电力建设工程装置性材料预算价格(2013年版)
电力建设工程装置性材料综合预算价格(2013 年版)
FZ16 凝汽器抽真空管道···················································································································· 16 FZ17 汽轮机本体轴封蒸汽及疏水系统··································································································17 FZ18 汽轮发电机组油、氮气、二氧化碳、外部冷却水系统管道································································18 FZ19 给水泵汽轮机本体系统管道········································································································19 FZ20 主厂房循环水、冷却水管道········································································································20 FZ21 主厂房内空气管道···················································································································· 21 FZ22 厂区中低压管道······················································································································· 22 FZ23 热网管道································································································································ 23 FZ24 临时吹管管道·························································································································· 24 FZ25 输煤冲洗水管道······················································································································· 25 FZ26 卸油管道································································································································ 26 FZ27 燃油泵房管道·························································································································· 27 FZ28 油罐区管道····························································································································· 28 FZ29 厂区燃油管道·························································································································· 29 FZ30 锅炉房燃油管道······················································································································· 30 FZ31 冲洗除尘水管道······················································································································· 31 FZ32 灰渣泵房管道·························································································································· 32
2013年版电力建筑定额介绍
单击此处编辑母版标题样式
3、 编制工作范围 本次定额编制范围包括:
——2006年版《电力建设工程概算定额》第一册: 建筑工程。 ——2006年版《电力建设工程预算定额》第一册: 建筑工程。
下列工程项目与技术不列入编制范围内: ——铁路; ——桥梁; ——码头; ——航道及港池; ——取排水隧洞。
架)已经综合在相应的定额子目中,其费用不再单独 计算。
Page 35
