文档下载后可定制随意修改,请根据实际需要进行相应的调整和使用,谢谢!并且,本店铺为大家提供各种各样类型的实用资料,如教育随笔、日记赏析、句子摘抄、古诗大全、经典美文、话题作文、工作总结、词语解析、文案摘录、其他资料等等,如想了解不同资料格式和写法,敬请关注!Download tips: This document is carefully compiled by theeditor. I hope that after you download them,they can help yousolve practical problems. The document can be customized andmodified after downloading,please adjust and use it according toactual needs, thank you!In addition, our shop provides you with various types ofpractical materials,such as educational essays, diaryappreciation,sentence excerpts,ancient poems,classic articles,topic composition,work summary,word parsing,copy excerpts,other materials and so on,want to know different data formats andwriting methods,please pay attention!木龙骨安装施工工艺流程木龙骨安装施工工艺流程:一、准备工作1.1 清理基层地面,弹线、找规矩1.2 在地面用砖、水泥砂浆做地枕带(又称踢脚座)二、立龙骨2.1 根据弹线,立边框墙筋2.2 安装沿地、沿顶木楞,立隔断立龙骨三、钉横龙骨3.1 在立龙骨上钉横龙骨3.2 横龙骨间距一般为450600mm四、封罩面板4.1 预留插座位置,设加强垫木4.2 封罩面板五、处理面板5.1 对面板进行打磨、刷漆等处理5.2 检查面板安装是否牢固,进行修正总结:木龙骨安装施工工艺流程主要分为准备工作、立龙骨、钉横龙骨、封罩面板和处理面板五个方面。
装修知识-木龙骨隔断墙的施工工艺流程

装修知识-木龙骨隔断墙的施工工艺流程
1.木龙骨隔断墙的施工程序
清理基层地面→弹线、找规矩→在地面用砖、水泥砂浆做地枕带(又称踢脚座)→弹线,返线至顶棚及主体结构墙上→立边框墙筋→安装沿地、沿顶术楞→立隔断立龙骨→钉横龙骨→封罩面板,预留插座位置并设加强垫木→罩面板处理。
2.木龙骨隔断墙施工要点
木龙骨架应使用规格为40毫米×70毫米的红、白松木。
立龙骨的间距一般在450~600毫米之间。
安装沿地、沿顶木楞时,应将术楞两端伸入砖墙内至少l20毫米,以保证隔断墙与原结构墙连接牢固。
木龙骨隔断墙的施工工艺流程

木龙骨隔断墙的施工工艺流程介绍木龙骨隔断墙是一种常见的室内隔断墙体结构,具有良好的隔音效果和美观的外观。
本文将介绍木龙骨隔断墙的施工工艺流程,以帮助施工人员正确、高效地进行施工。
材料准备在开始施工之前,需要准备以下材料: - 木龙骨:一般使用尺寸为50mm50mm的木条作为龙骨材料。
- 石膏板:常用尺寸为1200mm2400mm,厚度为10mm的石膏板。
- 龙骨配件:包括龙骨连接件、螺丝等。
- 隔音材料:如隔音棉、隔音膜等。
- 工具:电钻、墙面水平仪、电锯、刷子等。
施工步骤步骤1:确定隔断墙位置和尺寸首先,根据设计要求确定隔断墙的位置和尺寸,并在地面上进行标记。
步骤2:安装木龙骨1.根据标记好的位置,在地面上安装木龙骨,使用墙面水平仪保证龙骨的水平度。
2.使用螺丝将龙骨固定在地面上。
步骤3:安装顶部龙骨1.在天花板上安装顶部龙骨,保证与地面上的龙骨平行,并使用墙面水平仪进行校正。
2.使用螺丝将顶部龙骨固定在天花板上。
步骤4:安装竖向龙骨1.根据隔断墙的高度,在地面和顶部龙骨之间安装竖向龙骨。
2.使用螺丝将竖向龙骨固定在地面和顶部龙骨上。
步骤5:安装隔音材料在木龙骨的间隔处,安装隔音材料,如隔音棉或隔音膜,这样可以提高隔音效果。
步骤6:安装石膏板1.将石膏板切割为所需尺寸,并用电钻在板边打洞,方便后续固定。
2.将石膏板和木龙骨对齐,使用螺丝将石膏板固定在木龙骨上。
3.依次安装其他石膏板,保证板与板之间有适当的缝隙。
步骤7:填充融合剂使用填充融合剂填充石膏板之间的缝隙,并使用刷子将融合剂均匀涂抹在缝隙上,以获得平整的墙面。
步骤8:修整墙面等待融合剂干燥后,使用砂纸对墙面进行修整,使其表面平整光滑。
步骤9:涂装根据设计要求,对已修整的墙面进行涂装,使其具有美观的外观。
总结以上就是木龙骨隔断墙的施工工艺流程。
通过正确地进行每个步骤的操作,可以保证隔断墙的稳定性和隔音效果,同时获得美观的墙面。
施工人员需要在施工过程中注意安全,并严格按照施工规范进行操作,以确保施工质量。
木龙骨施工工艺(详细完整版)

木龙骨施工工艺1. 准备工作:●材料准备:购买所需的木质龙骨和固定件,如螺丝、钉子等。
●工具准备:备齐必要的工具,如电钻、手锯、尺子、墙角仪、螺丝起子等。
2. 测量和规划:●测量空间:使用尺子和墙角仪测量空间的尺寸,并根据需要规划木质龙骨的位置和数量。
●做出设计:根据测量结果做出木质龙骨的设计图纸,包括龙骨的长度、距离和夹角等。
3. 安装顶部悬挂龙骨:●标记位置:根据设计图纸,在天花板上使用尺子和墙角仪标记出顶部悬挂龙骨的位置。
●切割木质龙骨:根据标记的位置,使用手锯或电锯将木质龙骨剪裁成所需尺寸,并确保其垂直度。
●固定龙骨:使用螺丝或钉子,将悬挂龙骨固定在天花板上,确保其坚固稳定。
4. 安装墙侧龙骨:●标记位置:根据设计图纸,在墙体上使用尺子和墙角仪标记出木质龙骨的位置。
●切割木质龙骨:根据标记的位置,使用手锯或电锯将木质龙骨剪裁成所需尺寸,并确保其水平度。
●固定龙骨:使用螺丝或钉子,将木质龙骨固定在墙体上,确保其坚固稳定。
5. 安装中间龙骨:●根据龙骨设计图纸确定需要安装的中间龙骨数量和位置。
●使用相同的方法,切割并安装中间龙骨,确保其位置和间距符合设计要求。
6. 确定夹角和转角位置:●根据设计要求,在需要转角或夹角的位置安装木质龙骨,并使用金属夹或木质三角支撑夹紧龙骨。
7. 龙骨调整和收尾:●调整水平和垂直:使用水平仪和垂直仪检查龙骨的水平度和垂直度,如果需要调整,使用木楔或调整螺丝进行校正。
●使用电钻预留插座和开关位置:在木质龙骨上预留插座和开关的位置,使用电钻钻出洞口,并确保大小和位置准确无误。
●龙骨装饰:可以根据需要,使用油漆、贴墙纸或其他装饰材料对木质龙骨进行表面处理,使其与周围环境协调一致。
●清理清洁:在施工完成后,清理施工现场,并擦拭木质龙骨表面,确保其干净整洁。
需要注意的是,在施工过程中,要确保龙骨的稳固性和安全性。
此外,在选择木质龙骨时,应注意其质量和适用情况,以确保隔断的质量和效果。
木龙骨吊顶施工工艺

