雅思A类小作文范文 Cement Used 流程图类
雅思流程图小作文
雅思流程图小作文The given diagram illustrates the process of how chocolate is produced, from the cacao bean to the final chocolate bar. Overall, it can be seen that there are several stages involved in the production of chocolate.To begin with, the process starts with the harvesting of cacao beans. These beans are then transported to the factory, where they undergo a thorough inspection to ensure that they are of high quality. Once the beans have been approved, they are then roasted at a high temperature to bring out the rich flavor of the cacao.Following this, the roasted beans are then cracked open to reveal the cacao nibs inside. These nibs are then ground into a thick, smooth paste known as chocolate liquor. It is important to note that this chocolate liquor contains both cocoa solids and cocoa butter.Next, the chocolate liquor is further processed toseparate the cocoa solids from the cocoa butter. This is achieved through a pressing process, which results in the creation of two separate products: cocoa powder and cocoa butter. The cocoa powder is then used in the production of various chocolate products, while the cocoa butter is utilized in the creation of chocolate bars and other confectionery items.Finally, the cocoa powder and cocoa butter are combined in precise proportions to create the desired type of chocolate. The mixture is then heated and stirred to ensure that the ingredients are thoroughly blended. Once the chocolate has reached the desired consistency, it is poured into molds and allowed to cool and solidify.In conclusion, the production of chocolate is a complex process that involves several stages, from the harvesting of cacao beans to the creation of the final chocolate bar. Each stage plays a crucial role in ensuring that the chocolate produced is of the highest quality. Overall, the process of chocolate production is a fascinating and intricate one that requires precision and expertise.。
【雅思写作真题】剑桥8Test3小作文实例批改
【雅思写作真题】剑桥8Test3⼩作⽂实例批改【雅思写作真题】剑桥8 Test3 ⼩作⽂实例批改“真题:剑桥8 Test3 ⼩作⽂”The diagrams below show the stages and equipment used in the cement-making process, and how cement is used to produce concrete for building purposes.Summarise the information by selecting and reporting the main features, and make comparisons where relevant.考⽣原⽂Let’s have a look the left diagram which introduces the cement production.In the beginning, the cude materials are Limestone and Clay. Both of them have a shape of beads. We start to put them into a crusher at same time and they become a combinational power. After crushing, place the power into a mixer and pass though a rotating heater which had a heat at bottom. These heated power will go through a Grinder then finally become Cement, and seprate in to different bags.When builders need concrete, the steps show on the right hand side diagram will guide them to get it. Firstly, there should be a concrete mixer which can contain everything. Secondly, add15% of cement, 10% of water, 25% of sand and 50% of Gravel (kind of small stones).Make sure the concentration of each element is correct. Thirdly, keep rotating the mixer. At last the production will be a ultrafine concrete.批改By 晟睿葡萄本次批改严格按照IELTS⼩作⽂评分标准进⾏。
雅思碳循环流程图作文
雅思碳循环流程图作文英文回答:The carbon cycle is a vital process that plays a crucial role in maintaining the balance of carbon dioxide in the Earth's atmosphere. It involves the movement of carbon between the atmosphere, land, and oceans through various processes such as photosynthesis, respiration, decomposition, and combustion.To begin with, carbon dioxide is constantly exchanged between the atmosphere and the oceans through a process known as diffusion. The oceans act as a sink for carbon dioxide, absorbing it from the atmosphere. This process helps to regulate the levels of carbon dioxide in the atmosphere, preventing it from accumulating excessively.Furthermore, plants play a significant role in the carbon cycle through photosynthesis. During this process, plants absorb carbon dioxide from the atmosphere andconvert it into glucose and oxygen. The glucose is thenused by the plants for growth and development, while the oxygen is released back into the atmosphere. This processnot only helps to remove carbon dioxide from the atmosphere but also provides oxygen for other organisms.Moreover, animals and humans contribute to the carbon cycle through respiration. During respiration, organisms release