(3)混凝土施工费用调整 ——混凝土施工使用混凝土泵车浇注时,每浇制1m3 混凝土成品增加22元施工费用,其中:材料费增加22.7 元,机械费增加9.7元,人工费减少10.4元。泵送混凝 土工程量在初步设计阶段可以按照全厂(站)混凝土 量80%计算。混凝土量不包括临建工程中的混凝土量、 不包括购置成品混凝土构件混凝土量。如有施工组织 设计,泵送混凝土工程量按照施工组织设计确定。 ——混凝土施工采用现场制备(搅拌)时,每制备 1m3混凝土减少9.8元施工费用,其中:机械费减少 18.4元,人工费增加8.6元。
Page 15
单击此处编辑母版标题样式
(4)2013年国内人工、材料、机械台班单价。 (5)形成“四新”内容的技术标准、设计文件、施 工方案等资料。 (6)发电、电网企业定额标准。 (7)调研资料及有关资料。
Page 16
单击此处编辑母版标题样式
6、建筑工程概预算定额结构 (1)2013年版建筑工程概预算定额包括发电、变电、 换流站、通信站、串补站等建筑工程定额子目。 (2)2013年版《电力建设工程概算定额》第一册建 筑工程定额设置11章。包括建筑物与构筑物的一般 土建、给水、排水、采暖、通风空调、除尘、照明 与接地、特殊消防及烟塔接地工程定额子目。
P)2013年版《电力建设工程预算定额》第一 册建筑工程上册设置15章。包括建筑物与构筑 物的一般土建工程与措施工程定额子目。 (4)2013年版《电力建设工程预算定额》第一 册建筑工程下册设置7章。包括建筑物与构筑物 的给水与排水、照明与接地、消防、除尘、通 风与空调、采暖、防腐与绝热工程定额子目。
关于发布2013版电力建设项目工程概预算定额价格水平调整的通知
电力工程造价与定额管理总站文件
定额〔2014〕1号
关于发布2013版电力建设工程概预算定额价格水平调整的通知
各有关单位:
按照新版电力建设工程概预算定额价格水平调整办法的有关规定,电力工程造价与定额管理总站根据各地区收集并上报的电力建设工程各种要素价格变化情况,完成了电力建设工程概预算定额人工费、材料和施工机械费价差调整测算工作,现予发布,请遵照执行。
附件:1.电力建设工程概预算定额人工费调整系数汇总表
2.电网安装工程概预算定额材机调整系数汇总表
3.发电安装工程概预算定额材机调整系数汇总表
4.电力建设建筑工程概预算定额材料价差调整汇总表
5.电力建设建筑工程概预算定额施工机械价差调整汇总表
附件1浏览
附件2浏览
附件3浏览
附件4浏览
附件5浏览
二〇一四年一月十五日
附件1。
电力建设工程装置性材料预算价格
只
C01030102 线路电瓷 悬式玻璃绝缘子(盘式) LXY-100
只
C01030103 线路电瓷 悬式玻璃绝缘子(盘式) LXY-120
只
C01030104 线路电瓷 悬式玻璃绝缘子(盘式) LXY-160
只
C01030105 线路电瓷 悬式玻璃绝缘子(盘式) LXY-210
只
C01030106 线路电瓷 悬式玻璃绝缘子(盘式) LXY-300
单位
只 只 只 只 只 只 只 只 只 只 只 只 只 只 只 只 只 只 只 只 只 只 只 只 只 只 只 只 只 只 只 只 只 只 只 只 只 只 只 只 只 只 只 只 只
C01010146 线路电瓷 合成绝缘子 FXBW4-110/75-5
只
C01010147 线路电瓷 合成绝缘子 FXBW4-110/100
只
C01030122 线路电瓷 悬式玻璃绝缘子(盘式) LXP-30
只
C01030123 线路电瓷 悬式玻璃绝缘子(盘式) LXP3-16
只
C01030124 线路电瓷 悬式玻璃绝缘子(盘式) LXP3-12W
只
C01030125 线路电瓷 悬式玻璃绝缘子(盘式) LXHY3-40
只
C01030126 线路电瓷 悬式玻璃绝缘子(盘式) LXHY3-160
HDG-220/120 HDG-500/120 HHD-10 HHD-35 HJG-220/100 XSH-220/100 XSH-500/100 XSH-500/160 XSH-500/210 XSH-500/240 HXS2-35/70 HXS2-66/70 HXS2-110/70 HXS2-110/100 HXS2-220/100 HXS2-220/120 HXS2-220/160 HXS2-330/160 HXS2-500/100 HXS2-500/180 HXS2-500/210 HXS2-500/240 HXS2-500/300 YDG10 FXB-35/100 FXB-66/100 FXB-110/100 FXB-220/100 FXB-220/160 FXB-220/210 FXB-500/100 FXB-500/160 FXB-500/180 FXB-500/210 FXB-500/300 FXB1-220/100 FXB1-110/100 FXBW-35/70 FXBW-35/100 FXBW4-35/70 FXBW-110/70 FXBW-110/100 FXBW3-110/70 FXBW3-110/100 FXBW4-110/70
广西电网工程建设预算编制与计算标准实施细则(2013年版)
XX电网工程建设预算编制与计算标准实xx 细则(2013年版)第一章总则第一条为加强广西电网工程建设预算管理,统一建设预算的编制和计算规则,合理确定工程造价,根据国家能源局发布的《电网工程建设预算编制与计算规定》(2013 年版)(以下简称《预规》),结合广西电网有限责任公司(以下简称公司)具体情况,制定本细则。
第二条本细则适用于各种投资渠道建设的35kV〜1000kV交流输变电(串联补偿)工程、士800k\及以下直流输电工程、换流站工程以及系统通信工程的新建、扩建和改建工程。
第三条变电站扩建和改建工程按变电站的高压侧电压等级执行相关费用标准。
第四条本细则与《预规》配套使用,本细则未提及部分费用计算标准按《预规》有关规定执行。
第五条《预规》及本实施细则作为电网工程投资估算、初步设计概算、施工图预算和工程量清单报价(以下简称预算)的编制和费用计算依据,应与电力建设工程投资估算指标、概算定额、预算定额和工程量清单计价规范配套使用。
第二章建筑安装工程费第六条人工费1、人工工日单价按照2013 年电力行业定额基准工日单价执行,各册定额基准工日单价标准为:普工34元/工日,建筑技工48元/工日,安装技工53元/工日,输电技工55 元/工日,调试技工75 元/ 工日。
