建筑电气文献及外文翻译

合集下载

建筑电气外文文献

建筑电气外文文献

Increasing an individual’s quality of life via theirintelligent homeThe hypothesis of this project is: can an individual’s quality of life be increased by integrating ‚intelligent technology‛ into their home environment. This hypothesis is very broad, and hence the researchers will investigate it with regard to various, potentially over-lapping, sub-sections of the population. In particular, the project will focus on sub-sections with health-care needs, because it is believed that these sub-sections will receive the greatest benefit from this enhanced approach to housing. Two research questions flow from this hypothesis: what are the health-care issues that could be improved via ‚intelligent housing‛, and what are the technological issues needing to be solved to allow ‚intelligent housing‛ to be constructed? While a small number of initiatives exist, outside Canada, which claim to investigate this area, none has the global vision of this area. Work tends to be in small areas with only a limited idea of how the individual pieces contribute towards a greater goal. This project has a very strong sense of what it is trying to attempt, and believes that without this global direction the other initiatives will fail to address the large important issues described within various parts of this proposal, and that with the correct global direction the sum of the parts will produce much greater rewards than the individual components. This new field has many parallels with the fieldof business process engineering, where many products fail due to only considering a sub-set of the issues, typically the technology subset. Successful projects and implementations only started flow when people started to realize that a holistic approach was essential. This holistic requirement also applies to the field of ‚smart housing‛; if we genuinely want it to have benefit to the community rather than just technological interest. Having said this, much of the work outlined below is extremely important and contains a great deal of novelty within their individual topics.Health-Care and Supportive housing:To date, there has been little coordinated research on how ‚smart house‛ technologies can assist frail seniors in remaining at home, and/or reduce the costs experienced by their informal caregivers. Thus, the purpose of the proposed research is to determine the usefulness of a variety of residential technologies in helping seniors maintain their independence and in helping caregivers sustain their caring activities.The overall design of the research is to focus on two groups of seniors. The first is seniors who are being discharged from an acute care setting with the potential for reduced ability to remain independent. An example is seniors who have had hip replacement surgery. This group may benefit from technologies that would help them become adapted to their reduced mobility. The second is seniors who have a chronic health problem suchas dementia and who are receiving assistance from an informal caregiver living at a distance. Informal caregivers living at a distance from the cared-for senior are at high risk of caregiver burnout. Monitoring the cared-for senior for health and safety is one of the important tasks done by such caregivers. Devices such as floor sensors (to determine whether the senior has fallen) and access controls to ensure safety from intruders or to indicate elopement by a senior with dementia could reduce caregiver time spent commuting to monitor the senior.For both samples, trials would consist of extended periods of residence within the ‘smart house’. Samples of seniors being discharged from acute care would be recruited from acute care hospitals. Samples of seniors being cared for by informal caregivers at a distance could be recruited through dementia diagnosis clinics or through request from caregivers for respite.Limited amounts of clinical and health service research has been conducted upon seniors (with complex health problems) in controlled environments such as that represented by the ‚smart house‛. For example, it is known that night vision of the aged is poor but there is very little information regarding the optimum level of lighting after wakening or for night activities. Falling is a major issue for older persons; and it results in injuries, disabilities and additional health care costs. For those with dementing illnesses, safety is the key issue during performanceof the activities of daily living (ADL). It is vital for us to be able to monitor where patients would fall during ADL. Patients and caregivers activities would be monitored and data will be collected in the following conditions.Projects would concentrate on sub-populations, with a view to collecting scientific data about their conditions and the impact of technology upon their life styles. For example:-Persons with stable chronic disability following a stroke and their caregivers: to research optimum models, types and location of various sensors for such patients (these patients may have neglect, hemiplegia, aphasia and judgment problems); to research pattern of movements during the ambulation, use of wheel chairs or canes on various type of floor material; to research caregivers support through e-health technology; to monitor frequencies and location of the falls; to evaluate the value of smart appliances for stroke patients and caregivers; to evaluate information and communication technology set up for Tele-homecare; to evaluate technology interface for Tele-homecare staff and clients; to evaluate the most effective way of lighting the various part of the house; to modify or develop new technology to enhance comfort and convenience of stroke patients and caregivers; to evaluate the value of surveillance systems in assisting caregivers.- Persons with Alzheimer’s disease and their caregivers: to evaluate theeffect of smart house (unfamiliar environment) on their ability to conduct self-care with and without prompting; to evaluate their ability to use unfamiliar equipment in the smart house; to evaluate and monitor persons with Alzheimer’s disease movement pattern; to evaluate and monitor falls or wandering; to evaluate the type and model of sensors to monitor patients; to evaluate the effect of wall color for patients and care givers; to evaluate the value of proper lighting.Technology - Ubiquitous Computing:The ubiquitous computing infrastructure is viewed as the backbone of the ‚intelligence‛ within the house. In common with all ubiquitous computing systems, the primary components with this system will be: the array of sensors, the communication infrastructure and the software control (based upon software agents) infrastructure. Again, it is considered essential that this topic is investigated holistically. Sensor design: The focus of research here will be development of (micro)-sensors and sensor arrays using smart materials, e.g. piezoelectric materials, magneto strictive materials and shape memory alloys (SMAs). In particular, SMAs are a class of smart materials that are attractive candidates for sensing and actuating applications primarily because of their extraordinarily high work output/volume ratio compared to other smart materials. SMAs undergo a solid-solid phase transformation when subjected to an appropriate regime of mechanical andthermal load, resulting in a macroscopic change in dimensions and shape; this change is recoverable by reversing the thermo mechanical loading and is known as a one-way shape memory effect. Due to this material feature, SMAs can be used as both a sensor and an actuator. A very recent development is an effort to incorporate SMAs in micro-electromechanical systems (MEMS) so that these materials can be used as integral parts of micro-sensors and actuators.MEMS are an area of activity where some of the technology is mature enough for possible commercial applications to emerge. Some examples are micro-chemical analyzers, humidity and pressure sensors, MEMS for flow control, synthetic jet actuators and optical MEMS (for the next generation internet). Incorporating SMAs in MEMS is a relatively new effort in the research community; to the best of our knowledge, only one group (Prof. Greg Carman, Mechanical Engineering, University of California, Los Angeles) has successfully demonstrated the dynamic properties of SMA-based MEMS. Here, the focus will be to harness the sensing and actuation capabilities of smart materials to design and fabricate useful and economically viable micro-sensors and actuators.Communications: Construction and use of an ‚intelligent house‛ offers extensive opportunities to analyze and verify the operation of wireless and wired home-based communication services. While some of these are already widely explored, many of the issues have received little or noattention. It is proposed to investigate the following issues:-Measurement of channel statistics in a residential environment: knowledge of the indoor wireless channel statistics is critical for enabling the design of efficient transmitters and receivers, as well as determining appropriate levels of signal power, data transfer rates, modulation techniques, and error control codes for the wireless links.Interference, channel distortion, and spectral limitations that arises as a result of equipment for the disabled (wheelchairs, IV stands, monitoring equipment, etc.) is of particular interest.-Design, analysis, and verification of enhanced antennas for indoor wireless communications. Indoor wireless communications present the need for compact and rugged antennas. New antenna designs, optimized for desired data rates, frequency of operation, and spatial requirements, could be considered.-Verification and analysis of operation of indoor wireless networks: wireless networking standards for home automation have recently been commercialized. Integration of one or more of these systems into the smart house would provide the opportunity to verify the operation of these systems, examine their limitations, and determine whether the standards are over-designed to meet typical requirements.-Determination of effective communications wiring plans for ‚smart homes.‛: there exist performance/cost tradeoffs regarding wired andwireless infrastructure. Measurement and analysis of various wireless network configurations will allow for determination of appropriate network designs.-Consideration of coordinating indoor communication systems with larger-scale communication systems: indoor wireless networks are local to the vicinity of the residence. There exist broader-scale networks, such as the cellular telephone network, fixed wireless networks, and satellite-based communication networks. The viability and usefulness of compatibility between these services for the purposes of health-care monitoring, the tracking of dementia patients, etc needs to be considered.Software Agents and their Engineering: An embedded-agent can be considered the equivalent of supplying a friendly expert with a product. Embedded-agents for Intelligent Buildings pose a number of challenges both at the level of the design methodology as well as the resulting detailed implementation. Projects in this area will include:-Architectures for large-scale agent systems for human inhabited environment: successful deployment of agent technology in residential/extended care environments requires the design of new architectures for these systems. A suitable architecture should be simple and flexible to provide efficient agent operation in real time.At the same time, it should be hierarchical and rigid to allowenforcement of rules and restrictions ensuring safety of the inhabitants of the building system. These contradictory requirements have to be resolved by designing a new architecture that will be shared by all agents in the system.-Robust Decision and Control Structures for Learning Agents: to achieve life-long learning abilities, the agents need to be equipped with powerful mechanisms for learning and adaptation. Isolated use of some traditional learning systems is not possible due to high-expected lifespan of these agents. We intend to develop hybrid learning systems combining several learning and representation techniques in an emergent fashion. Such systems will apply different approaches based on their own maturity and on the amount of change necessary to adapt to a new situation or learn new behaviors. To cope with high levels of non-determinism (from such sources as interaction with unpredictable human users), robust behaviors will be designed and implemented capable of dealing with different types of uncertainty(e.g. probabilistic and fuzzy uncertainty) using advanced techniquesfor sensory and data fusion, and inference mechanisms based on techniques of computational intelligence.-Automatic modeling of real-world objects, including individual householders: The problems here are: ‚the locating and extracting‛of information essential for representation of personality and habitsof an individual; development of systems that ‚follow and adopt to‛individual’s mood and behavior. The solutions, based on data mining and evolutionary techniques, will utilize: (1) clustering methods, classification tress and association discovery techniques for the classification and partition of important relationships among different attributes for various features belonging to an individual, this is an essential element in finding behavioral patterns of an individual; and (2) neuro-fuzzy and rule-based systems with learning and adaptation capabilities used to develop models of an individual’s characteristics, this is essential for estimation and prediction of potential activities and forward planning.-Investigation of framework characteristics for ubiquitous computing: Consider distributed and internet-based systems, which perhaps have the most in common with ubiquitous computing, here again, the largest impact is not from specific software engineering processes, but is from available software frameworks or ‘toolkits’, which allow the rapid construction and deployment of many of the systems in these areas.Hence, it is proposed that the construction of the ubiquitous computing infrastructure for the ‚smart house‛ should also be utilized as a software engineering study. Researchers would start by visiting the few genuine ubiquitous computing systems in existence today, to try to build up an initial picture of the functionality of the framework.(This approach has obviously parallels with the approach of Gamma, Helm, Johnson and Vlissides deployed for their groundbreaking work on ‚design patterns‛. Unfortunately, in comparison to their work, the sample size here will be extremely small, and hence, additional work will be required to produce reliable answers.) This initial framework will subsequently be used as the basis of the smart house’s software system. Undoubtedly, this initial framework will substantially evolve during the construction of the system, as the requirements of ubiquitous computing environment unfold. It is believed that such close involvement in the construction of a system is a necessary component in producing a truly useful and reliable artifact. By the end of the construction phase, it is expected to produce a stable framework, which can demonstrate that a large number of essential characteristics (or patterns) have been found for ubiquitous computing.-Validation and Verification (V&V) issues for ubiquitous computing: it is hoped that the house will provide a test-bed for investigating validation and verification (V&V) issues for ubiquitous computing. The house will be used as an assessment vehicle to determine which, if any, V&V techniques, tools or approaches are useful within this environment.Further, it is planned to make this trial facility available to researchers worldwide to increase the use of this vehicle. In thelong-term, it is expected that the facilities offered by this infrastructure will evolve into an internationally recognized ‚benchmarking‛ site for V&V activities in ubiquitous computing. Other technological areas:The project also plans to investigate a number of additional areas, such as lighting systems, security systems, heating, ventilation and air conditioning, etc. For example, with regard to energy efficiency, the project currently anticipates undertaking two studies:-The Determination of the effectiveness of insulating shutters: Exterior insulating shutters over time are not effective because of sealing problems. Interior shutters are superior and could be used to help reduce heat losses. However, their movement and positioning needs appropriate control to prevent window breakage due to thermal shock. The initiation of an opening or closing cycle would be based on measured exterior light levels; current internal heating levels;current and expected use of the house by the current inhabitants, etc. - A comparison of energy generation alternatives: The energy use patterns can easily be monitored by instrumenting each appliance.Natural gas and electricity are natural choices for the main energy supply. The conversion of the chemical energy in the fuel to heat space and warm water can be done by conventional means or by use ofa total energy system such as a Volvo Penta system. With this system,the fuel is used to power a small internal combustion engine, which in turn drives a generator for electrical energy production. Waste heat from the coolant and the exhaust are used to heat water for domestic use and space heating. Excess electricity is fed back into the power grid or stored in batteries. At a future date, it is planned to substitute a fuel cell for the total energy system allowing for a direct comparison of the performance of two advanced systems.。

