箱式变电站停送电操作流程The operational flow for stopping and resuming power supply in a box-type substation involves several key steps. Initially, it is crucial to ensure that all personnel involved in the operation are properly trained and qualified. Safety equipment such as gloves, helmets, and insulated boots must be worn to minimize the risk of accidents.Before stopping the power supply, it is essential to notify all relevant personnel and departments to ensure that they are aware of the impending operation and can take necessary precautions. Additionally, it is important to inspect the substation equipment for any abnormalities or potential hazards.During the power supply stopping process, the main switchgear should be operated first. This involves opening the circuit breakers and disconnecting the transformers to isolate the substation from the power grid. It is crucial to follow the specified operating procedures to ensure safety and prevent damage to the equipment.After the power supply has been stopped, it is necessary to conduct a thorough inspection of the substation to ensure that all power sources have been effectively isolated. This includes checking for residual voltages and verifying the isolation status of all relevant equipment.When resuming the power supply, the same safety precautions and operating procedures must be followed. The transformers and circuit breakers should be reconnected in the reverse order of the stopping process. It is important to monitor the equipment's operational status and ensure that there are no abnormalities or issues during the resumption.Finally, once the power supply has been fully resumed, a final inspection should be conducted to verify that all equipment is operating normally and that there are no remaining hazards. All personnel involved in the operation should also be debriefed on the process and any observed issues or concerns.箱式变电站的停送电操作流程涉及几个关键步骤。

箱变停送电操作流程

箱变停送电操作流程

箱变停送电操作流程一、准备工作在进行箱变停送电之前,首先要进行一些准备工作。

操作人员应该穿戴好个人防护用具,如安全帽、绝缘手套、绝缘靴等。

同时,还需要检查工作区域是否有明显的危险物品,确保工作环境安全。

二、停电操作1. 停电前,应提前通知相关单位和居民,告知停电时间和原因,以免造成不必要的损失。

2. 在停电前,应先关闭箱变的进线开关,并确保进线开关处于断开状态。

3. 然后,依次关闭箱变的出线开关,先关闭高压侧的出线开关,再关闭低压侧的出线开关。

4. 关闭完所有的出线开关后,再关闭箱变的刀闸开关,将箱变与电网完全隔离,确保安全停电。

三、送电操作1. 送电前,应确保箱变内部和外部的工作环境安全,检查各个设备的运行状态是否正常。

2. 先打开箱变的刀闸开关,确保箱变与电网连接。

3. 然后,依次打开箱变的出线开关,先打开低压侧的出线开关,再打开高压侧的出线开关。

4. 最后,打开箱变的进线开关,允许电能从电网进入箱变,实现送电操作。

四、注意事项1. 在进行停送电操作时,应遵循“先送后停、先停后送”的原则,确保操作的安全性。

2. 操作人员在进行停送电操作时,应注意操作的顺序,确保操作的正确性。

3. 在操作过程中,要密切关注各个设备的运行状态,如有异常情况应及时采取相应的措施,确保安全。

4. 在进行送电操作时,应注意电压的稳定性,避免电压过高或过低造成设备的损坏。

5. 操作完成后,应及时清理工作现场,将工具和设备归位,确保工作区域的整洁和安全。

通过以上的操作流程,我们可以实现箱变的停送电操作。

在进行操作时,一定要严格按照操作规程进行,确保操作的安全性和准确性。

同时,在操作过程中要密切关注设备的运行状态,如有异常情况要及时采取相应的措施。

只有做好各项准备工作和注意事项,我们才能顺利完成箱变的停送电操作,确保电力系统的安全运行。

箱式变电站停送电操作流程

箱式变电站停送电操作流程

箱式变电站停送电操作流程英文回答:Box-type substation is an important component of the power distribution system. It is responsible for transforming high voltage electricity from the transmission system into low voltage electricity for local consumption. The operation of stopping and restoring power in a box-type substation involves several steps. Let me explain the process in detail.Firstly, before initiating any operation, it is crucial to ensure the safety of the personnel involved. This includes wearing appropriate personal protective equipment (PPE) such as gloves, safety glasses, and helmets. It is also important to isolate the substation from the power supply by opening the circuit breaker and locking it in the open position.Next, the power supply to the substation needs to bedisconnected. This can be done by switching off the main switch or disconnecting the power cables from the incoming supply. It is important to follow the correct proceduresand ensure that all power sources are properly isolated to avoid any accidents.Once the power supply is disconnected, it is necessaryto check the status of the equipment inside the substation. This includes inspecting the circuit breakers, transformers, and other components for any signs of damage or malfunction. Any issues should be reported and resolved beforeproceeding with the operation.After ensuring the equipment is in good condition, the next step is to perform the necessary maintenance or repairs. This may involve replacing faulty components, cleaning or lubricating moving parts, or conducting routine inspections. It is important to follow the manufacturer's instructions and industry best practices during this process.Once the maintenance or repairs are completed, thepower can be restored to the substation. This involves reversing the steps taken to disconnect the power supply. The main switch can be turned on or the power cables can be reconnected, depending on the specific configuration of the substation. It is essential to follow the correct sequence and ensure that all connections are secure.Finally, after restoring power, it is important to test the substation to ensure everything is functioning properly. This may involve conducting voltage and current measurements, checking for any abnormal readings, and verifying the proper operation of all equipment. Any issues should be addressed before the substation is put back into service.中文回答:箱式变电站是电力配电系统的重要组成部分。

