测试报告 Test Report

合集下载

31-Software test report软件测试报告

31-Software test report软件测试报告

Erstellungsdatum / Report dateFirma /CompanyAbteilung /Department Name /Name Telefon /Telephone Unterschrift /SignatureErsteller / Produced by:Freigabe durch 2) / Approved by 2) :Daimler-Sachnummer 1) / D aimler item number 1):Zeichnungs und Geometriestand/Drawing and geometry status(ZGS):Absender / Sender:Anlage zum PPF-B / Appendix tothe PPA -RSoftwareprüfbericht /Software Test ReportEmpfänger / Recipient:Beschreibung der Software 3) / Description of software 3):Diese Software löst folgende D aimler -Sachnummern ab / This software replaces the following D aimler item number:Änderungen zur vorherigen Software 4) / Changes compared to previous software 4):Softwareprüfbericht Konfiguration-Configuration Version: 1.6.4Uncontrolled copy when printed (QM/LS: Joern Lewerenz, 2008-01-03)Kompatibilität 6)/Compatibility 6)Auf welche Hardware(Sachnummer) kann die Software geflasht werden(Sachnummer)? / On which Hardware (Item number) it is possible to flash the Software(item number)?:HW Stand/HW Version HW Stand/HW Version HW Stand/HW Version HW Stand/HW Version HW Stand/HW Version HW Stand/HW VersionDaimler -Sachnummer / D aimler item number:ZGS / ZGS:Unterschrift / SignatureBetriebssystem/Operating systemQuarzfrequenz/Quartz frequency Blatt 2: Durchgeführte Prüfungen / Sheet 2: Tests completedSoftwareprüfbericht /Software Test Report2. 3.1.2.3.Allgemeine Angaben zur Hardware und Software / General datas to the hardware and software 3.1.Prozessor/MicrocontrollerProzessorfrequenz/ Microcontroller frequency 1. 2.Softwareprüfbericht Test - TestVersion: 1.6.4Uncontrolled copy when printed (QM/LS: Joern Lewerenz, 2008-01-03)Softwareprüfbericht /Software Test ReportBlatt 3: Erläuterungen / Sheet 3: NotesPlease see below for English textIm Fall von Komponenten welche Software beinhalten ist dieser Softwareprüfbericht als Anlage dem PPF-B erichtbeizulegen. Im Fall der Vorstellung von Software ersetzt dieser Softwareprüfbericht die Musterkarte für die betreffendeSachnummer. Der Begriff Software umfaßt in diesem Fall Flashware (Programme und Daten) und zugehörige Diagnosedaten(Diogenesdaten).1) Im Falle der Vorstellung von Software muß in diesem Feld die Softwaresachnummer stehen. Im Fall der Vorstellung einerHardware mit Software muß in diesem Feld die dazugehörige Bestellsachnummer eingetragen werden.2) Um eine unvoreingenommene Prüfung der Software gewährleisten zu können, wird für die Freigabe das …Vier-Augen-Prinzip“angewendet. Das bedeutet, daß der Unterzeichner nicht an der Entwicklung der geprüften Sachnummer mitgearbeitet haben darf.Er darf aber ein Abteilungs- oder Teamkollege sein, solange er an anderen Projekten arbeitet.3) Es sind alle offenen und nicht realisierten Merkmale aus dem Lastenheft zu dokumentieren unter Benennung derLastenheftversion. Zusätzlich muß der Auftraggeber der Software benannt werden.4) In diesem Feld müssen alle Änderungen und deren Auswirkungen auf externe Schnittstellen benannt werden.5) Bei der Angabe von mehreren Softwaresachnummern (Softwaremodulen) in der Konfigurationsmatrix ist zu beachten, dass dieeinzelnen Softwaresachnummern in der Reihenfolge anzugeben sind, die bei der Flashreihenfolge berücksichtigt werden müssen.6) Es müssen alle Hardwarevarianten genannt werden unter Angaben der Hardwaresachnummer und den dazugehörigenHardwareständen auf welche die Software geflasht werden kann. Dabei muss beachtet werden, dass nur dieseHardwaresachnummern aufgezählt werden die mit diesem Softwarestand getestet wurden.7) Es ist die gültige Testspezifikation zu nennen mit der die funktionalle Überprüfung der vorgestellten Konfiguration überprüft wurde.Sollte die Komponente einzelnen Testsequenzen nicht bestanen haben sind diese aufzuzählen und mit Maßnahmen zu belegen.Zusätzlich ist der Termin des Wiederholungsrelease zu nennen.This test report must be appended as related dokument with the PP A-report for Components containing software. In the case that only software is presented this software test report replaces the sample card for the relevant item number. In this case the term Software includes Flashware (programs and data) and associated diagnostic data (Diogenes data).1) In the case that only the software is presented, the item number must be dokumented in this field. If hardware is presented withsoftware the order number must be documented.2) The "four-eyes principle" is used during approval to ensure an unbiased examination of the software. This means that thesignatory must not have been involved in the development of the tested item number, however he may be a department or team colleague as long as he works on other projects.3) All open and not realized features from the specification under designation the specification version have to be stated.The sponsorof the changes has to be named.4) In this field all modifications and their effects on external interfaces must be designated.5) In case several software item numbers (software components) are indicated in the configuration matrix the order within the list hasto represent the flash sequence.6) All hardware variants able to be flashed have to be stated including hardware item number and hardware version. It is vital thatonly these hardware item numbers are listed that have been tested under these Software conditions.7) The valid test specification must be mentioned which was used to verify the functional requirements. Test sequences which did notpass must be mentioned with measures. In addition the date of the next bugfix release is to be noted.Softwareprüfbericht Erläuterung - Notes Version: 1.6.4 Uncontrolled copy when printed (QM/LS: Joern Lewerenz, 2008-01-03)。

