文档下载后可定制随意修改,请根据实际需要进行相应的调整和使用,谢谢!并且,本店铺为大家提供各种各样类型的实用资料,如教育随笔、日记赏析、句子摘抄、古诗大全、经典美文、话题作文、工作总结、词语解析、文案摘录、其他资料等等,如想了解不同资料格式和写法,敬请关注!Download tips: This document is carefully compiled by the editor. I hope that after you download them, they can help yousolve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!In addition, our shop provides you with various types of practical materials, such as educational essays, diary appreciation, sentence excerpts, ancient poems, classic articles, topic composition, work summary, word parsing, copy excerpts,other materials and so on, want to know different data formats and writing methods, please pay attention!随着建筑技术的不断发展,水泥砂浆防水施工工艺也在不断完善。

水泥砂浆防水层施工工艺

水泥砂浆防水层施工工艺

水泥砂浆防水层施工1 范围本工艺标准适用于地下砖石结构地下室、水池等工程的防水层及防水混凝土结构的附加防水层,属潮湿条件下施工的刚性防水施工工艺。

2 施工准备2.1材料要求及主要机具:2.1.1水泥:宜用325号以上的普通硅酸盐水泥,亦可用矿渣硅酸盐水泥,有侵蚀性介质作用时,应按设计要求选用。

2.1.2砂:用中砂,不得含有杂物。

含泥量不得超过3%,使用前必须过3~5mm孔径的筛。

2.1.3外加剂:防水粉、防水油,也可采用有机硅防水剂、氯化物金属盐类防水剂。

均应按产品说明书正确使用。

2.1.4主要机具:灰板、铁抹子、阴阳角抹子、半截大桶、钢丝刷、软毛刷、八字靠尺、榔头、尖凿子、捻錾子、铁锹、扫帚、木抹子、刮杠等。

更多内容可进QQ群:家装市场营销学习群或关注微信公众号:装修百科常识2.2作业条件:2.2.1结构验收合格,已办好验收手续。

2.2.2地下防水施工期间做好排水,直至防水工程全部完工为止。

排水、降水措施应按施工方案执行。

2.2.3地下室门窗口、预留孔洞、管道进出口等细部处理完毕。

3 操作工艺3.1工艺流程:→→→→→→3.2基层处理:3.2.1混凝土墙面如有蜂窝及松散的混凝土,要剔掉,用水冲刷干净,然后用1∶3水泥砂浆抹平或用1∶2干硬性水泥砂浆捻实。

表面油污应用10%火碱水溶液刷洗干净,混凝土表面应凿毛。

3.2.2砖墙抹防水层时,必须在砌砖时划缝,深度为10~12mm。

穿墙预埋管露出基层,在其周围剔成20~30mm宽,50~60mm深的槽,用1∶2干硬性水泥砂浆捻实。

管道穿墙应按设计要求做好防水处理,并办理隐检手续。

3.3混凝土墙抹水泥砂浆防水层3.3.1刷水泥素浆:配合比为水泥∶水∶防水油=1∶0.8∶0.025(重量比),先将水泥与水拌合,然后再加入防水油搅拌均匀,再用软毛刷在基层表面涂刷均匀,随即抹底层防水砂浆。

3.3.2底层砂浆,用1∶2.5水泥砂浆,加水泥重3%~5%的防水粉,水灰比为0.6~0.65,稠度为7~8cm。

水泥砂浆防水层施工工艺

水泥砂浆防水层施工工艺

水泥砂浆防水层施工工艺1 适用范围:本工艺标准适用于屋面、卫生间等水泥砂浆防水层工程的施工。

2 材料准备:2.1 普通水泥防水砂浆2.1.1 材料要求:水泥:标号不低于42.5 级的普通硅酸盐水泥或42.5 级矿渣硅酸盐水泥砂:洁净中砂或细砂,粒径不大于3mm,含泥量不大于2%防水剂:宜采用氯化物金属盐类防水剂,质量符合要求水:自来水或洁净天然水,不得含有糖类、油类等有害杂质2.1.3 砂浆的制备:防水净浆:将防水剂置于桶中,再逐渐加入水,搅拌均匀,然后加入水泥,反复匀。

防水砂浆:防水砂浆应采用机械搅拌,以保证水泥砂浆的匀质性。

拌制时要严格握水灰比,水灰比过大,砂浆易产生离析现象;水灰比过小则不易施工。

施工时应将防水剂与定量用水配制成混合液。

拌制砂浆时,先将水泥和砂投入砂浆搅拌机内干拌均匀(色泽一致),然后加入混合液,搅拌1~2min 即可。

每次拌制的防水净浆和防水砂浆应在初凝前用完。

2.2 聚合物水泥防水砂浆的制备要求。

水泥砂浆防水层的施工要求见下表:3 施工机具:砂浆搅拌机、磅秤秤、台秤、手推车、卷扬机、井架、平锹、木刮板、木抹子、铁抹子和抹光机、水准仪、水平尺、小线等4 施工工艺流程:4.1 水泥砂浆防水分为普通水泥砂浆和聚合物水泥砂浆防水两类。

普通水泥砂浆防水层的施工工艺流程如下图:4.2 水泥砂浆防水层的施工要点:4.2.1 结构层施工:结构层宜采用现浇钢筋混凝土结构,当设计为预制板时,板必须用C20 以上的细石混凝土嵌填密实,并适当配筋,板端应留设分格缝,并嵌填密封料4.2.2 板面处理:板面有凹凸不平或蜂窝麻面、孔洞时,应先用比结构混凝土高一强度等级的混凝土或水泥砂浆牵平或修补,表面疏松的石子、浮渣等应先清除干净,以保证防水层与基层牢固结合。

