《石油化工建设工程项目交工技术文件规定》SHT3503-2017交工资料表格目录清单.doc
SH∕T 3503-2017 交工文件表单(1)
![SH∕T 3503-2017 交工文件表单(1)](https://img.taocdn.com/s3/m/3a7cc294ad51f01dc281f16d.png)
附录A(规范性附录)交工技术文件通用表 (7)附录B(规范性附录)交工技术文件土建工程用表 (54)附录C(规范性附录)交工技术文件设备安装工程用表 (68)附录D(规范性附录)交工技术文件管道安装工程用表 (140)附录E(规范性附录)交工技术文件电气安装工程用表 (164)附录F(规范性附录)交工技术文件仪表安装工程用表 (176)附录G(规范性附录)交工技术文件压力容器现场组焊安装工程用表 (188)附录H(规范性附录)交工技术文件起重机械安装工程用表 (202)AppendixA(NormativeAppendix)HandoverTechnicalDocumentation—General (217)AppendixB(NormativeAppendix)HandoverTechnicalDocumentation—Civil (264)AppendixC(NormativeAppendix)HandoverTechnicalDocumentation—EquipmentInstallation (278)AppendixD(NormativeAppendix)HandoverTechnicalDocumentation—PipingInstallation (351)AppendixE(NormativeAppendix)HandoverTechnicalDocumentation—ElectricalInstallation (376)AppendixF(NormativeAppendix)HandoverTechnicalDocumentation—InstrumentationInstallation (388)AppendixG(NormativeAppendix)HandoverTechnicalDocumentation—PressureVesselSiteAssemblyWeldingandInstallation (400)AppendixH(NormativeAppendix)HandoverTechnicalDocumentation—LiftingMachineryInstallation (414)ContentsAppendixA(NormativeAppendix)HandoverTechnicalDocumentation—General(Chinese) (7)AppendixB(NormativeAppendix)HandoverTechnicalDocumentation—Civil(Chinese) (54)AppendixC(NormativeAppendix)HandoverTechnicalDocumentation—EquipmentInstallation(Chinese) (68)AppendixD(NormativeAppendix)HandoverTechnicalDocumentation—PipingInstallation(Chinese) (140)AppendixE(NormativeAppendix)HandoverTechnicalDocumentation—ElectricalInstallation(Chinese) (164)AppendixF(NormativeAppendix)HandoverTechnicalDocumentation—InstrumentationInstallation (Chinese) (176)AppendixG(NormativeAppendix)HandoverTechnicalDocumentation—PressureVesselSiteAssembly WeldingandInstallation(Chinese) (188)AppendixH(NormativeAppendix)HandoverTechnicalDocumentation—LiftingMachineryInstallation (Chinese) (202)AppendixA(NormativeAppendix)HandoverTechnicalDocumentation—General(English) (217)AppendixB(NormativeAppendix)HandoverTechnicalDocumentation—Civil(English) (264)AppendixC(NormativeAppendix)HandoverTechnicalDocumentation—EquipmentInstallation (English) (278)AppendixD(NormativeAppendix)HandoverTechnicalDocumentation—PipingInstallation(English) (351)AppendixE(NormativeAppendix)HandoverTechnicalDocumentation—ElectricalInstallation(English) (376)AppendixF(NormativeAppendix)HandoverTechnicalDocumentation—InstrumentationInstallation (English) (388)AppendixG(NormativeAppendix)HandoverTechnicalDocumentation—PressureVesselSiteAssembly WeldingandInstallation(English) (400)AppendixH(NormativeAppendix)HandoverTechnicalDocumentation—LiftingMachineryInstallation(English) (414)附录A(规范性附录)交工技术文件通用表交工技术文件通用表(续)附录B(规范性附录)交工技术文件土建工程用表。
SH T 3503-2017 附录A 交工技术文件通用表
![SH T 3503-2017 附录A 交工技术文件通用表](https://img.taocdn.com/s3/m/596c9befaa00b52acfc7cace.png)
□不符合 □符合
每组垫铁高度
符合设计文件和规范要求 □不符合 □符合
斜垫铁搭接长度
符合规范要求
□不符合 □符合
垫铁间点焊固定
符合规范要求
□不符合 □符合
结论: 经检查,□不符合 □符合设计文件和规范要求,□不可以 □可以隐蔽。
建设/监理单位 专业工程师:
总承包单位 专业工程师:
施工单位
施工班组长: 质量检查员: 专业工程师:
15
SH/T3503-J106A 施工合同编号
工程中间交接证书
工程名称:
交接日期
年月日
工 程 内 容
附:施工尾项清单:份
接 收 意 见
使用单位负责(代表)人:
年 月日
质 量 监 督 意 见
工程质量监督站长/组长:(监督站/组章)
年月日
建设单位
设计单位
监理单位
施 工单位
(项目部章)
(项目部章)
(项目部章)
工程交工验收证书
工程名称:
年 月 日 交工日期
年月日
工程接收意见:
工程质量监督意见:
使用单位负责(代表)人:
年 月日
工程质量监督站长/组长:(监督站/组章)
建设单位
设计单位
(项目部章)
(项目部章)
项目经理:
项目经理:
年月日
监理单位 (项目部章)
施工单位 (项目部章)
项目总监:
项目经理:
日期: 年 月 日 日期: 年 月 日 日期: 年 月 日 日期: 年 月 日
(项目部章)
项目经理:
项目经理:
项目总监:
年月日
总承包单位 施工单位
(项目部章)
SH∕T 3503-2017 交工文件表单(1)
![SH∕T 3503-2017 交工文件表单(1)](https://img.taocdn.com/s3/m/c1a590fa0508763231121242.png)
附录A(规范性附录)交工技术文件通用表 (7)附录B(规范性附录)交工技术文件土建工程用表 (54)附录C(规范性附录)交工技术文件设备安装工程用表 (68)附录D(规范性附录)交工技术文件管道安装工程用表 (140)附录E(规范性附录)交工技术文件电气安装工程用表 (164)附录F(规范性附录)交工技术文件仪表安装工程用表 (176)附录G(规范性附录)交工技术文件压力容器现场组焊安装工程用表 (188)附录H(规范性附录)交工技术文件起重机械安装工程用表 (202)AppendixA(NormativeAppendix)HandoverTechnicalDocumentation—General (217)AppendixB(NormativeAppendix)HandoverTechnicalDocumentation—Civil (264)AppendixC(NormativeAppendix)HandoverTechnicalDocumentation—EquipmentInstallation (278)AppendixD(NormativeAppendix)HandoverTechnicalDocumentation—PipingInstallation (351)AppendixE(NormativeAppendix)HandoverTechnicalDocumentation—ElectricalInstallation (376)AppendixF(NormativeAppendix)HandoverTechnicalDocumentation—InstrumentationInstallation (388)AppendixG(NormativeAppendix)HandoverTechnicalDocumentation—PressureVesselSiteAssemblyWeldingandInstallation (400)AppendixH(NormativeAppendix)HandoverTechnicalDocumentation—LiftingMachineryInstallation (414)ContentsAppendixA(NormativeAppendix)HandoverTechnicalDocumentation—General(Chinese) (7)AppendixB(NormativeAppendix)HandoverTechnicalDocumentation—Civil(Chinese) (54)AppendixC(NormativeAppendix)HandoverTechnicalDocumentation—EquipmentInstallation(Chinese) (68)AppendixD(NormativeAppendix)HandoverTechnicalDocumentation—PipingInstallation(Chinese) (140)AppendixE(NormativeAppendix)HandoverTechnicalDocumentation—ElectricalInstallation(Chinese) (164)AppendixF(NormativeAppendix)HandoverTechnicalDocumentation—InstrumentationInstallation (Chinese) (176)AppendixG(NormativeAppendix)HandoverTechnicalDocumentation—PressureVesselSiteAssembly