负压手术室洁净室案例
负压手术间集中净化空调系统运行原理
Title:Negative Pressure Operating Room Central Air Conditioning System Operation PrincipleWith the increasing demand for medical surgery, the requirements for the environment of operating rooms have be more and more stringent, especially in the control of 本人r quality, temperature, and humidity. The negative pressure operating room central 本人r conditioning system has be the m 本人nstream in modern hospital operating rooms. In this article, we will explore the operation principle of the negative pressure operating room central 本人r conditioning system.I. Introduction to the Negative Pressure Operating RoomThe negative pressure operating room is designed to prevent the spread of 本人rborne infectious diseases and protect the health of medical staff and patients. By m本人nt本人ning a lower 本人r pressure in the operating roompared to adjacent areas, any potential 本人rborne contaminants are drawn into the operating room and filtered before being exhausted to the outside environment.II. Components of the Central Air Conditioning System1. Air Handling Unit (AHU)The AHU is responsible for circulating and conditioning the 本人r within the operating room. It consists of a blower, heating and cooling coils, filters, and dampers. The blower moves the 本人r through the system, while the coils regulate the temperature. The filters remove particles and contaminants, and the dampers control the flow of 本人r.2. Exhaust SystemThe exhaust system is crucial in m本人nt本人ning the negative pressure within the operating room. It expels the 本人r from the operating room to the outside, along with any potential contaminants. The exhaust must be properly filtered to ensure that no harmful particles are released into the environment.3. Temperature and Humidity Control SystemM本人nt本人ning a stable temperature and humidity level is important for thefort of the surgical team and the proper functioning of medical equipment. The temperature andhumidity control system works in conjunction with the AHU to achieve the desired environment.III. Operation Principle1. Negative PressureThe negative pressure within the operating room is created by the AHU exhausting more 本人r than it supplies. This pressure difference ensures that any 本人rborne contaminants are drawn into the operating room and prevented from escaping into adjacent areas.2. Air FiltrationThe 本人r filtration system within the AHU is crucial for m本人nt本人ning a clean and sterile environment. High-efficiency particulate 本人r (HEPA) filters are used to remove particles as small as 0.3 microns, including bacteria, viruses, and allergens. The filtration system ensures that the 本人r circulated within the operating room is of the highest quality.3. Air Exchange RateThe 本人r exchange rate, or the number of times the 本人r within the operating room ispletely replaced within a given time period, is an important factor in m本人nt本人ning 本人r quality. The negative pressure operating room central 本人r conditioning system is designed to achieve a specific 本人r exchange rate to ensure the removal of contaminants and the supply of fresh, clean 本人r.IV. Benefits of the Negative Pressure Operating Room Central Air Conditioning System1. Infection ControlBy m本人nt本人ning negative pressure and filtering the 本人r, the central 本人r conditioning system effectively reduces the risk of 本人rborne infections in the operating room. This is essential for the safety of both medical staff and patients undergoing surgery.2. Clean and Sterile EnvironmentThe filtration and ventilation systems of the central 本人rconditioning system ensure that the 本人r within the operating room is clean, sterile, and free from contaminants. This is important for the success of surgical procedures and the recovery of patients.3. Comfort and SafetyThe temperature and humidity control systems of the central 本人r conditioning system create afortable and safe environment for the surgical team to perform their duties. Additionally, the negative pressure design provides a level of protection ag本人nst potential hazards within the operating room.V. ConclusionThe operation principle of the negative pressure operating room central 本人r conditioning system is based on m本人nt本人ning a clean, sterile, and safe environment for surgical procedures. By utilizing abination of negative pressure, 本人r filtration, and temperature/humidity control, the system ensures the success of medical procedures and the well-being of medical staff and patients. As technology continues to advance,the central 本人r conditioning system will play a crucial role in the future of operating room environments.。
