20米箱梁张拉计算
20m箱梁张拉计算书(五号梁场)
20米箱梁预应力筋张拉计算书一、平均张拉力计算计算公式:PP=P*(1-e-(K*X+μ*θ))/(K*X+μ*θ)PP---预应力筋平均张拉力(N)P---预应力筋张拉端张拉力(N)X---张拉端至计算截面的孔道长(m)θ---从张拉端至计算截面曲线孔道部分切线的夹角之和(rad) K---管道偏差系数(设计图中给出0.0015)μ---管道摩擦系数(设计图中给出0.25)1、中跨N1束已知量:P = 775.62KN R = 3000cm K = 0.0015 μ = 0.25可得出:θ= 0.096(rad) Xab = 9.264m Xbc= 0.537m带入公式:①ab段为曲线段,有摩擦力PP=775.62*(1-e-(0.0015*9.264+0.25*0.096))/(0.0015*9.264+0.25*0.096) =761.11KN②bc段为直线段,有摩擦力PP=761.11*(1- e-(0.0015*0.537))/(0.0015*0.537)=760.8 KN2、中跨N2束已知量:P = 581.72KN R = 3000cm K = 0.0015 μ = 0.25 可得出:θ= 0.096(rad) Xab =7.803m Xbc= 2.015m带入公式:①ab段为曲线段,有摩擦力PP=581.72*(1-e-(0.0015*7.803+0.25*0.096))/(0.0015*7.803+0.25*0.096) =571.45KN②bc段为直线段,有摩擦力PP=571.45*(1- e-(0.0015*2.015))/(0.0015*2.015)=570.59KN3、中跨N3束已知量:P= 581.7KN R = 3000cm K = 0.0015 μ = 0.25可得出:θ= 0.024(rad) Xab = 1.800m Xbc=7.901m带入公式:①ab段为曲线段,有摩擦力PP=581.7*(1-e-(0.0015*1.8+0.25*0.024))/(0.0015*1.8+0.25*0.024) =579.16KN②bc段为直线段,有摩擦力PP=579.16*(1- e-(0.0015*7.901))/(0.0015*7.901)=575.74KN4、边跨非连续端N1束已知量:P=775.62KN R=3000cm K=0.0015 μ=0.25可得出:θ= 0.096 (rad) Xab = 7.699m Xbc= 2.128m带入公式:①ab段为曲线段,有摩擦力PP=775.62*(1-e-(0.0015*7.698+0.25*0.096))/(0.0015*7.698+0.25*0.096) = 762.0KN②bc段为直线段,有摩擦力PP= 762.0*(1-e-(0.0015*2.128))/(0.0015*2.128)= 760.78KN5、边跨非连续端N2束已知量:P= 775.62KN R = 3000cm K = 0.0015 μ = 0.25 可得出:θ= 0.096 (rad) Xab = 6.238m Xbc= 3.582 m带入公式:①ab段为曲线段,有摩擦力PP=775.62*(1-e-(0.0015*6.238+0.25*0.096))/(0.0015*6.238+0.25*0.096) =762.83KN②bc段为直线段,有摩擦力PP= 762.83*(1-e-(0.0015*3.582))/(0.0015*3.582)= 760.78KN6、边跨非连续端N3束已知量:P= 775.62KN R = 3000cm K = 0.0015 μ = 0.25 可得出:θ= 0.024(rad) Xab =1.799m Xbc=8.001m带入公式:①ab段为曲线段,有摩擦力PP=775.62*(1-e-(0.0015*1.799+0.25*0.096))/(0.0015*1.799+0.25*0.096) =772.21KN②bc段为直线段,有摩擦力PP= 772.21*(1-e-(0.0015*8.001))/(0.0015*8.001) = 767.6KN二、理论伸长值计算计算公式:ΔL = PP * L/(AP* EP)ΔL --- 预应力筋的理论伸长值(mm)PP--- 预应力的平均张拉力(N)L --- 预应力筋的长度(mm)AP--- 预应力筋的截面面积(139mm2/根)EP--- 预应力筋的弹性模量(设计图给出值为195000N/mm2)考虑锚具变形及钢筋回缩量 --- 6 mm1、中跨N1束①ab段:ΔLab=761.1*103*9.264/(139*4*195)=65.0(mm)②bc段:ΔLbc=760.8*103*0.537/(139*4*195)=3.8(mm)ΔL=ΔLab +ΔLbc=68.8(mm)2、中跨N2束①ab段:ΔLab=571.4*103*7.803/(139*3*195)=54.8(mm)②bc段:ΔLbc=570.5*103*2.015/(139*3*195)=14.1(mm)ΔL=ΔLab +ΔLbc=68.98(mm)3、中跨N3束①ab段:ΔLab=579.2*103*1.8/(139*3*195)=12.8(mm)②bc段:ΔLbc=575.8*103*7.901/(139*3*195)=55.9(mm)ΔL=ΔLab +ΔLbc=68.7(mm)4、边跨N1束①ab段:ΔLab=762.0*103*7.698/(139*4*195)=54.11(mm)②bc段:ΔLbc=760.8*103*2.128/(139*4*195)=14.93(mm)ΔL=ΔLab +ΔLbc=69.04(mm)5、边跨N2束①ab段:ΔLab=762.8*103*6.238/(139*4*195)=43.89(mm)②bc段:ΔLbc=760.8*103*3.582/(139*4*195)=25.13(mm)ΔL=ΔLab +ΔLbc=69.02(mm)6、边跨N3束①ab段:ΔLab=765.4*103*1.799/(139*4*195)=12.81(mm)②bc段:ΔLbc=760.8*103*8.001/(139*4*195)=56.65(mm) ΔL=ΔLab+ΔLbc=69.46(mm)由以上计算可得出:中跨N1、N2、N3束的理论伸长值ΔL为:ΔL1=68.8 * 2=137.6(mm)ΔL2=68.9 * 2=137.95(mm)ΔL3=68.7* 2=137.52(mm)边跨N1、N2、N3束的理论伸长值ΔL为:ΔL1=68.8 + 69.0=137.8(mm)ΔL2=68.9 + 69.0=138.0(mm)ΔL3=68.7 + 69.5=138.22(mm)三、实际伸长值计算计算公式:ΔL =ΔL1 +ΔL2ΔL --- 预应力筋张拉的实际伸长值(mm)ΔL1 --- 从初应力至最大张拉力间的实测伸长值(mm)ΔL2 --- 初应力以下的推算伸长值(mm),采用相邻级的伸长值。
20米小箱梁后张法控制张拉计算书
20米箱梁顶板负弯矩张拉计算书一、预应力筋张拉顺序为:根据设计文件要求:预制箱梁预应力筋每束张拉顺序为0 →0.1σk→0.2σk→张拉控制应力σk(含锚口摩阻损失)→持荷5分钟→锚固。
箱梁的钢绞线束张拉顺序为N2→N1→N3,采用两端对称张拉。
预制箱梁采用张拉力和引申量双重控制,即张拉力通过油表读数控制,但应与实际伸长值校核,实际伸长值与理论伸长值误差控制在±6%之内,否则应暂停张拉,提出解决方案,待有关部门审查批准后。
方可重新张拉。
二、后张法钢绞线理论伸长值计算公式及参数:钢绞线采用符合GB/T5224-2003标准的低松驰高强度预应力钢绞线,单根钢绞线直径d=15.2mm,抗拉强度标准值f pk=1860MPa,公称截面积Ap=140mm2,弹性模量E p=1.95*105 MPa,松弛率ρ=0.035,松弛系数ξ=0.3,每束钢绞线4根或5根。
(一)力学指标及计算参数:预应力筋力学性能指标及相关计算参数如下:※弹性模量:Ep=1.95*105 MPa※张拉控制应力:σcon=0.75fpk=1395MPa※孔道偏差系数:κ=0.0015※孔道摩阻系数:μ=0.17※锚具变形及钢束回缩每端按6mm计千斤顶控制张拉力,根据上述参数,计算张拉力P=1395*140*1=195.3KN,根据规范要求,千斤顶的额定张拉力不小于所需张拉力的1.2倍。
因此,选用不小于25T 的千斤顶就可以满足要求。
理论伸长值的计算:根据现行《公路桥梁施工技术规范》,关于预应筋伸长值的计算按如下公式进行: L=EA L P L **= (公式1) 式中:L ——各分段预应力筋的理论伸长值(mm );P ——预应力筋的平均张拉力(N );L ——预应力筋的长度(mm );A ——预应力筋的截面面积(mm 2);E ——预应力筋的弹性模量(Mpa )。
预应力筋的平均张拉力P 按如下公式计算:预应力张拉端的张拉力P 值按如下公式计算:N *A *σcon =P (公式2)上式中:P ——预应力筋的张拉力(N );σcon ——预应力筋的张拉控制力(MPa );A ——每根预应力筋的截面面积(mm 2);其它各段的起终点力可以从张拉端开始进行逐步的计算。
20m小箱梁钢绞线理论伸长量及张拉力计算
后张法钢铰线张拉数值与压力表数值关系一览表后张法钢铰线张拉数值与压力表数值关系一览表(20米小箱梁5束)(20米小箱梁5束)华厦建设集团广西黄姚景区道路连接道路(省道S327大风坳隧道至潮江段)扩建工程项目部华厦建设集团广西黄姚景区道路连接道路(省道S327大风坳隧道至潮江段)扩建工程项目部
千斤顶型号规格/编号: YDC-1500/1595(A1)千斤顶型号规格/编号: YDC-1500/15110(B1)
后张法钢铰线张拉数值与压力表数值关系一览表后张法钢铰线张拉数值与压力表数值关系一览表(20米小箱梁5束)(20米小箱梁5束)华厦建设集团广西黄姚景区道路连接道路(省道S327大风坳隧道至潮江段)扩建工程项目部华厦建设集团广西黄姚景区道路连接道路(省道S327大风坳隧道至潮江段)扩建工程项目部