机械性能测试报告

机械性能测试报告

检验结果 Test Result
综合判定Integrated Result:■合格Pass □不合格Not Pass
签发日期Issue Date: (YY/MM/DD)
注意事项Attention:
1.报告无检验单位公章无效;复制报告未重新加盖单位公章无效。 Report (Or Copy) will not be effective if no original chop of testing department。
规定非比例延伸强度
Proof strength at non-proportional
Mpa
elongation
≥180
195.00
■符合Match □不符合Not Match
延伸率 Elongaton(50mm)

/
/
备注 Remark
≥8
Match
/
□符合Match □不符合Not Match
2.报告涂改无效,无编号及批准人签章无效。 Report also will not be effective if altered,no ref. number and approval signature。
核准Approved By:
制作Prepared By:
Ref No.:
2011-0116B01
产品型号 Section No.
客户名称 Customer Name
测试日期 Test Date
检验项目 Item No.
抗拉强度Tensile Strength
机械性能测试报告
MECHANICAL PROPERTY TEST REPORT
Page No.:1/1

reliable test report(可靠性测试报告)

reliable test report(可靠性测试报告)

Conclusion
Baking test heat up to 320°C , keep 5 minutes , do not change color . The maximum leak rate is 1.6*10-9 atm·cc·s-1. For insulation resistance , minimum is 384,200 MΩ . Nickel thickness is between 1.69 μm and 1.92 μm . Gold thickness is between 0.129 μm and 0.168 μm. Conclusion : TO46(4+1)AP0156A header quality is good enough for
Resistance test result
Spec. is more than 1000 MΩ,minimum is 384,200 MΩ , judge OK. sample
Unit Ω MΩ 1 7.091 T 686.5G 2 744.2G 3 2.436T 4 384.2G 5 442.8G 6 826.7G 7 903.1G 8
Leak test result
Spec. is no more than 1.0*10-8 atm·cc·s-1 (means 1.0*10-9 Pa·m3·s-1),maximum is 1.6*10-9 atm·cc·s-1,judge OK.
Unit Pa·m ·s
3 -1
1 1.2*10
-10
Bake test result
All samples plating did not change color.
Reliability Test Report for TO46(4+1) AP0156A header