负压层流手术室空气净化技术研究
负压层流手术室空气净化技术研究随着现代医疗技术的不断发展,医疗卫生领域也在不断地进步和创新。
在手术室的净化方面,负压层流技术被广泛应用和研究。
负压层流手术室具备高效的空气净化能力,能够有效地防止病菌和灰尘的传播,确保手术室内的洁净环境。
本文就负压层流手术室的空气净化技术进行了深入的研究和探讨。
一、负压层流手术室的概念负压层流手术室是通过负压机组对手术室进行负压排风,使手术室内部的空气呈现出自上而下的层流状。
在负压层流手术室中,正压区为无菌区,负压区为洁净区,负压层流设计可确保患者的安全和手术室内的洁净环境。
二、负压层流手术室的空气净化技术1.室外空气处理负压层流手术室的空气净化技术首先需要对室外空气进行处理,以确保空气达到一定的洁净度要求。
通过对室外空气的过滤、杀菌、除尘等处理,可以有效地避免病菌、灰尘等污染物进入手术室内部。
2.室内过滤系统负压层流手术室中的空气净化还需要通过室内的过滤系统进行,主要包括初效过滤、中效过滤、高效过滤等。
初效过滤可以有效地过滤掉大颗粒物,中效过滤可以过滤掉颗粒物和细菌,而高效过滤则可以过滤掉更小的颗粒物和病毒。
3.负压排风系统负压排风系统是负压层流手术室中发挥重要作用的一门技术。
它可以将手术室内的空气进行负压排风,从而有效地防止室内空气的循环和污染。
负压排风系统一般包括负压机组、风管及排风口等组成部分。
4.室内空气质量监测为了确保负压层流手术室中的空气质量达到一定的标准要求,需要进行室内空气质量监测。
通过对手术室内的温度、湿度、风速、洁净度等指标进行实时监测,可以发现并及时处理各种患者可能面临的风险因素,保障手术室内的洁净环境。
三、负压层流手术室的应用负压层流手术室的应用范围非常广泛,主要包括病房手术、感染性疾病手术、器官移植手术等。
在病房手术中,负压层流手术室可以有效地防止病菌和细菌的传播,最大程度地保障了患者的安全。
而在感染性疾病手术和器官移植手术中,负压层流手术室的应用则更为广泛。
某县医院新院净化手术部ICU、CCU五层产房中心供应室设计方案 精品
XX县医院新院净化手术部/ICU/CCU/五层产房/中心供应室方案设计文件目录一、编制依据二、平面布局三、方案说明四、百级手术室效果图五、各专业系统图六、设备配置清单七、报价预算一、编制依据1、工程执行的技术标准规范如下:《医院洁净手术部建筑技术规范》(GB50333-2002)《空气过滤器》(GB/T14295-93)《高效空气过滤器》(GB/T13554-92)《医院消毒卫生标准》(GB15982-1995)《高层民用建筑设计防火规范》(GB50045-95)《建筑设计防火规范》(GBJ16-87)《压缩空气站规范》(GBJ29-90)《装饰工程施工及验收规范》(GBJ210-83)《通风与空调工程质量检验评定标准》(GBJ304-88)《综合医院建筑设计规范》(JGJ49-88)《民用建筑电气设计规范》(JGJ71-90)《洁净厂房设计规范》(GBJ-73-84)《洁净室施工及验收规范》(JGJ 71-90);《通风与空调工程施工及验收规范》(GBJ243);《医院洁净手术部建设标准》(2000);《军队医院洁净手术部建筑技术规范》(YFB001-1995);《医用中心吸引系统通用技术条件》(YY/T0186-94);《医用中心供氧系统通用技术条件》(YY/T0187-94);《采暖与卫生工程施工及验收规范》(GBJ242-82);《制冷设备安装工程施工及验收规范》(GBJ66-84);《工业设备及管道绝热工程施工及验收规范》(GBJ126-89);《低压电气施工及验收规范》(GB50254-96);《1KV及以下配线工程施工及验收规范》(GB50258-96);《电气照明装置施工及验收规范》(GB50259-96);《接地装置施工及验收规范》(GB50169-92);《电缆线路施工及验收规范》(GB50168-92);《盘、柜及二次回路结线施工及验收规范》(GB50171-92);《工业安装工程质量检验评定统一标准》(GB50252-94);2、工程概况:XX县医院新院拟建设成为一所综合性二级甲等医院。
上海市某医院洁净手术部净化空调系统设计
上海市某医院洁净手术部净化空调系统设计摘要:本工程属于医院洁净手术部净化空调系统工程,位于上海市,医院建筑整体为8层,手术部处于第2层,层高5.2m,上一层设备夹层是办公区及空调机房。
此次设计的手术室吊顶高度3m,辅房吊顶高度2.8m,净化空调系统为1971m2提供净化服务,总冷负荷为856kw。
设计洁净中央空调净化系统不但可以实现手术区洁净的目的,还可以使办公区达到洁净要求。
设计中先计算掌握各空间的冷、热负荷需求,然后合理规划空调运行方式与选用其他设备。
根据相关规范要求,针对I~Ⅲ级洁净手术室应当采用全空气系统;对于Ⅳ级洁净手术室及Ⅲ级洁净辅助用房,选择净化风机盘管配置独立新风系统形式,同时需要具备高中效及其以上过滤效能的过滤器。
本次设计区域属于洁净区,在设计中有效计算,从而科学确定风管、水管的管径、水力及水力平衡等,结合计算数据对系统设备进行合理选用,并将风管、水管的平面图、系统图绘制出来。
关键词:洁净区;空调系统;水力计算1工程概况本次设计的工程对象是位于上海某医院的洁净手术部净化空调系统,手术部位于2层,办公区及设备层位于上一层。
手术部洁净区包含洁净手术室和洁净辅助用房两个部分,总面积为1733m2;其中有100级洁净等级的手术室100间,10000级洁净等级的手术室4间,其他为10000级、100000级、300000级洁净等级的辅助用房。
上一层的办公洁净区包括会议室和办公区两个部分,设备夹层办公洁净区面积为238m2,包括了100000级洁净等级的洁净等级辅助用房和走廊。
2空调系统的确定2.1空调系统的划分原则空调管路系统根据不同的环路,有不同的划分原则,具体如下,见表1:表1空调管路系统的划分原则2.2空调管路管材选择表2空调管路管材选择3空调系统风管水力计算基于已经确定了空调送排风风量及布置点、风管材料、系统及设备的位置后,选择假定流速法进行空调系统风管水力计算,具体如下:①编制通风或空调系统轴测图纸,编号标识各管段,将风量及长度进行明确;②对空气流速进行科学计算和确定;③依据所确定的空气流速及风管风量,合理设计各管段的断面尺寸,并对相应的局部阻力与摩擦阻力进行有效计算;④计算并联管路的阻力平衡;⑤计算系统总阻力。
负压洁净室施工技术
负压洁净室施工技术负压洁净室简介目前负压洁净室的应用越来越广泛,大多集中在动物房、医院手术室和病房、制药厂、生物安全实验室等。
不同类型、不同用途的负压洁净室,工艺布局、生产流程其对洁净区域的环境要求也各有特点,在满足通用洁净室环境要求前提下,还需有其他一些要求,如有的需要对高效排风系统进行检漏;有的需要对洁净室内沉降菌的含量进行检测;有的需要对压差进行特别关注。
下面主要从负压洁净室设计及施工方面进行介绍。
设计深化●正压源、负压汇负压汇是指由于压力原因,周围微小粒子会随着压差梯度不断地向负压绝对值最高的区域吸附,对与这个房间的选择通常是毒性最大的房间或者是病毒最容易扩散的房间。
正压源就是在整个负压区入口的第一个房间(缓冲间),设计成正压,洁净送风,无排风或回风,压力控制在+10Pa~+15Pa,形成一个正压源。
如此设计,洁净空气通过门缝渗透到负压区,同时隔断了外界的污染空气进入负压区的路径,负压区内的病毒也无法通过正压源(缓冲间)扩散到外界,就像安装了一个气闸一样。
如下图所示:●减少开孔因素洁净室整体与外界接触面越多,对负压影响的可能性会越大。
所以我们应尽可能减少开孔项目,一些不可避免的开孔因素,也应密封完好。
比如消防手报、开关插座等的86盒可以采用气密性接线盒,自开孔的形式,并进行打胶处理,很大程度上提高了密封的稳定性,如下图所示。
灯具的选用形式尽量避免嵌入式灯具的使用,特别是数量比较大的洁净空间,在实际安装和调试过程中很难进行控制。
压差梯度设计、换气次数负压洁净室,压差梯度设计应当合理,优化平面布局,尽量减少开向普通区域的进口。
“一路负到底”是生物安全控制的一条经典理论,即从换鞋间开始一直到最高级别的负压洁净室,不断加大负压差,可以形成一条有序的负压梯度,再采用“正压源”原理,将进入负压区的第一个口设计成正压,可以有效地控制洁净度。
这种情况对与比较小的负压洁净室是比较好的,如果负压区比较大房间比较多,这样可能会导致级别最高的房间负压差非常高,这样也是不利的。
洁净手术室空气净化技术
净化设备 空气过滤器 高效空气过滤器 初效过滤器 空调过滤器 风淋室 FFU风机过滤单元 净化工程 风机过滤单元 空气过滤器专业生产厂家/ 净化设备专业制造厂家 空气过滤器专业生产厂家 净化设备专业制造厂家
• 2、按净化空间分型 • (1)全室净化 采用天花板或单侧墙全部送风,使 采用天花板或单侧墙全部送风,
洁净手术室 空气净化技术
淨化設備及空氣過濾器製造安装 淨化設備及空氣過濾器製造安装 潔淨無塵室設計及建造 维护施工
金田瑞麟 初效过滤器 净化设备 空气过滤器 净化工程 风淋室 高效空气过滤器 空调过滤器 风淋室 FFU风机过滤单元 FFU风机过滤单元 净化工作台
• 手术室的历史沿革 • 现代的手术室源于16 世纪的意大利和法国, 现代的手术室源于 16世纪的意大利和法国 ,
与洁净度有关的基本概念
浮游菌法细菌浓度:在空气中随机采样, 浮游菌法细菌浓度:在空气中随机采样 , 对采样培养 基经过培养得出菌落数( cfu ) 基经过培养得出菌落数 ( cfu) , 代表空气中的浮游菌数 个/ m³。 沉降法细菌浓度:用直径90mm的培养皿在空气中暴 沉降法细菌浓度:用直径90mm的培养皿在空气中暴 露30分钟,经过培养得出的菌落数。代表空气中可以沉降 30分钟,经过培养得出的菌落数。代表空气中可以沉降 下来的细菌数。 净化手术室空气培养方法:既以直径90mm的培养皿, 净化手术室空气培养方法:既以直径90mm的培养皿, 静置室内30分钟,然后培养得出的每个皿的菌落数。每个 静置室内30分钟,然后培养得出的每个皿的菌落数。每个 手术间内放置13个培养皿,中间5 手术间内放置13个培养皿,中间5个(局部净化区域,相 当于手术床的位置),四周每面墙2 当于手术床的位置),四周每面墙2个,放置位置、高度 与普通采样方法要求一致。
基于PLC的洁净手术室负压系统的设计与实现
基 于 P C的洁 净手 术 室负 压 系统 的 L 设 计 与 实 现
剥、 可
( 阳师 范 大 学 学 报 编 辑 部 , 宁 沈 阳 1 0 3 ) 沈 辽 10 4
摘 要 : 负压手术室对空气压 力有特殊要 求, 针对某 医院洁净手术 室净化 空调 自动控 制 系统项 目, 在项 目需
3 控 制 策 略
3 1 压 力 控 制 原 理 .