千斤顶型号规格/编号: YDC-1500/1596(A2)千斤顶型号规格/编号: YDC-1500/15109(B2)
计算: 复核: 日期:。
20米箱梁预应力张拉计算书
20m后张法连续箱梁预应力计算书一、预应力配套张拉机具说明1、张拉机具选用:根据设计文件给定的圆锚张拉数据,采用每个钢绞线根数最多的圆锚进行计算。
查设计文件得:钢绞线张拉控制应力σk=1395MPa;钢绞线截面积:Ay=139㎜2;钢绞线最多根数:n=5。
计算张拉力:Ny=σk×Ay×n=1395×139×5=969525(N)据此:我部选用规格为150t的油压千斤能满足施工要求。
2、张拉机具数量表:3、千斤顶的标定和压力表读数的确定①千斤顶的标定:千斤顶、压力表(1块进油表、1块回油表)、高压油泵三者必须固定配套使用。
我部对其已经进行标定,标定报告附后。
②张拉:在张拉过程中,实际伸长量与理论伸长量差值控制在±6%之内,钢束理论伸长量附后。
二、张拉程序及张拉力说明1、查《公路桥涵施工技术规范》,对于夹片式具有自锚性能的锚具,采用的是低松弛力钢绞线,其张拉程序:0 初应力 δcon (持荷2min 锚固) (δcon 是指张拉时的控制应力,包括预应力损失值)。
设计图纸要求δcon=1395Mpa ,钢绞线面积A=139mm2,弹性模量Ey=1.95×105Mpa,标准强度1860 Mpa ,管道摩擦系数μ=0.25,k=0.0015。
2、张拉应力控制(1)预应力筋的张拉控制应力应符合设计要求。
当施工中预应力筋需要超张拉或计人锚圈口预应力损失时,可比设计要求提高5%,但在任何情况下不得超过设计规定的最大张拉控制应力。
(2)预应力筋采用应力控制方法张拉时,应以伸长值进行校核,实际伸长值与理论伸长值的差值应控制在6%以内,否则应暂停张拉,待查明原因并采取措施予以调整后,方可继续张拉。
(3)预应力筋的理论伸长值L ∆ (mm)可按下式计算:PP P E A LP L =∆式中:PP ——预应力筋的平均张拉力(N)L ——预应力筋的长度(mm); A P ——预应力筋的截面面积(mm2); E P ——预应力筋的弹性模量(N /mm2)。
20m箱梁理论伸长量计算书
20m后张法预应力箱梁理论伸长量计算书一、计算说明:1、本计算书依据中华人民共和国行业标准《公路桥涵施工技术规范》(JTG/TF50-2011)和《施工图设计》进行编制。
2、本计算书中所有计算参数均来源于施工图纸、施工技术规范及相关试验检测报告。
3、本次伸长量计算书主要分为:中跨端梁、边跨非连续端梁和顶板负弯矩三种情况。
二、张拉注意事项:1、箱梁张拉时采用张拉力和伸长量双控制,伸长量作为校核依据,误差范围为±6%,张拉力控制误差为±3%,并按设计张拉顺序为N1,N2,N3,自左到右对称张拉;如果实测张拉数据超限,应暂停张拉,待查明原因并采取措施予以调整后,方可继续张拉。
2、实际张拉过程中按10%,20%,100%三个阶段应力来控制伸长量,张拉力所对应油表读数均以千斤顶《标定报告》中直线回归方程计算,其它注意事项参照设计规范执行。
三、主要工程量:K11+239峡口桥20m先简支后连续后张法预应力箱梁,合计9片,其中:中跨中梁:1片中跨边梁:2片边跨中梁:2片边跨边梁:4片设计参数:梁高,梁底宽,梁顶宽,悬臂宽;四、20m箱梁理论伸长量计算相关公式:1、预应力钢绞线理论张拉伸长量计算公式:ΔL=(PpL)/(ApEp)式中:Pp—预应力筋的平均张拉力(N);L—预应力筋的长度(mm),分为直线和曲线两种;Ap—预应力筋的总截面面积(mm2);Ep—预应力筋的弹性模量(N/mm2);(2)预应力筋平均张拉力计算公式:Pp=P×(1-e-(kx+μθ))/(kx+μθ)式中:Pp—预应力筋平均张拉力(N);P—预应力筋张拉端的张拉力(N);x—计算曲线截面的孔道长度(m);θ—计算曲线截面的切线偏角(rad),以弧度表示;k—孔道每米局部偏差对摩擦的影响系数;μ—预应力筋与孔道壁的摩擦系数;备注:当预应力筋为直线时Pp=P;2、计算公式中的主要参数值及相关参数值:(1)预应力钢绞线抗拉强度标准值:?pk=1860Mpa;(2)单根钢绞线公称直径:d=;(3)单根预应力钢绞线张拉锚下控制应力:σcon =×?pk=×1860=1395Mpa(4)预应力钢绞线弹性模量:Ep=×105(N/mm2);(5)预应力筋与孔道壁的摩擦系数μ=;(6)孔道每米局部偏差对摩擦的影响系数k=(7)单根钢绞线截面面积:A=139mm2;五、20m箱梁理论伸长量计算说明:(一)中跨连续端(中梁和边梁)1、中跨连续端N1束(1)因N1束钢绞线孔道呈对称型,故取单端计算其伸长量,然后乘2为总伸长量。
20米箱梁张拉计算书
20米预制箱梁张拉计算方案一、基础数据本标段20米预制箱梁正弯矩预应力钢束共有N 1、N 2、N 3各2束,设计锚下张拉控制应力:σcon =1860×0.75=1395MP a 。
按设计要求箱梁砼强度达到设计强度的90%后方可张拉,并采用两端对称张拉,张拉程序为:0 初应力 σcon (持荷2min )锚固,张拉顺序为N 1、N 2、N 3。
二、预应力钢束张拉力计算1、经咨询设计单位,因设计图中张拉控制应力已经考虑了预应力损失,故张拉力按公式:F n =σcon ×A ×n 进行计算,如下:N 1 钢束锚下张拉力 F 1=σcon ×A ×n=1395 MP a ×140㎜2×3 =585.9KN 其中:A 为每根预应力钢绞线的截面积;n 为同时张拉的预应力钢绞线的根数; F 为钢绞线锚下张拉力。
其余钢束张拉力计算同N 1,各钢束张拉力如下表:中跨箱梁预应力钢束张拉力计算明细表(表一)边跨箱梁预应力钢束张拉力计算明细表(表二)三、压力表读数计算本桥采用200吨千斤顶进行张拉,经校验:编号为312#千斤顶对应的压力表编号为Y01280283,Y01280257,校准方程分别为F=0.0353P+0.6243, F=0.0351P+0.4491。
编号为80602号千斤顶对应的压力表编号为20087029,校准方程为P=0.013172F+0.004535。
故N1钢束采用312#千斤顶张拉时的压力表度数分别为:1)压力表编号为Y01280283:F1=0.0353P+0.6243=0.0353×585.9+0.6243=21.3 MP a2)压力表编号为Y01280257:F2=0.0351P+0.4491=0.0351×585.9+0.4491=21MP a其余钢束压力表读书计算同N1,压力表度数详见下表:预应力钢束100%бk张拉力所对应的压力表度数明细表(中跨箱梁)(表三)预应力钢束10%бk张拉力所对应的压力表度数明细表(中跨箱梁)(表四)预应力钢20%бk张拉力所对应的压力表度数明细表(中跨箱梁)(表五)另边跨箱梁的腹板N1、N2、N3钢束均为4根钢绞线,张拉时其各钢束的压力表读数同中跨箱梁N2钢束的数据。
20m箱梁(后张法)计算参数
20m箱梁(后张法)计算参数=1860MPa,单根面积140mm2,钢绞线为高强度、低松弛φj15.24钢绞线,标准强度R by管道摩擦系数μ=0.25,管道影响系数k=0.0015,钢筋回缩和锚具变形为6mm,锚下控制应力为σk=0.75R b=1395MPa。
y钢绞线下料长度:中跨:钢束编号下料长度伸长值计算长度曲线长度直线长度(cm) (cm) (cm) (cm) N1 2075 1945 813.3 159.2N2 2080 1950 624.4 350.6N3 2052 1922 179.8 781.2边跨:钢束编号下料长度伸长值计算长度曲线长度直线长度(cm) (cm) (cm) (cm) N1 2083 1953 809.1 167.4N2 2085 1955 621.7 355.8N3 2069 1939 171.4 798.1钢束编号下料长度伸长值计算长度曲线长度直线长度(cm) (cm) (cm) (cm) T1 761 701 87.8 262.7T2 1361 1301 87.8 562.7T3 1361 1301 87.8 562.7=1395MPa,各束钢控制应力:依据设计规定所有钢束锚下控制应力均为σk=0.75R by绞线控制张拉力如下:中跨:钢束编号每束根数控制应力(KN) 张拉方式N1 3 585.9 两端张拉N2 3 585.9 两端张拉N3 4 781.2 两端张拉边跨:钢束编号每束根数控制应力(KN) 张拉方式N1 4 781.2 两端张拉N2 4 781.2 两端张拉N3 4 781.2 两端张拉钢束编号每束根数控制应力(KN) 张拉方式T1 4 195.3(781.2) 两端单根张拉T2 5 195.3(976.5) 两端单根张拉T3 4 195.3(781.2) 两端单根张拉张拉程序:依据<<公路桥规>>JTJ041-2000及设计之规定对N1、N2、N3钢束采用两端整体张拉,对T1、T2、T3钢束采用两端单根对称张拉,张拉程序均采用0→初应力→σk(持荷2min 锚固)依据<<公路桥规>>JTJ041-2000规定拟定初应力为0.15σk张拉步骤:0→0.15σk→0.3σk→1.0σk张拉顺序:N1→N2→N3 T1→T2→T3张拉采用YDC1500A-200型千斤顶张拉钢束时,张拉缸活塞面积为28510mm2,千斤顶的摩阻为0.32%和0.36%。
预应力钢绞线初张拉理论伸长量计算表20m
3.131 27.7 ###### 138.6 △L=Pp L/Ap Ep(㎜) △L=Pp L/Ap Ep(㎜) 2.532 13.9 5.063 27.8 ###### 138.8 △L=Pp L/Ap Ep(㎜) △L=Pp L/Ap Ep(㎜) 5.705 ###### ###### 13.9 27.8 139.1