4.2.3 特殊部位处理:4.2.3.1 天沟、檐口及女儿墙泛水等处的阴阳角应做成圆弧形,阳角半径一般10mm,阴角半径一般为50 mm。

4.2.3.2 穿过防水层的管道的四周应剔成深30 mm,宽20 mm 左右的沟槽,并把埋入基层部位的管道表面铁锈清除干净,然后用水冲洗沟槽,用布擦去积水,随即用防水砂浆修补填平。

水泥砂浆防水层施工工艺

水泥砂浆防水层施工工艺

水泥砂浆防水层施工1 范围本工艺标准适用于地下砖石结构地下室、水池等工程的防水层及防水混凝土结构的附加防水层,属潮湿条件下施工的刚性防水施工工艺。

2 施工准备2.1 材料要求及主要机具:2.1.1 水泥:宜用325号以上的普通硅酸盐水泥,亦可用矿渣硅酸盐水泥,有侵蚀性介质作用时,应按设计要求选用。

2.1.2 砂:用中砂,不得含有杂物。

含泥量不得超过3%,使用前必须过3~5mm孔径的筛。

2.1.3 外加剂:防水粉、防水油,也可采用有机硅防水剂、氯化物金属盐类防水剂。

均应按产品说明书正确使用。

2.1.4 主要机具:灰板、铁抹子、阴阳角抹子、半截大桶、钢丝刷、软毛刷、八字靠尺、榔头、尖凿子、捻錾子、铁锹、扫帚、木抹子、刮杠等。

更多内容可进QQ群:家装市场营销学习群或关注微信公众号:装修百科常识2.2 作业条件:2.2.1 结构验收合格,已办好验收手续。

2.2.2 地下防水施工期间做好排水,直至防水工程全部完工为止。

排水、降水措施应按施工方案执行。

2.2.3 地下室门窗口、预留孔洞、管道进出口等细部处理完毕。

3 操作工艺3.1 工艺流程:→3.2 基层处理:3.2.1 混凝土墙面如有蜂窝及松散的混凝土,要剔掉,用水冲刷干净,然后用1∶3水泥砂浆抹平或用1∶2干硬性水泥砂浆捻实。

表面油污应用10%火碱水溶液刷洗干净,混凝土表面应凿毛。

3.2.2 砖墙抹防水层时,必须在砌砖时划缝,深度为10~12mm。

穿墙预埋管露出基层,在其周围剔成20~30mm宽,50~60mm深的槽,用1∶2干硬性水泥砂浆捻实。

管道穿墙应按设计要求做好防水处理,并办理隐检手续。

3.3 混凝土墙抹水泥砂浆防水层3.3.1 刷水泥素浆:配合比为水泥∶水∶防水油=1∶0.8∶0.025(重量比),先将水泥与水拌合,然后再加入防水油搅拌均匀,再用软毛刷在基层表面涂刷均匀,随即抹底层防水砂浆。

3.3.2 底层砂浆,用1∶2.5水泥砂浆,加水泥重3%~5%的防水粉,水灰比为0.6~0.65,稠度为7~8cm。

水泥砂浆防水剂防水施工工艺MicrosoftWord文档模板

水泥砂浆防水剂防水施工工艺MicrosoftWord文档模板

水泥砂浆防水剂防水施工工艺MicrosoftWord文档水泥砂浆防水剂防水施工工艺一般防水施工工艺一、施工前防水基层的地面、竖面须平整、粗糙、清洁而潮湿, 一般防水砂浆层须分两遍完成, 先将防水剂配水=1: 8左右与水泥搅拌素灰抹1mm-1.5mm厚度做结合层, 待素灰初凝时再抹防水砂浆10mm-20mm厚, 缓凝期间须养护并赶光压实1-2次。

养护方法与常规水泥养护方法相同, 如需粘瓷砖可在完全上强度前擦出麻面( 地下室或水压大的疑难防水工程, 可根据现场情况按上述工艺重复做一遍或两遍) 。

二、在做防水砂浆时现场如卫生间遇有管件、地漏、柱体等特殊部分需先做处理。

示意图4方法: 用钎子将其根部周围钻ぁ一级建造成凹型, 清净、潮湿, 再用素灰将其根部周围抹成凸型( 坡型) , 与上述的1mm-1.5mm厚的素灰结合层形成一体, 初凝时做防水砂浆。

三、在维修渗漏工程时, 原基础为光面时, 需用钎子钻成麻面。

四、在外墙饰面喷刷时, 可喷刷防水剂的原液( 不配水) 2-3遍与液体装饰涂料合拌时, 可根据涂料的色彩添加, 一般防水剂配水=1: ( 1-3) 左右, 合拌在涂料中, 涂料的喷刷工艺不变。

注意事项一、防水剂应随时配比随时使用, 在存放或施工中切勿与白灰接触, 存放气温须在零度以上。

防水剂如出现沉淀, 摇匀使用不影响其效果。

防水剂保质期两年。

二、如需作闭水实验, 须在施工后超过36小时。

三、在施工时现场中有渗漏处需先做堵漏处理( 我厂可提供堵漏材料与方法) , 在地下水位以下施工时, 施工前需将水位抽降到抹灰层以下, 并保持到防水砂浆完全上强度后再停止抽水。

四、施工时, 对现场的管件、地漏、柱体根部及阴阳角处, 要压实精心操作, 避免在爆晒的阳光下施工, 以免龟裂。

五、配制混凝土的防水剂有减水功能, 与正常见水量减少5%, 防水剂配水按1: 6稀释, 其它水泥、砂子、石子及操作过程不变。

人工挖孔桩施工㈠、施工方法表层土质或砂石层部分人工直接用铁锹或风镐开挖, 石质则采用浅眼松动爆破法开挖, 松碴装入吊筒后简易电动提升架提升, 采用内撑式标准组合钢模浇注砼护壁, 钢筋笼现场制作, 吊车吊放, 砼由砼搅拌站统一拌制, 砼运输车运输, 减速串筒灌注, 插入式振捣器振捣。