carbon dioxide into the atmosphere as a byproductof cellular respiration. This carbon dioxide can then be absorbed by plants during photosynthesis, completing the cycle.Additionally, the decomposition of organic matter also plays a crucial role in the carbon cycle. When plants and animals die, their remains are broken down by decomposers such as bacteria and fungi. During this process, carbon is released back into the atmosphere as carbon dioxide. This carbon dioxide can then be used by plants for photosynthesis, continuing the cycle.Lastly, combustion, such as the burning of fossil fuels,releases carbon dioxide into the atmosphere. This process is a major contributor to the increase in carbon dioxide levels in the atmosphere, leading to global warming and climate change. It is important to reduce our reliance on fossil fuels and promote the use of renewable energy sources to mitigate the negative impacts of combustion on the carbon cycle.In conclusion, the carbon cycle is a complex and interconnected process that involves the exchange of carbon dioxide between the atmosphere, land, and oceans. It is essential for maintaining the balance of carbon dioxide in the atmosphere and regulating the Earth's climate. Understanding and managing the carbon cycle is crucial for mitigating the effects of climate change and ensuring a sustainable future.中文回答:碳循环是一个至关重要的过程,对于维持地球大气中二氧化碳的平衡起着至关重要的作用。
雅思小作文-真题解析
注意写作时态
如果是遇到描述某个建筑,景点位置的变化, 那么时间节点意味着考生还需要注意时态问题。 如果是出现过去时间,那么就用过去时,描述 为了,那就是将来时,总之时态问题不能轻视。
从这个题目来看,右图是现在及将来的情况, 我们则需要用到一般现在时、现在完成时以及 一般将来时这几个时态。如:所有虚线标出的 地方是需要用到一般将来时态的。
1975年,在大学的每个角落都可以看到四个主 要区域,它们之间有几棵树。
In the north-western corner a sports center was situated, surrounded by a road which intersected another road leading to a lecture room in the south-eastern part. A library lay in the southwestern end and to its opposite side, there was a drama room and a music room boarding a big car park.
The graph shows the development of a particular college campus from 1975 to 2002 and the proposed development of 2020.
Summarize the details. Select and report the main features and make comparisons where relevant.
2002年,一个显著的变化是体育中心被拆除,一个室内中心计划在 2020年建成。此外,为了给中心的科学大楼让路,穿过校园的道路也 被拆除了。但是另一条新的道路将会被修建起来,将室内运动中心和 以前的图书馆连接起来,图书馆被分成了两部分,一半作为一个IT室。 虽然百家讲坛比1975年大了一倍,但原来的戏剧演播室被改成了地质 演播室,原来的地方被停车场占了,所以容量变大了。
雅思小作文范文--装置图 流程图 表格
小作文流程图The given graph indicates the procedures of glass bottle recycle by three main stages.According to the table, various glass bottles are gathered in the collecting site and then transported to the cleaning station at the very beginning. Then it comes to the second stage where the bottles are washed by the high pressured water, after which they are categorized into Brown, Green as well as clear groups based on their color. After that, bottles are delivered to the recycling plant where the prepared bottles are burned in furnace with high temperature into liquid glass for recycle. Next, the recycled liquid glass along with new liquid glass is shaped into bottles again through glass moulds. Finally, the newly produced glass bottles are launched into the customer supermarket, till this point, the process of glass recycle is finished completely.In summary, it is obvious that stage 2 is the most crucial and complex one during the whole recycling process.装置图The given table reveals how the water collecting set functions to gather water in the wild.At the very beginning, in order to prepare the set, it is necessary to find a hole on the ground which can receive sufficient sunshine and abound with plenty of green plants. Then a container used to collect water is placed in the center of the hole, and the hole is covered by a plastic sheet, fixed by stones on the edge. However, it is recommended to place a suitable stone in the middle of the sheet to ensure its lower position exactly above the water container.When the sun shines above the green plants, plants will generate water vapor owing to the photosynthesis, and the water vapor is condensed into water drops on the plastic sheet. Under the effect of gravity, the water drops increasingly gather in the lower point and fall into the container placed under the plastic sheet.