木龙骨吊顶施工工艺1 适用范围本标准适用于工业与民用建筑中吊顶采用木龙骨骨架,安装各类罩面板的顶棚安装工程。
2 施工准备2.1 原材料、半成品要求2.1.1 木料:木龙骨料应为烘干,无扭曲的红、白松树种,并按设计要求进行防火处理。
木龙骨规格按设计要求,如设计无明确规定时,大龙骨规格为50mm×70mm或50mm×100mm;小龙骨规格为50mm×50mm或40mm×50mm;木吊杆规格为50mm×50mm或40mm×40mm。
2.1.2 罩面板材及压条按设计选用。
较常用的罩面材料有胶合板、纤维板、实木板、纸面石膏板、矿棉板、吸声穿孔石膏板、矿棉装饰吸声板、泡沫钙塑板、塑料装饰板等,选用时严格掌握材质及规格标准。
2.1.3 其它材料φ6或φ8吊筋、膨胀螺栓、射钉、圆钉、角钢、扁钢、胶粘剂、木材防腐剂、防火剂、8号镀锌铁丝、防锈漆。
2.2 主要工机具主要工机具见表2.2。
表2.2 主要工机具一览表序号工机具名称规格序号工机具名称规格1 电圆锯φ400mm/1.4kw 12 钢卷尺 3m,15m2 木工台刨 13 扳手3 电钻φ4~φ13 14 钳子4 电锤 ZIC-22 15 方尺5 木刨 16 液压升降台 ZTY66 线刨 17 木工斧7 射钉枪 SDT-A301 18 扫槽刨8 木工锯 19 螺丝刀9 手锤 20 扁铲10 水平尺 1m 21 电焊机 BX-20011 墨线盒 22 凿子2.3 作业条件2.3.1 现浇楼板或预制楼板缝中已按设计间距预埋φ6或φ8吊筋。
当设计未做说明时,间距一般不大于1000mm。
2.3.2 墙为砌体时,应根据顶棚标高,在四周墙上预埋固定龙骨的木砖。
2.3.3 直接接触墙体的木龙骨,应预先刷防腐剂。
2.3.4 按工程不同防火等级和所处环境要求,对木龙骨进行喷涂防火涂料或置于防火涂料槽内浸渍处理。
2.3.5 顶棚内各种管线及通风管道均已安装完毕并经验收合格。
木龙骨施工工艺

木龙骨施工工艺木龙骨施工工艺一、木龙骨夹板墙身施工木龙骨夹板墙身分为独立的隔断墙与靠建筑墙体的单边木墙身两种,其施工方法也有所不同,以下将分别进行阐述。
1.施工前的准备工序(1)施工条件:在墙身结构施工前,吊顶面的龙骨架吊装应完毕。
需要通入墙面的电器线路应敷设到位,必要的施工材料已进场,施工所需的工具与吊顶施工相同。
(2)弹线:靠建筑墙体的单边木墙身的弹线,一般按木龙骨的分档尺寸,在建筑墙面上弹出分格线。
独立隔断墙的弹线,需在地面和墙面上弹出墙体的位置宽度线和高度线,并标出门的位置。
也就是说,经过弹线,找出施工的基准点和基准线,使工人在施工中有所依据。
(3)刷防火漆:室内装饰中的木结构墙身均需防火处理。
应在制作墙身木龙骨上与木夹板的背面,涂刷三遍防火漆,涂刷方法可按本章第一节所述方法进行。
2.靠建筑墙面木墙身结构施工(1)拼装木龙骨架:墙身结构一般使25*30mm的带凹槽木方作为龙骨,该木龙骨架可在地面进行拼装,拼装框体的规格一般是a300或a400方框架法(a300=300*300mm,a400=400*400mm,该尺寸是木框架两木方中心线之间的距离)。
对于面积不大的墙身,可一次拼成木骨架后,再安装固定在墙面上。
对于大面积的墙身,可将拼成的木龙骨架分片安装固定。
木龙骨架的拼装方法与吊顶木龙骨架相同,可参见本章第一节。
(2)木骨架在建筑墙身上的固定:1)检查墙身的平整度与垂直度:用垂线法和水平线来检查墙身的垂直度和平整度,并在墙面上标出最高点和最低点。
对墙面平整误差在10mm以内的墙体,可进行重新抹灰浆修正,如误差大于10mm,一般不再修正墙体,而是在建筑墙体与木骨架间加木垫来调整,以保证木骨架的平整度和垂直度。
2)木楔圆钉固定法:用16-20mm的冲击钻头在建筑面钻孔,钻孔的位置应在弹线的交叉点位置上,钻孔的孔距600mm左右,钻孔深度不小于60mm。
在钻出的孔中打入木楔,如在潮湿的地区或墙面易受潮的部位,木楔可刷上桐轴,待干燥后再打入墙孔内。
木龙骨吊顶施工方案(3篇)