水泥砂浆防水层施工工艺

水泥砂浆防水层施工工艺
7质量记录
本工艺标准应具备以下质量记录:
7.1原材料(水泥、砂、外加剂等)出厂合格证、试验报告。
7.2隐检记录。
7.3分项工程质量检验评定。
7.4设计变更及洽商记录。
7.5其它技术文件。
技术负责人:交底人:接交人:
3.3.3刷水泥素浆:在底灰抹完后,常温时隔1d,再刷水泥素浆,配合比及做法与第一层相同。
3.3.4抹面层砂浆:刷过素浆后,紧接着抹面层,配合比同底层砂浆,抹灰厚度在5~10mm左右,凝固前要用木抹子搓平,用铁抹子压光。
3.3.5刷水泥素浆:面层抹完后1d刷水泥素浆一道,配合比为水泥∶水∶防水油=1∶1∶0.03(重量比),做法和第一层相同。
3.4.4抹面层砂浆:抹完水泥素浆之后,紧接着抹面层砂浆,配合比与底层相同,先用木抹子搓平,后用铁抹子压实、压光。抹灰厚度在6~8mm之间。
3.4.5刷水泥素浆:面层抹灰1d后,刷水泥素浆,配合比为水泥∶水∶防水油=1∶1∶0.03(重量比),方法是先将水泥与水拌匀后,加入防水油再搅拌均匀,用软毛刷子将面层均匀涂刷一遍。
3.5地面抹水泥砂浆防水层:
3.5.1清理基层:将垫层上松散的混凝土、砂浆等清洗干净,凸出的鼓包剔除。
3.5.2刷水泥素浆:配合比为水泥∶防水油=1∶0.03(重量比),加上适量水拌合成粥状,铺摊在地面上,用扫帚均匀扫一遍。
3.5.3抹底层砂浆:底层用1∶3水泥砂浆,掺入水泥重3%~5%的防水粉。拌好的砂浆倒在地上,用杠尺刮平,木抹子顺平,铁抹子压一遍。
2.2作业条件:
2.2.1结构验收合格,已办好验收手续。
2.2.2地下防水施工期间做好排水,直至防水工程全部完工为止。排水、降水措施应按施工方案执行。
2.2.3地下室门窗口、预留孔洞、管道进出口等细部处理完毕

水泥砂浆防水层施工工艺

水泥砂浆防水层施工工艺

水泥:符合国家标准、质量稳定的水泥。 砂:中砂或粗砂,含泥量不大于3%。 水:饮用水或洁净的天然水。 辅助材料:如防水剂、膨胀剂等,根据设计要求选择。
搅拌器:用于搅拌水泥砂浆,确保均匀混合 抹子:涂抹水泥砂浆,使其均匀覆盖施工面 刮刀:用于刮平水泥砂浆,确保表面平整 铁锹:用于铲运砂浆,方便施工
水泥砂浆防水层施工 工艺
汇报人:XX
目录
水泥砂浆防水层施 工前的准备
水泥砂浆防水层的 施工过程
质量验收与注意事 项
水泥砂浆防水层施 工前的准备
清理基层:清除表面的灰尘、油污和其他杂质 修补缺陷:对裂缝、孔洞等缺陷进行修补,确保基层平整 浇水湿润:在施工前将基层充分湿润,防止空鼓和开裂 阴阳角处理:对阴阳角进行圆角或八字角处理,以增强防水层的抗裂性
水泥砂浆防水层的 施工过程
按照设计比例将水泥、砂、水和添加剂混合搅拌均匀。 搅拌时应控制搅拌时间,确保砂浆搅拌均匀,无结块现象。 砂浆的稠度应符合设计要求,以便于施工操作。 配制好的砂浆应及时使用,避免长时间存放。
涂抹时应采用抹灰刀或刮板 将砂浆均匀涂抹在基层上
底层砂浆的厚度应控制在510mm之间
环境保护:采取措施 减少施工对环境的影 响,如控制施工噪音、 减少粉尘排放等。
感谢您的观看
汇报人:XX
添加标题
添加标题
添加标题
验收时间:防水层施工完成后,砂 浆干燥前
验收标准:符合设计要求和相关质 量标准
砂浆开裂:采用抗裂砂浆或纤 维砂浆,加强养护
空鼓:基层清理干净,洒水湿 润,刷素浆结合层,铺砂浆
渗漏:加强防水层施工,确保 无渗漏
厚度不均:严格控制砂浆厚度, 分层抹灰
施工安全:确保施工 现场安全,采取必要 的安全措施,如佩戴 安全帽、使用安全带 等。