地面变电所停送电制度范本

地面变电所停送电制度范本

地面变电所停送电制度范本一、停送电的目的和依据1.1 目的为了确保地面变电所的运行安全和电力供应可靠,维护设备设施的正常运行,减少事故发生的风险,特制定本停送电制度。

1.2 依据本停送电制度制定依据《电力维护管理规程》、《电力设备运行规程》以及相关的法律法规、规范和技术规程。

二、适用范围本停送电制度适用于地面变电所内的设备维护、检修、运行以及其他情况下的停电和送电操作。

三、停送电程序3.1 停电程序(1)工作准备:停电操作前,相关人员应穿戴好个人防护装备,核对停电指令以及停电范围,做好相关设备的标示和封锁。

(2)通知停电:经过核实工作准备无误后,通知相关部门或设备运维人员,以确保停电操作的安全进行。

(3)开关操作:按照停电指令,依次关闭变电所内的开关设备,确保电力供应完全切断。

(4)设备准备:在电力完全切断后,进行设备的停止运行、拆卸或维修。

(5)工作结束:设备维护、检修或其他需要的工作完成后,重新启动和检修设备,准备送电。

3.2 送电程序(1)工作准备:送电操作前,相关人员应核对送电指令以及送电范围,并保证送电设备和线路的正常运行状态。

(2)通知送电:经过核实工作准备无误后,通知相关部门或设备运维人员,以确保送电操作的安全进行。

(3)开关操作:按照送电指令,依次启动并关闭变电所内的开关设备,确保电力供应恢复正常。

(4)设备检查:检查送电后设备的运行情况,确保设备正常运行。

(5)工作结束:送电操作完成后,报告相关部门或设备运维人员。

四、安全措施4.1 施工标准进行停送电操作期间,必须按照相关的施工标准和操作规程进行操作,确保人员和设备的安全。

4.2 操作人员操作人员必须具备相应的岗位资格和操作经验,参加相关的培训和考核,并持证上岗。

4.3 个人防护停送电操作人员必须穿着符合规定的个人防护装备,包括安全帽、绝缘手套、绝缘鞋等,确保自身安全。

4.4 设备防护停送电过程中,必须在设备开关上进行标识和封锁,防止误操作以及他人的非授权接触设备。

箱变标准化作业指导书

箱变标准化作业指导书

箱变作业指导书目录前言 (2)1 范围 (3)2 规范性引用文件 (3)3 运行人员技能要求 (3)4 运行人员配备.............................错误!未定义书签。

5 主要工器具和资料准备.....................错误!未定义书签。

6 工作前准备 (4)7 安全措施 (4)8 二交一查 (4)9 作业程序及作业标准 (4)前言风电场箱变巡视、检测、维修质量的好坏对保证风电场安全运行具有重要作用,为了严格执行相关的规程、规范、标准及其它规定,规范箱变巡视、维护和检修作业,保证巡检人员安全、优质地完成各项现场工作,确保作业人员的人身安全及风电场箱变的安全稳定,华东分公司根据日常工作的需要,组织编写了《中广核风电有限公司华东分公司箱变作业指导书》,并组织有关专业人员进行了认真审查。

本作业指导书是依据国家有关标准、规程和规范并,并结合公司系统各运行风场箱变运检工作人员的现场工作经验而制定的,适用于华东分公司管辖内所有风电场的箱式变压器。

35kV箱变作业指导书1 范围本标准规定了电缆线路运行人员的技能、程序、报告和记录等方面的要求。

本作业指导书规定了箱变运行工作中危险源辨识,做到安全生产。

本标准适用于35kV箱变定期运行巡视、检修工作中危险源辨识2 规范性引用文件下列文件中的条款通过本标准的引用而成为本标准的条款。

凡是注日期的引用文件,其随后所有的修改单(不包括勘误的内容)或修订版均不适用于本标准,然而,鼓励根据本标准达成协议的各方研究是否可使用这些文件的最新版本。

凡是不注日期的引用文件,其最新版本适用于本标准。

国家电网公司电力安全工作规程(变电部分、线路部分)中广核风电有限公司下发的各项制度规程3 运行人员技能要求3.1 熟悉《国家电网公司电力安全工作规程》(线路部分、变电部分);3.2应熟悉并掌握《电力法》;3.3 应身体健康、精神状态良好,心态正常,工作责任心强,有一定的对外协调处理能力。

10KV箱式变电站停送电操作规程精选全文

10KV箱式变电站停送电操作规程精选全文

精选全文完整版(可编辑修改)
10KV箱式变电站停送电操作规程
1.停电操作顺序
1.1当线路停电时,按以下停电操作顺序进行操作。

1.2 高压柜停电的程序:先分断路器→把手柄旋至分断闭锁装置位置→分下隔离→分上隔离→合接地刀闸→进行闭锁。

1.3 停电完毕后必须在负荷开关(隔离开关)操作手柄上悬挂“禁止合闸,有人作业”标识牌,并通知调度室,做好记录,停电操作必须严格执行“手指口述”安全确认法进行操作。

