrete is reduced, is called and shrunk to shrink (do and contract). Because concrete top layermoisture loss soon, it is slow for inside to lose, produce surface shrink heavy , inside shrink a light one even to shrink, it is out of shape to restrain from by the inside concrete for surface to shrink, cause the surface concrete to bear pulling force, when the surface concrete bears pulling force to exceed its tensile strength, produce and shrink the crack. The concrete hardens after-contraction to just shrink and shrink mainly .Such as mix muscle rate heavy component (exceed 3% ), between reinforcing bar and more obvious restraints relatively that concrete shrink, the concrete surface is apt to appear in the full of cracks crackle. Shrink spontaneously. Spontaneous to it shrinks to be concrete in the course of hardenning , cement and water take place ink react, the shrink with have nothing to do by external humidity, and can positive (whether shrink, such as ordinary portland cement concrete), can negative too (whether expand, such as concrete, concrete of slag cement and cement of fly ash). The char shrinks. Between carbon dioxide and hyrate of cement of atmosphere take place out of shape shrink that chemical reaction cause. The char shrinks and could happen only about 50% of humidity, and accelerate with increase of the density of the carbon dioxide. The char shrinks and seldom calculates . The characteristic that the concrete shrinks the crack is that the majority belongs to the surface crack, the crack is relatively detailed in width , and criss-cross, become the full of cracks form , the form does not have any law . Studies have shown , influence concrete shrink main factor of crack as follows, 1, Variety of cement , grade and consumption. Slag cement , quick-hardening cement , low-heat cement concrete contractivity are relatively high, ordinary cement , volcanic ash cement , alumina cement concrete contractivity are relatively low. Cement grade low in addition, unit volume consumption heavy rubing detailed degree heavy, then the concrete shrinks the more greatly, and shrink time is the longer. For example, in order to improve the intensity of the concrete , often adopt and increase the cement consumption method by force while constructing, the result shrinks the stress to obviously strengthen . 2, Variety of aggregate. Such absorbing water rates as the quartz , limestone , cloud rock , granite , feldspar ,etc. are smaller, contractivity is relatively low in the aggregate; And such absorbing water rates as the sandstone , slate , angle amphibolite ,etc. are greater, contractivity is relatively high. Aggregate grains of foot-path heavy to shrink light inaddition, water content big to shrink the larger. 3, Water gray than. The heavier water consumption is, the higher water and dust are, the concrete shrinks the more greatly. 4, Mix the pharmaceutical outside. It is the better to mix pharmaceutical water-retaining property outside, then the concrete shrinks the smaller. 5, Maintain the method . Water that good maintenance can accelerate the concrete reacts, obtain the intensity of higher concrete. Keep humidity high , low maintaining time to be the longer temperature when maintaining, then the concrete shrinks the smaller. Steam maintain way than maintain way concrete is it take light to shrink naturall. 6, External environment. The humidity is little, the air drying , temperature are high, the wind speed is large in the atmosphere, then the concrete moisture is evaporated fast, the concrete shrinks the faster. 7, Shake and smash the way and time. Machinery shake way of smashing than make firm by ramming or tamping way concrete contractivity take little by hand. Shaking should determine according to mechanical performance to smash time , are generally suitable for 55s / time. It is too short, shake and can not smash closely knit , it is insufficient or not even in intensity to form the concrete; It is too long, cause and divide storey, thick aggregate sinks to the ground floor, the upper strata that the detailed aggregate stays, the intensity is not even , the upper strata incident shrink the crack. And shrink the crack caused to temperature, worthy of constructing the reinforcing bar againing can obviously improve the resisting the splitting of concrete , structure of especially thin wall (thick 200cm of wall ). Mix muscle should is it adopt light diameter reinforcing bar (8 |? construct 14 |? ) to have priority , little interval assign (whether @ 10 construct @ 15cm ) on constructing, the whole section is it mix muscle to be rate unsuitable to be lower than 0 to construct. 3%, can generally adopt 0 . 3%~0. 5%.(4), crack that causes out of shape of plinth of the groundBecause foundation vertical to even to subside or horizontal direction displacement, make the structure produce the additional stress, go beyond resisting the ability of drawing of concrete structure, cause the structure to fracture. The even main reason that subside of the foundation is as follows, 1, Reconnoitres the precision and is not enough for , test the materials inaccuratly in geology. Designing, constructing without fully grasping the geological situation, this is the main reason that cause the ground not to subside evenly .Such as hills area or bridge, district of mountain ridge,, hole interval to be too far when reconnoitring, and ground rise and fall big the rock, reconnoitring the report can't fully reflect the real geological situation . 2, The geological difference of the ground is too large. Building it in the bridge of the valley of the ditch of mountain area, geology of the stream place and place on the hillside change larger, even there are weak grounds in the stream, because the soil of the ground does not causes and does not subside evenly with the compressing. 3, The structure loads the difference too big. Under the unanimous terms, when every foundation too heavy to load difference in geological situation, may cause evenly to subside, for example high to fill out soil case shape in the middle part of the culvert than to is it take heavy to load both sides, to subside soon heavy than both sides middle part, case is it might fracture to contain 4, The difference of basic type of structure is great. Unite it in the bridge the samly , mix and use and does not expand the foundation and a foundation with the foundation, or adopt a foundation when a foot-path or a long difference is great at the same time , or adopt the foundation of expanding when basis elevation is widely different at the same time , may cause the ground not to subside evenly too 5, Foundation built by stages. In the newly-built bridge near the foundation of original bridge, if the half a bridge about expressway built by stages, the newly-built bridge loads or the foundation causes the soil of the ground to consolidate again while dealing with, may cause and subside the foundation of original bridge greatly 6, The ground is frozen bloatedly. The ground soil of higher moisture content on terms that lower than zero degree expands because of being icy; Once temperature goes up , the frozen soil is melted, the setting of ground. So the ground is icy or melts causes and does not subside evenly . 7, Bridge foundation put on body, cave with stalactites and stalagmites, activity fault,etc. of coming down at the bad geology, may cause and does not subside evenly . 8, After the bridge is built up , the condition change of original ground . After most natural grounds and artificial grounds are soaked with water, especially usually fill out such soil of special ground as the soil , loess , expanding in the land ,etc., soil body intensity meet water drop, compress out of shape to strengthen. In the soft soil ground , season causes the water table to drop to draw water or arid artificially, the ground soil layer consolidates and sinks again,reduce the buoyancy on the foundation at the same time , shouldering the obstruction of rubing to increase, the foundation is carried on one's shoulder or back and strengthened .Some bridge foundation is it put too shallow to bury, erode , is it dig to wash flood, the foundation might be moved. Ground load change of terms, bridge nearby is it is it abolish square , grit ,etc. in a large amount to put to pile with cave in , landslide ,etc. reason for instance, it is out of shape that the bridge location range soil layer may be compressed again. So, the condition of original ground change while using may cause and does not subside evenly Produce the structure thing of horizontal thrust to arched bridge ,etc., it is the main reason that horizontal displacement crack emerges to destroy the original geological condition when to that it is unreasonable to grasp incompletely , design and construct in the geological situation.桥梁裂缝产生原因浅析近年来,我省交通基础建设得到迅猛发展,各地建立了大量的混凝土桥梁。

