发电机出口断路器GCB介绍参考资料
合集下载
相关主题
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
FKG断路器介绍
21/02/2012
GRID
FKG2 GENERATOR CIRCUIT-BREAKERS
FKG2发电机断路器
Presentation title - 01/01/2010 - P 2
FKG2发电机断路器
Presentation title - 01/01/2010 - P 3
Presentation title - 01/01/2010 - P 4
Presentation title - 01/01/2010 - P 42
➢Electrical Wearing: ➢电气磨损
FKG2 GCB Preventive Maintenance FKG2 GCB预防维护
NI 2,22 = 55 000 kA 2,22
Interrupt a 63kA current 7 times or
Presentation title - 01/01/2010 - P 36
Presentation title - 01/01/2010 - P 37
Presentation title - 01/01/2010 - P 38
SKG隔离开关
Presentation title - 01/01/2010 - P 39
Opening latch Opening system Closing and Opening actuators (mech./el.) Auxiliary equipment
Function description FK 3-X
Functional units FK 3-X, closing/tripping system
Presentation title - 01/01/2010 - P 9
FKG2隔离开关
辅助开关 机械连锁
Presentation title - 01/01/2010 - P 10
电机
继电器
FKG2 G2 Architecture FKG2 G2架构
Disconnector linking rods 隔离开关连接杆
Operating states
Stationary operating states
Function description FK 3-X
Presentation title - 01/01/2010 - P 27
Non stationary operating states
Function description FK 3-X
»… to Preventive Condition
Based Maintenance 到根据环境进行维护 ➢ Refurbishing : when one of following criteria is reached : ➢翻修:当下列达到下列任一条件 ▪ Operating time ≥ 20 years ▪操作时间≥20年 ▪ Mechanical wearing : according to operation conditions ▪机构磨损:根据操作状况 ▪ Electrical wearing: according to interrupted currents ▪电气磨损:根据断续电流
Presentation title - 01/01/2010 - P 23
Main functional components FK3-X
Presentation title - 01/01/2010 - P 24
Closing spring Charging gear Closing latch Closing system Opening spring
Function description FK 3-X
Non stationary position: - closing spring partially charged (recuperation) - opening spring charged (CB closed) - motor actuated automatically through control cam
Presentation title - 01/01/2010 - P 15
Presentation title - 01/01/2010 - P 16
Presentation title - 01/01/2010 - P 17
Presentation title - 01/01/2010 - P 18
➢Main FKG2 Inspection Operations:
➢主FKG2检测操作:
FKG2 GCB Preventive Maintenance FKG2 GCB预防维护
Presentation title - 01/01/2010 - P 46
➢ Control of SF6 gas rated pressure
Presentation title - 01/01/2010 - P 19
Presentation title - 01/01/2010 - P 20
Presentation title - 01/01/2010 - P 21
Presentation title - 01/01/2010 - P 22
➢ Checking of good tightness of mechanism damper
机械和电气在机构中的功能
Presentation title - 01/01/2010 - P 32
Presentation title - 01/01/2010 - P 33
Presentation title - 01/01/2010 - P 34
Presentation title - 01/01/2010 - P 35
Presentation title - 01/01/2010 - P 5
FK3-X机构
Presentation title - 01/01/2010 - P 6
FK3-12 FK3-4
FK3-1
FK3-5
Presentation title - 01/01/2010 - P 7
Presentation title - 01/01/2010 - P 8
FKG2S / 6,800 Amps One phase: 一个相:
Presentation title - 01/01/2010 - P 40
FKG2S / 6,800 Amps One phase: 一个相:
Presentation title - 01/01/2010 - P 41
FKG2 GCB Preventive Maintenance FKG2 GCB预防维护
Charging of the closing spring
Position (non stationary) corresponding to the delivery state: - closing spring partially charged (recuperation) - opening spring discharged (CB open)
Function description FK 3-X
Functional units FK 3-X
3
9
10
12
6
13 7
11
8
4
5
1
2
Presentation title - 01/01/2010 - P 26
1. Charging motor 2. Charging gearing 3. Closing spring 4. Closing latch 5. Closing coil 6. Closing cam disc 7. Closing shaft 8. Trip coil 9. Roller lever 10. Main shaft 11. Trip latch 12. Trip spring 13. Trip dashpot
Presentation title - 01/01/2010 - P 11
