工程竣工验收总结报告

合集下载

工程竣工报告总结【优秀4篇】

工程竣工报告总结【优秀4篇】

工程竣工报告总结【优秀4篇】(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。

文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如工作总结、计划大全、策划方案、报告大全、心得体会、演讲致辞、条据文书、作文大全、教案资料、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, this store provides various types of classic sample essays for everyone, such as work summaries, plan summaries, planning plans, report summaries, insights, speeches, written documents, essay summaries, lesson plan materials, and other sample essays. If you want to learn about different formats and writing methods of sample essays, please stay tuned!工程竣工报告总结【优秀4篇】在现在社会,报告的用途越来越大,要注意报告在写作时具有一定的格式。

建筑工程竣工验收总结(精选5篇)

建筑工程竣工验收总结(精选5篇)

建筑工程竣工验收总结(精选5篇)建筑工程竣工验收总结篇1本人在重庆某高层建筑任总监时编写的一份监理,供各位同仁参考,愿能为各位的工作提供一点帮助。

如有好的建议,本人倾心聆听。

重庆建设监理咨询有限公司受重庆××地产开发有限公司委托,对重庆×单位工程实施施工阶段监理。

本工程于20xx年5月8日开工,于20xx年12 月30日进行了工程预验收。

监理单位已完成委托监理合同中约定的工作内容,现对本工程的施工监理工作总结如下:一、工程概况重庆商住楼位于重庆××新区地块。

本工程为高层民用住宅建筑,抗震设防烈度为6度,防火等级为一级,屋面防水二级,设计使用年限50年。

本工程总建筑面积45000m2,房屋总高/93.00 m、-3/28层,最大跨度7.8m。

基础工程采用了人工挖孔桩、独立柱基、条形基槽,基础置于中风化泥岩上,设计泥岩的天然抗压强度为9.12MPa。

主体结构为框架剪力墙结构,主体结构混凝土强度为C30-C45,内外填充墙为加气砼砌块、页岩空心砖砌筑,混合砂浆砌筑(强度等级为M5.0),构造柱、预制小件(过梁)混凝土C20。

屋面平屋面,SBS改性沥青卷材防水层3mm,聚苯板保温层30mm,细石混凝土C25防水层40厚。

户内为初装修,水泥瓜米石找平层、墙面砂浆抹底层,无罩面层、天棚刮防水腻子,楼梯间地面、踏步采用耐磨地板砖、电梯前室为玻化地砖,电梯门处贴墙砖,梯间铁栏杆扶手、其余墙面白色乳胶漆罩面;阳台栏杆采用夹胶玻璃及不锈钢栏杆,进户门为防盗安全门、外墙窗和阳台门均为5+9A+5中空玻璃塑钢窗。

外墙门窗为5+9A+5中空玻璃塑钢窗,进户门为钢质门。

排水工程:室内排水管和雨水管采用PVC管材安装。

节能工程:聚苯颗粒保温外墙,聚笨板保温隔热屋面、塑钢窗双层中空玻璃隔热保温层。

给水与电气安装及电梯安装均按合同实施。

二、参建单位建设单位:重庆××地产开发有限公司监理单位:重庆建设监理咨询有限公司设计单位:重庆工程设计有限公司勘察单位:地质勘察院承包单位:重庆建筑工程公司三、质量监督单位:重庆市××区质量监督站四、监理组织及监理制度重庆建设监理咨询有限公司受重庆××地产开发有限公司委托,按照相关法律、法规及委托监理合同的约定,根据建设施工承包合同、设计施工图及相关设计文件、相关技术规范的要求,对本工程的施工质量、进度实施监理。

建设工程竣工验收报告(18篇)

建设工程竣工验收报告(18篇)

建设工程竣工验收报告(18篇)篇1:建设工程竣工验收报告一、工程概况我消防工程建设工程项目,建设方为,位于。

施工单位为;设计单位为。

该消防工程于20xx年月日完成并进行了初验收;且消防工程档案资料完整、齐全,并经总监理工程师审查通过。

我公司对初验项目在20 年7月日已全部完成工程并符合质量标准要求。

二、质量控制措施我公司在工程开工后,组织精干力量,挑选优秀的管理人员组成项目指挥部,由项目技术负责人主持编制施工组织设计和方案,并经公司技术负责人审核后,报请总监理工程师审查通过。

我们在施工现场建立了完善的质量保证体系和安全管理体系,把质量责任落实到每一个员工,实行质量与经济挂勾制度,在施工中严格执行“三检”制度,并切实把好原材料质量关;从开始施工至结束施工始终按照设计图纸和有关设计变更文件进行施工,严格遵守《建筑法》、《建设工程质量管理条例》、《中华人民共和国消防法》、公安部《建设工程消防监督管理规定》和国家现行施工质量验收规范:按照《建筑工程施工质量验收统一标准》GB50300-20xx的新规范进行质量验收,没有违反工程建设标准强制性条文,没有发生质量事故和人员伤亡事故。