2、人工费价格水平调整,根据电力工程造价与定额管理总站《关于颁布〈电力建设工程概预算定额价格水平调整办法〉的通知》(定额[2014]13号)规定执行,按照编制当期颁布的综合系数进行调整。
编制预算时,人工费调整金额汇入“编制基准期价差”,只计取税金,作为建筑安装工程费的组成内容。
第七条材料费电网工程建设预算中的材料费包括消耗性材料费和装置性材料费两部分。
1、消耗性材料费消耗性材料在建设预算定额中已经计价,消耗性材料价格水平调整,根据电力工程造价与定额管理总站文件《关于颁布〈电力建设工程概预算定额价格水平调整办法〉的通知》(定额[2014]13 号)规定执行。
2013年版电网预规指南(2014年.3.16)
《电网工程建设预算编制与计算规定》使用指南电力工程造价与定额管理总站2014年8月目录前言2013年8月,国家能源局以国能电力[2013]289号文批准了“2013版电力建设工程定额和费用计算规定”,为了使广大从业人员尽快了解、熟悉和掌握2013年版《电网工程建设预算编制与计算规定》(以下简称“预规”),电力工程造价与定额管理总站组织业内专家编制了《电网工程建设预算编制与计算规定使用指南》(以下简称《使用指南》)。
本《使用指南》能够有效帮助大家正确理解和使用新版定额及新预规,依规合理计取各项建筑安装工程费用和其他费用。
《使用指南》重点就定额总体价格水平的确定,各项建筑安装费用和其它费用的项目设置,各项目的计算公式和计算标准以及它们在使用过程中应注意的问题等,做了较为详尽的阐述和说明。
其主要内容包括修编概述(编制过程、主要特点、修编原则、主要变化)、总则、术语、建设预算费用构成及计算规定、建设预算费用性质划分、建设预算项目划分、建设预算编制办法、进口设备工程费计算办法等几个部分。
另外,为便于使用者更好的了解和学习国家有关工程造价方面的法律、法规、政策,促进其独立思考和解决工作中的相关问题的能力,在本《使用指南》最后部分以附录形式列出了近期国家有关行政主管部门颁发的文件供大家参考。
本《使用指南》在编写过程中,先后以多种形式进行了广泛的意见征求,认真听取和采纳了多方意见和建议。
所有这些工作,均对本《使用指南》的顺利完成打下了坚实基础。
在此,谨对为本书编写工作付出辛勤努力和给予无私帮助的单位及个人表示由衷的谢意。
同时,由于受时间和能力所限,对本《使用指南》中存在的疏落和不当之处,敬请批评指正。
意见反馈电话:邮箱:本《使用指南》由电力工程造价与定额管理总站负责解释。
主要编写人:主要审查人:第一章修编概述为了适应技术快速进步的要求,科学反映工程设计与“新设备、新材料、新工艺”条件下工程建设中各生产要素消耗数量的变化,动态跟进与及时调整要素市场价格,并将国家最新的有关工程造价管理方面的法律、法规、规章、制度及标准及时落实到电力工程计价依据体系当中去,促进电力建设工程造价的合理确定与有效控制。
2013年版电力建设工程概预算定额价格水平调整办法
附件2013年版电力建设工程概预算定额价格水平调整办法第一章总则第一条为规范电力建设工程概预算定额价格水平的测算、发布和实施工作,科学反映不同时间和不同地区价格水平差异,合理确定工程投资,特制订本办法。
第二条本办法适用于以《火力发电工程建设预算编制与计算规定(2013年版)》、《电网工程建设预算编制与计算规定(2013年版)》(以下简称“预规”)和《电力建设工程概算定额(2013年版)》、《电力建设工程预算定额(2013年版)》(以下简称“定额”)为计价依据,编制电力建设工程概预算时,对定额内人工费、材料费和施工机械费价格水平的调整。
第三条本办法调整的主要内容包括:工程所在地编制基准期价格与概预算定额价格之间的时间差及地区差水平调整。
第四条电力建设工程概预算编制基准期价格水平与定额编制价格水平之间的价差计算:发电和电网工程的人工费均以系数的形式进行调整;发电安装工程和电网安装工程的材料及机械费以系数的形式进行调整;发电建筑工程和电网建筑工程按照本办法中给定的典型材料及机械种类、品种及规格等直接进行价差调整。
第二章人工费调整第五条定额人工费每年调整一次,分别按照建筑工程和安装工程,采用综合系数法进行调整(见附件1)。
不分工种(普通工、技术工)、安装工程不分专业(热力设备安装工程、电气设备安装工程、输电线路安装工程和调试工程),计算时按照对应定额基价中人工费总额乘相应的调整系数。
第六条各地区定额人工费调整系数是参照住房与城乡建设部发布的各地区人工信息价格,或当地定额与造价管理部门公布的本地区定额人工价格,但其组成内容要与电力建设工程预规和定额所规定的组成内容相一致,进行转化后综合取定。
第七条定额人工费综合调整系数计算公式:建筑工程定额人工费调整系数=[(转化后当地建筑工程定额人工工日单价/定额普通人工工日单价)*0.79] *100%-1 安装工程定额人工费调整系数=[(转化后当地安装工程定额人工工日单价/定额普通人工工日单价)*0.72] *100%-1 第八条定额人工费调整金额计算公式:定额人工费调整金额合计=建筑工程定额人工费调整合计+ 安装工程定额人工费调整合计建筑工程定额人工费调整合计=建筑工程定额基价人工费总额*建筑工程定额人工费调整系数安装工程定额人工费调整合计=安装工程定额基价人工费总额*安装工程定额人工费调整系数—2——3—此处安装工程包括热力设备安装工程、电气设备安装工程、输电线路安装工程和调试工程。
电力建设工程装置性材料综合预算价格(2013年版)(除税版)
电力建设工程装置性材料综合预算价格(2013年版)FZ01冷风道范围:从送风机、一次风机风口到预热器入口管道、磨煤机调温用的压力冷风道、磨煤机的密封风管道、安全监控系统冷却风道。
不包括消音器及暖风器。
内容:方圆形管道、孔门、补偿器、传动装置、支吊架、螺栓。
编码项目单位预算价(元)FZ011125MW冷风道t5589FZ012200MW冷风道t5613FZ013300MW冷风道t6951FZ014600MW冷风道t7005FZ0151000MW冷风道t7380FZ02热风道范围:从空气预热器出口分别到磨煤机入口、燃烧器(二次风)及煤粉混合器入口。
