1号办公楼清单工程量计算式
合集下载
相关主题
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
粒砌块墙体,M5泥合砂浆
m3
177.55
外墙砖厚250mm,墙砖厚200mm
外墙V=65.2×(3.6-0.7)×0.25×3层=141.81m3
墙V=(6-0.6)×6×(3.6-0.7)×0.2×3层+[(4.5+0.3-0.25-0.1)+(6+0.35-0.25-0.1)]×(3.6-0.5)×0.2×2层+[(4.5+0.3-0.25-0.1)+(6+0.35-0.25-0.1)]×(3.6-0.15)×0.2×1层=76.54m3
女儿墙:V=(22.9-0.25+15.6-0.25)×2×0.25×0.54
=10.26m3
扣门窗所占体积: -0.9×2.4×0.2×20+0.75×2.1×0.2×6+
4.2×2.9×0.25+1.5×2×0.25×18+3×2×0.25×9+3.3×2×0.25×5)=-48.83m3
扣过梁体积:-0.69m3
扣构造柱体积:-(1.69-0.149)=-1.54m3
小计:141.81+76.54+10.26-48.83-0.69
-1.54=177.55 m3
9
1
台阶平台处3:7灰土垫层
m3
2.43
V=(1.8+1.2)/2×0.3×5.4=2.43m3
10
2
砾石灌浆垫层地面
m3
46.34
(42.21+5.04+40.05+33.83+187.8)×0.15=46.34m3
办公室:(6+0.35-0.25-0.1+6-0.2+6-0.2+3.3+0.35-0.25-0.1)×(6+0.3-0.25-0.1)×(0.45-0.236)
=26.61 m3
走廊:(3-0.2)×(22.9-0.252)×(0.45-0.236)=13.57 m3
楼梯间:(3.3-0.1+0.35-0.25)×(6+0.3-0.25+0.1)×(0.45-0.236)=4.34 m3
女儿墙上GZ1:V=0.25×0.25×0.54×24+马牙槎0.03×0.25×2×0.54×24=1.0m3 小计:1.69m3
18
1
C30混凝土有梁板
m3
214.14
标高3.55、7.15处梁:
KL1(4) =0.3×0.7×(22.2-0.35×2-0.7×3)=4.07m3
会议室:(6.9-0.2)×(6+0.3-0.25-0.1)×(0.45-0.25)
=7.97m3
厕所:[(6+0.35-0.25-0.2-0.1)×(4.5+0.3-0.25-0.1) +(6-0.35-0.25-0.1)×(1.5-0.2)] ×(0.45-0.234)
=7.06m3
室回填:8.24+26.61+13.57+4.34+7.97+7.06=67.79m3
砖基础:L=(6-0.6)×6+(4.5+0.3-0.25-0.1)+(6+0.35-0.25-0.1)=42.85m
V=65.2×0.25×1.0+42.85×0.2×1.0-(0.25×0.25×1.0×2
+0.03×0.2×1.0×2×2)=24.87-(Z1)0.149=24.72 m3
8
1
小计:201.58+67.79=269.37m3
6
2
塔吊基础回填方
m3
8.3
参照《2014省建筑工程消耗量》下册垂直运输工程定额说明:塔吊基础回填方8.3m3
附录D 砌筑工程
7
1
砖基础,M5水泥砂浆
m3
24.72
砖基础高1.0m。外墙砖基础厚250mm墙砖基础厚200mm
外墙砖基础:L=(22.9+15.6)×2-(0.7×10+0.6×8)=65.2m
序号
项目编码
项目名称
单位
工程量
计算式
附录A 土石方工程
1
1
平整场地
m2
357.24
22.9×15.6=357.24 m2
2
1
挖满堂基础土方
m3
504
挖土底标高为-1.7m,室外设计地坪标高-0.45m,挖土深度为1.7-0.45=1.25m。24×16.8×1.25=504 m3
3
1
挖基础梁土方
m3
8.13
挖土底标高为-1.8m,挖土深度为1.8-1.7=0.1m JZLI(4) V=0.5×0.1×(22.4×2+21.9×2)=4.43m3