HELIUM LEAKAGE TESTING REPORT 压力测试报告

HELIUM LEAKAGE TESTING REPORT 压力测试报告
□ Y □ N
压力传感器的量程
Pressure guage range
2.Check with customer to make sure all components capable for the testing pressure
请客户检查确定所有部件可承受试验压力
□ Y □ N
压力传感器精度
Pressure gauge accuracy class :
3.All valves and regulators are in full open position
阀门和减压阀等在全开状态
□ Y □ N
压力传感器校验日期
Verification date:
4.All connections are tight, end fittings are properly capped
所有连接紧固,末端接头盖帽拧紧
□ Y □ N
测试开始温度
TestbeginningTemp:
测试数据
Test data
合格标准
Acceptance criteria
测试起始压力
Test beginning pressure
测试结束压力
Test end pressure
测试结束温度
Test end Temp
项目名称
Project name
测试时间
Test date
客户名称
End user
订单号
Order No.:
负责人
Supervisor
合同号
Contract No.
测试面板:
Panel description
测试区域
Test area

Test Report模版

Test Report模版

单元测试报告Unit Test ReportV1.0拟制人:学号:审核人:批准人:年月日目录(Content)1 引言(Introduction) (2)1.1 编写的目的(Purpose) (2)1.2 背景说明(Background) (2)1.3 定义(Definition) (2)1.4 参考文献(Reference) (2)2 测试情况概述(Test Overview) (2)2.1 测试对象(Test Object) (2)2.2 测试时间(Test Time) (3)2.3 测试方法(Test Methods) (3)2.4 测试约束(Test Constraint) (5)2.5 测试人员(Testers) (5)3 测试环境(Test Environment) (5)3.1 测试硬件环境(Test Hardware Environment) (5)3.2 测试软件环境(Test Software Environment) (5)4 测试情况(Test Situation) (6)4.1 测试内容(Test Content) (6)4.2 测试完成情况(Test Completion Situation) (9)5 测试结果及分析(Test Result and Analysis) (9)5.1 注册(Registration) (10)5.1.1 注册简介(Registration Instruction) (10)5.1.2 数据约束(Data Constraint) (10)5.1.3 无效测试案例(Invalid Test Case) (11)5.1.4 有效测试案例(Valid Test Case) (14)5.2 登录(Login) (18)5.2.1 登录简介(Login Instruction) (18)5.2.2 数据约束(Data Constraint) (18)5.2.4 有效测试案例(Valid Test Case) (20)5.3 用户列表(User List) (22)5.3.1 用户列表简介(User List Instruction) (22)5.3.2 数据约束(Data Constraint) (23)5.3.3 无效测试案例(Invalid Test Case) (23)5.3.4 有效测试案例(Valid Test Case) (23)6 评价 (23)1 引言(Introduction)1.1 编写的目的(Purpose)xxx小组成员对高校大学生生活信息平台进行测试后编写的单元测试报告,根据实际测试过程和测试结果进行汇总,并反映测试情况。

testreport中文翻译

testreport中文翻译

testreport中文翻译
Testreport是一种记录测试任务所进行的工作,和实施的结果的文档。

测试报告的目的在于提供一个可靠的,可重复的,有效的方法来收集,分析,记录和汇报测试任务的结果,其中包括错误和异常情况。

测试报告也是一种有效的沟通方式,可以帮助软件开发团队,管理人员和客户之间建立沟通,使用测试报告可以把测试任务的结果传达给客户,并且可以根据客户的要求做出相应的调整。