2.送电操作顺序
2.1进行送电操作时必须要确认该线路上无工作人员,确认无误后,方可按规定程序送电。

2.2操作中有疑问时,不准擅自更改操作记录和操作票,必须向当班调度员报告,弄清楚后在进行操作。

2.3 倒闸操作时操作人要填写操作票,每张操作票只准填写一项操作任务,操作票用钢笔或圆珠笔填写,且字迹工整清晰。

2.4送电的操作顺序如下
高压柜送电的操作顺序:打开闭锁→手柄旋至工作位置→分开接地刀闸→合上隔离→合下隔离→合断路器。

3.停送电操作注意事项
3.1 操作人员必须熟悉供电系统图及供电设备状态。

3.2 停电、送电、倒闸操作,必须服从调度的统一指挥,得到准确命令和许可后,方可进行。

停送电前必须听清命令并准确找对所停送电开关(设备序号和所控制区域名称)。

3.3操作时严格执行停送电操作规程,必须戴绝缘手套,穿绝缘靴或站在绝缘台上操作。

操作时一人监护,一人操作。

变电设备停送电操作作业指导书

变电设备停送电操作作业指导书

变电设备停送电操作作业指导书Q/GXD⼴西电⽹公司企业标准变电设备停送电操作作业指导书⼴西电⽹公司发布前⾔为提⾼⼴西电⽹公司供电企业输变电设备的运⾏⽔平,规范操作⽅法,确保设备的安全可靠性,⼴西电⽹公司组织编写了变电设备停送电操作作业指导书。

该作业指导书纳⼊公司的标准化和技术管理体系。

本作业指导书由⼴西电⽹公司标准化委员会提出并归⼝。

本作业指导书主要起草⼈:黄甄、谭⽴贤、潘红静、廖⽟忠、梁曲栩本作业指导书主要审核⼈:潘如佳、黄翠、陈⽉红、陆青林、李秋、林芸、杨波、刘旭本作业指导书审定⼈:江⾰⼒本作业指导书批准⼈:林⽕华本作业指导书由⼴西电⽹公司⽣产技术部负责解释。

1⽬次1 ⽬的 (1)2 适⽤范围 (1)3 规范性引⽤⽂件 (1)4 ⽀持⽂件 (1)5 技术术语 (1)6 安全措施 (2)7 作业准备 (2)8 作业流程 (2)9 作业项⽬、⼯艺要求和质量标准 (4)10 作业中可能出现的主要异常现象及对策 (4)11 作业后的验收与交接 (4)12 附录 (5)附录A 母线由运⾏转检修操作作业流程 (5)附录B 母线由检修转运⾏操作作业流程 (9)附录C 主变由运⾏转检修操作作业流程 (12)附录D 主变由检修转运⾏操作作业流程 (14)附录E 开关由运⾏转检修操作作业流程 (16)附录F 开关由检修转运⾏操作作业流程 (17)附录G 线路由运⾏转检修操作作业流程 (19)附录H 线路由检修转运⾏操作作业流程 (20)附录I PT由运⾏转检修操作作业流程 (21)附录J PT由检修转运⾏操作作业流程 (22)附录K 站⽤变由运⾏转检修操作作业流程 (23)附录L 站⽤变由检修转运⾏操作作业流程 (24)21 ⽬的为了规范变电站的设备停电作业过程,指导变电站值班员安全、⾼效地完成设备停电作业。

2 适⽤范围本标准适⽤于⼴西电⽹公司下属供电局(公司)各变电站的设备停送电操作。

3 规范性引⽤⽂件DL 408—91 《电业安全⼯作规程》(发电⼚和变电所电⽓部分)DL/T 969—2005 《变电站运⾏导则》CSG/MS 0813-2005 《中国南⽅电⽹调度运⾏操作管理规定》Q/CSG 1 0006-2004 《电⽓操作导则》4 ⽀持⽂件《⼴西电⽹调度管理规程》⼴西电⽹调度通信中⼼《⼴西电⽹调度术语》⼴西电⽹调度通信中⼼《变电站运⾏规程》各供电局5 技术术语电⽓操作:是指将电⽓设备状态进⾏转换、变更⼀次系统运⾏⽅式,继电保护定值调整、装置的启停⽤、⼆次回路切换、⾃动装置投切、切换试验等所进⾏的操作执⾏过程的总称。

箱式变电站停送电操作流程

箱式变电站停送电操作流程

箱式变电站停送电操作流程英文回答:The process of shutting down and restoring power in a pad-mounted substation, also known as a box-type substation, involves several steps to ensure safety and proper operation. Here is a general outline of the operating procedure:1. Preparation: Before initiating any power shutdown,it is essential to ensure that all necessary safety measures are in place. This includes wearing appropriate personal protective equipment (PPE) such as gloves, safety glasses, and flame-resistant clothing. Additionally, the operator must have a clear understanding of the equipment and its operating procedures.2. Communication: Effective communication is crucial during the shutdown process. The operator should inform all relevant parties, including other operators, maintenancepersonnel, and customers, about the upcoming power interruption. This can be done through various means suchas phone calls, emails, or in-person meetings.3. Isolation: The next step is to isolate thesubstation from the power grid. This involves opening the main circuit breaker or switches to disconnect the substation from the upstream power source. It is importantto verify that all disconnecting devices are in the open position and properly locked out to prevent accidental re-energization.4. Load Shedding: If necessary, load shedding may be performed to reduce the power demand on the substation.This can be achieved by selectively opening feeder breakers or switches to disconnect certain loads from the substation. Load shedding helps prevent overloading and ensures a smooth transition during the shutdown and restoration process.5. De-energization: After isolating the substation and shedding the load, the operator can proceed with de-energizing the equipment within the substation. This may involve opening additional circuit breakers or switches to de-energize specific equipment such as transformers, switchgear, or control panels. It is crucial to follow proper procedures and safety guidelines to avoid electrical hazards.6. Visual Inspection: Once the substation is de-energized, the operator should visually inspect the equipment for any signs of damage or abnormal conditions. This includes checking for loose connections, overheating, or any physical damage that could pose a safety risk. If any issues are identified, appropriate actions should be taken to rectify them before restoring power.7. Maintenance and Repairs: During the power interruption, maintenance or repair work can be performed on the substation equipment. This may involve replacing faulty components, conducting routine inspections, or addressing any identified issues. It is important to follow proper maintenance procedures and ensure that all work is carried out safely and efficiently.8. Power Restoration: Once all necessary maintenance and repairs are completed, the operator can proceed with restoring power to the substation. This involves reversing the steps taken during the shutdown process. The operator should close the circuit breakers or switches, re-energize the equipment, and gradually reconnect the substation to the power grid. This ensures a smooth and controlled restoration of power without causing any sudden surges or disruptions.中文回答:箱式变电站的停送电操作流程涉及多个步骤,以确保安全和正常运行。