内容:方圆形管道、风门、孔门、补偿器、异形管件、传动装置、支吊架、螺栓。
编码项目单位预算价(元)FZ021125MW热风道t6576FZ022200MW热风道t6399FZ023300MW热风道t7440FZ024600MW热风道t7247FZ0251000MW热风道t7492FZ03烟道范围:从空气预热器出口到烟囱入口的所有钢管道,并包括高温炉烟道及烟气再循环管道。
内容:方圆形管道、孔门、补偿器、传动装置、支吊架、螺栓,不包括高温烟道的内衬材料。
编码项目单位预算价(元)FZ031125MW烟道t5337FZ032200MW烟道t5450FZ033300MW烟道t6820FZ034600MW烟道t6694FZ0351000MW烟道t6797FZ04原煤管道范围:从原煤斗出口到磨煤机入口,包括金属小煤斗。
内容:方圆形管道及管件、煤闸门、传动装置、接口法兰及支吊架。
编码项目单位预算价(元)FZ041125MW原煤管道t5369FZ042200MW原煤管道t5913FZ043300MW原煤管道t5597FZ044600MW原煤管道t5558FZ0451000MW原煤管道t5511FZ05制粉管道范围:从钢球磨煤机出口到煤粉仓和排粉机入口的全部煤粉空气管道,包括粗粉分离器至磨煤机入口的回粉管、细粉分离器至煤粉仓和螺旋输粉机粉仓的下粉管、煤粉仓的吸潮管和防爆门引出管、煤粉仓的粉位测量装置。
110千伏电网工程建设预算编制规定
某省地方电力(集团)有限公司35-110千伏电网工程建设预算编制规定第一章总则第一条为统一某省地方电力(集团)有限公司(以下简称“集团公司”)电网建设工程预算编制和计算规则,提高编制质量,加强电网建设工程造价管理,合理确定工程造价,提高投资效益,特制定本规定。
第二条本规定根据国家能源局发布的•电网工程建设预算编制与计算规定‣和•电力建设工程概、预算定额‣(国能电力…2013‟289号)及中国电力企业联合会发布的•电力建设工程装置性材料预算价格‣等有关文件为依据,结合某地区实际及造价水平制定,并作为工程项目投资控制的依据和标准。
第三条本规定所称的建设预算是指可行性研究投资估算、初步设计概算及施工图预算。
第四条本规定适用于集团公司35千伏及以上的电网建设工程。
第二章预算编制内容及程序第五条建设预算内容组成(一)、变电工程建设预算按费用性质分为建筑工程费、安装工程费、设备购置费和其他费用四个部分,送电线路工程建设预算按费用性质划分为线路本体工程、辅助设施工程和其他费用三部分。
(二)、建设预算由编制说明、工程概况及主要技术经济指标表、总预(概、估)算表、专业汇总预(概、估)算表、单位工程预算表、其它费用预(概、估)算表、建设场地征用及清理费用预(概、估)算表以及相应附表、附件等组成。
(三)、建设预算的编制说明要有针对性,要具体、确切、简练、规范。
其内容一般应包括:1.工程概况变电工程包括:设计依据,本期及规划建设规模、变压器台数及单台规划容量(分土建、安装);静态投资、静态单位投资,动态投资、动态单位投资;计划投产日期;资金来源;外委设计项目名称及分工界限;站址特点及交通运输状况;自然地理条件和对投资有较大影响的情况。
送电工程包括:线路经过地区的地形、地貌、地质、地下水位、风力、地震烈度、气象条件;线路长度;导、地线型号,杆塔类型;静态投资、静态单位投资,动态投资、动态单位投资;计划投产日期;资金来源;外委设计项目名称及分工界限等。
电力建设工程预算定额完全版1-7册(2013版)
名称 等离子(微油)点火装置调整 锅炉蒸发量 670t/h 等离子(微油)点火装置调整 锅炉蒸发量 1025t/h 等离子(微油)点火装置调整 锅炉蒸发量 2008t/h 等离子(微油)点火装置调整 锅炉蒸发量 3033t/h 汽水系统调试 锅炉蒸发量 220t/h 汽水系统调试 锅炉蒸发量 440t/h 汽水系统调试 锅炉蒸发量 670t/h 汽水系统调试 锅炉蒸发量 1025t/h 汽水系统调试 锅炉蒸发量 2008t/h 汽水系统调试 锅炉蒸发量 3033t/h 锅炉吹管 锅炉蒸发量 220t/h 锅炉吹管 锅炉蒸发量 440t/h 锅炉吹管 锅炉蒸发量 670t/h 锅炉吹管 锅炉蒸发量 1025t/h 锅炉吹管 锅炉蒸发量 2008t/h 锅炉吹管 锅炉蒸发量 3033t/h 脱硫工艺系统调试 锅炉蒸发量 440t/h 脱硫工艺系统调试 锅炉蒸发量 670t/h 脱硫工艺系统调试 锅炉蒸发量 1025t/h 脱硫工艺系统调试 锅炉蒸发量 2008t/h 脱硫工艺系统调试 锅炉蒸发量 3033t/h 脱硝工艺系统调试 锅炉蒸发量 440t/h 脱硝工艺系统调试 锅炉蒸发量 670t/h 脱硝工艺系统调试 锅炉蒸发量 1025t/h 脱硝工艺系统调试 锅炉蒸发量 2008t/h 脱硝工艺系统调试 锅炉蒸发量 3033t/h 循环流化床分系统调试 锅炉蒸发量 220t/h 循环流化床分系统调试 锅炉蒸发量 440t/h 循环流化床分系统调试 锅炉蒸发量 670t/h 循环流化床分系统调试 锅炉蒸发量 1025t/h 蒸汽系统调试 机组容量 50MW 蒸汽系统调试 机组容量 135MW
定额编号 YS1-65 YS1-66 YS1-67 YS1-68 YS1-69 YS1-70 YS1-71 YS1-72 YS1-73 YS1-74 YS1-75 YS1-76 YS1-77 YS1-78 YS1-79 YS1-80 YS1-81 YS1-82 YS1-83 YS1-84 YS1-85 YS1-86 YS1-87 YS1-88 YS1-89 YS1-90 YS1-91 YS1-92 YS1-93 YS1-94 YS1-95 YS1-96
电力建设工程预算定额(2013年版)
m³
YT1-88
自卸汽车运淤泥、流砂,运距每增加1km
m³
YT1-89
机械钻孔 爆破冻土
m³
YT1-90
推土机推冻土 推距60m以内
m³
YT1-91
自卸汽车运冻土,运距1km以内
m³
YT1-92
机械平整场地
m²
YT1-93
机械原土碾压
m²
YT1-94
机械填土碾压
m³