中文翻译:
测试报告是一种记录测试过程和结果的文件,旨在提供一种稳定、可重复的、有效的方法来收集、分析、记录和汇报测试任务的结果,包括错误和异常情况。

测试报告不仅是促进软件开发团队、管理者和客户之间沟通的一种有效方式,而且也可以将测试任务的结果反馈给客户,并根据客户的要求做出相应的调整。

AS NZS 1337 TEST REPORT 报告格式

AS NZS 1337 TEST REPORT 报告格式
□2.8 Extra HighImpact Resistance(mmBallistic,Velocityof175+4,−0m/s)
Sample ID
Location
Velocity(ft/sec)
Pass
Fail
1
Right ocular on32mmfrom the centre-line of the frame
Thermal Stability(Drop Ball)
Sample ID
Location
Pass
Fail
1
Right ocular on32mmfrom the centre-line of the frame
2
Right frame above the lens,within20 mmof the mid-line
.1SpecialTransmittanceRequirementsfor Photochromic Filters
Sample ID
FadedState(T0)
Darkened State(T1)
T0/T1
Pass
Fail
1
2
3
Specification
T0/T1≥1.25.
.2SpecialTransmittanceRequirementsPolarizingFilters
5
Left frame above the lens,within20 mmof the mid-line
6
Left at 90 ° the line through the front of both eyes
Note:Note:1m/s=0.3048 ft/s.

电磁兼容(EMC)测试报告

电磁兼容(EMC)测试报告

测试环形天线:环1 单项判定:P
附件2:9kHz-30MHz辐射电磁骚扰测试
测试环形天线:环2 单项判定:P
测试环形天线:环3 单项判定:P
第2页共3页
LAB-F-AAK0
报告编号:EMC- / 电磁兼容(EMC)测试报告 EMC Test Report
附件3:30M-300MHz辐射电磁骚扰测试
报告编号:EMC- /
电磁兼容(EMC)测试报告 EMC Test Report
测试申请单编 号NO.: 申请单位 Apply Dep: 测试单位Test Dept.:
样品描述 :
产品名称 Name: 产品型号 Product Model:
实验室地址 Address:
样品数量 Quantities:
环境温度Envionment Temperature:26℃
相对湿度Relative Humidity:60%
标准条款 测试项目 Test Item
测试仪器
Test Equipment
标准要求 Standard required
GB17743(4.3.1 )电源端子骚扰
电压
ESCI ENV216
电源端子L/N对外产生骚扰电压,频率范围为9KHz30MHz的电源端子骚扰电压限值见表2a。
Pቤተ መጻሕፍቲ ባይዱ
高频辐射电磁 CDN L-801 值见表3b,或按附录B规定的试验方法进行,每根电缆 符合 符合 符合 附件
骚扰
M2/M3 上测得共模端子电压不得超过标准中附B表B.1限值
3
GBT18595 周波跌落
EMS61000- 跌落电压30%,周期数10,相位180°,试验后灯应正 11K 常点亮
符合 符合 符合

样品测试报告(模板)

样品测试报告(模板)
46g钢球50cm高度跌落3
目测 Visual
落球测试
次,无破损 46g ball
落球测试仪
Falling ball test 50cm height drop 3
Falling ball tester
times, no damage
备注 Remarks
检测人员请严格按照以上内容进行测量
Inspection personnel in strict accordance with the above content measurement
透过率测试仪 Transmittance
透过率测试仪 Transmittance
铅笔硬度测试仪 Pencil hardness
tester
是否有彩虹纹 Is there a rainbow
否 no
目测 Visual
成品贴合排气 Finished fit
exhaust
排气是否正常 Exhaust is normal
测试日 产品名称
Product name
测试项目 Test item
样品测试报告
Sample test report
测试编号 Test
外观、尺寸、结构、透光率、表面硬度、贴合排气、水滴角、钢化强度 Appearance, size, structure, light transmittance, surface hardness, fit and exhaust, water drop angle, tempering strength
9H
千分尺/卡尺 Micrometer /
caliper 千分尺/卡尺 Micrometer /
caliper 千分尺/卡尺 Micrometer /