变压器停、送电操作指导书

变压器停、送电操作指导书

一、变压器停、送电操作的顺序:
停电时先停负荷侧:《开关箱→分配电箱→配电屏(总配电箱)》,后停电源侧。

送电时先送电源侧:《配电屏(总配电箱)→分配电箱→开关箱》,再送负荷侧。

(1)从电源侧向负荷侧送电,如有故障,便于确定故障范围,及时作出判断和处理,以免故障蔓延扩大;
(2)多电源的情况下,先停负荷可以防止变压器反充电,若先停电源侧,遇有故障可能造成保护装置误动或拒动,延长故障切除时间,并可能扩大故障范围;
(3)当负荷侧母线电压互感器带有低频减负荷装置,而未装电流闭锁时,一旦先停电源侧开关,由于大型同步电机的反馈,可能使低频减负荷装置误动。

二、优点:
这种操作顺序的优点是:送电时,除开关箱中的控制开关以外,其余配电装置中的开关电器均是空载会闭.不会产生危害操作者和开关电器的电弧或电火花;停电时,只要开关箱中的控制开关分闸,其余配电装置中的开关电器都是空载分闸,也不会产生危害操作者和开关电器的电弧或电火花。

如果倒置操作,则当送电时,配电屏或总配电箱中的开关电器将带大负荷合闸,会产生强大电弧,尤其当最后合闸的是电源隔离开关时,对操作者的隔离开关的危害更大,这是不允许的,同时,远离配电屏或总配电箱的用电设备突然起动,也会给其周围的操作者和作业人员带来意外伤害。

停电时,也有类似的危害,一方面配电屏或总配电箱中的开关电器,尤其是电源隔离开关带强大负荷分闸,会产生强烈电弧或电火花,会对操作者和开关电器带来危害,另一方面,全现场突然停电也不容易与所有用电设备操作者的停电准备达成一致。

箱变断电送电操作流程

箱变断电送电操作流程

箱变断电送电操作流程下载温馨提示:该文档是我店铺精心编制而成,希望大家下载以后,能够帮助大家解决实际的问题。

文档下载后可定制随意修改,请根据实际需要进行相应的调整和使用,谢谢!并且,本店铺为大家提供各种各样类型的实用资料,如教育随笔、日记赏析、句子摘抄、古诗大全、经典美文、话题作文、工作总结、词语解析、文案摘录、其他资料等等,如想了解不同资料格式和写法,敬请关注!Download tips: This document is carefully compiled by theeditor. I hope that after you download them,they can help yousolve practical problems. The document can be customized andmodified after downloading,please adjust and use it according toactual needs, thank you!In addition, our shop provides you with various types ofpractical materials,such as educational essays, diaryappreciation,sentence excerpts,ancient poems,classic articles,topic composition,work summary,word parsing,copy excerpts,other materials and so on,want to know different data formats andwriting methods,please pay attention!箱变断电送电操作流程如下:一、断电操作流程1. 断开低压侧断路器:需要断开箱变低压侧的所有断路器,以确保低压侧电路处于断电状态。

箱式变电站停送电操作流程

箱式变电站停送电操作流程

箱式变电站停送电操作流程英文回答:To begin with, I would like to explain the process of shutting down and restoring power in a box-type substation. This process involves several steps to ensure the safety of the operators and the equipment.1. Preparation: Before shutting down the power, it is important to gather all the necessary information and equipment. This includes reviewing the work permit, checking the isolation points, and ensuring that all required tools and personal protective equipment (PPE) are available.For example, I once had to shut down a box-type substation for maintenance. I reviewed the work permit to understand the scope of work and identified the isolation points, such as the circuit breakers and disconnect switches. I also made sure that I had my safety gloves,helmet, and other PPE ready.2. Communication: It is crucial to communicate withother team members and relevant stakeholders before proceeding with the shutdown. This involves informing the control center, notifying any affected customers, and coordinating with other maintenance teams if necessary.For instance, I once had to coordinate with the control center to schedule a power outage for a box-type substation.I informed them about the maintenance work and requested a temporary interruption in power supply. I also communicated with the affected customers to minimize any inconvenience caused by the outage.3. Power shutdown: Once all the necessary preparations and communications are done, the next step is to shut down the power. This involves operating the circuit breakers and disconnect switches to isolate the substation from the grid.For example, when shutting down a box-type substation,I operated the circuit breakers to open them and interruptthe flow of electricity. I also turned off the disconnect switches to ensure complete isolation of the substation.4. Verification: After shutting down the power, it is important to verify that the substation is completely de-energized. This involves using appropriate testing equipment to confirm the absence of voltage.For instance, I used a voltage tester to check for the presence of voltage at various points in the substation. I also ensured that all the circuit breakers and disconnect switches were in the open position, indicating that no electricity was flowing through them.5. Work execution: Once the substation is confirmed to be de-energized, the maintenance work can be carried out safely. This may involve tasks such as equipment inspection, repairs, or replacement.For example, during a maintenance outage, I inspectedthe transformers and switchgear in the box-type substation.I identified any faulty components and replaced them asnecessary. I also conducted routine checks and preventive maintenance to ensure the smooth operation of the substation.6. Power restoration: After completing the maintenance work, the final step is to restore power to the substation. This involves reversing the steps taken during the shutdown, such as closing the circuit breakers and reconnecting the disconnect switches.For instance, I closed the circuit breakers one by one, allowing the flow of electricity to resume in a controlled manner. I also reconnected the disconnect switches torestore the substation's connection to the grid.中文回答:首先,我想解释一下箱式变电站停送电的流程。