第1篇本工程为一栋建筑面积为XX平方米的住宅楼,共XX层,层高为XX米。
吊顶工程采用木龙骨吊顶,主要应用于客厅、卧室、餐厅等空间。
本方案旨在确保吊顶工程的质量,达到美观、实用、安全的要求。
二、施工准备1. 材料准备(1)木龙骨:采用干燥、无变形、无虫蛀、无腐朽的木材,规格应符合设计要求。
(2)饰面板:选用符合国家标准的饰面板,厚度、颜色、纹理等应符合设计要求。
(3)配套件:如膨胀螺丝、自攻螺丝、吊杆、卡扣等。
2. 工具准备(1)电动工具:电钻、电锯、电动扳手等。
(2)手动工具:钢卷尺、水平尺、线锤、墨斗等。
3. 人员准备施工人员应具备一定的木工技能,熟悉木龙骨吊顶施工工艺,确保施工质量。
三、施工工艺1. 放线定位根据设计图纸,确定吊顶标高,使用钢卷尺和水平尺在墙面、顶面弹出吊顶标高线,作为施工依据。
2. 龙骨安装(1)吊杆安装:根据设计要求,确定吊杆间距,将吊杆固定在墙体或梁上,吊杆间距一般为600mm~1200mm。
(2)主龙骨安装:将主龙骨吊杆固定在吊杆上,主龙骨间距一般为600mm~1200mm,主龙骨与吊杆连接牢固。
(3)次龙骨安装:将次龙骨固定在主龙骨上,次龙骨间距一般为300mm~500mm,次龙骨与主龙骨连接牢固。
3. 饰面板安装(1)切割饰面板:根据现场实际情况,对饰面板进行切割,确保饰面板尺寸准确。
(2)安装饰面板:将切割好的饰面板安装到龙骨上,饰面板应平整、牢固,缝隙均匀。
(3)收口处理:对吊顶边缘、阴阳角等部位进行收口处理,确保美观。
4. 验收(1)外观验收:检查吊顶表面平整度、阴阳角方正度、缝隙均匀度等,确保吊顶美观。
(2)功能验收:检查吊顶的承重能力、防水、防火等性能,确保吊顶安全、实用。
四、施工注意事项1. 施工过程中,应严格按照施工工艺进行操作,确保施工质量。
2. 施工现场应保持整洁,避免杂物堆积,影响施工。
3. 施工过程中,应注意安全,佩戴安全帽、手套等防护用品。
木龙骨、轻钢龙骨施工工艺流程

木龙骨、轻钢龙骨施工工艺流程了解施工工艺的设计师都知道所谓的龙骨就是装修中在装饰物内部主要起支撑作用的架构,比如搭建吊顶、地台等造型的骨架,龙骨根据材料的不同主要分为木龙骨、轻钢龙骨、铝合金龙骨、钢龙骨等,其中最常用的是轻钢龙骨和木龙骨。
木龙骨、轻钢龙骨施工工艺流程。
木龙骨施工工艺流程木龙骨骨架是吊顶工程中常用的材料,但如果前期的施工不规范,会严重影响美观效果,甚至还可能影响居住者的安全。
为此业之峰装饰为大家总结了木龙骨吊顶施工中的主要步骤,以供大家参考。
1、抄平弹线。
弹线包括:标高线、顶棚造型位置线、吊挂点布局线、大中型灯位线。
(1)确定标高线:根据室内墙上+50cm水平线,用尺量至顶棚设计标高,在该点画出高度线,用一条塑料透明软管灌满水后,将软管的一端水平面对准墙面上的高度线。
再将软管的另一端头水平面,在同侧墙面找出另一点,当软管内水平面静止时,画下该点的水平面位置,再将这两点连线,即得吊顶高度水平线。
用同样方法在其它墙面做出高度水平线。
操作时应注意,一个房间的基准高度点只用一个,各个墙的高度线测点共用。
沿墙四周弹一道墨线,这条线便是吊顶四周的水平线,其偏差不能大于5mm。
(2)确定造型位置线:对于较规则的建筑空间,其吊顶造型位置可先在一个墙面量出竖向距离,以此画出其它墙面的水平线,即得吊顶位置外框线,而后逐步找出各局部的造型框架线。
对于不规则的空间画吊顶造型线,宜采用找点法,即根据施工图纸测出造型边缘距墙面的距离,从墙面和顶棚基层进行实测,找出吊顶造型边框的有关基本点,将各点连线,形成吊顶造型线。
(3)确定吊点位置:对于平顶天花,其吊点一般是按每m2布置1个,在顶棚上均匀排布。
对于有叠级造型的吊顶,应注意在分层交界处布置吊点,吊点间距0.8~1.2m,较大的灯具应安排单独吊点来吊挂。
2、木龙骨处理对吊顶用的木龙骨进行筛选,将其中腐蚀部分、斜口开裂、虫蛀等部分剔除。
对工程中所用的木龙骨均要进行防火处理,一般将防火涂料涂刷或喷于木材表面,也可把木材放在防火涂料槽内浸渍。
木龙骨墙面施工工艺流程

木龙骨墙面施工工艺流程下载温馨提示:该文档是我店铺精心编制而成,希望大家下载以后,能够帮助大家解决实际的问题。
文档下载后可定制随意修改,请根据实际需要进行相应的调整和使用,谢谢!并且,本店铺为大家提供各种各样类型的实用资料,如教育随笔、日记赏析、句子摘抄、古诗大全、经典美文、话题作文、工作总结、词语解析、文案摘录、其他资料等等,如想了解不同资料格式和写法,敬请关注!Download tips: This document is carefully compiled by theeditor.I hope that after you download them,they can help yousolve practical problems. The document can be customized andmodified after downloading,please adjust and use it according toactual needs, thank you!In addition, our shop provides you with various types ofpractical materials,such as educational essays, diaryappreciation,sentence excerpts,ancient poems,classic articles,topic composition,work summary,word parsing,copy excerpts,other materials and so on,want to know different data formats andwriting methods,please pay attention!木龙骨墙面施工工艺流程详解在建筑装饰领域,木龙骨墙面施工是一种常见的工艺,它以其结构稳固、施工便捷等优点被广泛应用。
木龙骨吊顶的施工工艺流程