土木工程混凝土论文中英文资料外文翻译文献

土木工程混凝土论文中英文资料外文翻译文献

土木工程混凝土论文中英文资料外文翻译文献外文资料STUDIES ON IMPACT STRENGTH OF CONCRETESUBJECTED TO SUSTAINEDELEVATED TEMPERATUREConcrete has a remarkable fire resisting properties. Damage in concrete due to fire depends on a great extent on the intensity and duration of fire. Spalling cracking during heating are common concrete behaviour observed in the investigation of the fire affected structures. Plenty of literature is available on the studies of concrete based on time temperature cures. In power, oil sectorsand nuclear reactors concrete is exposed to high temperature for considerable period of time. These effects can be reckoned as exposure to sustained elevated temperature. The sustained elevated temperature may be varying from a few hours to a number of years depending upon practical condition of exposures. The knowledge on properties under such conditions is also of prime importance apart from the structures subjected to high intensity fire. Impact studies of structure subjected to sustained elevated temperature becomes more important as it involves sensitive structures which is more prone to attacks and accidents. In this paper impact studies on concrete subjected to sustained elevated temperature has been discussed. Experiments have been conducted on 180 specimens along with 180 companion cube specimens. The temperatures of 100°C, 200°C and 300°C for a duration of exposure of 2 hours 4 hours and 6 hours has been considered in the experiments. The results are logically analyzed and concluded.1. INTRODUCTIONThe remarkable property of concrete to resist the fire reduces the damage in a concrete structure whenever there is an accidental fire. In most of the cases the concrete remains intact with minor damages only. The reason being low thermal conductivity of concrete at higher temperatures and hence limiting the depth of penetration of firedamage. But when the concrete is subjected to high temperature for long duration the deterioration of concrete takes place. Hence it is essential to understand the strength and deformation characteristics of concrete subjected to temperature for long duration. In this paper an attempt has been made to study the variation in Impact Strength of concrete when subjected to a temperature range 100oC, 200oC and 300oC sustained for a period of 2 hrs, 4 hrs and 6 hrs.The review of the literature shows that a lot of research work [1 – 3] has taken place on the effect of elevated temperature on concrete. All these studies are based on time –temperature curves. Hence an attempt has been made to study the effect of sustained elevated temperature on impact strength of concrete and the results are compared with the compressive strength. The experimental programme has been planned for unstressed residual strength test based on the available facilities. Residual strength is the strength of heated and subsequently cooled concrete specimens expressed as percentage of the strength of unheated specimens.2. EXPERIMENTAL INVESTIGATION2.1. TEST SPECIMEN AND MATERIALSA total of 180 specimens were tested in the present study along with 180 companion cubes. An electric oven capable of reaching a maximum temperature of 300oC has been used for investigation. Fine and coarse aggregates conforming to IS383 has been used to prepare the specimen with mix proportions M1 = 1:2.1:3.95 w/c = 0.58, M2 = 1:1.15:3.56 w/c = 0.53, M3 = 1:0.8:2.4 w/c = 0.4.2.2 TEST VARIABLESThe effects of the following variables were studied.2.2.1 Size sSize of Impact Strength Test Specimen was 150 mm dial and 64 mm thickness and size of companion cube 150 x 150 x 150 mm.2.2.2 Maximum TemperatureIn addition to room temperature, the effect of three different temperatures (100oC, 200oC and 300oC) on the compressive strength was investigated.2.2.3 Exposure Time at Maximum TemperatureThree different exposure times were used to investigate the influence of heat on compressive strength; they are 2 hrs, 4 hrs and 6 hrs.2.2.4 Cooling MethodSpecimens were cooled in air to room temperature.3. TEST PROCEDUREAll the specimens were cast in steel moulds as per IS516 and each layer was compacted. Specimens were then kept in their moulds for 24 hours after which they were decoupled and placed into a curing tank until 28 days. After which the specimens were removed and were allowed to dry in room temperature. These specimens were kept in the oven and the required target temperature was set. Depending on the number of specimen kept inside the oven the time taken to reach the steady state was found to vary. After the steady state was reached the specimens were subjected to predetermined steady duration at the end of which the specimens are cooled to room temperature and tested.ACI drop weight impact strength test was adopted. This is the simplest method for evaluating impact resistance of concrete. The size of the specimen is 150 mm dial and 64 mm thickness. The disc specimens were prepared using steel moulds cured and heated and cooled as. This consists of a standard manually operated 4.54 kg hammer with 457 mm drop. A 64 mm hardened steel ball and a flat base plate with positioning bracket and lugs. The specimen is placed between the four guides pieces (lugs) located 4.8 mm away from the sample. A frame (positioning bracket) is then built in order to target the steel ball at the centre of concrete disc. The disc is coated at the bottom with a thin layer of petroleum jelly or heavy grease to reduce the friction between the specimen and base plate. The bottom part of the hammer unit was placed with its base upon the steel ball and the load was applied by dropping weight repeatedly. The loading was continued until the disc failed and opened up such that it touched three of the four positioning lugs. The number of blows that caused this condition is recorded as the failure strength. The companion cubes were tested for cube compression strength (fake).4. ANALYSIS AND RESULTS4.1 RESIDUAL COMPRESSIVE STRENGTH VS. TEMPERATUREFrom Table 1, at 100°C sustained elevated temperature it is seen that the residual strength of air cooled specimens of mixes M1, M2 and M3 has increased in strength 114% for M1 mix, 109% for M2 mix and 111% for M3 mix for 6 hours duration of exposure. When the sustained elevated temperature is to 200°C for air cooled specimens there is a decrease in strength up to 910% approximately for M1 mix for a duration of 6 hours, but in case of M2 mix it is 82% and for M3 mix it is 63% maximum for 6 hours duration of exposure. When the concrete mixes M1, M2 and M3 are exposed to 300°C sustained temperature there is a reduction in strength up to 78% for M1 mix for 6 hour duration of exposure.4.2 RESIDUAL COMPRESSIVE STRENGTH VS DURATION OF EXPOSUREFrom Table 1, result shows that heating up to 100°C for 2 hours and 4 hours, the residual strength of mix M1 has decreased where as the residual strength of mix M2 and M3 has increased. The residual strength is further increased for 6 hours duration of exposure in all the three mixes M1, M2 and M3 even beyond the strength at room temperature. When the specimens of mixes M1, M2 and M3 are exposed to 200°C for 2,4 and 6 hours of duration, it is observed that the residual strength has decreased below the room temperature and has reached 92% for M1 mix, 82 and 73% for M2 and M3 mix respectively. Concrete cubes of mixes M1, M2 and M3 when subjected to 300°C temperature for 2,4 and 6 hours the residual strength for mix M1 reduces to 92% for 2 hours up to 78% for six hours duration of exposure, for M2 mix 90% for 2 hours duration of exposure up to 76% for six hour duration of exposure, for M3 mix 88% up to 68% between 2 and 6 hours of duration of exposure.5. IMPACT STRENGTH OF CONCRETE5.1 RESIDUAL IMPACT STRENGTH VS TEMPERATUREFrom the table 1, it can be observed that for the sustained elevated temperature of 100°C the residual impact strength of all the specimens reduces and vary between 20 and 50% for mix M1, 15 to 40% for mix M2 and M3. When the sustained elevated temperature is 200°C the residual impact strength of all the mixes further decreases. The reduction is around 60-70% for mix M1, 55 to 65% for M2 and M3 mix. When the sustained elevated temperature is 300°C it is observed that the residual impact strength reduces further and vary between 85 and 70% for mix M1 and 85 to 90% for mix M2 and mix M3.5.2 RESIDUAL IMPACT STRENGTH VS DURATION OF EXPOSUREFrom the Table 1 and Figures 1 to 3, it can be observed that there is a reduction in impact strength when the sustained elevated temperature is 100°C for 2 hrs, 4 hrs and 6 hrs, and its range is 15 to 50% for all the mixes M1, M2 and M3. The influence of duration of exposure is higher for mix M1 which decreases more rapidly as compared to mix M2 and mix M3 for the same duration of exposure. When the specimens are subjected to sustained elevated temperature of 200°C for 2,4 and 6 hour of duration, further reduction in residual impact strength is observed as compared to at 100°C. The reduction is in the range of 55-70% for all the mixes. The six hour duration of exposure has a greater influence on the residual impact strength of concrete. When the sustained elevated temperature is 300°C for 2,4 and 6 hours duration of exposure the residualimpact strength reduces. It can be seen that both temperature and duration of exposure have a very high influence on the residual impact strength of concrete which shows a reduction up to 90% approximately for all the mixes.6. CONCLUSIONThe compressive strength of concrete increases at 100oC when exposed to sustained elevated temperature. The compressive strength of concrete decreases when exposed to 200°C and 300°C from 10 to 30% for 6 hours of exposure. Residual impact strength reduces irrespective of temperature and duration. Residual impact strength decreases at a higher rate of 20% to 85% as compared to compressive strength between 15% and 30 % when subjected to sustained elevated temperature. The impact strength reduces at a higher rate as compared to compressive strength when subjected to sustained elevated temperature.混凝土受持续高温影响的强度的研究混凝土具有显着的耐火性能。

毕业论文外文翻译-建筑施工混凝土开裂预防加工

毕业论文外文翻译-建筑施工混凝土开裂预防加工

毕业论文外文翻译-建筑施工混凝土开裂预防加工Prevention and Treatment of Concrete Cracks in Building ConstructionAbstract:Concrete is widely used in building construction because of its advantages such as durability, strength and low maintenance cost. However, concrete cracks can not only affect the aesthetic appearance of buildings, but also have negative impact on structural integrity and durability. This paper focuses on the prevention and treatment of concrete cracks in building construction. Firstly, the causes of concrete cracking are analyzed, including shrinkage, thermal stress, structural design, material quality and construction quality. Then, preventive measures in design and construction are proposed, such as proper reinforcement arrangement, control of concrete mix proportions, proper curing and protection after pouring, etc. Treatment measures for existing concrete cracks include surface treatment, filling and injection, and reinforcement. Finally, some new techniques are briefly introduced, such as fiber-reinforced concrete, self-healing concrete and material testing technology. This paper provides a comprehensive understanding of the prevention and treatment of concrete cracks in building construction, and proposes practical solutions to improve the quality of concrete structures.Key words: concrete cracks; building construction; prevention; treatmentIntroduction:Concrete is a popular building material due to its properties such as durability, strength and low maintenance cost. However, concrete cracking is a common problem in building construction, which can not only affect the aesthetic appearance of buildings, but also have negative impact on structural integrity and durability. Therefore, preventing and treating concrete cracks are crucial to ensure the long-term performance of buildings. This paper analyzes the causes of concrete cracking in building construction, and proposes preventive and treatment measures based on practical experience and research.1. Causes of Concrete Cracking:1.1 ShrinkageShrinkage is the most common cause of concrete cracking, which is due to the decrease in volume of concrete as it dries and hardens. Shrinkage can be classified into autogenous shrinkage, plastic shrinkage and drying shrinkage.Autogenous shrinkage is caused by the chemical reaction between water and cement, and it can lead to micro-cracks. Plastic shrinkage is caused by the evaporation of water from the surface of fresh concrete, which can cause cracks in the surface layer. Drying shrinkage is caused by the loss of moisture from the hardened concrete, which can lead to cracks in the bulk of the structure.1.2 Thermal StressThermal stress is another cause of concrete cracking, which is due to the temperature difference between the interior and exterior of concrete. When the temperature change is rapid or large, thermal stress can exceed the tensile strength of concrete and cause cracking.1.3 Structural DesignPoor structural design can also cause concrete cracking. For example, inadequate reinforcement or improper placement of reinforcement can lead to excessive stress concentration and cracking. In addition, insufficient structural support or improper joint design can also cause concrete cracking.1.4 Material QualityThe quality of concrete materials such as cement, aggregates and water can also affect concrete cracking. Poor quality materials can result in uneven shrinkage, low strength, and high water permeability, which can cause cracking.1.5 Construction QualityConstruction quality is an important factor in the prevention of concrete cracking. Improper placement, compaction and curing of concrete can lead to poor quality, which can cause cracking. In addition, inadequate protection measures such as insufficient cover or damage to the surface layer can also cause cracking.2. Prevention of Concrete Cracking:2.1 Reinforcement ArrangementProper reinforcement arrangement is essential to prevent concrete cracking. The size, spacing and distribution of reinforcement should be designed according to the structural requirements and the characteristics of concrete. In addition, the use of fiber reinforcement can improve the crack resistance of concrete.2.2 Control of Concrete Mix ProportionsThe control of concrete mix proportions is critical to the prevention of concrete cracking. The ratio of water to cement, the type and quality of aggregates, and the use of admixtures should be carefully considered to ensure proper workability and strength of concrete.2.3 Proper Curing and ProtectionProper curing and protection measures can effectively prevent concrete cracking. Adequate moist curing can reduce evaporation and shrinkage, and increase strength and durability. In addition, proper protection measures such as sufficient cover and protective coatings can protect the surface layer of concrete from damage.3. Treatment of Concrete Cracks:3.1 Surface TreatmentSurface treatment is a common method to repair concrete cracks. The damaged concrete is removed, and the surface is cleaned and roughened. Then, a bonding agent is applied and a new layer of concrete is poured to fill the crack.3.2 Filling and InjectionFilling and injection is another effective method to repair concrete cracks. The crack is filled with cementitious material, such as epoxy or polymer, to restore theintegrity of the structure. Injection is also used to repair cracks in reinforced concrete structures, where the material is injected under pressure to fill the voids and cracks.3.3 ReinforcementReinforcement is used when the crack is severe and structural integrity is compromised. Steel bars or plates are installed into the crack and bonded to the surrounding concrete to restore the strength and load-carrying capacity of the structure.4. New Techniques:4.1 Fiber-Reinforced ConcreteFiber-reinforced concrete is a new type of concrete that contains short fibers, such as glass, steel or synthetic fibers, which can improve the crack resistance and toughness of concrete.4.2 Self-Healing ConcreteSelf-healing concrete is a novel material that can repair micro-cracks by itself through the chemical reaction between water and the embedded capsules.4.3 Material Testing TechnologyMaterial testing technology such as acoustic emission and electrical resistance can effectively detect and monitor the formation and propagation of cracks in concrete structures, and provide early warning for potential failures.Conclusion:Concrete cracking is a common problem in building construction, which can affect the aesthetic appearance, structural integrity and durability of buildings. This paper analyzes the causes of concrete cracking, and proposes practical preventive and treatment measures to improve the quality of concrete structures. In addition, some new techniques such as fiber-reinforced concrete, self-healing concrete andmaterial testing technology are briefly introduced. With proper design, construction and maintenance, the occurrence and impact of concrete cracking can be effectively reduced, and the long-term performance of concrete structures can be ensured.。