WeldingandInstallation(Chinese) (188)AppendixH(NormativeAppendix)HandoverTechnicalDocumentation—LiftingMachineryInstallation (Chinese) (202)AppendixA(NormativeAppendix)HandoverTechnicalDocumentation—General(English) (217)AppendixB(NormativeAppendix)HandoverTechnicalDocumentation—Civil(English) (264)AppendixC(NormativeAppendix)HandoverTechnicalDocumentation—EquipmentInstallation (English) (278)AppendixD(NormativeAppendix)HandoverTechnicalDocumentation—PipingInstallation(English) (351)AppendixE(NormativeAppendix)HandoverTechnicalDocumentation—ElectricalInstallation(English) (376)AppendixF(NormativeAppendix)HandoverTechnicalDocumentation—InstrumentationInstallation (English) (388)AppendixG(NormativeAppendix)HandoverTechnicalDocumentation—PressureVesselSiteAssembly WeldingandInstallation(English) (400)AppendixH(NormativeAppendix)HandoverTechnicalDocumentation—LiftingMachineryInstallation(English) (414)附录A(规范性附录)交工技术文件通用表附录B(规范性附录)交工技术文件土建工程用表。
(完整版)SH∕T3503-2017交工文件表格(1)
![(完整版)SH∕T3503-2017交工文件表格(1)](https://img.taocdn.com/s3/m/b8f1e540de80d4d8d15a4fe6.png)
目次附录A(规范性附录)交工技术文件通用表 (7)附录B(规范性附录)交工技术文件土建工程用表 (54)附录C(规范性附录)交工技术文件设备安装工程用表 (68)附录D(规范性附录)交工技术文件管道安装工程用表 (140)附录E(规范性附录)交工技术文件电气安装工程用表 (164)附录F(规范性附录)交工技术文件仪表安装工程用表 (176)附录G(规范性附录)交工技术文件压力容器现场组焊安装工程用表 (188)附录H(规范性附录)交工技术文件起重机械安装工程用表 (202)Appendix A(Normative Appendix)Handover Technical Documentation—General (217)Appendix B(Normative Appendix)Handover Technical Documentation—Civil (264)Appendix C(Normative Appendix)Handover Technical Documentation—Equipment Installation (278)Appendix D(Normative Appendix)Handover Technical Documentation—Piping Installation (351)Appendix E(Normative Appendix)Handover Technical Documentation—Electrical Installation (376)Appendix F(Normative Appendix)Handover Technical Documentation—Instrumentation Installation 388 Appendix G(Normative Appendix)Handover Technical Documentation—Pressure Vessel Site Assembly Welding and Installation (400)Appendix H(Normative Appendix)Handover Technical Documentation—Lifting Machinery Installation (414)IContentsAppendix A(Normative Appendix)Handover Technical Documentation—General (Chinese) (7)Appendix B(Normative Appendix)Handover Technical Documentation—Civil (Chinese) (54)Appendix C(Normative Appendix)Handover Technical Documentation—Equipment Installation (Chinese) (68)Appendix D(Normative Appendix)Handover Technical Documentation—Piping Installation (Chinese) .. 140 Appendix E(Normative Appendix)Handover Technical Documentation—Electrical Installation (Chinese) (164)Appendix F(Normative Appendix)Handover Technical Documentation—Instrumentation Installation (Chinese) (176)Appendix G(Normative Appendix)Handover Technical Documentation—Pressure Vessel Site Assembly Welding and Installation (Chinese) (188)Appendix H(Normative Appendix)Handover Technical Documentation—Lifting Machinery Installation (Chinese) (202)Appendix A(Normative Appendix)Handover Technical Documentation—General (English) (217)Appendix B(Normative Appendix)Handover Technical Documentation—Civil (English) (264)Appendix C(Normative Appendix)Handover Technical Documentation—Equipment Installation (English) (278)Appendix D(Normative Appendix)Handover Technical Documentation—Piping Installation (English) (351)Appendix E(Normative Appendix)Handover Technical Documentation—Electrical Installation (English) (376)Appendix F(Normative Appendix)Handover Technical Documentation—Instrumentation Installation (English) (388)Appendix G(Normative Appendix)Handover Technical Documentation—Pressure Vessel Site Assembly Welding and Installation (English) (400)Appendix H(Normative Appendix)Handover Technical Documentation—Lifting Machinery Installation (English) (414)II附录A(规范性附录)交工技术文件通用表7交工技术文件通用表(续)891011121314附录B(规范性附录)交工技术文件土建工程用表。
《石油化工建设工程项目交工技术文件规定》SHT3503-2017交工资料表格目录清单.doc
![《石油化工建设工程项目交工技术文件规定》SHT3503-2017交工资料表格目录清单.doc](https://img.taocdn.com/s3/m/27efbffec1c708a1284a44b6.png)
《石油化工建设工程项目交工技术文件规定》SH T3503-2017 交工资料表格目录清单.doc2007 版 SH/T3503石油化工建设工程项目交工建设文件汇总表格目录《第一册》一、交工技术文件通用表 ( 共 45 张 )(3503-J101A~J131-2)1、 J101A ——封面2、 J101B ——封面3、 J101C——封面4、 J101D——封面5、 J102 ——交工技术文件总目录6、 J103 ——交工技术文件目录7、 J104 ——交工技术文件说明8、 J105B ——开工报告9、 J106A ——工程中间交接证书10、 J106B ——工程中间交接证书11、 J107A ——工程交工证书12、 J107B ——工程交工证书13、 J108A ——交工技术文件移交证书14、 J108B ——交工技术文件移交证书15、 J109 ——重大质量事故处理报告16、 J110 ——工程变更一览表17、 J111 ——隐蔽工程记录18、 J112 ——工程联络单19、 J113 ——合格焊工登记表20、 J114 ——无损检测人员登记表121、 J115A ——开箱检验记录 ( 一) 22 、 J115B ——开箱检验记录 ( 二 ) 23 、J116——防腐工程质量验收记录 24 、 J117 ——隔热工程质量验收记录25 、J118——接地电阻测量记录26、 J119 ——安全阀调整试验记录27 、 J120 ——安全附件安装检验记录28、 J121 ——射线检测结果确认表29 、 J122-1 ——射线检测报告 ( 一) 30 、J122-2 ——射线检测报告 ( 二 ) 31 、 J123-1 ——焊缝超声检测报告 ( 一) 32 、J123-2 ——焊缝超声检测报告 ( 二) 33 、 J124-1 ——材料超声检测报告 ( 一) 34 、J124-2 ——材料超声检测报告 ( 一) 35 、 J125-1 ——超声测厚报告 ( 一) 36 、J125-2 ——超声测厚报告 ( 一 ) 37 、 J126-1 ——磁粉检测报告 ( 一 ) 38 、 J126-2 ——磁粉检测报告 ( 二) 39 、 J127-1 ——渗透检测报告 ( 一) 40 、 J127-2 ——渗透检测报告 ( 二) 41 、 J128 ——金属材料化学成分分析检验报告 42 、 J129 ——硬度检验报告43、 J130 ——垫铁隐蔽记录44、 J131-1 ——设备 / 材料质量证明文件一览表( 一)45、 J132-2 ——设备 / 材料质量证明文件一览表( 