钢绞线面积 140 L L 7.596 7.596 7.596 L 6.237 6.237 6.237 L 1.7495 1.7495 1.7495 Ap Ap 560 560 560 Ap 560 560 560 Ap 560 560 560
管道偏差系数k 0.0015 曲线段 △L=Pp L/Ap Ep(㎜ Ep Ep 195 195 195 Ep 195 195 195 Ep 195 19.97407 0.97407 0.97407 e-(kx+μθ ) 0.97606 0.97606 0.97606 e-(kx+μθ ) 0.99361 0.99361 0.99361
△L=Pp L/Ap Ep(㎜ 5.363
0.155 0.0263 0.155 0.0263 0.155 0.0263 μ kx+μθ
管道偏差系数k 0.0015 Ep 195
伸长值(mm)
曲线段 直线段 △L=Pp L/Ap Ep(㎜) 11.87035796
合计
20% N1 100% N1 N2 钢束号 10% N2 20% N2 100% N2 N3 钢束号 10% N3 20% N3 100% N3
10.727 53.633 △L=Pp L/Ap Ep(㎜ △L=Pp L/Ap Ep(㎜
0.155 0.0242 0.155 0.0242 0.155 0.0242 μ kx+μθ
20米箱梁张拉计算书
20米箱梁张拉计算说明一、预应力张拉计算说明根据***公路工程项目施工设计图纸,结合《公路桥涵施工技术规范》JTG/T F50-2011提供的张拉计算公式进行张拉计算。
采用平均张拉法,计算箱梁主体钢束张拉力和预应力筋理论伸长值。
1、计算参数确定:采用符合GB/T 5224-2003标准的低松弛高强度预应力钢绞线,结构1*7-15.2-1860-GB/T5224-2003。
单根钢绞线直径为15.2mm,钢绞线公称面积为140mm2,标准强度为1860MPa,弹性模量Eg=1.9687×105MPa,U=0.25,K=0.0015。
钢绞线张拉锚下控制应力为σcon=1395 MPa。
钢筋回缩和锚具变形为6mm(一端)。
二、连续端箱梁张拉计算1)钢束N1钢绞线:Ay=4×140=560mm2,L=AB+BC+CD=7.034+2.879+0.537=10.45m。
钢束的张拉力a、张拉力的计算:ΡA=σk×Ay×n×1/1000=1395×1×560×1/1000=781.2KNΡB= P A=781.2KNΡC=ΡB*[1-e-(Kx+μθ)]/(Kx +μθ)μ=0.25,k=0.0015,θ=0.095993109rad ,x=2.879ΡC=766.193KNb、伸长值的计算:△L AB=ΡA *L/Ay*Eg=50.321mm△L BC=ΡC *L/Ay*Eg=20.493mm△L CD=``````ΡC *L/Ay*Eg=3.768mm理论伸长值L=2(△L AB +△L BC +△L CD )=149.16mm伸长值=理论伸长值+ 回缩量=149.16+12=161.16mm2)钢束N2钢绞线:Ay=4×140=560mm2,L=AB+BC+CD=5.573+2.879+2.015=10.467m。
钢束的张拉力a、张拉力的计算:ΡA=σk×Ay×n×1/1000=1395×1×560×1/1000=781.2KNΡB= P A=781.2KNΡC=ΡB*[1-e-(Kx+μθ)]/(Kx +μθ)μ=0.25,k=0.0015,θ=0.095993109rad ,x=2.879ΡC=767.032KNb、伸长值的计算:△L AB=ΡA *L/Ay*Eg=39.869mm△L BC=ΡC *L/Ay*Eg=20.515mm△L CD=ΡC *L/Ay*Eg=14.153mm理论伸长值L=2(△L AB +△L BC +△L CD )=149.08m伸长值=理论伸长值+ 回缩量=149.08+12=161.08mm3)钢束N3钢绞线:Ay=3×140=420mm2,L=AB+BC+CD=7.901+0.733+1.716=10.35m。
20m小箱梁钢绞线张拉计算电子版
CD 6.835
0
0.0102525 0.989799885 749.69 742.0392 745.8555574 4 0.046684274
Pp
Pp={P[1-e-(kx+μθ)]}/(kx+μθ)
表C1 系数k及μ值表
P
756
张拉端控制力=张拉控制应力×4个公称面积/1000 (KN)
μ值
0
0.003771
0.993707624 756 751.243 753.6184726 4 0.029041736 0.980770517 751.24 736.7969 743.9960818 4 0.020809585 0.06678 0.996236104 736.8 734.0237 735.4089698 4 0.016930569
△L=Pp·L/Ap·Ep
管道成型方式
k
x
从张拉端至计算截面的孔道长度(m)
钢丝束、钢绞线 螺纹钢筋
θ
从张拉端至计算截面曲线孔道部.0030
0.35
0.40
k
0.0015
μ
0.17
Ep
1.95*10^5
孔道每米局部偏差对摩擦的影响系数,参见表C1 预应力筋与孔道壁的摩擦系数,参见表C1 弹性模量(MPa)
K102+523温德河大桥中跨20m箱梁平均张拉计算
预应力筋平均张拉力的计算公式 Pp={P[1-e-(kx+μθ)]}/(kx+μθ)
钢
钢绞
束
x 钢绞线下 线工 圆心角 R
编
线段 (m)
料长度 (m)
作长 度 (m 度 (°) )
号
(m)
20米箱梁预应力张拉伸长量计算(最终10.9)
20米箱梁预应力张拉伸长量计算钢铰线强度:1860MPa 控制应力:1860×0.75=1395 MPa钢铰线公称面积:140 mm2单根控制力:1395×140.0=195300 N伸长量计算公式:△L=Pp×L÷(Ap×Ep)一、中跨1#束①直线段长 0.537米②竖曲线段长 L=π÷180°×a×R=3.1415926÷180°×5.5°×30.0=2.880米③直线段长4.869 米④平曲线段长 L=π÷180°×a×R=3.1415926÷180°×1.8°×25.0=0.785÷COS5.5°=0.789 ⑤直线段长 0.728米⑥工具段长 0.74米(由于箱梁板顶预埋筋影响,千斤顶不能靠近锚环,为不弯曲板顶预埋筋,需增加一个过渡环,具体尺寸为:锚环0.046m+限位板0.035m+过渡环0.25m+千斤顶0.363m+锚环0.046m=0.74m)Pp=P×(1-e-(kx+μθ))÷(kx+μθ)Pp=P=195300 N Ep=198 GPa得:⑥的伸长量:e=2.718281828 k=0.0015 x=0.74 μ=0.25θ=0°195300×(1-2.71828-(0.0015×0.74))÷(0.0015×0.74)=195191.52 N195191.52×740÷(140×198000)=5.21mm⑤的伸长量:e=2.718281828 k=0.0015 x=1.468 μ=0.25θ=0°195300×(1-2.71828-(0.0015×1.468))÷(0.0015×1.468)=195085.00 N195085.00×728÷(140×198000)=5.12mm④的伸长量:e=2.718281828 k=0.0015 x=2.257 μ=0.25θ=1.8°×0.017453293=0.03142195300×(1-2.71828-(0.0015×2.257+0.25×0.03142))÷(0.0015×2.257+0.25×0.03142)=194206.34 N194206.34×789÷(140×198000)=5.53 mme=2.718281828 k=0.0015 x=7.126 μ=0.25θ=1.8°×0.017453293=0.03142195300×(1-2.71828-(0.0015×7.126+0.25×0.03142)))÷(0.0015×7.126+0.25×0.03142)=193500.19 N193500.19×4869÷(140×198000)=34.00mm②的伸长量:e=2.71828 k=0.0015 x=10.006 μ=0.25θ=7.3°×0.017453293=0.12741195300×(1-2.71828-(0.0015×10.006+0.25×0.12741))÷(0.0015×10.006+0.25×0.12741)=190794.5 N190794.5×2880÷(140×198000)=19.82mm①的伸长量:e=2.718281828 k=0.0015 x=10.543 μ=0.25θ=7.3°×0.017453293=0.12741195300×(1-2.71828-(0.0015×10.543+0.25×0.12741))÷(0.0015×10.543+0.25×0.12741)=190718.28 N190718.28×537÷(140×198000)=3.69mm1#束的伸长量为:5.21+5.12+5.53+34.0+19.82+3.69=73.37×2=146.74 mm 2#束①直线段长 2.015米②竖曲线段长 L=π÷180°×a×R=3.1415926÷180°×5.5°×30.0=2.88米③直线段长 3.408 米④平曲线段长 L=π÷180°×a×R=3.1415926÷180°×1.8°×25.0=0.785÷COS5.5°=0.789 ⑤直线段长 0.728米⑥工具段长0.49米(锚环0.046m+限位板0.035m+千斤顶0.363m+锚环0.046m=0.49m)Pp=P×(1-e-(kx+μθ))÷(kx+μθ)Pp=P=195300 N Ep=198 GPa得:⑥的伸长量:e=2.718281828 k=0.0015 x=0.49 μ=0.25θ=0°195300×(1-2.71828-(0.0015×0.49))÷(0.0015×0.49)=195228.11 