JZL2(3) V=0.5×0.1×(15.1×2+14.6×3)=3.70m3
小计:8.05m3
4
1
挖塔吊基础土方
m3
52.2
参照《2014省建筑工程消耗量》下册垂直运输工程定额说明:塔吊基础开挖土方52.2m3
15
1
C30混凝设备基础
m3
33.75
参照《2014省建筑工程消耗量》下册垂直运输工程定额说明:塔吊基础33.75m3
16
1
C30混凝土矩形柱
m3
98.7
KZ1:V=0.7×0.6×(1.0+10.75)×20(个)=98.7m3
17
1
C25混凝土构造柱
m3
1.69
Z1: V=0.25×0.25×(1+1.8)×2+0.25×0.25×(5.4-3.6)×2+马牙槎0.03×0.2×2× (1+1.8)×2+0.03×0.2×2×1.8×2=0.69m3
5
1
回填方
m3
269.37
基础回填:V=挖方体积-室外地坪以下基础体积=504+8.05-40.32(垫层)-251.85(满堂基础)-0.7×0.6×0.55×20 (柱子)-24.72×0.55 (砖基础)-0.149×0.55(构造柱)=201.58m3
室回填:V=主墙间面积回填厚度
大厅:(6.9-0.2)×(6+0.3-0.25+0.1)×(0.45-0.25)=8.24 m3
14
1
C30混凝土满堂基础
m3
251.85
底板:V=23.8×16.6×0.6=237.05m3
基础梁:
JZL1(4) V=0.5×(0.8-0.6)×(22.4×2+21.9×2)=8.86m3JZL2(3) V=0.5×(0.8-0.6)×(15.1×2+14.6×2)=5.94 m3
小计:251.85m3
11
3
地面C10砼垫层
m3
13.76
(42.21+5.04+40.05+187.8)×0.05=13.76m3
附录E 混凝土及钢筋混凝土工程
12
1
C15混凝土垫层
m3
40.32
满堂基础基础垫层:V=24×16.8×0.1Fra Baidu bibliotek40.32 m3
13
2
C15混凝土垫层
m3
2.7
参照《2014省建筑工程消耗量》下册垂直运输工程定额说明:塔吊基础垫层2.7m3
m3
177.55
外墙砖厚250mm,墙砖厚200mm
外墙V=65.2×(3.6-0.7)×0.25×3层=141.81m3
墙V=(6-0.6)×6×(3.6-0.7)×0.2×3层+[(4.5+0.3-0.25-0.1)+(6+0.35-0.25-0.1)]×(3.6-0.5)×0.2×2层+[(4.5+0.3-0.25-0.1)+(6+0.35-0.25-0.1)]×(3.6-0.15)×0.2×1层=76.54m3
女儿墙:V=(22.9-0.25+15.6-0.25)×2×0.25×0.54
=10.26m3
扣门窗所占体积: -0.9×2.4×0.2×20+0.75×2.1×0.2×6+
4.2×2.9×0.25+1.5×2×0.25×18+3×2×0.25×9+3.3×2×0.25×5)=-48.83m3
扣过梁体积:-0.69m3
扣构造柱体积:-(1.69-0.149)=-1.54m3
小计:141.81+76.54+10.26-48.83-0.69
-1.54=177.55 m3
9
1
台阶平台处3:7灰土垫层
m3
2.43
V=(1.8+1.2)/2×0.3×5.4=2.43m3
10
2
砾石灌浆垫层地面
m3
46.34
(42.21+5.04+40.05+33.83+187.8)×0.15=46.34m3
办公室:(6+0.35-0.25-0.1+6-0.2+6-0.2+3.3+0.35-0.25-0.1)×(6+0.3-0.25-0.1)×(0.45-0.236)
=26.61 m3
走廊:(3-0.2)×(22.9-0.252)×(0.45-0.236)=13.57 m3
楼梯间:(3.3-0.1+0.35-0.25)×(6+0.3-0.25+0.1)×(0.45-0.236)=4.34 m3
女儿墙上GZ1:V=0.25×0.25×0.54×24+马牙槎0.03×0.25×2×0.54×24=1.0m3 小计:1.69m3
18
1