外文翻译混凝土裂缝的成因预防及处理

外文翻译混凝土裂缝的成因预防及处理

The causes, prevention and treatment of cracks in concrete Abstract:In the building construction concrete cracks a quality common problem, the causes of cracks in concrete, prior prevention, as well as after the repair process is a more common phenomenon in the process of building production, should be taken seriously enough. The concrete is a brittle material of a gravel aggregate, cement, water and other additional material formed by mixing a non-homogeneous. Concrete construction and deformation constraints and a series of problems, there are a large number of micro-porosity, cavitation and micro-cracks in the concrete hardening molding. The author combines his engineering work experience, summed up the cracks in concrete causes and prevention measures.Keywords: causes of cracks in concrete preventive treatmentIn building construction, concrete cracks is a widespread problem, cracks solution is a more difficult problem. Cracks in concrete reasons are manifold, deformation: such as contraction, expansion, settlement and other causes cracks; external load caused by: improper maintenance of concrete; cracks caused by the external additive problems.Concrete cracks, if not prevention measures to solve, extending its further development will lead to the internal reinforcement corrosive, reducing the carrying capacity of the reinforced concrete structure, impermeability, durability useful life, and even affect people's lives and property safety . Crack is impossible to completely eliminate the engineering specification expressly provides some structure in which the different conditions, allowing the existence of a certain width and depth of the crack. But in the construction process should be as far as possible to take effective preventive and technical safeguards to effectively control the cracks, as little as possible or minimize crack width, depth, and in particular to avoid in key positions or harmful cracks.1.Causes and types of concrete cracksThe concrete is a brittle material of a gravel aggregate, cement, water and other additional material formed by mixing a non-homogeneous. Hardening molding concrete concrete construction and deformation constraints there are a large number of micro-porosity, cavitation and micro-cracks, precisely because of the existence of these initial defects before the concrete showing some heterogeneity characteristics . Micro-cracks is usually a harmless cracks on concrete load-bearing, seepage and use the function does not cause harm. But in the concrete under load, temperature effects, the micro-cracks will continue to expand and connectivity, and ultimately the formation of visible macro cracks, the cracks is often said that the concrete works.Many cracks in concrete cracks caused by deformation: such as temperature change, shrinkage, expansion, uneven subsidence caused cracks; external load induced cracks; cracks caused by improper conservation of the environment and chemical action, etc. .Common cracks in the concrete are the following: (1) shrinkage cracks; ②plastic shrinkage cracking; (3) settlement cracks; ④temperature cracks; ⑤chemical reaction caused by cracks.2.Concrete cracks and prevention2.1 Shrinkage cracks and prevention ofShrinkage cracks appear in a week or so after the end of the concrete curing period of time or after concrete pouring. The evaporation of the water in the slurry will produce shrinkage, and the shrinkage is irreversible. Drying shrinkage cracks are mainly caused due to the different degree of evaporation of the moisture inside and outside the concrete result of deformation of the type: concrete affected by the influence of external conditions, excessive surface moisture loss, large deformation, internal humidity changes smaller deformation smaller, the larger the surface shrinkage deformation by concrete internal constraints, have a greater tensile stress cracks. The lower the relative humidity, the greater the shrinkage of cement paste shrinkage cracks are easy to produce. Shrinkage cracks parallel to the surface of the linear or reticular light fine cracks, width of more than 0.05 to 0.2 mm between the flat parts more common in mass concrete, thin flat-slab along the short to distribution. Shrinkage cracks usually affect the impermeability of concrete, causing corrosion of steel affect the durability of concrete, water pressure will produce hydraulic fracturing affecting concrete bearing capacity. The concrete shrinkage main and to the water-cement ratio of the concrete, cement component, the amount of cement used, thenature and amount of aggregate, the amount of admixture.The main preventive measures:(1)Selection of a smaller amount of shrinkage cement, commonly used in low heat cement and fly ash cement, reduce the amount of cement.(2)Concrete shrinkage by water-cement ratio, the greater the water-cement ratio, the greater the shrinkage in the concrete mix design should try to control the selection of a good water-cement ratio, while mixing the water-reducing agent .(3)Strict control than with concrete mixing and construction, concrete water consumption must not be greater than the amount of water given by the mixture ratio design.(4)To strengthen the early curing of concrete and appropriate to extend the concrete curing time. Appropriate to extend the winter construction concrete insulation cover, and brushing curing agent curing.(5) Set the appropriate contraction joints in concrete structures2.2 Plastic shrinkage cracks and preventionThe plastic shrinkage refers to the before condensation, the concrete surface due to rapid dehydration resulting contraction. Plastic shrinkage cracking is generally hot and dry or windy weather, the cracks mostly wide in the middle, both ends of the thin and vary in length, non-coherentstate. Short cracks as long as 20 to 30cm the longer cracks of up to 2 to 3 m, width of 1 to 5 mm. Main causes: the concrete before the final setting almost no strength or intensity is very small or just the final setting concrete small strength, high temperature or a larger wind, the concrete surface excessive water loss, resulting in capillary have a greater negative pressure of the concrete volume of a sharp contraction, but this time the strength of the concrete can not resist its own contraction, resulting in cracking. The main factors affecting the plastic shrinkage cracking water-cement ratio, the setting time of the concrete, the ambient temperature, wind speed, relative humidity, and so on.The main preventive measures:(1) Selection of shrinkage values smaller high early strength Portland cement or ordinary Portland cement.(2) Strict control of water-cement ratio, to increase the slump and workability of the concrete, to reduce the amount of cement and water mixed with superplasticizer.(3) Pouring concrete before watering the grass roots and templates evenly soaked.(4) Timely covered by plastic film or wet straw, hemp sheet to maintain final setting of concrete the moist front surface or the surface of the concrete spraying curing agent for conservation.To set the sun and wind facilities .(5) At high temperatures and windy weather, timely conservation.2.3 subsidence cracks and preventionSubsidence cracks caused by structural foundation soil is uneven, soft, or backfill or flooding due to uneven settlement; template stiffness, the template support spacing is too large or the bottom of the support as a result of loose, especially in the template support winter on the frozen ground, permafrost thaw uneven settlement, resulting in the concrete structure cracks. Such cracks are deep into or through the cracks, toward subsidence, generally along the perpendicular to the ground or in the form of an angle of 30 °to 45 °direction, subsidence cracks tend to have a certain amount of dislocation, crack width is often and is proportional to the amount of the settlement. Crack width was less affected by temperature changes. Ground deformation stability, subsidence cracks basically stabilized.The main preventive measures:(1)on the soft soil, filling foundation should be carried out prior to the construction of the superstructure necessary compaction and reinforcement.(2)to ensure that the template has a sufficient strength and stiffness, and firmly support the foundation uniform force.(3) prevent the process of concreting the foundation is immersed inwater.(4) template removal time can not be too early, and pay attention to the order form removal.(5) in the erection of the template on the permafrost to take certain precautions.2.4 Temperature cracks and preventionTemperature cracks occurred in mass concrete surface or larger changes in temperature regions in concrete structures. Concrete pouring, in the hardening process of cement hydration reaction to produce large amounts of heat of hydration (when the amount of cement per cubic meter of concrete will release 17,500 27500kJ heat at 350 to 550 kg/m3, so that the internal temperature of the concrete SITA about 70 °C or higher). Cause the internal temperature to rise sharply due to the larger volume of concrete, the accumulation of a large amount of heat of hydration within the concrete and easy to distribute, and rapid cooling of the surface of the concrete, thus forming a larger temperature difference inside and outside, the larger the temperature difference caused by the internal and external different degrees of thermal expansion and contraction of the concrete surface tensile stress (Practice has proved that when the temperature difference between inside and outside of the concrete itself is 25 ° C to 26 °C, will produce roughly about10MPa concrete tensile stress). When the tensile stress exceeds the ultimate tensile strength of the concrete, the concrete surface cracks, cracks occurred in the concrete construction in the late. Concrete construction when the temperature changes, or concrete attacked by the cold wave will lead to concrete surface temperature sharp decline, and contraction, contraction of the concrete surface bound by internal concrete, will produce large tensile stress. cracks, such cracks are generated in the the shallow concrete surface within the range of usually only.The trend of temperature cracks usually certain rules, often criss-cross a large area of structural cracks; the length of the beam and plate size larger structures, cracks parallel to the short side; deep and penetrating temperature cracks are generally parallel or nearly parallel to the direction of the short side , cracks along the longest edge segments appear more dense middle. Crack width sizes, affected by temperature changes more obvious, summer, winter wide narrow. The high temperature expansion caused by the concrete temperature is usually middle coarse fine at both ends, while the the shrink cracks thickness less obvious changes. The emergence of such cracks can cause corrosion of steel, concrete carbonation, reduce freeze-thaw resistance of concrete, anti-fatigue and impermeability.The main preventive measures:(1) try to use low heat or moderate heat cement, slag cement, fly ash cement.(2) reduce the amount of cement to try to control the amount of cement 450kg/m3.(3) reduce the water-cement ratio, generally water-cement ratio of concrete is controlled below 0.6.(4) improve the aggregate gradation, fly ash or superplasticizer to reduce the amount of cement, lower heat of hydration.(5) improve the concrete mixing process, "secondary air" traditional "cold" on the basis of new technology, reduce the temperature of concrete pouring.(6)a certain amount of concrete admixture having less water, plasticizers, retarding admixture role to improve the fluidity of the concrete mixture, water retention, reduce the heat of hydration, delaying the time of occurrence of the thermal peak.(7)hot season puts up visor and other auxiliary measures to control the temperature rise of the concrete pouring, to reduce pouring concrete temperature.(8)mass concrete temperature stress associated with the structure size, the larger the size of the concrete structure, the greater the temperature stress, so reasonable arrangements for the construction process, hierarchical, block pouring, to facilitate cooling, reducingconstraints.2.5 chemical reaction caused cracks and preventionAlkali-aggregate reaction cracks and steel corrosion cracks caused by the most common due to the chemical reaction caused by cracks in the reinforced concrete structure. Concrete mixing will produce some of the alkaline ions, these ions produce a chemical reaction with certain reactive aggregate and absorbs water in the surrounding environment and the volume increases, resulting in concrete crisp, expansion cracking. Such cracks usually appear in the concrete structure during use, in the event difficult to remedy, should take effective measures to prevent it in the construction. Concrete pouring poor vibrators or reinforced protective layer is thin, harmful substances into the concrete reinforcing bars from corrosion, the corroded reinforcement volume expansion, leading to concrete Splitting the cracks of this type of longitudinal cracks along the location of reinforcement .The main preventive measures:(1) selection of the alkali reactivity of small sand and gravel aggregate.(2) selection of low-alkali cement and admixtures of low-alkali or alkali.(3) selection of a suitable admixture AAR with.3 crack treatmentCracks in concrete remedial measures mainly the following methods: surface repair method, grouting, caulking closure method, structural reinforcement, concrete replacement method, electrochemical protection and legal bionic self-healing.3.1 Surface repair methodSurface repair method is a simple, common repair method, the action is in the cracks in the surface of the painting grout, epoxy mortar or concrete surface coating paint, anti-corrosion materials such as asphalt, concrete protection at the same time in order to prevent various The Effect of cracking, usually can paste in cracks in the surface of the glass fiber cloth and other measures.3.2 grouting, caulking closure methodThe grouting method is the use of pressure equipment cementing material is pressed into the cracks in the concrete, the cementing material hardened concrete to form a whole, and thus play the purpose of plugging consolidation. Top cementing material grout, epoxy, methacrylate, polyurethane and other chemical materials. The filleting gouges along the cracks in the tank filled, the plastic or rigid sealing material, in order to achieve the purpose of closed cracks. Commonly used plastic materialsare PVC, clay, plastic ointment, butyl rubber, etc.; rigid sealing material is a polymer cement mortar.3.3 Structural reinforcement methodWhen the the cracks impact on the performance of concrete structures, to take structural reinforcement concrete structure. Commonly used in the following ways: structural reinforcement to increase the cross-sectional area of the concrete structure, corner in the component outsourcing steel, prestressed Reinforcing paste the steel reinforcement, additional the fulcrum reinforcement and shotcrete reinforcement.3.4 Concrete replacement methodThe concrete substitution method is an effective method for dealing with serious damage to the concrete, this method is deteriorated concrete is removed first, and then replaced into the new concrete or other materials. Top replacement materials: of Ordinary concrete or cement mortar, polymer or polymer modified concrete or mortar.3.5 electrochemical Protection ActCathodic protection, chloride extraction, alkaline recovery method, the use of the electrochemical action of the applied electric field in the medium, to change concrete or reinforced concrete in which the state of the environment, passivated steel, in order to achieve the purpose ofanti-corrosion.3.6 biomimetic self-healing legalBionic self-healing legitimate the traditional components of the concrete in some special components such as liquid-core fibers or capsules containing binder, formed within the concrete the intelligent bionic self-healing neural network system, when the concrete cracks secreted part of the liquid core fiber cracks can heal again. Conclusion:Cracks is a common phenomenon in the concrete structure, its appearance will not only reduce the impermeability of the building, affect the use of the building, and would lead to corrosion of steel, concrete carbonation, reduce the durability of the materials, the impact the carrying capacity of the building, so to carefully study the concrete cracks, be treated differently, using a reasonable method for processing to take effective preventive measures to prevent the emergence and development of cracks in the construction, to ensure the safety of buildings and structures and stable work.混凝土裂缝的成因、预防及处理摘要:在建筑工程施工中混凝土裂缝的产生是一项质量通病,因此对混凝土裂缝的成因分析、事先预防,以及产生后的修补处理是建筑生产过程中较为普遍的现象,应引起足够的重视。