三、消防工程施工质量情况分述如下我消防工程建设工程项目进水管数量为根,进水管直径为mm,室内消防栓计个,室外消防栓计个。

分项工程所含的检验批均符合合格质量的规定;检验批的质量验收记录完整;分项工程的质量均验收合格;质量控制资料完整;分部工程有关安全及功能的检验和抽样检测结果符合规范规定;观感质量验收合格。

综上所述,益阳裕敬鞋业发展有限公司厂房消防工程建设工程项目已竣工完成,消防施工档案资料完整,工程质量经企业自评合格。

建设单位(盖章):设计单位(盖章):施工单位(盖章):监理单位(盖章):年月日篇2:建设工程竣工验收报告单位工程名称:建设单位名称:竣工验收时间:x年x月x日建筑面积:结构类型、层数:施工单位名称:勘察单位名称:设计单位名称:监理单位名称:工程报建时间开工日期:x年x月x日工程造价:工程概况:除工程质量保证资料《工程概况表》所需反映的情况外,尚需反映室内及外墙装饰要求、屋面防水构造形式。

工程竣工验收工作总结7篇

工程竣工验收工作总结7篇

工程竣工验收工作总结7篇(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。

文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如演讲致辞、汇报材料、自我鉴定、条据文书、合同协议、心得体会、方案大全、教学资料、作文大全、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, our store provides various types of classic sample essays for everyone, such as speeches, presentation materials, self-evaluation, documentary evidence, contract agreements, reflections, comprehensive plans, teaching materials, essay summaries, and other sample essays. If you want to learn about different sample essay formats and writing methods, please stay tuned!工程竣工验收工作总结7篇态度的端正是我们在写工作总结的时候要注意的一点,工作总结是我们对自己工作的一种自我评估,可以帮助我们发现自己的不足之处,进而改进和提升,以下是本店铺精心为您推荐的工程竣工验收工作总结7篇,供大家参考。

竣工验收施工总结(通用9篇)

竣工验收施工总结(通用9篇)

竣工验收施工总结(通用9篇)竣工验收施工总结第1篇各位领导、专家:你们好!XX扩建工程自XX年XX月开工,历经近1年多的建设,在XX开发公司及各级主管部门的领导下,经过各个参建单位精诚配合、团结协助共同使本工程得以顺利竣工。

在此,请允许我代表公司及监理部向莅临XX扩建工程竣工验收的各位领导、专家表示衷心的感谢!下面将监理工作情况作简要汇报。

一、工程概况二、监理工作概述从XX年XX月,施工单位逐步进场施工至XX年XX月份竣工验收,根据设计及相关规范要求对分部分项工程进行结构验收,符合要求。

我公司对该项目十分重视,项目总监理工程师由我公司xxx担任,并抽调公司精干的专业技术人员组建项目监理部,编制了监理规划,组织各专业监理工程师在详细了解规范、强制行条文、招投标文件,认真熟悉施工图纸,在领悟设计意图的前提下,编制了具有可指导性和可操作性的各专业实施细则,并在监理过程中严格执行。

监理项目部为保障项目实施过程中高标准进行各项质量安全控制,实行了对施工单位的技术交底制度、安全交底制度、见证取样制度、工程验收等一系列监理措施,确保了工程监理工作的顺利开展。

三、工程质量控制1、业主、监理共同组织第一次工地例会,会议上明确了质量目标,并提出了达到该目标在质量控制方面应注意的问题。

2、工程施工前,要求施工单位完善和健全质量保证体系,包括项目经理、技术负责人在内的质检、资料、施工等“五员”必须到位,要求施工单位对每一道工序加强自检职能,经自检合格才能通知监理工程师确认,确保了工程各工序的质量。

3、根据实际情况,编制监理旁站计划,对应该旁站的重点和关键部位如:打桩、混凝土浇筑等进行全过程旁站,并做好相应的记录。

4、编制见证取样计划,严格按照计划执行,本工程检测送XX建设工程检测有限公司的钢筋原材、钢筋焊接、混凝土、砂浆等试件均合格。

5、严格把好材料进场质量关,作为工程质量控制的切入口,对其认真核对产品合格证、质保单、检测报告,并对外观进行检查,按规范抽取适当数量送检,对不符合的立即要求施工单位退场,不得在工程中使用。

工程竣工验收报告简短范文7篇

工程竣工验收报告简短范文7篇

工程竣工验收报告简短范文7篇工程竣工验收报告篇1一、工程完成情况:___水库除险加固工程经省、市主管部门批准立项,核定总投资1006万元,其中:国债资金投资700万元,地方配套资金306万元。

该水库除险加固的主要内容为:①、大坝前坝坡1563高程以上改为浆砌块石,加固上游坝坡,在大坝左坝肩心墙与溢洪道右侧墙接触面的齿墙后增设一道砼防渗墙;②、加固溢洪道及下游河道治理;③、更换弧形工作门及平板检修门,更换弧门启闭机;④、加固改造上坝及进库公路;⑤、增设大坝观测设施与自动化控制系统。