木龙骨吊顶的施工工艺流程以木龙骨吊顶的施工工艺流程为标题,本文将介绍木龙骨吊顶的施工步骤和注意事项。
一、施工准备在进行木龙骨吊顶施工之前,首先需要准备好所需材料和工具。
常用的材料包括木材、木龙骨、吊顶板等,而工具则包括锯子、电钻、锤子、螺丝刀等。
另外,还需要确保施工现场干燥、整洁,以及安全措施的落实。
二、确定吊顶尺寸和高度在进行木龙骨吊顶施工之前,需要测量房间的尺寸,确定吊顶的大小和高度。
根据实际情况和设计要求,确定吊顶板的布置方式和间距,以便后续进行施工。
三、安装木龙骨木龙骨是支撑吊顶板的重要组成部分。
根据吊顶的设计要求,将木龙骨固定在天花板上。
首先,使用电钻在天花板上打孔,然后使用螺丝将木龙骨固定在孔位上。
确保木龙骨的平整度和稳固性,以便后续安装吊顶板。
四、安装吊顶板在木龙骨安装完成后,开始安装吊顶板。
根据设计要求,将吊顶板依次安装在木龙骨上。
在安装吊顶板之前,需要对吊顶板进行切割和修整,确保吊顶板的大小和形状与实际需求相符。
安装吊顶板时,可以使用螺丝将其固定在木龙骨上,并确保吊顶板之间的连接紧密、平整。
五、修饰和装饰在吊顶板安装完成后,可以对吊顶进行修饰和装饰。
根据设计要求和个人喜好,可以在吊顶板上进行涂装、喷绘、贴饰等处理,以增加吊顶的美观性和装饰效果。
此外,还可以在吊顶板上安装灯具、风口等附件,以提升吊顶的功能性和实用性。
六、验收和保养吊顶施工完成后,需要进行验收工作。
检查吊顶的平整度、稳固性和装饰效果,确保吊顶符合设计要求和施工标准。
同时,还需要对吊顶进行保养和维护,定期清洁吊顶板,检查木龙骨和螺丝的稳固性,及时修复和更换损坏的部件,以延长吊顶的使用寿命。
总结:木龙骨吊顶的施工工艺流程包括施工准备、确定吊顶尺寸和高度、安装木龙骨、安装吊顶板、修饰和装饰、验收和保养等步骤。
在施工过程中,需要注意材料的选择和准备、工具的使用和安全、施工现场的环境和保护等方面的问题。
同时,要保证吊顶的平整度、稳固性和装饰效果,以及定期进行保养和维护,以确保吊顶的质量和使用寿命。
木龙骨板材隔墙施工工艺

第1节木龙骨板材隔墙施工工艺1施工准备1、技术准备编制木龙骨板材隔墙工程施工方案,并对工人进行书面技术及安全交底。
2、材料要求(1)罩面板应表面平整、边缘整齐、不应有污垢、裂纹、缺角、翘曲、起皮、色差、图案不完整的缺陷。
胶合板、拇指纤维板不应脱胶、变色和腐朽。
(2)龙骨和罩面板材料的材质均应符合现行国家标准和行业标准的规定。
(3)罩面板的安装宜使用镀锌的螺丝、钉子。
接触砖石、混凝土的木龙骨和预埋的木砖应做防腐处理。
所有木作都应作好防火处理。
3、主要机具(1)电动机械:小电锯、小台刨、手电钻、电动气泵、冲击钻。
(2)手动工具:木刨、扫槽刨、线刨、锯、斧、锤、螺丝刀、摇钻、直钉枪等。
4、作业条件(1)木龙骨板材隔断工程所用的材料品种、规格、颜色以及隔断的构造、固定方法,均应符合设计要求。
(2)隔断的龙骨和罩面板必须完好,不得有损坏、变形弯折、翘曲、边角缺损等现象;并要注意被碰撞和受潮。
(3)电气配件的安装,应嵌装牢固,表面应与罩面板的底面齐平。
(4)门窗框与隔断相接处应符合设计要求。
(5)隔断的下端如用木踢脚板覆盖,隔断的罩面板下端应离地面20~30mm;如用大理石、水磨石踢脚时,罩面板下端应与踢脚板上口齐平,接缝要严密。
(6)作好隐蔽工程和施工记录。
2关键质量要点1、材料的关键要求(1)各种龙骨、配件和罩面板材料以及胶粘剂的材质应符合现行国家标准和行业标准的规定。
(2)人造板、粘结剂必须有环保要求检测报告。
2、技术关键要求弹线必须准确,经复验后方可进行下道工序。
固定沿顶和沿地龙骨,各自交接后的龙骨,应保持平整垂直、安装牢固。
靠墙立筋应与墙体连接牢固紧密。
边框应与隔断立筋连接牢固,确保整体刚度。
按设计做好木作防火、防腐。
3、质量关键要求(1)沿顶和沿地龙骨与主体结构连接牢固,保证隔断的整体性。
(2)罩面板应经严格选材,表面应平整光洁。
安装罩面板前应严格检查龙骨的垂直度和平整度。
4、职业健康安全关键要求(1)在使用电动工具时,用电应符合《施工现场临时用电安全技术规范》JGJ46-88。
木龙骨吊顶施工工艺流程

木龙骨吊顶施工工艺流程:放线—木龙骨拼装—安装吊点、吊筋斗固定沿墙龙骨—安装龙骨—安装纸筋石膏板。
(1)放线放线工艺分为以下三步:.确定标高线:以地坪基准线为起点,杨浦区好的装潢公司根据设计要求在培(柱)面上量出吊顶的高度(加上一层板的厚度),并在该点画出标商线(作为吊顶龙骨的下皮线)。
可用水准仪或“水柱法”测定。
.确定造型位里线:根据设计要求,在顶栩或培面上画出造型的具体位置线。
(2)木龙骨拼装木龙骨在吊装前,应在楼(地)面上进行拼装,拼装的面积一般不超过10衬。
杨浦区好的设计公司,龙骨拼装的方法常采用咬口半禅扣接拼装法。
其具体做法:在龙骨上开槽,将槽与槽之间进行咬口拼装,槽内涂胶并用钉子固定,如图3一1所示。
(3)安装吊点、吊筋吊点常用膨胀螺栓、预埋件等,吊筋可用钢筋、角钢或方木,吊点与吊筋之间可采用焊接、绑扎、钩挂、螺栓或螺钉等方式连接。
(4)固定沿墙龙骨用冲击钻在标高线上方打孔,杨浦区好的装修公司,孔内衬塞木楔,将沿墙龙骨钉在木楔上。
(5)龙骨吊装固定用铁丝将拼装好的木龙骨吊直在标高线以上,临时固定,用棒线绳或尼龙线沿吊顶标高线拉出几条平行线和对角交叉线,以此为准,杨浦区装饰公司,将龙骨慢慢移动至与标高线平齐,然后与吊筋连接固定。
用同样的方法对叠级吊顶龙骨进行固定,按图3一2将上下两级龙骨连接起来。
点与吊筋之间可采用焊接、绑扎、钩挂、螺栓或螺钉等方式连接。
(4)固定沿墙龙骨用冲击钻在标高线上方打孔,杨浦区设计公司,孔内衬塞木楔,将沿墙龙骨钉在木楔上。
(5)龙骨吊装固定用铁丝将拼装好的木龙骨吊直在标高线以上,临时固定,用棒线绳或尼龙线沿吊顶标高线拉出几条平行线和对角交叉线,以此为准,杨浦区装修公司,将龙骨慢慢移动至与标高线平齐,然后与吊筋连接固定。
用同样的方法对叠级吊顶龙骨进行固定,按图3一2将上下两级龙骨连接起来。
(6)龙骨调平、起拱整个龙骨连接后,在吊顶底面下拉出对角交叉线,检查调整吊顶的平整度,面积较大时可起拱,杨浦区装潢公司,起拱高度约为房间跨度的1/200 ~1/3000(7)安装纸筋石膏板用自攻螺钉把纸筋石青板铺钉在龙骨上,安装时应注意:.石膏板的长边必须与次龙骨呈垂直交叉状态,使端边落在次龙骨中央部位。
木龙骨隔墙的工艺流程和施工工艺