土木工程外文翻译参考3篇

土木工程外文翻译参考3篇

学校毕业设计(论文)附件外文文献翻译学号:xxxxx 姓名:xxx所在系别:xxxxx 专业班级:xxx指导教师:xxxx原文标题:Building construction concrete crack of prevention and processing2012年月日建筑施工混凝土裂缝的预防与处理1摘要混凝土的裂缝问题是一个普遍存在而又难于解决的工程实际问题,本文对混凝土工程中常见的一些裂缝问题进行了探讨分析,并针对具体情况提出了一些预防、处理措施。

关键词:混凝土裂缝预防处理前言混凝土是一种由砂石骨料、水泥、水及其他外加材料混合而形成的非均质脆性材料。

由于混凝土施工和本身变形、约束等一系列问题,硬化成型的混凝土中存在着众多的微孔隙、气穴和微裂缝,正是由于这些初始缺陷的存在才使混凝土呈现出一些非均质的特性。

微裂缝通常是一种无害裂缝,对混凝土的承重、防渗及其他一些使用功能不产生危害。

但是在混凝土受到荷载、温差等作用之后,微裂缝就会不断的扩展和连通,最终形成我们肉眼可见的宏观裂缝,也就是混凝土工程中常说的裂缝。

混凝土建筑和构件通常都是带缝工作的,由于裂缝的存在和发展通常会使内部的钢筋等材料产生腐蚀,降低钢筋混凝土材料的承载能力、耐久性及抗渗能力,影响建筑物的外观、使用寿命,严重者将会威胁到人们的生命和财产安全。