工程于20__年5月31日开工建设,20__年6月底全面竣工,历时13个月,除险加固工程按照设计批准的方案已完成了主要工程,即:完成了大坝前坝坡加固工程;溢洪道加固及下游河道治理工程;完成上坝公路加固工程,包括1.27公里的公路护坡及3.2公里的沥青路面铺设,以及公路桥1座,过洪涵洞6座;完成输水泄洪洞事故门、工作门、启闭设备制安工程;完成大坝自动化监测设备的安装及其它工程等,由于受地方配套资金影响大坝砼防渗墙工程未能完成和坝体渗流水位测量仪未安装,其余主体工程均已按设计要求完成。

该工程共完成投资额915.24万元(不包括待验费20万元),完成主要工程量为:土石方开挖8.39万m3,土石方回填2.02万m3,浆砌石1.16万m3,砼0.15万m3,耗用水泥1782T,钢筋(钢材)40.54T,木材11.26m3,沥青93.70m3,劳动工日5.69个工日。

二、验收条件检查结果:依据水利部《水利水电建设工程验收规程》的有关规定,该工程按设计要求已完成了主要工程施工任务,虽然受地方配套资金影响使个别尾工未能完工,但不影响工程正常安全运用。

工程投资使用合理,竣工决算已经完成并通过了竣工审计。

竣工资料已准备齐全,工程施工质量已通过了__市水利基本建设质监站的质量检验,并出具了《工程质量检验评定报告》,工程质量合格。

在工程完工试运行中,工程能正常运行,经济效益和社会效益显著,已具备正式验收条件。

工程竣工验收总结报告(5篇)

工程竣工验收总结报告(5篇)

工程竣工验收总结报告(5篇)工程竣工验收总结报告(模板)篇11、施工单位质量责任行为情况(如是否依法承揽工程、分包工程签订合同与资质相符;是否建立工程质量保证体系,是否建立各级质量责任制及质量掌握程序);2、本工程是否已按要求完成工程设计和合同商定的各项内容;3、在施工过程中,执行强制标准和强制性条文的`情况;4、施工过程中对监理和监督机构提出的要求整改的质量问题是否确已改正,并得到监理单位的认可;5、工程完工后,企业自查,是否确认工程达到竣工标准,工程质量达到合格质量等级,满意结构平安和使用功能要求;6、工程质量保证资料(包括检)测报告的功能试验资料)基本齐全且已按要求装订成册;7、建筑物沉降观察成果和倾斜率情况;8、其它需说明的情况。

工程竣工验收总结报告(模板)篇2一、工程概况工程名称:工程地点:建设单位:监理单位:设计单位:施工单位:工程质量标准:合格开工日期:20__年6月1日竣工日期:20__年6月30日本项目工程内容有:绿化种植、园林景观构筑物及其他造景、园林铺地、园林给排水和园林用电工程。

二、工程质量验收情况施工单位在工程量大、难度高、交叉作业频繁的情况下,充分发挥自身优势,各专业之间最大限度的协作、合理安排根据合同内质量标准完成各分部分项工作,工程质量达到合格标准。

绿化种植部分因本标段以地下车库顶层回填土为主,种植时采取土壤改良措施,满意植物生长所必需的养分。

苗木规格严格按设计要求进场,栽植过程中留意保证本标段节点景观效果,做到节点四周苗木不短截,只疏剪,保证施工后尽快达到设计效果。

自然式片林在栽植过程中,没有成行成排栽植,体现自然、生态、田园风光,形式自然,高低错落。

重要节点大规格苗木由设计、监理看苗确认后进行栽植。

在材料进场之前,请设计、监理单位进行选样,并严格根据选定样品进场。

园林铺地部分:本标段铺地在道路、广场等硬质景观除设计认样外,做样板段,甲方、设计、监理现场确认后,进行全面施工。

工程竣工验收报告(优秀8篇)

工程竣工验收报告(优秀8篇)

工程竣工验收报告(优秀8篇)工程竣工验收报告篇一各位专家、各位领导:首先,我代表公司向在百忙之中来参加验收庆阳市西峰区南北大街道路改造工程的各位领导、专家,表示热烈的欢迎和感谢。

陕西航天建筑工程公司承建的庆阳市西峰区南北大街道路改造工程现已完工。

自20__年3月开工以来,在庆阳市市政工程监督管理站,庆阳市西峰区住房和城乡建局以及庆阳市业兴监理工程有限公司的大力支持下,经全体参建人员尽职尽责的精心施工,现已完成合同约定的全部内容,于20__年5月组织各参建单位进行预验,预验过程中提出的问题现已全部整改到位,现具备竣工验收条件,请各位领导、专家对本工程予以验收。

我就工程施工的基本情况向各位领导及专家作以简要汇报,不当之处请指正。

一、工程概况:本工程是由陕西市政建筑设计研究院设计,由陕西工程勘察研究院勘察,庆阳市盛捷公路检测有限公司跟踪检测,庆阳市业兴工程监理有限责任公司监理、陕西航天建筑工程公司承建施工,该工程位于西峰区中心,道路共长3580.47米,规划红线宽50m,本次实施36米,内容设计及道路工程、电力、电信工程、供热工程、给水工程(包含分质供水)、排水工程(雨水、污水)、照明工程等,本工程于20__年3月19日开工,20__年11月18日竣工。