(完整版)建筑电气文献及外文翻译

(完整版)建筑电气文献及外文翻译

建筑电气电气工程设计包括两个主要的设计方面。

主要是一部分的电能的转换及分配和电力的供配、照明系统、防雷接地系统。

一般来说,建筑主要的变化包括:高压和低压配电系统、变压器、备用电源系统。

电力系统包括配电和控制,室内和室外照明系统包括所有类型的照明,防雷系统包括入侵波防护、闪电传感器、接地、等电位连接和局部等电位连接等。

辅助等电位连接等。

在短短的20年里,系统在技术和产品的面貌发生了翻天覆地的变化。

许多的设计理念也发生了巨大的变化。

开关设备如高压系统的第一个断路器油断路器,后来油断路器的逐步发展,不仅规模大,但是一般都包含油物质。

由于开关设备尺寸较大,我们还必须建立独立的设备房间,占据了大量的建筑面积。

现在真空断路器和六氟化硫断路器,不仅体积小,而且短路容量大,外壳尺寸远小于原来的橱柜,并且断路器没有任何油,防火性能大大提高。

而且断路器和其他低压设备在一个房间里,这样即节省空间又方便管理。

过去大容量的低压断路器,短路电流容量逐渐变大,规模也逐渐变小,而且更加稳定,使系统运行更加安全可靠,为设计带来了方便。

向着智能化低压断路器方向发展,断路器各种参数可以通过总线工业控制,信号直接传输到计算机。

干式变压器的出现,对建筑电气设计带来了极大的方便,因为没有变压器油泄漏和火灾的可能性,以便它可以很容易地安装在建筑本身,甚至直接到负荷中心。

它还消除变压器对油的需求限制,构建大容量设备时可以使用干式变压器。

在实际工程设计中曾应用四个台湾2500kVA干式变压器。

在使用紧急发电机方面,从性能和尺寸的角度来看,比过去进步很多。

除了使用柴油发电机;应急照明使用EPS备用电源;中断供电在一个毫秒以内的设备,可以使用UPS。

电力设备的控制从单一元件的控制到控制继电器控制变化。

除了更好的性能的各种组件的规模较小,也降低控制箱的规模。

由于数字技术更多的运用于控制能达到最佳的控制状态来控制设备。

进一步提高了节能的效果。

照明系统从过去单一光源、灯具和低效率的状态向更广泛的前景发展。

3-电气工程及其自动化专业 外文文献 英文文献 外文翻译 plc方面

3-电气工程及其自动化专业 外文文献 英文文献 外文翻译 plc方面

1、外文原文(复印件)A: Fundamentals of Single-chip MicrocomputerTh e si ng le-ch i p mi cr oc om pu ter is t he c ul mi nat i on o f bo th t h e d ev el op me nt o f th e d ig it al com p ut er an d t he int e gr at ed ci rc ui ta r gu ab ly th e t ow m os t s i gn if ic ant i nv en ti on s o f t h e 20t h c en tu ry[1].Th es e to w typ e s of a rc hi te ctu r e ar e fo un d i n s in gl e-ch ip m i cr oc om pu te r. So m e em pl oy t he sp l it p ro gr am/d ata me mo ry o f th e H a rv ar d ar ch it ect u re, sh ow n in Fi g.3-5A-1, o th ers fo ll ow t hep h il os op hy, wi del y a da pt ed f or ge n er al-p ur po se co m pu te rs a ndm i cr op ro ce ss or s, of ma ki ng no lo gi c al di st in ct io n be tw ee n p ro gr am a n d da ta m em or y a s i n th e Pr in cet o n ar ch it ec tu re,sh ow n inF i g.3-5A-2.In g en er al te r ms a s in gl e-chi p m ic ro co mp ut er i sc h ar ac te ri zed b y the i nc or po ra tio n of al l t he uni t s o f a co mp ut er i n to a s in gl e dev i ce, as s ho wn in Fi g3-5A-3.Fig.3-5A-1 A Harvard typeFig.3-5A-2. A conventional Princeton computerFig3-5A-3. Principal features of a microcomputerRead only memory (ROM).R OM i s u su al ly f or th e p er ma ne nt,n o n-vo la ti le s tor a ge o f an a pp lic a ti on s pr og ra m .M an ym i cr oc om pu te rs an d mi cr oc on tr ol le r s a re in t en de d fo r h ig h-v ol ume a p pl ic at io ns a nd h en ce t he e co nom i ca l ma nu fa ct ure of t he d ev ic es r e qu ir es t ha t the co nt en ts o f the pr og ra m me mo ry b e co mm it te dp e rm an en tl y d ur in g th e m an uf ac tu re o f c hi ps . Cl ear l y, th is im pl ie sa ri g or ou s a pp roa c h t o R OM co de d e ve lo pm en t s in ce c ha ng es ca nn otb e m ad e af te r man u fa ct ur e .T hi s d e ve lo pm en t pr oce s s ma y in vo lv e e m ul at io n us in g a s op hi st ic at ed deve lo pm en t sy st em w i th a ha rd wa re e m ul at io n ca pa bil i ty a s we ll a s th e u se of po we rf ul so ft wa re t oo ls.So me m an uf act u re rs p ro vi de ad d it io na l RO M opt i on s byi n cl ud in g i n th ei r ra ng e de vi ce s wi th (or i nt en de d fo r us e wi th) u s er pr og ra mm ab le m em or y. Th e s im p le st of th es e i s us ua ll y d ev ice w h ic h ca n op er ate in a m ic ro pr oce s so r mo de b y usi n g so me o f th e i n pu t/ou tp ut li ne s as a n ad dr es s an d da ta b us f or acc e ss in g e x t er na l m e mo ry. T hi s t ype o f d ev ic e c an b e ha ve fu nc ti on al l y a s t he si ng le c h ip mi cr oc om pu te r fr om wh ic h i t i s de ri ve d a lb eit w it h r es tr ic ted I/O an d a mo di fie d e xt er na l ci rcu i t. T he u se o f t h es e RO Ml es sd e vi ce s is c om mo n e ve n in p ro du ct io n c ir cu it s wh er e t h e v ol um e do es n o t ju st if y th e d e ve lo pm en t co sts of c us to m on-ch i p RO M[2];t he re c a n st il l b e a si g ni fi ca nt s a vi ng in I/O a nd ot he r c hi ps co mp ar ed t o a c on ve nt io nal mi cr op ro ce ss or b as ed c ir cu it. M o re e xa ctr e pl ac em en t fo r RO M d ev ic es c an b e o bt ai ne d in t he f o rm o f va ri an ts w i th 'pi gg y-ba ck'EP RO M(Er as ab le p ro gr am ma bl e ROM)s oc ke ts o rd e vi ce s w it h EP ROM i ns te ad o f R OM 。

毕业论文外文翻译-高层建筑供配电系统设计

毕业论文外文翻译-高层建筑供配电系统设计

毕业论文外文翻译-高层建筑供配电系统设计Design of Power Supply and Distribution System for High-rise BuildingsAbstractPower supply and distribution system is the lifeline of high-rise buildings. The design of power supply and distribution system is based on the characteristics of high-rise buildings, which requires not only reliable supply of power, but also the safety of electricity utilization and efficient energy consumption. In this paper, the design of power supply and distribution system for high-rise buildings is discussed, focusing on the selection of power supply mode, the design of power distribution system, the design of grounding system, the selection of electrical equipment and the design of lightning protection system. The application of advanced technologies such as distributed power supply, energy management and control system, and intelligent electrical equipment can improve the energy efficiency and utilization of high-rise buildings, reduce energy consumption and carbon emissions, and promote the development of green buildings.Keywords: high-rise buildings; power supply and distribution system; energy efficiency; green buildingsIntroductionHigh-rise buildings are an important symbol of urban development and represent the trend of modern architecture. With the continuous improvement of people’s living standards, the demand for high-rise buildings is increasing. Power supply and distribution system is an essential part of high-rise buildings, which plays a crucial role in the operation and maintenance of buildings. The design of power supply and distribution system for high-rise buildings needs to consider many factors, such as technical performance, safety and reliability, energy efficiency, economic benefits and environmental protection, etc. In recent years, with the rapid development of new energy and advanced technology, the design of power supply and distribution system for high-rise buildings has undergone significant changes, which focus on improving energy efficiency and reducing emissions. This paper analyzes the design of power supply and distribution system for high-rise buildings, summarizes the selection principles and design methods of various systems, and explores the application of new technologies to improve energy efficiency and promote the development of green buildings.1. Selection of Power Supply ModeThe power supply mode is the basic foundation of power supply and distribution system of high-rise buildings. In the selection of power supply mode, it is necessary to consider the characteristics of the building and the surrounding environment, and ensure the reliability and safety of power supply. Currently, the main power supply modes for high-rise buildings are grid-connected power supply and distributed power supply.1.1 Grid-connected Power SupplyGrid-connected power supply is a traditional power supply mode, which is widely used in high-rise buildings. It has the advantages of reliable power supply, convenient operation and maintenance, and stable voltage and frequency. However, grid-connected power supply is vulnerable to natural disasters such as typhoons and earthquakes, and may cause power outages, which will affect the normal life and work of residents. Moreover, the development of distribution network is limited by the capacity of the grid, which may cause overloaded operation and reduce the energy efficiency of high-rise buildings.1.2 Distributed Power SupplyDistributed power supply is a new power supply mode, which can improve the energy efficiency of high-rise buildings and reduce the dependence on the grid. Distributed power supply includes combined heat and power (CHP), solar power, wind power and other renewable energy sources. CHP is a highly efficient power generation technology, which can generate electricity and heat at the same time, and utilize the waste heat for air conditioning and domestic hot water. Solar power and wind power are clean energy sources, which have the advantages of zero emissions and long service life. Distributed power supply can reduce the transmission and distribution losses of power supply, and improve the energy efficiency of high-rise buildings. However, the initial investment of distributed power supply is relatively high, and the technical level of electrical equipment and maintenance management is demanding.2. Design of Power Distribution SystemThe power distribution system is responsible for the power transmission and distribution of high-rise buildings, which should ensure the safety and reliability of the power supply. The design of power distribution system includes the selection of power distribution equipment, the layout of power distribution room, and the calculation of power load.2.1 Selection of Power Distribution EquipmentThe selection of power distribution equipment should meet the requirements of technical performance, safety and reliability, and energy efficiency. The main power distribution equipment includes switchgear, transformer, busbar, distribution panel, etc. The switchgear should have the function of over-current protection, short-circuit protection and earth leakage protection, and should have the advantages of small volume, low noise and high reliability. The transformer should be selected according to the capacity and voltage level, and should have the advantages of low loss, high efficiency and small size. The busbar should have the advantages of high strength, good conductivity and low resistance. The distribution panel should have the functions of metering, control, protection and communication, and should be easy to operate and maintain.2.2 Layout of Power Distribution RoomThe layout of power distribution room should be reasonable and convenient for operation and maintenance. The power distribution room should be located near the power supply entrance, and should have the advantages of good ventilation, dry, clean and spacious. The power distribution room should be equipped with the necessary security measures, such as fire prevention, explosion-proof, and lightning protection.2.3 Calculation of Power LoadThe calculation of power load is the key to the design of power distribution system. The power load includes lighting load, air conditioning load, power load and special load, etc. The calculation of power load should take into account the diversity of load, the possibility of peak load, and the capacity of power supply equipment. The primary consideration is to ensure the safety and reliability of power supply, and then to improve the energy efficiency of power utilization.3. Design of Grounding SystemThe grounding system is an important safety measure for high-rise buildings. The design of grounding system should meet the requirements of electrical safety and electrostatic discharge protection.3.1 Electrical SafetyThe grounding system should have the functions of lightning protection, over-voltage protection, over-current protection and earth leakage protection, etc. The grounding resistance should be less than the specified value, and the grounding wire should have good conductivity and corrosion resistance. The grounding system should be comprehensively tested and maintained regularly.3.2 Electrostatic Discharge ProtectionThe electrostatic discharge protection is to prevent the accumulation of static electricity and the damage of electrical equipment. The design of electrostatic discharge protection includes the selection of anti-static grounding material, the setting of anti-static floor, and the installation of anti-static equipment. The electrostatic discharge protection is especially important for data centers and sensitive electrical equipment.4. Selection of Electrical EquipmentThe selection of electrical equipment is an important part of the design of power supply and distribution system for high-rise buildings. The selection of electrical equipment should meet the requirements of technical performance, safety and reliability, environmental protection and energy efficiency.4.1 Technical PerformanceThe electrical equipment should meet the relevant national and international standards, and have the characteristics of high efficiency, low noise, long service life and easy maintenance. The electrical equipment should have the functions of protection, control, measurement and communication, and should be compatible with the automation system.4.2 Safety and ReliabilityThe electrical equipment should have the functions of over-current protection, short-circuit protection, ground connection protection and lightning protection, etc. The electrical equipment should be installed and maintained by qualified personnel, and should be tested and checked regularly to ensure the safety and reliability of power supply and distribution system.4.3 Environmental Protection and Energy EfficiencyThe electrical equipment should have the advantages of environmental protection and energy efficiency, and should meet the requirements of green building standards. The electrical equipment should have the functions of power monitoring, energy management and control, and should be able to optimize the energy utilization and reduce the energy consumption.5. Design of Lightning Protection SystemThe lightning protection system is an important safety measure for high-rise buildings, which can prevent the damage of lightning to electrical equipment and human life. The design of lightning protection system includes the selection of lightning protection device, the installation of lightning rod, the connection of grounding wire, and the calculation of lightning protection zone.5.1 Selection of Lightning Protection DeviceThe lightning protection device should have the functions of lightning protection, over-voltage protection, surge protection and electromagnetic pulse protection, etc. The lightning protection device should be reliable and durable, and should meet the relevant national and international standards.5.2 Installation of Lightning RodThe lightning rod should be installed on the roof of high-rise buildings, and should be connected with the grounding system. The lightning rod should be placed in a high position, and should be made of light and strong materials, such as aluminum alloy or stainless steel. The lightning rod should be inspected regularly to ensure its effectiveness.5.3 Connection of Grounding WireThe grounding wire should be connected with the lightning rod, the grounding system, and the electrical equipment. The grounding wire should have the advantages of low resistance, good conductivity and corrosion resistance. The grounding wire should be tested and checked regularly to ensure its effectiveness.5.4 Calculation of Lightning Protection ZoneThe calculation of lightning protection zone is the basis for the design of lightning protection system. The lightning protection zone includes the direct lightning strike zone and the induced lightning zone. The direct lightning strike zone is the area covered by the lightning rod, and the induced lightning zone is the area beyond the direct lightning strike zone. The calculation of lightning protection zone should consider the characteristics of lightning, such as the stroke current, the distance from the lightning source, and the soil resistivity.ConclusionThe design of power supply and distribution system for high-rise buildings is a complex and important work. The selection of power supply mode, the design of power distribution system, the design of grounding system, the selection of electrical equipment, and the design of lightning protection system are the main aspects of the design of power supply and distribution system. The application of advanced technologies such as distributed power supply, energy management and control system, and intelligent electrical equipment can improve the energy efficiency and utilization of high-rise buildings, reduce energy consumption and carbon emissions, and promote the development of green buildings. The design of power supply and distribution system for high-rise buildings should adhere to the principles of safety, reliability, energy efficiency, economic benefits and environmental protection, and strive to create a better living and working space for residents.。

电气毕业设计英文文献及翻译——智能建筑中火灾探测系统的发展

电气毕业设计英文文献及翻译——智能建筑中火灾探测系统的发展

附录一:中文翻译智能建筑中火灾探测系统的发展Z.刘,学者马卡尔和A.K.光金建筑研究协会加拿大国家研究委员会,电子邮件:******************摘要火灾探测和其相应的安全系统是智能建筑的关键部分。