组合图-C6T1The curve graph reveals the international water consumption during the entire 20th century, and water usage in Brazil as well as Congo in 2000 is illustrated in the second chart.According to the line chart, the global water used in agriculture(500 km³) considerably outweighed that in industry (50 km³) and household(20 km³) section were, and they lead a similarly slight increase in the first 50 years. However, since 1950, the agricultural water consumption witnessed a constantly dramatic rise, reaching the peak at exactly 3000 km³in 2000. On the other hand, industrial and domestic water usage rose moderately in the second half century, peaking at around 1300 and 400 km³respectively. In the second chart, we can clearly find that the water use of each person(359 m³) of Brazil in 2000, which possessed 176 million inhabitants and 26,500㎡irrigating lands, intensively surpassed that of Congo (8 m³), with only 5.2 million dwellers and 100㎡irrigating lands.In summary, the water worldwide was mainly consumed by agriculture field during the given 100 years, and Brazil’s average individual substantially overweighed that of Congo in 2000.柱状图-C7T3A glance at this bar chart reveals the changing average prices of house in five cities (New York, Madrid, Tokyo, Frankfurt and London)between 1990 and 2002 in comparison of that in 1989.According to the graph, during the first stage, from 1990 to 1995, the average house prices of New York, Tokyo and London suffered a dramatic fall compared with that 1989, with the percentage decreasing more than 5%. On the other hand, the housing prices in Madrid and Frankfurt experienced a slight increase less than 3%.Between 1996 and 2002, the average house prices of London and New York rose dramatically, especially London with a 12% increase which represented the largest ascent. Madrid and Frankfurt witnessed a slight increase (4% and 2% respectively). Oppositely, the house price in Tokyo still decreased (exactly 5%), even though it recovered a little than the first stage (8%).In conclusion, the average house prices in the given cities from 1990 to 2002 all increased correspondingly except Tokyo compared with 1989.The line curve illustrates the changes of fish and meat consumption in a European country during the year 1979 to 2004.装置图As can be seen from the chart, the consumption of beef stood the largest in 1979 with the data of around 220 grams for each person every week. However, after a fluctuation between 1979 and 1988, it dropped dramatically to the bottom at approximately 100 grams in 2004. Similarly, the lamb also declined constantly in the same period, ending up with about 60 grams in 2004. However, the figure of chicken experienced a significant rise from 140 grams in 1979 to over 250 grams in around 2002, which leveled off to exactly 250 grams in the end. As to the fish consumption, the figure maintained a long-term slight decrease tendency in the whole stage, remaining the least popular food option among the four.In conclusion, the chicken consumption witnessed a staggering increasing whilst other meats decreased to a certain degree in the given period.表格图-C5T4The graph describes data about the subway systems in London, Paris, Tokyo, Washington DC, Kyoto and Los Angeles.According to the table, London railway possesses the longest history among the six cities, which was opened in 19th century (1863), while that of Los Angeles was opened in the 21st century (2001), also the latest one. The other four underground systems were all built in 20 century. In terms of kilometers of route, London subway holds the first place with the length of 394km. The length of subway in Paris, Tokyo as well as Washington DC is between 100 and 200 kilometers. However, that of Kyoto and Los Angeles isbelow 100 kilometers, with Kyoto theshortest (only 11 kilometers). When it comes to the annual passenger transporting capability, Tokyo and Parisexceeds 1000 million, especially Tokyo the largest (1927 million), while Los Angeles and Kyoto transport fewer than 100 million per year, 50 and 45 million respectively. The number of the rest two cities lies between 100 and 1000 million.In conclusion, London railway ranks the first in terms of opening date and route length whereas Kyoto the least in route length as well as annual passenger transporting.。
雅思小作文-流程图