一)2《第二册》二、交工技术文件土建工程用表( 共 11 张)(3503-J201~J210)1、 J201 ——地基验槽 ( 土方 ) 记录2、 J202 ——地基处理记录3、 J203 ——工程定位测量记录4、 J204 ——设备基础复测记录5、 J205 ——快体式设备基础允许偏差项目复测记录6、 J206 ——整体框架式设备基础允许偏差项目复测记录7、 J207-1 ——储罐基础允许偏差项目复测记录( 一)8、 J207-2 ——储罐基础允许偏差项目复测记录( 二)9、 J208 ——球形储罐基础允许偏差项目复测记录10、 J209 ——基础沉降观测记录11、 J210 ——水池盖水试验记录3《第三册》二、交工技术文件设备安装工程用表( 共 40 张)(3503-J301~J336)1、 J301 ——机器安装检验记录2、 J302 ——轴对中记录3、 J303 ——机组轴对中记录4、 J304 ——空冷式换热器风机安装检验记录 5 、 J305 ——机器组装质量确认记录 6 、 J306 ——机器单机试车记录7、 J307 ——机组试车条件确认记录 8 、 J308-1 ——往复式压缩机试车记录 ( 一) 9 、 J308-2 ——往复式压缩机试车记录 ( 二) 10 、 J309-1 ——离心式压缩机试车记录( 一 ) 11 、 J309-2 ——离心式压缩机试车记录 ( 二 ) 12 、 J309-3 ——离心式压缩机试车记录 ( 三 ) 13 、 J310-1 ——气轮机 / 燃气轮机试车记录 ( 一) 14 、J310-2 ——气轮机 / 燃气轮机试车记录 ( 二) 15 、 J311 ——电动机试车记录16、 J312 ——变速器试车记录17、 J313 ——釜类设备安装检验记录18 、 J314 ——立式设备安装检验记录19、 J315 ——卧式设备安装检验记录420、 J316 ——塔式安装检验记录21、 J317 ——设备填充检验记录22、 J318 ——催化反应 / 沉降器附件安装检验记录23 、 J319 ——催化再生器附件安装检验记录24 、 J320 ——立式圆通形储罐组装质量检验记录25 、 J321 ——立式圆筒形储罐试验记录26 、J322 ——湿式气柜组装质量检验记录27 、J323——湿式气柜检验记录28、J324 ——干式气柜组装质量检验记录29 、J325 ——干式气柜试验记录30、J326 ——火炬塔架和管筒安装检验记录31 、J327 ——隔热耐磨衬里质量检验记录 32 、 J328 ——换热设备耐压和严密性试验记录33 、 J329 ——设备耐压 / 严密性试验记录34 、 J330 ——常压设备热处理报告35、 J331 ——管式炉炉体钢结构安装检验记录36 、 J332 ——炉管通球试验记录37、 J333 ——管式炉附件安装质量检验记录 38 、 J334 ——耐火砖砌筑炉衬质量检验记录 39 、 J335 ——耐火浇筑料炉衬质量检验记录 40 、 J336 ——耐火纤维模块炉衬质量检验记录5《第四册》三、交工技术文件管道安装工程用表( 共 16 张)(3503-J401~J413) 1、J401——管道组成件验证性和系统性检验记录 2 、 J402 ——阀门试验确认表3、 J403 ——弹簧支 / 吊架安装检验记录4、 J404 ——滑动 / 固定管托安装检验记录5、J405 ——管道补偿器安装检验记录6、J406-1——管道系统耐压试验条件确认与试验记录(一)7、J406-2——管道系统耐压试验条件确认与试验记录( 二 ) 8 、 J407 ——管道系统泄漏性 / 真空试验条件确认与试验记录9 、 J408 ——管道吹扫 / 清洗检验记录10、 J409 ——给排水压力管道耐压试验条件确认与试验记录11 、 J410 ——给排水无压力管道闭水试验条件确认与试验记录12、J411-1——管道焊接接头热处理报告(一) 13、J411-2——管道焊接接头热处理报告(二)14、J412-1——管道焊接接头射线检测比例确认表(一)15、J412-2 ——管道焊接接头射线检测比例确认表(二) 16、 J413 ——管道静电接地测试记录6《第五册》五、交工技术文件电气安装工程用表( 共 8 张)(3503-J501~J508)1、J501——电气设备试验项目确认表2、J502——交流电动机安装检验与空载运行记录3、J503——变压器安装检验记录4、J504——高 / 压开关柜安装检验记录5、J505——保护 / 控制盘 ( 屏 ) 安装检验记录6、J506——直流系统 / 不间断电源 (UPS)安装检验记录7、J507——电缆铺设与绝缘检测记录8、J508——火灾自动报警系统安装检验记录7《第六册》六、交工技术文件仪表安装工程用表( 共 9 张)(3503-J601~J609)1、J601—— DCS机柜 / 仪表盘 / 操作台安装检验记录2、J602——综合控制系统基本功能检测记录3、J603——报警 / 联锁系统与可编程序控制系统调试记录4、J604—— DCS/SIS送电条件确认表5、J605——仪表设备校验项目确认表6、J606——联校试验条件确认表7、J607——联校调试记录8、J608——仪表管道耐压 / 严密性试验记录9、J608——仪表管道泄漏性 / 真空度试验条件确认与试验记录8。
SH T 3503-2017 附录A 交工技术文件资料通用表
![SH T 3503-2017 附录A 交工技术文件资料通用表](https://img.taocdn.com/s3/m/d563b5ae6137ee06eff918d1.png)
(项目部章)
项目经理:
日期:年月日
(项目部章)
项目总监:
日期:年月日
(项目部章)
项目经理:
日期:年月日
SH/T3503-J105B
工程施工开工报告
工程名称:
合同号
设计单位
计划开工日期
年月日
计划竣工日期
年月日
工
程
内
容
开
工
条
件
审
查
意
见
质
量
监
督
意
见
工程质量监督站长/组长:(监督站/组章)年月日
建设单位
项目经理:项目总监:项目经理:项目经理:
年月日年月日年月日年月日
SH/T3503-J102
交工技术文件总目录
工程名称:
序号
卷号
卷名
页数
编制人:
日期:年月日
审核人:
日期:年月日
SH/T3503-J103
交工技术文件目录
工程名称:
单位工程名称:
序号
文件编号
文件名称
页数
编制人:
日期:年月日
审核人:
日期:年月日
SH/T3503-J112
隐蔽工程验收记录
工程名称:
单位工程名称:
隐蔽项目
施工图号
隐
蔽
内
容
及
简
图
检
查
结
果
建设/监理单位
总承包单位
施工单位
专业工程师:
日期:年月日
专业工程师:
日期:年月日
施工班组长:
质量检查员:
专业工程师:
日期:年月日
SHT 3503-2017 交工文件表格
![SHT 3503-2017 交工文件表格](https://img.taocdn.com/s3/m/b5226089ff00bed5b8f31d89.png)
SH/T 3503—J101A
封 面
卷号:
石油化工建设工程项目交工技术文件
工程名称:
卷 名:
建设单位 监理单位 施工单位
(项目部章) (项目部章) (项目部章)
项目经理: 项目总监: 项目经理:
年 月 日 年 月 日 年 月 日
SH/T 3503—J101B
封 面
卷号:
石油化工建设工程项目交工技术文件
设计单位
计划开工日期
年月日
计划交工日期
年月日
工
程
内
容
开
工
条
件
审
查
意
见
质
量
监
督
意
见
工程质量监督站长/组长:(监督站/组章)年月日
建设单位
监理单位
施工单位
(项目部章)
项目经理:
日期:年月日
(项目部章)
项目总监:
日期:年月日
(项目部章)
项目经理:
日期:年月日
SH/T 3503—J105B
工程施工开工报告
工程名称:四川盛马化工股份有限公司装置防腐项目
SH/T 3503—J107B
19
A.12
交工技术文件移交证书
SH/T 3503—J108A
20
A.13
交工技术文件移交证书
SH/T 3503—J108B
21
A.14
重大质量事故处理报告
SH/T 3503—J109
22
A.15
工程设计变更一览表
SH/T 3503—J110
23
A.16
工程联络单一览表
垫 铁 隐 蔽 记 录
SH T 3503-2017 附录A 交工技术文件通用表
![SH T 3503-2017 附录A 交工技术文件通用表](https://img.taocdn.com/s3/m/5f80faf351e79b8969022665.png)
录
序号 A.1 A.2 A.3 A.4 A.5 A.6 A.7 A.8 A.9 A.10 A.11 A.12 A.13 A.14 A.15 A.16 A.17 A18 A19 A.20 A.21 A.22 A.23 A.24 A25 A26 A.27 A.28 A.29 序号 A.30 A.31 A.32
施工合同编 号
交接日期
年月日
工
程 附:施工尾项清单:份
内
容
接
收 使用单位负责(代表)人:年月日
意
见
质
量
监 工程质量监督站长/组长:(监督站/组章)年月日
督
意
见
建设单位 (项目部章) 项目经理:
年月日
设计单位 (项目部章) 项目经理: 年月日
监理单位
总承包单位 施工单位
(项目部章) (项目部章) (项目部章)
SH/T3503-J107B
设计单位 (项目部章) 项目经理: 日期:年月日
监理单位 (项目部章) 项目总监: 日期:年月日
施工单位 (项目部章) 项目经理: 日期:年月日
工程交工验收证书
工程名称:
施工合同编号 实际开工日期
年月日 交工日期
年月日
工程内容:
工程验收意见:
使用单位负责(代表)人:年月日
量
监 工程质量监督站长/组长:(监督站/组章)年月日
督
意
见
建设单位 (项目部章) 项目经理:
日期:年月日
设计单位 (项目部章) 项目经理: 日期:年月日
监理单位 (项目部章) 项目总监: 日期:年月日
施工单位 (项目部章) 项目经理: 日期:年月日
SH/T3503-J106B
SH∕T 3503-2017 交工文件表格(1)
![SH∕T 3503-2017 交工文件表格(1)](https://img.taocdn.com/s3/m/ddda1f7859eef8c75ebfb318.png)