本文论述了火灾探测及报警系统在智能建筑中最新的发展趋势。

新的技术和概念在智能建筑中的开发,例如先进的多功能传感器,计算机视觉系统和无线传感器通过因特网实时控制,对综合服务体系建设同时也进行了审查和讨论。

这些新技术和概念将提高火灾探测系统对区分火和非火威胁的能力并且将增加更多有效的时间进行生命财产保护。

然而,仍然需要许多的努力去消除这些新技术进一步发展所遇到的障碍。

简介智能建筑可以被定义为一个结合了最佳概念,设计,材料,系统和技术,可以提供快速响应,有效的可支持智能的环境,为实现以上目标所具有充分生命跨度的建筑[1-6]。

与传统建筑相比,智能建筑能够减少能源消耗,减少维修和服务操作的成本,提供更好的安全服务,改进易用的布局规划和重新规划,并增加了建设占用的满意度[4-7]。

其他好处还包括对提供更安全,更健康,更舒适的工作条件和环保成效和不断变化的用途、技术的适应。

智能建筑的支持者还认为这些建筑物将通过改善工作环境来提高员工的生产能力。

在过去二十年来,智能建筑的概念在许多新的或扩建办公室的规划中已成为一个重要的参考因素[3-6]。

这也进一步发展到涵盖了其他类型的居住与工作环境,如家庭,工厂和教育设施环境。

火灾探测和相应的安全系统是智能化建筑的关键部分。

在每年的安装和维护建筑中火灾探测系统要花费数十亿美元,以确保来自避免不了的火灾的安全[8]。

智能建筑中智能系统的发展为使完成这项任务更有效,更高效,更经济提供了机会。

新型传感器将生产的更早,提供更可靠的消防检测。

无线系统将消除对布线的需要并为消防人员在到达火灾现场之前提供机会去制定灭火策略。

综合建筑系统会减少误报的可能性,提升建筑疏散和协助灭火的速度。

电气工程及其自动化专业外文文献英文文献外文翻译方面

电气工程及其自动化专业外文文献英文文献外文翻译方面

1、 外文原文(复印件)A: Fundamentals of Single-chip MicrocomputerT h e sin gle -ch ip mi c ro co m p u t e r is t h e cu lm in at io n of b ot h t h e d e ve lo p me nt of t h e d ig ita l co m p u t e r a n d t h e i nte g rated c ircu it a rgu ab l y t h e to w mo st s ign if i cant i nve nt i o n s of t h e 20t h c e nt u ry [1].T h ese to w t yp e s of arch ite ct u re are fo u n d in s in gle -ch ip m i cro co m p u te r. S o m e e mp l oy t h e sp l it p ro gra m /d at a m e m o r y of t h e H a r va rd arch ite ct u re , s h o wn in -5A , ot h e rs fo l lo w t h e p h i lo so p hy, wid e l y ad a p ted fo r ge n e ral -p u rp o se co m p u te rs an d m i cro p ro ce ss o rs , of m a kin g n o l o g i ca l d i st in ct i o n b et we e n p ro gra m an d d ata m e m o r y as in t h e P rin c eto n a rch ite ct u re , sh o wn in -5A.In ge n e ra l te r m s a s in g le -ch ip m ic ro co m p u t e r is ch a ra cte r ized b y t h e in co r p o rat io n of all t h e u n its of a co mp u te r into a s in gle d e vi ce , as s h o w n in F i g3-5A-3.-5A-1A Harvard type-5A. A conventional Princeton computerProgrammemory Datamemory CPU Input& Output unitmemoryCPU Input& Output unitResetInterruptsPowerFig3-5A-3. Principal features of a microcomputerRead only memory (ROM).RO M is u su a l l y fo r t h e p e r m an e nt , n o n -vo lat i le sto rage of an ap p l i cat io n s p ro g ram .M a ny m i c ro co m p u te rs a n d m i cro co nt ro l le rs are inte n d ed fo r h i gh -vo lu m e ap p l i cat io n s a n d h e n ce t h e e co n o m i cal man u fa c t u re of t h e d e vi ces re q u ires t h at t h e co nt e nts of t h e p ro gra m me mo r y b e co mm i ed p e r m a n e nt l y d u r in g t h e m a n u fa ct u re of c h ip s . C lea rl y, t h i s imp l ies a r i go ro u s ap p ro a ch to ROM co d e d e ve lo p m e nt s in ce ch an ges can n o t b e mad e af te r m an u fa ct u re .T h i s d e ve l o p m e nt p ro ces s m ay i nvo l ve e mu l at i o n u sin g a so p h ist icated d e ve lo p m e nt syste m wit h a h ard wa re e mu l at i o n capab i l it y as we ll as t h e u s e of p o we rf u l sof t war e to o l s.So m e m an u fa ct u re rs p ro vi d e ad d it i o n a l ROM o p t io n s b y in clu d in g in t h e i r ran ge d e v ic es w it h (o r inte n d ed fo r u s e wit h ) u se r p ro g ram m a b le m e mo r y. T h e s im p lest of t h e se i s u su a l l y d e v i ce wh i ch can o p e rat e in a m i cro p ro ce s so r mo d e b y u s in g s o m e of t h e in p u t /o u t p u t l in es as an ad d res s a n d d ata b u s fo r a cc es sin g exte rn a l m e m o r y. T h is t yp e o f d e vi ce can b e h ave f u n ct i o n al l y as t h e s in gle ch ip m i cro co m p u t e r f ro m wh i ch it i s d e ri ved a lb e it wit h re st r icted I/O an d a m o d if ied exte rn a l c ircu it. T h e u s e of t h e se RO M le ss d e vi ces i s co mmo n e ve n in p ro d u ct io n circu i ts wh e re t h e vo lu m e d o e s n ot ju st if y t h e d e ve lo p m e nt co sts of cu sto m o n -ch ip ROM [2];t h e re ca n st i ll b e a si gn if i cant sav in g in I/O an d o t h e r ch ip s co m pared to a External Timing components System clock Timer/ Counter Serial I/O Prarallel I/O RAM ROMCPUco nve nt io n al m i c ro p ro ces so r b ased circ u it. M o re exa ct re p l a ce m e nt fo rRO M d e v ice s can b e o b tain ed in t h e fo rm of va ria nts w it h 'p i g g y-b a c k'E P ROM(E rasab le p ro gramm ab le ROM )s o cket s o r d e v ice s w it h E P ROMin stead of ROM 。

电气外文文献-翻译

电气外文文献-翻译

Circuit breaker断路器Compressed air circuit breaker is a mechanical switch equipment, can be i 空气压缩断路器是一种机械开关设备,能够在n normal and special conditions breaking current (such as short circuit cur 正常和特殊情况下开断电流(比如说短路电流)。

rent). For example, air circuit breaker, oil circuit breaker, interference circ 例如空气断路器、油断路器,干扰电路的导体uit conductor for the application of the safety and reliability of the circuit 干扰电路的导体因该安全可靠的应用于其中,breaker, current in arc from is usually divided into the following grades: a 电流断路器按灭弧远离通常被分为如下等级:ir switch circuit breaker, oil circuit breaker, less oil circuit breaker, compr 空气开关断路器、油断路器、少油断路器、压缩空essed air circuit breaker, a degaussing of isolating switch, six sulfur hexaf 气断路器、具有消磁性质的隔离开关、六氟luoride circuit breaker and vacuum breaker. Their parameters of voltage, 化硫断路器和真空断路器。

他们的参数有电压等级、current, insulation level of breaking capacity, instantaneous voltage off ti 开断容量的电流、绝缘等级开断时间的瞬时电压恢复和me of recovery and a bombing. Breaker plate usually include: 1 the maxi 轰炸时间。

建筑电气外文文献

建筑电气外文文献

提高个人的生活质量,通过他们的智能家居该项目的假设是:可以增加一个人的生活质量的“智能技术”集成到他们的家庭环境。

这个假设是非常广泛的,因此,研究人员将调查它考虑到多方面的,潜在的过度研磨,分节的人口。

特别是,该项目将重点放在与卫生保健需求的环节,因为它认为,这些子章节将获得最大的受益于这种增强的方法住房。

两个研究问题流从这一假说:什么是保健,可以改善通过“智能住宅”的问题,什么是技术问题需要解决,让“智能住宅”建造?虽然存在少量的措施,在加拿大境外,据称这方面的调查,没有这方面的全球视野。

工作往往是在小围的各个部分是如何有助于实现更大的目标只有有限的想法。

这个项目有一个非常强烈的责任感,并认为,如果没有这一全球性的方向,其他措施将失败,以解决各部分的重要问题,而且正确的全局方向的总和的部分会产生更大的回报比的各个组成部分。

这个新的领域与业务流程工程领域,有许多相似之处,很多产品失败的原因只考虑一个子集的问题,通常是技术的子集。

成功的项目和实施才开始启动,当人们开始认识到,一个全面的方法是至关重要的。

这种整体性的要求也适用于领域的“聪明屋”,如果我们真的希望它有利益于社区,而不仅仅是技术的兴趣。

话虽如此,下面列出的大部分工作是非常重要的,在其个人的主题包含了大量新奇的。

医疗保健和保障性住房:至目前为止,很少有人协调,研究如何“聪明屋”的技术可以帮助体弱的老人留在家里,或降低成本所经历的非正式照顾者。

因此,建议研究的目的是确定帮助老年人保持自己的独立性和帮助照顾者维持他们的爱心活动中的各种住宅技术的实用性。

整体设计的研究是集中在两个群体的老年人。

首先是老人出院急性护理环境的潜在能力下降,保持独立。

一个例子是有髋关节置换手术的老年人。

本集团可能会受益于技术,这将有助于他们成为适应他们的行动不便。

第二个是老年人有慢性健康问题,如老年痴呆症和接受援助的非正式护理员的生活在距离。

关心的高级生活的距离是非正式照顾者在照顾者的职业倦怠的高风险。

电气外文文献及翻译---高层建筑供配电系统设计 精品

电气外文文献及翻译---高层建筑供配电系统设计 精品

Power supply system of high-rise building designAbstract: With the continuous development of city size, more and more high-rise buildings, therefore, high-rise building electrical design to the designers had to face. In this paper, an engineering example, describes the electrical design of high-rise buildings and some of the more typical issues of universal significance, combined with the actual practice of an engineering solution to the problem described.Key words: high-rise building; electrical design; distribution; load calculation1 Project OverviewThe commercial complex project, with a total construction area of 405570m2, on the ground floor area of 272330m2, underground construction area of 133240m2, the main height of 99m. Project components are: two office buildings, construction area is 70800m2, 28 layers, the standard story is 3.2m.2 Load Calculation1) Load characteristics: electric load, much larger than the "national civil engineering technical measures" Large 120W/m2 indicators, especially in the electricity load more food, and different types of food and beverage catering different cultural backgrounds also high.2) the uncertainty of a large load, because the commercial real estate rents are often based on market demand, and constantly adjust the nature of the shops, making the load in the dynamic changes.3) There is no specification and technical measures in the different types of commercial projects refer to the detailed parameters of the shops, engineering design load calculation in the lack of data, in most cases to rely on staff with previous experience in engineering design calculations. Load the selection of parameters: for the above problems, the load calculation, the first developer of sales and good communication, to determine the form of layers of the forms and nature of floor area, which is calculated on the basis of electrical load basis; followed to determine parameter index within the unit area of shops is also very important and complex because there is no clear indicator of the specification can refer to; and different levels of economic development between cities is not balanced, power indices are also different; will be in the same city, different regions have different consumer groups .3) the need to factor in the choice: parameters determined, the need for load calculation. Need to factor commonly used method, the calculation will not repeat them. Need to explore is the need for coefficient selection, which in the current specifications, manuals and the "unified technical measures" is also not clear requirements, based on years of design experience that most end shops in the distribution or level within the household distribution box with case Kx generally take a while, in the calculation of the loop route to take 0.7 to 0.8, the distribution transformers in the substation calculations take 0.4 to 0.6.3 substations setLoad calculation based on the results of this project the total installed capacity of transformer 43400Kv.A, after repeated consultations with the power company, respectively, in the project innorthern, central and southern three sections set the three buildings into three power substations, 1 # set 6 sets 2500Kv.A transformer substation, take the northern section of power supply; 2 # 4 1600Kv.A transformer substations located, plus 6 sets 2000Kv.A transformers, take the middle of the power supply, in addition to 5 Taiwan 10Kv.A high-pressure water chillers (total 4000Kv.A); 3 # substation located 2 units plus 2 units 1000Kv.A 2000Kv.A transformers, take the southern section of A, B two office supply. 10Kv power configuration of this project into two points, each at the two 10Kv lines, the power company under the provisions of 10Kv power capacity: maximum load per channel is about to 11000Kv.A, two is the 22000Kv.A, design # 1 , 3 # combination of a substation 10Kv, power line, with a total capacity of 21000Kv.A; 2 # substation transformers and 10Kv, 10Kv chillers sharing a power line, with a total capacity of 22400Kv.A. The design of the substation layout, in addition to meeting regulatory requirements, it also need to consider the high-pressure cabinets, transformers and low voltage power supply cabinet by order of arrangement, especially in low voltage distribution cabinet to feed the cable smooth and easy inspection duty problems are not seriously consider the construction of the cable crossing will cause more long detour, a waste of floor space, and convenient inspections and other issues.4 small fire load power supplyIn the design of large commercial projects often encounter small fire load of electrical equipment and more dispersed distribution, if fed by a substation, a substation will be fed a lot of low-voltage low-current counter circuit breaking capacity circuit breaker and conductor of the dynamic and thermal stability in a certain extent. According to GB50045-1995 "fire protection design of tall buildings," rule "should be used in Fire Equipment dedicated power supply circuit, the power distribution equipment shall be provided with clear signs." Interpretation of the provisions of the power supply circuit means "from the low-voltage main distribution room (including the distribution of electrical room) to last a distribution box, and the general distribution lines should be strictly separated." In this design, the use of methods to increase the level of distribution, that is different from the substation bus segments, respectively, a fire fed a special circuit, set in place two distribution cabinets, distribution cabinets and then the resulting radial allocated to the end of the dual power to vote each box, so that not only meets the specification requirements for dedicated power supply circuit, but also to avoid feeding the substation level of many small current loop.5, the choice of circuit breaker and conductorCommercial real estate projects use the room as the uncertainty in the choice of circuit breakers and conductors must be considered in a certain margin to meet the needs caused by adjustment of the load changes. According to this characteristic, increased use in the design of the plug bus-powered, not only meet the requirements of large carrying capacity, and also allows the flexibility to increase supply and distribution, are reserved in each shaft in the plug-box backup in order to change, according to changes in upper and lower load, to adjust. For example: a bus is responsible for a shaft 1 to 3 layers of power, when a layer due to the change in capacity increases, while the 3-layer capacity is reduced, you can use a spare plug box layer off the 3-layer 1 layer capacity rationing . This level distribution in the substation, select the circuit breaker to choose the setting value when the circuit breaker to adjust to changes at the end to adjust the load setting value; in the bus and the transformer circuit breaker according to the choice of the general framework of values to select . For example: Route certain equipment capacity 530Kv, Kx take 0.7 to calculate current of 704A, select the frame circuit breaker is 1000A, tuning is 800A; currenttransformer for the 1000/50; bus carrying capacity for the 1000A, this road can meet the maximum 1000A current load requirements, even if there is adjustment, power distribution switches and circuit can not make big changes.6 layer distribution box setAccording to the division of layers of fire protection district, respectively numbered as A ~ K layers within the set level shaft for the retail lighting power distribution box, with one on one power supply shops in radial power. Should be noted that the forms of the complex layers of layers of fire partition, does not correspond to the lower, making some of shaft power in charge of the fire district at the same time, also responsible for the power supply adjacent to the fire district. At design time, using the principle of proximity, while also taking into account the burden of the whole trunk load conditions, so that each shaft as far as possible a more balanced load.7 public area distribution box setTaking into account the future needs of the business re-decoration of public areas must be reserved for power. Here the design needs to consider the following points: ①question of how much reserve power, lighting and electricity, which according to GB50034-2004"Architectural Lighting Design Standards" table of Article 6.1.3 and 6.1.8, commercial building lighting power density value, high-end supermarkets, business offices as 20W/m2, under the "decorative lighting included 50% of the total lighting power density calculation" requirements, using the reserved standard 40W/m2. ②In order to facilitate the decoration in each partition set fire lighting in public areas and emergency lighting distribution box distribution box, in order to identify the electrical power distribution decoration cut-off point.③the staircase, storage rooms and other parts of the decoration does not need to do, set the power distribution circuit or a separate distribution box, try not to be reserved from the public area of electricity distribution board fed hardcover out.④control of lighting in public areas, the majority in two ways, namely, C-BUS control system or the BA system, the use of C-BUS has the advantage of more flexible control, each road can be fed out of control, adjustable light control; shortcomings is a higher cost. BA system control advantages of using low cost, simple control; disadvantage is that the exchanges and contacts for the three-phase, three-way control may be related both to open, or both, in the decoration of the contacts required to feed the power supply circuit diverge to avoid failure blackouts.Design of distribution box 8In the commercial real estate design, shop design is often only a meter box, and outlet route back to the needs of the user according to their second design, but the shops are difficult to resolve within the power supply fan coil units, air-conditioning system as a whole can not debug. The project approach is to add a circuit breaker in the meter box for the coil power supply, another way for users to use the second design, as shown below.User distribution box design9 distribution cabinet / box number and distribution circuitsLarge-scale projects are often low voltage distribution cabinet / box number, low-voltage circuits to feed the more often there will be cabinet / box number and line number duplication, resulting in the design and the future looks difficult maintenance and overhaul. The project has three 10Kv substations, 20 transformer, hundreds of low-voltage fed out of the closet, fed the circuit more. Accordance with the International Electrotechnical Commission (IEC) and the Chinese nationalstandard requirements: ①All the distribution number to be simple and clear, not too box and line numbers are not repeated. ②number to simple and clear, not too long. ③distinction between nature and type of load. ④law was easy to find, make viewer at a glance. Based on the above requirements and on the ground, fire district and the underground construction industry form the different conditions, using two slightly different ways. Essential for the underground garage, uses a single comparison, also relatively fire district neat, according to fire district number, such as AL-BL-1 / 1, AP and APE, the meaning of the letters and numbers: AL on behalf of lighting distribution (AP on behalf of Power distribution box, APE on behalf of the emergency power distribution box); BI on behalf of the basement; 1 / 1 for partition 1, I fire box. Above ground is more complex, more fire district, and on the fire district does not correspond to the lower, according to shaft number is better, such as AL-1-A1, AP, and APE, letters and numbers mean: 1 represents a layer; A1 on behalf of A, No. 1 shaft fed a distribution box. Fed a low-voltage circuits, such as the number of uses: W3-6-AL-1-A1, W3-6) indicates that the route back to power supply transformer 3, 6, feed the power distribution cabinet, AL-1-A1, said the then the first loop of the distribution box for the AL-1-A1 and so on, and so on.10 ConclusionWith more and more complex commercial design projects, designers need to continually improve the design level, designed to make fine. These are only bits of the design in the business lessons learned, and the majority of designers want to communicate高层建筑供配电系统设计摘要:随着城市规模的不断发展,高层建筑越来越多,因此,高层建筑电气设计就成为设计者不得不面对的问题。

