TITLE:

TYPHOON COUNTER MEASURES PLAN

CB&I EUROPE B.V. / CHINA CHENGDA ENGINEERING CORPORATION (LTD) CONSORTIUM

FJLNG PHASE I ADDITIONAL #3 AND #4 TANKS PROJECT

TYPHOON COUNTER MEASURES PLAN

台风防范措施方案 CONTROL SHEET

Revision Date Done By

Checked

By

Reason for Issue Owner Approval (Sign and Date) Document Status*

0 09 Jan. 09

XXB TS For Approval

A

* Document Status Key Codes

A = Work May Proceed

B = Revise. Incorporate Changes as Indicated. Re-submittal not required. Work may proceed.

C = Revise & resubmit. Work may proceed, subject to incorporation of Owner comments.

D = Revise & resubmit. Work may not proceed.

E = Review not required. Work may proceed.

TITLE:TYPHOON COUNTER MEASURES PLAN

CB&I EUROPE B.V. / CHINA CHENGDA ENGINEERING CORPORATION (LTD) CONSORTIUM

TABLE OF CONTENTS内容

1. Introduction & Purpose 介绍&目的 3

2. Reference 参考3

3. Typhoon Alarm 台风警报 4

4. Typhoon Preparation防台准备 4

5. Typhoon Management防台管理 5

6. Emergency stand by Personnel紧急后备人员 6

7. Typhoon Response Team (TRT) 台风相应小组(TRT)6

8. Typhoon Response Procedures台风反应程序8

•Priority 优先考虑8

•Typhoon during Working Hours工作时间内的台风8

•Typhoon during Non-Working Hours非工作时间内的台风9

•Checklist of Typhoon Procedures台风程序的检查清单9

9. Sub-contractors’ responsibility承包商责任11

10. Wind Protection Requirements 防风要求12

11. Checklist 检查清单14

TITLE:TYPHOON COUNTER MEASURES PLAN

CB&I EUROPE B.V. / CHINA CHENGDA ENGINEERING CORPORATION (LTD) CONSORTIUM

1. Introduction & Purpose介绍&目的

Fujian job site, due to its geographical location may be subject to both typhoon and rainstorm

disasters. To cope with these potential this document addresses the preparation for and reaction to four separate scenarios (situations) 因为其地理位置的特殊性,福建现场可能经常会遭受到台风和风暴的袭击。为了应付这些潜在的风

险,本文件说明了在四种情况下如何采取准备和应对措施。

1) Design environment to eliminate or reduce the probability of a disaster.

设计环境以排除和降低灾害和可能性。

2) Develop plans and operational procedures to address the specific needs in preparing for

disasters.

制定方案和操作程序说明在特定情况下如何做好灾害预防工作。

3) Implement these plans before and during a typhoon period.

在发生台风之前和台风发生过程中实施这些方案。

4) Plan for activities to return systems to a normal status after the typhoon.

台风发生后系统恢复方案

Scope 范围

The FJLNG Typhoon emergency plan is presented in three parts.

FJLNG 防台预案具体分为三个部分

1) Typhoon preparation.

防台准备

2) Evacuation of site in case of typhoon

现场撤离

3) Other emergencies.

其他紧急情况

2. References

参考

This document has been prepared in conjunction with all relevant safety standards, contract documentation and in particular the under mentioned specifications/standards.

本程序综合了所有相关的安全标准,合同文件,特别是下列标准

Customer HSE standards

业主HSE 标准

FJLNG HSE standards & relevant work method statements

FJLNG HSE 标准&相关方案

Local Authority Requirements.

地方政府要求