C30混凝土有梁板
m3
214.14
标高3.55、7.15处梁:
KL1(4) =0.3×0.7×(22.2-0.35×2-0.7×3)=4.07m3
会议室:(6.9-0.2)×(6+0.3-0.25-0.1)×(0.45-0.25)
=7.97m3
厕所:[(6+0.35-0.25-0.2-0.1)×(4.5+0.3-0.25-0.1) +(6-0.35-0.25-0.1)×(1.5-0.2)] ×(0.45-0.234)
=7.06m3
室回填:8.24+26.61+13.57+4.34+7.97+7.06=67.79m3
砖基础:L=(6-0.6)×6+(4.5+0.3-0.25-0.1)+(6+0.35-0.25-0.1)=42.85m
V=65.2×0.25×1.0+42.85×0.2×1.0-(0.25×0.25×1.0×2
+0.03×0.2×1.0×2×2)=24.87-(Z1)0.149=24.72 m3
8
1
小计:201.58+67.79=269.37m3
6
2
塔吊基础回填方
m3
8.3
参照《2014省建筑工程消耗量》下册垂直运输工程定额说明:塔吊基础回填方8.3m3
附录D 砌筑工程
7
1
砖基础,M5水泥砂浆
m3
24.72
砖基础高1.0m。外墙砖基础厚250mm墙砖基础厚200mm
外墙砖基础:L=(22.9+15.6)×2-(0.7×10+0.6×8)=65.2m
序号
项目编码
项目名称
单位
工程量
计算式
附录A 土石方工程
1
1
平整场地
m2
357.24
22.9×15.6=357.24 m2
2
1
挖满堂基础土方
m3
504
挖土底标高为-1.7m,室外设计地坪标高-0.45m,挖土深度为1.7-0.45=1.25m。24×16.8×1.25=504 m3
3
1
挖基础梁土方
m3
8.13
挖土底标高为-1.8m,挖土深度为1.8-1.7=0.1m JZLI(4) V=0.5×0.1×(22.4×2+21.9×2)=4.43m3
JZL2(3) V=0.5×0.1×(15.1×2+14.6×3)=3.70m3
小计:8.05m3
4
1
挖塔吊基础土方
m3
52.2
参照《2014省建筑工程消耗量》下册垂直运输工程定额说明:塔吊基础开挖土方52.2m3
15
1
C30混凝设备基础
m3
33.75
参照《2014省建筑工程消耗量》下册垂直运输工程定额说明:塔吊基础33.75m3
16
1
C30混凝土矩形柱
m3
98.7
KZ1:V=0.7×0.6×(1.0+10.75)×20(个)=98.7m3
17
1
C25混凝土构造柱
m3
1.69
Z1: V=0.25×0.25×(1+1.8)×2+0.25×0.25×(5.4-3.6)×2+马牙槎0.03×0.2×2× (1+1.8)×2+0.03×0.2×2×1.8×2=0.69m3
5
1
回填方
m3
269.37
基础回填:V=挖方体积-室外地坪以下基础体积=504+8.05-40.32(垫层)-251.85(满堂基础)-0.7×0.6×0.55×20 (柱子)-24.72×0.55 (砖基础)-0.149×0.55(构造柱)=201.58m3
室回填:V=主墙间面积回填厚度
大厅:(6.9-0.2)×(6+0.3-0.25+0.1)×(0.45-0.25)=8.24 m3
14
1
C30混凝土满堂基础
m3
251.85
底板:V=23.8×16.6×0.6=237.05m3
基础梁:
JZL1(4) V=0.5×(0.8-0.6)×(22.4×2+21.9×2)=8.86m3JZL2(3) V=0.5×(0.8-0.6)×(15.1×2+14.6×2)=5.94 m3
小计:251.85m3
11
3
地面C10砼垫层
m3
13.76
(42.21+5.04+40.05+187.8)×0.05=13.76m3
附录E 混凝土及钢筋混凝土工程
12
1
C15混凝土垫层
m3
40.32
满堂基础基础垫层:V=24×16.8×0.1Fra Baidu bibliotek40.32 m3
13
2
C15混凝土垫层
m3
2.7
参照《2014省建筑工程消耗量》下册垂直运输工程定额说明:塔吊基础垫层2.7m3