很多工程的失事都是由于裂缝的不稳定发展所致。

近代科学研究和大量的混凝土工程实践证明,在混凝土工程中裂缝问题是不可避免的,在一定的范围内也是可以接受的,只是要采取有效的措施将其危害程度控制在一定的范围之内。

钢筋混凝土规范也明确规定:有些结构在所处的不同条件下,允许存在一定宽度的裂缝。

但在施工中应尽量采取有效措施控制裂缝产生,使结构尽可能不出现裂缝或尽量减少裂缝的数量和宽度,尤其要尽量避免有害裂缝的出现,从而确保工程质量。

混凝土裂缝产生的原因很多,有变形引起的裂缝:如温度变化、收缩、膨胀、不均匀沉陷等原因引起的裂缝;有外载作用引起的裂缝;有养护环境不当和化学作用引起的裂缝等等。

建筑施工混凝土裂缝的预防与处理毕业论文中英文资料对照外文翻译文献

建筑施工混凝土裂缝的预防与处理毕业论文中英文资料对照外文翻译文献

建筑施⼯混凝⼟裂缝的预防与处理毕业论⽂中英⽂资料对照外⽂翻译⽂献建筑施⼯混凝⼟中英⽂资料对照外⽂翻译⽂献1,⽂献原⽂:Building construction concrete crack ofprevention and processingAbstractThe crack problem of concrete is a widespread existence but again difficult in solve of engineering actual problem, this text carried on a study analysis to a little bit familiar crack problem in the concrete engineering, and aim at concrete the circumstance put forward some prevention, processing measure.Keyword:Concrete crack prevention processingForewordConcrete's ising 1 kind is anticipate by the freestone bone, cement, water and other mixture but formation of the in addition material of quality brittleness not and all material.Because the concrete construction transform with oneself, control etc. a series problem, harden model of in the concrete existence numerous tiny hole, spirit cave and tiny crack, is exactly because these beginning start blemish of existence just make the concrete present one some not and all the characteristic of quality.The tiny crack is a kind of harmless crack and accept concrete heavy, defend Shen and a little bit other use function not a creation to endanger.But after the concrete be subjected to lotus carry, difference in temperature etc. function, tiny crack would continuously of expand with connect, end formation we can see without the aid of instruments of macro view the crack be also the crack that the concrete often say in the engineering.Concrete building and Gou piece usually all take sewer to make of, because of crack of existence and development usually make inner part of reinforcing bar etc. material creation decay, lower reinforced concrete material of loading ability, durable and anti- Shen ability, influence building of external appearance, service life, severity will threat arrive people's life and property safety.A lot of all of crash of engineerings is because of the unsteady development of the crack with the result that.Modern age science research with a great deal of of the concrete engineering practice certificate, in the concrete engineering crack problem is ineluctable, also acceptable in certainly of the scope just need to adopt valid of measure will it endanger degree control at certain of scope inside.The reinforced concrete norm is also explicit provision:Some structure at place of dissimilarity under the condition allow existence certain the crack of width.But at under construction should as far as possible adopt a valid measure control crack creation, make the structure don't appear crack possibly or as far as possible decrease crack of amount and width, particularly want to as far as possible avoid harmful crack of emergence, insure engineering quality thus.Concrete crack creation of the reason be a lot of and have already transformed to cause of crack:Such as temperature variety, constringency, inflation, the asymmetry sink to sink etc. reason cause of crack;Have outside carry the crack that the function cause;Protected environment not appropriate the crack etc. caused with chemical effect.Want differentiation to treat in the actual engineering, work°out a problem according to the actual circumstance.In the concrete engineering the familiar crack and the prevention1.Stem Suo crack and preventionStem the Suo crack much appear after the concrete protect be over of a period of time or concrete sprinkle to build to complete behind of around a week.In the cement syrup humidity of evaporate would creation stem Suo, and this kind of constringency is can't negative.Stem Suo crack of the creation be main is because of concrete inside outside humidity evaporate degree dissimilarity but cause to transform dissimilarity of result:The concrete is subjected to exterior condition of influence, surface humidity loss lead quick, transform bigger, inner part degree of humidity variety smaller transform smaller, bigger surface stem the Suo transform to be subjected to concrete inner part control, creation more big pull should dint but creation crack.The relativehumidity is more low, cement syrup body stem Suo more big, stem the Suo crack be more easy creation.Stem the Suo crack is much surface parallel lines form or the net shallow thin crack, width many between 0.05-0.2 mm, the flat surface part muchsee in the big physical volume concrete and follow it more in thinner beam plank short to distribute.Stem Suo crack usually the anti- Shen of influence concrete, cause the durable of the rust eclipse influence concrete of reinforcing bar, under the function of the water pressure dint would creation the water power split crack influence concrete of loading dint etc..Concrete stem the Suo be main with water ash of the concrete ratio, the dosage of the composition, cement of cement, gather to anticipate of the dosage of the property and dosage, in addition etc. relevant.Main prevention measure:While being to choose to use the constringency quantity smaller cement, general low hot water mire and powder ash from stove cement in the adoption, lower the dosage of cement.Two is a concrete of stem the Suo be subjected to water ash ratio of influence more big, water ash ratio more big, stem Suo more big, so in the concrete match the ratio the design should as far as possible control good water ash ratio of choose to use, the Chan add in the meantime accommodation of reduce water.Three is strict control concrete mix blend with under construction of match ratio, use of concrete water quantity absolute can't big in match ratio design give settle of use water quantity.Four is the earlier period which strengthen concrete to protect, and appropriate extension protect of concrete time.Winter construction want to be appropriate extension concrete heat preservation to overlay time, and Tu2 Shua protect to protect.Five is a constitution the accommodation is in the concrete structure of the constringency sew.2.The Su constringency crack and preventionSu constringency is the concrete is before condense, surface because of lose water quicker but creation of constringency.The Su constringency crack is general at dry heat or strong wind the weather appear, crack's much presenting in the center breadth, both ends be in the centerthin and the length be different, with each other not coherent appearance.Shorter crack general long 20-30 cm, the longer crack can reach to a 2-3 m, breadth 1-5 mm.It creation of main reason is:The concrete is eventually almost having no strength or strength before the Ning very small, perhaps concrete just eventually Ning but strength very hour, be subjected to heat or compare strong wind dint of influence, the concrete surface lose water to lead quick, result in in the capillary creationbigger negative press but make a concrete physical volume sharply constringency, but at this time the strength of concrete again can't resist its constringency, therefore creation cracked.The influence concrete Su constringency open the main factor of crack to have water ash ratio, concrete of condense time, environment temperature, wind velocity, relative humidity...etc.. Main prevention measure:One is choose to use stem the Suo value smaller higher Huo sour salt of the earlier period strength or common the Huo sour brine mire.Two is strict the control water ash ratio, the Chan add to efficiently reduce water to increment the collapse of concrete fall a degree and with easy, decrease cement and water of dosage.Three is to sprinkle before building concrete, water basic level and template even to soak through.Four is in time to overlay the perhaps damp grass mat of the plastics thin film, hemp slice etc., keep concrete eventually before the Ning surface is moist, perhaps spray to protect etc. to carry on protect in the concrete surface.Five is in the heat and strong wind the weather to want to establish to hide sun and block breeze facilities, protect in time.3.Sink to sink crack and preventionThe creation which sink to sink crack is because of the structure foundation soil quality not and evenly, loose soft or return to fill soil dishonest or soak in water but result in the asymmetry sink to decline with the result that;Perhaps because of template just degree shortage, the template propped up to once be apart from big or prop up bottom loose move etc. to cause, especially at winter, the template prop up at jelly soil up, jelly the soil turn jelly empress creation asymmetry to sink to decline and cause concrete structure creation crack.This kind crack many is deep enter or pierce through sex crack, it alignment have something to do with sinking to sink a circumstance, general follow with ground perpendicular or present 30 °s-45°Cape direction development, bigger sink to sink crack, usually have certain of wrong, crack width usually with sink to decline quantity direct proportion relation.Crack width under the influence of temperature variety smaller.The foundation after transform stability sink to sink crack also basic tend in stability.Main prevention measure:One is rightness loose soft soil, return to fill soil foundation a construction at the upper part structure front should carry on necessity of Hang solid with reinforce.Two is the strength that assurance template is enough and just degree, and prop up firm, and make the foundation be subjected to dint even.Three is keep concrete from sprinkle infusingthe foundation in the process is soak by water.Four is time that template tore down to can't be too early, and want to notice to dismantle a mold order of sequence.Five is at jelly soil top take to establish template to notice to adopt certain of prevention measure.4.Temperature crack and preventionTemperature crack much the occurrence is in big surface or difference in temperature variety of the physical volume concrete compare the earth area of the concrete structure.Concrete after sprinkling to build, in the hardening the process, cement water turn a creation a great deal of of water turn hot, .(be the cement dosage is in the 350-550 kg/m 3, each sign square the rice concrete will release a calories of 17500-27500 kJ and make concrete internal thus the temperature rise to reach to 70℃or so even higher)Because the physical volume of concrete be more big, a great deal of of water turn hot accumulate at the concrete inner part but not easy send forth, cause inner part the temperature hoick, but the concrete surface spread hot more quick, so formation inside outside of bigger difference in temperature, the bigger difference in temperature result in inner part and exterior hot the degree of the bulge cold Suo dissimilarity, make concrete surface creation certain of pull shoulddint.When pull should dint exceed the anti- of concrete pull strength extreme limit, concrete surface meeting creation crack, this kind of crack much occurrence after the concrete under construction period.In the concrete of under construction be difference in temperature variety more big, perhaps is a concrete to be subjected to assault of cold wave etc., will cause concrete surface the temperature sharply descend, but creation constringency, surface constringency of the concrete be subjected to inner part concrete of control, creation very big of pull should dint but creation crack, this kind of crack usually just in more shallow scope of the concrete surface creation.The alignment of the temperature crack usually none settle regulation, big area structure the crack often maneuver interleave;The size bigger structure of the beam plank length, the crack run parallel with short side more;Thorough with pierce through sex of temperature crack general and short side direction parallelism or close parallelism, crack along long side cent the segment appear, in the center more airtight.Crack width the size be different, be subjected to temperature variety influence more obvious, winter compare breadth, summer more narrow.The concrete temperature crack that the heat inflation cause is usually in the center the thick both ends be thin, but cold Suo crack of thick thin variety not too obvious.The emergence of the this kind crack willcause the rust eclipse of reinforcing bar, the carbonization of concrete, the anti- jelly which lower concrete melt, anti- tired and anti- Shen ability etc..Main prevention measure:One is as far as possible choose to use low hot or medium hot water mire, like mineral residue cement, powder ash from stove cement...etc..Two is a decrease cement dosage, cement dosage as far as possible the control is in the 450 kg/m 3 following.Three is to lower water ash ratio, water ash of the general concrete ratio control below 0.6.Four is improvement the bone anticipate class to go together with, the Chan add powder ash from stove or efficiently reduce water etc. to come to reduce cement dosage and lower water to turn hot.Five is an improvement concrete of mix blend to process a craft, lower sprinkle of concrete to build temperature.Six is the in addition that the Chan add a have of fixed amount to reduce water and increase Su, slow Ning etc. function in the concrete, improvement the concrete mix to match a thing of mobility, protect water, lower water to turn hot, postpone hot Feng of emergence time.Seven is the heat season sprinkle to build can the adoption take to establish to hide sun plank etc. assistance measure control concrete of Wen Sheng, lower to sprinkle temperature of build the concrete.Eight is the temperature of big physical volume concrete should the dint relate to structure size, concrete structure size more big, temperature should dint more big, so want reasonable arrangement construction work preface, layering, cent the piece sprinkle to build, for the convenience of in spread hot, let up control.Nine is at great inner part constitution of the physical volume concrete cool off piping, cold water perhaps cold air cool off, let up concrete of inside outside difference in temperature.Ten is the supervision which strengthen concrete temperature, adopt to cool off in time, protection measure.11 is to reserve temperature constringency to sew.12 is to let up to control, sprinkle proper before building concrete in the Ji rock and old concrete top build a 5 mm or so sand mat a layer or usage asphalt etc. material Tu2 Shua.13 is to strengthen concrete to protect, the concrete after sprinkle build use moist grass Lian in time, hemp slice's etc. overlay, and attention sprinkle water to protect, appropriate extension protect time, assurance the concrete surface be slow-moving cool off.At the cold season, concrete surface should constitution heat preservation measure, in order to prevent cold wave assault.14 is the allocation be a little amount in the concrete of reinforcing bar perhaps add fiber material concrete of temperature crack control at certain of scope inside.5.Crack and prevention that the chemical reaction causeAlkali bone's anticipating the crack that reaction crack and reinforcing bar rust eclipse cause is the most familiar in the reinforced concrete structure of because of chemical reaction but cause of crack.The concrete blend a future reunion creation some alkalescence ion, these ion with some activity the bone anticipate creation chemical reaction and absorb surroundings environment in of water but the physical volume enlarge, make concrete crisp loose, inflation open crack.In this kind of crack general emergence concrete structure usage period, once appear very difficult remediable, so should at under construction adopt valid the measure carry on prevention.Main of prevention measure:While being to choose to anticipate with the alkali activity small freestone bone.Two is the in addition which choose to use low lye mire with low alkali or have no alkali.Three is the Chan which choose to use accommodation with anticipate to repress an alkali bone to anticipate reaction.Because the concrete sprinkle to build, flap Dao bad perhaps is a reinforcing bar protection layer thinner, the harmful material get into concrete to make reinforcing bar creation rust eclipse, the reinforcing bar physical volume of the rust eclipse inflation, cause concrete bulge crack, the crack of this kind type much is a crack lengthways, follow the position of reinforcing bar /doc/7711103392.htmlually of prevent measure from have:One is assurance reinforcing bar protection the thickness of the layer.Two is a concrete class to go together with to want good.Three is a concrete to sprinkle to note and flap Dao airtight solid.Four is a reinforcingbar surface layer Tu2 Shua antisepsis coating.Crack processingThe emergence of the crack not only would influence structure of whole with just degree, return will cause the rust eclipse of reinforcing bar, acceleration concrete of carbonization, lower durable and anti- of concrete tired, anti- Shen ability.Therefore according to the property of crack and concrete circumstance we want differentiation to treat, in time processing, with assurance building of safety usage.The repair measure of the concrete crack is main to have the following some method:Surface repair method, infuse syrup, the Qian sew method, the structure reinforce a method, concrete displacement method, electricity chemistry protection method and imitate to living from healmethod.Surface repair the method be a kind of simple, familiar of repair method, it main be applicable to stability and to structure loading the ability don't have the surface crack of influence and deep enter crack of processing.The processing measure that is usually is a surface in crack daubery cement syrup, the wreath oxygen gum mire or at concrete surface Tu2 Shua paint, asphalt etc. antisepsis material, at protection of in the meantime for keeping concrete from continue under the influence of various function to open crack, usually can adoption the surface in crack glue to stick glass fiber cloth etc. measure.1, infuse syrup, the Qian sew methodInfuse a syrup method main the concrete crack been applicable to have influence or have already defend Shen request to the structure whole of repair, it is make use of pressure equipments gum knot the material press into the crack of concrete, gum knot the material harden behind and concrete formation one be whole, thus reinforce of purpose.The in common use gum knot material has the cement the syrup, epoxy, A Ji C Xi sour ester and gather ammonia ester to equalize to learn material. The Qian sew a method is that the crack be a kind of most in common use method in, it usually is follow the crack dig slot, the Qian fill Su in the slot or rigid water material with attain closing crack of purpose.The in common use Su material has PVC gum mire, plastics ointment, the D Ji rubber etc.;In common use rigid water material is the polymer cement sand syrup.2, the structure reinforce a methodWhen the crack influence arrive concrete structure of function, will consideration adopt to reinforce a method to carry on processing to the concrete structure.The structure reinforce medium in common use main have the following a few method:The piece of enlargement concrete structure in every aspect accumulate, outside the Cape department of the Gou piece pack type steel, adoption prepare should the dint method reinforce, glue to stick steel plate to reinforce, increase to establish fulcrum to reinforce and jet the concrete compensation reinforce.3, concrete displacement methodConcrete displacement method is processing severity damage concrete of a kind of valid method, this method be first will damage of the concrete pick and get rid of, then again displacement go into new of concrete or other material.The in common use displacement material have:Commonconcrete or the cement sand syrup, polymer or change sex polymer concrete or sand syrup.4, the electricity chemistry protection methodThe electricity chemistry antisepsis is to make use of infliction electric field in lie the quality of electricity chemical effect, change concrete or reinforced concrete the environment appearance of the place, the bluntness turn reinforcing bar to attain the purpose of antisepsis.Cathode protection method, chlorine salt's withdrawing a method, alkalescence to recover a method is a chemistry protection method in three kinds of in common use but valid method.The advantage of this kind of method is a protection method under the influence of environment factor smaller, apply reinforcing bar, concrete of long-term antisepsis, since can used for crack structure already can also used for new set up structure.5, imitate to living from legal moreImitate to living from heal the method be a kind of new crack treatment, its mimicry living creature organization secrete a certain material towards suffering wound part auto, but make the wound part heal of function, join some and special composition(such as contain to glue knot of the liquid Xin fiber or capsule) in the concrete of the tradition the composition, at concrete inner part formation the intelligence type imitate to living from heal nerve network system, be the concrete appear crack secrete a parts of liquid Xin fiber can make the crack re- heal. ConclusionThe crack is widespread in the concrete structure existence of a kind of phenomenon, it of emergence not only will lower theanti- Shen of building ability, influence building of usage function, and will cause the rust eclipse of reinforcing bar, the carbonization of concrete, lower the durable of material, influence building of loading ability, so want to carry on to the concrete crack earnest research, differentiation treat, adoption reasonable of the method carry on processing, and at under construction adopt various valid of prevention measure to prevention crack of emergence and development, assurance building and Gou piece safety, stability work.From《CANADIAN JOURNAL OF CIVIL ENGINEERING》2,译⽂:建筑施⼯混凝⼟裂缝的预防与处理混凝⼟的裂缝问题是⼀个普遍存在⽽⼜难于解决的⼯程实际问题,本⽂对混凝⼟⼯程中常见的⼀些裂缝问题进⾏了探讨分析,并针对具体情况提出了⼀些预防、处理措施。

混凝土裂缝的预防与处理—中外文翻译毕业论文

混凝土裂缝的预防与处理—中外文翻译毕业论文

中英文翻译材料办学学院南通职业大学建筑工程学院专业工程管理姓名准考证号混凝土裂缝的预防与处理摘要:混凝土的裂缝问题是一个普遍存在而又难于解决的工程实际问题,本文对混凝土工程中常见的一些裂缝问题进行了探讨分析,并针对具体情况提出了一些预防、处理措施。

关键词:混凝土裂缝预防处理1 引言混凝土是一种由砂石骨料、水泥、水及其他外加材料混合而形成的非均质脆性材料。

由于混凝土施工和本身变形、约束等一系列问题,硬化成型的混凝土中存在着众多的微孔隙、气穴和微裂缝,正是由于这些初始缺陷的存在才使混凝土呈现出一些非均质的特性。

微裂缝通常是一种无害裂缝,对混凝土的承重、防渗及其他一些使用功能不产生危害。

但是在混凝土受到荷载、温差等作用之后,微裂缝就会不断的扩展和连通,最终形成我们肉眼可见的宏观裂缝,也就是混凝土工程中常说的裂缝。

混凝土建筑和构件通常都是带缝工作的,由于裂缝的存在和发展通常会使内部的钢筋等材料产生腐蚀,降低钢筋混凝土材料的承载能力、耐久性及抗渗能力,影响建筑物的外观、使用寿命,严重者将会威胁到人们的生命和财产安全。