除 负压手 术 室外 , 他 手术室 一般要 求 室 内与室外保 持 5 1 a正压 差 。控制 系统采 用 P D控制 其 ~ OP I
算法 实 现对手 术室 内外 压差 的控制 。
控 制系 统通 过 压差 变送 器 测量 手 术室 与 室外 的气 压 差值 , 检测 信 号传 送 给 P C, L 将 L P C根 据 检测 数值 做 出控 制判 断 , 并将 控制 指令 传给执 行 器 , 由执 行 器驱 动送 风 阀或 排 风 阀 的 电机 , 节 2个 风 阀 开 调
图 2中 , 监控 : AI 回风温度 , 回风湿 度 ; 监控 : 冷 器 控 制 器 , 风 阀控 制 器 , 机 变频 控 制 器 ; A0 表 排 风
D 监 控 : 效过 滤器 压差 , I 粗 中效 过滤 器压 差 , 效过 滤 器 压差 , 温 防 冻开 关 , 风保 护报 警 开关 , 频 高 低 缺 变
第 3 卷 5
根据手 术 室洁净 度等 方面 的 国家 标准 及 医院对项 目操 作方 面 的 特别 要 求 , 目需 要 对建 设 医 院 项
1 O个手 术 室及 手术 室 走廊 的空调 实现 自动控 制 , 室 内温度 、 度 、 力等 达 到 国家标 准要 求 , 实 现 使 湿 压 并 自动 消毒 、 净化 除尘 等功 能 。设 计对象 是一 个 1 9层 的综合 大楼 。其 中 , 术 室及 空 调 主控 室位 于第 1 手 8 层, 空调 机组 安装在第 1 9层 。文献 E 3 绍 了医院空 调系 统 的组 成 、 8介 医院手 术部 概况 及各单 元 的特点 及
洁净工程案例分享
洁净工程案例分享洁净工程是指在特定的环境条件下,通过科学的技术手段,对工业生产和生活环境进行清洁、净化、控制和保护的一项工程技术。
它广泛应用于医院、实验室、电子、食品等行业,保障了生产过程和人员的安全。
下面我们将分享一个医院洁净工程的案例。
案例:医院洁净工程项目医院计划进行洁净工程改造,旨在提高手术室、病房等特定区域的洁净度,降低感染的风险,保障患者和医护人员的安全。
该项目包括手术室、ICU病房、普通病房等区域的洁净化改造。
首先,项目团队与医院管理层和科室负责人进行沟通,了解洁净工程的目标、需求和预算。
在与医院沟通的基础上,项目团队进行了充分的工程勘测和设计,制定了详细的工程方案。
1.手术室洁净工程改造手术室是医院洁净工程的重点区域,洁净度要求非常高。
首先,项目团队对手术室的三废排放、空气净化、照明、墙面、地面等进行了全面的分析和评估。
根据评估结果,团队制定了手术室改造的详细方案。
项目团队选择了高效的HEPA过滤器和新风系统,确保手术室空气中的微粒和细菌得到有效过滤和清除。
同时,采用了防霉、防菌、防水的环保涂料,保证了手术室的工作环境安全和卫生。
此外,还进行了照明系统的升级,确保手术室内的照明均匀、柔和。
2.ICU病房和普通病房改造对于ICU病房和普通病房,项目团队也进行了细致的分析和设计。
他们考虑到这两个区域的实际情况和工作需求,制定了相应的改造方案。
在ICU病房方面,除了采用高效过滤器和新风系统外,还增加了气体监测和报警装置,及时检测和报警有害气体的浓度,确保患者和医护人员的安全。
同时,为了提高病房的舒适度,项目团队还进行了空调系统优化,确保室内温湿度恒定。
在普通病房方面,项目团队增加了空气净化器和空气清洁系统,提高室内空气质量。
并为每个病房设置了独立的送风系统,避免交叉感染的风险。
3.工程实施及验收在洁净工程改造过程中,项目团队与医院管理层、科室负责人密切合作,确保施工进度和质量。
施工人员严格按照设计方案进行施工,保证了改造效果的实施。
医用真空负压机组 用途
医用真空负压机组1. 引言医用真空负压机组是一种用于医疗环境中的设备,主要用于产生负压环境,以确保手术室、隔离病房和其他特定区域的空气清洁,防止病原体传播。
本文将详细介绍医用真空负压机组的用途、工作原理、特点以及在医疗领域中的应用。
2. 用途医用真空负压机组主要用途如下: - 手术室:在手术室内使用医用真空负压机组可以保持手术区域的洁净和无菌,有效防止细菌和病毒的传播。
- 隔离病房:在隔离病房中使用医用真空负压机组可以将患者排放出来的有害气体和颗粒物吸入设备内部,并通过过滤处理后排放到安全区域。
- 感染性疾病治疗:对于感染性肺结核、SARS等传染性疾病患者,使用医用真空负压机组可以避免病原体通过空气传播,保护医护人员和其他患者的安全。
- 实验室:在实验室中使用医用真空负压机组可以控制实验环境的洁净度,确保实验结果的准确性。
3. 工作原理医用真空负压机组通过以下步骤实现负压环境: 1. 吸入空气:医用真空负压机组通过内置的风机吸入外部空气。
2. 过滤处理:吸入的空气经过预过滤器、高效过滤器等多级过滤系统进行净化处理,去除其中的颗粒物和有害物质。
3. 压缩:经过过滤处理后的空气被压缩,并进一步净化。
4. 排放:经过净化处理后的空气被排放到安全区域或外部环境中。
4. 特点医用真空负压机组具有以下特点: - 高效净化:内置多级过滤系统,能够有效去除颗粒物和有害物质,确保排放出来的空气洁净无害。
- 自动控制:设备配备智能控制系统,能够实现自动启停、调节负压力等功能,操作简便方便。
- 低噪音:采用先进的消声技术,降低噪音污染,提供安静的工作环境。
- 可靠性高:设备采用优质材料和先进工艺制造,具有稳定可靠的性能和长寿命。
5. 应用案例医用真空负压机组在医疗领域中得到广泛应用,以下是一些典型的应用案例: ### 5.1 手术室医用真空负压机组被广泛应用于手术室中,确保手术区域的洁净和无菌。
通过产生负压环境,可以有效防止细菌和病毒的传播,保护患者免受感染。
沈阳医院手术室洁净空调系统方案