建筑电气毕业设计外文翻译及译文

建筑电气毕业设计外文翻译及译文

附录一:中文译文消防系统运行可靠性的估计在过去的三年中,美国国家标准技术研究所(NIST)已经在研究开发一种新的加密标准,以确保政府的信息安全。

该组织目前正处于为新的先进加密标准(AES)选择一个或几个算法或数据打乱公式的开放过程的最后阶段,并计划在夏末或秋初作出决定。

此标准内定明年实施。

Richard W. Bukowski:体育,高级工程师,瑟斯堡建筑及消防研究实验室的MST,美国医学博士20899-8642;Edward K. Budnick:体育,巴尔的摩休斯联合公司副总裁,美国医学博士21227-1652;Christopher F. Scheme1,克里斯托弗计划1,巴尔的摩休斯联合公司化学工程师、美国医学博士21227-1652;前言背景资料:为执行特定功能而设计和安装的美国消防计划。

例如,自动喷水灭火系统目的在于控制或扑灭火灾。

为此:自动灭火系统必须长开,即能满足火灾地所需水量达到控制或消灭火灾,火灾探测系统是为了尽早提供火灾预警通报来通知楼内人员安全逃生,并提供消防通知,使其他的消防组成部分开启(例如,特殊灭火系统、排烟系统)。

两种消防系统启动(检测)和(警报)必须达到尽早报警。

建筑防火墙的一般设计目的为:限制火灾蔓延的程度和保持建筑物的结构的完整,以及在火灾发生时保护逃生路线的安全性。

为了做到这一点,特殊的消防系统必须按标准测试及保持特殊消防系统完整性的特点.。

消防系统的组成部分如探测系统、自动灭火系统、防火墙的可靠性,在于提高基于设计基础上的联合演习的细节分析的投入。

在安全系统方面,有几个可靠性要素包括有效和能使用的可靠性,运行可靠性能提供一定程度的概率,即消防系统在需要时运行。

运行可靠性能在特定的火灾情况下利用起特点成功完成起任务的一种检测手段。

前者是系统组成和可靠性的评估,而后者是系统设计适宜性的评估。

这项研究的范围仅限于运行可靠性的评估,其主要原因是在于来自文献资料内容的可靠性。

建筑电气与智能化专业外文献翻译--PCLTA-20简介

建筑电气与智能化专业外文献翻译--PCLTA-20简介

外文原文:PCLTA-20 IntroductionThis guide describes the mechanical characteristics and the hardware and software driver installation for the Echelon PCLTA-20 Interface (Models 74401, 74402, 74403, 74404, and 74405) and the Echelon PCLTA-20 Protocol Analyzer Card (included with Model 33100-20). Except where noted, the term “PCLTA-20” used in this guide refers to both cards. Echelon’s PCLTA-20 card is a high-performance LONWORKS® interface for desktop, and embedded personal computers equipped with a 32-bit PCI interface and a compatible operating system. Designed for use in LONWORKS networks that require a PC to monitor, manage, or diagnose the network, the PCLTA-20 card is ideal for industrial control, building automation, and process control applications. The PCLTA-20 card features support for a wide range of transceivers, downloadable memory, a network management interface, and Plug n’ Play capability with Microsoft®Windows 95, 98, Me, NT, and 2000 operating systems. The PCLTA-20 protocol analyzer requires Windows 95 or 98. The four versions of the PCLTA-20 interface with integral twisted pair transceivers support the TP/FT-10 (Model 74401), TP/XF-78 (Model 74402), TP/XF-1250 (Model 74403), and TP-RS485 (Model 74404) channels, respectively. The Model 74405 PCLTA-20/SMX interface and the PCLTA-20 Protocol Analyzer support SMX transceivers, and may therefore be used on a wide range of channels, including Echelon’s TP/FT-10 free topology and PL-10, PL-20, and PL-30 power line channels.The PCLTA-20 card can be used as an LNS Fast Network Interface, a standard LNS network interface, or a LonManager API-compatible interface.The LONWORKS PCLTA-20 Protocol Analyzer provides LONWORKS manufacturers, system integrators, and end-users with a rich set of Windows tools and a PCLTA-20 card for observing, analyzing, and diagnosing the behavior of LONWORKS networks. In addition to providing the network analysis functionality, the PCLTA-20 card included with the protocol analyzer also provides all the functionality of the PCLTA-20 PCI Interface.IntroductionThe PCLTA-20 card provides any PC equipped with a 32-bit PCI interface and compatible Windows operating system with access to a LONWORKS network. Installation software for the PCLTA-20 card is included with the Model 33100-20 LONWORKS PCLTA-20 Protocol Analyzer, the Model 37000 LonMaker Integration Tool, the Model 37200 LNS DDE Server, the Model 34309 LNS Application Developer’s Kit, and the Model 58030-01 Connectivity Starter Kit (which must be purchased separately). The software provides a software-based control panel and a software driver for Microsoft Windows 95, 98, Me, NT, or 2000 operating systems (the PCLTA-20 Protocol Analyzer requires Windows 95 or 98). Installation software also is available on Echelon’s web site at /toolbox. The control panel provides a convenient means of setting and modifying installation parameters, as well as displaying error messages. The adapter supports Windows 95, 98, Me, and 2000 Plug n’ Play operation, simplif ying installation and use.The PCLTA-20 card operates at 10MHz and, depending on the model selected, includes either an integral twisted pair transceiver or an SMX transceiver interface. For models with an integral twisted pair transceiver, the network connection is made via a removable screw terminal block.As shown in figure 1.1 below, the LNS network operating system allows any number of installation, maintenance, monitoring, and control devices to exist in a system and to adapt to network configuration changes automatically. That is, it allows users to reconfigure the system from any user interface device anywhere on the network and ensures that all monitoring and control stations are always up-to-date with respect to the system’s configuration. When used with the appropriate software, the LNS Fast Network Interface functionality of the PCLTA-20 card allows the attached host to tap into the LNS infrastructure as a client or server application.The card also permits the host PC to act as a LONWORKS network device, running application-specific programs while the card handles lower layer functions such as media access control, collision avoidance, and message validationFirmware for the card is downloaded from the host PC.This allows the card to be updated as new versions of the software and firmware are released, without modifying or physically accessing the PCLTA-20 card. This feature extends the useful service life of the card, and minimizes the cost and time associated with software and firmware updates. The card is provided with 32Kbytes of off-chip RAM for use as network and application buffers.AudienceThis manual is intended for developers and end users of LONWORKS systems using the PCLTA-20 card, and for network integrators and end users of the PCLTA-20 Protocol Analyzer.ContentThis manual provides detailed technical specifications on the electrical and mechanical interfaces and operating environment characteristics for the PCLTA-20 card.Related DocumentationThe following Echelon publications are suggested for additional information:•LONWORKS® SMX™ Transceiver Installation Instructions (078-0145-01) •LONWORKS FTT-10A Free Topology Transceiver User’s Guide (078-0156-01) •LONWORKS Junction Box and Wiring Guidelines Application Note (005-0023-01) •LONWORKS TPT Twisted Pair Transc eiver Module User’s Guide (078-0025-01)•LNS for Windows Programmer’s Guide (078-0177-01)•LonManager Protocol Analyzer User’s Guide (078-0121-01)•LonMaker User’s Guide (078-0168-02)•LNS DDE Server User’s Guide (078-0170-01)PCLTA-20 ConfigurationPCLTA-20 configuration is accomplished by using the LONWORKS Plug ‘n Play control panel application. Open the control panel application by selecting the LONWORKS ® Plug ‘n Play icon in the Windows Control Panel.Figure 1.2PCLTA-20 Control Panel and IconThe LONWORKS Plug ‘n Play control panel application is divided into three parts: a device selection area, a general settings area, and a control section. The device selection area contains configuration settings and diagnostic controls that are specific to an individual PCLTA-20 card and its device driver. Thegeneral settings area contains settings for all PCLTA-20 cards used with the PC. The control section contains buttons for accepting or canceling the changes made in the control panel, as well as a Help button.PCLTA-20 InitializationIn most cases, PCLTA-20 initialization occurs automatically upon installation of the card and subsequent power-up of the computer. Manual initialization will be required following software installation to a directory other than c:\lonworks, or following the moving of the PCLTA-20 system images.To manually initialize the PCLTA-20 card, verify that the control panel application’s System Image Path entry is correct, then click the Apply button.An error will be reported if an attempt is made to view the transceiver type before the PCLTA-20 card is initialized. Testing the card with the Diagnostics button, assuggested by the error message, produces the diagnosis: “Image file not found.” In this case, return to the control panel application’s main window and manually initialize the PCLTA-20 card.Device Specific SettingsThe PCLTA-20-specific options consist of five separate controls (figure 3.2). These controls are defined as follows:Figure 1.3 PCLTA-20-specific ControlsDevice SelectedControls which PCLTA-20 card is selected for configuration. The PCCLON1 and PCCLON2 drivers are installed by the installation software. If additional drivers have been manually installed, they also will be available.Automatic Flush CancelFor non-LNS images, this function controls whether the device driver will automatically force the network interface for the selected PCLTA-20 card to leave the post-reset flush state whenever it is reset; an LNS network interface does not and cannot come up in the flush state. The post-reset flush state prevents any inbound or outbound network traffic following a reset. If this box is not checked, it is up to the client application to manage this state. If it is checked, the device driver will automatically allow network traffic to resume. The default is checked.NI ApplicationControls the type of image or application to be used on the PCLTA-20 card. This selection is handled automatically by the protocol analyzer software. For all other applications, a PCLTA-20 card can only hold one image at a time. Loading a new image will replace the currently loaded image. The choices for these images are determined by the image files (.NBI extension) found in the system image path specified under General Settings. Some of the possibilities include the following:•PCL10VNI, the LNS Fast Network Interface image (for use with LNS 3 and newer)•NSIPCLTA, the LNS network interface image (for use with LNS 1 and LNS 2 only)•PCC10L7, the basic network interface application imageTransceiverOpens the PCLTA-20 Transceiver dialog (figure 1.4). Choosing this option will retrieve the transceiver configuration of the selected PCLTA-20 card. If there is no PCLTA-20 card currently installed in a PCI-bus slot, a message appears stating that the operating system has removed, or has not loaded, the PCLTA-20 device driver.Figure 1.4PCLTA-20 Transceiver Dialog BoxThe Transceiver value specifies the transceiver type for the selected PCLTA-20 card. The default transceiver is a TP/FT-10 compatible transceiver. Other standard transceiver configurations, and a custom configuration, may be chosen. The Custom Properties values are not accessible unless the Custom transceiver type is selected: you cannot modify the transceiver type as it is a product of the transceiver ID (XID), however, if the XID is custom then you can modify the fields using the Custom Properties dialog box. If an incorrect transceiver type error is received while modifying the transceiver type, click the Apply button, then proceed to modify the transceiver type.The Custom Properties area contains custom transceiver properties. The information in this area reflects the current configuration within the PCLTA-20 card. It will not change until a transceiver is selected, and then configured using the OK or Apply buttons.When configuring a custom transceiver or adding custom parameters for a standard transceiver, the Custom Properties Raw Data values must be entered as hexadecimal values separated by dashes. Further explanation of Raw Data values can be found in the LonBuilder® User’s Guide.DiagnosticsOpens the PCLTA-20 Diagnostics dialog. For more information, see the section on PCLTA-20 Diagnostics.中文译文:PCLTA - 20简介本指南描述了埃施朗PCLTA - 20接口(型号74401,74402,74403,74404,和74405)的机械特性及硬件和软件驱动程序的安装和埃施朗PCLTA - 20协议分析器卡(包括型号33100-20)。