19.75 25.26 44.38 73.16 23.36 29.86 36.89 58.51 88.28 33.49 45.04
m³
359.05
52.63 285.94
m³
465.96
47.80 367.07
m³
157.85
31.08
47.02
m³
1222.82
35.66 1085.78
m³
1210.84
24.07 1085.78
m³
1170.02
2.85 3.89 4.58 5.84 6.98 10.15 12.00 15.30 7.52 13.06 15.97 23.01 0.24 0.24 0.24 0.24 0.24 0.24 0.23
0.22 43.35 43.35 42.52 10.12 114.60 186.37 67.53 201.70 241.66 85.99 201.70 297.94 127.27 201.70 575.00 146.57 13.16
第一册_建筑工程预算定额2013
定额编号
YT1-1 YT1-2 YT1-3 YT1-4 YT1-5 YT1-6 YT1-7 YT1-8 YT1-9 YT1-10 YT1-11 YT1-12 YT1-13 YT1-14 YT1-15 YT1-16 YT1-17 YT1-18 YT1-19 YT1-20 YT1-21 YT1-22 YT1-23 YT1-24 YT1-25 YT1-26 YT1-27 YT1-28 YT1-29 YT1-30 YT1-31 YT1-32 YT1-33 YT1-34 YT1-35 YT1-36 YT1-37 YT1-38
电力建设工程预算定额(2013版)结算范例
26.57 15.42
送电线路单位工程结算表
金额单位:元 合 价 安装费 其中机械 8.40 50.39
1025.52 2.04 8.28 51.79 1087.63 1139.00
地形系数 小计 附件安装 YX6-1 YX6-19 YX6-84 耐张杆塔 导线挂线及绝缘子串安装 直线杆塔 绝缘子串悬挂安装 防震锤安装 单导线 地形系数 小计 定额小计 35kv 35kv
0.2
组 单相 个 0.05
12.00 6.00 36.00
497.79 4.9 5.67
410.65 4.4 4.62
YX1-107 砂、石、水泥 YX1-108 砂、石、水泥
2 YX3-65 YX3-65 YX3-66 YX3-43
基础部分 每基混凝土量20m3以内 每基混凝土量20m3以内 (高低腿) 每基混凝土量40m3以内 基础钢筋加工及制作 一般钢筋 m3 m3 m3 t t 根 每基100m内 基 基 地形系数 0.1 24.9 57.39 28.03 2.44 0.42 28.00 7.00 7.00 158.7 175.31 148.83 427.57 219.79 8.79 39.34 21.8 98.37 113.13 95.52 282.52 123.7 7.94 32.49 9.1 12.34 14.19 11.73 135.43 89.46 0.85 3.39 12.7 3951.63 10061.04 4171.70 1042.04 92.31 246.12 275.38 152.60 2449.41 6492.27 2677.43 688.54 51.95 222.32 227.43 63.70 1287.31
பைடு நூலகம்
电网建设预规2013版变化综合介绍
执行的定额与取费标准
电力工程造价编制执行以下标准:
(1)概算定额(共四册): 第一册 建筑工程; 第三册 电气设备安装工程; 第五册 通信工程; (2)预算定额(共七册): 第一册 建筑工程(上下册); 第三册 电气设备安装工程; 第五册 调试工程; 第七册:加工配制工程
第二册 热力设备安装工程; 第四册 调试工程;
线路工程 (%)
可行性研究估算
5
4
3%
5.0
初步设计概算
3
2.5
2
3.0
施工图预算
1.5
1
1
1.5
14
目录
一、2013预规介绍 二、2013预规与2006预规的差异 三、2013定额介绍 四、2013定额与2006定额的差异
15
2011预规与2006预规的差异
术语解释补充完善 建设预算费用构成及计算标准
工程的评审费用标准;增加了施工图文件审查费=基本设计费*2.5%; 5)工程建设监督检测费中环境监测验收费计算标准按照各电压等级类型进行
了细化; 6)原其他费用中的建设标准和定额编制管理费两项合并为“电力工程技术经
济标准编制管理费”; 7)原其他费用中的调试费用删除、基本预备费删除。
19
建设预算项目划分
6
相关术语解释
建设期贷款利息:指筹措债务资金时在建设期内发生并按照规定允许在投产后
计入固定资产原值的利息。
铺底流动资金:指建设项目投产初期所需的,为保证项目建成后进行试运转和
初期正常生产运行所必需的流动资金,对于电网工程,铺底流动资金主要用于项 目生产消耗材料、生产用备品备件和支付工资所需的周转性自有资金。
(二)间接费:包括规费、企业管理费和施工企业配合调试费
2013版定额 输电线路定额100问
输电线路预算定额100问(截至2015年1月)1. 输电线路工程人工工日怎么计算答:人工工日为八小时工作制,输电普通工单价为34元/工日,输电技术工单价为55元/工日。
2. 2013版定额输电线路定额怎么计算线路拆除费答:输电线路拆除执行电网技改拆除定额。
3. 定额中未计价材料在编制预算时采用什么价格答:采用中国电力企业联合会颁发的《电力建设工程装置性材料预算价格》(2013版)。
4. 编制预算时导地线计算长度如何确定答:按照设计所提的导地线长度(含与电气设备连接、跳线及弧垂等)另加上规定的损耗计算。
5. 电缆线路中输电电缆按什么价进入预算答:根据《电网工程建设预算编制与计算规定》(2013年版)第条.按照设备费进入预算并计算设备运杂费。
6. 钢管杆怎么计算损耗答:钢管杆不计算损耗。
7. 定额中施工机械台班内不包括养路费和牌照税,你怎么办答:在当地电力定额站所发布的材机调整系数中已考虑,编制概预算时,按工程所在地电力定额站所发布的材机调整系数计算即可。