箱式变电站停送电操作流程

箱式变电站停送电操作流程

箱式变电站停送电操作流程英文回答:To explain the process of shutting down and restoring power in a box-type substation, I will break it down into several steps.Step 1: Preparation.Before shutting down the substation, it is important to gather all the necessary information and equipment. This includes checking the status of the power supply, ensuring the availability of backup power sources, and having the appropriate tools and protective gear.Step 2: Communication.Effective communication is crucial during the shutdown process. I would inform all relevant parties, such as the power company, maintenance team, and any affected customers,about the planned power outage. This can be done through phone calls, emails, or even public announcements.Step 3: Isolation.The next step is to isolate the substation from the power grid. This is done by opening the circuit breakers that connect the substation to the main power supply. It is important to follow the proper safety procedures and use the correct tools when performing this task.Step 4: Verification.After isolating the substation, it is necessary to verify that there is no electricity flowing into the substation. This can be done by using a voltage detector or other appropriate testing equipment. It is important to ensure that all the circuits are de-energized before proceeding to the next step.Step 5: Maintenance.Once the substation is shut down and verified to be free of electricity, any necessary maintenance or repairs can be carried out. This may include replacing faulty equipment, conducting inspections, or performing routine maintenance tasks. It is important to follow all safety protocols and use the appropriate tools and equipment during this process.Step 6: Power restoration.After completing the necessary maintenance work, it is time to restore power to the substation. This involves closing the circuit breakers that were previously opened to isolate the substation. It is important to do this gradually to avoid any sudden power surges that could damage the equipment or disrupt the power supply.Step 7: Testing.Once the power is restored, it is important to test the substation to ensure that everything is functioning properly. This may involve checking voltage levels,conducting load tests, or performing other diagnostic procedures. It is important to document the results of these tests for future reference.Step 8: Notification.Finally, after the substation has been successfully restored and tested, it is important to notify all relevant parties, including the power company and any affected customers, that the power has been restored. This can be done through the same communication channels used to inform them of the planned outage.中文回答:箱式变电站停送电的操作流程可以分为以下几个步骤:第一步,准备工作。

10KV箱式变安装标准化作业流程图及指导书

10KV箱式变安装标准化作业流程图及指导书

10千伏**线箱式变安装标准作业流程图
编制人:班组审核人:单位审核人:
编号: ZDS-20211001 10千伏**线安装箱式变作业指导书
编写:年月日审核:年月日批准:年月日工作负责人:
作业日期年月日至年月日内蒙古东部电力有限公司-呼伦贝尔电业局-**供电局-配电班
1、范围
1.1本指导书适用于**供电局10千伏**线**安装箱式变电站工作。

2、引用文件
2.1内蒙古东部电力有限公司《架空配电线路安装检修规程》
2.2内蒙古东部电力有限公司《中低压配电网建设与技术改造原则意见》2.3DL/T5220-2005《10kV及以下架空配电线路设计技术规程》
2.4GB 50173-92 《35kV及以下架空电力线路施工及验收规范》。