水泥砂浆抹面防水施工技术模版

水泥砂浆抹面防水施工技术模版

水泥砂浆抹面防水施工技术模版一、施工前准备1. 确定抹面防水的施工区域,并做好周边的防护措施,保证施工的安全性。

2. 清理施工面,确保无杂物和灰尘,以免影响抹面防水的粘结性。

3. 根据设计要求,选择适当的水泥砂浆材料,并按比例混合,确保施工质量。

二、基本流程1. 将调配好的砂浆铺于施工面上,并用铲子或抹刀均匀推平,厚度一致。

2. 采用拉光法,用抹刀将砂浆表面拉平,使其与周边平整的面成一条直线。

3. 用马毛刷蘸水后纵横交叉地刷在水泥砂浆表面,以增加附着力。

4. 通过刮毛刷或抹刀进行二次拉光,保证水泥砂浆表面平整、光滑。

三、注意事项1. 抹面防水施工时,保持施工面的湿润,避免太干引起空鼓或开裂。

2. 施工过程中,注意保护好已施工区域,避免损坏或破坏。

3. 施工面上应均匀振实,确保抹面防水层的均匀厚度。

4. 施工后的抹面防水层应保持湿润,防止干燥过快导致开裂,并视施工情况进行湿润养护。

四、质量检查1. 检查施工面的平整度和垂直度,符合设计要求。

2. 检查抹面防水层的厚度,应符合设计要求。

3. 检查抹面防水层的质地和颜色是否均匀一致,无明显色差。

五、维护保养1. 抹面防水层建议进行定期检查,发现开裂或破损及时修复,以确保水密性。

2. 避免在抹面防水层上进行重物撞击或尖锐物划伤,以免造成破损。

3. 如果需要进行后续的装修或施工,应采取保护措施,避免对抹面防水层造成损害。

六、施工安全1. 施工人员应佩戴好防护装备,并遵守施工现场的安全规定。

2. 施工时需注意搅拌水泥砂浆时的粉尘产生,尽量减少粉尘对工人身体的危害。

七、材料要求1. 水泥:应选用普通硅酸盐水泥或抗渗硅酸盐水泥,按设计要求掺加适量的外加剂。

2. 砂子:应选用符合规定的骨料,经检测合格的细砂备用。

3. 外加剂:应选用高效的增水剂和减缩剂,以提高混凝土的流动性和减少收缩裂缝的产生。

八、工具设备要求1. 搅拌设备:应选用搅拌机、搅拌盆等设备进行水泥砂浆的调配,以保证砂浆的均匀性。

水泥砂浆抹面防水施工技术范本

水泥砂浆抹面防水施工技术范本

水泥砂浆抹面防水施工技术范本1. 施工准备(1) 去除基层污物和松散物,清扫基层表面。

(2) 封堵渗漏点和裂缝。

(3) 对于旧建筑,需清除旧涂层,以保证新涂层的附着力。

(4) 检查水泥砂浆基层是否平整,如不平整需要进行修补。

2. 材料准备(1) 防水级别为Ⅰ级的水泥砂浆原材料。

(2) 防水剂。

(3) 网格布或纤维布。

(4) 铺贴石材或瓷砖所需的粘结剂。

3. 施工方法(1) 水泥砂浆的配制:按照水泥和砂的比例1:3~4进行调配,并加入适量防水剂。

搅拌均匀至没有颗粒感。

(2) 基层处理:将配好的水泥砂浆均匀涂抹在基层上,厚度可根据需要来定,一般不小于10mm。

使用抹子将砂浆抹平,注意保持平整度和光滑度。

(3) 防水剂使用:在砂浆表面抹布前,将防水剂均匀地涂刷在砂浆表面。

根据环境温度和湿度,等待一定时间使防水剂渗透进砂浆内部。

(4) 布网处理:将网格布或纤维布铺贴在湿砂浆表面上,压实并批刮至网格与砂浆基层间粘结牢固。

(5) 二次抹涂:将剩余的水泥砂浆涂抹在布网上,厚度一般为2~3mm。

抹平并保持平整度。

(6) 刮涂处理:待水泥砂浆初凝后,用刮板将表面的不平整处修正并抹平,提升表面的美观度。

注意使刮涂部位与周围材料衔接平滑。

(7) 后期处理:待水泥砂浆完全干燥后,进行养护操作。

避免受到外力的破坏。

4. 注意事项(1) 施工环境温度一般应在5℃以上,避免在低温或高温下施工。

(2) 施工过程中要保持工具和材料清洁,避免异物或杂质进入。

(3) 施工后要及时清理施工现场,并做好养护工作,以保证施工质量。

(4) 如需在水泥砂浆表面贴砖或石材,要先进行前期处理,如打毛、刮沙等。

水泥砂浆防水施工工艺流程

水泥砂浆防水施工工艺流程

水泥砂浆防水施工工艺流程英文回答:Waterproofing construction process for cement mortar:1. Surface Preparation: Before applying the waterproofing material, it is important to prepare the surface properly. This involves cleaning the surface, removing any loose particles, and repairing any cracks or unevenness. The surface should be smooth and free from any contaminants.2. Priming: Priming is done to improve the adhesion between the surface and the waterproofing material. A primer is applied to the surface, which helps in better bonding of the waterproofing material. The primer should be allowed to dry before proceeding to the next step.3. Mixing the Waterproofing Material: The waterproofing material, such as a cement-based waterproofing compound ora liquid waterproofing membrane, should be mixed according to the manufacturer's instructions. It is important to achieve a homogeneous mixture without any lumps.4. Application of Waterproofing Material: The waterproofing material is then applied to the surface using a brush, roller, or spray. It is important to apply the material in multiple coats, ensuring that each coat is dry before applying the next one. This helps in achieving a more effective waterproofing layer.5. Curing: After the application of the waterproofing material, it is important to allow it to cure properly. Curing helps in the formation of a strong and durable waterproofing layer. The curing time may vary depending on the type of waterproofing material used.6. Quality Check: Once the waterproofing layer has cured, it is important to check its quality. This can be done by conducting a water test or using a moisture meter to ensure that no water is seeping through the waterproofing layer.7. Finishing: Finally, after the waterproofing layerhas been successfully applied and checked, the surface can be finished as per the requirements. This may involve applying a protective coating or finishing material to enhance the appearance and durability of the surface.中文回答:水泥砂浆防水施工工艺流程:1. 表面处理,在施工防水材料之前,重要的是要正确处理表面。