Presentation title - 01/01/2010 - P 12
Presentation title - 01/01/2010 - P 13
Presentation title - 01/01/2010 - P 14
Transformers inspection 变压器检查 Measurement of contact resistances 测量接触电阻
Presentation title - 01/01/2010 - P 45
Insulators inspection 检查绝缘体
Inspection of linkage system 检查连接系统
The mechanism is ready for a closing operation: - closing spring charged - trip spring discharged (CB open)
Presentation title - 01/01/2010 - P 28
Closing operation (a)
➢控制SF6气体额定压力
➢Test of SF6 density switch thresholds
➢检测SF6密度开关的极限
➢Main FKG2 Inspection Operations:
➢主FKG2检测操作:
FKG2 GCB Preventive Maintenance FKG2 GCB预防维护
Interrupt a 4,5kA current 3000 times
中断63kA电流7次或中断4.5kA电流3000次
Presentation title - 01/01/2010 - P 43
FKG2 GCB Preventive Maintenance FKG2 GCB预防维护
Before all intervention on the operating device, make sure that the circuit-breaker is opened with released closing spring 在所有操作装置全部启动前,确保断路器合闸弹簧全部开启
»From Preventive Time Based Maintenance »从根据时间进行维护
➢ Visual Inspection : Once or Twice a year ➢外观检查:一年一次或两次 ➢ Inspection : Every 5 years of service ➢检查:每五年进行一次服务
Presentation ห้องสมุดไป่ตู้itle - 01/01/2010 - P 29
Function description FK 3-X
Closing operation (b) / closing spring charging
Position after closing operation: - closing spring charged - opening spring charged (CB closed)
Closing spring charged
Tripping spring discharged CB main contact
Presentation title - 01/01/2010 - P 25
C2 Crank wheel system
B2 Cam with special shape
b g
Presentation title - 01/01/2010 - P 44
➢Main FKG2 Inspection Operations:
➢主FKG2检查操作:
FKG2 GCB Preventive Maintenance FKG2 GCB预防维护
Measurement of operating times 测量操作次数
Presentation title - 01/01/2010 - P 30
Opening operation
Function description FK 3-X
Opening spring discharged (CB open)
Presentation title - 01/01/2010 - P 31
21/02/2012
GRID
FKG2 GENERATOR CIRCUIT-BREAKERS
FKG2发电机断路器
Presentation title - 01/01/2010 - P 2
FKG2发电机断路器
Presentation title - 01/01/2010 - P 3
Presentation title - 01/01/2010 - P 4
Presentation title - 01/01/2010 - P 42
➢Electrical Wearing: ➢电气磨损
FKG2 GCB Preventive Maintenance FKG2 GCB预防维护
NI 2,22 = 55 000 kA 2,22
Interrupt a 63kA current 7 times or
Presentation title - 01/01/2010 - P 36
Presentation title - 01/01/2010 - P 37
Presentation title - 01/01/2010 - P 38
SKG隔离开关
Presentation title - 01/01/2010 - P 39
Opening latch Opening system Closing and Opening actuators (mech./el.) Auxiliary equipment
Function description FK 3-X
Functional units FK 3-X, closing/tripping system
Presentation title - 01/01/2010 - P 9
FKG2隔离开关
辅助开关 机械连锁
Presentation title - 01/01/2010 - P 10
电机
继电器
FKG2 G2 Architecture FKG2 G2架构
Disconnector linking rods 隔离开关连接杆
Operating states
Stationary operating states
Function description FK 3-X
Presentation title - 01/01/2010 - P 27
Non stationary operating states
Function description FK 3-X
»… to Preventive Condition
Based Maintenance 到根据环境进行维护 ➢ Refurbishing : when one of following criteria is reached : ➢翻修:当下列达到下列任一条件 ▪ Operating time ≥ 20 years ▪操作时间≥20年 ▪ Mechanical wearing : according to operation conditions ▪机构磨损:根据操作状况 ▪ Electrical wearing: according to interrupted currents ▪电气磨损:根据断续电流
Presentation title - 01/01/2010 - P 23
Main functional components FK3-X
Presentation title - 01/01/2010 - P 24
Closing spring Charging gear Closing latch Closing system Opening spring
Function description FK 3-X
Non stationary position: - closing spring partially charged (recuperation) - opening spring charged (CB closed) - motor actuated automatically through control cam