8 . 砂、石、水泥由于地形不同,其损耗率不同,编制预算时遇到多种地形情况下,你怎么办答:按工程中不同的地形比例,计算出综合损耗率系数,在工程中计列。
9. 同一定额子目遇有两种及以上调整系数时你如何处理答:按定额规定,凡各章无特殊规定者外,系数一律相加。
10. 一个工程有多种地形构成,地形系数如何调整答:按工程不同的地形比例,计算综合地形系数计算。
11.汽车、船舶运输距离不足1km时怎么计算答:不足1km按照1km计算。
12.OPGW光缆与线路同时施工时,光缆通信工程如何取费答:按输电线路工程的费率执行。
13.OPGW光缆与线路不同时施工时,光通信工程如何取费答:按光缆线路工程的费率执行。
14. 线路工程在野外,作业点的材料看管费如何计取答:作业点的材料看管费已在线路工程定额中进行了综合考虑,不另计算。
15. 线路的参数测试费包含在什么地方答:包含在输电线路工程整套启动试运费中。
电力建设工程装置性材料综合预算价格(2013年版)教程
编码
项目
单位
Z071 125MW主蒸汽管道
t
28385
Z072 200MW主蒸汽管道
t
28709
Z073 300MW主蒸汽管道 P22
t
87426
Z074 300MW主蒸汽管道 P91
t
122045
Z075 600MW主蒸汽管道 P91
t
111864
Z076 600MW主蒸汽管道 P92
t
124093
Z022 200MW热风道
t
7423
Z023 300MW热风道
t
8630
Z024 600MW热风道
t
8407
Z025 1000MW热风道
t
8691
Z03 范围: 内容: 编码
烟道
从空气预热器出口到烟囱入口的所有钢管道,并包括高温炉烟道及烟气再循环管 道。 方圆形管道、孔门、补偿器、传动装置、支吊架、螺栓,不包括高温烟道的内衬 材料。
t
12821
t
12526
Z07 范围: 内容:
主蒸汽管道 300~1000MW机组从锅炉过热器集箱出口至汽机高压缸主汽门进口止,100~ 200MW机组至汽机本体定型设计界线接口止,包括高压旁路入口侧蒸汽管道、疏 放水管道、给水泵汽轮机高压进汽管道及主汽至轴封供汽管道(如采用主汽供) 。 管道、管件、疏放水闸门、接管座、蠕胀测点、位移指示器(含维护平台)、中 频弯管加工、支吊架,不包含主蒸汽阀门。
主给水管道 由主给水泵出口至锅炉入口的全部给水管道,包括给水再循环管道、过热器及旁 路减温水管道、上述管道的放水放气管道以及主给水杂项管道。母管制供水系统 还包括给水母管、冷供管。 管道、阀门、管件、节流装置、流量测量装置(不含维护平台)、中频弯管加工 、支吊架及接管座,不包括母管阀门、高加进出口三通阀、给水再循环阀、高压 旁路减温阀、汽泵和电泵出口逆止阀、电泵和汽泵最小流量阀前后的隔离阀。
电力建设工程装置性材料预算价格(2013年版)
60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90
S01020402 S01030101 S01030102 S01030103 S01030104 S01030105 S01030106 S01040101 S01040102 S01040103 S01040104 S01040105 S01040106 S01040107 S01040108 S01040109 S01040110 S01040111 S01040112 S01040113 S01040114 S01040115 S01040116 S01040117 S01040118 S01040119 S01040120 S01040121 S01040122 S01040123 S01040201
聚氯乙烯塑料板 聚氯乙烯塑料板 聚氯乙烯塑料板 聚四氟乙烯板 聚四氟乙烯板 橡胶板 橡胶板 橡胶板 橡胶板 橡胶板 高压石棉橡胶板 高压石棉橡胶板 高压石棉橡胶板 中压石棉橡胶板 中压石棉橡胶板 中压石棉橡胶板 低压石棉橡胶板 低压石棉橡胶板 低压石棉橡胶板 耐油石棉橡胶板 耐油石棉橡胶板 耐油石棉橡胶板 耐油石棉橡胶板 耐油石棉橡胶板 耐油石棉橡胶板 耐油石棉橡胶板 耐油石棉橡胶板 耐油石棉橡胶板
序号 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
材料编码 S01010101 S01010102 S01010103 S01010201 S01010202 S01010301 S01010302 S01010303 S01010304 S01010305 S01010401 S01010402 S01010403 S01010501 S01010502 S01010503 S01010601 S01010602 S01010603 S01010701 S01010702 S01010703 S01010704 S01010705 S01010706 S01010707 S01010708 S01010709
电力建设工程预算定额(2013年版)
19.75 25.26 44.38 73.16 23.36 29.86 27.57 46.67 73.75 23.34 29.60 49.12 77.36 9.01 2.16 6.74 12.84 4.33 5.54 11.68 22.45 0.17 0.17 0.17 0.16 0.16 0.16 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.70 0.97 9.56 0.28 0.24 0.03 0.03 0.18
2.85 3.89 4.58 5.84 6.98 10.15 12.00 15.30 7.52 13.06 15.97 23.01 0.24 0.24 0.24 0.24 0.24 0.24 0.23 0.22 43.35 43.35 42.52 10.12 114.60 186.37 67.53 201.70 241.66 85.99 201.70 297.94 127.27 201.70 575.00 146.57 13.16 52.63 47.80 31.08 35.66 24.07 16.27