N195228.11×490÷(140×198000)=3.45 mme=2.718281828 k=0.0015 x=1.218 μ=0.25θ=0°195300×(1-2.71828-(0.0015×1.218))÷(0.0015×1.218)=195121.57 N195121.57×728÷(140×198000)=5.12mm④的伸长量:e=2.718281828 k=0.0015 x=2.007 μ=0.25θ=1.8°×0.017453293=0.03142195300×(1-2.71828-(0.0015×2.007+0.25×0.03142))÷(0.0015×2.007+0.25×0.03142)=194242.69 N194242.69×789÷(140×198000)=5.53 mm③的伸长量:e=2.718281828 k=0.0015 x=5.415 μ=0.25θ=1.8°×0.017453293=0.03142195300×(1-2.71828-(0.0015×5.415+0.25×0.03142))÷(0.0015×5.415+0.25×0.03142)=193747.94 N193747.94×3408÷(140×198000)=23.82 mm②的伸长量:e=2.71828 k=0.0015 x=8.295 μ=0.25θ=7.3°×0.017453293=0.12741195300×(1-2.71828-(0.0015×8.295+0.25×0.12741))÷(0.0015×8.295+0.25×0.12741)=191037.63 N191037.63×2880÷(140×198000)=19.85 mm①的伸长量:e=2.718281828 k=0.0015 x=10.31 μ=0.25θ=7.3°×0.017453293=0.12741195300×(1-2.71828-(0.0015×10.31+0.25×0.12741))÷(0.0015×10.31+0.25×0.12741)=190751.34 N190751.34×2015÷(140×198000)=13.87 mm2#束的伸长量为:3.45+5.12+5.53+23.82+19.85+13.87=71.64×2=143.28 mm 3#束①直线段长 7.901米②竖曲线段长 L=π÷180°×a×R=3.1415926÷180°×1.4°×30.0=0.733米③直线段长 1.065 米④工具段长 0.74米(由于箱梁板顶预埋筋影响,千斤顶不能靠近锚环,为不弯曲板顶预埋筋,需增加一个过渡环,具体尺寸为:锚环0.046m+限位板0.035m+过渡环0.25m+千斤顶0.363m+锚环0.046m=0.74m)Pp=P×(1-e-(kx+μθ))÷(kx+μθ)Pp=P=195300 N Ep=198 GPa得:④的伸长量:e=2.718281828 k=0.0015 x=0.74 μ=0.25θ=0°195300×(1-2.71828-(0.0015×0.74))÷(0.0015×0.74)=195191.52 N195191.52×740÷(140×198000)=5.21 mm③的伸长量:e=2.718281828 k=0.0015 x=1.805 μ=0.25θ=0°195300×(1-2.71828-(0.0015×1.805))÷(0.0015×1.805)=195035.72 N195035.72×1065÷(140×198000)=7.49 mm②的伸长量:e=2.71828 k=0.0015 x=2.538 μ=0.25θ=1.4°×0.017453293=0.02443195300×(1-2.71828-(0.0015×2.538+0.25×0.02443))÷(0.0015×2.538+0.25×0.02443)=194334.91 N194334.91×733÷(140×198000)=5.14 mm①的伸长量:e=2.71828 k=0.0015 x=10.439 μ=0.25θ=1.4°×0.017453293=0.02443195300×(1-2.71828-(0.0015×10.439+0.25×0.02443))÷(0.0015×10.439+0.25×0.02443)=193189.76 N193189.76×7901÷(140×198000)=55.06mm3#束的伸长量为:5.21+7.49+5.14+55.06=72.9×2=145.8 mm二、边跨1#束①直线段长 2.148米②竖曲线段长 L=π÷180°×a×R=3.1415926÷180°×5.5°×30.0=2.880米③直线段长 3.308 米④平曲线段长 L=π÷180°×a×R=3.1415926÷180°×1.8°×25.0=0.785÷COS5.5°=0.789 ⑤直线段长 0.724米⑥工具段长 0.64米(由于箱梁板顶预埋筋影响,千斤顶不能靠近锚环,为不弯曲板顶预埋筋,需增加一个过渡环,具体尺寸为:锚环0.046m+限位板0.035m+过渡环0.15m+千斤顶0.363m+锚环0.046m=0.64m)Pp=P×(1-e-(kx+μθ))÷(kx+μθ)Pp=P=195300 N Ep=198 GPa得:⑥的伸长量:e=2.718281828 k=0.0015 x=0.64 μ=0.25θ=0°195300×(1-2.71828-(0.0015×0.64))÷(0.0015×0.64)=195206.15 N195206.15×640÷(140×198000)=4.51 mm⑤的伸长量:e=2.718281828 k=0.0015 x=1.364 μ=0.25θ=0°195300×(1-2.71828-(0.0015×1.364))÷(0.0015×1.364)=195100.21 N195100.21×724÷(140×198000)=5.10 mm④的伸长量:e=2.718281828 k=0.0015 x=2.153 μ=0.25θ=1.8°×0.017453293=0.03142195300×(1-2.71828-(0.0015×2.153+0.25×0.03142))÷(0.0015×2.153+0.25×0.03142)=194221.46 N194221.46×789÷(140×198000)=5.53 mm③的伸长量:e=2.718281828 k=0.0015 x=5.461 μ=0.25θ=1.8°×0.017453293=0.03142195300×(1-2.71828-(0.0015×5.461+0.25×0.03142))÷(0.0015×5.461+0.25×0.03142)=193741.28 N193741.28×3308÷(140×198000)=23.12 mm②的伸长量:e=2.71828 k=0.0015 x=8.341 μ=0.25θ=7.3°×0.017453293=0.12741195300×(1-2.71828-(0.0015×8.341+0.25×0.12741))÷(0.0015×8.341+0.25×0.12741)=191031.09 N191031.09×2880÷(140×198000)=19.85 mm①的伸长量:e=2.718281828 k=0.0015 x=10.489 μ=0.25θ=7.3°×0.017453293=0.12741195300×(1-2.71828-(0.0015×10.489+0.25×0.12741))÷(0.0015×10.489+0.25×0.12741)=190725.94 N190725.94×2148÷(140×198000)=14.78 mm1#束的伸长量为:4.51+5.10+5.53+23.12+19.85+14.78=72.89+73.37=146.26 mm 2#束①直线段长 3.608米②竖曲线段长 L=π÷180°×a×R=3.1415926÷180°×5.5°×30.0=2.88米③直线段长 1.84 米④平曲线段长 L=π÷180°×a×R=3.1415926÷180°×1.8°×25.0=0.785÷COS5.5°=0.789 ⑤直线段长 0.724米⑥工具段长0.64米(由于箱梁板顶预埋筋影响,千斤顶不能靠近锚环,为不弯曲板顶预埋筋,需增加一个过渡环,具体尺寸为:锚环0.046m+限位板0.035m+过渡环0.15m+千斤顶0.363m+锚环0.046m=0.64m)Pp=P×(1-e-(kx+μθ))÷(kx+μθ)Pp=P=195300 N Ep=198 GPa得:⑥的伸长量:e=2.718281828 k=0.0015 x=0.64 μ=0.25θ=0°195300×(1-2.71828-(0.0015×0.64))÷(0.0015×0.64)=195206.15 N195206.15×640÷(140×198000)=4.51 mm⑤的伸长量:e=2.718281828 k=0.0015 x=1.364 μ=0.25θ=0°195300×(1-2.71828-(0.0015×1.364))÷(0.0015×1.364)=195100.21 N195100.21×724÷(140×198000)=5.10 mm④的伸长量:e=2.718281828 k=0.0015 x=2.153 μ=0.25θ=1.8°×0.017453293=0.03142195300×(1-2.71828-(0.0015×2.153+0.25×0.03142))÷(0.0015×2.153+0.25×0.03142)=194221.46 N194221.46×789÷(140×198000)=5.53mm③的伸长量:e=2.718281828 k=0.0015 x=3.993 