雅思小作文——流程图出现频率:低难易程度:高流程图和普通图表的区别在于:●流程图基本上不会出现数据,文字信息占主要地位●流程图以描述为主,比较的概率比较少●流程图需要把图中出现的信息都做描述,而普通图表则不需要将每一个数据都表述●流程图的时态比较单一,主要是用一般现在时●流程图的分段比较灵活,只要不同阶段之间的差距很明显,就可以另起一段●流程图可以不写总结段【如果写总结段,可以把步骤稍微总结一下】流程图注意事项:1)注意掌握段落连接或者不同阶段之间的说法(sequence expression)表示首阶段的一些说法:①The process starts from (名词or动名词)②At the first/initial stage + 句子③At the beginning of the cycle + 句子④During the initial phase + 句子⑤The beginning of the whole cycle is marked by (名词or动名词)⑥(名词or动名词)is the first step in (名词or动名词)表示次阶段的一些说法:①The second stage is(名词or动名词)②The next step in the process is (名词or动名词)表示最后阶段的一些说法:①(名词or动名词)is the last step in the procedure②The final phase of the procedure is about (名词or动名词)③In the final phase + 句子④Entering the final phase + 句子⑤(名词or动名词)is the final stage2)单词的转换主要体现在名词转换成动词。
流程图经常会出现一些器具的名词,如“grinder”“mixer”“heater”,考生需要改动成名词使用,如”ground”, “mixed”和”heated”例:The powders are delivered to the grinder, where they are ground into cement.3)注意流程图读图的顺序,很多是以循环形式出现4)除了连接词外,还可以使用分词结构和状语从句来表示顺序,如:下面几句话的意思是一样的,●Liquor butter is filtered, before being converted into solid butter.●Once liquor butter is filtered, it is converted into solid butter.●Liquor butter is filtered, until it is converted into solid matter.5)常用被动语态●误:Put these materials in the heater.●正:These materials are put in the heater.6)工序图的叙述流程图可以遵循下面的步骤:步骤1:确定材料步骤2:确定工具步骤3:确定动词,然后将这些信息写成一句话。
雅思流程图和地图题范文
The diagram on the left illustrates the process by which cement is made whilst the diagram on the right shows us how concrete is made.We can clearly see that the first stage in cement production is to put two substances –limestone and clay –through a crusher to create a powder. This powder then goes through a mixer and is then heated in a rotating heater. Once the powder has gone through the mixer and heater, it is ground and the cement is packed into bags.The diagram on the right hand side tells us that concrete is a mixture of four ingredients in differing proportions. Cement makes up 15% of the mixture, water constitutes 10%, sand 25%, and gravel (i.e. small stones) 50%. These ingredients are mixed in a rotating concrete mixer to make concrete.In summary, the production of cement and the production of concrete appear to be fairly simple processes.左边的图描述的是水泥生产的流程,而右边的图则是混凝土生产的流程。
雅思小作文流程图英文
雅思小作文流程图英文Alright, here's an example of a descriptive IELTS-style diagram essay in English, following the given requirements:Okay, let's break down this process step by step. First things first, you start with a blank canvas. Then, you select your colors and brushes. It's like choosing the ingredients for a meal, you know? Once you've got that,it's all about layering. You start with the base colors, building up the foundation.Next up, comes the detailing. It's like adding the spices and herbs to your dish. You go in with precision, adding highlights and shadows, making sure everything is just right. And don't forget, just like in cooking, sometimes you need to step back and take a look at the big picture. Adjustments are key.After that, comes the finishing touches. It's like adding the garnish to your meal. You might add a few extrastrokes, a bit of gloss or maybe even some texture. It'sall about making it perfect.Finally, you stand back and admire your work. Just like when you serve up a delicious meal, you take a moment to appreciate the beauty of what you've created. And remember, every painting is unique, just like every meal. So, enjoy the process and let your creativity shine!Note that each paragraph is written independently, focusing on a different aspect of the process, while maintaining a conversational tone and avoiding any formal introductions or transitions.。
英语考试作文-9分雅思图表写作范文全集之流程图 水泥生产
英语考试作文9分雅思图表写作范文全集之流程图水泥生产9分雅思范文之流程图水泥制造The diagrams below show the stages and equipment used in the cement-making process, and how cement is used to produce concrete for building purposes.范文集结:全部15篇9分雅思流程图范文汇总放送范文:The diagrams illustrate the phases and apparatus to make cement and how cement is utilised in the production of concrete for construction.The production of cement involves a 5 stage, linear process that begins with the mixing of raw materials and culminates in the packaging of new cement. Making concrete is a simpler process that involves mixing four ingredients in a concrete mixer.Limestone and clay are crushed and the resultingpowder is then mixed before being passed through a rotating heater. Once heated this mixture travels over a conveyor belt and is ground through a grinder. Now that the cement has been produced, it is packaged and transported to a building site where it can be used to make concrete.Concrete is made up of half gravel, quarter sand, 10% water and 15% cement. All of these are added together in a cylindrical drum and rotated until concrete is yielded.(151 words)。
雅思写作地图题和流程图题怎么写?