最新资料;Word版;可自由编辑案例一、沈阳某医院手术室洁净空调系统设计说明一. 工程概况本工程为某总医院病房楼手术室改造净化工程..净化面积185.2m2;万级和十万级..顶棚相对本层地面高度为3.000m;走廊顶棚相对本层地面高度2.700m;内部梁下相对本层地面高度为3.720m..二. 室外计算参数本工程室外计算参数参照辽宁省沈阳市室外计算参数..季节干球温度湿球温度相对湿度平均风速主导风向夏季31.4℃25.4℃78% 2.9m/s南冬季-22℃——64% 3.4m/s北三. 室内设计参数温度:22-25℃..湿度:45-65%..洁净度:万级和十万级..四. 冷源为3台空调室外机组..设置在离空调机组较近的顶层楼板上..热源为电热;设置在空调机组内..五. 空调系统选择空调系统选用全空气集中式处理方式;新风量的确定原则以空调净化设计规范及军队医院洁净手术部建筑技术规范的规定确定新风量;空气处理系统为吊顶式空调机组;设置位置在走廊吊顶夹层内;空调机组的功能有直接蒸发式表冷段;加湿段;风机段;中效过滤段;风机送风段..新风口为带过滤固定单百叶新风口;在外墙处开口;新风管段设电动保温新风阀..系统回风总管设防火阀;当有火灾发生的时候;防火阀处流通空气温度>70℃时;防火阀的熔断片熔断;电讯号输出;与其连锁的风机停止;空调系统不再运行..七.气流组织为高效送风口上送;带阻尼网回风口侧下回至回风夹墙经回风管回至空调机组..九.材料选择风管道采用镀锌钢板;保温采用铝箔离心玻璃棉板;厚度为30毫米;保护装饰层为铝箔..冷媒管采用紫铜管;保温采用阿姆斯壮保温管;厚度为20毫米..冷凝水管及加湿器给水管采用镀锌钢管;冷凝水管外保温为铝箔离心玻璃棉管壳;厚度为30mm..十.施工说明1.施工程序与施工配合1.1通风工程施工前;施工人员应复核通风工程的设备及其基础尺寸;土建留洞及予埋件的位置及尺寸;密切配合土建施工..1.2风管施工最好在吊顶施工前结束;如有交叉;应注意防止破坏吊顶及风管保温..1.3高效过滤器未安装不得开箱;其安装必须在洁净室内各专业安装工程均告结束;洁净室清洗擦净;并全面清扫吹洗风道系统12小时以后才能进行;工作人员按人员清洁要求进入室内..2.风管标高相对本层地面;以标注为准;单位为米..3.风管壁厚选用:风管和配件的板材连接;采用咬接..咬口缝处采取涂密封胶或其他密封措施..4.风管法兰选用:风管与角钢法兰连接采用翻边铆接;铆接应牢固;法兰螺栓及铆钉的间距应小于或等于100mm..铆钉缝及法兰翻边四角采取涂密封胶或其他密封措施..5.矩形风管弯头宽边尺寸大于等于500毫米时;应设导流片..6.配件6.1法兰垫片:采用聚乙烯胶条;厚4毫米;宽度稍小于法兰;不得突入风管内部;垫片擦洗干净;用粘结剂粘在法兰上;契型接头..6.2风管软连接:空调机进、出口相连处;设置长200~250mm的软接;高效送风支管与高效静压箱连接处接长150~250mm的软接;内面光滑..7.风管及配件安装7.1风管上的可拆卸接口;不得设置在墙体或楼板内..7.2所有水平或垂直的风管;必须设置风管支、吊或托架;其构造形式应保证牢固、可靠..风管支、吊或托架应设置与保温层外部;并在支吊架与风管间镶以垫木;同时;应避免在法兰、测量孔、调节阀等部件处设置支吊架..7.3安装防火阀时;应先对其外观质量及动作的灵活性与可靠性进行检验;确认合格后再行安装;防火阀必须单独配置支吊架..7.4送风干管上配有消声器;安装时应单独配置支吊架..8.空调机组安装:直接吊装即可..9.空气净化系统要求9.1风管及配件:净化系统安装前先用清洗液将内表面洗刷干净;干燥后两端开口处用塑料薄膜和胶带密封;并贮与干净处;在安装前应防止风管被再次污染;风阀及其他通风构件的清洁工作均按此要求进行..9.2高效过滤器风口安装:在吊顶上安装一般采用4点带花篮螺栓吊杆拉紧的方式..吊顶与风口翻边密封;高效过滤器风口连接支管上均装软连接及调节阀..9.3净化系统的风管在保温前做漏光实验;检查方法和评价标准根据洁净厂房施工及验收规范..10.空调系统安装完毕;系统投入使用之前;须进行设备单机试运转及系统联合试运转的测定及调整..11.其他未尽事宜;详见工艺设计及通风与空调工程施工及验收规范GBJ50243-97采暖与卫生工程施工及验收规范GBJ242-82洁净室施工及验收规范JGJ71-90中国人民解放军工程建设行业标准YFB001-1995及相关标准..操作说明1、空调净化系统组成1.1空调净化系统划分辽宁省总医院手术室改造空调净化空气处理系统划分为三个独立空调系统及二个独立工作区..其中K1系统为供第三手术室;K2系统为供第二手术室;K3系统为供第一手术室..所供区域的详细说明详见表一..表一序号系统送风区域1K1第三手术室2K2第二手术室3K3第一手术室4ZJ器械室、走廊该工程的排风划分为 3 个系统..详细说明详见表二..表二1.2各功能区域控制标准:2、空调净化工程制冷加热流程2.1空调净化工程制冷加热流程组成:空调室外机组及室内机;电加热器..2.2空调净化工程制冷流程说明本工程所使用的冷源为沈阳第一冷冻机有限公司;生产的空调室外机组KWJ-15..布置在八层楼顶;工程所使用的冷源有3个:L1、L2、L3;即为空调净化系统所使用的冷源;工程冷源及使用区域详见表三.. 表三2.2.2 L1、L2、L3系统制冷流程说明:L1、L2、L3空调制冷系统流程为:制冷剂R22在室外空调机组内经压缩机压缩后;进入室外空调机组的冷凝器内;通过风机的吹淋而冷却;再通过蒸发器的供液管进入室内;经过膨胀阀的减压后;进入机组的蒸发器..被加热后由回气管回到空调室外机组内..2.3空调净化工程加热流程说明本工程热源采用电加热;电源由甲方提供..电加热器设置在空调机组内..3、空调净化系统设备3.1辽宁省总医院手术室改造净化设备一览表见竣工图..3.2辽宁省总医院手术室改造空调净化设备选用说明:选型依据:空调净化有限公司发放编号2001-040-10中;空净-01-040-02图纸要求而选用..为设计人员根据计算确定的设备运行参数..各种设备配件按该工程施工图纸要求而选用本工程净化空调部分设置三台吊顶式空调机组和四台独立净化机组;均为东宇空调产品..3.3空调机组空调机组根据设计图设计其工作原理..1新回风混合段室外新风补充排风机排出的风量;满足了额定风量;回收系统中经送风段送出的空气..回收风量等于送出风量减掉总排风量..2初效段将风进行初级过滤;应定期检查更换或清洗..3蒸发式表冷段表冷段由热交换器组成..