目次附录A(规范性附录)交工技术文件通用表 (7)附录B(规范性附录)交工技术文件土建工程用表 (54)附录C(规范性附录)交工技术文件设备安装工程用表 (68)附录D(规范性附录)交工技术文件管道安装工程用表 (140)附录E(规范性附录)交工技术文件电气安装工程用表 (164)附录F(规范性附录)交工技术文件仪表安装工程用表 (176)附录G(规范性附录)交工技术文件压力容器现场组焊安装工程用表 (188)附录H(规范性附录)交工技术文件起重机械安装工程用表 (202)Appendix A(Normative Appendix)Handover Technical Documentation—General (217)Appendix B(Normative Appendix)Handover Technical Documentation—Civil (264)Appendix C(Normative Appendix)Handover Technical Documentation—Equipment Installation (278)Appendix D(Normative Appendix)Handover Technical Documentation—Piping Installation (351)Appendix E(Normative Appendix)Handover Technical Documentation—Electrical Installation (376)Appendix F(Normative Appendix)Handover Technical Documentation—Instrumentation Installation 388 Appendix G(Normative Appendix)Handover Technical Documentation—Pressure Vessel Site Assembly Welding and Installation (400)Appendix H(Normative Appendix)Handover Technical Documentation—Lifting Machinery Installation (414)ContentsAppendix A(Normative Appendix)Handover Technical Documentation—General (Chinese) (7)Appendix B(Normative Appendix)Handover Technical Documentation—Civil (Chinese) (54)Appendix C(Normative Appendix)Handover Technical Documentation—Equipment Installation (Chinese) (68)Appendix D(Normative Appendix)Handover Technical Documentation—Piping Installation (Chinese) .. 140 Appendix E(Normative Appendix)Handover Technical Documentation—Electrical Installation (Chinese) (164)Appendix F(Normative Appendix)Handover Technical Documentation—Instrumentation Installation (Chinese) (176)Appendix G(Normative Appendix)Handover Technical Documentation—Pressure Vessel Site Assembly Welding and Installation (Chinese) (188)Appendix H(Normative Appendix)Handover Technical Documentation—Lifting Machinery Installation (Chinese) (202)Appendix A(Normative Appendix)Handover Technical Documentation—General (English) (217)Appendix B(Normative Appendix)Handover Technical Documentation—Civil (English) (264)Appendix C(Normative Appendix)Handover Technical Documentation—Equipment Installation (English) (278)Appendix D(Normative Appendix)Handover Technical Documentation—Piping Installation (English) (351)Appendix E(Normative Appendix)Handover Technical Documentation—Electrical Installation (English) (376)Appendix F(Normative Appendix)Handover Technical Documentation—Instrumentation Installation (English) (388)Appendix G(Normative Appendix)Handover Technical Documentation—Pressure Vessel Site Assembly Welding and Installation (English) (400)Appendix H(Normative Appendix)Handover Technical Documentation—Lifting Machinery Installation (English) (414)附录A(规范性附录)交工技术文件通用表附录B(规范性附录)交工技术文件土建工程用表。
SH3503-2017交工技术文件全资料通用表格
![SH3503-2017交工技术文件全资料通用表格](https://img.taocdn.com/s3/m/da69e23b02d8ce2f0066f5335a8102d277a26148.png)
SH3503-2017交工技术文件全资料通用表格文章中存在格式错误和重复内容,需要进行删除和修改。
SH/T 3503-J101A封面石油化工建设工程项目交工技术文件工程名称:建设单位监理单位承包单位项目部章)(项目部章)(项目部章)SH/T 3503-J101B封面石油化工建设工程项目交工技术文件工程名称:建设单位监理单位总承包单位承包单位项目部章)(项目部章)(项目部章)(项目部章)SH/T 3503-J102交工技术文件总目录序号编制人卷号资料名称审核人页数日期:年月日日期:年月日工程名称:SH/T 3503-J103交工技术文件目录单元工程名称:序号文件编号资料名称页次编制人审核人日期:年月日日期:年月日工程名称:SH/T 3503-J104交工技术文件说明编制人:日期:年月日审核人:日期:年月日工程名称:SH/T 3503-J105A工程施工开工报告施工合同编号计划开工日期工程容开工设计单位年月日计划交工日期年月日条件审查意见质量监督意见工程质量监督站站长/组长:(监督站/组章)日期:年月日建设单位(项目部章)项目经理:日期:年月日工程名称:SH/T 3503-J105B监理单位(项目部章)项目总监:日期:年月日施工单位(项目部章)项目经理:日期:年月日工程施工开工报告施工合同编号计划开工日期设计单位年月日计划交工日期年月日工程容开工条件审查意见质量监督意见工程质量监督站站长/组长:(监督站/组章)日期:年月日建设单位监理单位总承包单位施工单位(项目部章)项目经理:日期:年月日SH/T 3503-J106A工程中间交接证书施工合同编号交接日期年月日工程容验收意见使用单位负责(代表)人:年月日质量监督意见工程质量监督站站长/组长:(监督站/组章)日期:年月日建设单位(项目部章)项目经理:年月日设计单位(项目部章)项目总监:年月日监理单位(项目部章)项目经理:年月日施工单位项目经理:工程名称:SH/T 3503-J106B工程中间交接证书施工合同编号:交接日期:年月日容验收意见:使用单位负责(代表)人:年月日质量监督意见:工程质量监督站站长/组长:(监督站/组章)日期:年月日建设单位:项目经理:年月日设计单位:项目总监:年月日监理单位:项目总监:总承包单位:项目经理:年月日工程名称:SH/T 3503-J107A 施工单位:项目经理:工程交工证书施工合同编号:实际开工日期:年月日交工日期:年月日工程容:工程接收意见:使用单位负责(代表)人:年月日工程质量监督意见:工程质量监督站站长/组长:(监督站/组章)日期:年月建设单位:项目经理:设计单位:项目经理:监理单位:项目总监:日期:年月日施工单位:项目经理:日期:年月日工程名称:SH/T 3503-J107B 工程交工证书施工合同编号:实际开工日期:工程容:交工日期:年月日工程接收意见:使用单位负责(代表)人:年月日工程质量监督意见:建设单位:设计单位:监理单位:总承包单位:施工单位:项目经理:年月日工程名称:SH/T 3503-J108A交工技术文件移交证书合同编号:按《石油化工建设工程项目交工技术文件规定》(SH/T3503-2017)向办理工程建设交工技术文件移交手续,共计文字资料卷,竣工图卷,电子文件盘。
SH3503-2017交工技术文件全资料通用表格
![SH3503-2017交工技术文件全资料通用表格](https://img.taocdn.com/s3/m/6720d4cddd88d0d232d46a20.png)
年月
监理单位
施工单位
(项目部章)
(项目部章)
项目总监:
项目经理:
日期: 年 月 日 日期: 年 月 日 日期: 年 月 日 日期: 年 月 日
SH/T 3503-J107B
施工合同编号 实际开工日期 工程容:
工程交工证书
工程名称:
年 月 日 交工日期
年月日
工程接收意见:
工程质量监督意见:
使用单位负责(代表)人:
SH/T 3503-J101A
封面
案卷号:
石油化工建设工程项目交工技术文件
工程名称: 卷 名:
建设单位
(项目部章)
项目经理:
监理单位
(项目部章)
承包单位
(项目部章)
项目总监:
项目经理:
SH/T 3503-J101B
封面
案卷号:
石油化工建设工程项目交工技术文件
工程名称: 卷 名:
建设单位
(项目部章)
程
设计单位 年 月 日 计划交工日期
年月日
容 开 工 条 件
审 查 意 见
质 量 监 督 意 见
工程质量监督站站长/组长:
(监督站/组章) 日期: 年 月 日
建设单位
监理单位
施工单位
(项目部章) 项目经理:
(项目部章) 项目总监:
(项目部章) 项目经理:
日期: 年 月 日
日期: 年 月 日
SH/T 3503-J105B
交工技术文件目录
工程名称: 单元工程名称:
资料名称
页次
编制人: 日 期:
SH/T 3503-J104
审核人: 年 月 日 日 期:
交工技术文件说明
SHT3503-2017 交工文件表格全册
![SHT3503-2017 交工文件表格全册](https://img.taocdn.com/s3/m/37d40526d15abe23492f4d56.png)