μ=0.25θ=1.8°×0.017453293=0.03142195300×(1-2.71828-(0.0015×3.993+0.25×0.03142))÷(0.0015×3.993+0.25×0.03142)=193954.17 N193954.17×1840÷(140×198000)=12.87mm②的伸长量:e=2.71828 k=0.0015 x=6.873 μ=0.25θ=7.3°×0.017453293=0.12741195300×(1-2.71828-(0.0015×6.873+0.25×0.12741))÷(0.0015×6.873+0.25×0.12741)=191240.01N191240.01×2880÷(140×198000)=19.87 mm①的伸长量:e=2.718281828 k=0.0015 x=10.481 μ=0.25θ=7.3°×0.017453293=0.12741195300×(1-2.71828-(0.0015×10.481+0.25×0.12741))÷(0.0015×10.481+0.25×0.12741)=190727.08 N190727.08×3608÷(140×198000)=24.82 mm2#束的伸长量为:4.51+5.10+5.53+12.87+19.87+24.82=72.7+71.64=144.34 mm 3#束①直线段长 8.021米②竖曲线段长 L=π÷180°×a×R=3.1415926÷180°×1.4°×30.0=0.733米③直线段长 1.065 米④工具段长 0.74米(由于箱梁板顶预埋筋影响,千斤顶不能靠近锚环,为不弯曲板顶预埋筋,需增加一个过渡环,具体尺寸为:锚环0.046m+限位板0.035m+过渡环0.25m+千斤顶0.363m+锚环0.046m=0.74m)Pp=P×(1-e-(kx+μθ))÷(kx+μθ)Pp=P=195300 N Ep=198 GPa得:④的伸长量:e=2.718281828 k=0.0015 x=0.74 μ=0.25θ=0°195300×(1-2.71828-(0.0015×0.74))÷(0.0015×0.74)=195191.52 N195191.52×740÷(140×198000)=5.21 mm③的伸长量:e=2.718281828 k=0.0015 x=1.805 μ=0.25θ=0°195300×(1-2.71828-(0.0015×1.805))÷(0.0015×1.805)=195035.72 N195035.72×1065÷(140×198000)=7.49 mm②的伸长量:e=2.71828 k=0.0015 x=2.538 μ=0.25θ=1.4°×0.017453293=0.02443195300×(1-2.71828-(0.0015×2.538+0.25×0.02443))÷(0.0015×2.538+0.25×0.02443)=194334.91 N194334.91×733÷(140×198000)=5.14 mm①的伸长量:e=2.71828 k=0.0015 x=10.559 μ=0.25θ=1.4°×0.017453293=0.02443195300×(1-2.71828-(0.0015×10.559+0.25×0.02443))÷(0.0015×10.559+0.25×0.02443)=193172.44 N193172.44×8021÷(140×198000)=55.90 mm3#束的伸长量为:5.21+7.49+5.14+55.90=73.74+72.9=146.64 mm。
20米预应力空心小箱梁张拉伸长量计算
20⽶预应⼒空⼼⼩箱梁张拉伸长量计算20⽶预应⼒空⼼⼩箱梁张拉伸长量计算⼀、钢绞线张拉控制⼒计算边跨:N1=N2=N3=5×(1860×0.75×140)=976.5KN中跨:N1=N3=4×(1860×0.75×140)=781.2 KNN2=5×(1860×0.75×140)=976.5 KN⼆、钢绞线伸长量计算已知θ1=(2×3.14)÷180=0.035θ2=θ3=(6×3.14)÷180=0.1047E=2.0×105Mpa A=140mm2U=0.17 K=0.0015边跨:N1 L ab=2.198+(0.05+0.35+0.025)=2.198+0.425=2.623mL bc=1.047mm L CD=5.256+1.237=6.493m§=0.75×1860×140=195.3KNAB段:Pq=195.3×5=976.5KNPz=976.5×e-(0.0015×2.623+0.17×0)=974.35KNPp=Pq×(1-e-(KX+UQ))/(KX+UQ)=(Pq+ Pz)/2=(976.5+974.35)/2=975.42KN△L1=Pp*L/(A×E)=975.42×2.623/(5×140×200)×1000=18.34mmBC段:Pq=974.35KNPz=974.35×e-(0.0015×1.047+0.17×0.035)=967.05KNPp=(974.35+967.05)÷2=970.7KN△L2=Pp*L/(A×E)=970.7×1.047÷(5×140×200)×1000=7.26mmCD段:Pq=967.05KNPz=967.05×e-(0.0015×6.493+0.17×0)=957.68KNPp=(967.05+957.68)÷2=962.37KN△L3= 962.37×6.493÷(5×140×200)×1000=44.63mm则总伸长值为:L=(△L1+△L2+△L3)×2=(18.34+7.26+44.63)×2=140.46mmN2L ab=2.637+0.425=3.062m L bc=3.142m L cd=2.716+1.237=3.953mAB段:Pq=195.3×5=976.5KNPz=976.5×e-(0.0015*3.062+0.17*0)=972.03KNPp=(976.5+972.03)÷2=974.27KN△L1=Pp*L/(A*E)=974.27×3.062/(5×140×200)×1000=21.31mmBC段:Pq=Pzab=972.03KN Pz=972.03×e-(0.0015×3.142+0.17×0.1047)=955.14KNCD段:Pq=955.14KNPz=955.14×e-(0.0015×3.953+0.17×0)=950.74KNPp=(955.14+950.74)÷2=952.94KN△L3= 952.94×3.953÷(5×140×200)×1000=26.91mm则总伸长值为:L=(△L1+△L2+△L3)×2=(21.31+21.63+26.91)×2=139.7mm N3 L ab=5.077+0.425=5.502m L bc=3.142m L cd=0.29+1.237=1.527mAB段:Pq=195.3×5=976.5KNPz=976.5×e-(0.0015×5.502+0.17×0.1047)=951.39KNPp=(976.5+951.39)÷2=963.95KN△L1= 963.95×5.502÷(5×140×200)×1000=37.88mmBC段:Pq=Pzab=951.39KNPz=951.39×e-(0.0015×3.142+0.17×0.1047)=934.86KNPp=(951.39+934.86)÷2=943.13KN△L2= 943.13×3.142÷(5×140×200)×1000=21.17mmCD段:Pq=934.86KNPz=934.86×e-(0.0015×1.527+0.17×0)=933.19KNPp=(934.86+933.19)÷2=934.03KN△L3= 934.03×1.527÷(5×140×200)×1000=10.19mm则总伸长值为:L=(△L1+△L2+△L3)×2=(37.88+21.17+10.19)×2=138.48mm 中跨:N1L ab=2.198+(0.05+0.35+0.025)=2.198+0.425=2.623mL bc=1.047m L cd=5.256+1.194=6.45mAB段:Pq=4×(1860×0.75×140)=781.2 KNPz=781.2×e-(0.0015×2.623+17×0)=778.81KNPp=(781.2+778.81)÷2=780.01KN△L1= 780.01×2.623÷(4×140×200)×1000=18.27mmBC段:Pq=778.81KNPz=778.81×e-(0.0015×1.047+0.17×0.1047)=767.15KNPp=(778.81+767.15)÷2=772.98KN△L2 =772.98×1.047÷(4×140×200)×1000=7.23mmCD段:Pq=767.15KNPz=767.15×e-(0.0015×6.45+0.17×0)=761.39KN则总伸长值为:L=(△L1+△L2+△L3)×2=(18.27+7.23+44.01)×2=139.02mm N2 L ab=2.637+0.425=3.062m L bc=3.142m L cd=2.716+1.194=3.91mAB段:Pq=195.3×5=976.5KNPz=976.5×e-(0.0015×3.062+0.17×0)=972.03KNPp=(976.5+972.03)÷2=974.27KN△L1 =974.27×3.062÷(5×140×200)×1000=21.31mmBC段:Pq =972.03KNPz=972.03×e-(0.0015×3.142+0.17×0.1047)=955.14KNPp=(972.03+955.14)÷2=963.59KN△L2= 963.59×3.142÷(5×140×200)×1000=21.63mmCD段:Pq=955.14KNPz=955.14×e-(0.0015×3.91+0.17×0)=950.81KN△L3= 950.81×3.91÷(5×140×200)×1000=26.55mm则总伸长值为:L=(△L1+△L2+△L3)×2=(21.31+21.63+26.55)×2=138.98mm N3 L ab=5.077+0.425=5.502mm L bc=3.142mm L cd=0.29+1.194=1.484mmAB段:Pq=4×(1860×0.75×140)=781.2 KNPz=781.2×e-(0.0015×5.502+0.17×0)=774.78KNPp=(981.2+774.78)÷2=777.99KN△L1= 777.99×5.502÷(4×140×200)×1000=38.22mmBC段:Pq =774.78KNPz=774.78×e-(0.0015×3.142+0.17×0.1047)=757.53KNPp=(774.78+757.53)÷2=766.16KN△L2= 766.16×3.142÷(4×140×200)×1000=21.49mmCD段:Pq=757.53KNPz=757.53×e-(0.0015×1.484+0.17×0)=755.85KNPp=(757.53+755.85)÷2=756.69KN△L3= 756.69×1.484÷(4×140×200)×1000=10.03mm则总伸长值为:L=(△L1+△L2+△L3)×2=(38.22+21.49+10.03)×2=139.48mm设计控制张拉⼒及伸长量⼀览表实际计算控制张拉⼒及伸长量⼀览表。