供夏季使用..交换器里流动经空调室外机组处理产生的液体制冷剂;经过与空气交换使空气温度降低..4风机段额定风量3×103m3/h的风机将额定风量向系统中送风..注意:应定期检查皮带是否破损;风机轴应定期加油..5加热段冬季供暖使用;采用电加热..6加湿段为保证空气相对温度达到45~65%而设置..湿源为水通过电极加湿器对机组内空气加湿..7中效段将既将进入洁净区的空气再次过滤..应定期检查清洗、更换..8送风段此段是经过两次过滤的空气流入各房间的出口最终通过高效过滤器吹入房间..框图如下:事项:1开启风机时;送、回风系统管道上的阀门尤其是主阀门必须呈开启状态;否则送风送不出去;机内正压增加造成机组及风管变形;回风回不来;机内负压增加造成机组及风管变形..2开启机组时详细检查机组内是否存有杂物..3空调机组没有降压启动装置;启动时应点动启动..4定期检查空调机组内的初效、中效过滤器..当系统风量不能满足要求时;应及时更换或清洗初效、中效过滤器..如更换后系统风量仍不能满足要求时;应更换高效过滤器;并核定风量..5定期清洗机组内外灰尘..空调机组的操作与维护详见空调机组操作与维护说明..3.4百级洁净层流罩层流罩设置与局部百级区域;技术要求较高;所以要求操作人员必须是经过培训合格人员上岗操作..使用方法:在手术进行前开启;进行自净过程;时间约10~20分钟..打开照明灯;再开启风机方可使用..手术结束后;10分钟后再停风机最后关闭照明灯..并切断供电电源..更详细使用说明请读百级洁净层流罩使用说明书..3.5独立净化机组具有独立的风机及高效过滤器;能进行对单个房间的净化工作..可单独开启..3.6设备开启时间1每个手术室所对应的空调机组的开启时间;是该手术室进行手术前的20~40min;2对于设有层流罩的手术室;层流罩应在手术前10~20min开启;3走廊内独立净化机组;应在任何一手术室有手术进行前30~50 min 开启;4器械室内独立净化机组;应在第二或第三手术室有手术进行前20~40 min开启..4、制冷系统设备配件及材料4.1制冷系统设备选型说明制冷系统设备为空调室外机组..空调室外机组资料详见“竣工资料”..4.2制冷系统配件选用说明制冷系统配件是指除设备外;使系统能够正常运行的过滤;减振;调节等装置;主要有干燥器、电磁阀等均随机配带..4.3制冷系统材料选用说明管道采用紫铜管..供液、回气管保冷采用阿姆斯壮管壳;厚度为20mm;冷凝水管保冷采用铝箔离心玻璃棉管壳;厚度为30mm..5、系统操作规程5.1操作前的检查工作系统操作运行前或上一次的运行过程中;对参与运行的设备进行逐一发现问题;及早解决检修并记录..5.2空调净化系统运行操作规程注:空调净化系统设备均有操作说明书;该部分运行之前;操作人员需详细阅读相关说明书后方可进行操作..5.2.1系统运行操作规程空调净化系统夏季制冷启动程序:手动连锁1吊顶式空调机组无降压启动时;先点动;无异常时;正常启动..2吊顶式空调机组中K1、K2、K3;冷量的调整为自动..注意事项:以下所述为常见问题1空调系统运行后;经常对房间的温湿度进行复检;偏差出现时;注意调节;调节方式按5.3所述..2每年首次使用冷机需提前将冷机机油加热12h 以上..注意:系统运行时;确保防火阀处在开启状态;各种风阀处于调整的状态..注意:夏季制冷停止程序与启动程序相反冬季加热启动程序.. 5.3系统工况调节系统运行时部分参数达不到设计状态时;需进行调节..通常情况系统的风量洁净度及正压已在系统调试时;调节完毕;正常情况下;不会改变;工况调节只限于温度湿度的调节..5.3.1温度的调节设计时通常负荷及运行状态接近的房间设置成一个系统..但个别房间由于室内负荷不同也会出现差别..温度的调节有两种情况;一种是整个系统温度达不到设计要求;另一种是个别房间温度达不到设计要求..当整个系统温度达不到设计要求时:夏季室内温度较高;可将控制表盘上的控制温度调低;系统会自动将送风温度降低达到设计要求..K1、K2、K3系统自动实现..夏季室内温度较低;调节方式同上;不过将表盘上的控制温度调高..K1、K2、K3系统自动实现..冬季室内温度较低..可将控制表盘上的控制温度调高;而使系统自动将送风温度增高;直到达到设计要求..K1、K2、K3系统自动实现..冬季室内温度较高;调节方式同上;不过将表盘上的控制温度调低..K1、K2、K3系统自动实现..5.3.2湿度的调节设计时;每一手术室设置成一个系统;个别房间散湿量较大时;也会出现差别..湿度的调节可能是整个系统湿度达不到设计要求..当整个系统湿度达不到设计要求时:夏季湿度过高;可将表盘上的控制湿度调低;K1、K2、K3系统自动实现..如湿度还降不下来;系统需安装除湿器..夏季湿度较低此种情况较少见可将表盘上的控制湿度调高;系统会自动提高湿度满足设计要求..K1、K2、K3系统自动实现..冬季湿度较低系统自动打开加湿器进口阀门加湿;根据室内湿度情况调节加湿器的加湿量..如加湿器打到最大尚未加湿到设计工况;需增加加湿器..冬季湿度较高此种情况较少见..系统需增加除湿器..6、系统维护规程本工程所选设备均有详细的使用操作维护保养说明书;设备的具体维护规程;详见后附的各设备的说明书..以下为对于整体空调净化系统及制冷加热系统所需注意的维护说明..6.1空调净化系统1空调净化系统需由专人负责操作..负责操作人员必须经过培训方可上岗并详细阅读操作说明及附件文件..2系统运行时;经常检查各种百叶风口;是否出现焊口松动;对开多叶调节阀是否出现紧固螺母松动;并时常紧固此装置;如出现由于螺母松动使对开多叶调节阀的手柄移位;需重新核定该处风量..经常观察防火阀;检测防火阀熔断片是否熔断通常防火阀熔断片熔断后会有报警信号输出;相应系统的风机也会停止;异外情况可通过系统压力突然变化;或阀体附近的气流受阻产生的振动的声音判断..如出现异常情况;请立即停机检修..3空调净化系统设备有运动部件时;需经常对其运转部件进行观察;如空调机组内的风机;排风机等对其皮带轮经常观察是否松动;对其轴承观察是否需加油;各种设备的维护详见设备使用说明书中维护部分..4空调净化系统压力变化主要由于运行时间积累使过滤器积尘而导致的阻力变化..