水泥砂浆抹面防水施工技术范文

水泥砂浆抹面防水施工技术范文

水泥砂浆抹面防水施工技术范文1. 引言水泥砂浆抹面防水是一种常用的建筑防水方法,通过在建筑表面涂抹一层水泥砂浆,可以起到防水的作用。

本文将介绍水泥砂浆抹面防水施工技术的步骤和要点。

2. 材料准备(1)水泥:选择符合国家标准的硅酸盐水泥,保证其质量稳定。

(2)砂子:选择粒度适中、干燥、无杂质的细砂。

(3)添加剂:根据实际需要添加抗裂剂、防水剂等,提高水泥砂浆的性能。

(4)水:选择清澈无杂质的水,控制好适宜的用水量。

3. 施工步骤(1)基层处理:将基层表面清理干净,去除油污、灰尘等杂物,确保表面平整。

(2)湿润基层:用水浸湿基层表面,保持基层与水泥砂浆之间的黏结性。

(3)制备砂浆:将水泥、砂子、添加剂按照一定比例混合,搅拌均匀,控制好砂浆的水灰比。

(4)抹面施工:将砂浆涂抹在基层表面,用抹刀均匀刮开,控制好厚度和密实度。

(5)收面处理:用刷子将抹面后的表面刷出纹路,增加抹面层的附着力和耐候性。

(6)养护处理:抹面完成后,及时进行养护,保持施工区域潮湿,防止砂浆过早干燥。

4. 施工要点(1)基层处理要彻底,确保表面干净、平整,使其具备良好的黏结性。

(2)砂浆配比要合理,控制好水灰比,并根据实际需要添加适量的添加剂,提高砂浆的性能。

(3)抹面施工要均匀,厚度要控制好,一般不超过3mm,并要求密实。

(4)抹面层表面的处理要细致,用刷子刷出纹路,增加抹面层的附着力和耐候性。

(5)养护处理要及时进行,保持施工区域潮湿,防止砂浆过早干燥。

5. 结论水泥砂浆抹面防水是一种常用的建筑防水方法,施工技术的正确应用可以提高防水效果,延长建筑的使用寿命。

在施工过程中,要注意基层处理、砂浆配比、抹面施工、表面处理和养护等要点,确保施工质量。

通过合理的施工工艺和材料的选用,可以达到良好的防水效果。

水泥砂浆防水层施工工艺

水泥砂浆防水层施工工艺

本工艺标准适用于地下砖石结构地下室、水池等工程的防水层及防水混凝土结构的附加防水层,属潮湿条件下施工的刚性防水施工工艺。

2.1 材料要求及主要机具:2.1.1 水泥:宜用325号以上的普通硅酸盐水泥,亦可用矿渣硅酸盐水泥,有侵蚀性介质作用时,应按设计要求选用.2.1.2 砂:用中砂,不得含有杂物。

含泥量不得超过3%,使用前必须过3~5mm孔径的筛。

2.1.3 外加剂:防水粉、防水油,也可采用有机硅防水剂、氯化物金属盐类防水剂.均应按产品说明书正确使用。

2.1。

4 主要机具:灰板、铁抹子、阴阳角抹子、半截大桶、钢丝刷、软毛刷、八字靠尺、榔头、尖凿子、捻錾子、铁锹、扫帚、木抹子、刮杠等。

2.2 作业条件:2。

2.1 结构验收合格,已办好验收手续.2。

2.2 地下防水施工期间做好排水,直至防水工程全部完工为止.排水、降水措施应按施工方案执行.2.2。

3 地下室门窗口、预留孔洞、管道进出口等细部处理完毕。

3。

1 工艺流程:墙、地面基层处理→刷水泥素浆→抹底层砂浆→刷水泥素浆→抹面层砂浆→刷水泥砂浆→养护3.2 基层处理:3。

2.1 混凝土墙面如有蜂窝及松散的混凝土,要剔掉,用水冲刷干净,然后用1∶3水泥砂浆抹平或用1∶2干硬性水泥砂浆捻实。

表面油污应用10%火碱水溶液刷洗干净,混凝土表面应凿毛。

3。

2.2 砖墙抹防水层时,必须在砌砖时划缝,深度为10~12mm.穿墙预埋管露出基层,在其周围剔成20~30mm宽,50~60mm深的槽,用1∶2干硬性水泥砂浆捻实。