20米小箱梁张拉计算书
千斤顶张拉力与对应油表读数计算一、锚下控制应力:σK=0.75fpa=1395Mpa二、预应力筋的截面面积Ap=140mm2三、单根钢绞线张拉的张拉力F=σk*Ap=1395Mpa*140mm2=195300N四、25m箱梁钢绞线的张拉控制力:3根钢绞线束:F1=3*σK*AP=3*195.3KN=585.9KN4根钢绞线束:F2=4*σK*AP=4*195.3KN=781.2KN5根钢绞线束:F3=5*σK*AP=5*195.3KN=976.5KN五、1#千斤顶张拉、9953号油表时:千斤顶回归方程:P=0.0478F(KN)+0.66式中:P——油压表读数(Mpa) F——千斤顶拉力(KN)油压表读数计算如下六、1#千斤顶张拉、5247号油表时:千斤顶回归方程:P=0.0484F(KN)-0.25式中:P——油压表读数(Mpa) F——千斤顶拉力(KN)油压表读数计算如下七、2#千斤顶张拉、7297号油表时:千斤顶回归方程:P=0.0482F(KN)+0.22式中:P——油压表读数(Mpa) F——千斤顶拉力(KN)油压表读数计算如下八、2#千斤顶张拉、7424号油表时:千斤顶回归方程:P=0.0502F(KN)+0.21式中:P——油压表读数(Mpa) F——千斤顶拉力(KN)油压表读数计算如下伸长量验算一、锚下控制应力:σK=0.75fpa=1395Mpa二、预应力筋的截面面积Ap=140mm2三、单根钢绞线张拉的张拉力P=σk*Ap=1395Mpa*140mm2=195300N四、预应力平均张拉力计算公式及参数:Pp=P*(1-e-(kx+μθ)/(kx+μθ)式中:Pp——预应力筋的平均张拉力(N)P ——预应力筋张拉端的张拉力(N)X——从张拉端至计算截面的孔道长度(m)θ——从张拉端至计算截面的曲线孔道部分切线的夹角之和(rad) K——孔道每米局部偏差对摩擦的影响系数,取0.0015μ——预应力筋与孔道壁的摩擦系数,取0.25五、预应力筋的理论伸长量计算公式及参数:△L=Pp*L/Ap*Ep式中:Pp——预应力筋平均张拉力(N)L——预应力筋的长度(mm)Ap——预应力筋的截面面积(mm2),取140mm2Ep——预应力筋的弹性模量(N/mm2),取1.95×105Pa六、伸长量计算:(1)20m中跨一片预制箱梁1、N1束一端的伸长量:单根钢绞线张拉的张拉力p=0.75×1860×140=195300N从张拉端开始分段计算至跨径中心线:X工作长=0.46m ;X斜直=6.384m;X曲=2.88m ; X直=0.437m;θ=5.5*π/180=0.09599rad伸长量计算如下:设计伸长量为139mm2、N2束一端的伸长量:单根钢绞线张拉的张拉力p=0.75×1860×140=195300N从张拉端开始分段计算至跨径中心线:X工作长=0.46m; X斜直=4.923m;X曲=2.88m;X直=1.915m;θ=5.5*π/180=0.09599rad伸长量计算如下:设计伸长量为138mm3、N3束一端的伸长量:单根钢绞线张拉的张拉力p=0.75×1860×140=195300N从张拉端开始分段计算至跨径中心线:X工作长=0.46m;X斜直=1.066m;X曲=0.733m;X直=7.783m;θ=1.4*π/180=0.024435rad伸长量计算如下:设计伸长量137mm(2)20m边跨一片预制箱梁1、N1束一端的伸长量:单根钢绞线张拉的张拉力p=0.75×1860×140=195300N从张拉端开始分段计算至跨径中心线:X工作长=0.46m;X斜直=4.772m;X曲=2.88m;X直=2.097m;θ=5.5*π/180=0.09599rad伸长量计算如下:设计伸长量139mm2、N2束一端的伸长量:单根钢绞线张拉的张拉力p=0.75×1860×140=195300N从张拉端开始分段计算至跨径中心线:X工作长=0.46m;X斜直=4.556m;X曲=3.49m;X直=4.267m;θ=5*π/180=0.0873rad伸长量计算如下:设计伸长量为173mm3、N3束一端的伸长量:单根钢绞线张拉的张拉力p=0.75×1860×140=195300N从张拉端开始分段计算至跨径中心线:X工作长=0.46m;X斜直=2.961m;X曲=3.49m;X直=5.867mθ=5*π/180=0.0873rad伸长量计算如下:设计伸长量为173mm4、N4束一端的伸长量:单根钢绞线张拉的张拉力p=0.75×1860×140=195300N从张拉端开始分段计算至跨径中心线:X工作长=0.46m;X斜直=1.017m;X曲=0.733m;X直=10.501mθ=1.4*π/180=0.0244rad伸长量计算如下:设计伸长量为173mm(3)25m箱梁顶板束钢绞线1、T1束一端的伸长量:单根钢绞线张拉的张拉力p=0.75×1860×140=195300N从张拉端开始分段计算至桥墩中心线:X工作长=0.46m;X直=3.5m;伸长量△L工作长=P*L/(Ap*Ep)=195300*0.46/(140*1.95*105)=3.29mm伸长量△L直=P*L/(Ap*Ep)=195300*3.5/(140*1.95*105)=25.03mm△L=(△L工作长+△L直)*2=(3.29+25.03)*2=56.64mm设计伸长量为50mm2、T2束一端的伸长量:单根钢绞线张拉的张拉力p=0.75×1860×140=195300N从张拉端开始分段计算至桥墩中心线:X工作长=0.46m ;X直=7m;伸长量△L工作长=P*L/(Ap*Ep)=195300*0.46/(140*1.95*105)=3.29mm伸长量△L直=P*L/(Ap*Ep)=195300*7/(140*1.95*105)=50.07mm△L=(△L工作长+△L直)*2=(3.29+50.07)*2=106.72mm设计伸长量为106.72mm亲爱的各位老师,您们好!我叫xxx,我的毕业论文题目是《数字图书馆资源共享中云计算的现状、颈瓶与对策研究》。
20米箱梁预应力张拉计算书
μ——预应力筋与孔道壁的摩擦系数,取 0.25 2、预应力筋的理论伸长值△LL 计算公式及参数: △LL= Pp L Ap Ep
Pz=Pq× e-(kX+μθ) 式中: Pp——预应力筋平均张拉力(N) L——预应力筋的长度(m) Ap——预应力筋的截面面积(mm2) ,取 140mm2 Ep——预应力筋的弹性模量(N/mm2)取 1.95×105N/mm2 Pz——分段终点力(N) Pq——分段的起点力(N) 二、 伸长值计算: 1、 N1 束一端的伸长量(中跨): 单根钢绞线张拉的张拉力 P=0.75×1860×140=195300N XAB=6.384m θ =5.5× XBC=2.880m XCD=0.537m
20m 箱梁预应力张拉计算书
第一章 伸长量计算 省道 309 线宝昌至沽源(蒙冀界)段公路 20m 箱梁,设计采用 1、 标准强度 fpk=1860Mpa 的高强度、低松弛钢绞线 2、 钢绞线公称直径Φ15.2mm 3、 钢绞线公称截面面积 Ap=140mm 4、 弹性模量 Eg=1.95×10 Mpa 5、 塑料波纹管μ=0.25,k=0.0015 为保证施工符合设计要求, 施工中采用油压表读数和钢绞线拉 伸测定值双控。 理论伸长量计算采用 《公路桥涵施工技术规范》 JTG/T F50-2011 第 7.6.3 条及附录 C1 预应力钢绞线理论伸长 值及平均张拉力计算公式。 一、 计算公式及参数 1、 预应力平均张拉力计算公式及参数: P(1-e-(kx+µθ)) Pp= kx+μθ P=0.75fpk×Ap×1860 Pp ——预应力筋的平均张拉力(N) P ——预应力筋张拉端的张拉力(N) x ——从张拉端至计算截面的孔道长度(m) θ ——从张拉端至计算截面的曲线孔道部分切线的夹角之和(rad) k ——孔道每米局部偏差对摩擦的影响系数,取 0.0015
20m箱梁预应力钢束张拉计算表
20m箱梁预应力钢束张拉计算表一、计算公式:△L=PpL/AyEg式中:△L—理论伸长值Pp—平均张拉力(N)L—预应力钢材长度(cm)Eg—预应力钢材弹性模量(N/mm2)Ay—预应力钢材截面面积(mm2)平均张拉力Pp的计算公式Pp=P[1-e-(kx+μθ)]/(kx+μθ)式中: P—预应力钢材张拉端张拉力x—从张拉端至计算截面的孔道长度(m)θ—从张拉端至计算截面曲线孔道部分切线的夹角之和(rad)μ—预应力钢筋与孔道壁的摩擦系数。
见(图纸)k—孔道每米局部偏差对摩擦的影响系数。