很多工程的失事都是由于裂缝的不稳定发展所致。

近代科学研究和大量的混凝土工程实践证明,在混凝土工程中裂缝问题是不可避免的,在一定的范围内也是可以接受的,只是要采取有效的措施将其危害程度控制在一定的范围之内。

钢筋混凝土规范也明确规定:有些结构在所处的不同条件下,允许存在一定宽度的裂缝。

但在施工中应尽量采取有效措施控制裂缝产生,使结构尽可能不出现裂缝或尽量减少裂缝的数量和宽度,尤其要尽量避免有害裂缝的出现,从而确保工程质量。

混凝土裂缝产生的原因很多,有变形引起的裂缝:如温度变化、收缩、膨胀、不均匀沉陷等原因引起的裂缝;有外载作用引起的裂缝;有养护环境不当和化学作用引起的裂缝等等。

在实际工程中要区别对待,根据实际情况解决问题。

2 混凝土工程中常见裂缝及预防2.1 干缩裂缝及预防干缩裂缝多出现在混凝土养护结束后的一段时间或是混凝土浇筑完毕后的一周左右。

土木工程-毕业设计-论文-外文翻译-中英文对照

土木工程-毕业设计-论文-外文翻译-中英文对照

英文原文:Concrete structure reinforcement designSheyanb oⅠWangchenji aⅡⅠFoundation Engineering Co., Ltd. Heilongjiang DongyuⅡHeilongjiang Province, East Building Foundation Engineering Co., Ltd. CoalAbstract:structure in the long-term natural environment and under the use environment's function, its function is weaken inevitably gradually, our structural engineering's duty not just must finish the building earlier period the project work, but must be able the science appraisal structure damage objective law and the degree, and adopts the effective method guarantee structure the security use, that the structure reinforcement will become an important work. What may foresee will be the 21st century, the human building also by the concrete structure, the steel structure, the bricking-up structure and so on primarily, the present stage I will think us in the structure reinforcement this aspect research should also take this as the main breakthrough direction.Key word:Concrete structure reinforcement bricking-up structure reinforcement steel structure reinforcement1 Concrete structure reinforcementConcrete structure's reinforcement divides into the direct reinforcement and reinforces two kinds indirectly, when the design may act according to the actual condition and the operation requirements choice being suitable method and the necessary technology.1.1the direct reinforcement's general method1)Enlarges the section reinforcement lawAdds the concretes cast-in-place level in the reinforced concrete member in bending compression zone, may increase the section effective height, the expansion cross sectional area, thus enhances the component right section anti-curved, the oblique section anti-cuts ability and the section rigidity, plays the reinforcement reinforcement the role.In the suitable muscle scope, the concretes change curved the component right section supporting capacity increase along with the area of reinforcement and the intensity enhance. In the original component right section ratio of reinforcement not too high situation, increases the main reinforcement area to be possible to propose the plateau component right section anti-curved supporting capacity effectively. Is pulled in the section the area to add the cast-in-place concrete jacket to increase the component section, through new Canada partial and original component joint work, but enhances the component supporting capacity effectively, improvement normal operational performance.Enlarges the section reinforcement law construction craft simply, compatible, and has the mature design and the construction experience; Is suitable in Liang, the board, the column, the wall and the general structure concretes reinforcement; But scene construction's wet operating time is long, to produces has certain influence with the life, and after reinforcing the building clearance has certain reduction.2) Replacement concretes reinforcement lawThis law's merit with enlarges the method of sections to be close, and after reinforcing, does not affect building's clearance, but similar existence construction wet operating time long shortcoming; Is suitable somewhat low or has concretes carrier's and so on serious defect Liang, column in the compression zone concretes intensity reinforcement.3) the caking outsourcing section reinforcement lawOutside the Baotou Steel Factory reinforcement is wraps in the section or the steel plate is reinforced component's outside, outside the Baotou Steel Factory reinforces reinforced concrete Liang to use the wet outsourcing law generally, namely uses the epoxy resinification to be in the milk and so on methods with to reinforce the section the construction commission to cake a whole, after the reinforcement component, because is pulled with the compressed steel cross sectional area large scale enhancement, therefore right section supporting capacity and section rigidity large scale enhancement.This law also said that the wet outside Baotou Steel Factory reinforcement law, the stress is reliable, the construction is simple, the scene work load is small, but is big with the steel quantity, and uses in above not suitably 600C in the non-protection's situation the high temperature place; Is suitable does not allow in the use obviously to increase the original component section size, but requests to sharpen its bearing capacity large scale the concrete structure reinforcement.4) Sticks the steel reinforcement lawOutside the reinforced concrete member in bending sticks the steel reinforcement is (right section is pulled in the component supporting capacity insufficient sector area, right section compression zone or oblique section) the superficial glue steel plate, like this may enhance is reinforced component's supporting capacity, and constructs conveniently.This law construction is fast, the scene not wet work or only has the plastering and so on few wet works, to produces is small with the life influence, and after reinforcing, is not remarkable to the original structure outward appearance and the original clearance affects, but the reinforcement effect is decided to a great extent by the gummy craft and the operational level; Is suitable in the withstanding static function, and is in the normal humidity environment to bend or the tension member reinforcement.5) Glue fibre reinforcement plastic reinforcement lawOutside pastes the textile fiber reinforcement is pastes with the cementing material the fibre reinforcement compound materials in is reinforced the component to pull the region, causes it with to reinforce the section joint work, achieves sharpens the component bearing capacity the goal. Besides has glues the steel plate similar merit, but also has anticorrosive muddy, bears moistly, does not increase the self-weight of structure nearly, durably, the maintenance cost low status merit, but needs special fire protection processing, is suitable in each kind of stress nature concrete structure component and the general construction.This law's good and bad points with enlarge the method of sections to be close; Is suitable reinforcement which is insufficient in the concrete structure component oblique section supporting capacity, or must exert the crosswise binding force to the compressional member the situation.6) Reeling lawThis law's good and bad points with enlarge the method of sections to be close; Is suitable reinforcement which is insufficient in the concrete structure component oblique section supporting capacity, or must exert the crosswise binding force to the compressional member the situation.7) Fang bolt anchor lawThis law is suitable in the concretes intensity rank is the C20~C60 concretes load-bearing member transformation, the reinforcement; It is not suitable for already the above structure which and the light quality structure makes decent seriously. 1.2The indirect reinforcement's general method1)Pre-stressed reinforcement law(1)Thepre-stressed horizontal tension bar reinforces concretes member in bending,because the pre-stressed and increases the exterior load the combined action, in the tension bar has the axial tension, this strength eccentric transmits on the component through the pole end anchor (, when tension bar and Liang board bottom surface close fitting, tension bar can look for tune together with component, this fashion has partial pressures to transmit directly for component bottom surface), has the eccentric compression function in the component, this function has overcome the bending moment which outside the part the load produces, reduced outside the load effect, thus sharpened component's anti-curved ability. At the same time, because the tension bar passes to component's pressure function, the component crack development can alleviate, the control, the oblique section anti-to cut the supporting capacity also along with it enhancement.As a result of the horizontal lifting stem's function, the original component's section stress characteristic by received bends turned the eccentric compression, therefore, after the reinforcement, component's supporting capacity was mainly decided in bends under the condition the original component's supporting capacity 。

建筑施工混凝土裂缝的预防与处理 毕业论文外文翻译

建筑施工混凝土裂缝的预防与处理  毕业论文外文翻译

建筑施工混凝土裂缝的预防与处理毕业论文外文翻译Prevention and Treatment of Concrete Cracks in ConstructionAbstract:Concrete has been widely used in construction because of its good durability and high structural strength. However, concrete is prone to cracks during construction, which can seriously affect the performance and service life of buildings or structures. Therefore, it is necessary to take preventive measures to reduce the occurrence of cracks in concrete. This paper summarizes the causes of concrete cracks and the measures to prevent and treat concrete cracks in construction, aiming at providing a reference for concrete construction engineering.Keywords:concrete; cracks; prevention; treatment1 IntroductionConcrete has been widely used in the construction industry due to its good durability, high structural strength and other advantages. However, concrete is also prone to cracks during construction, which can seriously affect the performance and service life of buildings or structures. Therefore, it is necessary to take preventive measures to reduce the occurrence of cracks in concrete.2 Causes of Concrete Cracks2.1 Internal Causes2.1.1 Material QualityThe quality of the concrete material directly affects the strength and durability of the concrete structure. If the raw materials are not properly prepared or mixed, the quality of the concrete will be affected, leading to cracks in the structure.2.1.2 Technical FactorsDuring the pouring and curing processes of concrete, technical factors such as the amount of water added, the mixing time, the compactness of the concrete, the curing conditions and the temperature control, etc., will affect the strength and durability of the concrete structure.2.2 External Causes2.2.1 Environmental FactorsDuring the construction of concrete structures, environmental factors such as temperature, humidity, wind, rain and snow, etc. can have an impact on the strength and durability of the concrete structure. For example, low temperatures can cause the concrete to freeze and form cracks, while high temperatures can cause the concrete to expand and crack.2.2.2 Load FactorsLoad factors refer to the external forces that act on the concrete structure, such as weight load, wind load, earthquake load, etc. If the load is too large or unevenly distributed, it can cause cracks or deformation in the concrete structure.3 Prevention of Concrete Cracks3.1 Ensure Good Construction QualityThe construction quality of concrete structures directly affects the occurrence of cracks. Therefore, in the construction process, it is necessary to strictly follow the design and construction specifications, and pay attention to the quality control of all aspects of the construction.3.2 Reasonably Design the StructureReasonable structure design can effectively prevent cracks in concrete. The design of the construction joints, expansion joints and contraction joints should be reasonably determined according to the characteristics of the structure and environmental factors to prevent the occurrence of cracks caused by temperature changes or load factors.3.3 Strengthen the Construction JointsStrengthening the construction joints can effectively prevent the occurrence of cracks in the joints between the old and new concrete structures, and between the precast concrete components and the cast-in-place concrete structures. Reinforcement measures can be taken to ensure the continuity and uniformity of the joints.3.4 Control the Temperature and HumidityControl of the temperature and humidity during the pouring and curing of the concrete is also an important measure to prevent the occurrence of cracks. The temperature and humidity must be controlled within a reasonable range to ensure the normal hydration and curing of the concrete.4 Treatment of Concrete Cracks4.1 Grouting and SealingGrouting and sealing are common methods for treating cracks in concrete structures. The method is to inject a certain amount of grouting material into the cracks to fill the gaps, and then use sealing materials to seal the surface of the cracks to prevent the intrusion of water and other substances.4.2 Patching and ReinforcementFor concrete cracks caused by insufficient structural strength or uneven load distribution, patching and reinforcement methods can be used. The method is to apply a new layer of concrete or repair mortar to the surface of the cracks to increase the strength and load-bearing capacity of the structure.4.3 ReplacementFor severe cracks or damaged concrete structures, replacement is often the only way to solve the problem. The method is to completely remove the damaged parts and replace them with new concrete or precast components.5 ConclusionIn summary, concrete cracks are a common problem in the construction industry, but they can be prevented and treated through effective measures. In the construction process, attention should be paid to the quality of the concrete material, the technical factors, and the environmental and load conditions. In addition, reasonable structure design and strengthening of the construction joints, as well as control of the temperature and humidity, should be considered to prevent the occurrence of cracks. For existing cracks, grouting and sealing, patching and reinforcement, or replacement methods can be used to effectively repair the damaged structures.。