二、工程质量1、为了保证工程质量,保证施工生产的安全进行,真正做到管理工作制度化、规范化、建立健全质量管理制度和职能管理体系,本工程设立项目经理室、安全组、施工组、测量组、质检组、实验室等6个组室,同时公司为本工程配备了高技术、强管理的项目领导班子,配备项目经理、施工员、技术员、专职质检员组成,质量管理小组,从项目部到施工班组形成层层把关的质量管理体系。

2、切实把好原材料质量关,材料进场前进行原材料复试试验,待检测合格后方可进行使用,杜绝不合格材料进入现场和用于工程实体中。

3、坚持工序质量、自检、互检、交接检制度,实行小组日检,项目部询检、公司月控制制度,实行奖罚制度,增强工人的质量意识,保证该单位工程无质量隐患,自检合格。

竣工工程总结报告范文(3篇)

竣工工程总结报告范文(3篇)

第1篇一、工程概况1. 工程名称:XX科技园一期工程2. 工程地点:XX市XX区3. 工程规模:占地面积约100亩,总建筑面积约20万平方米4. 工程类别:高新技术产业园区5. 工程投资:总投资约10亿元人民币6. 建设单位:XX市XX区人民政府7. 设计单位:XX建筑设计研究院8. 施工单位:XX建筑工程集团有限公司9. 监理单位:XX建设监理有限公司二、工程前期工作及实施情况1. 项目立项及审批:XX科技园一期工程于XX年XX月立项,经过多次讨论和论证,于XX年XX月获得市、区政府批准。

2. 设计阶段:设计单位根据项目需求,完成了项目可行性研究报告、初步设计及施工图设计等阶段工作。

3. 施工准备阶段:施工单位按照设计图纸和相关规范要求,完成了施工组织设计、施工方案编制、人员配备、材料设备采购等工作。

4. 施工阶段:工程于XX年XX月正式开工,按照合同约定的时间节点,分阶段、分批次完成各项施工任务。

三、设计、施工、监理等单位情况1. 设计单位:XX建筑设计研究院,具有甲级设计资质,具备丰富的设计经验。

2. 施工单位:XX建筑工程集团有限公司,具有一级施工总承包资质,具有丰富的施工经验。

3. 监理单位:XX建设监理有限公司,具有甲级监理资质,具备较强的监理能力。

四、各单项工程的开工及完工日期1. 土建工程:XX年XX月开工,XX年XX月完工。

2. 安装工程:XX年XX月开工,XX年XX月完工。

3. 装修工程:XX年XX月开工,XX年XX月完工。

4. 道路及管网工程:XX年XX月开工,XX年XX月完工。

五、完成工作量及生产能力1. 完成工作量:土建工程完成15万平方米,安装工程完成2.5万平方米,装修工程完成2.5万平方米,道路及管网工程完成1.5万平方米。

2. 生产能力:一期工程共建设12栋厂房,2栋办公楼,1栋宿舍楼,可容纳企业约50家,预计年产值达5亿元人民币。

六、初验与试运行情况1. 初验时间:XX年XX月。

工程验收工作总结(精选5篇)

工程验收工作总结(精选5篇)

工程验收工作总结(精选5篇)工程验收篇115住宅楼工程项目,该项目建设地点位于x镇,总建筑面积约57226.7平方米,建筑基底面积约2415平方米,建筑总高度为35米,地上11层;工程施工建设工期暂定284日历天。

该工程原由x房地产开发有限公司投资兴建,工程地质勘察单位为x市工程勘察院,设计单位为x建筑设计研究院,监理单位为x监理有限公司,施工总承包单位为中国建筑x局x分公司,政府质量安全监督部门为x市x区建筑工程施工质量安全监督站。

工程于20xx年12月10日开工,至20xx年5月10日止,工程施工建设完成主体结构8~9层,具体情况为:1楼主体结构完成至8层、2楼主体结构完成至9层、3楼主体结构完成至8层、4楼主体结构完成至9层、5楼主体结构完成至9层。

而后,该项目由于各种原因暂停建设,改由我公司继续投资建设。

原勘察、设计及施工总承包等参建单位无变动外,监理单位变更为x监理有限公司。

该项目于20xx年9月15日恢复施工,于20xx年11月整体工程基本全部完工。

为保证该工程能够按照约定要求如期按质顺利完工,我公司专门组建驻场项目管理机构及派出相关驻场代表,负责在施工现场的指挥与协调沟通工作,如开工复工手续,勘察、设计联系、监理委托、施工图审查,质量监督及安全监督等。

在工程施工过程中,我公司由专人负责施工现场的日常管理工作。

从材料进场,到各分项,分部工程及隐蔽工程的检验,均由专人进行检查验收,并积极参加监理组织的每周工程协调会议及专题会议,协调监理,施工及设计单位之间的工作,定期组织工程质量、安全生产及文明施工检查,全方位为工程项目做好后勤服务。

在项目施工建设过程中,要求勘察、设计、施工及监理等各工程参建单位严格执行工程建设强制性标准,不存在蓄意降低工程建设质量的行为,也无故意相关方任意压缩工程合理工期等行为。

在工程材料采购方面,我公司除对工程进场材料质量严格把关外,严格按照相关合同约定不强制指定材料供应商和厂家。

工程验收报告总结范文5篇

工程验收报告总结范文5篇

工程验收报告总结范文5篇验收报告范文1一、竣工报告(一)概述工程名称、工程位置、建设依据、建设规模、标准及主要内容、参建单位、主要项目及重要临建设施的建设过程等。

(二)工程建设管理1.项目单位组织机构及工作情况。

项目单位的项目管理体系,上级主管部门、质量监督机构和地方政府等为工程建设服务的机构设置及工作简述。

2.招投标管理:勘察、设计、监理、施工、材料及设备等招投标情况,中标单位的资质、承担的主要任务等。

3.设计变更管理:实施中重大技术问题的处理、设计变更的有关情况。

4.安全质量管理:安全质量管理体系、安全质量控制措施、事故处理结果、文明施工等。

5.投资管理:投资来源、投资控制措施、批复概算与实际执行情况、年度计划下达及完成情况、概算调整情况。

6.进度管理:主要工程节点计划控制目标和实际执行情况,进度控制措施等。

7.合同管理:签约单位的履约情况、合同价款结算方法及特殊问题的处理情况,至竣工时有无工程款拖欠情况等。

8.建设征地补偿及移民安置:征地与移民安置能否满足建设进度要求,有无违反政策情况,批准的征地与实际征地、有关征地手续办理情况、征地及移民安置费用的使用情况等。

9.创新成果:项目建设过程中取得的技术创新(新结构、新材料、新工艺、新设备等)、管理创新等成果。

10.廉政建设:廉政措施及廉政合同执行情况等。

11.其它:信息管理及其他需要说明的情况。

(三)历次验收情况历次交工验收、阶段验收、专项验收等结论及验收遗留问题的处理情况等。

(四)竣工决算审计竣工决算审计的开展情况和审计结论。

(五)工程试运行工程观测分析成果、工程试运用和效益发挥情况等。

(六)工程建设管理体会及建议结合工程项目特点及管理过程,总结项目管理经验教训、体会启示,对今后的建设、维护运行管理提出建议等。

二、设计工作报告(一)概述简述设计范围、主要内容和特点以及合同履行情况等。

(二)设计质量管理主要反映项目设计管理组织及主要技术人员配备情况;质量管理体系;设计管理措施(包括采用的工程建设标准强制性条文、设计质量、工期保证措施等)。

单位工程竣工验收报告总结

单位工程竣工验收报告总结

单位工程竣工验收报告总结(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。

文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如演讲致辞、总结报告、心得体会、合同协议、条据文书、策划方案、导游词、教学资料、作文大全、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, our store provides various types of classic sample essays for everyone, such as speeches, summary reports, insights, contract agreements, documentary evidence, planning plans, tour guides, teaching materials, complete essays, and other sample essays. If you want to learn about different formats and writing methods of sample essays, please stay tuned!单位工程竣工验收报告总结单位工程竣工验收报告总结(通用7篇)一份正确的验收报告中要说明工程概况及实际竣工情况,大家看看怎么写正确的验收报告吧。

竣工验收工作总结报告 竣工验收报告(优秀6篇)

竣工验收工作总结报告 竣工验收报告(优秀6篇)

竣工验收工作总结报告竣工验收报告(优秀6篇)竣工验收工作总结报告篇一由我公司承建的输煤系统消防完善工程,由xxx有限责任公司承包改造,市建设工程质量监督站负责质量跟踪监督,并委托消防工程监理有限公司承担现场监督,并由消防设施检测单位于20xx年4月26日完成本工程消防工程电气及消防设施检测,确认检测结果为合格。

本工程,自开工以来,在上级领导、质监站、建设单位、设计单位、监理单位及有关部门的大力支持下,通过全体参建员工的努力和辛勤劳动,工程于20xx年4月24日通过了预验收工作,并完成了有关问题的质量整改闭合,现消防工程已具备竣工验收条件。

下面就工程具体情况汇报如下:1、喷淋系统由原来湿式报警系统该为干式预作用报警系统。

2、输煤管道原消防系统改为干式预作用报警系统。

按20xx年国家消防规范规定,原输煤系统喷淋所有管道全不符合消防规范,所有管线重新铺设,改为手、电两用系统。

1、本工程消防报警系统采用消防中心控制系统,由自动报警系统、消火栓系统、喷淋系统等系统组成。

消防中心采用集中报警控制器控制。

2、本工程联动系统为集中控制,联动控制台设在消防控制中心内,联动功能主要有:火灾报警后接通警报装置,启动消防水泵、喷淋泵。

3、消防控制室的联动逻辑和手动功能:a、手动按钮动作时,立即联动消防设备。

b、消防栓按钮动作时,立即启动消防泵和喷淋泵。

在施工过程中经我公司、项目部不懈努力,全体员工的辛勤劳动下,我施工方均已按设计要求和验收规范的规定,以及合同约定的施工内容,完成了各项工作,各设备经调试运行正常,各报警系统,经检测公司检测合格。

建设单位(公章):施工单位(公章):年月日年月日工程验收报告与工程竣工验收报告篇二(主要讲述工程位处的地理位置、各施工有关单位、该工程的基本情况、工程特点、工程的开工时间、××阶段完成时间)××工程位于西安市××区××街××路××号,南边为××,北边××。

工程验收报告总结12篇

工程验收报告总结12篇

工程验收报告总结12篇工程验收报告总结1根据《建筑工程施工质量验收同意标准》及现行相关法律、法规的要求,我单位特制定工程竣工验收方案,请____建设工程安全质量监督总站监督。

一、本项目有关情况1、已完成设计文件和合同约定的内容;2、经建设、监理、设计、勘察、施工等单位共同预验收,存在的问题已整改到位;3、涉及设计文件的变更,已由设计部门签署认可文件,其中重大变更经由图纸审查机构审查通过;4、施工单位对工程质量进行了检查,确认工程质量符合有关法律、法规和工程建设强制性标准、已提出工程竣工报告;5、监理单位对工程进行了评估,具有完整的监理资料,并已提出工程质量评估报告;6、勘察、设计单位对勘察、设计文件及施工过程中由设计单位签署的设计变更进行了检查,并已提出质量检查报告;7、工程质量控制资料(其中包括:□桩基、□钢结构、□幕墙、□装修、□安装、□节能等)已经建设、监理单位核查并符合要求;8、工程安全和功能检验资料已经建设、(监理)单位核查并符合要求;9、专项工程(□桩基、□地下防水、□钢结构、□幕墙、□住宅工程质量通病控制、□节能、□住宅工程质量分户验收、□安装工程)已按要求办完相关专项验收手续;10、报建面积______㎡,实际竣工面积为______㎡,超出面积已按要求办完相应批准手续;11、已具备以下文件:单位工程施工许可证,重大设计变更补充审查意见书,规划部门的认可文件,消防部门的认可文件,环境部门的认可文件,气象部门的认可文件,档案专项验收意见书,室内环境检测报告,门窗三性检测报告,单位工程质量保修书,工程合同付款不拖欠证明,商品住宅的《住宅质量保修书》和《住宅使用说明书》。

12、本项目配套工程已办完相应批准手续。

二、竣工验收组织建设单位负责组织实施该项目的单位工程竣工验收工作,____建设工程安全质量监督总站监督。

竣工验收时间为20____年__月__日__时,地点______。

(一)验收人员根据规定,我单位组建了竣工验收组,成员包括:建设单位(项目)负责人、施工(含分包单位)、设计、监理等单位(项目)负责人以及相关单位技术、质量负责人、验收组成员中土建、水电及其他安装专业方面的人配齐,验收组组长由______担任。

工程项目竣工验收总结报告7篇

工程项目竣工验收总结报告7篇

工程项目竣工验收总结报告7篇(实用版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。

文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的实用范文,如学习资料、英语资料、学生作文、教学资源、求职资料、创业资料、工作范文、条据文书、合同协议、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!In addition, this shop provides various types of practical sample essays, such as learning materials, English materials, student essays, teaching resources, job search materials, entrepreneurial materials, work examples, documents, contracts, agreements, other essays, etc. Please pay attention to the different formats and writing methods of the model essay!工程项目竣工验收总结报告7篇工程项目竣工验收总结报告(7篇)竣工验收报告是工程项目竣工有关部门进行质量评估验收以后形成的书面报告,大家是否接触过该类报告呢?下面是本店铺为大家整理的关于工程项目竣工验收总结报告,欢迎大家来阅读。

建筑工程竣工验收监理工作总结 竣工验收监理总结报告(五篇)

建筑工程竣工验收监理工作总结 竣工验收监理总结报告(五篇)

建筑工程竣工验收监理工作总结竣工验收监理总结报告(五篇)建筑工程竣工验收监理工作总结竣工验收监理总结报告篇一1.竣工验收应当具备的条件:(1)、施工单位按施工合同所规定的承包范围的各项工程内容均已完成。

(2)、施工单位对各项工程均已进行了自检(隐蔽部位已通过了中间验收)均符合设计施工验收规范及质量检评标准,质量达到合格及以上标准。

‘(3)、各种设备:消防、空调、通讯、水、电、暖、煤气已与外线接通并网,联幼试转、量测数据能满足设计和使用要求,各种数据均有记录。

(4)、竣工图按规定如实绘制,验收必备技术资料已齐备,竣工技术档案按有关要求整理完毕。

2.工程验收必备技术资料:(1)、工程项目施工图纸、设计变更单及有关技术资料。

(2)、工程项目施工竣工图真实地记录各种地下、地上建筑物,构筑物的真实情况,包括在施工结构中结构、建筑、管道、电气等变更内容,重新绘制的竣工图施工单位加竣工图章方为有效。

(3)、分项、分部、单位工程竣工技术资料已通过保证项目、观感测量、实测实量项目的综合检查评定记录。

(4)、上下水管道及卫生洁具已做过通水实验,电气线路及设备已做通电、绝缘实验,达到设计要求,满足正常使用,并有实验记录。

(5)其他有关技术资料。

3.竣工验收程序;(1)、当单位工程达到竣工验收条件后,承包单位应在自审、自查、自评工作完成后,填写工程竣工报验单,并将全部竣工资料报送监理机构,申请竣工验收。

(2)、总监理工程师应组织专业监理工程师,依据有关法律、法规工程建设强制性标准、设计文件及施工合同,对承包单位报送的竣工资料进行审查,并对各专业工程的质量情况进行全面检查。

对存在的问题以书面形式通知承包单位,并及时要求承包单位整改。

(3)、对需要进行功能实验的工程项目(包括单机试车和无负荷试车)监理工程师应督促承包单位及时进行实验,并对重要项目进行现场监督检查,必要时请建设单位和设计单位参加,监理工程师应认真审查实验报告单。

竣工验收工作报告8篇

竣工验收工作报告8篇

竣工验收工作报告8篇(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。

文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如报告大全、培训计划、策划方案、合同协议、规章制度、应急预案、心得体会、教学资料、作文大全、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, our store provides various types of classic sample essays for everyone, such as report summaries, training plans, planning plans, contract agreements, rules and regulations, emergency plans, reflections, teaching materials, essay summaries, and other sample essays. If you want to learn about different sample essay formats and writing methods, please stay tuned!竣工验收工作报告8篇工作报告是我们工作一段时间之后一定要接触的文本,可以从中收获到更多的感触,没有出色的工作报告,我们就无法在后续工作中表现更好,本店铺今天就为您带来了竣工验收工作报告8篇,相信一定会对你有所帮助。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

xxx程竣工验收质量自评报告编制人:审核人:审批人:UP 有眼公司第五廛设公司ZHONGTIAN CONSTRUCTION GROUP CO,, LTD.[5]xxx程竣工验收自评报告(范本)尊敬的各领导:你们好!首先我谨代表XX工程所有建设者对各位领导的莅临表示热烈的欢迎,现就本工程的施工情况向在座的各位领导进行汇报。

汇报分为工程概况、施工依据、施工组织情况、现场质量控制措施、主要施工过程控制情况、安全文明施工及获得的荣誉、工程技术资料整编情况、工程质量评定等八个部分。

一、工程概况(主要讲述工程所处的地理位置、各施工有关单位、该工程的基本情况、工程特点、工程的开工时间、XX阶段完成时间)建设单位:设计单位:勘察单位:监理单位:施工单位:监督单位:工程位于XXXXX,由XX楼及XX裙房组成,总建筑面积为XX m2°x楼地下x层,地上x层,建筑高度为xx m。

本工程系XX结构,抗震设防裂度为X度,人防等级为X级。

本工程地下处理采用xxxx桩,梁板式筏型基础,地下一层作为汽车车库及部分设备用房;地上x层裙房为商业用房;x层为住宅楼(或办公用房)。

楼内设有高低压配电系统、给排水系统、通风系统、集中供暖地辐射系统、消火栓和自动喷淋系统、电梯系统和车库管理、楼宇监控、通信网络、信息网络、火灾自动报警和消防联动等智能化系统,设施齐全、功能先进、节能显著。

本工程自xx年x月x日开工,至xx年x月x日顺利竣工。

施工进度满足合同工期的要求,施工过程中未发生质量、安全事故,未发生拖欠农民工工资事件。

二、施工依据1、建设单位与施工单位签订的施工合同;2、本工程经审查合格的施工图纸及设计单位出具的设计变更单;3、国家、行业现行法律法规及相关建筑施工验收规范、质量评定标准;4、国家现行颁布的强制性标准;5、施工单位经审批的施工组织设计及各专项施工方案;6、中天建设集团综合管理体系手册、程序文件及施工工艺标准。

三、工程施工概况(一)施工组织与管理(介绍本项目部的施工组织与管理的体系,以下样文仅供参考)1、在开工之初,就明确了“确保雁塔杯,争创长安杯”的质量目标。

建立了质量责任制,根据公司《综合管理体系程序文件》和《质量创优计划》把质量工作落实到各个职能人员和各个工作岗位,各行其职,各尽其责,对工序和工程负责到底。

2、抽调一批项目骨干组成强有力的项目经理部及管理班子,落实经项目经理负责制,选调业务素质高,施工经验丰富,责任心强的专业施工队伍施工。

3、强化创优意识,在全体管理和施工人员中开展创优目标教育努力使创优目标活动深入人心。

(二)技术管理情况工程开工前,组织项目部施工技术人员熟悉、审查设计图纸,进行图纸会审;并由技术负责人组织编制好施工组织设计,报公司总工程师及监理单位审批,通过后方可进行施工。