木龙骨隔墙的工艺流程和施工工艺下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。
文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!本店铺为大家提供各种类型的实用资料,如教育随笔、日记赏析、句子摘抄、古诗大全、经典美文、话题作文、工作总结、词语解析、文案摘录、其他资料等等,想了解不同资料格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you! In addition, this shop provides you with various types of practical materials, such as educational essays, diary appreciation, sentence excerpts, ancient poems, classic articles, topic composition, work summary, word parsing, copy excerpts, other materials and so on, want to know different data formats and writing methods, please pay attention!隔墙的施工工艺对于整个装修工程来说至关重要,木龙骨隔墙作为一种常用的隔墙材料,其施工工艺更是需要认真对待。
木龙骨施工工艺

木龙骨施工工艺一、引言木龙骨施工工艺是一种常见的室内装修施工技术,主要用于吊顶、隔墙、隔音墙等建筑结构中。
本文将介绍木龙骨施工的具体步骤和注意事项,以帮助施工人员更好地进行施工。
二、施工准备1. 材料准备:所需材料包括木龙骨、螺丝、扣板等。
选购时要注意材料的质量和规格是否符合要求。
2. 施工工具:常用的施工工具有电钻、电锯、螺丝刀等,施工前要确保工具的完好。
三、施工步骤1. 标线:根据设计要求和实际测量结果,在天花板或墙壁上进行标线,确定安装位置和尺寸。
2. 安装龙骨:使用电钻和螺丝刀将龙骨与墙壁或天花板连接起来。
注意要选择合适的螺丝长度,以确保固定牢固。
3. 安装扣板:将扣板固定在龙骨上,使其与墙壁或天花板平齐。
可以使用螺丝刀或电钻进行固定。
4. 检查调整:在安装过程中,及时检查调整木龙骨的水平度和垂直度,确保其位置和角度正确。
四、注意事项1. 施工前需仔细阅读设计图纸和施工要求,确保施工符合要求。
2. 施工人员应佩戴好个人防护装备,如安全帽、防护眼镜、手套等。
3. 施工现场要保持整洁,材料垃圾应及时清理。
4. 施工过程中应注意施工质量,确保龙骨安装牢固,扣板平整。
五、工艺优点木龙骨施工工艺具有以下优点:1. 施工简便:木龙骨施工工艺相对简单,不需要复杂的施工设备和技术,施工人员容易掌握。
2. 施工成本低:木龙骨施工工艺所需材料简单且价格相对较低,适用于各类装修项目。
3. 施工效果好:木龙骨施工工艺固定效果好,可实现吊顶、隔墙等结构的稳定性和美观性要求。
六、总结木龙骨施工工艺是一种常用的室内装修工艺,应用广泛。
本文介绍了木龙骨施工的具体步骤和注意事项,希望能对施工人员提供一定的帮助和指导。
在施工过程中,一定要严格按照要求进行操作,确保工艺质量和施工效果。
同时,建议施工单位根据具体情况,结合相关施工规范和经验,制定施工方案,确保施工的顺利进行。
木龙骨吊顶施工工程(3篇)

一、概述
木龙骨吊顶施工工程是一种常见的室内装饰工程,通过在室内顶部安装木龙骨,再在其上铺设装饰板材,从而达到美化室内空间、提高室内舒适度的目的。木龙骨吊顶施工工艺流程严谨,施工质量要求高,以下将详细介绍木龙骨吊顶施工工程的相关内容。
二、施工准备
1. 材料准备:根据设计要求,准备相应规格的木龙骨、装饰板材、钉子、膨胀螺栓、墨斗、水平尺、钢锯等施工材料。
2. 确定造型位里线:根据设计要求,在顶面或培面上画出造型的具体位置线。
3. 木龙骨拼装:在楼(地)面上进行木龙骨拼装,拼装的面积一般不超过10平方米。采用咬口半禅扣接拼装法,将槽与槽之间进行咬口拼装,槽内涂胶并用钉子固定。
4. 安装吊点:安装吊点、吊筋吊点常用膨胀螺栓、预埋件等,吊筋可用钢筋、角钢或方木,吊点与吊筋之间可采用焊接、绑扎、钩挂、螺栓或螺钉等方式连接。
5. 固定沿墙龙骨:用冲击钻在标高线上方打孔,孔内衬塞木楔,将沿墙龙骨钉在木楔上。
6. 龙骨吊装固定:用铁丝将拼装好的木龙骨吊直在标高线以上,临时固定。用棒线绳或尼龙线沿吊顶标高线拉出几条平行线和对角交叉线,以此为准,将龙骨慢慢移动至与标高线平齐。
7. 龙骨吊装调整:调整龙骨的平整度,确保吊顶的平整度符合要求。
3. 安装主龙骨:将主龙骨吊直,用铁丝固定在吊杆上。主龙骨间距根据设计要求确定,一般不超过600mm。
4. 安装次龙骨:在主龙骨上安装次龙骨,次龙骨间距根据设计要求确定,一般不超过300mm。
5. 安装装饰板材:将装饰板材铺设在次龙骨上,用钉子固定。装饰板材与龙骨之间的缝隙要均匀,板面要平整。
6. 修饰和装饰:对吊顶进行修饰,如安装灯具、风口、烟感等设备。
8. 安装吊顶板:将吊顶板安装在木龙骨上,注意接缝处要均匀、美观。
简述木龙骨隔断墙的施工工艺流程