见(图纸)二、计算参数的选取:Eg=1.962×105(实验数据),Ay=140mm2。
k=0.0015,μ=0.23三、曲线预应力钢绞线束平均张拉力的计算中梁曲线段N1、N2钢绞线束(n×φj15.24)从张拉端至计算截面的曲线段孔道长度为两永久锚固端间各段曲线段纯孔道长度之和,如下表:⑴曲线段每束钢绞线平均张拉力的计算=9.413(m)xN1=7.935(m)xN2=2.067(m)xN3=5.5°×2×π/180=0.19197(rad)θN1=5.5°×2×π/180=0.19197(rad)θN2=1.4°×2×π/180=0.04887(rad)θN3在N1钢绞线束曲线段张拉时平均张拉力计算:Pp= P[1-e-(kx+μθ)]/(kx+μθ) =758874(N)在N2钢绞线束曲线段张拉时平均张拉力计算:Pp= P[1-e-(kx+μθ)]/(kx+μθ)=569781(N)在N3钢绞线束曲线段张拉时平均张拉力计算:Pp= P[1-e-(kx+μθ)]/(kx+μθ)=581719(N)在N1钢绞线束(4根)张拉时各阶段理论伸长值计算:ΔL= PpL/ApEp=64.42(mm)在N2钢绞线束(3根)张拉时各阶段理论伸长值计算:ΔL= PpL/ApEp=54.37(mm)在N3钢绞线束(3根)张拉时各阶段理论伸长值计算:ΔL= PpL/ApEp=14.46(mm)⑵直线段预应力钢绞线束平均张拉力中梁直线段=PPP直线段理论伸长值计算直线段预应力钢绞线束有效张拉长度:L=L 直线段1(两永久锚固端间钢绞线直线段长度)+ L 直线段2(千斤顶工作长度)×2各参数如下表:L 直线段钢绞线束理论伸长值计算N1:ΔL= PL/ApEp=15.32mmN2:ΔL= PL/ApEp=36.14mmN3:ΔL= PL/ApEp=118.83mm中跨箱梁20m后张法预应力钢绞线束张拉计算成果表通过以上计算数椐并根据各阶段千斤顶和对应油表的检定线性回归方程(附:千斤顶及对应压力表鉴定证书及鉴定结果,含检定线性回归方程)得出张拉成果表如下:注:1#千斤顶对应1#油表号为:0L0701249542#千斤顶对应2#油表号为:0L0214中跨箱梁⑴中跨箱梁N1钢绞线束(4根)张拉计算成果表回归方程式:1、1#顶,表号070124954,方程式:F=33.451P+21.73;2、2#顶,表号0214,方程式:F=33.529P-2.79;四、1.曲线预应力钢绞线束平均张拉力的计算边梁曲线段(非连续端)N1、N2钢绞线束(n×φj15.24)从张拉端至计算截面的曲线段孔道长度为两永久锚固端间各段曲线段纯孔道长度之和,如下表:⑴曲线段每束钢绞线平均张拉力的计算x=7.753(m)N1=6.299(m)xN2x=1.880(m)N3=5.5°×2×π/180=0.19197(rad)θN1θ=5.5°×2×π/180=0.19197(rad)N2θ=1.4°×2×π/180=0.04887(rad)N3在N1钢绞线束曲线段张拉时平均张拉力计算:Pp= P[1-e-(kx+μθ)]/(kx+μθ) =759811(N)在N2钢绞线束曲线段张拉时平均张拉力计算:Pp= P[1-e-(kx+μθ)]/(kx+μθ)=760632(N)在N3钢绞线束曲线段张拉时平均张拉力计算:Pp= P[1-e-(kx+μθ)]/(kx+μθ)=775734(N)在N1钢绞线束(4根)张拉时各阶段理论伸长值计算:ΔL= PpL/ApEp=53.13(mm)在N2钢绞线束(4根)张拉时各阶段理论伸长值计算:ΔL= PpL/ApEp=43.21(mm)在N3钢绞线束(4根)张拉时各阶段理论伸长值计算:ΔL= PpL/ApEp=13.15(mm)2. 曲线预应力钢绞线束平均张拉力的计算边梁曲线段(连续端)N1、N2钢绞线束(n×φj15.24)从张拉端至计算截面的曲线段孔道长度为两永久锚固端间各段曲线段纯孔道长度之和,如下表:⑴曲线段每束钢绞线平均张拉力的计算=9.413(m)xN1=7.935(m)xN2=2.067(m)xN3θ=5.5°×2×π/180=0.19197(rad)N1=5.5°×2×π/180=0.19197(rad)θN2=1.4°×2×π/180=0.04887(rad)θN3在N1钢绞线束曲线段张拉时平均张拉力计算:Pp= P[1-e-(kx+μθ)]/(kx+μθ)=758874(N)在N2钢绞线束曲线段张拉时平均张拉力计算:Pp= P[1-e-(kx+μθ)]/(kx+μθ)=759708(N)在N3钢绞线束曲线段张拉时平均张拉力计算:Pp= P[1-e-(kx+μθ)]/(kx+μθ)=775625(N)在N1钢绞线束(4根)张拉时各阶段理论伸长值计算:ΔL= PpL/ApEp=64.42(mm)在N2钢绞线束(4根)张拉时各阶段理论伸长值计算:ΔL= PpL/ApEp=54.37(mm)在N3钢绞线束(4根)张拉时各阶段理论伸长值计算:ΔL= PpL/ApEp=14.46(mm)⑵直线段预应力钢绞线束平均张拉力中梁直线段=PPP直线段理论伸长值计算直线段预应力钢绞线束有效张拉长度:L=L 直线段1(两永久锚固端间钢绞线直线段长度)+ L 直线段2(千斤顶工作长度)×2各参数如下表:L 直线段钢绞线束理论伸长值计算N1:ΔL= PL/ApEp=27.01mmN2:ΔL= PL/ApEp=39.43mmN3:ΔL= PL/ApEp=111.90mm中跨箱梁20m后张法预应力钢绞线束张拉计算成果表通过以上计算数椐并根据各阶段千斤顶和对应油表的检定线性回归方程(附:千斤顶及对应压力表鉴定证书及鉴定结果,含检定线性回归方程)得出张拉成果表如下:注:1#千斤顶对应1#油表号为:0L0701249542#千斤顶对应2#油表号为:0L0214边跨箱梁⑴边跨箱梁N1钢绞线束(4根)张拉计算成果表⑵边跨箱梁N2钢绞线束(4根)张拉计算成果表⑶边跨箱梁N3钢绞线束(4根)张拉计算成果表回归方程式:1、1#顶,表号070124954,方程式:F=33.451P+21.73;2、2#顶,表号0214,方程式:F=33.529P-2.79;中建二局新兴产业示范区廊坊项目经理部二0一一年八月四日。
20米箱梁张拉计算书
20米箱梁张拉计算书20米预制箱梁张拉计算方案一、基础数据本标段20米预制箱梁正弯矩预应力钢束共有N1、N2、N3各2束,设计锚下张拉控制应力:σcon=1860×0.75=1395MP a。
按设计要求箱梁砼强度达到设计强度的90%后方可张拉,并采用两端对称张拉,张拉程序为:0 初应力σcon(持荷2min)锚固,张拉顺序为N1、N2、N3。
二、预应力钢束张拉力计算1、经咨询设计单位,因设计图中张拉控制应力已经考虑了预应力损失,故张拉力按公式:F n=σcon×A×n进行计算,如下:N1钢束锚下张拉力F1=σcon×A×n=1395 MP a×140㎜2×3=585.9KN其中:A为每根预应力钢绞线的截面积;n为同时张拉的预应力钢绞线的根数;F为钢绞线锚下张拉力。
其余钢束张拉力计算同N1,各钢束张拉力如下表:中跨箱梁预应力钢束张拉力计算明细表(表一)边跨箱梁预应力钢束张拉力计算明细表(表二)钢束号锚下张拉控制应力钢绞线根数(n) 截面积(A)㎜ 2 张拉力(Fn)KNN11395MPa 4 140 781.2N2 4 140 781.2N3 4 140 781.2三、压力表读数计算本桥采用200吨千斤顶进行张拉,经校验:编号为312#千斤顶对应的压力表编号为Y01280283,Y01280257,校准方程分别为F=0.0353P+0.6243, F=0.0351P+0.4491。
编号为80602号千斤顶对应的压力表编号为20087029,校准方程为P=0.013172F+0.004535。
故N1钢束采用312#千斤顶张拉时的压力表度数分别为:1)压力表编号为Y01280283:F1=0.0353P+0.6243=0.0353×585.9+0.6243=21.3 MP a2)压力表编号为Y01280257:F2=0.0351P+0.4491=0.0351×585.9+0.4491=21MP a其余钢束压力表读书计算同N1,压力表度数详见下表:预应力钢束100%бk张拉力所对应的压力表度数明细表(中跨箱梁)(表三)预应力钢束10%бk张拉力所对应的压力表度数明细表(中跨箱梁)(表四)N3 2.1 2.1 2.1 2.1 2.1 2.1 2.1 2.1钢束号20%бk时304#千斤顶压力表读数(MPa)20%бk时309#千斤顶压力表读数(MPa)20%бk时312#千斤顶压力表读数(MPa)20%бk时313#千斤顶压力表读数(MPa)编号(Y01280327)编号( Y01280336)编号(Y01196290)编号( Y01280347)编号(Y01280283)编号( Y01280257)编号(Y01280315)编号(Y01280309)预应力钢20%бk张拉力所对应的压力表度数明细表(中跨箱梁)(表五)另边跨箱梁的腹板N 1、N 2、 N 3钢束均为4根钢绞线,张拉时其各钢束的压力表读数同中跨箱梁N 2钢束的数据。
20m箱梁张拉伸长量计算1
