XX项目专项工程合同-英文版

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

Special engineering design, supply and installation contract

Contract No:201604

Buyer( Party A): Best way Gulf Steel Structure LLC

Supplier(Second Party): HongKong Fertile Trading (Branch).

Party A commissioned Party B to undertake Party A's designated60beds Hospital project special engineering design,supply,installation,by mutual agreement,the signing of this contract,joint implementation.

1.The scope of work :both parties confirm the intelligent systems within the scope of construction drawing processing production, including drawing deepening design, processing production , per assembling, packing, loading, technical support and services, Party B should provide the export required documents of relevant information, documents and assistance which the Party A need.

2. Design basis

2.1 The contract or the power of attorney which party A provide.

2.2 Submission basic data of party A

2.3 The design USES the main technical standards: Design should comply with UAE municipality and related departments approved by the planning and design drawings, and meet the relevant international BS standards,and to meet the requirements of Party A assigned supervisor, project related department.

3.Design content

3.1 The list of design work

3.2 Quota design

a. Party B design according to the basic drawing which is the Party A to provide. Party B according to the specifications and technical requirements for reasonable deployment configuration.

b. In line with the design requirements on the basis of party A, by party b in the supply of equipment and material list limit cost is as follows

4, Contract amount:

Both parties agreed the contract amount of $ 2,926,900 , for the completion of the term of the contract for the design, supply and installation work of all costs, profits, taxes, and so on.

5,payment condition:

5.1 Pay 15% of the contract amount after get the approval from the owners and supervision for the completed design drawings.

5.2 Pay 45% of the contract amount upon goods ordering process and list approved by Party A 5.3 Pay 30% of the contract amount upon goods ordered ready to board.

5.4 pay 5 % of the contract amount upon arrival on site completion of installation.

5.5 Pay 5% of the contract amount as retention, to be paid after one year warranty period has come to an end.

5.6 Payment by bank transfer.

5.7 Party B shall provide the original Commercial invoice to party A.

6 Both parties to submit relevant information, documents and time.

6.1 Project the existing building and structural drawings can be provided within one week after signing the contract .