管道气压试验 Pneumatic test.
五、先决条件:Precondition 5.1 试验范围内的管道安装工程除涂漆、绝热及允许预留的焊口、阀门、支架之外, 都已按设计图纸全部完成,安装质量符合规范要求。
Pipe installation works within test scope, except painting, insulation as well as joints, valves, supports that permitted to remain, have been completed according to the design drawing and the installation quality meets the requirement of specification. 5.2 试验范围内的管道焊接无损检测符合标准与项目规范要求。 NDE of pipe within test scope comply with requirement of standard and project codes. 5.3 焊缝及其他待检部位尚未涂漆和绝热。 Painting and insulation haven’t been implemented on weld and other tested positions.
Page 5 of 11
管道气压试验方案 Method Statement for Piping Pneumatic Test
0.4025
GNI
1.32
1.518
IA
1.10
1.265
FW
1.60
1.84
试验介质 Test medium
空气或氮气
Air or nitrogen
空气或氮气
Air or nitrogen
空气或氮气
Air or nitrogen
空气或氮气
Air or nitrogen
空气或氮气
Air or nitrogen
修订说明
Control. No.
受控编号
Method Statement for Piping Pneumatic Test 管道气压试验方案
Rev.
版次
Date
日期
Prepared By
编制
Reviewed By
审核
Approved by
批准
EPC 总包单位
Owner/Supervisor
业主/监理
Status
状态
Contractor Name 施工单位名称
Page 1 of 11
管道气压试验方案 Method Statement for Piping Pneumatic Test
目录 Contents
一、编制目的:Purpose 二、编制说明:Description 三、编制依据及执行标准:Substantiation and executive standard 四、试压流程:Flow chart 五、先决条件:Precondition 六、施工准备:Preparation 七、施工机具:Tools 八、气压试验:Pneumatic test 九、安全要求 Requirement on safety
rack and foundation to ensure normal operation. The test is an important procedure for
line quality. 在******工程管道安装后和系统调试前对管道及其附件进行试压,检查管道的
强度和严密性,为最后的系统调试和设备单机试车创造条件。
Page 2 o Statement for Piping Pneumatic Test
一、编制目的:Purpose 管道试压的目的,是检查已安装好的管道系统的强度和严密性是否能达到设计
要求,也对承载管架及基础进行考验,以保证正常运行使用,它是检查管道质量的
一项重要措施。
The test of purging and pressure test on pipe and its accessories after the
installation of tank complement project pipe and prier to the commissioning of the
管道气压试验方案 Method Statement for Piping Pneumatic Test
Contractor Name 施工单位名称
Doc .Type
文件类型
No. of pages 文件页数
11
No. of pages Attached
附件页数
1
施工方案编号:
Rev.
版次
1
Revision Description
The purpose of pipe pressure test is to inspect whether the intensity and tightness of
installed pipe system can meet the design requirement and also to test the bearing pipe
Page 3 of 11
管道气压试验方案 Method Statement for Piping Pneumatic Test
三、编制依据及执行标准:Substantiation and executive standard 3.1 **提供的管道单线图、PID 工艺流程图 Isometric drawing and PID process diagram provided by **. 3.2 管线一览表——DD-EQL-TS-PR-0201- Rev3 General sheet of line-- DD-EQL-TS-PR-0201- Rev3 3.3 工业金属管道工程施工及验收规范——GB50235-97 Construction and acceptance criteria of industrial metallic pipe project——GB50235-97 3.4 工业金属管道压力试验规范——DD-SPC-TS-PI-0203-Rev0 Specification for pressure testing of metallic pipework DD-SPC-TS-PI-0203-Rev0
试压资料检查确认 Inspect and confirm document for test.
试压检查清单确认 Inspect and confirm test list.
技术交底 Technique briefing.
试压实体检查确认 Inspect and confirm test body.
安全措施检查确认 Inspect and confirm HSE measures.
四、试压流程:Flow chart
试压用临时材料准备 Prepare temporary material for test
试压用施工机具准备 Prepare tools for test.
提交试压方案并获得批准 Submit test plan. Approved
提交试压包并获得批准 Submit test package. Approved
system in ****** project can inspect the intensity and tightness of pipe and create
condition for final system commissioning and equipment motor run test. 二、编制说明:Description
序号 No. 1 2 3 4 5
管道系统试压明细表 Detailed table of pressure test for pipe system
系统名称 设计压力(MPa) 试验压力(MPa) Name Design pressure Test pressure
LNG
1.86
2.139
NG
0.35
Page 4 of 11
管道气压试验方案 Method Statement for Piping Pneumatic Test
5.4 管道支、吊架经检查符合设计要求,爆破吹扫排放口临时固定支架要牢固可靠。 The pipe supports and hanger are qualified after inspecting, and the temporary fixed support shall be fastened and secured at the rupture purging outlet. 5.5 试验用压力表已经校验,并在有效期内,其精度不得低于 1.5 级,表的满刻度 值应为被测最大压力的 1.5~2 倍,压力表不得少于两块。 Pressure gauge for test has been calibrated and the accuracy should not be lower than level 1.5. The full graduation value shall be 1.5~2 times of the maximum pressure and two pieces of pressure gauge is a must. 5.6 符合压力试验的气体已经备齐。 Air or nitrogen that meets the requirement of pressure test has been prepared. 5.7 待试管道与无关系统已用盲板或采取其他措施隔开。 Testing pipes have been separated with blind or using other measures from irrelevant system. 5.8 待试管道上的安全阀、爆破板及仪表元件等已经拆下或加以隔离。 Safety valve, rupture plate and instrument fittings on testing pipe have been removed or separated. 5.9 试验方案已经过批准,并向参与试验的所有人员进行了技术交底。 The method statement of pressure test has been approved and technique briefing has been conducted to personnel involved in pressure test. 六、施工准备:Preparation 6.1 管道试压包准备就绪并经批准。 Pipe pressure test package has been prepared and approved. 6.2 管道试压前,检查清单确认并经批准。 Checking list has been confirmed and approved prior to test. 6.3 涉及的 NDE 报告提交完成并经批准。 Relevant NDE report has been submitted and approved. 6.4 管道试压用的临时材料及工装准备就绪并经检查确认(分气包已经试验并确认 合格)。试压用临时材料应喷上红漆,不可同正式合同材料混淆。 Temporary materials and equipments for pressure test have been prepared and confirmed (Manifold have be tested is confirmable). Test fittings shall be painted in
本次管道试压范围是******工程所有管道系统。采用气压试验,具体系统明细 如下表:
This pressure test applies to all pipe system of ****** project. Pneumatic test is
adopted and the specific details are in the following table: