某变电站消防系统方案

某变电站消防系统方案
某变电站消防系统方案

某变电站消防系统方案

某变电站

消防系统设计技术方案

(审核稿)

目录

1 概述 (1)

1.1前言 (1)

1.2总则 (1)

1.3适用范围 (1)

1.4引用标准 (1)

1.5变电站形式 (2)

2 建筑防火 (2)

2.1变电所火灾危险性分类、耐火等级、防火间距 (2)

2.2站区道路 (3)

2.3站内建筑物 (4)

3电缆防火封堵 (4)

4火灾应急照明和疏散指示 (5)

5消防给水和灭火设施 (5)

5.1 一般规定 (5)

5.2 变电站室外消防用水量、消防给水管道和消火栓 (6)

5.3 变电站室内消防用水量及消防给水管道、消火栓和消防水箱 (7)

5.4 消防水泵房及消防水池 (9)

6水喷雾灭火系统 (9)

6.1一般规定 (9)

6.2操作与控制 (11)

7气体灭火系统 (12)

7.1一般规定 (12)

7.2 操作与控制 (14)

7.3安全要求 (14)

8火灾自动报警系统 (15)

8.1布置原则 (15)

8.2点型火灾探测器的选择 (16)

8.3线型火灾探测器的选择 (16)

8.4消防控制室防火要求 (17)

8.5系统设计原则 (17)

8.6火灾警报装置 (17)

8.7消防控制室和消防联动控制 (18)

8.8消防控制设备的功能 (18)

8.9线型火灾探测器的选择 (18)

8.10系统供电 (19)

8.11系统布线 (19)

9灭火器配置 (19)

9.1灭火器配置场所的火灾种类 (19)

9.2危险等级 (19)

9.3灭火器的类型选择 (19)

9.4灭火器的最大保护距离 (20)

9.5灭火器配置原则: (21)

9.6灭火器的最低配置基准 (22)

10 110~500KV变电站消防标准设计 (27)

10.1第一类:110K V变电站常规电器设备、紧凑型(COPASS)电器设备敞开式布

置 (27)

10.2第二类:110K V变电站六氟化硫组合电器设备户内、半户内布置 (27)

10.3第三类:220K V变电站常规电器设备敞开式布置 (28)

10.4第四类:220K V变电站六氟化硫组合电器设备户内、半户内布置 (28)

10.5第五类:500K V变电站 (28)

(附录一)国家电力公司电缆防火封堵工作标准 (28)

变电站基础施工方案

100万吨/年重油催化制烯烃项目中控、中变、总变 土建施工方案 编制: 审核: 批准: 中国化学工程第四建设公司 2007年3月16日

目录 一、编制依据 二、工程概况 三、主要实物工程量 四、土建施工方法 五、劳动力安排及施工进度计划 六、主要施工机械计划 七、质量保证体系及措施 八、HSE管理 九、文明施工措施 附:施工进度网络计划

一、编制依据 1.1 《混凝土结构工程施工质量验收规范》GB50204-2002 1.2 《混凝土结构工程施工质量验收规范》GB50204-2002 1.3 《混凝土结构工程施工质量验收规范》GB50204-2002 1.4 《建筑工程施工质量验收标准》GB50300-2001 1.5 我公司编制并实施的符合ISO-9002标准的《质量手册》 1.6中国石油天然气华东勘察设计的结构施工图:6130D602-2006JZ-00/; 6130D206-2006JZ-00/; 1.7扬州苏源电力设计有限公司设计的结构施工图:381-B0689S-T03; 二、工程概况 该设施为实友化工(扬州)有限公司100万吨/年重油催化制烯烃项目所配套的总变、配电设施和中心控制室。为重油催化制烯烃项目提供电力供应和全部自动仪表的控制。其中中心变配电所为两层混凝土框架结构,基础为独立柱基础,一层框架标高3.570米,二层框架标高8.867米,建筑面积2326.78平方米,彩色塑钢门窗,二楼彩色水磨石地面,办公室、卫生间轻钢龙骨铝塑板吊顶,室内混合砂浆刷墙后白色乳胶漆刷面,外墙为丙烯酸外墙涂料;总变电所上部结构图纸未到;中心控制室为两层混凝土框架结构,建筑面积2154.2平方米。

消防工程专项施工方案

****仓储一期项目 消防安装工程 专项施工方案

目录 第一章、工程基本概况及编制依据 一、编制说明 二、编制依据 三、工程基本概况 第二章、施工部署及施工准备 一、施工总体目标 二、施工准备 三、施工程序 第三章、组织机构 一、组建项目组 二、施工管理 三、工程主要管理人员 第四章、施工组织及施工计划 一、本公司管理组织机构图 二、施工现场组织图 三、施工调度 四、施工进度计划 第五章、施工方法 一、自动喷水灭火系统、消火栓给水系统 二、火灾自动报警系统及联动控制系统 三、应急照明、疏散指示系统 第六章、安全管理保证措施 一、确保品质管制的技术组织措施 二、确保工程施工安全卫生及雨季技术组织措施 三、确保文明施工的技术组织措施 四、确保工期技术组织措施 五、降低成本控制措施 六、建立与土建、装饰装修单位的配合协调措施 七、主要部位质量通病及防治办法 第七章、系统主要工作流程 一、火灾自动报警系统 二、自动喷淋灭火系统 三、消火栓给水系统 四、应急照明系统、疏散指示系统 第八章、工程项目竣工验收 一、竣工验收的准备工作

二、竣工验收依据 三、竣工验收的标准 四、竣工验收的范围 五、验收程序 第九章、成品及设备的保护措施第十章、售后服务承诺 一、售后服务承诺的具体内容资源配备计划 附表

第一章工程基本概况及编制依据 一、编制说明 本施工组织设计作为指导施工的依据 ,编制时对目标工期、工程质量、项目管理机构设置、劳动力组织、施工进度计划控制、机械设备及周期材料配备、主要分部分项工程施工方法、安全保证措施、文明施工及环境保护措施、选用设备材料品牌优质生产厂家,降低成本措施等诸多因素尽可能充分考虑,突出科学性及可行性。目前,我公司已做好了相应的技术、资源准备,我们的宗旨是对能为业主更好的服务。为实现本工程“优质、快速、安全、低耗”的施工目标 ,我们将“用我们的智慧和行动 ,实现对用户的承诺”。 二、编制依据 1 、依据**,提供的施工图。 2 、主要法规 : (1) 中华人民共和国建筑法、中华人民共和国消防法 (2) 中华人民共和国安全生产法 (3) 中华人民共和国环境保护法 (4) 建设工程质量管理条例 3 、主要规程、规范 : (1) 火灾自动报警施工验收规范 GB50166-92 (2) 自动喷水灭火系统施工验收规范 GB50261-96 (3) 火灾自动报警系统检验规程 DB21 / T1204-2003 (4) 自动喷水灭火系统检验规程 DB21 / T1205-2003

消防工程施工方案样本

消防工程施工方案

5、关键部位施工方法: 5.1、消防水系统施工方法: 1)、系统安装工序: (1)、室内消火栓系统:立管安装——环管安装——消火栓箱安装——消防泵房及消防水箱间安装——室外消防水泵结合器连接——套管洞口封堵——油漆。 (2)、自动喷淋系统安装:主管安装——报警阀——水平管网——冲洗试压、喷头安装——油漆——套管、洞口封堵。 2)、支吊架制作安装: (1)、支架按设计选国家标准图集(S161)中相应图集及技术标准制作安装。 (2)、立管支架安装,每层间高度等于或小于5m,安装一付,每层间高度大于5m,安装二付。支架离地面 1.5m—1.8m,二付以上应均称安装。 (3)、喷淋水平管道支吊架安装间距按下表: (4)、支吊架距喷头不小于300m,距末端喷头不大于750m。 (5)、自动喷水管道的吊架采用防晃吊架,吊架与喷头之间的距离应不小于300mm,距末端喷头距离不大于750mm,吊架应位于相邻喷头间的管段上,当喷头间距不大于 3.6m时,可设一个,小于 1.8m允许隔段设置。

(6)、支吊架安装应符合下列要求: A、位置正确,安装平整、牢固。水平管吊架应成一条直线,间距均等支管吊架安装应有相邻两喷头之间的管段上设吊架不少于1副;喷头间距小于1.8m时可隔断设一付,可是间距不大于3.60m. B、支架与管道接触严密,固定可靠。 C、固定在结构上的支、吊架不得影响建筑结构的安全。 D、支吊架安装要考虑管道安装的0.002—0.005的坡度,坡向排水方向。 3)、管段预制及安装: 切管:机械切割后的毛刺、飞边应处理干净,切口端不得倾斜。不允许用电旱切管。 套丝:机械套丝、人工套丝。螺纹加工要求规整,螺纹密封面应符合现行国家标准(普通螺纹的基本尺寸要求)有关规定。如有断丝或缺丝,不得大于螺纹全口数的10%,连接前清除管内异物。 (1)、管道安装应横平竖直立管安装允许垂直度偏差为2/1000,5m 以上不大于8mm;水平纵横方向弯曲度允许1/1000,25m以上不大于25mm。 (2)、套管制作预埋:管道穿过墙体和楼板处应安装套管。 a、刚性防水套管规格应比主管道二号;套管长度;过墙套管两端与墙面齐平(要求美观,套管两端可不低于墙两面10mm,堵塞后让装修做外观美)。过楼板套管的上端高出装饰地面20—50mm;下端与楼板底面齐平。套管封堵要严实,材料为不燃品。 b、管网安装,报警阀后,管子公称直径小于70mm时,应采用螺纹连

变电站基础施工方案设计

100万吨/年重油催化制烯烃项目中控、中变、总变土建施工方案 编制: 审核: 批准: 中国化学工程第四建设公司 2007年3月16日

目录 一、编制依据 二、工程概况 三、主要实物工程量 四、土建施工方法 五、劳动力安排及施工进度计划 六、主要施工机械计划 七、质量保证体系及措施 八、 HSE管理 九、文明施工措施 附:施工进度网络计划

一、编制依据 1.1 《混凝土结构工程施工质量验收规范》 GB50204-2002 1.2 《混凝土结构工程施工质量验收规范》 GB50204-2002 1.3 《混凝土结构工程施工质量验收规范》 GB50204-2002 1.4 《建筑工程施工质量验收标准》 GB50300-2001 1.5 我公司编制并实施的符合ISO-9002标准的《质量手册》 1.6中国石油天然气华东勘察设计的结构施工图:6130D602-2006JZ-00/; 6130D206-2006JZ-00/; 1.7扬州苏源电力设计有限公司设计的结构施工图:381-B0689S-T03; 二、工程概况 该设施为实友化工(扬州)有限公司100万吨/年重油催化制烯烃项目所配套的总变、配电设施和中心控制室。为重油催化制烯烃项目提供电力供应和全部自动仪表的控制。其中中心变配电所为两层混凝土框架结构,基础为独立柱基础,一层框架标高3.570米,二层框架标高8.867米,建筑面积2326.78平方米,彩色塑钢门窗,二楼彩色水磨石地面,办公室、卫生间轻钢龙骨铝塑板吊顶,室内混合砂浆刷墙后白色乳胶漆刷面,外墙为丙烯酸外墙涂料;总变电所上部结构图纸未到;中心控制室为两层混凝土框架结构,建筑面积2154.2平方米。 三、主要实物工程量

电力隧道工程雨季施工方案(精编文档).doc

【最新整理,下载后即可编辑】 目录 一、编制依据 (2) 二、工程基本概况 (2) 三、雨季防汛任务 (3) 四、雨季施工措施 (3) 五、项目部防汛抢险机构 (6) 六、防汛抢险指挥机构的职责 (6) 七、防汛抢险应急措施 (7) 八、防汛抢险器材 (8) 九、项目部防汛抢险救援程序 (9) 一、编制依据 雨季防汛工作是在各级政府领导下组织群众与汛情作斗争的一项活动,是维护社会稳定和促进国民经济发展的一件大事。为加强雨季

施工中的防汛工作,依据《中华人民共和国防洪法》《动漫城110kV 送电电力隧道工程(二标段)工程图纸》《施工组织设计》《北京市市政工程施工安全操作规程》及国家、北京市、本公司、甲方和监理的有关法规、规程及文件的要求,为确保汛期电力隧道工程顺利施工及周边群众的生命财产安全,认真贯彻“安全第一,长备不懈,预防为主,全力抢险”的防汛总方针,为结合北京地区雨季施工特点和本工程具体情况,制定雨季施工方案,避免险情发生。 二、工程基本概况 为满足动漫城110kV变电站进出线要求,需新建电缆隧道L1、L2、L3线。 L1线隧道起点自张仪村220kV变电站113号间隔,向东至现状张仪村西路,穿越张仪村西路向东至张仪村二号路南红线北侧2.0m位置向东至张仪村路,沿张仪村路东红线西侧3.0m位置向南至梅市口路,沿梅市口路北红线南侧3.0m向东至规划张仪村东三路,沿张仪村东三路西红线东侧5.0m位置向北与动漫城110kV变电站东侧两个隧道甩口连接,路径长度1634.3m。 L2线隧道起点自张仪村114号间隔,隧道向北与L1线隧道2#明开三通井相接,路径全长23.2m。 L3线隧道起点接动漫城110kV变电站东侧10kV隧道甩口,隧道向东与L1线隧道24#明开三通井相接,路径全长5m。

《220kV变电站电气部分初步设计》开题报告

电气与信息学院 毕业设计(论文)开题报告

《220kV变电站电气部分初步设计》开题报告 一、课题的目的和意义 随着国民经济的迅速发展,电力工业的腾飞,人们对能源利用的认识越来越重视。现在根据电力系统的发展规划,拟在某地区新建一座220KV的变电站。 本次设计是在掌握变电站生产过程的基础上完成的。通过它我不仅复习巩固了专业课程的有关内容,而且拓宽了知识面,增强了工程观念,培养了变电站设计的能力。同时对能源、发电、变电和输电的电气部分有个详细的概念,能熟练的运用有些知识,如短路计算的基本理论和方法、主接线的设计、导体电气设备的选择以及变压器的运行等。 二、文献综述 1 变电站的概述 随着经济的发展,工业水平的进步,人们生活水平不断的提高,电力系统在整个行业中所占比例逐渐趋大。现代电力系统是一个巨大的、严密的整体。各类发电厂、变电站分工完成整个电力系统的发电、变电和配电的任务。电力系统是国民经济的重要能源部门,而变电站的设计是电力工业建设中必不可少的一个项目。由于变电站的设计内容多,范围广,逻辑性强,不同电压等级,不同类型,不同性质负荷的变电站设计时所侧重的方面是不一样的。设计过程中要针对变电站的规模和形式,具体问题具体分析。 变电站是电力系统中变换电压、接受和分配电能、控制电力的流向和调整电压的电力设施,它通过其变压器将各级电压的电网联系起来。我国电力系统的变电站大致分为四大类:升压变电站,主网变电站,二次变电站,配电站。我国电力工业的技术水平和管理水平正在逐步提高,对变电所的设计提出了更高的要求,更需要我们提高知识理解应用水平,认真对待。[1] 结合我国电力现状,为国民经济各部门和人民生活供给充足、可靠、优质、廉价的电能,优化发展变电站,规划以220KV、110KV、10KV电压等级设计变电站。从我国目前部分地区用电发展趋势来看,新建变电站应充分体现出安全性、可靠

110kv变电站施工组织设计方案(完整版)

施工组织设计 批准: 审查: 校核: 编写:

3.1 工程概况 ** 水利枢纽施工供电110kv 变电站工程是为满足** 水利枢纽工程施工用电而建设,该项目位于枢纽** 大桥左侧下游约200m 处。施工变电站的110kv 进线接于** 地区东笋变,施工变电站建成投产后,将枢纽右岸已建成的35kv 临时变电站设备搬迁至施工变电站合并运行,35kv 线路延伸过江进110kv 施工变作为枢纽施工保安电源。 本工程主要工程项目有: (1)35kv 施工供电备用线路工程; (2)110kv 施工供电线路工程; (3)110kv 施工变电站土建及安装工程; 3.2 施工布署 3.2.1 工程质量目标 满足国家或电力施工验收规范,做到:土建分项工程和单位工程合格率100%,优良率85%以上;电气设备安装工程合格率100%,优良率90%以上;整项工程质量等级达到优良。 3.2.2 工期目标 按招标范围的施工图纸工程内容及招标文件要求,计划总工期210 日历天。 3.2.3 安全目标 群伤群亡事故为零;

重大设备事故为零; 重大火灾事故为零; 轻伤事故率控制在5‰ 以内。 3.2.4 工程主要施工负责人简介 施工主要负责人简介见第二章中“ 2.4 拟投入本工作的主要人员表”。

3.2.5 施工工序总体安排 本工程的施工是在场地平整工作完成后进行。施工队伍进场后,先按施工总平面图 布置临时设施,并按平面布置要求对站内的主控楼基础和排水系统及110kv 线路工程进行施工,在主控楼基础和排水系统完成后即安排主控楼主体工程、设备基础、电缆沟、构 架基础等施工;最后进行电气设备安装及站内各附属设施的施工。110kv 施工变电所建成投产后,即进行35kv 临时变电站搬迁工作。在土建施工过程中安排电气预埋、接地等交 叉作业。 3.3 施工进度计划 根椐招标文件要求,本工程计划2001 年5 月25 日开工,2001 年12 月20 日完工,总日历工期210 天,详细的施工进度见《** 水利枢纽施工供电110KV 输变电工程施工进度横道图》。

消防工程施工方案

济东高速公路房建工程二标段 济阳服务区 消 防 工 程 施 工 方 案 编制人: 审核人: 审批人:

编制日期:

一、编制依据: (1)设计文件及有关资料:设计图纸、总说明; (2)现行规范、规程: 1.《火灾自动报警系统施工及验收规范》GB50166-92 2.《自动喷水灭火系统工程施工及验收规范》GB50261-2005 3.《建筑给水排水及采暖工程施工质量验收规范》GB50242-2002 二、方案编制原则: 1、严格遵守国家现行规范规程 2、合理安排施工程序和顺序: 根据施工现场和工程实际进度情况组织施工,能够确保各项施工工序相互促进、紧密衔接,避免不必要的重复工作,加快施工进度,缩短施工工期; 3、采用流水作业法安排施工进度计划,保证各施工工序的连续性、均衡性和有节奏地进行、合理地使用人力、物力、财力和各种施工设备,达到完成施工任务的目的; 4、从实际出发,做好人力、物力和机械设备的综合平衡,组织均衡施工; 5、尽量利用当地资源,合理安排运输、装卸与储存作业,精心进行规划布置,节约施工用地,防止施工事故,做到文明施工。

三、工程概况: 我单位所承建的济南至东营高速公路济阳服务区位于济阳县仁风镇,主要包含服务区南北区综合楼、泵房发电机房、南北区加油站、南北区汽修车间、南北区空调机房、消防水池和生活水池附属设施。济阳服务区总建筑面积5564.2平方米,绿地面积21714.24平方米,铺装地面面积3884.74平方米。服务区综合楼为框架结构,基础为独立基础,主体填充墙为加气砼砌块,楼地面为整体地面砖,外窗为氟碳铝合金窗,中空玻璃,吊顶工程为普通石膏板吊顶,屋面为坡屋面,外墙装饰为灰色毛菇砖。本工程还包括水、电、消防、空调等分项工程。附属设施泵房发电机房、汽修车间为框架结构,其余附属设施为砖混结构。 (二)、服务区南区综合楼:本建筑地上2层,一层层高4.5m,二层层高3.9m,建筑面积为2267.85平方米,建筑高度为8.04米,室内外高差为0.45米,采用钢筋混凝土框架结构,柱下独立基。 (二)、服务区北区综合楼:本建筑地上2层,一层层高4.5m,二层层高3.9m,建筑面积为2267.85平方米,建筑高度为8.04米,室内外高差为0.45米,采用钢筋混凝土框架结构,柱下独立基。 (三)、服务区泵房发电机房(主要分布在南区):本建筑地上1层,局部地下一层,层高3.3m,地下一层层高3.6m,建筑面积为110.54平方米,采用砖混结构,钢筋混凝土条形基础。地下一层为框架剪力墙结构。 (四)、服务区加油站(南北区各一座):本建筑地上1层,建筑面积为129.73平方米,建筑高度为3.9m,室内外高差为0.3米,采用砖混结构,钢筋混凝土条形基础。

电力隧道工程雨季施工方案

一、编制依据 (2) 二、工程基本概况 (2) 三、雨季防汛任务 (3) 四、雨季施工措施 (3) 五、项目部防汛抢险机构 (6) 六、防汛抢险指挥机构的职责 (6) 七、防汛抢险应急措施 (7) 八、防汛抢险器材 (8) 九、项目部防汛抢险救援程序 (9)

、编制依据 雨季防汛工作是在各级政府领导下组织群众与汛情作斗争的一项活动,是维护社会稳定和促进国民经济发展的一件大事。为加强雨季施工中的防汛工作,依据《中华人民共和国防洪法》《动曼城110kV送电电力隧道工程(二标段)工程图纸》《施工组织设计》《廿京市市政工程施工安全操作规程》及国家、北京市、本公司、甲方和监理的有关法规、规程及文件的要求,为确保汛期电力隧道工程顺利施工及周边群众的生命财产安全,认真贯彻“安全第一,长备不懈,预防为主,全力抢险”的防汛总方针,为结合北京地区雨季施工特点和本工程具体情况,制定雨季施工方案,避免险情发生。 二、工程基本概况 为满足动漫城110kV变电站进出线要求,需新建电缆隧道 L1、L2、L3 线。 L1线隧道起点自张仪村220kV变电站113号间隔,向东至现状张仪村西路,穿越张仪村西路向东至张仪村二号路南红线北侧 2.0m位置向东 至张仪村路,沿张仪村路东红线西侧3.0m位置向南至梅市口路,沿梅市口路北红线南侧3.0m向东至规划张仪村东三路,沿张仪村东三路西红线东侧5.0m位置向北与动漫城110kV变电站东侧两个隧道甩口连接,路径长度1634.3m。 L2线隧道起点自张仪村114号间隔,隧道向北与L1线隧道2#明开三通井相接,路径全长23.2m。 L3线隧道起点接动漫城110kV变电站东侧10kV隧道甩口,隧道向东 与L1线隧道24#明开三通井相接,路径全长5m

变电站电气设计

变电站电气设计

————————————————————————————————作者:————————————————————————————————日期:

摘要 本次毕业设计的题目是《110/35/10KV变电站电气部分初步设计》。根据设计的要求,在设计的过程中,根据变电站的地理环境、容量和各回路数确定变电站电气主接线和站用电接线,并选择各变压器的型号;进行参数计算、画等值网络图,并计算各电压等级侧的短路电流,列出短路电流结果表;计算回路持续工作电流、选择各种高压电气设备,并根据相关技术条件和短路电流计算结果表校验各高压设备。 随着科学技术的发展,网络技术的普及,数字化技术成为当今科学技术发展的前沿,变电站数字化对进一步提升变电站综合自动化水平将起到极大促进作用,是未来变电站建设的发展方向。基于这种发展的需求,该变电站采用EDCS-6200型110kV变电站综合自动化。利用数字化技术来解决目前综合自动化变电站存在的问题已成为可能。本变电站就是利用数字化技术使变电站的信息采集、传输、处理、输出过程全部数字化,并使通信网络化、模型和通信协议统一化、设备智能化、运行管理自动化。 通过本次设计,学习了设计的基本方法,巩固三年以来学过的知识,培养独立分析问题的能力,而且加深对变电站的全面了解。 关键词主接线,短路电流,电气设备,主变保护,配电装置,EDCS-6200

Abstract This graduation project topic is: "110/35/10KV Transformer substation Electricity Part Preliminary design".According to the design request, in the design process, according to the transformer substation geographical environment, the capacity and various return routes number determined the transformer substation electricity host wiring and the station use electricity the wiring, and chooses various transformers the model; Carries on the parameter computation, the picture equivalent network chart, and calculates various voltages rank side the short-circuit current, lists the short-circuit current result table; Calculates the return route continually operating current, chooses each kind of high pressure electrical equipment, and verifies various high pressure unit according to the correlation engineering factor and the short-circuit current computed result table. Along with the science and technology development, the networking popularization,the digitized technology will become now the science and technology development the front, the transformer substation digitization to further promotes the transformer substation synthesis automation level to get up to the limit the big promoter action, is the future transformer substation construction development direction.Based on this kind of development demand, this transformer substation uses EDCS-6200 the 110kV transformer substation synthesis automation.Solves at present using the digitized technology to synthesize the automated transformer substation existence the question possibly to become.This transformer substation is causes the transformer substation using the digitized technology information gathering, the transmission, processing, the output process to digitize completely, and causes the correspondence network, the model and communication protocol unitizing, the equipment intellectualization, the movement management automation. Through this design, has studied the design essential method, since the consolidated four years have studied the knowledge, raises the independent analysis question ability, moreover deepens to the transformer substation comprehensive understanding. Key words Main wiring, Short-circuit current, Electrical equipment, The host changes the protection, Power distribution equipment,EDCS-6200 目录

变电站基础施工方案

盛年不重来,一日难再晨。及时宜自勉,岁月不待人。 编号:004实友化工(扬州)有限公司 100万吨/年重油催化制烯烃项目中控、中变、总变 土建施工方案 编制: 审核: 批准: 中国化学工程第四建设公司 2007年3月16日

目录 一、编制依据 二、工程概况 三、主要实物工程量 四、土建施工方法 五、劳动力安排及施工进度计划 六、主要施工机械计划 七、质量保证体系及措施 八、 HSE管理 九、文明施工措施 附:施工进度网络计划

一、编制依据 1.1 《混凝土结构工程施工质量验收规范》 GB50204-2002 1.2 《混凝土结构工程施工质量验收规范》 GB50204-2002 1.3 《混凝土结构工程施工质量验收规范》 GB50204-2002 1.4《建筑工程施工质量验收标准》 GB50300-2001 1.5 我公司编制并实施的符合ISO-9002标准的《质量手册》 1.6中国石油天然气华东勘察设计的结构施工图:6130D602-2006JZ-00/; 6130D206-2006JZ-00/; 1.7扬州苏源电力设计有限公司设计的结构施工图:381-B0689S-T03; 二、工程概况 该设施为实友化工(扬州)有限公司100万吨/年重油催化制烯烃项目所配套的总变、配电设施和中心控制室。为重油催化制烯烃项目提供电力供应和全部自动仪表的控制。其中中心变配电所为两层混凝土框架结构,基础为独立柱基础,一层框架标高3.570米,二层框架标高8.867米,建筑面积2326.78平方米,彩色塑钢门窗,二楼彩色水磨石地面,办公室、卫生间轻钢龙骨铝塑板吊顶,室内混合砂浆刷墙后白色乳胶漆刷面,外墙为丙烯酸外墙涂料;总变电所上部结构图纸未到;中心控制室为两层混凝土框架结构,建筑面积2154.2平方米。 三、主要实物工程量

110千伏变电站变扩建工程设备基础施工方案

110千伏变电站#3变扩建工程 地基与基础分部工程施工方案 工程名称: 工程地点: 施工单位: 编制单位: 项目负责人: 编制人:编制日期: 审批负责人:审批日期:

目录 一、工程概况及特点 (3) 二、施工准备 (3) 三、施工总体安排 (5) 四、主要工序的施工方法 (5) 五、各项施工资源计划 (11) 六、施工质量保证措施 (11) 七、消除质量通病的具体措施 (13) 八、施工安全措施 (14)

一、工程概况及特点 1.1 工程概况 本工程地基与基础工程主要包括如下项目:避雷器支架及基础1组、电容式电压互感器支架及基础3个、隔离开关支架及基础3组、电流互感器基础1组、断路器基础1座、110kV中间构架及基础1组、旁路母线构架及基础2组、端子箱基础1个、#3主变压器基础1个、#3主变构架及基础1组、中性点支架及基础1个、母线桥支架及基础4个、#3主变防火墙1道;户外电容器基础6组、配电室1间、400*400电缆沟65m、800*800电缆沟60m、2*1200*1000电缆沟75m及部分200*200电缆沟等。 1.2工程特点 本期扩建工程均近距离带电设备,施工时应在确保安全的情况下进行施工。 工程10千伏配电室、主变基础构架及电容器设备基础采用φ500水泥搅拌桩对地基进行处理加固,其余设备基础采取换土处理,换填3:7砂石1米厚;2*1200*1000电缆沟底换填块石基础500厚;400*400电缆沟、800*800电缆沟沟底换填3:7砂石500厚。水泥搅拌桩使用的固化剂为普通硅酸盐水泥,强度等级为32.5R,掺入量为15%。具体施工方法另详水泥搅拌桩专项施工方案。 二、施工准备 2.1 技术准备 1、组织施工技术人员熟悉图纸、施工工艺及有关技术规范,了解设计要 求达到的技术标准、明确工艺流程。 2、将编制好且通过审批的《施工方案》作为作业指导书,与施工人员进

110kV变电站电气方案设计书

作者:PanHongliang 仅供个人学习 山东电力高等专科学校 题目:"OkV变电站设计 专业:发电厂及电力系统 学生姓名: 指导教师: 摘要 变电站是电力系统的重要组成部分,它直接影响整个电力系统的安全与经济运行,是联系发电厂和用户的中间环节,起着变换和分配电能的作用。电气主接线是发电厂变电所的主要环节,电气主接线的拟定直接关系着全厂(所)电气设备的选择、配电装置的布置、继电保护和自动装置的确定,是变电站电气部分投资大小的决定性因素。 本次设讣建设一座110KV降压变电站,首先,根据主接线的经济可翥、运行灵活的要求选择各个电压等级的接线方式,在技术方面和经济方面进行比较,选取灵活的最优接线方式。 根据各电压等级的额定电压和最大持续工作电流进行设备选择,然后进行校验。 关键词:变电站电气主接线主变压器电气设备选择 -2-/2

目录 第一章分析原始资料 (3) 第二章主变压器容量、型号和台数的选择 (4) 2.1主变压器台数选择 (4) 2.2主变压器的选择 (4) 2.3主变型号选择 (5) 第三章电气主接线设计 (5) 3.1110KV侧主接线的设计 (6) 3.235KV侧主接线的设计 (6) 3.310KV侧主接线的设计 (6) 3.4主接线方案的比较选择 (7) 第四章电气设备的选择 (7) 4.1.按正常工作条件选择电气设备 (7) 4.2 按短路状态校验 (8) 4.3 断路器的选择及校验 (9) 4.4隔离开关的选择及校验 (12) 4.5电压互感器的选择及校验 (14) 4.6电流互感器的选择及校验 (14) 4.7接地开关的选择及校验 (15) 4.8载流导线的选择 (15)

变电站进站施工方案

奥磊工贸金江钛渣厂35kV生产用电线路工程变电站线路进站施工方案 攀枝花网源电力建设工程公司 2013年11月18日

奥磊工贸金江钛渣厂35kV生产用电线路工程 变电站进站施工方案 批准年月日审核年月日校核年月日编写年月日

目录附:简易平面图

一、工程概况 1、工程概况 1、进站工作的原因:①、奥磊工贸金江钛渣厂35kV生产用电线路工程已建完成。N1#至变电站原设计为光纤进站,设计要求,需连光纤进入白岩子110kV变电站与N1#连接,施工时需进站工作(敷设光缆、做光缆头等) 2、进站工作的内容:①、从N1#隔空拉设光纤线至变电站内闸盒,并敷设光缆,做光缆头及光缆试验等。 3、需进变电站:白岩子110kV变电站。 二、组织措施 一、施工管理机构的设置及职能 1、施工管理机构的设置 为了满足施工的有关要求,便于工程的外部协调和内部的统一指挥,对施工过程进行可控在控,根据本工程的特点,结合现场实际情况,决定成立以网源公司李志强为项目经理的施工现场项目指挥站。项目经理全权负责对本工程进行现场管理指挥。负责工程的施工管理及对协调工作。 对本工程设现场工作负责人二人,负责以下工作: (1)向工作班成员布置当天的任务、内容以及工作范围,使工作班每个成员都明白当天的工作。组织人员进行安全“三查”(查安全思想、查安全措施、查安全器具),并说明施工任务,安全措施及注意事项,重点讲明当天的重点危险施工作业及其予防措施,并随时抽问,

在使全体作业人员明了后,方可作业;做到“四清楚、四到位”。(2)组织工作班主要成员进行危险点分析,提出控制措施或解决方案。 (3)向工作班成员明确各自的工作,不允许工作班成员做超出工作票范围的工作。 (4)向工作班成员宣布现场工作纪律,加强现场安全监护,设专职监护人二名,并开展一对一互相监督活动。 (5)要求进站作业工作班成员着装统一,正确使用劳保用品及安全防护用品等。 (6)施工前,组织人员对施工机械、安全用具进行全面检查,确认已经试验合格并经维护保养,确保进场施工机械、安全用具有良好性能,均为合格品。 (7)施工前,由项目负责人组织施工负责人、现场安全员、技术员、班组长等对施工现场进行勘察,明了施工作业环境、施工任务、临近带电的范围、停电范围、交叉跨越等情况。 (8)施工前,组织全体施工人员学习施工措施,有针对性的对施工人员进行安全知识和技术培训,使用体施工人员明确施工任务,明确作业中的安全施工措施及安全注意事项。 (9)正确、合理的按照标准化工序工艺组织施工作业,严格督促全体作业人员遵守执行安规和相关规定。 (10)当天工作结束,要在现场清点班组成员,并把现场清理完毕,方可离开现场。

消防工程施工方案.doc

5、关键部位施工方法: 5.1、消防水系统施工方法: 1)、系统安装工序: (1)、室内消火栓系统:立管安装——环管安装——消火栓箱安装——消防泵房及消防水箱间安装——室外消防水泵结合器连接——套管洞口封堵——油漆。 (2)、自动喷淋系统安装:主管安装——报警阀——水平管网——冲洗试压、喷头安装——油漆——套管、洞口封堵。 2)、支吊架制作安装: (1)、支架按设计选国家标准图集(S161)中相应图集及技术标准制作安装。 (2)、立管支架安装,每层间高度等于或小于5m,安装一付,每层间高度大于5m,安装二付。支架离地面1.5m—1.8m,二付以上应均称安装。 (3)、喷淋水平管道支吊架安装间距按下表: (4)、支吊架距喷头不小于300m,距末端喷头不大于750m。 (5)、自动喷水管道的吊架采用防晃吊架,吊架与喷头之间的距离应不小于300mm,距末端喷头距离不大于750mm,吊架应位于相邻喷头间的管段上,当喷头间距不大于3.6m时,可设一个,小于1.8m允许隔段设置。 (6)、支吊架安装应符合下列要求:

A、位置正确,安装平整、牢固。水平管吊架应成一条直线,间距均等支管吊架安装应有相邻两喷头之间的管段上设吊架不少于1副;喷头间距小于 1.8m时可隔断设一付,但是间距不大于3.60m. B、支架与管道接触严密,固定可靠。 C、固定在结构上的支、吊架不得影响建筑结构的安全。 D、支吊架安装要考虑管道安装的0.002—0.005的坡度,坡向排水方向。 3)、管段预制及安装: 切管:机械切割后的毛刺、飞边应处理干净,切口端不得倾斜。不允许用电旱切管。 套丝:机械套丝、人工套丝。螺纹加工要求规整,螺纹密封面应符合现行国家标准(普通螺纹的基本尺寸要求)有关规定。如有断丝或缺丝,不得大于螺纹全口数的10%,连接前清除管内异物。 (1)、管道安装应横平竖直立管安装允许垂直度偏差为2/1000,5m以上不大于8mm;水平纵横方向弯曲度允许1/1000,25m以上不大于25mm。 (2)、套管制作预埋:管道穿过墙体和楼板处应安装套管。 a、刚性防水套管规格应比主管道二号;套管长度;过墙套管两端与墙面齐平(要求美观,套管两端可不低于墙两面10mm,堵塞后让装修做外观美)。过楼板套管的上端高出装饰地面20—50mm;下端与楼板底面齐平。套管封堵要严实,材料为不燃品。 b、管网安装,报警阀后,管子公称直径小于70mm时,应采用螺纹连接;当管子公称直径大于等于70mm时,采用沟槽式卡箍连接。 c、管网安装前应校直管子,并应清除管子内部的杂物;安装时应随时清除已安装管道内部的杂物。

xx水电站工程雨季施工专项方案

目录 **水电站工程雨季施工专项方案 (1) 1、编制、范围依据 (1) 1.1、编制范围 (1) 1.2、编制依据 (1) 1.3、编制原则 (1) 2、工程概况 (1) 3、雨季施工预防措施 (2) 3.1、加强现场数据统计 (2) 3.2、完善排水防护设施 (2) 3.3、加快水毁处理速度 (2) 4、基坑雨季施工 (2) 4.1、箱涵、沉砂池 (2) 4.2、回填管 (3) 4.3、竖井 (3) 4.4、厂房 (4) 5、混凝土浇筑雨季施工 (4) 6、雨季施工安全注意事项 (5)

**水电站工程雨季施工专项方案 1、编制、范围依据 1.1、编制范围 编制范围为**水电站范围内的围堰工程、挡泄水工程、引水系统工程(含进水口、箱涵、沉砂池、回填管、调压塔和竖井等结构)、发电厂房等建筑物结构的雨季施工。 1.2、编制依据 (1)、**水电站相关图纸。 (2)、《**水电工程施工组织设计》、施工进度计划。 (3)、所在地区和河流的自然条件(地形、地质、水文、气象特征情况等)、交通、环境保护、防洪、供水等现状。 1.3、编制原则 通过提前预防、施工过程控制,确保**水电站雨季施工正常进行。 2、工程概况 河流域属于典型热带雨林气候,常年高温多雨,年内温差较小,降雨年内分配差异不大,四季不分明。 坝址属于Coronas分区的Ⅲ类区域,降雨年内分配区分不大,其中6-10月份为雨季,降雨量偏多。前期当地雨量数据统计不全,根据现场实际情况旱雨季划分如下: 根据设计,**水电站工程由围堰工程、挡泄水工程、引水系统工程(含进水口、箱涵、沉砂池、回填管、调压塔和竖井)、发电站等建筑物组成。

电气设计方案

电气设计方案.doc 电气设计一、设计依据1 .国家及地方的有关设计规范和标准(1 )3110KV 高压配电装置设计规范GB5006092 (2 )10KV 及以下变电所设计规范GB5005394 (3 )供配电系统设计规范GB500522009 (4 )通用用电设备配电设计规范GB5005593 (5 )低压配电设计规范GB5005495 (6 )建筑设计防火规范GB50016-2006 (7 )汽车库、修车库、停车场设计防火规范GB 50067-97 (8 )建筑物防雷设计规范GB5005794(2000 年版)(9 )建筑物电子信息系统防雷技术规范GB50343-2004 (10)民用建筑电气设计规范JGJ162008 (11)高层民用建筑设计防火规范GB50045-95 (2005 版)(12)建筑照明设计标准GB50034-2004 (13)火灾自动报警系统设计规范GB50116-98 2 .根据国家有关建筑电气规范,甲方提供的设计任务书,以及各专业提供的资料进行设计。 二、设计范围本地块的照明、电力、防雷接地等内容的设计。 三、用电负荷估算1 .酒店约49881m2 100W/m2 4988KW; 2 .办公约52266m2 80W/m2 4181KW; 3 .商业约13812m2 150W/m2 2071KW; 4 .地下车库、设备用房约25370m2 20W/m2 507KW; 5 .广告、景观用电200KW;用电负荷同期系数取0.8 整个地块用电负荷合计9558KW; 四、供电设计1 .拟在地下一层设置 1 座10KV 电业开关站,2 路10KV 电源由上一级市政不同区域变电站引来。

消防工程施工组织设计方案(完整版)

消防工程施工组织设计方案(完整版) 目录 第一章工程概况 第二章施工现场平面布置图 第三章施工进度计划 第四章劳动力、主要设备材料、施工机械设备需求计划 第五章拟投入本项目的主要施工机械设备表 第六章确保工程质量的技术组织措施 第七章确保安全生产的技术组织措施 第八章确保文明施工的技术组织措施 第九章确保工期进度的技术组织措施 第十章保证项目成本目标的措施 第十一章施工技术方案 第十二章施工质量检测办法 第十三章与设计、监理、土建承包方及其他专业的协调配合措施

第一章工程概况 一、工程概况: 工程名称:*******************************(B3、B4地块)消防、防排烟、通风及人防工程 建设单位:******************************* 设计单位:********************** 项目地点:*******城东片区 质量要求:符合《工程施工质量验收规范》合格标准 工期要求:满足工程总体工期要求 本项目A标段为东区工程,包括地下室、*#楼、*#楼、*#楼、*#楼、*#楼工程。 二、主要施工内容与范围: 项目施工内容: 火灾自动报警系统、消防联动控制系统、消防广播系统、消防对讲电话系统、消火栓系统、自动喷水灭火系统、通风及防排烟系统。 其主要工程量包括:智能报警控制器、消防联动控制柜、消防对讲电话主机、消防广播主机、消防对讲电话分机、消防电话插孔、感烟探测器、感温探测器、手动报警按钮、消火栓报警按钮、监视控制模块、广播扬声器、离心式消防水泵、湿式报警阀、消防水泵接合器、金属软管、线槽、管内及槽内配线、镀锌钢管、沟槽管件、各类阀门、消火栓箱、无机玻璃钢风管、风口、防火排烟阀、消声器、防排烟风机、正压送风机、等。 项目施工范围: 1、火灾自动报警及联动控制系统

变电站雨季施工方案

雨季施工方案 1、编制依据 《建筑工程冬、雨季施工及验收规范》(国家行业标准) 《混凝土结构工程施工及验收规范》(国家行业标准) 《砌筑工程施工及验收规范》(国家行业标准) 《高压电气设备安装工程施工及验收规范》(国家行业标准) 2、变电站雨季工程施工概述 为防止雨期来临给本所建筑和电气安装工程施工带来了诸多不利因素,特编制此方案。 根据本站施工特点可划分如下几个施工阶段: 2.1、建筑工程阶段 2.2、电气安装工程阶段 3、雨期施工措施及技术要求 3.1、建筑工程雨期施工 3.1.1、原材料进场检查其是否已受潮变质,对变质或性状改变的原材料应杜绝进场; 3.1.2、原材料进场后应搭蓬设台,以保证原材料不受雨水侵蚀; 3.1.3、水泥应定期检查其受潮程度,杜绝变质水泥的使用; 3.1.4、砂石应防止其在雨天混入泥土,对料场应设置挡土围沿; 3.1.5、钢筋、木料放置在托架上,严禁浸泡在水中; 3.1.6、土方施工应加大放坡系数,预留1m的工作面,并筑起围沿防止雨水侵入基

槽造成积水和坍塌; 3.1.6、机械挖方基底预留150mm淤土,人工清槽,基槽上部搭设苫布,防止槽底积水; 3.1.7、钢筋加工、绑扎应有防锈措施,绑扎完的钢筋应及时覆盖遮雨; 3.1.6、混凝土拌制中应根据情况适当调整水灰比和坍落度; 3.1.8、砂浆拌制中也根据情况适当调整水灰比,严禁雨天进行砌筑施工; 3.1.9、遭遇雨天进行混凝土浇筑施工时,应搭设雨棚筑起围沿,防止雨水灌入基槽和侵入基础模板内造成灰浆流失; 3.1.10、及时与当地气象部门联系,应尽量避免雨天进行建筑施工。 3.2、电气安装工程 3.2.1、对进场的设备应事先检查其受潮情况; 3.2.2、设备存放应选择地势较高,平缓不宜积水的环境,应有防雨和防止倾覆的措施; 3.2.3、电缆、导线严禁雨淋也应选择地势较高,平缓不宜积水的环境放置; 3.2.4、金具和设备备品备件应放置在室内; 3.2.5、设备安装调整严禁在雨天施工; 3.2.6、对焊接后的工件应及时涂刷油漆,避免雨水锈蚀; 3.2.7、电缆终端严禁在雨天或湿度较大的天气下制作,电缆应在敷设后将电缆断口部用防水材料包裹;防止受潮和水浸; 3.2.8、母线严禁雨天施工; 3.2.9、材料进场检查其是否已受潮变质,对变质或性状改变的材料应杜绝进场; 3.2.10、材料进场后应搭蓬设台,以保证材料不受雨水侵蚀。 4、雨期施工质量控制