简述木龙骨隔断墙的施工工艺流程
木龙骨隔断墙是一种常见的隔断墙体结构,其施工工艺流程主要包括墙体基础处理、龙骨安装、隔墙板安装、填充材料处理和装饰面处理等步骤。
一、墙体基础处理
1. 检查墙体基础的平整度和垂直度,确保墙体基础符合施工要求。
2. 清理墙体基础表面的杂物和污垢,并进行清洁处理。
3. 在墙体基础上涂刷防水涂料,提高墙体的防水性能。
二、龙骨安装
1. 根据设计要求,在墙体两侧确定龙骨的位置和间距。
2. 使用水平仪和尺子进行龙骨的定位和测量,确保龙骨的安装平整和垂直。
3. 使用电钻和螺丝刀将龙骨固定在墙体上,确保牢固可靠。
三、隔墙板安装
1. 根据设计要求,将隔墙板切割成所需的尺寸和形状。
2. 将隔墙板放置在龙骨上,调整位置和水平度,并使用螺丝刀将其固定在龙骨上。
3. 检查隔墙板的安装是否平整、垂直和牢固。
四、填充材料处理
1. 在隔墙板之间的缝隙处填充隔音、保温和防火材料,提高隔断墙
的性能。
2. 使用填充材料填充隔墙板与墙体之间的缝隙,确保隔墙板与墙体之间的连接牢固。
五、装饰面处理
1. 对隔断墙的装饰面进行处理,如涂刷、贴瓷砖、贴壁纸等。
2. 根据设计要求,选择合适的装饰材料进行处理,提高隔断墙的美观性和装饰效果。
通过以上施工工艺流程,木龙骨隔断墙可以有效地进行施工和安装。
在施工过程中,需要注意墙体基础的处理、龙骨的安装、隔墙板的安装、填充材料的处理和装饰面的处理等关键步骤,确保隔断墙的稳固性和美观性。
同时,在施工过程中还需要注意安全措施,确保施工人员的人身安全和工程质量的达标要求。
木龙骨吊顶施工工艺

一、施工准备(一)材料准备1.木龙骨(东北红、白松木,规格为30mm×50mm)2.防腐涂料、防潮布3.木地板(二)工具及辅料准备电锤、射钉枪、射钉、射弹(水泥钉、钢钉)、汽钉、铁钉、胶粘剂。
二、施工作业条件1.施工现场地面须干净、干燥、平整符合国家或地方建筑验收标准。
2.有可能引起潮湿隐患的工序已完成,厨卫间做闭水试验无渗水漏水现象。
3.门窗安装完毕,具备封闭条件。
门底边预留高度是否标准。
安好后的地板在门框下的厚度为:地板厚度+龙骨厚度。
三、施工方法(一)铺设程序施工放线-木龙骨防腐处理椖玖 瞧痰婕肮潭 防潮处理椀匕迕娌闫套啊? (二)铺设施工方法1.施工放线:弹出木龙骨上水平标高线。
2.以进户门为准在混凝土基层或找平后地面弹出龙骨横向排布线。
3.木龙骨铺垫及固定:(1)必要时木龙骨铺垫前应进行防腐处理。
(2)木龙骨之间一定要拉直找平。
(3)垫木长度以200mm为宜,厚度可根据具体填充情况而定,垫木间距以不超过40mm 为宜。
(4)主龙骨间距由木地板长度来决定,龙骨间距最大不可超过400mm。
(5)木龙骨靠墙部分应与墙面留有5mm~10mm伸缩缝,木龙骨固定方法为钉连接或胶连接。
(6)根据地面混凝土标号来决定采用电锤打眼法和射钉固定法:①电锤打眼法:如果地面有找平层,一般采用电锤打眼法,具体做法如下:用电锤在弹好的地面龙骨线上打眼,然后把做过防腐处理的木塞,用铁钉将龙骨固定在地面上,一般电锤打入地面眼的深度不能小于40mm;②射钉固定法:如果直接在现浇混凝土基层上固定木龙骨,因混凝土标号高、硬度好,可采用射钉固定法,具体做法如下:射钉透过木龙骨进入混凝土基层深度不得小于15mm,当地面误差过大时,应以垫木找平。
先用射钉把垫木固定于混凝土基层,再用铁钉将木龙骨固定在垫木上;当地面过高时,应刨薄木龙骨或在木龙骨排放位置上剔槽后嵌入木龙骨,待调试达到正常标高后,将射钉固定在混凝土基层上。
(7)对铺设完毕的木龙骨进行全面的平直度调整和牢固性的检测,使其达到标准后方可进行下道工序。
木龙骨施工工艺标准