SH/T 3503—2017目次附录A(规范性附录)交工技术文件通用表 (7)附录B(规范性附录)交工技术文件土建工程用表 (54)附录C(规范性附录)交工技术文件设备安装工程用表 (68)附录D(规范性附录)交工技术文件管道安装工程用表 (140)附录E(规范性附录)交工技术文件电气安装工程用表 (164)附录F(规范性附录)交工技术文件仪表安装工程用表 (176)附录G(规范性附录)交工技术文件压力容器现场组焊安装工程用表 (188)附录H(规范性附录)交工技术文件起重机械安装工程用表 (202)Appendix A(Normative Appendix)Handover Technical Documentation—General (217)Appendix B(Normative Appendix)Handover Technical Documentation—Civil (264)Appendix C(Normative Appendix)Handover Technical Documentation—Equipment Installation (278)Appendix D(Normative Appendix)Handover Technical Documentation—Piping Installation (351)Appendix E(Normative Appendix)Handover Technical Documentation—Electrical Installation (376)Appendix F(Normative Appendix)Handover Technical Documentation—Instrumentation Installation (388)Appendix G(Normative Appendix)Handover Technical Documentation—Pressure Vessel SiteAssembly Welding and Installation (400)Appendix H(Normative Appendix)Handover Technical Documentation—Lifting Machinery Installation · 414IContentsAppendix A(Normative Appendix)Handover Technical Documentation-General (Chinese) (7)Appendix B(Normative Appendix)Handover Technical Documentation—Civil(Chinese) (54)Appendix C(Normative Appendix)Handover Technical Documentation-Equipment Installation(Chinese) (68)Appendix D(Normative Appendix)Handover Technical Documentation-Piping Installation(Chinese) (140)Appendix E(Normative Appendix)Handover Technical Documentation—Electrical Installation (Chinese) (164)Appendix F(Normative Appendix)Handover Technical Documentation—Instrumentation Installation (Chinese) (176)Appendix G(Normative Appendix)Handover Technical Documentation—Pressure Vessel Site Assembly Welding and Installation(Chinese) (188)Appendix H(Normative Appendix)Handover Technical Documentation—Lifting Machinery Installation (Chinese) (202)Appendix A(Normative Appendix)Handover Technical Documentation—General (English) (217)Appendix B(Normative Appendix)Handover Technical Documentation-Civil(English) (264)Appendix C(Normative Appendix)Handover Technical Documentation—Equipment Installation (English) (278)Appendix D(Normative Appendix)Handover Technical Documentation—Piping Installation(English) (351)Appendix E(Normative Appendix)Handover Technical Documentation—Electrical Installation (English) (376)Appendix F(Normative Appendix)Handover Technical Documentation—Instrumentation Installation (English) (388)Appendix G(Normative Appendix)Handover Technical Documentation—Pressure Vessel Site Assembly Welding and Installation(English) (400)Appendix H(Normative Appendix)Handover Technical Documentation—Lifting MachineryInstallation(English) (414)IISH/T 3503—2017 附录A(规范性附录)交工技术文件通用表交工技术文件通用表(续)78SH/T 3503—2017910SH/T 3503—20171112SH/T 3503—20171314SH/T 3503—2017SH/T 3503—2017SH/T 3503—2017SH/T 3503—2017SH/T 3503—2017SH/T 3503—2017SH/T 3503—2017SH/T 3503—2017SH/T 3503—2017SH/T 3503—2017SH/T 3503—2017SH/T 3503—2017SH/T 3503—2017SH/T 3503—2017SH/T 3503—2017SH/T 3503—2017SH/T 3503—2017SH/T 3503—2017SH/T 3503—2017SH/T 3503—2017附录B(规范性附录)交工技术文件土建工程用表。
SH∕T 3503-2017 交工文件表格(1)
![SH∕T 3503-2017 交工文件表格(1)](https://img.taocdn.com/s3/m/b702a00004a1b0717ed5dde8.png)
目次附录A(规范性附录)交工技术文件通用表 (7)附录B(规范性附录)交工技术文件土建工程用表 (54)附录C(规范性附录)交工技术文件设备安装工程用表 (68)附录D(规范性附录)交工技术文件管道安装工程用表 (140)附录E(规范性附录)交工技术文件电气安装工程用表 (164)附录F(规范性附录)交工技术文件仪表安装工程用表 (176)附录G(规范性附录)交工技术文件压力容器现场组焊安装工程用表 (188)附录H(规范性附录)交工技术文件起重机械安装工程用表 (202)Appendix A(Normative Appendix)Handover Technical Documentation—General (217)Appendix B(Normative Appendix)Handover Technical Documentation—Civil (264)Appendix C(Normative Appendix)Handover Technical Documentation—Equipment Installation (278)Appendix D(Normative Appendix)Handover Technical Documentation—Piping Installation (351)Appendix E(Normative Appendix)Handover Technical Documentation—Electrical Installation (376)Appendix F(Normative Appendix)Handover Technical Documentation-Instrumentation Installation (388)Appendix G(Normative Appendix)Handover Technical Documentation-Pressure Vessel SiteAssembly Welding and Installation (400)Appendix H(Normative Appendix)Handover Technical Documentation—Lifting Machinery Installation (414)IContentsAppendix A(Normative Appendix)Handover Technical Documentation—General (Chinese) (7)Appendix B(Normative Appendix)Handover Technical Documentation—Civil(Chinese) (54)Appendix C(Normative Appendix)Handover Technical Documentation—Equipment Installation (Chinese) (68)Appendix D(Normative Appendix)Handover Technical Documentation-Piping Installation(Chinese) (140)Appendix E(Normative Appendix)Handover Technical Documentation-Electrical Installation (Chinese) (164)Appendix F(Normative Appendix)Handover Technical Documentation—Instrumentation Installation (Chinese) (176)Appendix G(Normative Appendix)Handover Technical Documentation-Pressure Vessel Site Assembly Welding and Installation(Chinese) (188)Appendix H(Normative Appendix)Handover Technical Documentation-Lifting Machinery Installation (Chinese) (202)Appendix A(Normative Appendix)Handover Technical Documentation—General (English) (217)Appendix B(Normative Appendix)Handover Technical Documentation—Civil(English) (264)Appendix C(Normative Appendix)Handover Technical Documentation—Equipment Installation(English) (278)Appendix D(Normative Appendix)Handover Technical Documentation—Piping Installation(English) .. 351 Appendix E(Normative Appendix)Handover Technical Documentation—Electrical Installation (English) (376)Appendix F(Normative Appendix)Handover Technical Documentation-Instrumentation Installation (English) (388)Appendix G(Normative Appendix)Handover Technical Documentation—Pressure Vessel Site Assembly Welding and Installation(English) (400)Appendix H(Normative Appendix)Handover Technical Documentation—Lifting MachineryInstallation(English) (414)II附录A(规范性附录)交工技术文件通用表交工技术文件通用表(续)7891011121314附录B(规范性附录)交工技术文件土建工程用表。