变频器 试验报告Test Report

变频器 试验报告Test Report
结论Conclusion:合格
审核人Auditer
试验人员Operator
变频器试验报告Test Report
共 页 第 页
项目:
Project
广西盛隆冶金
装置:
Unit
--
工号:
Section
--
名称
Name
2#主电低配室
试验日期
Test Date
2008.10.25
集卷平台升降变频器(G76)
型号:6SE6440-2UD37-5FB1 电机:75KW (90KW VT)
六.变频调节控制器调校:
给变频器加4-20mA电流信号,变频器按比例增加转数,其反馈模拟量与给定量相符合
试验仪器及其编号Test Apparatus & Apparatus No.:兆欧表ER05-8-0075307-8005微机继电保护测试仪 数字万用表
试验依据 According to trial:GB50150-2006《电气装置安装工程电气设备交接试验标准》
结论Conclusion:合格
审核人Auditer
试验人员Operator
输入:3AC 380V…480V +10%…-10% 43A 47~63HZ
输出:3AC 0…INPU+38A 45A(VT)0~650HZ
厂家:西门子电气传动有限公司 出厂编号:ZYW21766400023
一.变频器内部接线正确,外部接线正确。
二.变频器内部线路,外部线路绝缘均正常。
三.参数设定:
六.变频调节控制器调校:
给变频器加4-ቤተ መጻሕፍቲ ባይዱ0mA电流信号,变频器按比例增加转数,其反馈模拟量与给定量相符合
试验仪器及其编号Test Apparatus & Apparatus No.:兆欧表ER05-8-0075307-8005微机继电保护测试仪 数字万用表

测试报告英文

测试报告英文

测试报告英文Test ReportDate: [Date of the test]Tester: [Name of the tester]Introduction:This test report provides an overview of the testing performed on [product or software name]. The purpose of this test was to evaluate the functionality and performance of the [product or software] to identify any issues or bugs and suggest improvements. Testing Environment:The testing was carried out on the following equipment and software:- Computer: [Computer specifications]- Operating System: [Operating system name and version]- Internet Connection: [Internet connection type and speed]- Software: [Software name and version]Test Cases:The following test cases were executed during the testing process: 1. Functional Testing:- Test Case 1: [Describe the test case]- Test Case 2: [Describe the test case]- Test Case 3: [Describe the test case]2. Performance Testing:- Test Case 4: [Describe the test case]- Test Case 5: [Describe the test case]- Test Case 6: [Describe the test case]Test Results:After executing the test cases, the following results were obtained: 1. Functional Testing:- Test Case 1: The [function or feature] worked as expected without any issues.- Test Case 2: The [function or feature] encountered a bug where [describe the bug]. This issue needs to be addressed and fixed.- Test Case 3: The [function or feature] worked as expected without any issues.2. Performance Testing:- Test Case 4: The [function or feature] performed well within the expected response time.- Test Case 5: The [function or feature] encountered a performance issue where [describe the issue]. This issue needs to be addressed and optimized.- Test Case 6: The [function or feature] performed well within the expected response time.Conclusion:In conclusion, the [product or software] performed well in terms of its functionality, except for the issues identified in Test Case 2 and Test Case 5. These issues need to be addressed and fixed in order to improve the overall performance of the [product or software].The performance of the [product or software] met expectations in all other test cases.Recommendations:Based on the test results, the following recommendations are made: - Fix the bug identified in Test Case 2 to ensure the proper functionality of the [product or software].- Optimize the performance issue identified in Test Case 5 to improve the overall speed and responsiveness of the [product or software].Overall, the [product or software] has the potential to be a reliable and efficient tool, but further improvements are necessary to enhance its functionality and performance. Further testing and development should be conducted to address the identified issues and ensure a smoother user experience.。