变电运行标准化作业指导书

变电运行标准化作业指导书

国家电网公司现场标准化作业指导书编制导则变电运行标准化作业指导书第一章变电运行倒闸操作一、变电运行倒闸操作流程图(一)大型复杂倒闸操作流程图(二)一般倒闸操作流程图二、变电运行停送电操作顺序图(一)出线停送电操作顺序图(二)双绕组变压器停止、加入运行操作顺序图(三)三绕组变压器停止、加入运行操作顺序图三、变电运行倒闸操作执行标准(一)受理调度下达的操作指令(二)审核研究操作指令的可行性(三)确定危险点,制定控制措施(四)填写操作票(五)审核操作票(六)模拟演习(七)操作前准备(八)操作(九)操作结束(十)布置现场安全措施(十一)总结四、变电运行办理工作票标准流程图第二章变电设备巡视一、设备巡视的基本要求二、设备巡视流程图三、变电站巡视路线示意图四、主设备的巡视项目(一)主变压器的巡视检查项目(二)有载分接开关的巡视检查项目(三)真空断路器的巡视检查项目(四)SF6断路器的巡视项目(五)油断路器的巡视检查项目(六)弹簧操作机构的巡视检查项目(七)电磁操作机构的巡视检查项目(八)隔离开关的巡视检查项目(九)电容器的巡视检查项目(十)互感器、耦合电容器的巡视检查项目(十一)防雷设施的巡视检查项目(十二)母线的巡视检查项目(十三)阻波器的巡视检查项目(十四)电力电缆的巡视检查项目(十五)微机保护装置的巡视检查项目(十六)微机监控装置的巡视检查项目(十七)直流电源装置的巡视检查项目(十八)小电流接地微机选线装置的巡视检查项目(十九)计量和指示仪表的巡视检查项目第三章变电设备维护一、变电站交直流熔丝(控制开关)运行维护(一)总则(二)交直流熔丝(控制开关)检查核对的要求二、变电所直流接地故障处理三、设备接点测温第四章变电设备验收一、基本要求二、设备验收作业流程图三、变电站设备验收作业执行卡四、设备验收卡、变压器验收卡五、主要设备的验收项目(一)变压器(二)断路器(三)电流、电压互感器,电容式电压互感器(四)隔离开关(五)高压熔断器(六)母线(七)避雷器(八)电力电容器(九)电抗器(十)耦合电容器(十一)阻波器(十二)二次控制、保护自动装置(十三)交直流电源装置(十四)电能计量装置(十五)电缆(十六)接地装置六、应移交的资料文件清单。

11停、送电作业指导书

11停、送电作业指导书

1.目的规范配电设备停送电作业,确保人员与设备的安全。

2.适用范围本作业指导书适用于分公司、各项目管辖范围内配电设备停送电作业。

3.职责3.1工程部经理负责小区的各类停送电管理工作。

3.2工程部协同客户服务部做好停电工作的准备和解释工作。

4.方法与过程4.1供电局计划停电,客户服务部应提前通知住户,并做好解释工作,同时工程部应做好小区停电前的准备工作。

4.2 因设备设施进行维修保养需要的计划停电,由设备责任人提前三天填写《工作票》、《操作票》,详细说明停电设备名称、内容、范围、停电起止时间及注意事项,经工程部经理审核后,上报项目经理审批。

批准后客户服务部做好如下安排:4.2.1 应提前一天由客户服务部通知住户。

4.2.2 提前二天通知安全责任部门,做好应急工作。

4.2.3项目计划停电检修时间应考虑尽可能地减少停电给住户带来的不便。

4.2.4 计划停电必须保证小区消防设施处于警戒状态。

4.2.4 工程部强电主管应安排设备维修人员提前一天作好停电检修所需工具及材料。

4.3 因设备(设施)等故障引起的突发停电,设备责任人必须迅速赶到现场,查明停电原因,同时立即通知项目经理,启动《工程突发事件处理预案》,执行《工程突发事件处理管理规定》的相关要求。

待事件处理完毕后,需将处理过程记录在《设备抢修(大修)记录》中。

4.4 当发生威胁设备或人身安全的紧急停电时,应立即断开有关负载开关,查明原因,待修复后方可按送电程序恢复供电。

4.5 停电时间、原因、恢复送电时间必须向物管中心总经理报告。

4.6 停电必须及时通知住户,做好解释工作。

凡停电在一小时以上必须在小区通知栏内张贴书面通知。

4.7 停电检修设备时安全注意事项:4.7.1停送电工作前:4.7.1.1必须清楚知道停送电的电压等级,所用到的工具,并检查工具是否完好,有无损坏等。

4.7.1.2 熟悉现场环境,找到所要执行电力开关的位置,准备向调度室申请停送电。

4.7.2停送电工作中:4.7.2.1必须按顺序停送电,切不可误操作,停电后进行验电、放电、挂接地线,然后再挂“禁止合闸,有人工作”标示牌。

10kv箱变停送电操作流程

10kv箱变停送电操作流程

10kv箱变停送电操作流程英文回答:To begin with, let me explain the process of stopping and restoring power for a 10kV transformer. This process is commonly referred to as "shutdown" and "re-energization."Before we proceed with the shutdown process, it is crucial to ensure the safety of personnel and equipment. This involves following proper safety procedures, such as wearing personal protective equipment (PPE) and isolating the transformer from the power source.The shutdown process typically involves the following steps:1. Notify relevant personnel: Inform the necessary personnel, such as the control room operator, maintenance team, and any other individuals who need to be aware of the shutdown.2. Prepare for shutdown: Gather the required tools and equipment, such as lockout/tagout devices, to isolate the transformer. Ensure that all necessary permits are obtained before proceeding.3. Isolate the transformer: Follow the properlockout/tagout procedures to disconnect the transformer from the power source. This may involve opening circuit breakers, disconnect switches, and grounding the transformer.4. Verify isolation: Use appropriate testing equipment, such as a voltage detector, to confirm that the transformer is completely de-energized and isolated from the power source.5. Perform maintenance or repairs: Once the transformer is safely isolated, maintenance or repair work can be carried out as required. This may include inspections, replacements, or any other necessary tasks.6. Restore power: After completing the maintenance or repair work, it is time to re-energize the transformer. This process involves reversing the steps taken during the shutdown process.7. Verify restoration: Use testing equipment to confirm that the power has been successfully restored and that the transformer is functioning properly.Now, let's switch to Chinese for the answer:中文回答:首先,让我解释一下10kV箱变停送电的过程。