雅思写作地图题和流程图题怎么写?用一个题目给大家说一下雅思小作文“流程图”的注意事项。
剑桥雅思8TestThe diagrams below show the stages andequipment used in the cement-making process,and how cement is used to produceconcrete for building purposes.顺序是核心,这也是绝大多数人都已经解决了的是问题。
简单说来,按照流程的顺序来写。
根据流程的先后,加上表示时间关系衔接词(下文中有)就可以把图形表述清楚。
简单说来,流程图的写作,就是看懂图形并用图中的词造句。
这幅图中标注了大量的名词和动词,基础不够好的考鸭,在造句的时候会出现大量的名词单复数和动词词形错误。
所以,首先,考鸭必须判断出图中的名词是否可数(是否有复数,复数是否可以加-s)。
1.图中器具类(crusher,mixer,rotating heater,grinder,bags)都是可数名词。
0)I like apple.(误,可数名词不能单独出现)1)I like the apple.(正,the apple指苹果这一类事物)2)I like apples.(正)3)I like the apples.(正)4)I like an apple.(正)2.图中材料类(limestone,clay,power,cement,water,sand,gravel)都是不可数名词(加了-s都是错的)。
第二,应该判断词性是否可变。
crusher-->crushmixer-->mixheater-->heatgrinder-->grind(都是名词变成动词;没有这些动词,作文无法写)时态通常情况下,流程图都是用一般现在时来写(注意be动词应该用is还是are,注意实意动词是否应该加-s)范文:The first flow chat shows how cement is produced and what materials and equipment are required in the process.The production of cement can be divided into4steps andlimestone and clay are the raw materials required.They are first crushed into powder by two crushers.The powder is mixed in a mixer before being heated in a cylindrical rotatingheater.What comes out of the heater is then ground into the desired cement,which is later packaged in individual bags.The second chart illustrates that cement can be used toproduce concrete and that the concrete-producing process is much simpler than that of cement alone.The procedureconsists only of combining cement,sand,gravel and water ina concrete mixer,and the proportions of each ingredient needto be15%,25%,50%and10%respectively.Even though concrete is an essential ingredient in theproduction of cement,concrete mainly consists of gravel.范文解析(建议保存图片后查看):上过写作课的宝宝们可能会感觉流程图题比数据表还要简单,所以对于大家说的很难的地图题和流程图题,上过写作课的宝宝们都没有感觉很难,有时甚至感觉流程图题比数据表还要简单。
雅思小作文范文-流程图
1. The process of brick manufacturing.注意:1. 介绍过程要使用一般现在时2. 使用定语从句将有关联的两句话连接。
3. 大量使用被动语态。
4. 使用一些表示顺序的连接词。
5. 一般不需要写总结。
The flow chart illustrates the production process of bricks usually used in building industry. Generally, seven stages are included, from material exploitation to delivery.Firstly, underground clay is dug up as the raw material by a large digger. Clay lumps are then stacked on a metal grid which serves to break up chunks into much smaller pieces. After falling on a roller, the stuff is further conveyed and mixed with sand and water.In following stage, the well-blended compound is pressed in a mould or cut by a wire cutter, in order to form brick-shaped pieces. During next 24-48 hours, dozens of these fresh bricks are kept in a room, namely drying oven.Once the bricks are dry, the next stage is heating and cooling process. bricks are transferred in a so-called kiln, another type of hotter oven, in which they are burned twice, moderately and highly, in temperature from 200°C-980°C to about 870°C-1300°C. This is followed by depositing heated bricks in a cooling chamber for 2 or 3 days.Finally, cooled hard bricks get packed and delivered by trucks to their destination, a building site.(194)2. The production of steam using a gas cooled nuclear reactor.1. 看懂基本过程和原理,定位流程的起点和终点。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
You should spend about 20 minutes on this task.
The diagrams below show the stages and equipment used in the cement-making process, and how cement is used to produce concrete for building purposes.
Summarise the information by selecting and reporting the main features, and make comparisons where relevant.
Write at least 150 words.
The diagrams show how cement and concrete are produced. Overall, there are five stages in the production of cement, while the procedure for producing concrete from cement and a few other simple ingredients involves a single stage.
Cement production begins when the initial raw materials, namely limestone and clay, are crushed using two rotating drums to make a fine powder which is then mixed in a cylindrical mixer. The next stage involves a tube-like rotating heater with a blowtorch mounted at its bottom opening. The mixed powder is fed from the top and simultaneously heated and blended, after which it is transferred to a grinder using a conveyor belt. There, it is milled to yield the final cement product which is eventually packed in bags.
This cement is used as raw material in the production of concrete in a second process. An initial mixture comprising 15% cement, 10% water, one-quarter sand and half gravel is fed into a rotating concrete mixer where they are stirred until the concrete mix is ready for construction purposes.
(174 words)。