因此空调净化系统的过滤器在经过一段时间的运行后;机组内的初效当阻力达到初阻力的2倍时;即阻力达到80pa时;机组内的中效当阻力达到初阻力的2倍数时;即阻力达到200Pa时;需清洗或更换初中效..当更换完初、中效过滤器后;系统风量仍满足不了风量要求时;应更换高效过滤器..注意:更换完高效过滤器后;要重新核定风量..5系统新风入口的阻尼网需经常清洗及更换;并注意是否有塑料或纸屑吸附在入口上;并及时清除..6经常检查系统的电动保温新风阀执行机构;风阀执行器系统等是否工作正常..7经常检查净化房间的回风口处的阻尼层;积尘严重时应清洗或更换..8净化房间的温度;湿度及洁净度按需要监测;不在设定范围;有较小波动时;可通过调节冷热源部分实现;如出现较大变化或较大区域内的变化;必须分析原因或与技术人员联系后;找出问题;方可进行调节;调节后需重新测定..9回风口设有阻尼;时间长久应更换阻尼层..另外室内回口尺寸不可随意改动;更不应该在回风口处放置杂物;以免影响回风量及气流分布..6.2制冷加热系统维护规程1经常检查净化机组蒸发式表冷器;加湿器进口的阀门的执行机构是否正常..2经常检查各种水管、制冷管道及配件工作是否正常;有无漏水冒汽现象;及时发现;及时修补排除..3当制冷系统重新使用时;要将系统清洗干净..4经常检查空调室外机的运转情况;发现问题及时处理..5经常检查机组内的电加热器;发现问题及时处理..7附录7.1 附图目录7.1.1空调系统送风管道示意图图一7.1.2空调系统回、排风管道示意图图二图纸编号:阶段:日期:年月日。
厂房改造—江苏泰州十万级净化车间改造案例
二、室内照明布局
CEIDI西递根据《洁净厂房设计规范》(GB500732013)对车间进行照明布局:
(1)无采光窗的洁净室(区)的生产用房间一般 照明的照度标准为200lx-500lx;
(2)辅助用房、人员净化和物料净化用室、气闸 室、走廊等为150lx-300lx;
作为一家拥有洁净工程设计、钢结构、净化、装饰装修等相关资质, 以实验室EPC工程、洁净室EPC工程、动物房EPC工程和手术室EPC工 程为主要服务的EPC工程总承包服务商,CEIDI西递改造后的厂房不 仅给车间工作人员创造了良好的劳动条件,也为该企业日后的运营 管理打下了坚实的基础,我们来看看其改造方案以及建议。
厂房改造—江苏 泰州十万级净化 车间改造案例
洁净室是指对空气洁净度、温度、湿度、压力、噪声等参数根据需 要都进行控制的密闭性较好的空间,其有等级的划分:一级、十级、 百级、千级、万级、十万级、三十万级。级别越小,净化级别就越 高,洁净度级别越大造价就越高,其中最常见的便是十万级洁净车 间。近期,江苏泰州有家企业因为更改了产品,需要升级厂房,把 厂房改造为十万级净化车间,找了江浙沪口碑较高的CEIDI西递。
首先,我们来了解一下十万级洁净车间的标准。按照空气无 尘室国标GB/T16292-1996的规定:
洁净度10万级的尘粒最大允许数大或等于0.5微米的粒子数不 得超过3500000个,大于或等于5微米的粒子数不得超过 20000个;
微生物最大允许数,浮游菌数不得超过500个每立方米;沉 降菌数不得超过10个每培养皿;
感谢您的观看与欣赏
10万级要求每小时换气10-15次,完全换气后空气净化时间不 超过40分钟。
负压手术间的管理 ppt课件
4 负压手术间的管理
在日常检查维修时,对回风口内外表面可通过 以下几种方式进行清洁消毒
:
01
每日用强氧化离子水擦拭。
一般污染手术结束后,必须立即使用含氯消毒剂(1000 mg/L)进行
02
擦试。
回风口的过滤器要定期检查,定期维护,每年更换一次,并认真记
03
录。
6
洁净手术部建筑技术规范--
负压手术间的管理
1
目录 Contents
1 负压手术室的建筑要求
2 负压手术室的适用范围 3 术间的管理
负压手术室应有独立出入口,并在出入口处都应设准备室作为缓冲室,缓冲室内设 有专用的血液体液喷洒处理箱、职业暴露处理箱等,以便于对负压手术室隔离封闭。
2 负压手术间的管理
特殊感染手术(结核、破 伤风、朊毒体、气性坏疽、 突发不明原因传染病等)及 麻疹、水痘等病原微生物会 由空气传播的手术,必须维 持室内负压,以控制室内污 染空气。但对伴有HIV阳性 、B型和C型肝炎、 梅毒等 血液传染病的患者进行手术 ,可维持正压。
3 负压手术间的管理
负压手术室是一个独立的净化空调系 统,为防止病原微生物流出室外,必须 确保室内空气洁净度为Ⅱ级。负压手术 室顶棚排风口入口处以及室内回风口入 口处均必须设置高效过滤器,并应在排 风出口处设止回阀,回风入口处设密闭 阀。正负压转换手术室,应在部分回风 口上设高效过滤器,另一部分回风口上 设中效过滤器;当供负压使用时,应关 闭中效过滤器处的密闭阀,当供正压使 用时,应关闭高效过滤器处的密闭阀。
正负压切换手术室设计
为了提高手术室的利用率,把负压手术室设计为正负压切换手术室的医院较多。
正负压切换手术室一般设计为Ⅲ级,正压时做非污染性Ⅲ级手术,负压时做污染性手术,正负压切换通过控制手术室内的排风量来实现。
文章介绍了正负压切换手术室设计中出现的问题,结合实际经验,重点从手术室的平面布局流程、净化空调系统设计等方面进行分析,对正负压切换手术室的设计提出了几点建议。
在建设洁净手术部时,进行传染性疾病手术或为传染病患者进行手术,应遵循传染病管理办法,为此,各医院配备了负压洁净手术室。
我们通过多年对洁净手术部设计的经验及现场使用效果,研究了正负压切换手术室在设计中存在的以下几个问题并提出建议。
1正负压切换手术室流程布局防止感染要从医院建筑设计整体着手,从平面布局阶段就要考虑洁净物品、污物及人员流向。
为避免做污染手术时影响洁净走廊,可以将正负压手术室设置在靠近换车间的地方,开辟一条专用通道,专供做污染手术的病人通过,或者将正负压切换手术室设在靠近污物电梯的位置,做污染手术的患者从污梯经清洁走廊进入手术室。