管道穿墙应按设计要求做好防水处理,并办理隐检手续。

3.3 混凝土墙抹水泥砂浆防水层3。

3.1 刷水泥素浆:配合比为水泥∶水∶防水油=1∶0。

8∶0。

025(重量比),先将水泥与水拌合,然后再加入防水油搅拌均匀,再用软毛刷在基层表面涂刷均匀,随即抹底层防水砂浆。

3.3.2 底层砂浆,用1∶2。

5水泥砂浆,加水泥重3%~5%的防水粉,水灰比为0.6~0。

水泥砂浆防水层施工工艺

水泥砂浆防水层施工工艺

本工艺标准适用于地下砖石结构地下室、水池等工程的防水层及防水混凝土结构的附加防水层,属潮湿条件下施工的刚性防水施工工艺。

2.1 材料要求及主要机具:2.1。

1 水泥:宜用325号以上的普通硅酸盐水泥,亦可用矿渣硅酸盐水泥,有侵蚀性介质作用时,应按设计要求选用。

2。

1.2 砂:用中砂,不得含有杂物。

含泥量不得超过3%,使用前必须过3~5mm孔径的筛。

2.1。

3 外加剂:防水粉、防水油,也可采用有机硅防水剂、氯化物金属盐类防水剂.均应按产品说明书正确使用。

2。

1.4 主要机具:灰板、铁抹子、阴阳角抹子、半截大桶、钢丝刷、软毛刷、八字靠尺、榔头、尖凿子、捻錾子、铁锹、扫帚、木抹子、刮杠等。

2。

2 作业条件:2.2。

1 结构验收合格,已办好验收手续.2。

2。

2 地下防水施工期间做好排水,直至防水工程全部完工为止。

排水、降水措施应按施工方案执行。

2.2.3 地下室门窗口、预留孔洞、管道进出口等细部处理完毕。

3。

1 工艺流程:墙、地面基层处理→刷水泥素浆→抹底层砂浆→刷水泥素浆→抹面层砂浆→刷水泥砂浆→养护3。

2 基层处理:3.2.1 混凝土墙面如有蜂窝及松散的混凝土,要剔掉,用水冲刷干净,然后用1∶3水泥砂浆抹平或用1∶2干硬性水泥砂浆捻实。

表面油污应用10%火碱水溶液刷洗干净,混凝土表面应凿毛。

3。

2。

2 砖墙抹防水层时,必须在砌砖时划缝,深度为10~12mm。

穿墙预埋管露出基层,在其周围剔成20~30mm宽,50~60mm深的槽,用1∶2干硬性水泥砂浆捻实。

管道穿墙应按设计要求做好防水处理,并办理隐检手续。

3.3 混凝土墙抹水泥砂浆防水层3.3.1 刷水泥素浆:配合比为水泥∶水∶防水油=1∶0。

8∶0。

025(重量比),先将水泥与水拌合,然后再加入防水油搅拌均匀,再用软毛刷在基层表面涂刷均匀,随即抹底层防水砂浆。

3。

3.2 底层砂浆,用1∶2。

5水泥砂浆,加水泥重3%~5%的防水粉,水灰比为0.6~0。

水泥砂浆防水层施工工艺

水泥砂浆防水层施工工艺

水泥砂浆防水层施工1 范围本工艺标准适用于地下砖石结构地下室、水池等工程的防水层及防水混凝土结构的附加防水层,属潮湿条件下施工的刚性防水施工工艺。

2 施工准备2。

1材料要求及主要机具:2.1.1水泥:宜用325号以上的普通硅酸盐水泥,亦可用矿渣硅酸盐水泥,有侵蚀性介质作用时,应按设计要求选用.2。

1。

2砂:用中砂,不得含有杂物。

含泥量不得超过3%,使用前必须过3~5mm孔径的筛.2。

1.3外加剂:防水粉、防水油,也可采用有机硅防水剂、氯化物金属盐类防水剂.均应按产品说明书正确使用。

2.1。

4主要机具:灰板、铁抹子、阴阳角抹子、半截大桶、钢丝刷、软毛刷、八字靠尺、榔头、尖凿子、捻錾子、铁锹、扫帚、木抹子、刮杠等。

更多内容可进QQ群:家装市场营销学习群或关注微信公众号:装修百科常识2。

2作业条件:2.2。

1结构验收合格,已办好验收手续。

2。

2.2地下防水施工期间做好排水,直至防水工程全部完工为止。

排水、降水措施应按施工方案执行。

2。

2.3地下室门窗口、预留孔洞、管道进出口等细部处理完毕。

3 操作工艺3。

1工艺流程:→→→→→3.2基层处理:3.2.1混凝土墙面如有蜂窝及松散的混凝土,要剔掉,用水冲刷干净,然后用1∶3水泥砂浆抹平或用1∶2干硬性水泥砂浆捻实.表面油污应用10%火碱水溶液刷洗干净,混凝土表面应凿毛。

3。

2。

2砖墙抹防水层时,必须在砌砖时划缝,深度为10~12mm。

穿墙预埋管露出基层,在其周围剔成20~30mm宽,50~60mm深的槽,用1∶2干硬性水泥砂浆捻实。

管道穿墙应按设计要求做好防水处理,并办理隐检手续.3.3混凝土墙抹水泥砂浆防水层3.3.1刷水泥素浆:配合比为水泥∶水∶防水油=1∶0。

8∶0.025(重量比),先将水泥与水拌合,然后再加入防水油搅拌均匀,再用软毛刷在基层表面涂刷均匀,随即抹底层防水砂浆.3.3。

2底层砂浆,用1∶2.5水泥砂浆,加水泥重3%~5%的防水粉,水灰比为0.6~0.65,稠度为7~8cm。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

水泥砂浆防水剂防水施工工艺一般防水施工工艺一、施工前防水基层的地面、竖面须平整、粗糙、清洁而潮湿,一般防水砂浆层须分两遍完成,先将防水剂配水=1:8左右与水泥搅拌素灰抹1mm-1.5mm厚度做结合层,待素灰初凝时再抹防水砂浆10mm-20mm 厚,缓凝期间须养护并赶光压实1-2次。

养护方法与常规水泥养护方法相同,如需粘瓷砖可在完全上强度前擦出麻面(地下室或水压大的疑难防水工程,可根据现场情况按上述工艺反复做一遍或两遍)。

二、在做防水砂浆时现场如卫生间遇有管件、地漏、柱体等特殊部分需先做处理。

示意图4方法:用钎子将其根部周围钻ぁ一级建造成凹型,清净、潮湿,再用素灰将其根部周围抹成凸型(坡型),与上述的1mm-1.5mm厚的素灰结合层形成一体,初凝时做防水砂浆。

三、在维修渗漏工程时,原基础为光面时,需用钎子钻成麻面。

四、在外墙饰面喷刷时,可喷刷防水剂的原液(不配水)2-3遍与液体装饰涂料合拌时,可根据涂料的色彩添加,一般防水剂配水=1:(1-3)左右,合拌在涂料中,涂料的喷刷工艺不变。