Presentation title - 01/01/2010 - P 15
Presentation title - 01/01/2010 - P 16
Presentation title - 01/01/2010 - P 17
Presentation title - 01/01/2010 - P 18
➢Main FKG2 Inspection Operations:
➢主FKG2检测操作:
FKG2 GCB Preventive Maintenance FKG2 GCB预防维护
Presentation title - 01/01/2010 - P 46
➢ Control of SF6 gas rated pressure
Presentation title - 01/01/2010 - P 19
Presentation title - 01/01/2010 - P 20
Presentation title - 01/01/2010 - P 21
Presentation title - 01/01/2010 - P 22
➢ Checking of good tightness of mechanism damper
机械和电气在机构中的功能
Presentation title - 01/01/2010 - P 32
Presentation title - 01/01/2010 - P 33
Presentation title - 01/01/2010 - P 34
Presentation title - 01/01/2010 - P 35
Presentation title - 01/01/2010 - P 5
FK3-X机构
Presentation title - 01/01/2010 - P 6
FK3-12 FK3-4
FK3-1
FK3-5
Presentation title - 01/01/2010 - P 7
Presentation title - 01/01/2010 - P 8
FKG2S / 6,800 Amps One phase: 一个相:
Presentation title - 01/01/2010 - P 40
FKG2S / 6,800 Amps One phase: 一个相:
Presentation title - 01/01/2010 - P 41
FKG2 GCB Preventive Maintenance FKG2 GCB预防维护
Charging of the closing spring
Position (non stationary) corresponding to the delivery state: - closing spring partially charged (recuperation) - opening spring discharged (CB open)
Function description FK 3-X
Functional units FK 3-X
3
9
10
12
6
13 7
11
8
4
5
1
2
Presentation title - 01/01/2010 - P 26
1. Charging motor 2. Charging gearing 3. Closing spring 4. Closing latch 5. Closing coil 6. Closing cam disc 7. Closing shaft 8. Trip coil 9. Roller lever 10. Main shaft 11. Trip latch 12. Trip spring 13. Trip dashpot
Presentation title - 01/01/2010 - P 11
Presentation title - 01/01/2010 - P 12
Presentation title - 01/01/2010 - P 13
Presentation title - 01/01/2010 - P 14
Transformers inspection 变压器检查 Measurement of contact resistances 测量接触电阻
Presentation title - 01/01/2010 - P 45
Insulators inspection 检查绝缘体
Inspection of linkage system 检查连接系统
The mechanism is ready for a closing operation: - closing spring charged - trip spring discharged (CB open)
Presentation title - 01/01/2010 - P 28
Closing operation (a)
➢控制SF6气体额定压力
➢Test of SF6 density switch thresholds
➢检测SF6密度开关的极限
➢Main FKG2 Inspection Operations:
➢主FKG2检测操作:
FKG2 GCB Preventive Maintenance FKG2 GCB预防维护
Interrupt a 4,5kA current 3000 times
中断63kA电流7次或中断4.5kA电流3000次
Presentation title - 01/01/2010 - P 43
FKG2 GCB Preventive Maintenance FKG2 GCB预防维护
Before all intervention on the operating device, make sure that the circuit-breaker is opened with released closing spring 在所有操作装置全部启动前,确保断路器合闸弹簧全部开启
»From Preventive Time Based Maintenance »从根据时间进行维护
➢ Visual Inspection : Once or Twice a year ➢外观检查:一年一次或两次 ➢ Inspection : Every 5 years of service ➢检查:每五年进行一次服务
Presentation ห้องสมุดไป่ตู้itle - 01/01/2010 - P 29
Function description FK 3-X
Closing operation (b) / closing spring charging
Position after closing operation: - closing spring charged - opening spring charged (CB closed)
Closing spring charged
Tripping spring discharged CB main contact
Presentation title - 01/01/2010 - P 25
C2 Crank wheel system
B2 Cam with special shape
b g
Presentation title - 01/01/2010 - P 44
➢Main FKG2 Inspection Operations:
➢主FKG2检查操作:
FKG2 GCB Preventive Maintenance FKG2 GCB预防维护
Measurement of operating times 测量操作次数
Presentation title - 01/01/2010 - P 30
Opening operation
Function description FK 3-X
Opening spring discharged (CB open)
Presentation title - 01/01/2010 - P 31