m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m² m² m² m² m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m² m² m³
19.75 25.26 44.38 73.16 23.36 29.86 36.89 58.51 88.28 33.49 45.04 69.8 103.92 9.01 2.16 6.74 12.84 4.33 5.54 11.68 22.45 2.02 2.79 4.34 2.5 3.31 6 3.37 4.28 0.91 2.03 2.56 7.49 7.71 6.31 1.28 5.06 15.23 1.32 14.16 9.93 15.73 0.4 0.06.00 0.00 0.00 9.32 11.84 14.53 10.15 15.44 20.68 26.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.73 0.00 0.00 0.00 0.00 0.03
电网工程建设预算编制与计算规定2013
• 2.1.3 工程结算 工程结算是指承、发包双方根据合同约
定,对实施中、终止、竣工的工程项目,依据工程资料经 行工程量计算和核定,对合同价款进行的计算、调整和确 认。工程结算经具有相关专业资格人员根据和合同和电力 行业工程结算规定进行编制,形成的成品文件为工程结算 书。
电网工程建设预算编制与 计算规定(2013版)
1 2 3 部分专题讲座
2023/12/5
2023/12/5
总则
造价工程师
1.0.1 为规范电网工程建设预算的编制和计 算规则,合理确定工程造价,提高投资效益, 维护工程建设各方的合法权益,促进电力事业 健康发展制定本规则。
1.0.2 电网工程建设预算费用的构成与计算、 费用性质划分、建设预算项目划分、建设预算 编制方法以及建设预算的计价格式等执行本规 定。
1.03 本规定作为电网工程投资估算、初步设 计概算、施工图预算和工程量清单的编制和费 用计算依据,应与电力工程投资估算指标、概 2023/算12/5定额和工程量清单造计价工价程师规范配套使用。
1.0.4 本规定是编制电网工程招标标底、最 高投标限价、投标标价和工程结算的依据,同 时也是调解处理工程建设经济纠纷的依据。
返回目录
• 2.2.6.2 间接费
• 间接费是指建筑安装工程的施工过程中,为全工程项目 服务而不直接消耗在特定产品对象上的费用。包括规费、 企业管理费和施工企业配合调试费。
• 1 规费 • 规费是指按照国家行政主管部门或省级有关权力部门规
定必须缴纳并计入建筑安装工程造价的费用。包括社会 保险费、住房公积金、危险作业意外伤害保险费。其他 应列而未列入的规费,按设计文
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
硬质粘土(熟料) 硬质粘土(熟料) 硬质粘土(熟料) 硬质粘土(熟料) 一般高铝钒土(熟料) 一般高铝钒土(熟料) 一般高铝钒土(熟料) 一般高铝钒土(熟料) 高铝钒土(生料) 高铝钒土(生料) 高铝钒土(生料) 高铝钒土(生料) 高铝钒土(生料) 高铝钒土(生料) 高铝钒土(生料) 散状耐火材料 散状耐火材料 保温(绝热)浇注料 耐火浇注料 耐磨耐火浇注料 耐磨耐火浇注料 耐磨耐火浇注料 HF高强浇注料 高铝质涂抹料 高温密封涂料 耐火可塑料 耐磨耐火可塑料 耐磨耐火可塑料 粘结剂 粘结剂 铝质耐火混凝土
序号 材料编码
名称
1 N01010101 2 N01010102 3 N01010103 4 N01010104 5 N01010201 6 N01010202 7 N01010203 8 N01010204 9 N01010301 10 N01010302 11 N01010303 12 N01010304 13 N01010401 14 N01010402 15 N01010403 16 N01010404 17 N01010501 18 N01010502 19 N01010503 20 N01010504 21 N01010505 22 N01020101 23 N01020201 24 N01020202 25 N01020301 26 N01020401 27 N01020501 28 N01020601
t
1000.000
t
1000.000
t
1000.000
t
1000.000
m3
2400.000
m3
1050.000
t
1000.000
t
1000.000
t
1000.000
t
1000.000
t
1000.000
t
1000.000
t
1000.000
t
1000.000
t
1000.000
t
1000.000
t
1000.000
规 格、型 号
单位
单重 (千克)
氧化铝含量≥65% 标准型 氧化铝含量≥65% 普通型 氧化铝含量≥65% 异型 氧化铝含量≥65% 特异型 耐火度≥1710℃ 标准型 耐火度≥1710℃ 普通型 耐火度≥1710℃ 异型 耐火度≥1710℃ 特异型
标准型 普通型 异型 特异型 标准型 普通型 异型 特异型 珍珠岩保温砖 磷酸岩耐火砖 耐火高铝砖 高铝绝热砖 耐磨耐火砖 氧化铝含量≥40% 不分粒度 氧化铝含量≥70% 粗 氧化铝含量≥70% 细 氧化镁含量≥82% 不分粒度 二氧化硅含量≥90% 不分粒度 散装 散装
t
1000.000
t
1000.000
t
1000.000
t
1000.000
t
1000.000
t
1000.000
t
1000.000
t
1000.000
t
1000.000
t
1000.000
t
1000.000