木龙骨施工工艺一、木龙骨夹板墙身施工木龙骨夹板墙身分为独立的隔断墙与靠建筑墙体的单边木墙身两种,其施工方法也有所不同,以下将分别进行阐述。
1.施工前的准备工序(1)施工条件:在墙身结构施工前,吊顶面的龙骨架吊装应完毕。
需要通入墙面的电器线路应敷设到位,必要的施工材料已进场,施工所需的工具与吊顶施工相同。
(2)弹线:靠建筑墙体的单边木墙身的弹线,通常按木龙骨的分档尺寸,在建筑墙面上弹出分格线。
独立隔断墙的弹线,需在地面和墙面上弹出墙体的位置宽度线和高度线,并标出门的位置。
也就是说,通过弹线,找出施工的基准点和基准线,使工人在施工中有所依据。
(3)刷防火漆:室内装饰中的木结构墙身均需防火处理。
应在制作墙身木龙骨上与木夹板的背面,涂刷三遍防火漆,涂刷方法可按本章第一节所述方法进行。
2.靠建筑墙面木墙身结构施工(1)拼装木龙骨架:墙身结构通常使25*30mm的带凹槽木方作为龙骨,该木龙骨架可在地面进行拼装,拼装框体的规格通常是a300或a400方框架法(a300=300*300mm,a400=400*400mm,该尺寸是木框架两木方中心线之间的距离)。
对于面积不大的墙身,可一次拼成木骨架后,再安装固定在墙面上。
对于大面积的墙身,可将拼成的木龙骨架分片安装固定。
木龙骨架的拼装方法与吊顶木龙骨架相同,可参见本章第一节。
(2)木骨架在建筑墙身上的固定:1)检查墙身的平整度与垂直度:用垂线法和水平线来检查墙身的垂直度和平整度,并在墙面上标出最高点和最低点。
对墙面平整误差在10mm以内的墙体,可进行重新抹灰浆修正,如误差大于10mm,通常不再修正墙体,而是在建筑墙体与木骨架间加木垫来调整,以保证木骨架的平整度和垂直度。
2)木楔圆钉固定法:用16-20mm的冲击钻头在建筑面钻孔,钻孔的位置应在弹线的交叉点位置上,钻孔的孔距600mm左右,钻孔深度不小于60mm。
在钻出的孔中打入木楔,如在潮湿的地区或墙面易受潮的部位,木楔可刷上桐轴,待干燥后再打入墙孔内。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
木龙骨施工工艺一、木龙骨夹板墙身施工木龙骨夹板墙身分为独立的隔断墙与靠建筑墙体的单边木墙身两种,其施工方法也有所不同,以下将分别进行阐述。
1.施工前的准备工序(1)施工条件:在墙身结构施工前,吊顶面的龙骨架吊装应完毕。
需要通入墙面的电器线路应敷设到位,必要的施工材料已进场,施工所需的工具与吊顶施工相同。
(2)弹线:靠建筑墙体的单边木墙身的弹线,通常按木龙骨的分档尺寸,在建筑墙面上弹出分格线。
独立隔断墙的弹线,需在地面和墙面上弹出墙体的位置宽度线和高度线,并标出门的位置。
也就是说,通过弹线,找出施工的基准点和基准线,使工人在施工中有所依据。
(3)刷防火漆:室内装饰中的木结构墙身均需防火处理。
应在制作墙身木龙骨上与木夹板的背面,涂刷三遍防火漆,涂刷方法可按本章第一节所述方法进行。
2.靠建筑墙面木墙身结构施工(1)拼装木龙骨架:墙身结构通常使25*30mm勺带凹槽木方作为龙骨,该木龙骨架可在地面进行拼装,拼装框体的规格通常是a300或a400方框架法(a300=300*300mm a400=400*400mm该尺寸是木框架两木方中心线之间勺距离)。
对于面积不大勺墙身,可一次拼成木骨架后,再安装固定在墙面上。
对于大面积的墙身,可将拼成的木龙骨架分片安装固定。
木龙骨架的拼装方法与吊顶木龙骨架相同,可参见本章第一节。
(2)木骨架在建筑墙身上的固定:1)检查墙身的平整度与垂直度:用垂线法和水平线来检查墙身的垂直度和平整度,并在墙面上标出最高点和最低点。
对墙面平整误差在10mn以内的墙体,可进行重新抹灰浆修正,如误差大于10mm通常不再修正墙体,而是在建筑墙体与木骨架间加木垫来调整,以保证木骨架的平整度和垂直度。
2)木楔圆钉固定法:用16-20mm的冲击钻头在建筑面钻孔,钻孔的位置应在弹线的交叉点位置上,钻孔的孔距600mm左右,钻孔深度不小于60mm在钻出的孔中打入木楔,如在潮湿的地区或墙面易受潮的部位,木楔可刷上桐轴,待干燥后再打入墙孔内。
固定木骨架时,应将骨架立起后靠在建筑墙面上,用垂线法检查木骨架垂直度,用水平直线法检查木骨架的平整度。
对校正好的木骨架进行固定。
固定前,先看骨架木龙骨与建筑墙面有否缝隙,如有缝隙应先用木片或木块将缝隙垫实,再用圆钉将木龙骨与木楔钉牢固。
(3)木夹板面安装:1)将木夹板进行挑选,分出不同色泽与残次件。
把选好的木夹板正面四边刨出45 度倒角,倒角处宽3mn左右。
2)用15mm|枪钉或25mn铁钉,把木夹板固定在木龙骨上。
要求布钉均匀,钉距100mm 左右。
通常5mm厚以下木夹板用25mm铁钉固定,9mm左右厚木夹板用30-35mm铁钉固定。
3)对钉入木夹板的钉头,有二种方法处理。
一种是先将钉头打扁,再将钉头打入木夹板内;另一种是先将钉头与木夹板钉平,待木夹板全部固定后,再用尖头冲子,逐个将钉头冲入木夹板平面以内1mm如果不这样处理钉头的黄色锈斑将破坏饰面。
钉枪钉的钉头可直接埋入木夹板内,所以不必再处理,但在用钉枪时,要注意把钉枪嘴压在板面上后再扣动板机打钉,以保证钉头埋入木夹板内。
(4)钉踢脚线板:踢脚线板可用实木板制作,也可用原木夹板(9-15mn)制作。
还有塑料踢脚板制成品近年来,在一些高级装饰中采用模压板的制成品踢脚线。
实木板、厚夹板踢脚线,一般用铁钉与墙面木骨架固定,塑料踢脚线用螺钉固定,模压板踢脚线可用万能胶与木夹板墙面粘贴。
(5)饰面及收口在夹板墙身基面上,可进行的饰面种类主要有:油漆饰面、喷涂饰面、贴墙纸饰面、贴墙毡饰面、镶镜面、镶贴不锈钢板饰面、镶贴塑料饰面板饰面、镶包人造革饰面等。
饰面的收口压线通常用木饰线条或不锈钢饰线条。
各种饰面的方法将在第六章中详细介绍,收口工艺及方法将在本章第七节中介绍。
3.木墙裙及窗台板(1 )木墙裙与木墙身的区别是,木墙裙一般只有1-1.2m 的高度,而木墙身则需做到吊顶平面处。
木墙裙的骨架制作和安装方法与木质墙身基本相同,只有在有造型要求的墙裙面上,钉面板的方法有所不同。
常见的有明缝安装面板、阶梯安装面板和压条缝安装等。
安装面板前应用#0 木砂纸打磨面板四周,使其棱边光滑而无毛刺和飞边。
(2)木墙裙与窗台板的接,在室内装饰工程中经常见到,这是因为木墙裙的高度通常与窗台等高,窗台板与木墙裙的接,就使木墙裙有了整体效果。