混凝土裂缝的产生与预防 毕业论文外文翻译

混凝土裂缝的产生与预防  毕业论文外文翻译

混凝土裂缝的产生与预防毕业论文外文翻译The production and prevention of concrete cracksAbstract:This paper discusses the reasons for the production of concrete cracks and the preventive measures for cracking in the construction process. In the production process of concrete, it is influenced by many factors, such as temperature, humidity, mix materials, construction technology, etc., which may lead to the formation of cracks in the concrete structure. This article analyzes the causes of concrete cracking from various aspects such as raw materials, mixing, placing, and curing, and puts forward corresponding preventive measures. The purpose of this paper is to provide a reference for the prevention of concrete cracks in the construction process and to improve the quality of the engineering.Keywords:concrete, crack, production, prevention1. IntroductionConcrete is one of the important building materials in modern engineering, and it is widely used in various types of buildings, road construction, and infrastructure projects. The quality of concrete is directly related to the safety and durability of the structure, and the requirements for the quality of the concrete become higher and higher as the engineering technology advances. In order to improve the quality of the concrete, it is necessary to control the factors that affect the production and use of the concrete, especially the phenomenon of concrete cracking.The production and use of concrete are influenced by various factors, such as the raw materials, mixing, placing, and curing, which may cause concrete cracking. Therefore, it is necessary to analyze the factors that cause concrete cracking and adopt corresponding preventive measures in the construction process to prevent the occurrence of cracks in the concrete structure.2. The reasons for the production of concrete cracks2.1 The impact of raw materialsThe quality of raw materials, such as cement, aggregate, admixture and water, has a direct impact on the properties of concrete, and the quality of concrete isdirectly related to the occurrence of cracks. In the production process, if the quality of the raw materials is not good, it will affect the strength, elasticity, and crack resistance of the concrete.For example, if the water-cement ratio of the concrete is too high or the particle size of the aggregate is uneven, it will cause the internal pores to increase and the distribution to be uneven, which will reduce the compactness of the concrete, thus causing cracks in the hardened concrete. If the quality of the admixture is not good, it will affect the workability and cohesiveness of the concrete, and affect the fluidity of the concrete, which may cause cracks in the concrete.2.2 The impact of mixingMixing is a key process in the production of concrete, and the quality of mixing directly affects the properties of concrete. If the mixing is improper, it will cause the concrete to have uneven density, segregation, bleeding, and other phenomena, and the hardened concrete will be prone to cracking.For example, if the mixing time is too long, it will cause the concrete to segregate, the coarse aggregate to sink, and the mortar to float, which will cause the internal stress of the concrete to increase and crack under the action of external force. If the mixing speed is too fast, it will cause the air entrainment rate of the concrete to increase, which will reduce the density of the concrete and reduce the strength of the concrete.2.3 The impact of placingPlacing is the process of conveying concrete to the site and properly placing it in the formwork. If the placing operation is not standardized or the environmental conditions are not suitable, it will cause the concrete to be unevenly stressed and result in cracks in the structure.For example, if the pouring time is too long, the concrete will lose workability and result in poor compaction, which will lead to the occurrence of segregation and bleeding. If the temperature of the environment is too high or too low, it will affect the hydration of the cement and cause cracks in the hardened concrete.2.4 The impact of curingCuring is the process of keeping the concrete wet and at a suitable temperature after placing, in order to promote the continuous hydration of cement and the growth of the strength of the concrete. If the curing is not timely and sufficient or the curing conditions are not properly controlled, it will cause the concrete to lose moisture and strength, and lead to the occurrence of cracks in the concrete.For example, if the concrete is cured in a dry environment or exposed to sunlight, it will cause the surface of the concrete to dry out quickly and shrink, thus leading to the occurrence of cracks in the hardened concrete. If the curing time is not long enough or the curing conditions are not controlled properly, it will cause the strength of the concrete to be insufficient, which will also cause cracks in the structure.3. Methods of preventing concrete cracks3.1 Improving the raw materialsIn the production process of concrete, attention should be paid to the quality of raw materials, and the proportion of different materials should be reasonable. The quality of the cement should be strictly controlled, and the particle size and grading of the aggregate should be uniform. The admixture should be properly selected and used to improve the workability and cohesiveness of the concrete.3.2 Improving the mixing processIn the process of mixing, the mixing time and mixing speed should be properly controlled, and the mixing should be uniform to ensure the quality of the concrete. The operation should be standardized to prevent segregation and bleeding, and measures should be taken to reduce the air entrainment rate, so as to increase the density of the concrete.3.3 Improving the placing processIn the process of placing, the pouring time should be appropriate, and the operation should be carried out smoothly to prevent segregation and bleeding. The temperature and humidity of the environment should be kept suitable, and the temperature of the concrete should be controlled to prevent the occurrence of shrinkage cracks.3.4 Improving the curing processIn the process of curing, the concrete should be kept moist and at a suitable temperature, and the curing time should be sufficient to ensure the strength of the concrete. The curing conditions should be properly controlled to prevent the surface of the concrete from drying out and causing shrinkage cracks.4. ConclusionIn the production and use of concrete, the phenomenon of concrete cracking cannot be completely avoided, but through the analysis of the causes of concrete cracking and the adoption of corresponding preventive measures, the occurrence of concrete cracking can be effectively reduced, and the quality of the engineering can be improved. Therefore, it is necessary to carry out scientific and standardized production and construction, control the factors that affect the production and properties of concrete, and prevent the occurrence of concrete cracking.。

施工论文:浅谈混凝土施工的裂缝与预防措施

施工论文:浅谈混凝土施工的裂缝与预防措施

施工论文:浅谈混凝土施工的裂缝与预防措施【摘要】工程质量是决定工程建设成败的关键,质量的优劣对工程建成后的使用有直接影响,控制工程建设质量是参建各方工作的重点及共同的职责。

近几年来,我国基础建设迅速发展,各地兴建了大量的混凝土建筑,但混凝土裂缝现象极为普遍,裂缝的存在不仅影响到砼结构强度、整体性和耐久性,甚至引起严重渗漏,影响并缩短建筑物的使用寿命,成为影响建筑物的正常使用和结构安全的主要因素之一,如何预防、控制砼裂缝,是现代建筑工程施工中普遍关注的问题.【关键词】施工;裂缝;温度;应力;措施on the concrete cracks and prevention measureswang qing-feng1,chen xiao-min 2(1。

hebi coal and electricity co., ltd. to build at the chemical salt hebi henan 458000;2.henan cheong construction co。

, ltd hebi henan 458000)【abstract】construction project quality is to determine the key to success, the quality of the pros and cons of the project after the completion of the use of direct influence and control the construction quality is the focus of the parties participating inthe construction and common responsibilities。

in recent years, the rapid development of china's infrastructure, built around a large concrete building, but a very common phenomenon of concrete cracks, the presence of cracks in concrete not only affects the structural strength, integrity and durability, and even cause serious leakage, and reduce the impact life of the building, thus affecting the normal use of the building and structural safety of the main factors, prevention, control cracks in concrete,is a modern building construction issues of common concern。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