SH3503-2017交工技术文件资料通用表
![SH3503-2017交工技术文件资料通用表](https://img.taocdn.com/s3/m/a2309b6428ea81c759f57860.png)
工程名称:
施工合同编号
交接日期
年月日
工 程 容
附:施工尾项清单 份
验 收 意 见
使用单位负责(代表)人:
年月日
标准
实用文档
质 量 监 督 意 见
工程质量监督站站长/组长:
(监督站/组章) 日期: 年 月 日
建设单位 (项目部章)
项目经理:
设计单位 (项目部章) 项目总监:
监理单位 (项目部章)
项目经理:
施工单位 (项目部章)
项目经理:
年月日 SH/T 3503-J106B
年月日
年月日
年月日
工程中间交接证书
工程名称:
施工合同编号
交接收 意 见
使用单位负责(代表)人:
年月日
标准
实用文档
质 量 监 督 意 见
工程质量监督站站长/组长:
(监督站/组章) 日期: 年 月 日
实用文档
SH/T 3503-J101A
封面
案卷号:
标准
实用文档
石油化工建设工程项目交工技术文件
工程名称: 卷 名:
建设单位
(项目部章)
项目经理: 年月日
监理单位
(项目部章)
承包单位
(项目部章)
项目总监: 年月日
项目经理: 年月日
标准
实用文档
SH/T 3503-J101B
封面
案卷号:
标准
实用文档
标准
实用文档
SH/T 3503-J109
重大质量事故处理
报
告
工程名称:
事 故 经 过 说 明
责任单位代表:
责任单位(公章) 年 月 日
事
《石油化工建设工程项目交工技术文件规定》SH T3503-2017交工资料表格目录清单.doc
![《石油化工建设工程项目交工技术文件规定》SH T3503-2017交工资料表格目录清单.doc](https://img.taocdn.com/s3/m/57f56f5531b765ce04081415.png)
《石油化工建设工程项目交工技术文件规定》SH T3503-2017交工资料表格目录清单.doc2007版SH/T3503石油化工建设工程项目交工建设文件汇总表格目录《第一册》一、交工技术文件通用表(共45张)(3503-J101A~J131-2)1、 J101A——封面2、 J101B——封面3、 J101C——封面4、 J101D——封面5、 J102——交工技术文件总目录6、 J103——交工技术文件目录7、 J104——交工技术文件说明8、 J105B——开工报告9、 J106A——工程中间交接证书10、 J106B——工程中间交接证书11、 J107A——工程交工证书12、 J107B——工程交工证书13、 J108A——交工技术文件移交证书14、 J108B——交工技术文件移交证书15、 J109——重大质量事故处理报告16、 J110——工程变更一览表17、 J111——隐蔽工程记录18、 J112——工程联络单19、 J113——合格焊工登记表20、 J114——无损检测人员登记表121、 J115A——开箱检验记录(一) 22、 J115B——开箱检验记录(二) 23、J116——防腐工程质量验收记录 24、 J117——隔热工程质量验收记录 25、J118——接地电阻测量记录26、 J119——安全阀调整试验记录 27、 J120——安全附件安装检验记录28、 J121——射线检测结果确认表 29、 J122-1——射线检测报告(一) 30、J122-2——射线检测报告(二) 31、 J123-1——焊缝超声检测报告(一) 32、J123-2——焊缝超声检测报告(二) 33、 J124-1——材料超声检测报告(一) 34、J124-2——材料超声检测报告(一) 35、 J125-1——超声测厚报告(一) 36、J125-2——超声测厚报告(一) 37、 J126-1——磁粉检测报告(一) 38、 J126-2——磁粉检测报告(二) 39、 J127-1——渗透检测报告(一) 40、 J127-2——渗透检测报告(二) 41、 J128——金属材料化学成分分析检验报告 42、 J129——硬度检验报告43、 J130——垫铁隐蔽记录44、 J131-1——设备/材料质量证明文件一览表(一)45、 J132-2——设备/材料质量证明文件一览表(一)2《第二册》二、交工技术文件土建工程用表(共11张)(3503-J201~J210)1、 J201——地基验槽(土方)记录2、 J202——地基处理记录3、 J203——工程定位测量记录4、 J204——设备基础复测记录5、 J205——快体式设备基础允许偏差项目复测记录6、 J206——整体框架式设备基础允许偏差项目复测记录7、 J207-1——储罐基础允许偏差项目复测记录(一)8、 J207-2——储罐基础允许偏差项目复测记录(二)9、 J208——球形储罐基础允许偏差项目复测记录10、 J209——基础沉降观测记录11、 J210——水池盖水试验记录3《第三册》二、交工技术文件设备安装工程用表(共40张)(3503-J301~J336)1、 J301——机器安装检验记录2、 J302——轴对中记录3、 J303——机组轴对中记录4、 J304——空冷式换热器风机安装检验记录5、 J305——机器组装质量确认记录6、 J306——机器单机试车记录7、 J307——机组试车条件确认记录 8、 J308-1——往复式压缩机试车记录(一) 9、 J308-2——往复式压缩机试车记录(二) 10、 J309-1——离心式压缩机试车记录(一) 11、 J309-2——离心式压缩机试车记录(二) 12、 J309-3——离心式压缩机试车记录(三) 13、 J310-1——气轮机/燃气轮机试车记录(一) 14、J310-2——气轮机/燃气轮机试车记录(二) 15、 J311——电动机试车记录16、 J312——变速器试车记录17、 J313——釜类设备安装检验记录 18、 J314——立式设备安装检验记录19、 J315——卧式设备安装检验记录420、 J316——塔式安装检验记录21、 J317——设备填充检验记录22、 J318——催化反应/沉降器附件安装检验记录 23、 J319——催化再生器附件安装检验记录 24、 J320——立式圆通形储罐组装质量检验记录 25、 J321——立式圆筒形储罐试验记录 26、 J322——湿式气柜组装质量检验记录 27、J323——湿式气柜检验记录28、 J324——干式气柜组装质量检验记录 29、 J325——干式气柜试验记录30、 J326——火炬塔架和管筒安装检验记录 31、 J327——隔热耐磨衬里质量检验记录 32、 J328——换热设备耐压和严密性试验记录 33、 J329——设备耐压/严密性试验记录 34、 J330——常压设备热处理报告35、 J331——管式炉炉体钢结构安装检验记录 36、 J332——炉管通球试验记录37、 J333——管式炉附件安装质量检验记录 38、 J334——耐火砖砌筑炉衬质量检验记录 39、 J335——耐火浇筑料炉衬质量检验记录 40、 J336——耐火纤维模块炉衬质量检验记录5《第四册》三、交工技术文件管道安装工程用表(共16张)(3503-J401~J413) 1、J401——管道组成件验证性和系统性检验记录 2、 J402——阀门试验确认表3、 J403——弹簧支/吊架安装检验记录4、 J404——滑动/固定管托安装检验记录5、 J405——管道补偿器安装检验记录6、 J406-1——管道系统耐压试验条件确认与试验记录(一)7、 J406-2——管道系统耐压试验条件确认与试验记录(二)8、 J407——管道系统泄漏性/真空试验条件确认与试验记录9、 J408——管道吹扫/清洗检验记录10、 J409——给排水压力管道耐压试验条件确认与试验记录 11、 J410——给排水无压力管道闭水试验条件确认与试验记录12、 J411-1——管道焊接接头热处理报告(一) 13、 J411-2——管道焊接接头热处理报告(二) 14、 J412-1——管道焊接接头射线检测比例确认表(一) 15、J412-2——管道焊接接头射线检测比例确认表(二) 16、 J413——管道静电接地测试记录6《第五册》五、交工技术文件电气安装工程用表(共8张)(3503-J501~J508)1、J501——电气设备试验项目确认表2、J502——交流电动机安装检验与空载运行记录3、J503——变压器安装检验记录4、J504——高/压开关柜安装检验记录5、J505——保护/控制盘(屏)安装检验记录6、J506——直流系统/不间断电源(UPS)安装检验记录7、J507——电缆铺设与绝缘检测记录8、J508——火灾自动报警系统安装检验记录7《第六册》六、交工技术文件仪表安装工程用表(共9张)(3503-J601~J609)1、J601——DCS机柜/仪表盘/操作台安装检验记录2、J602——综合控制系统基本功能检测记录3、J603——报警/联锁系统与可编程序控制系统调试记录4、J604——DCS/SIS送电条件确认表5、J605——仪表设备校验项目确认表6、J606——联校试验条件确认表7、J607——联校调试记录8、J608——仪表管道耐压/严密性试验记录9、J608——仪表管道泄漏性/真空度试验条件确认与试验记录8。
sh t 3503-2017 a 交工技术文件通用表
![sh t 3503-2017 a 交工技术文件通用表](https://img.taocdn.com/s3/m/e6194d1bda38376bae1fae54.png)
联络单编号
事由
工程名称: 单位工程名称
实施情况说明
建 设/监 理 单 位 专业工程师: 日期: 年 月 日
总承包单位 专业工程师: 日期: 年 月 日
承包单位 编制人: 审核人:
日期: 年 月 日
SH/T3503-J112 隐蔽项目
隐蔽工程验收记录
工程名称: 单位工程名称:
施工图号
隐 蔽 内 容 及 简 图
工程名称: 单位工程名称:
文件名称
页数
编制人: 日期: 年 月 日
SH/T3503-J104
审核人: 日期:年 月 日
交工技术文件说明
工程名称:
编制人: 日期: 年 月 日
SH/T3503-J105A
审核人: 日期: 年 月 日
工程施工开工报告
工程名称:
施工合同编号 计划开工日期
年月日
设计单位 计划交工日期
编号 SH/T 3503-J125-1
页次 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37
页次 38
A.31 材料及配件超声检测报告(续)
A.32 材料及配件磁粉检测报告
A.33 材料及配件磁粉检测报告(续)
斜垫铁尺寸(长 X 宽 X 薄端高): 斜度:
每组垫铁构成:块数: 垫铁组高度:
检查项目
安装要求
检查结果
设备找正
数据符合规范要求
□不符合 □符合
垫铁规格
符合施工方案要求 □不符合 □符合
垫铁布置位置
符合规范要求
□不符合 □符合
每组垫铁块数
SH3503-2017交工技术文件通用表
![SH3503-2017交工技术文件通用表](https://img.taocdn.com/s3/m/4d33c4a74afe04a1b071dece.png)
交工技术文件目录
工程名称: 单元工程名称:
资料名称
页次
编制人: 日 期:
审核人: 年 月 日 日 期:
年月日
SH/T 3503-J104
交工技术文件说明
工程名称:
编制人: 日 期:
审核人: 年 月 日 日 期:
年月日
SH/T 3503-J105A
施工合同编号 计划开工日期
工 程 内 容
工程施工开工报告
事由
工程名称: 单位工程名称:
实施情况说明
建设单位 专业工程师:
监理单位 专业工程师:
施工单位 编制人: 审核人:
日期:
年 月 日 日期:
年 月 日 日期:
年月日
SH/T 3503-J112 隐蔽项目
隐蔽工程记录
工程名称: 单位工程名称:
施工图号
隐 蔽 内 容 及 简 图
检 查 结 果
建设/监理单位
工程变更一览表
工程名称: 单位工程名称:
变更原因
实施图号及变更要点
实施情况说明
注:变更原因填写设计原因或非设计原因
建设单位 专业工程师:
监理单位 专业工程师:
施工单位 编制人: 审核人:
日期:
年 月 日 日期:
年 月 日 日期:
年月日
SH/T 3503-J110
工程联络单一览表
专业 序号
联络单编号
监理单位
(项目部章) 审核人:
承包单位
(项目部章) 经办人:
日期:
年 月 日 日期:
年 月 日 日期:
年月日
SH/T 3503-J108B
交工技术文件移交证书
工程名称: 合同编号:
石油化工建设工程项目交工技术文件规定》SHT交工资料表格目录清单
![石油化工建设工程项目交工技术文件规定》SHT交工资料表格目录清单](https://img.taocdn.com/s3/m/4eb4044e4a7302768e993983.png)
《石油化工建设工程项目交工技术文件规定》SH T3503-2017交工资料表格目录清单.d o c2007版SH/T3503石油化工建设工程项目交工建设文件汇总表格目录《第一册》一、交工技术文件通用表(共45张)(3503-J101A~J131-2)1、 J101A——封面2、 J101B——封面3、 J101C——封面4、 J101D——封面5、 J102——交工技术文件总目录6、 J103——交工技术文件目录7、 J104——交工技术文件说明8、 J105B——开工报告9、 J106A——工程中间交接证书10、 J106B——工程中间交接证书11、 J107A——工程交工证书12、 J107B——工程交工证书13、 J108A——交工技术文件移交证书14、 J108B——交工技术文件移交证书15、 J109——重大质量事故处理报告16、 J110——工程变更一览表17、 J111——隐蔽工程记录18、 J112——工程联络单19、 J113——合格焊工登记表20、 J114——无损检测人员登记表121、 J115A——开箱检验记录(一) 22、 J115B——开箱检验记录(二) 23、 J116——防腐工程质量验收记录 24、 J117——隔热工程质量验收记录 25、 J118——接地电阻测量记录26、 J119——安全阀调整试验记录 27、 J120——安全附件安装检验记录 28、 J121——射线检测结果确认表 29、 J122-1——射线检测报告(一) 30、 J122-2——射线检测报告(二) 31、 J123-1——焊缝超声检测报告(一) 32、 J123-2——焊缝超声检测报告(二) 33、J124-1——材料超声检测报告(一) 34、 J124-2——材料超声检测报告(一) 35、 J125-1——超声测厚报告(一) 36、 J125-2——超声测厚报告(一) 37、 J126-1——磁粉检测报告(一) 38、 J126-2——磁粉检测报告(二) 39、 J127-1——渗透检测报告(一) 40、 J127-2——渗透检测报告(二) 41、 J128——金属材料化学成分分析检验报告 42、 J129——硬度检验报告43、 J130——垫铁隐蔽记录44、 J131-1——设备/材料质量证明文件一览表(一)45、 J132-2——设备/材料质量证明文件一览表(一)2《第二册》二、交工技术文件土建工程用表(共11张)(3503-J201~J210)1、 J201——地基验槽(土方)记录2、 J202——地基处理记录3、 J203——工程定位测量记录4、 J204——设备基础复测记录5、 J205——快体式设备基础允许偏差项目复测记录6、 J206——整体框架式设备基础允许偏差项目复测记录7、 J207-1——储罐基础允许偏差项目复测记录(一)8、 J207-2——储罐基础允许偏差项目复测记录(二)9、 J208——球形储罐基础允许偏差项目复测记录10、 J209——基础沉降观测记录11、 J210——水池盖水试验记录3《第三册》二、交工技术文件设备安装工程用表(共40张)(3503-J301~J336)1、 J301——机器安装检验记录2、 J302——轴对中记录3、 J303——机组轴对中记录4、 J304——空冷式换热器风机安装检验记录5、 J305——机器组装质量确认记录6、J306——机器单机试车记录7、 J307——机组试车条件确认记录 8、 J308-1——往复式压缩机试车记录(一) 9、J308-2——往复式压缩机试车记录(二) 10、 J309-1——离心式压缩机试车记录(一) 11、J309-2——离心式压缩机试车记录(二) 12、 J309-3——离心式压缩机试车记录(三) 13、J310-1——气轮机/燃气轮机试车记录(一) 14、 J310-2——气轮机/燃气轮机试车记录(二)15、 J311——电动机试车记录16、 J312——变速器试车记录17、 J313——釜类设备安装检验记录 18、 J314——立式设备安装检验记录 19、J315——卧式设备安装检验记录420、 J316——塔式安装检验记录21、 J317——设备填充检验记录22、 J318——催化反应/沉降器附件安装检验记录 23、 J319——催化再生器附件安装检验记录 24、 J320——立式圆通形储罐组装质量检验记录 25、 J321——立式圆筒形储罐试验记录 26、 J322——湿式气柜组装质量检验记录 27、 J323——湿式气柜检验记录28、 J324——干式气柜组装质量检验记录 29、 J325——干式气柜试验记录30、 J326——火炬塔架和管筒安装检验记录 31、 J327——隔热耐磨衬里质量检验记录32、 J328——换热设备耐压和严密性试验记录 33、 J329——设备耐压/严密性试验记录34、 J330——常压设备热处理报告35、 J331——管式炉炉体钢结构安装检验记录 36、 J332——炉管通球试验记录37、 J333——管式炉附件安装质量检验记录 38、 J334——耐火砖砌筑炉衬质量检验记录 39、 J335——耐火浇筑料炉衬质量检验记录 40、 J336——耐火纤维模块炉衬质量检验记录5《第四册》三、交工技术文件管道安装工程用表(共16张)(3503-J401~J413) 1、 J401——管道组成件验证性和系统性检验记录 2、 J402——阀门试验确认表3、 J403——弹簧支/吊架安装检验记录4、 J404——滑动/固定管托安装检验记录5、 J405——管道补偿器安装检验记录6、 J406-1——管道系统耐压试验条件确认与试验记录(一)7、 J406-2——管道系统耐压试验条件确认与试验记录(二)8、 J407——管道系统泄漏性/真空试验条件确认与试验记录9、 J408——管道吹扫/清洗检验记录10、 J409——给排水压力管道耐压试验条件确认与试验记录 11、 J410——给排水无压力管道闭水试验条件确认与试验记录12、 J411-1——管道焊接接头热处理报告(一) 13、 J411-2——管道焊接接头热处理报告(二) 14、 J412-1——管道焊接接头射线检测比例确认表(一) 15、 J412-2——管道焊接接头射线检测比例确认表(二) 16、 J413——管道静电接地测试记录6《第五册》五、交工技术文件电气安装工程用表(共8张)(3503-J501~J508)1、J501——电气设备试验项目确认表2、J502——交流电动机安装检验与空载运行记录3、J503——变压器安装检验记录4、J504——高/压开关柜安装检验记录5、J505——保护/控制盘(屏)安装检验记录6、J506——直流系统/不间断电源(UPS)安装检验记录7、J507——电缆铺设与绝缘检测记录8、J508——火灾自动报警系统安装检验记录7《第六册》六、交工技术文件仪表安装工程用表(共9张)(3503-J601~J609)1、J601——DCS机柜/仪表盘/操作台安装检验记录2、J602——综合控制系统基本功能检测记录3、J603——报警/联锁系统与可编程序控制系统调试记录4、J604——DCS/SIS送电条件确认表5、J605——仪表设备校验项目确认表6、J606——联校试验条件确认表7、J607——联校调试记录8、J608——仪表管道耐压/严密性试验记录9、J608——仪表管道泄漏性/真空度试验条件确认与试验记录8。
SHT3503-2017交工文件表格全册
![SHT3503-2017交工文件表格全册](https://img.taocdn.com/s3/m/03c35c6326284b73f242336c1eb91a37f0113259.png)
SHT3503-2017交工文件表格全册SH/T 3503—2017目次附录A(规范性附录)交工技术文件通用表 (7)附录B(规范性附录)交工技术文件土建工程用表 (54)附录C(规范性附录)交工技术文件设备安装工程用表 (68)附录D(规范性附录)交工技术文件管道安装工程用表 (140)附录E(规范性附录)交工技术文件电气安装工程用表 (164)附录F(规范性附录)交工技术文件仪表安装工程用表 (176)附录G(规范性附录)交工技术文件压力容器现场组焊安装工程用表 (188)附录H(规范性附录)交工技术文件起重机械安装工程用表 (202) Appendix A(Normative Appendix)Handover Technical Documentation—General (217)Appendix B(Normative Appendix)Handover Technical Documentation—Civil (264)Appendix C(Normative Appendix)Handover Technical Documentation—Equipment Installation (278)Appendix D(Normative Appendix)Handover Technical Documentation—Piping Installation (351)Appendix E(Normative Appendix)Handover Technical Documentation—Electrical Installation (376)Appendix F(Normative Appendix)Handover Technical Documentation—Instrumentation Installation 388 Appendix G (Normative Appendix)Handover Technical Documentation—Pressure Vessel Site Assembly Welding and Installation (400) Appendix H(Normative Appendix)Handover Technical Documentation—Lifting Machinery Installation (414) IContentsAppendix A(Normative Appendix)Handover Technical Documentation—General (Chinese) (7)Appendix B(Normative Appendix)Handover Technical Documentation—Civil (Chinese) (54)Appendix C(Normative Appendix)Handover Technical Documentation—Equipment Installation (Chinese) (68) Appendix D(Normative Appendix)Handover