否则,木墙裙就有不完整之感。
4.木隔断墙的施工(1 )木隔断墙的结构形式:木隔断墙分为全封隔断墙,有门窗隔断墙和半高隔断墙三种,其结构形式不尽相同。
1)大木方构架:这种结构的木隔断墙,通常用50*80mm或50*100mm勺大木方制作主框架,框体的规格为a500左右的方框架或500*800mm左右的长方框架,再用4-5mm厚的木夹板作为基面板。
该结构多用于墙面较高较宽的隔断墙。
2)小木方双层构架:为了使木隔断墙有一定的厚度,常用25*30mm勺带凹槽木方作成两片骨架的框体,每片规格为a300或a400的框架,再将两个框架用木方横杆相连接,其墙体的宽度通常为150mm左右。
3)单层小木方构架:这种结构常用25*30mm的带凹槽木方组装。
框体为a300mm与墙身木骨架,吊顶木骨架相同。
该结构木隔断墙多用于高度3m以下的全封隔断或普通半高矮隔断。
(2)隔断墙的固定:1 )弹线打孔:在需要固定木隔断墙的地面和建筑墙面,弹出隔断墙的宽度线与中心线。
同时画出固定点的位置,通常按300-400mnm勺间距在地面和墙面,用①7.8mm或①10.8mm的钻头,在中心线上打孔,孔深45mn左右,向孔内放入M6或M8的膨胀螺栓。
注意打孔的位置应与骨架竖向木方错开位。
如果用木楔铁钉固定,就需打出①20左右的孔,孔深50mm 左右,再向孔内打入木楔。
2)固定木骨架:固定木骨架的方式有几种,但在室内装饰工程中,通常遵循不破坏原建筑结构的规则,处理骨架固定工作。
固定木骨架的位置通常是在沿墙、沿地和沿顶面处。
固定木骨架前,应按对应地面的墙面的顶面的固定点的位置,在木骨架上画线,标出固定点位置。
如用膨胀螺栓固定,就应在标出的固定点位置打孔。
打孔的直径略大于膨胀螺栓直径。
对半高矮隔断墙来说,主要靠地面固定和端头的建筑墙面固定。
如果矮隔断墙的端头处无法与墙面固定,常用铁件来加固端头处。
对于各种木隔墙的门框竖向木方,均采应用铁件加固法,否则,木隔墙将会因门的开闭振动而出现较大颤动,进而使门框松动、木隔墙松动。
3)隔断墙与吊顶的连接:如隔断墙的顶端不是建筑结构,而是与吊顶相接触,其处理方法要根据不同的吊顶结构而定。
对于无门的隔断墙来说,当其与铝合金龙骨吊顶或轻钢龙骨吊顶接触时,只要求相接缝隙小、平直即可。
当其与木龙骨吊顶接触时,应将吊顶的木龙骨与隔断墙的沿顶龙骨钉接起来,如两者间有接缝,应垫实接缝后再钉钉子。
对于有门的隔断墙,考虑门开闭的振动和人来人往的碰动,所以顶端也应进行固定。
其固定方法为:木隔断的竖向龙骨应穿过吊顶面,至少在门框的竖向木龙骨顶端应穿过吊顶面,在吊顶面以上再与建筑层的顶面进行固定。
固定方法常用斜角支撑,斜角支撑杆可以是木方或角铁,斜角支撑杆与建筑层的顶面夹角以为60 度为好,斜角支撑与建筑层的顶面,可用木楔铁钉或膨胀螺栓来固定。
4)固定木隔断墙面木夹板:隔断墙上固定木夹板的方式主要有明缝固定和拼缝固定两种。
明缝固定是在两板之间留一条有一定宽度的缝,施工图无规定时,缝宽为8-10mm为宜。
如明缝处不用垫板,则应将木龙骨面刨光,明缝的上下宽度应一致,锯割木夹板时,应用靠尺来保证锯口的平直度与尺寸的准确性,并用#0木砂纸修边。
拼缝固定时,要对木夹板正面四边进行倒角处理,以便在以后的基层处理时可将木夹板之间缝隙补平。
其板边倒角为450*3 其钉板方法与木质墙身相同。
5)饰面及收口:木龙骨架隔断的饰面,一般为木板油漆、木板贴墙纸、木板喷涂和贴墙面饰面板等几种。
隔断墙的收口部位主要是一吊顶面之间,与建筑墙面之间,以及隔断墙与本身的门窗之间。
(3)木隔断墙体门窗的结构与做法:1 )门框结构:木隔断中的门框是以隔断门洞两侧的竖向木方为基体,配以挡位框、饰边板或饰边线条组合而成。
大木方骨架的隔墙门洞竖向木方较大,其挡位框的木方可直接固定在竖向木方上。
对小木方双层构架的隔断墙来说,因其木方较小,应该先在门洞内侧钉上12mm勺厚夹板或实木板之后,再在厚夹板上固定挡位框。
门框的包边饰边的结构形式有多种,常见的有厚夹板加木线条包边、阶梯式包边、大木线条压边等。
门框包边饰边板或木线条勺固定通常用铁钉,其铁钉均需按埋入式处理。
2)窗框结构:木隔断中勺窗框是在制作木隔断时预留出勺,然后用木夹板和木线条进行压边或定位。
木隔断墙勺窗有固定式和活动窗扇式,固定窗是用木压条把玻璃板定位在窗框中,活动窗扇式与普通活动窗基本相同。
二、轻钢龙骨石膏板吊顶工程一、施工准备吊顶采用轻钢龙骨38X 1.2,大厅采用50X1.2 , T型铝合金龙骨32X22X1.1、22X 22X 1.1,石膏硅钙板600X 600,①8吊杆,①8膨胀螺栓,角码40X 40X 4二、作业条件1 、按照施工图纸在现场放出主控制线。
2 、顶棚已按龙骨位置弹好线三、施工工艺施工顺序:弹吊点位置线弹吊顶高度线打眼安装吊杆安装主龙骨安装T型主龙骨及小骨机电设备安装、验收安装石膏板1、根据房间50水平线,用尺竖向量至吊顶设计标高,办公室2.6m(50 线上返2.1m, 水平允许偏差土3伽),走廊2.3m(50线上返1.8m)沿墙四周弹顶棚标高水平线,并在墙上画好龙骨分档线,吊杆距墙150mm主龙骨两端距墙距不大于150mm且每根龙骨的间距为1m,在楼板下面弹好1mx 1m方格线。
开敞大办公厅吊顶起拱20mm小办公室起拱5mm走廊、起拱2mm房间的短向跨度起拱。
2、弹好顶棚标高水平线及龙骨分档线位置后,确定吊杆下端的标高,按大龙骨位置和吊杆间距,把吊杆无螺丝扣一端与40X40X4角码焊接,吊杆用①8膨胀螺栓与顶棚固定。
3、吊杆端头螺纹外露长度不应小于3mm安装大龙骨时,应将大龙骨用吊挂件连接在吊杆上,拧紧螺丝卡牢。
大龙骨接长可用接插体连接。
大龙骨安装完毕后应进行调平。
4、38 及50 主龙骨宜平行于灯具方向布置,吊杆应躲开风口、灯具的位置。
开敞办公室天花需12米在大龙骨上部焊接横卧大龙骨一道,以加强大龙骨的侧向稳定及吊杆整体性。
5、中龙骨安装完毕,经检查标高、间距、平直度和吊挂荷载符合设计要求后,顶板的安装由顶棚中间行中龙骨的一端开始,先装一根边卡档小龙骨,再将硅钙板搁置在三面龙骨翼缘上,然后安装另一侧小龙骨,按上述程序分行安装,最后拉线调整T 型明龙骨。
等水、电、空调等专业工序完成后方可安装天花。
6、石膏硅钙板遇灯口、风口及墙边需要裁割时应垂直于板背面的肋裁割整齐。