巴斯巴叠层母排电性能测试

巴斯巴叠层母排电性能测试

Test Category 测试类别: Reliability Test可靠性测试 Qty of the Samples样品数量:1 SetsT RPhoto Generally, The test report is only responsible for samples 测试报告只对样品负责5 of 7BCG-20130802Test item 1: Dielectric withstand voltage 5000VDCNo.Generally, The test report is only responsible for samples 测试报告只对样品负责F-0227-A23test result 测试结果set up设置测试参数during testing 测试中Appendix Photo-1DescriptionPhoto16 of 7Test item 测试项目: Insulation resistance test 绝缘电阻测试Pass (通过)■Test instrument/EquipmentTypeCalibration Due Date 型号校准有效期1.Test Purpose (试验目的)验证铜排之间的绝缘电阻是否符合产品要求。

2.Test Condition, Method (试验条件和方法)BCG-201308024. Test Result (试验结果)( please detail the description of product appearance, dimension and performance, 请详细描述试验后测试中没有任何击穿和火花发生,,绝缘电阻满足要求.2.1 设置测试参数1000VDC/绝缘电阻值大于 20MΩ。

2.2 把规定的电压接到每一对铜排之间进行测试.绝缘电阻值要满足要求,测试过程中无任何击穿和火花产生.备注No.5.Test Conclusion (结果判断)DesignationEquipment IDRemark 1GY-5000V8A 2013-10-18绝缘耐压测试机1199045仪器名称仪器编号3.Request (评判要求)PageReport No. 7 of 7BCG-20130802Test item 测试项目: Insulation Resistance Test 绝缘电阻测试No.Generally, The test report is only responsible for samples 测试报告只对样品负责F-0000-AT EST R EPORTsample prepare 样品准备during testing 测试中Appendix PhotosDescriptionPhoto123test result 测试结果。

Reliability Test Report_可靠性测试报告_PP

Reliability Test Report_可靠性测试报告_PP

To:CC :Repor Repor t展旺连接器科技有限公司ZhanWang Linker Co., LTD.QC Reliability Test Report (PP 样板可靠性测试报告)Power off with battery IEC 60068-2-64:2008Sample status: Unpackaged, Non-operation Frequency Range: 5~500 Hz Orientation:Duration Vibration parameter table: X, Y, Zaxis1hr/axis,total 3hrsRMS= 1.627Grms 2 pcs 0Power off with battery WGI outdoor products should pass InternationalStandard IEC60529 IPX4 level water resistance test without water penetration in the direction most likely to cause water to enter the unit. 2 pcs 0* Products are switched off * 35°C 48h 5% NaCl salt fog concentration, 48hDrying time* Product cleaned after salt mist test (external and internal parts). 1 pcs 0Power off with battery * 0.6m drop on a hard wooden floor. 1 time for each side (front, back, top, bottom, left and rightsides)* After testing each side, please do functional and cosmetic check to make sure they can work properly. 1 pcs 0* Lowered Lead Limits to 100 PPM for WGI’s products. Please use ROHS standard to run the test.* Accessible Substrate: Lead limits to 100PPM for ALL WGI’s products* Lead limits on ALL WGI’s products, paint on the box, and paint on accessories will remain at 90 PPM.1 pcs 0Swing cable +/- 80 degree for 1K times.With 200g load.2 pcs 0*3M 610 tape adheres to the painting for 1minute, then pull up the tape at 45° anglerapidly, repeat 3 times. 2 pcs 0* Use Alcohol 95%* Load: 500gf* Cycles: 50 (One cycle= forward +backward)* Speed: 1 cycle per 2 sec* Stroke: 2cm 2 pcs 07. cable Swing test (弯曲)Pass 8. Scotch adhesive tape (透明胶带测试印刷强度)N.C 9. Cleaning agents Benzine 100/140 and denatured alcohol 96% (酒精测试印刷强度)N.C4. Salt mist test (盐雾)Pass5. Drop Resistance (跌落)Pass6. ROHS Test (RoHS )Pass 2. Vibration (振动)N.C3. Water Resistance (防水)Pass* 2H Pencils (Mitsubishi)* Rub the lead against an abrasive paper perpendicularly until a flat smooth and circular cross section is obtained * Hold the pencil firmly with the lead againstthe surface at 45°, push away from the operator* A weight of 500g applied 2 pcs 0* Test the Master carton package at-40C for 72 Hrs * After this test is completed, Observe any change in the Master Carton Package.* Then do next test (Damp Heat Storage Test)1 pcs 0* Test the Master Carton Package at 65C,RH 95% for 72 Hrs.* After test is completed, check any change on the Master Carton Package.* Then do next test (Package Random Vibration Test) 1 pcs 0* Packaged-product will be given random vibration inputs (vertical linear motion) first in the base-down (normal shipping) orientation for 30 minutes,then in the top-down orientation for 10minutes and continuing in the side-to-side and front-to-back orientations for 10 minutes each. The same vibration spectrum is used for all tests.* The acceleration vs. frequency profile (spectrum) used is shown in the following figure.Frequency band 5 –300 HZ (tolerance ± 10%) 1 pcs 013. Packaging Random Vibration Test (包装成品振动测试)Waiting...10. Hardness Test (Scratch Test)(2H 铅笔硬度测试)N.C11. Cold storage test (包装箱冷冻测试)Waiting...12. Damp Heat Storage (包装箱高温高湿测试)Waiting...MA-。