29 N01030101 30 N01030102 31 N01030103 32 N01030104 33 N01030201 34 N01030202 35 N01030203 36 N01030204 37 N01030301 38 N01030302 39 N01030303 40 N01030304 41 N01030305 42 N01030306 43 N01030307 44 N01030501 45 N01030502 46 N01030503 47 N01030504 48 N01030505 49 N01030506 50 N01030507 51 N01030508 52 N01030601 53 N01030701 54 N01031001 55 N01031002 56 N01031003 57 N01031101 58 N01031102 59 N01040101
一般高铝砖 一般高铝砖 一般高铝砖 一般高铝砖 一般粘土砖 一般粘土砖 一般粘土砖 一般粘土砖 轻质高铝砖 轻质高铝砖 轻质高铝砖 轻质高铝砖 轻质粘土砖 轻质粘土砖 轻质粘土砖 轻质粘土砖 耐火保温砖 耐火保温砖 耐火保温砖 耐火保温砖 耐火保温砖 黏土耐火泥 高铝耐火泥 高铝耐火泥 镁质耐火泥 硅质耐火泥 高温耐火胶泥 高温密封胶泥
特级 一级 二级 三级 特级 一级 二级 三级 一级 二级 三级 四级 矾石 耐火砂 硅土保温砂 氧化铝含量≥70-85% 骨料 氧化铝含量≥70-85% 粉料 保温(绝热)浇注料 耐火浇注料 普通煤粉炉用 CFB锅炉用 钢玉占55% CFB锅炉用 碳化硅占55% HF高强浇注料 耐火度≥1730℃ 散装 微涨型 CFB锅炉用 钢玉占55% CFB锅炉用 碳化硅占55% 高温 中温 综合规格
NP-45(高温) NP-75(高温) NB-45 NB-60 矾土水泥 硅藻土、珍珠岩 棉、板 毡 各种规格 棉、板 毡 硅酸铝棉 硅酸铝嵌棉 硅酸铝板 硅酸铝管壳 硅酸铝复合毡 原棉 板 毡 管套 绳 针刺棉 泡沫石棉 泡沫石棉板 泡沫石棉块 泡沫石棉管壳 复合泡沫石棉 复合泡沫石棉瓦 防水泡沫石棉 普通矿渣棉 粒状矿渣棉
t
1000.000
t
1000.000
t
1000.000
t
1000.000
t
1000.000
m3
2100.000
t
1000.000
t
1000.000
t
1000.000
t
1000.000
t
1000.000
t
1000.000
t
1000.000
t
1000.000
60 N01040201 61 N01040202 62 N01040301 63 N01040302 64 N01040401 65 N01040402 66 N01050101 67 N01050102 68 N01050201 69 N01050501 70 N01050502 71 N01050601 72 N01050602 73 N01050603 74 N01050604 75 N01050605 76 N01050801 77 N01050802 78 N01050803 79 N01050804 80 N01050805 81 N01050806 82 N01051001 83 N01051002 84 N01051003 85 N01051004 86 N01051005 87 N01051006 88 N01051007 89 N01060101 90 N01060102
t
1000.000
t
1000.000
t
1000.000
t
1000.000
t
1000.000
t
1000.000
t
1000.000t Nhomakorabea1000.000
t
1000.000
t
1000.000
t
1000.000
t
1000.000
t
1000.000
t
1000.000
t
1000.000
t
1000.000
t
1000.000
矿渣棉制品 矿渣棉制品 矿渣棉制品 矿渣棉制品 矿渣棉制品 矿渣棉制品 酚醛矿渣棉制品(半硬质) 酚醛矿渣棉制品(半硬质) 酚醛矿渣棉制品(半硬质) 岩棉制品 岩棉制品 岩棉制品 岩棉制品 岩棉制品 岩棉制品 岩棉制品 岩棉制品 微孔硅酸钙制品 微孔硅酸钙制品 微孔硅酸钙制品 微孔硅酸钙制品 微孔硅酸钙制品 微孔硅酸钙制品 微孔硅酸钙制品 微孔硅酸钙制品 膨胀珍珠岩制品 水泥珍珠岩制品 水泥珍珠岩制品 水玻璃珍珠岩制品 水玻璃珍珠岩制品 水玻璃珍珠岩制品
m3
200.000
m3
200.000
m3
200.000
m3
200.000
m3
200.000
m3
200.000
m3
200.000
t
1000.000
m3
250.000
m3
450.000
m3
450.000
m3
250.000
m3
250.000
m3
250.000
122 N01100304 123 N01100305 124 N01100306 125 N01100401 126 N01100402 127 N01100501 128 N01100502 129 N01100503 130 N01100504 131 N01100601 132 N01110101 133 N01110102 134 N01110103 135 N01110104 136 N01110105 137 N01110106 138 N01110107 139 N01110108 140 N01110109 141 N01110110 142 N01110111 143 N01110112 144 N01110113 145 N01110114 146 N01110201 147 N01110202 148 N01110203 149 N01110204 150 N01110205 151 N01110301 152 N01110401
水玻璃珍珠岩制品 水玻璃珍珠岩制品 水玻璃珍珠岩制品 高硅氧棉制品 高硅氧棉制品 复合硅酸盐制品 复合硅酸盐制品 复合硅酸盐制品 复合硅酸盐制品 岩棉硅酸铝复合保温制品 玻璃棉及制品 玻璃棉及制品 玻璃棉及制品 玻璃棉及制品 玻璃棉及制品 玻璃棉及制品 玻璃棉及制品 玻璃棉及制品 玻璃棉及制品 玻璃棉及制品 玻璃棉及制品 玻璃棉及制品 玻璃棉及制品 玻璃棉及制品 中级玻璃棉保温制品 中级玻璃棉保温制品 中级玻璃棉保温制品 中级玻璃棉保温制品 中级玻璃棉保温制品 中碱玻璃丝布 无碱玻璃丝布