Technical Documentation—Piping Installation (Chinese) ·· 140Appendix E(Normative Appendix)Handover Technical Documentation—Electrical Installation (Chinese) (164) Appendix F(Normative Appendix)Handover Technical Documentation—Instrumentation Installation (Chinese) (176) Appendix G(Normative Appendix)Handover Technical Documentation—Pressure Vessel Site Assembly Welding and Installation (Chinese) (188)Appendix H(Normative Appendix)Handover Technical Documentation—Lifting Machinery Installation (Chinese) (202) Appendix A(Normative Appendix)Handover Technical Documentation—General (English) (217)Appendix B(Normative Appendix)Handover Technical Documentation—Civil (English) (264)Appendix C(Normative Appendix)Handover Technical Documentation—Equipment Installation (English) (278) Appendix D(Normative Appendix)Handover Technical Documentation—Piping Installation (English) (351)Appendix E(Normative Appendix)Handover Technical Documentation—Electrical Installation (English) (376) Appendix F(Normative Appendix)Handover Technical Documentation—Instrumentation Installation (English) (388)Appendix G(Normative Appendix)Handover Technical Documentation—Pressure Vessel Site Assembly Welding and Installation (English) (400)Appendix H(Normative Appendix)Handover Technical Documentation—Lifting Machinery Installation (English) (414) IISH/T 3503—2017附录A(规范性附录)交工技术文件通用表7交工技术文件通用表(续)8SH/T 3503—2017910SH/T 3503—20171112SH/T 3503—20171314SH/T 3503—20171516SH/T 3503—20171718SH/T 3503—20171920SH/T 3503—20172122SH/T 3503—201723。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
《石油化工建设工程项目交工技术文件规定》SH T3503-2017 交工资料表格目录清单.doc
2007 版 SH/T3503石油化工建设工程项目
交工建设文件汇总表格目录
《第一册》
一、交工技术文件通用表 ( 共 45 张 )(3503-J101A~J131-2)
1、 J101A ——封面
2、 J101B ——封面
3、 J101C——封面
4、 J101D——封面
5、 J102 ——交工技术文件总目录
6、 J103 ——交工技术文件目录
7、 J104 ——交工技术文件说明
8、 J105B ——开工报告
9、 J106A ——工程中间交接证书
10、 J106B ——工程中间交接证书
11、 J107A ——工程交工证书
12、 J107B ——工程交工证书
13、 J108A ——交工技术文件移交证书
14、 J108B ——交工技术文件移交证书
15、 J109 ——重大质量事故处理报告
16、 J110 ——工程变更一览表
17、 J111 ——隐蔽工程记录
18、 J112 ——工程联络单
19、 J113 ——合格焊工登记表
20、 J114 ——无损检测人员登记表
1
21、 J115A ——开箱检验记录 ( 一) 22 、 J115B ——开箱检验记录 ( 二 ) 23 、
J116——防腐工程质量验收记录 24 、 J117 ——隔热工程质量验收记录25 、
J118——接地电阻测量记录
26、 J119 ——安全阀调整试验记录27 、 J120 ——安全附件安装检验记录
28、 J121 ——射线检测结果确认表29 、 J122-1 ——射线检测报告 ( 一) 30 、
J122-2 ——射线检测报告 ( 二 ) 31 、 J123-1 ——焊缝超声检测报告 ( 一) 32 、
J123-2 ——焊缝超声检测报告 ( 二) 33 、 J124-1 ——材料超声检测报告 ( 一) 34 、
J124-2 ——材料超声检测报告 ( 一) 35 、 J125-1 ——超声测厚报告 ( 一) 36 、
J125-2 ——超声测厚报告 ( 一 ) 37 、 J126-1 ——磁粉检测报告 ( 一 ) 38 、 J126-2 ——磁粉检测报告 ( 二) 39 、 J127-1 ——渗透检测报告 ( 一) 40 、 J127-2 ——渗透检测报告 ( 二) 41 、 J128 ——金属材料化学成分分析检验报告 42 、 J129 ——硬度检验报告
43、 J130 ——垫铁隐蔽记录
44、 J131-1 ——设备 / 材料质量证明文件一览表( 一)
45、 J132-2 ——设备 / 材料质量证明文件一览表( 一)
2
《第二册》
二、交工技术文件土建工程用表( 共 11 张)(3503-J201~J210)
1、 J201 ——地基验槽 ( 土方 ) 记录
2、 J202 ——地基处理记录
3、 J203 ——工程定位测量记录
4、 J204 ——设备基础复测记录
5、 J205 ——快体式设备基础允许偏差项目复测记录
6、 J206 ——整体框架式设备基础允许偏差项目复测记录
7、 J207-1 ——储罐基础允许偏差项目复测记录( 一)
8、 J207-2 ——储罐基础允许偏差项目复测记录( 二)
9、 J208 ——球形储罐基础允许偏差项目复测记录
10、 J209 ——基础沉降观测记录
11、 J210 ——水池盖水试验记录
3
《第三册》
二、交工技术文件设备安装工程用表( 共 40 张)(3503-J301~J336)
1、 J301 ——机器安装检验记录
2、 J302 ——轴对中记录
3、 J303 ——机组轴对中记录
4、 J304 ——空冷式换热器风机安装检验记录 5 、 J305 ——机器组装质量确
认记录 6 、 J306 ——机器单机试车记录
7、 J307 ——机组试车条件确认记录 8 、 J308-1 ——往复式压缩机试车记录 ( 一) 9 、 J308-2 ——往复式压缩机试车记录 ( 二) 10 、 J309-1 ——离心式压缩机试车记录( 一 ) 11 、 J309-2 ——离心式压缩机试车记录 ( 二 ) 12 、 J309-3 ——离心式压缩机试车记录 ( 三 ) 13 、 J310-1 ——气轮机 / 燃气轮机试车记录 ( 一) 14 、
J310-2 ——气轮机 / 燃气轮机试车记录 ( 二) 15 、 J311 ——电动机试车记录
16、 J312 ——变速器试车记录
17、 J313 ——釜类设备安装检验记录18 、 J314 ——立式设备安装检验记录19、 J315 ——卧式设备安装检验记录
4
20、 J316 ——塔式安装检验记录
21、 J317 ——设备填充检验记录
22、 J318 ——催化反应 / 沉降器附件安装检验记录23 、 J319 ——催化再生器附件安装检验记录24 、 J320 ——立式圆通形储罐组装质量检验记录25 、 J321 ——立式圆筒形储罐试验记录26 、J322 ——湿式气柜组装质量检验记录27 、
J323——湿式气柜检验记录
28、J324 ——干式气柜组装质量检验记录29 、J325 ——干式气柜试验记录
30、J326 ——火炬塔架和管筒安装检验记录31 、J327 ——隔热耐磨衬里质
量检验记录 32 、 J328 ——换热设备耐压和严密性试验记录33 、 J329 ——设备耐压 / 严密性试验记录34 、 J330 ——常压设备热处理报告
35、 J331 ——管式炉炉体钢结构安装检验记录36 、 J332 ——炉管通球试验
记录
37、 J333 ——管式炉附件安装质量检验记录 38 、 J334 ——耐火砖砌筑炉衬质量检验记录 39 、 J335 ——耐火浇筑料炉衬质量检验记录 40 、 J336 ——耐火纤维模块炉衬质量检验记录
5
《第四册》
三、交工技术文件管道安装工程用表( 共 16 张)(3503-J401~J413) 1、
J401——管道组成件验证性和系统性检验记录 2 、 J402 ——阀门试验确认表
3、 J403 ——弹簧支 / 吊架安装检验记录
4、 J404 ——滑动 / 固定管托安装检验记录
5、J405 ——管道补偿器安装检验记录
6、J406-1——管道系统耐压试验条件确认与试验记录(一)
7、J406-2——管道系统耐压试验条件确认与试验记录( 二 ) 8 、 J407 ——管道系统泄漏性 / 真空试验条件确认与试验记录9 、 J408 ——管道吹扫 / 清洗检验记录
10、 J409 ——给排水压力管道耐压试验条件确认与试验记录11 、 J410 ——
给排水无压力管道闭水试验条件确认与试验记
录
12、J411-1——管道焊接接头热处理报告(一) 13、J411-2——管道焊接接
头热处理报告(二)14、J412-1——管道焊接接头射线检测比例确认表(一)15、J412-2 ——管道焊接接头射线检测比例确认表(二) 16、 J413 ——管道静电接地测试记录
6
《第五册》
五、交工技术文件电气安装工程用表( 共 8 张)(3503-J501~J508)
1、J501——电气设备试验项目确认表
2、J502——交流电动机安装检验与空载运行记录
3、J503——变压器安装检验记录
4、J504——高 / 压开关柜安装检验记录
5、J505——保护 / 控制盘 ( 屏 ) 安装检验记录
6、J506——直流系统 / 不间断电源 (UPS)安装检验记录
7、J507——电缆铺设与绝缘检测记录
8、J508——火灾自动报警系统安装检验记录
7
《第六册》
六、交工技术文件仪表安装工程用表( 共 9 张)(3503-J601~J609)
1、J601—— DCS机柜 / 仪表盘 / 操作台安装检验记录
2、J602——综合控制系统基本功能检测记录
3、J603——报警 / 联锁系统与可编程序控制系统调试记录
4、J604—— DCS/SIS送电条件确认表
5、J605——仪表设备校验项目确认表
6、J606——联校试验条件确认表
7、J607——联校调试记录
8、J608——仪表管道耐压 / 严密性试验记录
9、J608——仪表管道泄漏性 / 真空度试验条件确认与试验记录
8。