箱变检修标准化作业指导书

箱变检修标准化作业指导书

编号:Q/×××
xxx箱变检修标准化作业指导书
编写: 年月日
审核: 年月日
批准: 年月日
工作负责人:
工作时间: 年月日时分至年月日时分
二号矿供电队
目次
1.范围
2.引用文件
3.停电时间
4.准备阶段
5.作业程序及作业标准
6.验收
7.指导书执行情况评估
1.范围
本工作指导书针对xxx箱变停电检修工作,仅适用于该项工作。

2.引用文件
1.《电力安全工作规程》
2.《配电作业安全管理规定》
3.《配电安全管理规定》
4.《配电工程安全管理暂行规定》
5.上级下发的有关文件、指令、通知3.作业停电时间
4.检修前准备
4.1 准备工作安排
xxx箱变停电检修准备工作安排
4.2 工作人员要求
xxx箱变停电检修作业人员要求
4.3 工器具准备
xxx箱变停电检修工器具准备
4.4xxx箱变停电检修材料
材料准备人:材料回收人:年月日
4.5 危险点分析
4.6 安全措施
4.7工作人员分工
5.作业程序及作业标准5.1开工
5.2作业内容及标准
5.3工作终结
5.4消缺记录
6.验收记录
7 指导书执行情况评估
Xxx箱变停电检修指导书执行情况评估。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
箱式变电站就地停送电 标准化作业指导书
目次
1. 适用范围 .....................................................2 2. 规范性引用文件 ...............................................2 3. 编制依据 .....................................................3 4. 箱式变电站就地停送电作业指导书 ...............................3 4.1. 准备工作 .....................................................3 4.2. 检修技术标准 .................................................4 4.3. 安全风险点及卡控措施 ........................................14 4.4. 注意事项 ....................................................14
15
10
4.2.17.1. 摘下高压电抗器开关柜、变压器开关柜、出线开关柜、进线开关 柜柜面悬挂“禁止合闸”牌; 4.2.17.2. 摘下高、低压开关柜“远方/就地”开关悬挂“禁止合闸”牌; 4.2.17.3. 摘下低压开关柜悬挂“禁止合闸”牌; 4.2.17.3.1. 分别摘下高压电抗器开关柜、变压器开关柜、出线开关柜、进线 开关柜悬挂“已接地”牌; 4.2.18. 摘下已经断开的相邻箱式变电站负荷开关柜柜面悬挂“禁止合闸” 牌;并锁闭开关柜。 4.2.19. 送电 4.2.19.1. 投运高压柜 4.2.19.2. 合上进线侧相邻箱式变电站的出线侧三工位开关负荷开关;
2
3. 编制依据
根据《铁路电力安全工作规程》、《铁路电力管理规则》、《铁路局
作业指导书编制规范》的相关要求,结合段具体实际,特编制此作业指导书。
4. 箱式变电站就地停送电作业指导书
4.1. 准备工作
4.1.1. 检修人员准备
序号 1 2 3 4 5 6
4.1.2.
作业内容 工作执行人 工作许可人 工作监护人 坐台防护人员 现场防护人员
9
图 16
4.2.14. 在已经断开的相邻箱式变电站负荷开关柜柜面悬挂“禁止合闸”牌; 并锁闭开关柜;
图 17
4.2.15. 打开电缆头间隔。 4.2.16. 送电操作 4.2.16.1. 拆除封线 4.2.16.1.1. 拆除变压器低压三相短封线; 4.2.16.1.2. 断开高压电抗器开关柜三工位开关接地刀闸; 4.2.16.1.3. 断开高压变压器开关柜三工位开关接地刀闸; 4.2.16.1.4. 断开高压出线开关柜三工位开关接地刀闸; 4.2.16.1.5. 断开高压进线开关柜三工位开关接地刀闸; 4.2.17. 摘牌解锁
4.3. 安全风险点及卡控措施
序号 1
危险点 触电伤害
控制措施
1.倒闸操作应由两人进行,一人操作,一人监护。 2.严禁打开高低压柜门,倒闸操作只能再面板上电动操作或者 手动手柄操作。
控制人
1、操作人应戴好安全帽和防护手套,站在稳固的构架或平台上。
碰伤、划伤、 2.箱变平台较高,操作人员不得在平台边沿行走,上下平台应
2
摔伤
从台阶处上下。
3.作业人员戴好安全帽。
1.严格执行操作票进行操作。 2.操作过程严格执行监护、唱票、复诵制度。 3 误操作事故 3.加强监护,监护人要始终在工作现场,对班组成员的安全要 认真监护,及时纠正不安全动作,不得擅自脱岗。
4
暑天中暑 备齐饮用水和防暑用品。
4.4. 注意事项 4.4.1. 进入工作现场必须戴安全帽穿工作服。
图8
4.2.2.2.4. 断开高压出线开关柜三工位开关负荷开关;
6
图9
4.2.2.2.5. 断开高压进线开关柜三工位开关负荷开关;
图 10
4.2.2.2.6. 断开出线侧相邻箱式变电站的进线侧三工位开关负荷开关;
注:出线柜带电显示器将显示无电
图 11
4.2.2.3. 断开进线侧相邻箱式变电站的出线侧三工位开关负荷开关;
1 提报月、日计划
2.提前 3 日打提报日计划。
3.网内作业应提报天窗计划
2 明确工作任务
本次作业内容是:
1.按《铁路局电力作业安全工作票执行
填发停电作业工作
3
标准》填写;