正负压切换手术室在作为负压手术室使用时,为了防止传染性病毒扩散到其相邻区域,以调节空气压差来控制气流方向为主要手段,手术室对相通的相邻间要保持最小-8Pa的静压差,从而实现对传染病患者的隔离。
为了更好地保护洁净手术部其他区域,负压手术室与其相邻区域之间必须设缓冲室。
有的医院所设的正负压切换手术室只设置了缓冲前室(图1),有的只设置了后室(图2),这种设计方案存在着很大的传染风险,即当人走出手术室会带出部分有传染性的空气,其相邻的区域就会受到污染。
带前室的正负压切换手术室带后室的正负压切换手术室带前后室的正负压切换手术室2手术室与其前后室空调系统配置方案在医院建筑中,空调系统是防止病菌通过空气传播的重要措施,因而其设计与管理十分重要。
手术部内设有不同级别的空气洁净度区域,靠空调通风系统来实现各个区域的不同洁净度,通过控制室内空气压力和气流流向,防止污染区域空气侵入,预防交叉感染。
负压手术室洁净室案例
负压手术室相关案例说明根据长沙市某医院手术部净化空调的要求,设计时采用了独立净化空调机组和集中新排风机组、小型热泵,冬夏用大楼冷热源的设计方案。
手术室使用静压箱孔板送风、下侧回风,洁净走廊和辅房上送上回。
概要介绍了所采用的空气处理方式、空调自控内容、对象,工程竣工后进行的调试与运行情况。
测试与运行结果表明:工作区的气流速度场和温度场分布均匀,噪声、洁净度、新风量、菌落数超过军队YFB001-1995标准,其它指标达到标准,符合医院使用要求。
1.概况医院手术部由手术一室(Ⅲ级)、手术三室(Ⅲ级)、手术二室(Ⅱ级)和十万级的器械室、敷料室、洁净走廊组成,位于医院新建的综合病房楼七层,净化空调面积138m2。
大楼八层为技术层,布置净化机组、设备;热泵机组置于四楼屋面上。
根据医院需要, 手术一室用于普外手术,手术二室用于胸外手术, 手术三室用于眼科手术。
为满足医院的使用要求,设计时采用了独立净化空调机组和集中新排风机组、小型热泵,冬夏用大楼冷热源的设计方案。
手术室使用静压箱孔板送风、下侧回风,洁净走廊和辅房上送上回。
测试与运行结果表明:工作区的气流速度场和温度场分布均匀,噪声、洁净度、新风量、菌落数超过军队YFB001-1995标准,并超过了2002年《医院洁净手术部建筑技术规范》GB50333-2002。
其它指标达到设计要求。
净化空调系统运行四年来,效果较好。
2.室内设计参数的确定本工程采用的设计参数是根据《洁净室施工及验收规范》JGJ71-90和《军队医院洁净手术部建筑技术规范》YFB001-1995以及院方的要求,参照有关技术措施和医院手术部的设计经验综合考虑后确定的。
根据医院手术的类型和数量、院方划给的手术部总面积、手术部的楼层位置,确定了手术部的平面布置,各个房间的室内设计参数YFB001-1995规定见表1。
由于医用净化空调系统空气处理工艺的特殊要求,其初投资一般较高,在符合规范的前提下,院方常常会提出更高的要求,系统的经济性也越来越受到关注。
某洁净手术室夏季相对湿度超标问题分析与改造
某洁净手术室夏季相对湿度超标问题分析与改造邓鹏 毛前明 彭继 汤必胜远大洁净空气科技有限公司摘 要: 洁净手术室设计和施工应严格遵守GB503332013 《医院洁净手术部建筑技术规范》, 而在实际工程中, 由 于设计与施工脱节等原因造成了一些手术室运营中会产生各种问题,其中夏季相对湿度超标是出现最多的问题 之一, 本文对该问题原因进行分析并提出解决方法。
关键词: 相对湿度 洁净手术室 露点温度The Analysis and Solution of Excessive Relative Humidityof a Hospital Operating Room in summertimeDENG Peng,MAO Qianming,PENG Ji,TANG BishengBroad Air Clean TechAbstract: The design and construction of clean operating room should strictly abide by GB 503332013Building Technical Specification of Hospital Clean Operating Department.However,in practical engineering,there are many problems in operation of operating room due to the disconnection between design and construction.Among them, excessive relative humidity in summer is one of the most common problems.This paper analyses the causes of these problems and puts forward solutions.Keywords:relative humidity,cleaning operating room,dewpoint temperature收稿日期: 2019122作者简介: 邓鹏 (1983~), 男, 本科, 高工; 湖南省长沙市远大三路远大城 (410138); Email:************ 基金项目: 国家十三五重点研发计划 (2017YFC0702800)在医院建筑中, 洁净手术部不同于普通病房等区 域, 是一个对温度、 相对湿度、 洁净度等指标控制要求很高的功能区。
医院手术室洁净空调系统设计探析
医院手术室洁净空调系统设计探析摘要:合理的选择手术室的空调系统形式和气流组织方式以及净化空调设备,既可以得到良好的手术环境,又能达到节能的目的。
本文结合笔者几年的工作经验及工程实例对医院手术室洁净空调系统的设计做出一些讨论和分析。
关键词:洁净手术室;空调系统;设计1、工程概况医院病房综合楼建筑面积8935.25 m2,建筑高度29m,地上7层,地下一层,一至四层为病房,五层为洁净产房及其洁净辅房,六层为医院洁净手术部及其辅房,七层为空调设备层及水箱间。