住宅小区配电设计外文文献翻译中英文

住宅小区配电设计外文文献翻译中英文

外文文献翻译(含:英文原文及中文译文)译文字数:3700多字文献出处:J Ehnberg. Power of Community Distribution to Design[J] Value Engineering, 2016, 2(3):14-21英文原文Power of Community Distribution to DesignJ EhnbergABSTRACTThe basic function of the electric power system is to transport the electric power towards customers. The l0kV electric distribution net is a key point that connects the power supply with the electricity using on the industry, business and daily-life. For the electric power, allcostumers expect to pay the lowest price for the highest reliability, but don't consider that it's self-contradictory in the co-existence of economy and reliable.To improve the reliability of the power supply network, we must increase the investment cost of the network construction But, if the cost that improve the reliability of the network construction, but the investment on this kind of construction would be worthless if the reducing loss is on the power-off is less than the increasing investment on improving the reliability .Thus we find out a balance point to make the most economic, between the investment and the loss by calculating the investment onpower net and the loss brought from power-off.KEYWORDS: power supply and distribution, power distribution reliability , reactive compensation, load distributionIn general, major changes to the building include: high voltage and low voltage distribution systems, transformers, and backup power systems. Power systems include power distribution and control, indoor and outdoor lighting systems include all types of lighting, and lightning protection systems include intrusion protection, lightning sensors, grounding, equipotential bonding, and local equipotential bonding. Auxiliary equipotential bonding. In just 20 years, the system has undergone enormous changes in the face of technology and products. Many design ideas have also changed dramatically. Switchgear, such as the first circuit-breaker oil circuit breaker in a high-voltage system, and the subsequent development of an oil circuit breaker, are not only large in size but generally contain oil. Due to the large size of the switchgear, we must also establish a separate equipment room that occupies a large amount of floor area. Vacuum circuit breakers and sulfur hexafluoride circuit breakers are not only small in size, but also have a large short-circuit capacity. The size of the housing is much larger than that of the original cabinets, and the circuit breakers do not have any oil and the fire performance is greatly improved. And circuit breakers and other low-voltage devices are in one room, which saves space and is easy tomanage. In the past, large-capacity low-voltage circuit breakers gradually increased the capacity of the short-circuit current, gradually reduced the scale, and became more stable, making the system safer and more reliable, which facilitated the design. Towards the development of intelligent low-voltage circuit breakers, various parameters of the circuit breaker can be controlled by the bus industry and the signals are transmitted directly to the computer.The appearance of dry-type transformers has brought great convenience to the electrical design of buildings because there is no possibility of leakage of transformer oil and fire so that it can be easily installed in the building itself and even directly into the load center. It also eliminates the transformer's demand for oil and can use dry-type transformers when building large-capacity equipment. Four Taiwanese 2500kV A dry-type transformers have been used in actual engineering design.In terms of using emergency generators, it is much more advanced than in the past in terms of performance and size. In addition to using diesel generators; emergency lighting uses EPS standby power; devices that interrupt power within a millisecond can use UPS.The control of electrical equipment varies from the control of a single component to the control of relays. In addition to the smaller size of the various components for better performance, the specification of thecontrol box is also reduced. Because digital technology is more used in control to achieve the best control status to control the equipment. Further improve the effect of energy conservation.The revolution of electric power system has brought a new big round construction, which is pushing the greater revolution of electric power technique along with the application of new technique and advanced equipment. Especially, the combination of the information technique and electric power technique, to great ex- tent, has improved reliability on electric quality and electric supply. The technical development decreases the cost on electric construction and drives innovation of electric network. On the basis of national and international advanced electric knowledge, the dissertation introduces the research hotspot for present electric power syetem as following.Firstly, This dissertation introduces the building condition of distribution automation(DA), and brings forward two typical construction modes on DA construction, integrative mode and fission mode .It emphasize the DA structure under the condition of the fission mode and presents the system configuration, the main station scheme, the feeder scheme, the optimized communication scheme etc., which is for DA research reference.Secondly, as for the (DA) trouble measurement, position, isolation and resume, This dissertation analyzes the changes of pressure andcurrent for line problem, gets math equation by educing phase short circuit and problem position under the condition of single-phase and works out equation and several parameter s U& , s I& and e I& table on problem . It brings out optimized isolation and resume plan, realizes auto isolation and network reconstruction, reduces the power off range and time and improves the reliability of electric power supply through problem self- diagnoses and self-analysis. It also introduces software flow and use for problem judgement and sets a model on network reconstruction and computer flow.Thirdly, electricity system state is estimated to be one of the key techniques in DA realization. The dissertation recommends the resolvent of bad measurement data and structure mistake on the ground of describing state estimate way. It also advances a practical test and judging way on topology mistake in state estimate about bad data test and abnormity in state estimate as well as the problem and effect on bad data from state measure to state estimate .As for real time monitor and control problem, the dissertation introduces a new way to solve them by electricity break and exceptional analysis, and the way has been tested in Weifang DA.Fourthly, about the difficulty for building the model of load forecasting, big parameter scatter limit and something concerned, the dissertation introduces some parameters, eg. weather factor, date type andsocial environment effect based on analysis of routine load forecasting and means. It presents the way for electricity load forecasting founded on neural network(ANN),which has been tested it’s validity by example and made to be good practical effect.Fifthly, concerning the lack of concordant wave on preve nting concordant wave and non-power compensation and non-continuity on compensation, there is a topology structure of PWM main circuit and nonpower theory on active filter the waves technique and builds flat proof on the ground of Saber Designer and proves to be practical. Meanwhile, it analyzes and designs the way of non-power need of electric network tre- nds and decreasing line loss combined with DA, which have been tested its objective economic benefit throu- gh counting example.Sixthly, not only do the dissertation design a way founded on the magrginal electric price fitted to our present national electric power market with regards to future trends of electric power market in China and fair trade under the government surveillance, that is group competitio n in short-term trade under the way of grouped price and quantity harmony, but also puts forward combination arithmetic, math model of trading plan and safty economical restriction. It can solve the original contradiction between medium and long term contract price and short term competitive price with improvement on competitive percentage and cut down the unfair income difference of electric factory, at the same time,it can optimize the electric limit for all electric factories and reduce the total purchase charge of electric power from burthen curve of whole electric market network.The distribution network is an important link among the power system. Its neutral grounding mode and operation connects security and stability of the power system directly. At the same time, the problem about neutral grounding is associated with national conditions, natural environment, device fabrication and operation. For example, the activity situation of the thunder and lightning, insulating structure and the peripheral interference will influence the choice of neutral grounding mode Conversely, neutral grounding mode affects design, operation, debugs and developing. Generally in the system higher in grade in the voltage, the insulating expenses account for more sizable proportion at the total price of the equipment. It is very remarkable to bring the economic benefits by reducing the insulating level. Usually such system adopt the neutral directly grounding and adopt the autoreclosing to guarantee power supply reliability. On the contrary, the system which is lower in the voltage adopts neutral none grounding to raise power supply reliability. So it is an important subject to make use of new- type earth device to apply to the distribution network under considering the situation in such factors of various fields as power supply reliability, safety factor, over-voltage factor, the choice of relay protection, investment cost, etc.The main work of this paper is to research and choice the neutral grounding mode of the l0kV distribution network. The neutral grounding mode of the l0kV network mainly adopts none grounding, grounding by arc suppressing coil, grounding by reactance grounding and directly grounding. The best grounding mode is confirmed through the technology comparison. It can help the network run in safety and limit the earth electric arc by using auto-tracking compensate device and using the line protection with the detection of the sensitive small ground current. The paper introduces and analyzes the characteristic of all kind of grounding modes about l0kV network at first. With the comparison with technological and economy, the conclusion is drawn that the improved arc suppressing coil grounding mode shows a very big development potential.Then, this paper researches and introduces some operation characteristics of the arc suppressing coil grounding mode of the l0kV distribution network. And then the paper put emphasis on how to extinguish the earth electric arc effectively by utilizing the resonance principle. This paper combines the development of domestic and international technology and innovative achievement, and introduces the computer earth protection and autotracking compensate device. It proves that the improved arc suppressing coil grounding mode have better operation characteristics in power supply reliability, personal security,security of equipment and interference of communication. The application of the arc suppressing coil grounding mode is also researched in this paper.Finally, the paper summarizes this topic research. As a result of the domination of the arc suppressing coil grounding mode, it should be more popularized and applied in the distribution network in the future.The way of thinking, project and conclusions in this thesis have effect on the research to choose the neutral grounding mode not only in I0kV distribution network but also in other power system..The basic function of the electric power system is to transport the electric power towards customers. The l0kV electric distribution net is a key point that connects the power supply with the electricity using on the industry, business and daily-life. For the electric power, all costumers expect to pay the lowest price for the highest reliability, but don't consider that it's self-contradictory in the co-existence of economy and reliable. To improve the reliability of the power supply network, we must increase the investment cost of the network con- struction But, if the cost that improve the reliability of the network construction, but the investment on this kind of construction would be worthless if the reducing loss is on the power-off is less than the increasing investment on improving the reliability .Thus we find out a balance point to make the most economic, between the investment and the loss by calculating the investment onpower net and the loss brought from power-off. The thesis analyses on the economic and the reliable of the various line modes, according to the characteristics various line modes existed in the electric distribution net in foshan..First, the thesis introduces as the different line modes in the l0kV electric distribution net and in some foreign countries. Making it clear tow to conduct analyzing on the line mode of the electric distribution net, and telling us how important and necessary that analyses are.Second, it turns to the necessity of calculating the number of optimization subsection, elaborating how it influences on the economy and reliability. Then by building up the calculation mode of the number of optimization subsection it introduces different power supply projects on the different line modes in brief. Third, it carries on the calculation and analyses towards the reliability and economy of the different line modes of electric distribution net, describing drafts according by the calculation. Then it makes analysis and discussion on the number of optimization subsection.At last, the article make conclusion on the economy and reliability of different line modes, as well as, its application situation. Accordion to the actual circumstance, the thesis puts forward the beneficial suggestion on the programming and construction of the l0kV electric distribution net in all areas in foshan. Providing the basic theories and beneficial guidelinefor the programming design of the lOkV electric distribution net and building up a solid net, reasonable layout, qualified safe and efficiently-worked electric distribution net.Auto-Tune SequenceThe auto-tuning sequence begins after the hysteresis and deviation values have been determined. The tuning process begins when the initial output step is applied to the loop output.This change in output value should cause a corresponding change in the value of the process variable. When the output change drives the PV away from setpoint far enough to exceed the hysteresis boundary a zero-crossing event is detected by the auto-tuner. Upon each zero crossing event the auto-tuner drives the output in the opposite direction.The tuner continues to sample the PV and waits for the next zero crossing event. A total of twelve zero-crossings are required to complete the sequence. The magnitude of the observed peak-to-peak PV values (peak error) and the rate at which zero-crossings occur are directly related to the dynamics of the process. Early in the auto-tuning process, the output step value is proportionally adjusted once to induce subsequent peak-to-peak swings of the PV to more closely match the desired deviation amount. Once the adjustment is made, the new output step amount is written into the Actual Step Size field (ASTEP) of the loop table. The auto-tuning sequence will be terminated with an error, if thetime between zero crossings exceeds the zero crossing watchdog interval time. The default value for the zero crossing watchdog interval time is two hours.中文译文住宅小区配电设计J Ehnberg摘要电力系统的基本功能是向客户输送电力。

建筑电气 英语

建筑电气 英语

Buildings ElectricalAbstract : School Official Cites Use Electrical construction technology, construction technology with the development of electrical technology development and the same time. In particular, with the development of information technology, such as computer technology, control technology, digital technology, display technology Internet technology and modern communication technology, electrical technology to achieve a leap forward in building the development. Since the beginning of reform and opening up, and conduct extensive international technical exchanges, many international advanced new products.Keywords : electrical technology ;buildings;developElectrical construction including two strong design elements include : a part of the transformation and distribution system. power and lighting systems, mine grounding system. In general, building key changes include : high-voltage and low-voltage distribution systems systems, transformers, standby power system. power systems including power distribution and control; indoor and outdoor lighting system include all types of lighting; Lightning Protection System, including mine waves penetrated, lightning sensors, grounded, equipotential bonding and local equipotential bonding. Auxiliary equipotential bonding and so on. In such a short span of 20 years, the system has undergone enormous changes in technology and products. Many of the design concept has also undergone tremendous changes. Swichgear such as high pressure system, the first circuit breaker to the oil circuit breakers. After the progressive development of the oil circuit breakers, is not only large in size, but did not fire. Swichgear are larger allocation, we must also set up independently in their own rooms, occupied a lot of the construction area. Now a vacuum circuit breaker and SF6 circuit breakers, is not only small size but also high-capacity short-circuit. enclosure size is a lot smaller than the original cabinets, circuit breakers without any oil, fire performance greatly improved. with a total of home and other low-voltage equipment in a room, saving both space and convenience of management. The large volume oflow-voltage circuit breaker from the past, the development of small to largeshort-circuit current capacity, the ability to continue to score small in size, stable, which makes the system more secure and reliable, and designed to bring the convenience. Intelligent directiontoward another recent low voltage circuit breaker, breaker various parameters can be controlled through the bus industry, Signals transmitted to the computer directly.The emergence of dry-type transformers, electrical design for the building posed a great convenience, Because there is no possibility of transformer oil spills and fires, so that it can be easily installed in the building itself, even go directly to the load center. It also eliminated restrictions on capacity building in the transformer oil, building greater capacity for dry-type transformers can be used. In the designs of the project, on the application of four Taiwan 2500kV A dry-type transformers.Used emergency power generators, from the performance and size perspective, a lot of progress than in the past. In addition to the use of diesel generators works, as emergency lighting, use EPS. allow for a millisecond interruption in the supply of equipment, can use UPS.Power equipment controlled from a single control to the control relay. Apart from the better performance of various components that are smaller in size and so reduce the volume control box, As a result of the digital technology is more controlled and controlled state control equipment at its best. further the energy saving effect.Lighting Project is a single source from the past, light lamps and the low efficiency of state toward even broader prospects. The light source used in the building are a number of varieties to choose from, toward a luminous efficiency of light, light color, develop in the direction of high color-rendering index, and lamps have been continuously improved its efficiency and allocation-form so that the application of different occasions. Source annex, for example, the fluorescent lamp ballasts Inductance ballasts from the ordinary inductance ballasts to energy-saving electronic ballasts. but also against the size of the harmonic components, to produce low harmonic electronic ballasts. Many technologies, accessories and lamps, can satisfy the design and design options, and fully meet the varied architecture, Lighting requirements for the various sites. Regardless of the lighting or indoor decorative lighting. Whether or road lighting and outdoor courtyard of the building of light illumination, all of the show lighting technology to the development of the architectural lighting benefits and convenience.Another design used in electrical devices and other equipment, such asco-switching power supply switch of mutual investment. from the traditional production of specialized products, inaddition to the conventional power switching meet, also a dual power supply can meet each other electronic equipment investment, in the fourth cycle power within mutual investment products, greatly increasing the reliability and continuity of supply.Electric power supply cables and wires is widely used products. Look past the wire and cable samples, the species is scarce, and now, introducing various cable, From ordinary to theflame-retardant PVC cables, fire resistance, Low-smoke halogen-free cable-radiation environment; Insulation materials to the mineral insulated from the ordinary; Bus Bus closed to regular insulation, pre-cable, etc. branches. Electrical construction of these technologies are safe, reliable, convenient, providing an effective environmental protection.Targeting special needs of the construction of distribution, some new device has been widely applied. For example, large hospital operating room medical establishments leakage protection, residual current monitoring system.The development of the technology for strong, and it is obvious to the engineering and technical personnel, as well as our own experience. Such a great development for China's construction of electrical construction and laying a good foundation also created the conditions for the construction of safe use of electricity.Along with the deepening of building intelligent technology applications, some of the equipment or system control, The control system has gradually become a professional monitor, and open its construction equipment monitoring and control system communication protocol. reach of the Internet and communications systems. Buildings such as the automatic power control system, using fieldbus technology data acquisition and processing, centralized control Variable distribution system to reach the remote monitoring, remote control that remote control and remote, unmanned substation achieve. Continuous collection and analysis systems, the necessary advice or warning is given in advance to facilitate the safe operationof the system. Automatic power control system using computer technology, information technology, control technology, sensor technology, communications networking technology, Power electronics technologies, it can basically replace the traditional secondary loop is the wiring simple, reliable performance and easy maintenance. Meanwhile, the energy consumption of buildings in the second major energy-efficient lighting controlsystem will also be paying. professional lighting control systems have been widely used in many buildings. Lighting control from a single real-time sensors to control the timing control,reduced-control development. In addition, scene control, remote control, and control a variety of flexible control of the scene, to achieve the maximum energy, while also achieving a comfortable lighting systems, functional and humane.For example, the late 1980s "compiled by the architectural design of fire safety regulations," GBJl6-87; 1990s, the "civil Lighting Design Standards" GBJl33-90; JGJ/16-92; "civil Electrical Design Standards" "Lighting design standards of industrial enterprises" GB50034-92; "Architectural Design Standards" GB50045-95; "Supply and Distribution System Design Standards" GB50052-95; "l0kV substation design and below"GB50053-94; "Low V oltage Distribution Design Standards" GB50054-95; "Universal design of electricity distribution equipment," GB50055-93; GB50057-94 "Building mine design," and so on. To be followed by the construction of electrical design basis for the construction of electrical taken a solid step toward standardization.Intelligent technology is only a means of building is equipped with intelligent functions, stressing efficiency, low energy consumption. Cleaner, in the true realization of people-centered, under the premise of achieving energy conservation, enhance building's function, protection of the environment and sustainable development goals. Building the implementation of sustainable development from a strategic perspective, ecosystem, emphasis on environmental protection. Sustainable development is an eternal theme. Through years of practice, in a rational and pragmatic attitude, from the actual needs, and practical application of the standards, not blindly follow theone-sided pursuit of a comprehensive and advanced intelligent systems, but technically ahead. The design also done a reasonable investment, the use of different functions. investment and management requirements of the specific situation, identify advanced, reliability, Economic rationality and the optimal point of this concept now has become the intelligent building industry consensus. Building Intelligent technology, which will enable the construction of all colleges and universities have opened up this technology corresponding professional courses and the development of relevant professional students.Intelligent Building Technology include : construction equipmentautomatic control system, security system, the car park management system, automatic fire alarm and fire system that communications and computer network systems, integrated wiring system, broadcasting system, cable systems, video conferencing systems and the number of meetings, more than 10sub-system integration. The first independent from the domestic building intelligent technology to the development of systems integration subsystem.(1) Construction equipment monitoring technology20th century mainly concentrated monitoring of the 1980s, due to poor reliability, speed slow After the 1990s has been rarely used, and have been replaced by the Distributed Control. In the late 1990s, as computer technology, control technology, network and communications technology development and integration, Monitoring construction equipment technology has been developing rapidly。