2.提前一天交由工作执行人。
4 绘制图示分工表
1.根据作业范围及内容绘制; 2.提前一天交由工作执行人。
5 填写派工单
1.根据作业内容和人员填写; 2.提前一天交由工作执行人。
1
1. 适用范围
本指导书适用于 供电段管内高速铁路远动系统故障,电调无法遥控操
作,现场对贯通线箱式变电站进行就地停送电的作业。
2. 规范性引用文件
下列文件对于本作业指导书的应用是必不可少的。凡是注日期的引用文件,
仅所注日期的版本适用于本作业指导书。凡是不注日期的引用文件,其最新版
本(包括所有的修改单)适用于本作业指导书。
图 18
4.2.19.3. 合上高压进线开关柜三工位开关负荷开关;
11
图 19
4.2.19.4. 合上高压电抗器开关柜三工位开关负荷开关; 4.2.19.5. 合上高压变压器开关柜三工位开关负荷开关; 4.2.19.6. 合上高压出线开关柜三工位开关负荷开关; 4.2.19.7. 合上出线侧相邻箱式变电站的进线侧三工位开关负荷开关;
图 20 注:此操作必须在出线侧断电下进行,防止贯通线并网;
4.2.19.8. 将高压柜“就地/远方”开关转换至远方位。
12
图 21
4.2.20. 投运低压柜 4.2.20.1. 合上低压开关柜手动刀闸; 4.2.20.2. 合上低压开关柜进线断路器;
图 22
4.2.20.3. 合上低压开关柜各负荷回路断路器;
《铁路电力安全工作规程》
铁运〔1999〕103 号
《铁路电力管理规程》
铁运〔1999〕103 号
《铁路电力工程施工技术指南》
TZ207-2007
《铁路电力工程施工质量验收标准》
TB10420-2003 J290-2004
《铁路电力设备安装标准》第三版
(80)铁机字 1817 号
《铁路技术管理规程》(普速铁路部分)
14
4.4.2. 箱变高压开关柜分合闸时,要特别注意操作顺序,合闸时应先合高 压侧负荷开关,后合低压侧主开关,再依次合分回路开关;分闸时,则按上述 逆过程进行。远动箱变就地操作时,应根据调度命令首先将“远方、就地”转 换开关置“就地”位,再按调度命令进行倒闸作业,操作完毕后再按调度命令 将“远方、就地”转换 开关置“远方”位。 4.4.3. 只有在确认高压柜电缆侧不带电时,才能合接地开关;变压器接地 开关也应在环网负荷开关都断开后,才能合闸。
责任人
备注
工作执行人
工长
工长 工作执行人
工长 工作执行人
工长 工作执行人
3
6 工器具、材料准备 7 召开作业前开工会
4.2. 检修技术标准
提前一天准备齐全并外观检查、实验合格。 工作执行人 1.组织学习本次作业指导书; 2.做好危险点分析,交待安全注意事项; 工作执行人 3.图示分工,明确人员分工职责。
图3
4.2.2.1.4. 断开低压开关柜手动刀闸;
图4
4.2.2.2. 停运高压柜: 4.2.2.2.1. 将高压柜“就地/远方”开关转换至就地位;
图5 注:在高压柜进行操作前,首先观察带电显示器指示是否正常。
5
图6
4.2.2.2.2. 断开高压电抗器开关柜三工位开关负荷开关;
图7
4.2.2.2.3. 断开高压变压器开关柜三工位开关负荷开关;
7
注:进线柜带电显示器将显示无电
4.2.3. 检封
图 12
4.2.4. 确认高压电抗器开关柜带电显示器指示无电并用低压数显测电笔监
测无电,合上高压电抗器柜三工位开关接地刀闸;
图 13
4.2.5. 确认高压变压器开关柜带电显示器指示无电并用低压数显测电笔监 测无电,合上高压变压器柜三工位开关接地刀闸;
8
图 14
4.2.6. 确认高压出线开关柜带电显示器指示无电并用低压数显测电笔监测 无电,合上高压出线柜三工位开关接地刀闸; 4.2.7. 确认高压进线开关柜带电显示器指示无电并用低压数显测电笔监测 无电,合上高压进线柜三工位开关接地刀闸;
图 15
4.2.8. 在变压器低压侧验电后设置低压三相短封线。 4.2.9. 挂牌加锁设防护 4.2.10. 分别在高压电抗器开关柜、变压器开关柜、出线开关柜、进线开关 柜柜面悬挂“禁止合闸”牌; 4.2.11. 在高、低压开关柜“远方/就地”开关悬挂“禁止合闸”牌; 4.2.12. 在低压开关柜悬挂“禁止合闸”牌; 4.2.13. 在高压电抗器开关柜、变压器开关柜、出线开关柜、进线开关柜分 别悬挂“已接地”牌;
4.2.1. 就地倒闸操作
4.2.1.1. 向局电调申请倒闸操作命令
4.2.2. 停电操作
4.2.2.1. 停运低压负荷:
4.2.2.1.1. 将低压柜“就地/远方”开关转换至就地位;
图1
4.2.2.1.2. 断开低压开关柜各负荷回路断路器;
图2 4
4.2.2.1.3. 断开低压开关柜进线断路器;
13
图 23
4.2.21. 将低压柜“就地/远方”开关转换至远方位。
4.2.21.1. 检查所有开关恢复操作前状态,“就地/远方”开关转换至远方位。
4.2.21.2. 巡视检查箱变设备有无异常。
相关文档
最新文档