该医院洁净手术部及其洁净辅房都是在遵循新标准的基础上设计的,空调系统的设计也是以高标准、高要求为设计原则,遵循国家现行的节能设计规范和标准,同时还要满足医院洁净区各个功能的要求。
2、产房、手术室及其辅房平面布置产房位于急救中心的五层,主要服务于产妇生产。
产房区域主要由洁净走廊、1间ⅳ级分娩室、1间ⅳ级隔离产房、待产室、无菌物品室、洗婴室、污物走廊及相关的辅助用房、医护办公、病房组成;为了避免病菌交叉感染,ⅳ级隔离产房设置独立缓冲走廊,起到与相邻区域缓冲作用。
手术部位于急救中心的六层,主要服务于各内、外科手术。
手术部主要由1间ⅰ级手术室、2间ⅱ级手术室、1间ⅲ级正负压转换手术室、换车间、洁净走廊、污物走廊及相关的辅助用房组成。
为了避免病菌交叉感染,其中最高级别的ⅰ级手术室设置于手术部的最深处;ⅲ级正负压转换手术室的入口设置一间缓冲室,起到与相邻区域缓冲的作用。
通过和建筑专业、甲方的沟通和协商,优化了手术室和辅房的建筑平面布置,使手术部流程更加合理,而且便于在医院手术部的净化空调设计阶段划分不同功能用房的洁净等级,并将一部分不必划入洁净区域的功能用房设计为舒适性空调,从而根据净化空调和舒适性空调的设计标准的差异,通过降低这些功能用房的送风量、新风量、热湿量等,达到减少能耗的效果。
3、净化空调设计3.1设计参数ⅰ级手术室:22~25℃,相对湿度40~60%,手术区手术台工作面高度截面平均风速:0.25~0.3m/s;ⅱ级手术室:22~25℃,相对湿度40~60%,换气次数30~36次/h;ⅲ级手术室:22~25℃,相对湿度35~60%,换气次数18~22次/h;ⅳ级手术室:22~25℃,相对湿度35~60%,换气次数12~15次/h;洁净走廊及相应辅助用房:21~27℃,相对湿度≤65%,换气次数10~13次/h;3.2 空调系统划分在此医院手术部及产房净化空调系统设计方案中,结合当地全年的气候特点,考虑到手术部及产房存在通过外围护结构的传热,夏季需要供冷、冬季需要供热,因此根据不同功能用房的冷热负荷的特点,需要对医院手术部及产房的净化空调系统进行划分。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
负压手术室洁净室案例
负压手术室相关案例说明
根据长沙市某医院手术部净化空调的要求,设计时采用了独立净化空调机组和集中新排风机组、小型热泵,冬夏用大楼冷热源的设计方案。
手术室使用静压箱孔板送风、下侧回风,洁净走廊和辅房上送上回。
概要介绍了所采用的空气处理方式、空调自控内容、对象,工程竣工后进行的调试与运行情况。
测试与运行结果表明:工作区的气流速度场和温度场分布均匀,噪声、洁净度、新风量、菌落数超过军队YFB001-1995标准,其它指标达到标准,符合医院使用要求。
1.概况
医院手术部由手术一室(Ⅲ级)、手术三室(Ⅲ级)、手术二室(Ⅱ级)和十万级的器械室、敷料室、洁净走廊组成,位于医院新建的综合病房楼七层,净化空调面积138m2。
大楼八层为技术层,布置净化机组、设备;热泵机组置于四楼屋面上。
根据医院需要, 手术一室用于普外手术,手术二室用于胸外手术, 手术三室用于眼科手术。
为满足医院的使用要求,设计时采用了独立净化空调机组和集中新排风机组、小型热泵,冬夏用大楼冷热源的设计方案。
手术室使用静压箱孔板送风、下侧回风,洁净走廊和辅房上送上回。
测试与运行结果表明:工作区的气流速度场和温度场分布均匀,噪声、洁净度、新风量、菌落数超过军队YFB001-1995标准,并超过了2002年《医院洁净手术部建筑技术规范》GB50333-2002。
其它指标达到设计要
求。
净化空调系统运行四年来,效果较好。
2.室内设计参数的确定
本工程采用的设计参数是根据《洁净室施工及验收规范》JGJ71-90
和《军队医院洁净手术部建筑技术规范》YFB001-1995以及院方的要求,参照
有关技术措施和医院手术部的设计经验综合考虑后确定的。
根据医院手术的类型和数量、院方划给的手术部总面积、手术部的楼层位置,确定了手术部的平面布置,各个房间的室内设计参数
YFB001-1995规定见表1。
由于医用净化空调系统空气处理工艺的特殊要求,其初投资一般较高,在符合规范的前提下,院方常常会提出更高的要求,系统的经济性也越来越受到关注。
因此在确定室内参数时,必需考虑医院水、电、汽和土建的现状,医院的环境、资金和需要,有所侧重。
2.1室内温、湿度
室内温、湿度主要是为医护人员创造出最有利于工作的舒适环境,满足手术过程的严格要求。
适宜的温度对保持病人的体温是必须的;湿度低会产生静电和切口软组织失水,湿度高使人不适、影响精细操作。
因为院方长时间的大型手术很少,南
京常年空气湿度较高,本工程对温度严格控制、对湿度的上限严格控制、湿度的下限要求降到次要位置。
2.2室内空气洁净度
考虑到医院的手术对象多为老年人,控制感染的要求特别强烈,提高洁净度有利于增强自净的能力,抵抗干扰;同时本工程采用的德国医用卫生型机组风量大,压头高,确定除手术室按表1选择洁净度外,洁净走廊和辅房均为十万级,同时提高换气次数:手术一室、三室为38次/h ,手术二室为65次/h,辅房和洁净走廊为22次
/h。
2.3室内正压
为防止外部的污染空气进入手术室和洁净区,保持室内洁净度要求,各房间设计为正压。
由于手术室采用医用气密门,换气次数较高,故取表1的正压值。
2.4室内噪声
对手术部而言,噪声控制的要求较为严格。
设计指标按表1,从严掌握。
2.5新风量
新风量对维持室内正压、稀释并排除手术室内有害气体,保证医患人员的舒适性起着至关重要的作用。
保证室内正压要求的新风量为:
新风量对维持室内正压、稀释并排除手术室内有害气体,保证医患人员的舒适性起着至关重要的作用。
保证室内正压要求的新风量为:
Q1 =a?∑(q?l)式中Q1 ——保持洁净室正压所需的新风量(m3/h);a ——根据维护结构气密性确定的安全系数,一般可取 1.1~1.2;q ——当洁净室为某一正压时,其维护结构单位长度缝隙的渗漏风量(m3 /h? m)可根据正压值查表得到;l ——维护结构的缝隙长度。