注意事项一、防水剂应随时配比随时使用,在存放或施工中切勿与白灰接触,存放气温须在零度以上。

防水剂如出现沉淀,摇匀使用不影响其效果。

防水剂保质期两年。

二、如需作闭水实验,须在施工后超过36小时。

三、在施工时现场中有渗漏处需先做堵漏处理(我厂可提供堵漏材料与方法),在地下水位以下施工时,施工前需将水位抽降到抹灰层以下,并保持到防水砂浆完全上强度后再停止抽水。

四、施工时,对现场的管件、地漏、柱体根部及阴阳角处,要压实精心操作,避免在爆晒的下施工,以免龟裂。

五、配制混凝土的防水剂有减水功能,与正常用水量减少5%,防水剂配水按1:6稀释,其它水泥、砂子、石子及操作过程不变。

人工挖孔桩施工㈠、施工方法表层土质或砂石层部分人工直接用铁锹或风镐开挖,石质则采用浅眼松动爆破法开挖,松碴装入吊筒后简易电动提升架提升,采用撑式标准组合钢模浇注砼护壁,钢筋笼现场制作,吊车吊放,砼由砼搅拌站统一拌制,砼运输车运输,减速串筒灌注,插入式振捣器振捣。

㈡、施工工艺流程挖孔桩施工工艺流程]见图7-3-4。

㈢、施工工艺要点⑴、场地平整当场地为旱地时,清除地表杂物,挖除软土,整平并用压路机碾压密实;当场地为陡坡时,用枕木搭设工作平台;当场地有少量水时,采用筑岛法施工,岛顶高出施工期间可能出现的最高水位60cm,筑岛采用粘性土,防水严密,并在孔口四周设排水沟、集水井,防止地表水进入孔。

井口围护比地面高30cm,防止土、石、杂物滚入孔伤人。

人工挖孔灌注桩施工一、施工机具人工挖孔灌注桩施工用的机具比较简单,主要有:1、卷扬机和提土桶,用于材料和弃土的垂直运输以及供施工人员上下工作使用。

2、护壁钢模板。

3、潜水泵。

4、鼓风机、空压机和送风管。

5、镐、锹、土筐等挖运工具: 若遇到硬土或岩石, 尚需风镐、潜孔钻。

6、插捣工具,用于插捣护壁砼。

7、应急软爬梯。

8、照明灯、对讲机、电铃等。

二、施工工艺采用现浇砼分段护壁的人工挖孔桩的施工流程是:1、放线定位: 按设计图纸放线, 定桩位。

2、开挖土方: 采取分段开挖,每段高度决定于土壁直立状态的能力, 以0.8~1.0m为一施工段。

开挖面积的围为设计桩径加护壁厚度。

挖土由人工从上到下逐段进行, 同一段挖土次序先中间后周边;扩底部分采取先挖桩身圆柱体,再按扩底尺寸从上到下削土修成扩底形。

在地下水位以下施工时,要及时用吊桶将泥水吊出,当遇大量渗水时,在孔底一侧挖集水坑,用高扬程潜水泵将水排出。

3、测量控制: 桩位轴线采取在地面设十字控制网、基准点。

安装提升设备时, 使吊桶的钢丝绳中心与桩孔中心一致,以做挖土时粗略控制中心线用。

4、支设护壁模板: 模板高度取决于开挖土方施工段的高度,一般为1m。

护壁中心线控制,系将桩控制轴线,高程引到第一节混凝土护壁上,每节以十字线对中、吊大线锤控制中心点位置, 用尺杆找圆周, 然后由基准点测量孔深。

5、设置操作平台,用来临时放置混凝土拌合料和灌注护壁混凝土用。

6、浇筑护壁砼: 护壁砼要捣实,上下壁搭接50~75mm,护壁采用外齿或齿式;护壁砼强度等级为C25,厚度150mm,护壁等距放置8根直径6~8mm长1m的直钢筋,插入下层护壁,使上下护壁有钢筋拉结,避免某段护壁出现流砂、淤泥而造成护壁因自重而沉裂的现象;第一节砼护壁高出地面200mm左右,便于挡水和定位。

7、拆除模板继续下一段施工: 护壁砼达到一定强度后(常温下24小时)便可拆模,再开挖下一段土方,然后继续支模灌注混凝土,如此循环,直到挖至设计要求的深度。

8、排除孔底积水,灌注桩身砼。

灌注桩身砼前,应先吊放钢筋笼,并再次测量孔底虚土厚度,并按要求清除。

三、施工中注意事项1、施工安全措施人工挖孔桩施工的安全措施: 从事挖孔作业的工人必需经健康检查和井下、高空、用电、吊装及简单机械操做等安全作业培训且考核合格后,方可进入现场; 要认真研究钻探资料,分析地质情况,对可能出现流砂、管涌、涌水以及有害气体等情况制定针对性的安全措施;施工时,施工人员必须带戴安全帽,穿绝缘胶鞋,孔有人时,孔上必须有人监督防护;孔周围要设置安全防护栏;每孔必须设置安全绳及应急软爬梯;孔下照明要用安全电压;使用潜水泵必须有防漏电装置;设置鼓风机,以便向孔强制输送清洁空气,排除有害气体等;爆破施工前,做好安全爆破的准备工作,划定安全距离,设置警戒哨,闪电雷鸣时禁止装药、接线,施工操作时严格按安全操作规程办事,爆破后向孔强制输送清洁空气,排除有害气体,待有害气体排完后方可下井。