外文翻译学生姓名学号专业班级指导教师职称毕业论文成绩Building construction concrete crack ofprevention and processingAbstractThe crack problem of concrete is a widespread existence but again difficult in solve of engineering actual problem, this text carried on a study analysis to a little bit familiar crack problem in the concrete engineering, and aim at concrete the circumstance put forward some prevention, processing measure.Keyword:Concrete crack prevention processingForewordConcrete's ising 1 kind is anticipate by the freestone bone, cement, water and other mixture but formation of the in addition material of quality brittleness not and all material.Because the concrete construction transform with oneself, control etc. a series problem, harden model of in the concrete existence numerous tiny hole, spirit cave and tiny crack, is exactly because these beginning start blemish of existence just make the concrete present one some not and all the characteristic of quality.The tiny crack is a kind of harmless crack and accept concrete heavy, defend Shen and a little bit other use function not a creation to endanger.But after the concrete be subjected to lotus carry, difference in temperature etc. function, tiny crack would continuously of expand with connect, end formation we can see without the aid of instruments of macro view the crack be also the crack that the concrete often say in the engineering.Concrete building and Gou piece usually all take sewer to make of, because of crack of existence and development usually make inner part of reinforcing bar etc. material creation decay, lower reinforced concrete material of loading ability, durable and anti- Shen ability, influence building of external appearance, service life, severity will threat arrive people's life and property safety.A lot of all of crash of engineerings is because of the unsteady development of the crack with the result that.Modern age science research with a great deal of of the concrete engineering practice certificate, in theconcrete engineering crack problem is ineluctable, also acceptable in certainly of the scope just need to adopt valid of measure will it endanger degree control at certain of scope inside.The reinforced concrete norm is also explicit provision:Some structure at place of dissimilarity under the condition allow existence certain the crack of width.But at under construction should as far as possible adopt a valid measure control crack creation, make the structure don't appear crack possibly or as far as possible decrease crack of amount and width, particularly want to as far as possible avoid harmful crack of emergence, insure engineering quality thus.Concrete crack creation of the reason be a lot of and have already transformed to cause of crack:Such as temperature variety, constringency, inflation, the asymmetry sink to sink etc. reason cause of crack;Have outside carry the crack that the function cause;Protected environment not appropriate the crack etc. caused with chemical effect.Want differentiation to treat in the actual engineering, work°out a problem according to the actual circumstance.In the concrete engineering the familiar crack and the prevention1.Stem Suo crack and preventionStem the Suo crack much appear after the concrete protect be over of a period of time or concrete sprinkle to build to complete behind of around a week.In the cement syrup humidity of evaporate would creation stem Suo, and this kind of constringency is can't negative.Stem Suo crack of the creation be main is because of concrete inside outside humidity evaporate degree dissimilarity but cause to transform dissimilarity of result:The concrete is subjected to exterior condition of influence, surface humidity loss lead quick, transform bigger, inner part degree of humidity variety smaller transform smaller, bigger surface stem the Suo transform to be subjected to concrete inner part control, creation more big pull should dint but creation crack.The relative humidity is more low, cement syrup body stem Suo more big, stem the Suo crack be more easy creation.Stem the Suo crack is much surface parallel lines form or the net shallow thin crack, width many between 0.05-0.2 mm, the flat surface part much see in the big physical volume concrete and follow it more in thinner beam plank short to distribute.Stem Suo crack usually the anti- Shen of influence concrete, cause thedurable of the rust eclipse influence concrete of reinforcing bar, under the function of the water pressure dint would creation the water power split crack influence concrete of loading dint etc..Concrete stem the Suo be main with water ash of the concrete ratio, the dosage of the composition, cement of cement, gather to anticipate of the dosage of the property and dosage, in addition etc. relevant.Main prevention measure:While being to choose to use the constringency quantity smaller cement, general low hot water mire and powder ash from stove cement in the adoption, lower the dosage of cement.Two is a concrete of stem the Suo be subjected to water ash ratio of influence more big, water ash ratio more big, stem Suo more big, so in the concrete match the ratio the design should as far as possible control good water ash ratio of choose to use, the Chan add in the meantime accommodation of reduce water.Three is strict control concrete mix blend with under construction of match ratio, use of concrete water quantity absolute can't big in match ratio design give settle of use water quantity.Four is the earlier period which strengthen concrete to protect, and appropriate extension protect of concrete time.Winter construction want to be appropriate extension concrete heat preservation to overlay time, and Tu2 Shua protect to protect.Five is a constitution the accommodation is in the concrete structure of the constringency sew.2.The Su constringency crack and preventionSu constringency is the concrete is before condense, surface because of lose water quicker but creation of constringency.The Su constringency crack is general at dry heat or strong wind the weather appear, crack's much presenting in the center breadth, both ends be in the centerthin and the length be different, with each other not coherent appearance.Shorter crack general long 20-30 cm, the longer crack can reach to a 2-3 m, breadth 1-5 mm.It creation of main reason is:The concrete is eventually almost having no strength or strength before the Ning very small, perhaps concrete just eventually Ning but strength very hour, be subjected to heat or compare strong wind dint of influence, the concrete surface lose water to lead quick, result in in the capillary creation bigger negative press but make a concrete physical volume sharply constringency, but at this time the strength of concrete again can't resist itsconstringency, therefore creation cracked.The influence concrete Su constringency open the main factor of crack to have water ash ratio, concrete of condense time, environment temperature, wind velocity, relative humidity...etc..Main prevention measure:One is choose to use stem the Suo value smaller higher Huo sour salt of the earlier period strength or common the Huo sour brine mire.Two is strict the control water ash ratio, the Chan add to efficiently reduce water to increment the collapse of concrete fall a degree and with easy, decrease cement and water of dosage.Three is to sprinkle before building concrete, water basic level and template even to soak through.Four is in time to overlay the perhaps damp grass mat of the plastics thin film, hemp slice etc., keep concrete eventually before the Ning surface is moist, perhaps spray to protect etc. to carry on protect in the concrete surface.Five is in the heat and strong wind the weather to want to establish to hide sun and block breeze facilities, protect in time.3.Sink to sink crack and preventionThe creation which sink to sink crack is because of the structure foundation soil quality not and evenly, loose soft or return to fill soil dishonest or soak in water but result in the asymmetry sink to decline with the result that;Perhaps because of template just degree shortage, the template propped up to once be apart from big or prop up bottom loose move etc. to cause, especially at winter, the template prop up at jelly soil up, jelly the soil turn jelly empress creation asymmetry to sink to decline and cause concrete structure creation crack.This kind crack many is deep enter or pierce through sex crack, it alignment have something to do with sinking to sink a circumstance, general follow with ground perpendicular or present 30 °s-45 °Cape direction development, bigger sink to sink crack, usually have certain of wrong, crack width usually with sink to decline quantity direct proportion relation.Crack width under the influence of temperature variety smaller.The foundation after transform stability sink to sink crack also basic tend in stability.Main prevention measure:One is rightness loose soft soil, return to fill soil foundation a construction at the upper part structure front should carry on necessity of Hang solid with reinforce.Two is the strength that assurance template is enough andjust degree, and prop up firm, and make the foundation be subjected to dint even.Three is keep concrete from sprinkle infusing the foundation in the process is soak by water.Four is time that template tore down to can't be too early, and want to notice to dismantle a mold order of sequence.Five is at jelly soil top take to establish template to notice to adopt certain of prevention measure.4.Temperature crack and preventionTemperature crack much the occurrence is in big surface or difference in temperature variety of the physical volume concrete compare the earth area of the concrete structure.Concrete after sprinkling to build, in the hardening the process, cement water turn a creation a great deal of of water turn hot, .(be the cement dosage is in the 350-550 kg/m 3, each sign square the rice concrete will release a calories of 17500-27500 kJ and make concrete internal thus the temperature rise to reach to 70 ℃or so even higher)Because the physical volume of concrete be more big, a great deal of of water turn hot accumulate at the concrete inner part but not easy send forth, cause inner part the temperature hoick, but the concrete surface spread hot more quick, so formation inside outside of bigger difference in temperature, the bigger difference in temperature result in inner part and exterior hot the degree of the bulge cold Suo dissimilarity, make concrete surface creation certain of pull should dint.When pull should dint exceed the anti- of concrete pull strength extreme limit, concrete surface meeting creation crack, this kind of crack much occurrence after the concrete under construction period.In the concrete of under construction be difference in temperature variety more big, perhaps is a concrete to be subjected to assault of cold wave etc., will cause concrete surface the temperature sharply descend, but creation constringency, surface constringency of the concrete be subjected to inner part concrete of control, creation very big of pull should dint but creation crack, this kind of crack usually just in more shallow scope of the concrete surface creation.The alignment of the temperature crack usually none settle regulation, big area structure the crack often maneuver interleave;The size bigger structure of the beam plank length, the crack run parallel with short side more;Thorough with pierce through sex of temperature crack general and short side direction parallelism or closeparallelism, crack along long side cent the segment appear, in the center more airtight.Crack width the size be different, be subjected to temperature variety influence more obvious, winter compare breadth, summer more narrow.The concrete temperature crack that the heat inflation cause is usually in the center the thick both ends be thin, but cold Suo crack of thick thin variety not too obvious.The emergence of the this kind crack will cause the rust eclipse of reinforcing bar, the carbonization of concrete, the anti- jelly which lower concrete melt, anti- tired and anti- Shen ability etc..Main prevention measure:One is as far as possible choose to use low hot or medium hot water mire, like mineral residue cement, powder ash from stove cement...etc..Two is a decrease cement dosage, cement dosage as far as possible the control is in the 450 kg/m 3 following.Three is to lower water ash ratio, water ash of the general concrete ratio control below 0.6.Four is improvement the bone anticipate class to go together with, the Chan add powder ash from stove or efficiently reduce water etc. to come to reduce cement dosage and lower water to turn hot.Five is an improvement concrete of mix blend to process a craft, lower sprinkle of concrete to build temperature.Six is the in addition that the Chan add a have of fixed amount to reduce water and increase Su, slow Ning etc. function in the concrete, improvement the concrete mix to match a thing of mobility, protect water, lower water to turn hot, postpone hot Feng of emergence time.Seven is the heat season sprinkle to build can the adoption take to establish to hide sun plank etc. assistance measure control concrete of Wen Sheng, lower to sprinkle temperature of build the concrete.Eight is the temperature of big physical volume concrete should the dint relate to structure size, concrete structure size more big, temperature should dint more big, so want reasonable arrangement construction work preface, layering, cent the piece sprinkle to build, for the convenience of in spread hot, let up control.Nine is at great inner part constitution of the physical volume concrete cool off piping, cold water perhaps cold air cool off, let up concrete of inside outside difference in temperature.Ten is the supervision which strengthen concrete temperature, adopt to cool off in time, protection measure.11 is to reserve temperature constringency to sew.12 is to let up to control, sprinkle proper before building concrete in the Ji rock and old concrete top build a 5 mm or so sand mat a layer or usage asphalt etc. materialTu2 Shua.13 is to strengthen concrete to protect, the concrete after sprinkle build use moist grass Lian in time, hemp slice's etc. overlay, and attention sprinkle water to protect, appropriate extension protect time, assurance the concrete surface be slow-moving cool off.At the cold season, concrete surface should constitution heat preservation measure, in order to prevent cold wave assault.14 is the allocation be a little amount in the concrete of reinforcing bar perhaps add fiber material concrete of temperature crack control at certain of scope inside.5.Crack and prevention that the chemical reaction causeAlkali bone's anticipating the crack that reaction crack and reinforcing bar rust eclipse cause is the most familiar in the reinforced concrete structure of because of chemical reaction but cause of crack.The concrete blend a future reunion creation some alkalescence ion, these ion with some activity the bone anticipate creation chemical reaction and absorb surroundings environment in of water but the physical volume enlarge, make concrete crisp loose, inflation open crack.In this kind of crack general emergence concrete structure usage period, once appear very difficult remediable, so should at under construction adopt valid the measure carry on prevention.Main of prevention measure:While being to choose to anticipate with the alkali activity small freestone bone.Two is the in addition which choose to use low lye mire with low alkali or have no alkali.Three is the Chan which choose to use accommodation with anticipate to repress an alkali bone to anticipate reaction.Because the concrete sprinkle to build, flap Dao bad perhaps is a reinforcing bar protection layer thinner, the harmful material get into concrete to make reinforcing bar creation rust eclipse, the reinforcing bar physical volume of the rust eclipse inflation, cause concrete bulge crack, the crack of this kind type much is a crack lengthways, follow the position of reinforcing bar ually of prevent measure from have:One is assurance reinforcing bar protection the thickness of the layer.Two is a concrete class to go together with to want good.Three is a concrete to sprinkle to note and flap Dao airtight solid.Four is a reinforcing bar surface layer Tu2 Shua antisepsis coating.Crack processingThe emergence of the crack not only would influence structure of whole with just degree, return will cause the rust eclipse of reinforcing bar, acceleration concrete of carbonization, lower durable and anti- of concrete tired, anti- Shen ability.Therefore according to the property of crack and concrete circumstance we want differentiation to treat, in time processing, with assurance building of safety usage.The repair measure of the concrete crack is main to have the following some method:Surface repair method, infuse syrup, the Qian sew method, the structure reinforce a method, concrete displacement method, electricity chemistry protection method and imitate to living from heal method.Surface repair the method be a kind of simple, familiar of repair method, it main be applicable to stability and to structure loading the ability don't have the surface crack of influence and deep enter crack of processing.The processing measure that is usually is a surface in crack daubery cement syrup, the wreath oxygen gum mire or at concrete surface Tu2 Shua paint, asphalt etc. antisepsis material, at protection of in the meantime for keeping concrete from continue under the influence of various function to open crack, usually can adoption the surface in crack glue to stick glass fiber cloth etc. measure.1, infuse syrup, the Qian sew methodInfuse a syrup method main the concrete crack been applicable to have influence or have already defend Shen request to the structure whole of repair, it is make use of pressure equipments gum knot the material press into the crack of concrete, gum knot the material harden behind and concrete formation one be whole, thus reinforce of purpose.The in common use gum knot material has the cement the syrup, epoxy, A Ji C Xi sour ester and gather ammonia ester to equalize to learn material.The Qian sew a method is that the crack be a kind of most in common use method in, it usually is follow the crack dig slot, the Qian fill Su in the slot or rigid water material with attain closing crack of purpose.The in common use Su material has PVC gum mire, plastics ointment, the D Ji rubber etc.;In common use rigid water material is thepolymer cement sand syrup.2, the structure reinforce a methodWhen the crack influence arrive concrete structure of function, will consideration adopt to reinforce a method to carry on processing to the concrete structure.The structure reinforce medium in common use main have the following a few method:The piece of enlargement concrete structure in every aspect accumulate, outside the Cape department of the Gou piece pack type steel, adoption prepare should the dint method reinforce, glue to stick steel plate to reinforce, increase to establish fulcrum to reinforce and jet the concrete compensation reinforce.3, concrete displacement methodConcrete displacement method is processing severity damage concrete of a kind of valid method, this method be first will damage of the concrete pick and get rid of, then again displacement go into new of concrete or other material.The in common use displacement material have:Common concrete or the cement sand syrup, polymer or change sex polymer concrete or sand syrup.4, the electricity chemistry protection methodThe electricity chemistry antisepsis is to make use of infliction electric field in lie the quality of electricity chemical effect, change concrete or reinforced concrete the environment appearance of the place, the bluntness turn reinforcing bar to attain the purpose of antisepsis.Cathode protection method, chlorine salt's withdrawing a method, alkalescence to recover a method is a chemistry protection method in three kinds of in common use but valid method.The advantage of this kind of method is a protection method under the influence of environment factor smaller, apply reinforcing bar, concrete of long-term antisepsis, since can used for crack structure already can also used for new set up structure.5, imitate to living from legal moreImitate to living from heal the method be a kind of new crack treatment, its mimicry living creature organization secrete a certain material towards suffering wound part auto, but make the wound part heal of function, join some and special composition(such as contain to glue knot of the liquid Xin fiber or capsule) in the concrete of the traditionthe composition, at concrete inner part formation the intelligence type imitate to living from heal nerve network system, be the concrete appear crack secrete a parts of liquid Xin fiber can make the crack re- heal.ConclusionThe crack is widespread in the concrete structure existence of a kind of phenomenon, it of emergence not only will lower the anti- Shen of building ability, influence building of usage function, and will cause the rust eclipse of reinforcing bar, the carbonization of concrete, lower the durable of material, influence building of loading ability, so want to carry on to the concrete crack earnest research, differentiation treat, adoption reasonable of the method carry on processing, and at under construction adopt various valid of prevention measure to prevention crack of emergence and development, assurance building and Gou piece safety, stability work.From《CANADIAN JOURNAL OF CIVIL ENGINEERING》建筑施工混凝土裂缝的预防与处理混凝土的裂缝问题是一个普遍存在而又难于解决的工程实际问题,本文对混凝土工程中常见的一些裂缝问题进行了探讨分析,并针对具体情况提出了一些预防、处理措施。

相关文档
最新文档