Column Tag No.:C-4101 (MAX)Job No.:4506A Client :JOL

Project :SR - Plant -4, 5

Input Data Packing type =Pall metal rings Packing size

=25mm

Gas / Vapour Properties Gas / Vapour flow rate, V =3843kg/h = 1.0675kg/s

= 3.9352kg/m 3

Liquid Properties

Liquid flow rate, L =2317kg/h =0.6436kg/s =769.87kg/m 3

Conversion :Liquid Viscosity, µL =0.0002218Ns/m 20.2218C p =

Ns/m 2

Packing factor, F p

=

160m -1

Calculation

Liq.-Vap. Flow factor, F LV

==Design for an initial pressure drop of 20mm H 2O /m packing From K 4 v/s F LV ,K 4

=0.76K 4 at flooding =

4.50

Trial % flooding

==Gas mass flow rate, V m

==

2.2198kg/m 2.s Trial column c/s area =V / V m

(Trial A s )

=

0.4809m 2Trial column dia., D =

0.7825m

D = (4/pi) x Trial A s COLUMN DIAMETER / HYDRAULIC CHECK

0.00022180(1/2)

Round off 'D' to nearest standard size

Therefore, D=0.600m

Column C/S area, A s=2A s =(pi/4) x D2

% flooding=% flooding = Trial % flooding x (Trial A s / A s) Conclusion

Generally packed towers are designed for 50% -- 85% flooding.

If flooding is to be reduced,

(i) Select larger packing size and repeat the above steps.

OR

(ii) Increase the column diameter and repeat the above steps.

Input Data 0.017 N/m =dyne/cm Liquid-phase Surface Tension, =17dyne/cm Liquid Viscosity =0.2218cP n

=

1.13080

Calculation ln HETP =HETP

=

1.323415ft =

0.403377m

For separations, less than 15 theoritical stages, a 20% design safety factor can be applied.Considering 20% safety factor, HETP =0.484052m

For separations, requiring 15 to 25 theoritical stages, a 15% design safety factor can be applied.Considering 15% safety factor, HETP =0.463883m

HETP PREDICTION

Norton's Correlation Applicable Norton's Correlation Applicable