电气工程高层建筑论文中英文资料外文翻译文献

电气工程高层建筑论文中英文资料外文翻译文献

电气工程高层建筑论文中英文资料外文翻
译文献
本文的主要目标是翻译一些电气工程和高层建筑方面的外文文献。

这些文献分别为:
1. "Application of lateral tuned mass damper to high-rise structure under random wind excitations",这篇文章主要介绍了侧向调谐质量阻尼器(lateral tuned mass damper)在高层建筑中的应用。

该文通过计算分析和试验研究,得出了调谐阻尼器的结构参数和其对建筑物抗震能力的影响。

2. "Reliability Analysis of Power Supply System in High-rise Building",这篇文章主要介绍了高层建筑电力供应系统的可靠性分析。

该文分别从电力系统的结构、功能和基本原理入手,阐述了电力系统的可靠性分析方法,并根据有关标准和规范,对高层建筑电力系统的可靠性进行了分析。

3. "Dynamic Analysis on Earthquake Resistance of High-rise Buildings Based on Pushover Method",该文介绍了基于 Pushover 方
法对高层建筑的抗震性能进行动力学分析。

该方法通过对结构的位移、剪力和弯矩等特性进行预测,可以更加准确地评估高层建筑的抗震性能。

以上三篇文献分别介绍了高层建筑中的电气工程和抗震技术方面的研究成果,对于高层建筑的设计和建造具有一定的参考价值。

建筑类外文文献及中文翻译

建筑类外文文献及中文翻译

forced concrete structure reinforced with anoverviewReinSince the reform and opening up, with the national economy's rapid and sustained development of a reinforced concrete structure built, reinforced with the development of technology has been great. Therefore, to promote the use of advanced technology reinforced connecting to improve project quality and speed up the pace of construction, improve labor productivity, reduce costs, and is of great significance.Reinforced steel bars connecting technologies can be divided into two broad categories linking welding machinery and steel. There are six types of welding steel welding methods, and some apply to the prefabricated plant, and some apply to the construction site, some of both apply. There are three types of machinery commonly used reinforcement linking method primarily applicable to the construction site. Ways has its own characteristics and different application, and in the continuous development and improvement. In actual production, should be based on specific conditions of work, working environment and technical requirements, the choice of suitable methods to achieve the best overall efficiency.1、steel mechanical link1.1 radial squeeze linkWill be a steel sleeve in two sets to the highly-reinforced Department with superhigh pressure hydraulic equipment (squeeze tongs) along steel sleeve radial squeeze steel casing, in squeezing out tongs squeeze pressure role of a steel sleeve plasticity deformation closely integrated with reinforced through reinforced steel sleeve and Wang Liang's Position will be two solid steel bars linkedCharacteristic: Connect intensity to be high, performance reliable, can bear high stress draw and pigeonhole the load and tired load repeatedly.Easy and simple to handle, construction fast, save energy and material, comprehensive economy profitable, this method has been already a large amount of application in the project.Applicable scope : Suitable for Ⅱ, Ⅲ, Ⅳgrade reinforcing bar (including welding bad reinfor cing bar ) with ribbing of Ф 18- 50mm, connection between the same diameter or different diameters reinforcing bar .1.2must squeeze linkExtruders used in the covers, reinforced axis along the cold metal sleeve squeeze dedicated to insert sleeve Lane two hot rolling steel drums into a highly integrated mechanical linking methods.Characteristic: Easy to operate and joining fast and not having flame homework , can construct for 24 hours , save a large number of reinforcing bars and energy. Applicable scope : Suitable for , set up according to first and second class antidetonation requirement -proof armored concrete structure ФⅡ, Ⅲgrade reinforcing bar with ribbing of hot rolling of 20- 32mm join and construct live.1.3 cone thread connectingUsing cone thread to bear pulled, pressed both effort and self-locking nature, undergo good principles will be reinforced by linking into cone-processing thread at the moment the value of integration into the joints connecting steel bars.Characteristic: Simple , all right preparatory cut of the craft , connecting fast, concentricity is good, have pattern person who restrain from advantage reinforcing bar carbon content.Applicable scope : Suitable for the concrete structure of the industry , civil buil ding and general structures, reinforcing bar diameter is for Фfor the the 16- 40mm one Ⅱ, Ⅲgrade verticality, it is the oblique to or reinforcing bars horizontal join construct live.conclusionsThese are now commonly used to connect steel synthesis methods, which links technology in the United States, Britain, Japan and other countries are widely used. There are different ways to connect their different characteristics and scope of the actual construction of production depending on the specific project choose a suitable method of connecting to achieve both energy conservation and saving time limit for a project ends.钢筋混凝土构造中钢筋连接综述改革开放以来,伴随国民经济旳迅速、持久发展,多种钢筋混凝土建筑构造大量建造,钢筋连接技术得到很大旳发展。

建筑电气数据采集系统设计及故障诊断外文文献翻译

建筑电气数据采集系统设计及故障诊断外文文献翻译

文献出处:Fischer M. The Study on the Design of Building Electrical Data Acquisition System and Fault Diagnosis [J]. Building and Environment, 2015, 5(6): 241-251.原文The Study on the Design of Building Electrical Data Acquisition System and FaultDiagnosisFischer MAbstractBuilding electrical systems can provide energy, and take the function of distribution power for buildings. It is an integral part of construction engineering. As people demand for work and living environment is getting higher and higher, and the continuous development of information technology, building electrical covered more widely, the content of the system structure is more complicated. Although compared to residential buildings in industrial buildings and other large public and commercial buildings, its electrical system structure is relatively simple, less electricity equipment complexity, but because of its use function, the electric system of residential type building also has its own characteristics and requirements. Once its electrical system failure, will lead to economic loss, disastrous, even safety accidents. So, need to be in fault occurs can rapidly and accurately judge the reason, location and damage degree, to reduce loss, lower maintenance costs.Keywords: Building Electrical; Data Acquisition; Fault Diagnosis; SVM1 IntroductionThe speeding up of urbanization leads to more and more buildings. And building electric serves as an integral part of construction engineering, undertaking to provide power for building, distribution, dynamic role, can be said to be the "engine" of the whole building. Building electrical is the use of electrical technology and electrical equipment, through the building space to create the sound, electricity, light, heat, wet, communication and management of the environment, to make it more suitable human life and the work of a kind of integrated disciplines. The "electric technology" refers to the power, information, and all kinds of intelligent building technology ofintegrated disciplines. Building electric is traditionally divided into two parts, heavy current and weak current. Building power supply, lighting, power, lightning protection and grounding part belong to high voltage, etc. Electricity from the substation, through the step-down 380/220 v output power distribution equipment, bus bar, cable, wire transmission power supply equipment, such as elevators, air conditioning, etc. Among them, the lightning protection system is mainly to prevent building caused by lightning strike damage. Grounding system is divided into protective earthling and work, its role is to ensure that the power system and equipment meet the work requirements, to prevent the occurrence of over voltage, system guarantee personal safety at the same time. Extra Low V oltage part include TV, radio, security, fire control and computer system, etc. Therefore, the related research is becoming more and more brought to the attention of the engineering and research workers. In order to satisfy the people to the requirement of working and living environment is getting higher and higher, and the continuous development of information technology, modern buildings in various equipment and subsystem is also more and more. And all equipment and systems in the buildings depends on electrical systems provide energy and power. And electrical, building covered more widely, the content of the system structure is more complicated. Modern architecture in the electrical system is no longer the only power supply, lighting, grounding, such as simple circuit, it is a use of electrical technology and electrical equipment, through the building space to create the sound, electricity, light, heat, wet, communication and management of the environment, to make it more suitable human life and the work of a comprehensive system.2 Fault diagnoses2.1 The definition of fault diagnosisFault diagnosis is in the continuous development of electronic technology and computer technology of a new technology. Refers to the system in a certain operating conditions to judge the running state and abnormal situation, and the abnormal state of separate parts, and find out the cause of the system function failure. Judge judging fault types at the same time, estimates the fault duration, forecasts the developmenttrend of fault state, and to provide the basis for system failure recovery.2.2 Methods of fault diagnosis and classificationDue to the fault diagnosis technology is based on electronic technology and computer technology, therefore, main show is in engineering with computers as the main body of the intelligent fault diagnosis system, it has three kinds of structure: stand-alone mode, distributed mode and network mode. Currently applied to intelligent fault diagnosis methods mainly include: the diagnosis method based on expert system, based on fuzzy logic diagnosis method, diagnosis method based on neural network, and the diagnosis method based on Multi - Agent, etc.3 The tradition of building electrical maintenance methodNowadays, the concept of building electrical has great development, while building electrical system in the intelligent approximately at the bottom, but it plays a vital role. Once the electrical system malfunction, light cause property damage, or threat to people's personal safety. Can, therefore, the failure occurs rapidly and accurately judge the reason, location and damage degree is very important. With the increasing of modern architectural features, building electrical system of large buildings have not only the power distribution system, including telecommunications, television, fire alarm, the data transmission and some remote monitoring of electrical equipment, and many other subsystems. These systems are connected to each other, and to make electrical system the possibility of failure multiplied. For building electrical failure after processing, at present it is still by means of artificial screening and maintenance. When unable to determine the exact cause of failure, in order to ensure promptly eliminate malfunction, maintenance personnel will all change, may lead to the fault line and device this way of troubleshooting for maintenance personnel's own experience and technology demand is higher, but also caused the increased cost of maintenance. Besides circuit and component aging caused by the failure, because of design changed randomly and non-standard construction procedures, also can cause hidden trouble to the electrical system, eventually leading to failure. Although intelligent fault detection technology in every industry has made considerable development, but the fault detection technology in the field of buildingelectrical rarely study. Investigate its reason, mainly because of building electrical belongs to the low voltage power distribution system, and at the end of the whole grid, neglected. Electrical fault diagnosis in the field of research, on the other hand, more concentrated in large electrical equipment, such as generator, transformer, etc., or the fault diagnosis of complex systems such as power grid, and building electrical systems because of its relatively simple structure, belongs to the engineering field, and therefore not be taken into account.4 The main content of building electrical systemsPower system refers to provide electric energy and transport, the use of electrical energy for the purpose of circuit and its related lines. The power system can also be referred to as the power supply or power transmission and distribution system. Transmission and distribution system is composed of transmission lines and substations and it has connected power plants and users, and provides electricity to the user directly. In building electric, the electric system usually refers to the 10 KV power distribution lines and substations under low voltage distribution network, it will power allocated to all types of users. And more than 10KV high voltage power supply network and power generation system, etc., are not within the scope of "building electric". Building electrical is divided into two most heavy current and weak current. High voltage part mainly includes distribution, dynamic lighting, lightning protection and grounding system, etc. Lightning protection grounding system mainly includes the grounding, lightning protection electricity, lightning protection waves intrusion, auxiliary equipotent connection, local equipotent connection and equipotent connection, etc. Weak current system is mainly used for the transmission of signals. Such as communication systems, public broadcasting system, fire linkage system, security monitoring system, cable TV system, etc. In addition, the modern building is also equipped with intelligent building systems, building all sorts of equipment through computer for unified control and management. In addition, as well as intelligent building systems, thanks to the rapid development of communication technology and automatic control technology, building is developing towards the trend of more and more intelligent. Intelligent building expands the function of thebuilding; improve the comfort and convenience to people in work and life. Building intelligent system will be independent of each other before building subsystem fuses in together, realize the real-time monitoring and remote control of building state. Intelligent building system adopts computer collecting and distributing control mode, namely "decentralized control, centralized management" model. Its controller is usually direct digital controller (DDC), management features carried by the upper machine and its software is responsible for the management, monitoring and management of the whole building. It is generally believed, building automation system, office automation system, security automation system, communication network automation system and fire linkage control system, etc., all belong to the category of intelligent building.5 The characteristics of residential building electrical systemResidential buildings are also known as the residence building. To live is to provide the family use buildings, including ordinary residential, hotel apartments, luxury villas, etc., belong to the category of civil buildings. Compared to residential buildings in industrial buildings and other large public and commercial buildings, the electric system structure is relatively simple, small electric equipment complexity., when the design requirements in compliance with the principles of security, practical, energy saving. Because its usage and function of residential building,electrical system also has its own characteristics and requirements.5.1 Residential load characteristicsElectricity at present stage is still the main body of social power, compared to the power industry. it has the characteristics of periodic peak. In the two periods in the morning and at night, there will be a peak season. During this time, people will use a lot of household electrical appliances and result in an increase in load. Therefore, to ensure that its load bearing capacity of the electrical system, to prevent it’s because of a certain "dot" trigger, lead to the collapse of the entire electrical system. In addition to fire power, emergency lighting, passenger lifts and life water pump load for a secondary load, other electricity are level 3 load.5.2 Distribution circuit design requirementsAccording to "residential building electrical design specification requirements, residential electricity capacity of less than 250KW, collective distribution can be set up. The lighting, electric power, fire and other disaster prevention electricity load should be distribution respectively. Indoor distribution box should be installed at the same time, disconnect phase line and neutral line into line switch, power supply circuit should be installed with short circuit and overload protection electric appliances, and furnish the residual current protective device. Due to some power distribution system in the design or installation quality cannot be guaranteed, can lead to "zero" break fault.” Break zero" refers to the three phases four wire systems, the neutral line N or protection line PEN disconnect or without conduction. If there is a "zero" broken when the three-phase unbalanced load, will appear the phenomenon of under voltage or over voltage, single-phase electric equipment will be damaged because of the voltage deviation is too large.译文建筑电气数据采集系统设计及故障诊断研究Fischer M摘要建筑电气作为建筑工程中不可或缺的一部分,承担着为建筑物提供能源、分配动力的作用。