相关主题
  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

SGS Taiwan Ltd.
Chemical-Taipei 33 WuChyuan Road, Wuku Industrial Zone, Taipei County, Taiwan /
33
t + 886 (02)2299 3279 f + 886 (02)2299 3237
Member of the SGS Group (SGS SA)
測試報告 Test Report
號碼(No.) : CE/2010/62637
日期(Date) : 2010/06/21
頁數(Page) : 2 of 7 *CE/2010/62637*
詮璨科技股份有限公司 SEMTRON MICROTECH CORPORATION 台北縣中和市健康路156號4樓 4F, NO. 156, JIANKANG RD., JHONGHE CITY TAIPEI COUNTY 235. TAIWAN
Unless otherwise stated the results shown in this test report refer only to the sample(s) tested. This test report cannot be reproduced, except in full, without prior written permission of the Company. This Test Report is issued by the Company under its General Conditions of Service printed overleaf or available on request and accessible at /terms_and_conditions.htm. Attention is drawn to the limitation of liability, indemnification and jurisdiction issues defined therein. Any holder of this Test Report is advised that information contained hereon reflects the Company’s findings at the time of its intervention only and within the limits of Client’s instructions, if any. The Company’s sole responsibility is to its Client and this document does not exonerate parties to a transaction from exercising all their rights and obligations under the transaction documents. Any unauthorized alteration, forgery or falsification of the content or appearance of this document is unlawful and offenders may be prosecuted to the fullest extent of the law.
Member of the SGS Group (SGS SA)
測試報告 Test Report
號碼(No.) : CE/2010/62637
日期(Date) : 2010/06/21
頁數(Page) : 3 of 7 *CE/2010/62637*
詮璨科技股份有限公司 SEMTRON MICROTECH CORPORATION 台北縣中和市健康路156號4樓 4F, NO. 156, JIANKANG RD., JHONGHE CITY TAIPEI COUNTY 235. TAIWAN 方法偵測 極限值 (MDL) 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
測試項目 (Test Items) 多溴聯苯總和 / Sum of PBBs 一溴聯苯 / Monobromobiphenyl 二溴聯苯 / Dibromobiphenyl 三溴聯苯 / Tribromobiphenyl 四溴聯苯 / Tetrabromobiphenyl 五溴聯苯 / Pentabromobiphenyl 六溴聯苯 / Hexabromobiphenyl 七溴聯苯 / Heptabromobiphenyl 八溴聯苯 / Octabromobiphenyl 九溴聯苯 / Nonabromobiphenyl 十溴聯苯 / Decabromobiphenyl 多溴聯苯醚總和 / Sum of PBDEs 一溴聯苯醚 / Monobromodiphenyl ether 二溴聯苯醚 / Dibromodiphenyl ether 三溴聯苯醚 / Tribromodiphenyl ether 四溴聯苯醚 / Tetrabromodiphenyl ether 五溴聯苯醚 / Pentabromodiphenyl ether 六溴聯苯醚 / Hexabromodiphenyl ether 七溴聯苯醚 / Heptabromodiphenyl ether 八溴聯苯醚 / Octabromodiphenyl ether 九溴聯苯醚 / Nonabromodiphenyl ether 十溴聯苯醚 / Decabromodiphenyl ether
鉛 / Lead (Pb)
mg/kg
2
n.d.
汞 / Mercury (Hg)
mg/kg
2
n.d.
六價鉻 / Hexavalent Chromium Cr(VI) by alkaline extraction