20m箱梁伸长量计算中跨σcon=1860×0.75=1395(MPa)N=σcon×A y=1395×140=195300=195.3(KN)CD:537 BC:2879.8 AB:6348 μ=0.25 k=0.0015Ay-预应力筋的截面面积(mm2)Eg-预应力筋的弹性模量(Eg取值为1.95×105N/mm2)L-从张拉端至计算截面的预应力筋长度θ-从张拉端至计算截面曲线孔道部分切线的夹角之和(rad)κ-孔道每米局部偏差对摩擦的影响系数(κ取值为0.0015)μ-预应力筋与孔道壁的摩擦系数(μ取值为0.25)AB:ΔL1=45.01767204BC:ΔL2=19.55681557CD:ΔL3=3.693505128(45.01767204+19.55681557+3.693505128)×2=136.5359855(mm)CD:2015 BC:2879.8 AB:4923.4 μ=0.25 k=0.0015AB:ΔL1=34.86592675BC:ΔL2=19.59828131CD:ΔL3=13.86740714(34.86592675+19.59828131+13.86740714)×2=136.6632304(mm)CD:7901 BC:733 AB:1065 μ=0.25 k=0.0015AB:ΔL1=7.611197676BC:ΔL2=5.179053855CD:ΔL3=55.03988817=(7.611197676+5.179053855+55.03988817)×2=135.6602794(mm)σcon=1860×0.75=1395(MPa)N=σcon×A y=1395×140=195300=195.3(KN)N1(4根):195.3×4=781.2(KN)N2(4根):195.3×4=781.2(KN)N3(3根):195.3×3=585.9(KN)4束:15%:117.18 , 30%:234.36 , 50%:390.63束:15%:87.885, 30%:175.77 , 50%:292.95边跨σcon=1860×0.75=1395(MPa)N=σcon×A y=1395×140=195300=195.3(KN)CD:537 BC:2879.8 AB:6348 μ=0.25 k=0.0015Ay-预应力筋的截面面积(mm2)Eg-预应力筋的弹性模量(Eg取值为1.95×105N/mm2)L-从张拉端至计算截面的预应力筋长度θ-从张拉端至计算截面曲线孔道部分切线的夹角之和(rad)κ-孔道每米局部偏差对摩擦的影响系数(κ取值为0.0015)μ-预应力筋与孔道壁的摩擦系数(μ取值为0.25)AB:ΔL1=34.00962935BC:ΔL2=19.60309761CD:ΔL3=14.6217618(34.00962935+19.60309761+14.6217618)×2=136.4689775(mm)CD:2015 BC:2879.8 AB:4923.4 μ=0.25 k=0.0015AB:ΔL1=23.82140171BC:ΔL2=19.64594751CD:ΔL3=24.59225592(23.82140171+19.64594751+24.59225592)×2=136.1192103(mm)CD:7901 BC:733 AB:1065 μ=0.25 k=0.0015AB:ΔL1=7.255000187BC:ΔL2=5.179374891CD:ΔL3=55.72775194=(7.255000187+5.179374891+55.72775194)×2=136.324254(mm)σcon=1860×0.75=1395(MPa)N=σcon×A y=1395×140=195300=195.3(KN)N1(5根):195.3×5=976.5(KN)N2(4根):195.3×4=781.2(KN)N3(4根):195.3×4=781.2(KN)5束:15%:146.48, 30%:292.95 , 50%:488.254束:15%:117.18 , 30%:234.36 , 50%:390.64束:3束:压力表:750184,千斤顶:908194 4束:3束:4束:3束:压力表:750183,千斤顶:908191 4束:3束:rad读作弧度。
后张20米空心板梁张拉计算式-8页word资料
布尔博松2-20m后张20米空心板梁张拉计算式理论依据及材料设备一钢束理论伸长值计算式:Pp=p(1-e-(kx+μθ))/ kx+μθ△L= PpL/AP.EP二材料与设备1 材料主要是钢绞线其标准必须是设计提出的Ф15.24mm每批材料都要送检,要求试验,检验证书其结果要达到设计标准。
2 设备主要是千斤顶,油表。
根据设计图纸要求选用OVM15系列锚具,千斤顶及油泵要符合施工要求。
选用油表,根据20米空心板梁设计图纸要求个该内梁板有两种钢束,分别由4、5股钢绞线构成,各钢束最大控制张拉应力775620N、969525N三伸长值计算1 钢束理论伸长值,边板N2钢束由5股钢绞线构成,设计总长L= 弹性模量EP=195000MPa最大控制张拉力P=1395×5×139=969525NA5=139×5=695㎜千斤顶工作长度为0.6 m根据设计图将一半钢束分为三段(L1、L2、L3)分别计算伸长量。
(1) L1为直线段 L1=2.665+0.6=3.265mθ=0°pP= p(1-e-kL1))/ KL1=969525×(1-e-(0.0015×3.265)/0.0015×3.265=967154NpP×L1/AP.EP=967154×3.265/695×195000=23.30∴△L1=23.30㎜(2) L2为抛物(曲线)L2= 1.571m θ=9°×∏/180°=0.157起点张拉力为(967154×97%)938139 NpP= p(1-e-(kx+μθ))/ kx+μθ938149×(1-e-(0.0015×1.571+0.2×0.157)/0.0015×1.571+0.2×0.157=922491NpP×L2/AP.EP=922491×1.571/695×195000=10.6 9㎜∴△L2=10.69㎜(3)L3 为直线段θ=0°L3=11207/2=5.6035mL3起点张拉力P=2×922491-938149=906833NpP= p(1-e-(kx+μθ))/ kx+μθ=906833×(1—e-0.0015×5.6035)/0.0015×5.6035=903032 NpP×L2/AP.EP=903032×5.6035/695×195000=37.3 3㎜∴△L3=37.3 3㎜(4)钢束一半一端为△L=(△L1+△L2+△L3)-回缩量=(23.30+10.69 +37.33)-8=63.32㎜设计为60.3㎜∴该伸长量符合要求。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
天大一标20米预制箱梁预应力计算书
一、工程概况
我单位承建天大高速公路第一合同段,起点里程K4+500,终点里程K8+660,线路全长4.16km。
我标段主要工程为,中桥1座,拱型小桥1座,拱涵1个,盖板涵9个,圆管涵2个,箱型通道4个。
共有桩基28根,墩台柱20个,系梁6个,盖梁10个,预制箱梁32片,路基挖方63万方,路基填方56.06万方,小型构造物826.428m。
我标段共有20m预制箱梁32片,其中边跨边梁8片,边跨中梁8片,中跨边梁8片,中跨中梁8片。
二、编制依据
1、《公路桥涵施工技术规范》JTJ 041-2000
2、《两阶段施工图设计》山西省交通规划勘察设计院 2009年10月
3、委托试验检测报告
三、预应力张拉
依据图纸要求:混凝土达到设计强度的85%后张拉正弯矩区钢束,压注水泥浆并及时清理箱梁底板通气孔,在主梁正弯矩索张拉完毕,孔道压浆强度达40MPa以上才允许移梁或吊装,吊装过程中要保持主梁轴线垂直,防止倾斜,注意横向稳定。
张拉正弯矩钢束时,若主梁连接端的预留钢筋影响张拉操作,可先将其折弯,待张拉完毕后再将其恢复,张拉时采用两端张拉,且应在横桥向对称均匀张拉,顶板负弯矩钢束也可采用两端张拉,并采用逐根对称张拉。
箱梁腹板张拉时钢束均采用两端对称均匀张拉,在张拉过程中应保证两端同步张拉,左右腹板钢束对称均匀张拉,张拉顺序为:
N1→N3→N2→N4。
四、实际伸长量的量取
最终伸长量的计算:由15%至30%的伸长量(L2-L1)加上由30%至100%的伸长量(L3-L1),即:△L=(L2-L1)+(L3-L1)。
注意:在量取伸长值的过程中,前后应以同一个位置为基点进行量取,并且使用钢板尺进行量测。
五、张拉控制方法
张拉采用张拉力和伸长量的双控方式,以伸长量作为校核,同时伸长量应控制在理论伸长量±6%的范围内,并控制张拉值。
六、预应力钢绞线理论伸长量计算
依据公式参见《公路桥涵施工技术规范》:
y
p p A E L P L ⨯⨯=∆;()[]
μθμθ+-⨯=
+-kx e P P kx p 1
△L :理论伸长量(m);
P p :预应力筋平均张拉力(N);
P :预应力筋张拉端的张拉力(N),其数值为:股数n ×0.75×1860×140; x :从张拉端至计算截面的孔道长度(m);
θ:从张拉端至计算截面曲线孔道部分切线的夹角之和(rad ); k :影响系数,按图纸取0.0015; μ:摩擦系数,按规范取0.20; L :预应力筋的长度(mm );
Ap :预应力筋的截面面积,取140mm 2;
Ep :预应力筋的弹性模量,根据检验报告取1.953×105Mpa 。
七、压浆
1、孔道的准备,压浆前应对孔道进行清洁处理,对抽芯成型的混凝土空心孔道采用皂液进行冲洗,并使孔壁完全湿润,冲洗后用不含油的压缩空气将孔道内的所有积水吹出;
2、压浆所用的配合比必须经监理工程师验证合格后方可适用;
3、压浆使用活塞式压浆泵,压力控制在0.5~0.7MPa ,为保证管道中充满灰浆,关闭出浆口后,应保持不小于0.5 MPa 的一个稳压期,该稳压期不小于2min ;
4、压浆过程中及压浆后48h 内,结构混凝土的温度不得低于5℃,否则应采取保温措施,当气温高于35℃时,压浆宜在夜间进行。
压浆时,每工作班留不少于3组试件,做为评定依据。
施工工艺流程表
附件:
1、理论伸长量计算表
2、张拉油表度数表
附件1、理论伸长量计算表
边跨钢绞线引伸量计算表(N1)
边跨钢绞线引伸量计算表(N2)
边跨钢绞线引伸量计算表(N3)
中跨钢绞线引伸量计算表(N1)
钢绞线引伸量计算表(N2)
钢绞线引伸量计算表(N3)
实际伸长值与理论伸长值的差值应控制在±6%以内,否则应暂停张拉,张拉伸长值见下表。
148表:P=0.034F+0.58; 28表:P=0.035F+0.3;59表:P=0.035F-0.02; 57表:P=0.35F。