建筑电气原文以及翻译

建筑电气原文以及翻译

Buildings ElectricalAbstract : School Official Cites Use Electrical construction technology, construction technology with the development of electrical technology development and the same time. In particular, with the development of information technology, such as computer technology, control technology, digital technology, display technology Internet technology and modern communication technology, electrical technology to achieve a leap forward in building the development. Since the beginning of reform and opening up, and conduct extensive international technical exchanges, many international advanced new products.Keywords : electrical technology ;buildings;developElectrical construction including two strong design elements include : a part of the transformation and distribution system. power and lighting systems, mine grounding system. In general, building key changes include : high-voltage and low-voltage distribution systems systems, transformers, standby power system. power systems including power distribution and control; indoor and outdoor lighting system include all types of lighting; Lightning Protection System, including mine waves penetrated, lightning sensors, grounded, equipotential bonding and local equipotential bonding. Auxiliary equipotential bonding and so on. In such a short span of 20 years, the system has undergone enormous changes in technology and products. Many of the design concept has also undergone tremendous changes. Swichgear such as high pressure system, the first circuit breaker to the oil circuit breakers. After the progressive development of the oil circuit breakers, is not only large in size, but did not fire. Swichgear are larger allocation, we must also set up independently in their own rooms, occupied a lot of the construction area. Now a vacuum circuit breaker and SF6 circuit breakers, is not only small size but also high-capacity short-circuit. enclosure size is a lot smaller than the original cabinets, circuit breakers without any oil, fire performance greatly improved. with a total of home and other low-voltage equipment in a room, saving both space and convenience of management. The large volume oflow-voltage circuit breaker from the past, the development of small to largeshort-circuit current capacity, the ability to continue to score small in size, stable, which makes the system more secure and reliable, and designed to bring the convenience. Intelligent directiontoward another recent low voltage circuit breaker, breaker various parameters can be controlled through the bus industry, Signals transmitted to the computer directly.The emergence of dry-type transformers, electrical design for the building posed a great convenience, Because there is no possibility of transformer oil spills and fires, so that it can be easily installed in the building itself, even go directly to the load center. It also eliminated restrictions on capacity building in the transformer oil, building greater capacity for dry-type transformers can be used. In the designs of the project, on the application of four Taiwan 2500kV A dry-type transformers.Used emergency power generators, from the performance and size perspective, a lot of progress than in the past. In addition to the use of diesel generators works, as emergency lighting, use EPS. allow for a millisecond interruption in the supply of equipment, can use UPS.Power equipment controlled from a single control to the control relay. Apart from the better performance of various components that are smaller in size and so reduce the volume control box, As a result of the digital technology is more controlled and controlled state control equipment at its best. further the energy saving effect.Lighting Project is a single source from the past, light lamps and the low efficiency of state toward even broader prospects. The light source used in the building are a number of varieties to choose from, toward a luminous efficiency of light, light color, develop in the direction of high color-rendering index, and lamps have been continuously improved its efficiency and allocation-form so that the application of different occasions. Source annex, for example, the fluorescent lamp ballasts Inductance ballasts from the ordinary inductance ballasts to energy-saving electronic ballasts. but also against the size of the harmonic components, to produce low harmonic electronic ballasts. Many technologies, accessories and lamps, can satisfy the design and design options, and fully meet the varied architecture, Lighting requirements for the various sites. Regardless of the lighting or indoor decorative lighting. Whether or road lighting and outdoor courtyard of the building of light illumination, all of the show lighting technology to the development of the architectural lighting benefits and convenience.Another design used in electrical devices and other equipment, such asco-switching power supply switch of mutual investment. from the traditional production of specialized products, inaddition to the conventional power switching meet, also a dual power supply can meet each other electronic equipment investment, in the fourth cycle power within mutual investment products, greatly increasing the reliability and continuity of supply.Electric power supply cables and wires is widely used products. Look past the wire and cable samples, the species is scarce, and now, introducing various cable, From ordinary to theflame-retardant PVC cables, fire resistance, Low-smoke halogen-free cable-radiation environment; Insulation materials to the mineral insulated from the ordinary; Bus Bus closed to regular insulation, pre-cable, etc. branches. Electrical construction of these technologies are safe, reliable, convenient, providing an effective environmental protection.Targeting special needs of the construction of distribution, some new device has been widely applied. For example, large hospital operating room medical establishments leakage protection, residual current monitoring system.The development of the technology for strong, and it is obvious to the engineering and technical personnel, as well as our own experience. Such a great development for China's construction of electrical construction and laying a good foundation also created the conditions for the construction of safe use of electricity.Along with the deepening of building intelligent technology applications, some of the equipment or system control, The control system has gradually become a professional monitor, and open its construction equipment monitoring and control system communication protocol. reach of the Internet and communications systems. Buildings such as the automatic power control system, using fieldbus technology data acquisition and processing, centralized control Variable distribution system to reach the remote monitoring, remote control that remote control and remote, unmanned substation achieve. Continuous collection and analysis systems, the necessary advice or warning is given in advance to facilitate the safe operationof the system. Automatic power control system using computer technology, information technology, control technology, sensor technology, communications networking technology, Power electronics technologies, it can basically replace the traditional secondary loop is the wiring simple, reliable performance and easy maintenance. Meanwhile, the energy consumption of buildings in the second major energy-efficient lighting controlsystem will also be paying. professional lighting control systems have been widely used in many buildings. Lighting control from a single real-time sensors to control the timing control,reduced-control development. In addition, scene control, remote control, and control a variety of flexible control of the scene, to achieve the maximum energy, while also achieving a comfortable lighting systems, functional and humane.For example, the late 1980s "compiled by the architectural design of fire safety regulations," GBJl6-87; 1990s, the "civil Lighting Design Standards" GBJl33-90; JGJ/16-92; "civil Electrical Design Standards" "Lighting design standards of industrial enterprises" GB50034-92; "Architectural Design Standards" GB50045-95; "Supply and Distribution System Design Standards" GB50052-95; "l0kV substation design and below"GB50053-94; "Low V oltage Distribution Design Standards" GB50054-95; "Universal design of electricity distribution equipment," GB50055-93; GB50057-94 "Building mine design," and so on. To be followed by the construction of electrical design basis for the construction of electrical taken a solid step toward standardization.Intelligent technology is only a means of building is equipped with intelligent functions, stressing efficiency, low energy consumption. Cleaner, in the true realization of people-centered, under the premise of achieving energy conservation, enhance building's function, protection of the environment and sustainable development goals. Building the implementation of sustainable development from a strategic perspective, ecosystem, emphasis on environmental protection. Sustainable development is an eternal theme. Through years of practice, in a rational and pragmatic attitude, from the actual needs, and practical application of the standards, not blindly follow theone-sided pursuit of a comprehensive and advanced intelligent systems, but technically ahead. The design also done a reasonable investment, the use of different functions. investment and management requirements of the specific situation, identify advanced, reliability, Economic rationality and the optimal point of this concept now has become the intelligent building industry consensus. Building Intelligent technology, which will enable the construction of all colleges and universities have opened up this technology corresponding professional courses and the development of relevant professional students.Intelligent Building Technology include : construction equipmentautomatic control system, security system, the car park management system, automatic fire alarm and fire system that communications and computer network systems, integrated wiring system, broadcasting system, cable systems, video conferencing systems and the number of meetings, more than 10sub-system integration. The first independent from the domestic building intelligent technology to the development of systems integration subsystem.(1) Construction equipment monitoring technology20th century mainly concentrated monitoring of the 1980s, due to poor reliability, speed slow After the 1990s has been rarely used, and have been replaced by the Distributed Control. In the late 1990s, as computer technology, control technology, network and communications technology development and integration, Monitoring construction equipment technology has been developing rapidly。

建筑工程外文文献(含翻译)

建筑工程外文文献(含翻译)

建筑工程外文文献(含翻译)外文文献:Construction of the competition and competition strategy Engineering and construction firms from the United States dominated the global market for many decades but recent world events have altered their position.To investigate the driving forces and trends that will affect engineering and construction competition in the next decade, a research project, called the "Anatomy of Construction Competition in the Year 2000", was sponsored by the Construction Industry Institute's Construc-tion 2000 Task Force- The project examined the factors that affect competitiveness, including the following, The shaping of corporate capabilities; vertical integration and horizontal expansion to increase corporate capabilities and market share, including acquisition and mergers by offshore conglomerates and the acquisition of foreign firms by U. S. companies.Financing options; the role of privatization, build-own-transfer projects, and the nature of project financing in future markets, Management, organization, and structure; future management and organizational approaches, structures, and techniques to attract personnel to perform in a global competitive environment.Work force characteristics; future availability of engineering and construction workers at the professional and craft levels.Technological issues:how technology will affect competition and be used to offset work force shortages.Research Objectives and ScopeThis research project's goal is to collect information, to adaptto the 2000 and the engineering construction after adjustment, formulate strategies needed to provide insight and formulate 2000 engineering construction of possible development plan. This study reviewed the project construction process of history, current development trend, to determine the impact of the industry, and the impetus to the future industrial enterprises are related to reshape the ability, privatisation and financing methods of potential function and management, organization structure, methods for future development direction.Research scope includes selected some of the company, the company has interviewed expertise personnel. The staff professional wide range, including commercial buildings, public buildings, industrial infrastructure, infrastructure construction, power, light industry. The production process and space science. Engineering construction competitive characteristics Engineering construction of competition because the following reasons in change features:In the 1980s, and plan in the 1990s, the implementation of theproject construction are guided from contradictory situation, to cooperate.Should be in a positive view of the new company to enter the international market, because of its construction increased global cooperation opportunities. Cooperation will make all the partners, because the American company benefit can be found in the country partner, likewise, foreign companies opportunities will break into the U.S. Market.Competitive strategyFuture strategyIn 2000, the company will strive to do:Provide the highest quality serviceCan assume any part of the worldIn order to reduce the split ground and risk controlOut in international market the most competitive priceIn order to achieve the ideal, engineering construction should be: Increase staff capital investmentThe knowledge and improve labor technology levelHave solid complete communications and transport infrastructure Concentrate on key research, product quality is guaranteed, fine, and arouse the enthusiasm of the workers, improve workers technology level.The 21st century is the main factor fractal ring will compete in the international market, including the integration of productivity, union salary to abate, reduce the power industry management and privatization.American company competition ability, largely depends on developing and effective use of technical innovation. American companies need not only use the technical innovation, domestic by other countries optimization improved technology. In the future will be popular technology innovation will not some big breakthrough, but the existing technology continuous improvements.British buildings company profileIn the early 1990s, the head of the flexible builders who don't make a building, but what else can do, making many buildings company suffered a serious blow the economic depression, experienced and excessive expansion of real estate industry also. But, when he saw them in the real estate industry (in the big money, most of them in order to disencumber the bet down again in the real estate market. By Alan cosmas indicopleustesunder the leadership of Mr. Shaw ai enjoy in the old field company Merck's reputation can earn cash on the balance sheet, and can keep the balance. However, in some areas of the world, the company also man a dilemma, especially in the United States, the change from a Louisiana oil and natural gas market of recession, it is especially outstanding in Britain, the commercial and industrial real estate market, the company is faced with a difficult situation, with profits. And it also became worse. The company's development, walid UK early 1990s third big house builders, probably because London suburb will have a copy from the era of George sell buildings of former prime minister Margaret thatcher and world-famous. The company's character, chairman of the unique Laurie walid from Mr Often "give" iron lady public support. The approximate mythological blessing that he seemed destined to enjoy. In fact, the company also is different, the influence of the housing slump is strong in Laurie, under the leadership of the company now recover its stronger towards the financial status. Laurie retired charge again situation (1991 fall after his retirement he restored to the company recalled). As most of its business competitors, the industry in different market also suffered a serious blow, although the slump in 1993, the company is beginning to improve long-term credit rating IBCA institution of the first buildings company business development for a while. John, the company is different, have very good to withstand the latest world construction difficulties. They have abundant capital, clearly recognized that they have greatly reduced the book value of the asset. For example, in early 1990, they in real estate in the bank delimit lost 1 £2m value. After that, they cut and labor. Despite their housing sales still quite good, but its profit isreduced. The company is in most lai attention is famous for its environmental problems.The status and the tower mike company walid special form bright contrast, in 1993, their credit rating agency reduced by IBCA. This company in the 1980s most time trying to prove to the world that they are the UK's biggest builders, the information being understanding, and either, but hopefully it never happened. They suffer from cope with high growth rate cuts, to build houses. But the company is still tower mike Britain's biggest construction and building materials group company. October 1992, they closed the real estate business, and this is the will of the seven business to three (building, quarrying and residential building) part of the plan. Michael essien, Somerville, resistant to fly, the group's President, in the company after 22 years in the spring of 1992, sit on the seat of the hot ass. People think that the housing problem of exposure, this position has arrived at the point, which including several on a company's balance sheet of the large-scale joint enterprise, joint enterprise business, actually makes corporation debts machine more. T aylor wood of real estate industry recession Royce unpleasant experiences embodied in 1992, when the estate of autumn is DanielPeter HeJi sudden resignation, it also happens in its predecessor, Peter trillion resigned after all shocked by only a few months. Home, then reverse, Taylor wood Rolls-Royce announced due to bad management, caused severe losses. Although construction contracting business increasingly important status in a recession, but company two-thirds of income from this business is. However, the company has a huge investment assets securities, rental income more than 5 year 2000 million pounds. The company has no longer conduct riskybusiness projects, at least until the situation in better later.Eastern European architectural market competition situation analysisAt present, the economic reforms of the eastern Europe, thus caused confusion of these areas of business activities with the new economic system. Experts say, analyzed from a long-term perspective, using the market economic policy will bring a more stable, and more favorable economic environment. The reform of political economy in eastern Europe will be for those who are willing to invest in this area of the company to create a lot of money but market. If you keep the momentum, before long, eastern Europe 5640 billion dollars each year for the construction of international construction market will be more than one-third of the market. This area is open to the worldsituation inaugurated a new construction.The object of studyThe goal is to establish a framework, and international engineering and construction company may formulate feasible strategy, and to evaluate the. The framework has been introduced for the project construction company outside the eastern area in the construction business is very helpful. In order to measure the market opportunities and challenges, we sent the questionnaires and interviews, the individual to identify important success factors or aspects. Thus illustrates construction company in determining their strategy must possess the characteristics. Through the research of strategic framework has been set up in this area by an actual construction, an international engineering and construction company is considering to undertake the engineering, to test this strategic framework in specific market environment effect.The research methodsBy reference to the literature, questionnaire issued a personal interview, and the research target has been achieved. This research using data from the world's major construction company. Including 13 U.S. companies, two south Korean companies.Questionnaires to collect data compiled for investigation and ensure the consistency of the content. The problem, not the way people won't produce a certain criteria. Free to answer this question, ask questions in order to guarantee the unfavorable and overmuch. Participate in the company's answer to the question, questionnaire involving the problems in three aspects:(1) the eastern architecture market opportunities and challenges,(2) the construction of key factors YangChengGong city, (3) to determine the strategic framework, construction industry should make adjustments. Each main parts attached to a set of problems under which the object of study, make clear further.Interview based on construction engineering company voluntary under the condition of the study of the company, in answerThe telephone interviews survey or separate. For these companies how to build and use their own in this area is a strategic framework, if the researchers believe that the method is feasible, and they put main skills assembly written. By visiting personnel to answer questions, what is eastern architecture market success factor ? The important factor in his company is a positive or negative impact? What effect? Researchers also collected from international architectural engineering, as well as a lesson in later in the project of measures have been taken.The future trend of real estate investmentHousing has been the most important in the modern life of demand.Families with more spacious and comfortable housing demand has increased, and hope to have more disposable income in the house. As a result, households residential become very expensive. In addition, the new population statistics show that currently existing housing needs to sell the house of points, recreational property and retiree community. Commercial and industrial real estate investment is also very good. In order to judge what real estate market within the scope of comparative spruce, analyzed the market is very important. However, many investment prospects are very optimistic.The feasibility of the economy, the future of the investment real estate showing strong. But in general economic conditions, also do not exclude it "low" period. If investors can develop a safety strategy, so they will get considerable income. These strategies including effective operation and management, analyzes the problem, real estate and correct treatment, the contradiction between the owner and the occupiers and understand the role of investment and investment project, the influence of the government in property. The real estate investor can dominate the market this problem with real estate income has more than ordinary shares, the problem is an old problem. Actually no reason to believe that an investor can use the same market information and analytical skills in long-term operation can obtain excess profit. However, using internal message, data analysis and complex analysis method, so investors will probably make a better choice than its competitors. According to the real estate market, real estate investment process for investment and reduce costs "and" obtain goodresults provide the opportunity of investors.We know "lucky" or luck may produce short-term abnormal returns. We even have a few people because of good news to avoid "seek more expensive and succeed. Although a few of these people, they have intuition according to the real estate investment process. If you have the talent, don't study also to investment.The types of real estate investment in real estate investment is residence though relatively common form, and some properties of future investors have quite attractive. In each of the different fields during, and residential areas including real estate, commercial real estate, industrial real estate, agriculture, such as golf, and real estate and other special purposes. Although effective analysis skills necessary to investment projects with enlarged and complex and increasing, but the basic skills and real estate investment process remains unchanged.But the real income in accordance with the income level can rent levels and geographical location and according to the classification. The position of urban real estate value economic influence the effect of economic environment, so the analysis is very important. However, some places of the land clearly more suitable for specific purposes. For example, in the development of new urban residential area, the land may be too expensive, is not suitable for the development of low density garden project. Because it is so hard to use accurate way to predict future events, forecast and actual differences between the results may cause some serious problems. Overestimates rent rate or future price, low operation cost estimates, or to determine equipment renewal fee will cause serious cash flow problems. Fail to fulfill debt obligations or real estate tax lien may be compelledto cancel. All these things are closely related with investors.中文译文:建筑业的竞争及竞争策略美国的工程建筑公司几十年来一直控制着国际建筑市场,但近来世界上发生的事件改变了它的主导地位。