mg/kg
2
n.d.
鹵素 / Halogen 鹵素 (氟) / Halogen-Fluorine (F) (CAS No.: 014762-94-8) 鹵素 (氯) / Halogen-Chlorine (Cl) (CAS No.: 022537-15-1) 鹵素 (溴) / Halogen-Bromine (Br) (CAS No.: 010097-32-2) 鹵素 (碘) / Halogen-Iodine (I) (CAS No.: 014362-44-8) 參考BS EN 14582:2007, 以離子層 析儀分析. / With reference to BS EN 14582:2007. Analysis was performed by IC.
=================================================================================================================== 測試結果(Test Results) : 請見下一頁 (Please refer to next pages).
測試結果(Test Results) 測試部位(PART NAME) NO.1 : 測試項目 (Test Items) 鎘 / Cadmium (Cd) 整體混測 (MIXED ALL PARTS) 單位 (Unit) mg/kg 測試方法 (Method) 參考IEC 62321: 2008方法, 以感 應藕合電漿原子發射光譜儀檢測. / With reference to IEC 62321: 2008 and performed by ICP-AES. 參考IEC 62321: 2008方法, 以感 應藕合電漿原子發射光譜儀檢測. / With reference to IEC 62321: 2008 and performed by ICP-AES. 參考IEC 62321: 2008方法, 以感 應藕合電漿原子發射光譜儀檢測. / With reference to IEC 62321: 2008 and performed by ICP-AES. 參考IEC 62321: 2008方法, 以UVVIS檢測. / With reference to IEC 62321: 2008 and performed by UV-VIS. 方法偵測 極限值 (MDL) 2 結果 (Result) NO.1 n.d.
SGS Taiwan Ltd.
Chemical-Taipei 33 WuChyuan Road, Wuku Industrial Zone, Taipei County, Taiwan /
33
t + 886 (02)2299 3279 f + 886 (02)2299 3237
測試報告 Test Report
Hale Waihona Puke 號碼(No.) : CE/2010/62637
日期(Date) : 2010/06/21
頁數(Page) : 1 of 7 *CE/2010/62637*
詮璨科技股份有限公司 SEMTRON MICROTECH CORPORATION 台北縣中和市健康路156號4樓 4F, NO. 156, JIANKANG RD., JHONGHE CITY TAIPEI COUNTY 235. TAIWAN
50 50 50 50
n.d. n.d. n.d. n.d.
mg/kg
Unless otherwise stated the results shown in this test report refer only to the sample(s) tested. This test report cannot be reproduced, except in full, without prior written permission of the Company. This Test Report is issued by the Company under its General Conditions of Service printed overleaf or available on request and accessible at /terms_and_conditions.htm. Attention is drawn to the limitation of liability, indemnification and jurisdiction issues defined therein. Any holder of this Test Report is advised that information contained hereon reflects the Company’s findings at the time of its intervention only and within the limits of Client’s instructions, if any. The Company’s sole responsibility is to its Client and this document does not exonerate parties to a transaction from exercising all their rights and obligations under the transaction documents. Any unauthorized alteration, forgery or falsification of the content or appearance of this document is unlawful and offenders may be prosecuted to the fullest extent of the law.
相关文档
最新文档