G lobal I ndustrial O perations

系统是否直接接触产品?

G lobal I ndustrial O perations

G lobal I ndustrial O perations

G lobal I ndustrial O perations G lobal I ndustrial O perations

4)来源于该组件的信息被记录在批记录中或其它GMP相关文件中

G lobal I ndustrial O perations

7)此组件用来建立和保持系统的关键状态

G lobal I ndustrial O perations

设计确认Design Qualification (DQ)

文件证明,设计标准涵盖所有的用户要求标准

Documented evidence to prove that the consideration of Design Specification fully covers User Requirements Specification

设计确认包括Design Qualification Activities:

准备DQ 核对单检查Produce a DQ check-list to check:•设计标准是按照用户要求纲要进行的DS against URB •评估供应商过程是按照设计标准进行的Supplier’s competency against DS

•准备IQ+OQ 方案IQ+OQ protocol preparation

32

Process/Stage

Function/Opera tion Identification of failure

Evaluation risk

Control

Measure

Validation of control measure

Residual Risk

Severity

Likelihood

Consequence

U

R S D S I Q

O Q

P Q

43

P r o c e s s U R S I O Q P Q 确认和研究风险可能性EM 建立可检测性

清洁

计划

降低可

能性

第6阶段-性能确认

Stage 6-Process Qualification

性能确认

Process Qualification

最终用户

End User Handover 验证批准

Validation Approval 第7阶段

To Stage 7

项目管理Project Management

Overview –Qualification Record

‘Baseline documents’& baseline

procedures

Number of documents depends

on system

Only update upon re‐

qualifcation

All original documents stored

under QA (Validation) function

–forms is a means of reference

only

Proposed changes are by CCF, or local SOPs

Provides a logic map on cause and effect; Every change requires an assessment of required

updates

Essential to support periodic review practices; central part of strategy on ‘Validation Life Cycle’

Each device that uses software / firmware is within scope

Scope can change over Validation Lifecycle

proof History

Issue is on ‘opening’instrument for maintenance

Each device that uses software / firmware is within scope Scope can change over Validation Lifecycle

Intended schedule of work

Unscheduled work i.e. breakdowns, repairs, Outcome of tamper‐evident label and

Specification

Base‐lining of requirements, either by system manuals and / or formal functional specification document Controls and records the progress on increasing

Traceability

Link to functional specification

Controls and records the progress on increasing capability

相关文档