外文翻译 建筑电气

外文翻译  建筑电气
rnal

February 2012
their sites and set up on individual systems. By running the system through several testing conditions and inputting system parameters/ characteristics, a fault'performance profile can be determined. An FDD system of this kind minimizes the upfi-ont eapital cost to the owner and can be used on a variety of systems. It is prone to operator error, either through incorrect sensor placement or through ineorrect manual input of the system parameters. Also, since it must work on many system types, its accuracy on any one model is not tnaximized. This type of system is only benefieial when a service or maintenance call is scheduled and the maintenance personnel are physically at the unit, where as other FDD systems can monitor continuously with no one onsite. For this reason, we focus only on the two types of FDD that provide continuous monitoring.
  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

建筑电气电气工程设计包括两个主要的设计方面。

主要是一部分的电能的转换及分配和电力的供配、照明系统、防雷接地系统。

一般来说,建筑主要的变化包括:高压和低压配电系统、变压器、备用电源系统。

电力系统包括配电和控制,室内和室外照明系统包括所有类型的照明,防雷系统包括入侵波防护、闪电传感器、接地、等电位连接和局部等电位连接等。

辅助等电位连接等。

在短短的20年里,系统在技术和产品的面貌发生了翻天覆地的变化。

许多的设计理念也发生了巨大的变化。

开关设备如高压系统的第一个断路器油断路器,后来油断路器的逐步发展,不仅规模大,但是一般都包含油物质。

由于开关设备尺寸较大,我们还必须建立独立的设备房间,占据了大量的建筑面积。

现在真空断路器和六氟化硫断路器,不仅体积小,而且短路容量大,外壳尺寸远小于原来的橱柜,并且断路器没有任何油,防火性能大大提高。

而且断路器和其他低压设备在一个房间里,这样即节省空间又方便管理。

过去大容量的低压断路器,短路电流容量逐渐变大,规模也逐渐变小,而且更加稳定,使系统运行更加安全可靠,为设计带来了方便。

向着智能化低压断路器方向发展,断路器各种参数可以通过总线工业控制,信号直接传输到计算机。

干式变压器的出现,对建筑电气设计带来了极大的方便,因为没有变压器油泄漏和火灾的可能性,以便它可以很容易地安装在建筑本身,甚至直接到负荷中心。

它还消除变压器对油的需求限制,构建大容量设备时可以使用干式变压器。

在实际工程设计中曾应用四个台湾2500kVA干式变压器。

在使用紧急发电机方面,从性能和尺寸的角度来看,比过去进步很多。

除了使用柴油发电机;应急照明使用EPS备用电源;中断供电在一个毫秒以内的设备,可以使用UPS。

电力设备的控制从单一元件的控制到控制继电器控制变化。

除了更好的性能的各种组件的规模较小,也降低控制箱的规模。

由于数字技术更多的运用于控制能达到最佳的控制状态来控制设备。

进一步提高了节能的效果。

照明系统从过去单一光源、灯具和低效率的状态向更广泛的前景发展。

建筑中使用的光源可供选择的品种数量很多。

光的发光效率和色调在向着高效的方向发展,灯具不断地改进其效率和不同形式的灯具运用于不同场合。

例如,普通的荧光灯镇流器由普通的镇流器向节能型镇流器方向发展。

还对谐波组件的大小进行精简,生产低谐波电子镇流器。

许多措施如配件和灯具的使用,可以满足设计要求,同时能实现不同的体系结构、照明要求的各种场所。

无论照明和室内装饰照明还是道路照明和户外庭院建筑的光照明,所有的都展示了照明技术的发展和建筑照明的好处与便利。

另一个设计使用于电气设备和其他设备,如双电源开关的互投。

与传统的专业生产产品相比,除了传统的功率切换外,双电源还能满足每个其他电子设备的需要,极大地提高供电的可靠性和连续性。

电力电缆和电线是被广泛使用的产品。

过去的电线电缆,种类稀少。

现在引入各种电缆,从普通阻燃PVC电缆到耐火、少烟无卤、防电磁干扰环境的电缆等。

导线材料从普通的矿物绝缘绝缘材料到总线绝缘,高效绝缘等分支机构。

电力建设中这些技术是安全、可靠、方便的,提供了一个有效的环境保护。

针对特殊需求分布、建设的一些新设备得到了广泛的应用。

例如大型医院手术室医疗机构漏电保护、漏电监测系统等。

技术的发展强大在很多地方都有显现如实际工程和技术人员,以及我们自己的经验。

如此巨大的发展为中国的电力建设和电力建设安全使用奠定了良好的基础也创造了条件。

随着建筑智能化技术的深入应用,一些设备、系统控制和控制系统已逐渐成为一个专业性的监控,并具有开放建筑设备监控系统通信协议、互联网和通信系统。

建筑物内如自动功率控制系统,采用现场总线技术的数据采集和处理,集中控制变量分配系统实现远程监控和远程控制以及远程无人变电站的实现。

连续收集和分析系统能提前给出建议或警告,以方便系统的安全运行。

自动功率控制系统利用计算机技术、信息技术、控制技术、传感器技术、通信网络技术、电力电子技术等综合技术,它基本上可以取代传统的二次回路而且接线简单、性能可靠、易于维护。

与此同时,根据建筑的能耗进行的第二次重大节能照明控制系统也会逐步实现。

专业照明控制系统已经广泛应用于许多建筑物。

照明控制由一个实时传感器控制定时控制。

此外,现场控制、远程控制和控制多种灵活的控制现场,达到最大的能量利用,同时实现功能和人性化的舒适的照明系统。

各种建筑标准也相应出台,如1980年代末《标准建筑设计防火规范》GBJ16-87;1990年代《民用建筑照明设计标准》GBJ133-90;《民用建筑电气设计规范》JGJ/ T16 - 92;《工业企业照明设计标准》GB50034 - 92;《高层民用建筑设计防火规范》GB50045 - 95;《供配电系统设计规范》GB50052 - 95;《l0kV及以下变电所设计规范》GB50053 - 94;《低压配电设计规范》GB50054 - 95;《通用用电设备设计规范》GB50055 - 93;《建筑物防雷设计规范》GB50057-94等等。

紧随后的是建筑电气设计基础建设电气设计的标准化。

智能建筑技术只是一种手段,配备智能功能、强调效率、能耗低、更干净,真正实现以人为本。

在实现节能的前提下,提高建筑的功能、环境保护和可持续发展的目标。

构建可持续发展的实现从战略的角度来看,注重环境保护,保持生态系统稳定。

可持续发展是一个永恒的主题,经过多年的实践,在一个理性和务实的态度下,以实际需要和实际应用为标准,不是盲目地追随片面而是追求全面、先进的智能系统,在技术上做到领先。

设计需做了合理的投资,使用不同的功能。

根据投资和管理需求的具体情况来确定先进的、可靠的、经济合理的和最优的方案,这个概念现在已经成为智能建筑行业的共识。

建筑智能技术使所有的学院和大学的建设开辟了这一技术相应的专业课程和促进了相关专业学生的发展。

智能建筑技术包括:建筑设备自动控制系统、安全系统、停车场管理系统、火灾自动报警和消防系统、通信和计算机网络系统、综合布线系统、广播系统、有线电视系统、视频会议系统等,超过10个子系统的集成。

是我国第一个独立于国内建筑智能技术系统集成子系统的开发。

1、20世纪的建筑设备监控系统的发展由1980年代的集中监控开始,由于可靠性差、速度慢,1990年代后已经很少使用,并取代了分布式控制。

在1990年代末,随着计算机技术、控制技术、网络和通信技术开发和集成,监控施工设备技术发展迅速。

2、安全技术和安全措施也逐步发展,包括中央监控、入侵警报、访问控制(门)、巡逻削减等更多的周边防御和其他子系统。

安全系统从最初的子系统相互独立的到各子系统之间相互联系。

大大增加了安全性、可靠性和实时为人们的工作、学习和生活安全保障。

闭路电视监控系统从模拟到数字的方向发展,整个安全系统的规模也在运动数字系统、集成的方向发展。

3、运用通信网络技术的智能建筑通信网络,包括计算机网络、双向有线电视传输网络和电话通讯网络。

前两个智能网络作为一个宽带主干网络把几乎所有的信息技术和信息资源管理的几乎所有的用户连接到一起。

在1990年代中期之前,有一个为所有类型的网络和用户的市场。

但在1990年代末,由于以太网连接的灵活性和优越的性能、易于维护和使用等优点,ICT网络逐渐在列表中。

以太网传输速率,从最初的10Mbps,100Mbps 到1 Gbps,10Gbps甚至更高的利率。

智能建筑电话网络(ISDN,SL)目前用于语音通信、数据和图像的窄带宽数据通信,它让人们通过通信网络、电视、电话会议等功能实现相互交流。

智能访问技术的关键是与外界建立联系,它使世界变得越来越小。

人们的工作、生活发生了剧大的变化。

智能建筑访问网络或互联网,越来越多的高带宽需求的接收,满足日益增长的用户需求数据通信。

在有线电视网络的发展同时,无线网络由于其灵活性,也进入了一个快速发展阶段。

从2003年的基于最初的路线的轮询策略的研究到现在超过100兆赫。

移动互联网正为人们提供很大的方便,并在许多领域发展潜力巨大,网络正在成为趋势。

4、综合布线技术PDS是智能建筑数据、语音和多媒体的通信平台。

综合布线技术进入中国市场以来,因其优异的性能,并且对于智能建筑的国内市场来说是一个新概念、新技术,在建筑业立即引起了巨大的反响。

该技术已广泛应用于所有类型的智能建筑。

为了满足网络传输带宽和新产品的开发速度,PDS引入3线、5线到6线,甚至提高标准到七线系统的产品,以满足千兆网络的需求。

提高网络的传输速率,以适应已经投入10G网络市场的发展。

新的多模和单模光纤传输媒介作为一个很好的材料将被广泛使用。

从铜线、光纤电缆、技术和产品的不断更新,PDS充分反映了智能建筑的快速发展,新技术的应用和广阔的发展前景。

5、智能建筑系统集成技术一般连接各个子网络。

每个子系统的操作预计将完成他们的工作,但尚未达到共享信息资源。

为了实现有效的管理,各个子系统之间的信息资源共享、系统集成。

在系统集成过程中,选择平台集成、网络结构、集成子系统的范围是不同的、集成模型也是不同的。

随着计算机技术、网络技术、控制技术、显示技术的发展,建筑设备监控系统和其他系统通过计算机网络连接。

完成基于建筑设备监控系统的系统集成模式。

平等的在各自的系统集成,建立一个网络管理系统集成。

作为一个子系统可以降低现场控制网络集成。

实时数据子系统、开放、行业标准接口,转换成统一的格式存储在数据库或服务器系统集成。

综合网络管理系统实现统一管理子系统程序、监控和信息交换系统集成, 系统集成实现协议的各个子系统之间的联系有关控制和信息共享。

提高管理效率,增强处理突发事件的能力和节约能源的目的、节省人力。

这是建筑设备管理系统(BMS)。

系统集成不是我们的目的,而是为了增强建筑的功能和技术手段,提高管理效率,整合内容不是更好,但根据使用和管理的需要,以及成熟的技术,该系统是可靠和合理的投资。

有效管理的前提是集成的需求。

(6)智能住宅区1990年代国际电子智能住宅提出的理念。

智能建筑技术逐渐蔓延到居民区,在最初几个经济较发达的沿海城市已经成功。

智能技术开始建设居住小区的住宅和公共建筑。

智能建筑智能技术迅速扩展,已成为智能建筑发展的一个重要市场。

公共建筑和住宅智能化,这是市场的需求,也是实际的发展需求。

智能设计研究所将中国住宅将放在一个重要位置,为住宅提供一个智能平台。

住宅的智能设计是先进的和具有挑战性的领域。

住宅小区智能化技术的发展可以分为以下方面:系统设计强调以人为本的设计理念,应该迎合居民所有级别的方便、安全、舒适和处理功能的要求,处理好先进和实用之间的关系和合理的投资。

安全系统从一个单独的安全子系统为家庭和社区结合防御到国防安全的技术体系。

从单个运营商宽带访问信息、通信模式选项、xD-SL宽带接入网络、一个双向有线电视网络,形成地区计算机网络发展。

相关文档
最新文档