Fig.1Structure of 18650 Li-ion battery
Fig.2 Drawing of Polymer Li-ion Prismatic Cell Capacity requirements
Testing procedure as below:
1>Suspend (time: 5 minutes)
2>Discharging (constant current)
3>Suspend (time: 5 minutes)
4>Charging (constant current/voltage)
5>Suspend (time: 5 minutes)
6>Cycle test (1 cycle: from step 2 to step 4)
7>Finish test
Features and protective function: Short-circuit protective function:
Charging / discharging functional test (on-line fully test)
Charging test Discharging test Short-circuit protection functional test (on-line fully test)
Over-charging protection functional test (sample per S-3)
Once the power bank shows that battery is fully charged, so that:
1>No input current to the battery, and
2>Charging indication light off or fully charging indication lighting up
3>Battery voltage should not exceed 4.2 V after over-charging (normal fully charged
time plus 1 hour charged)
Over-discharging protection functional test (sample per S-3)
Power Bank Requirements
Abuse test (sample per S-3)
1>USB socket plug & unplug cycle test (50 cycles)
2>Switch / control button cycle test (50 cycles)
3>Indication light cycle test (50 cycles)