2、桩孔质量要求保证开挖前,从桩中心位置向桩四周引出4个桩心控制点,施工过程用桩心点来校正模板位置,有专人严格校核中心位置及护壁厚度。

桩孔开挖后,当天一次灌注完毕护壁砼,护壁砼拌和料中掺入早强剂;护壁拆模后,若发现护壁有蜂窝、漏水现象要及时加以堵塞或导流,防止孔外水通过护壁流入孔。

严格按安全操作规程办事,爆破后向孔强制输送清洁空气,排除有害气体,待有害气体排完后方可下井。

2、桩孔质量要求保证开挖前,从桩中心位置向桩四周引出4个桩心控制点,施工过程用桩心点来校正模板位置,有专人严格校核中心位置及护壁厚度。

桩孔开挖后,当天一次灌注完毕护壁砼,护壁砼拌和料中掺入早强剂;护壁拆模后,若发现护壁有蜂窝、漏水现象要及时加以堵塞或导流,防止孔外水通过护壁流入孔。

3、注意防止土壁坍落及流砂事故在开挖过程中,如遇到特别松软的土层,流动性淤泥或流砂时,为防止土壁坍落及流砂,可减少每节护壁的高度或采用钢护筒,待穿过松软土层和流砂层后,再按一般的方法边挖边灌注砼护壁,继续开挖桩孔。

开挖流砂现象严重的桩孔可采用井点降水法。

创优计划案默认分类 2009-03-26 13:11 阅读184 评论0字号:大中小一、工程概况龙港广电大厦位于龙港镇龙港大道与西三街十字路口的西北角,为龙港镇规划的商业区,地理位置优越。

主体建筑地上二十一层,地下一层,裙房四层,集住宅、广播电视发射、办公、商业服务、车库于一体,是龙港较有影响的标志性建筑。

本工程地处一个L性地块,总建筑面积23792平方米,建筑高度为71.3米,由西向东总长49.54米,由南向北总长49.74米。

本工程地下室底板面标高为-3.90米,地下室顶板面标高为±0.000米,相当于绝对标高4.699米,室外地坪标高为-0.60米。

二、公司创优目标方针本工程列入我公司2000-2002年创优质名牌项目,工程质量确保“瓯江杯”,争创“钱江杯”。

精心组织工程项目部班子,并成立龙港广电大厦指挥部,重点管理,重点保证,确保创优目标的实现。

三、项目部创优目标、方针与计划根据公司计划,本工程创优目标为“工程确保瓯江杯,争创钱江杯”。

在具体实施过程中,我项目部将按质量目标提高一级的要求来执行各项工作,高标准、严要求,狠抓工程质量与施工现场的安全生产和文明施工,充分发挥公司综合实力优势,加强对创优计划关键因素的控制,确保创优目标的实现。

四、项目部对落实创优计划的措施 ?创优计划的实施,是一项系统的工作,其中包含的因素多,需要多方面加以控制,方能确保创优目标实现。

结合本工程实际情况,我项目部拟从以下几个方面着手,在施工工程中加强管理控制,保证创优计划的顺利实施。

1、项目部建设一个团结、稳定的项目管理班子是一个工程创名优项目的关键因素。

项目部的管理水平将直接影响到工程的质量。

本项目部主要成员均有着较深厚的理论功底和丰富的创优工程实践经验,自身业务素质较高。

项目部部团结一致,具有很强的战斗力。

项目部今后还将通过学习、交流、考察等多种形式提高项目部管理人员整体素质。

建立健全管理规章制度,管理人员职责分明,责任到位,杜绝管理漏洞的出现。

2、材料供应方面保证本工程采用的各种材料均应有出厂合格证并且符合设计要求和相应的国家、公司标准,经验收合格后方可在工程上使用。

公司有许多稳定的、长期与我公司有业务关系的分包商、材料供应商,项目部将通过公司物资的调配、畅通的材料供应渠道来保证本工程的顺利完成。

每批材料进场,有专人组织验收,并按不同规格、型号、批号不同材料分批堆放,严禁混放混用。

针对工程特点确定材料验收、保管、发放、退料、标识及标志移植等制度。

3、施工队伍组织项目部将根据施工组织设计中的劳动力投入计划,配备个专业工种施工力量,特种作业工种必须持证上岗。

充分利用公司人力优势,选择素质好作风过硬的民工队伍,并对各工种职工进行相应的技术培训,提高职工专业技能水平,保证优质完成施工任务。

加强对职工质量意识教育,在职工中牢固树立“工程质量就是企业生命”的思想,各班组都能严格地按规施工,工作认真负责,为创优打下良好的基础。

五、质量、施工技术、资料等保证措施1、工程质量控制按照公司质量方针和本工程质量目标,我项目部将从多方面着手控制工程质量。

第一是要建立起完整的质量保证体系,并使其保持有效运行,使质量管理各项活动规化、标准化、程序化。

第二是要建立相应的质量体系文件,包括质量保证手册、程序文件、质量计划、作业指导书、相关的技术文件和法令、法规。

第三是要与业主、监理方加强联系配合,为本工程业主和监理人员提供对工程质量监检的一切方便条件。

第四是要编制一份质量管理计划,其容主要包括所有现场施工的质量控制,产品提供厂家质量调查计划和实施的措施。

第五是要根据工程的特点和施工条件,对重点施工部位和关键过程编制切实可行的专项施工方案。

严抓产品的检验和试验,建立并严格执行完整的质量检验制度,确保产品符合预定要求。

这些质量检验制度主要有:材料、半成品(构配件)检验制度;预检与技术复核制度;隐蔽工程检查验收制度;结构工程质量验收制度;自检、互检、交接检制度;竣工、交工验收制度。

对用于本工程的物资由材料员、质量员进行验证,验证合格后填写供货质量记录存档;对需经试验室验证的材料由试验员按规定取样送样。