在每个分项工程施工前,由技术负责人编制专项施工方案,并组织施工员向施工班组长进行质量技术交底。

各班组长负责在每天作业前向本班职工进行施工交底,严格执行技术质量保证措施。

项目部制定各项技术管理制度和技术资料管理制度,保证有关技术工作正常运行。

(三)质量管理制度1编制并执行了创优计划和各分部分项的作业指导书,加强过程控制和工序管理,实行“三检制”,及时完整地做好了质量记录和验评资料。

2、执行公司综合管理体系程序文件,建立项目质量保证体系和建立各级质量责任制来明确质量责任。

3、加强施工过程控制,严把原材料复试和成品、半成品质量关,严格控制工序质量,严格实施隐蔽工程验收,每个分部、分项工程的关键工序(位置)设立质量管理点,贯彻实行自检互检和交接检制度。

4、严格执行样板间引路制度。

样板间的施工由各专业工种技术过硬的施工人员承担,提高样板自身质量水平,以样板工程带动工程质量全面提高。

5、在施工队伍的组建上,选择施工经验丰富的技术型操作工人参与施工,推行工程施工质量奖罚制度。

对班组承包价格采用固定单价加浮动单价,根据各个分项的施工质量进行奖罚。

6、认真做好各类计量器具及检测设备的检定工作,使其所有检测数据和检测结果更具有效性、可靠性。

7、制定质量通病的预防措施。

8、成立QC小组进行技术难点的现场攻关。

(四)质量保证情况在施工过程中,我们严把工程原材料、成品及半成品的进场关和验收关,对进场材料实行台帐管理,进行收、发、储、运等环节的技术管理。

对进场的钢材、水泥、普通混凝土小型砌块及商品砼等材料,首先检查其生产厂家是否具备相应生产资质;再结合出厂合格证和质量检测报告等质保资料,核对现场材料的质量、数量是否达到要求;最后在监理工程师现场见证取样情况下,送往x x检测试验中心试验室进行复试。

只有复试合格后,该批材料方可用于工程上。

1、地基与基础分部工程所有原材料经监理公司见证取样:①进场钢材x吨,试验x组,合格x组;②钢筋直螺纹套筒连接①x的连接接头x个,共试验x组,合格x组;③钢筋闪光对焊连接试验X组,合格X组;④钢筋电渣压力焊连接试验X组,合格X组;⑤XX防水卷材X卷(或xmj试验X组,合格X组;⑥进场水泥X吨,试验X组,合格X组;⑦进场C X商品砼X m3标养试件X组,试验X组,合格X组;⑧进场C X P X商品砼X m3抗渗试件X组,试验X组,合格X组;⑨土壤击实试验X组,合格X组。

2、主体结构及装饰装修工程所有原材料经监理公司见证取样:①进场钢材X吨,试验X组,合格X组;②钢筋直螺纹套筒连接①X的连接接头X个,共试验X组,合格X组;③钢筋闪光对焊连接试验X组,合格X 组;④钢筋电渣压力焊连接试验X组,合格X组;⑤XX防水卷材X卷(或X m),试验X组,合格X组;⑥进场水泥X吨,试验X组,合格X组;⑦进场C X商品砼X m,标养试件X组,试验X组,合格X组;⑧M X混合砂浆X m,试验X组,合格X组;⑨进场烧结普通砖X万块,试验X组,合格X组;空心砖X万块,试验X组,合格X组;⑩拉结筋试验X组,合格X组;(11)外墙面砖拉拔试验X组,合格X组;(12)XX防水卷材X卷(或xm),试验X组,合格X组。

(五)新技术应用情况在工程施工过程中,项目部积极推广应用了建设部推广使用十项新技术中的地基基础和地下空间工程技术(如复合土钉墙支护技术等)、高性能混凝土、高效钢筋与预应力技术、新型模板及脚手架应用技术、钢结构技术、安装工程应用技术、建筑节能和环保应用技术、建筑防水新技术、施工过程监测和控制技术、建筑企业管理信息化技术共X项新技术,新技术的应用既保证了工程的施工质量,又加快了材料的周转,节约了施工成本,大大缩短了建设工期,取得了良好的经济效益和社会效益。

四、主要施工过程控制情况1、本工程主要使用的测量仪器有:XX经纬仪、XX水准仪、XX垂直仪……,各项出厂合格证资料齐全;部分按规定,送陕西省测绘计量中心检测,均在有效鉴定期内。

施工测量放线,由专职施工员严格按照施工定位轴线图和施工图放样。

自检合格后,由技术负责人组织质量员、施工员等进行定位轴线的复核,经复核无误后再报监理工程师复检,复检合格后,方可进行下道工序施工。

轴线位移和标高引测控制在规定范围内。

2、基础与主体结构工程1)模板工程本工程墙柱模板采用组合小钢模,平板采用多层竹胶板。

施工前编制专项施工方案,对整个支模体系进行验算、受力分析,确保足够的强度、刚度、稳定性,对钢管、扣件、槽钢等材料进行强度检测。

绘制预埋、预留洞图。

对进场工人进行技术考核,上岗前做好技术交底工作,采用样版引路制度进行工程管理。

对施工难度较大的部位,如阴阳角、根部、钢木接头等部位进行重点技术公关。

地下外墙模板加固采用止水螺杆,确保混凝土墙面起到致密防水作用。

在支模过程中加强自检、互检,发现问题及时整改,再交由技术负责人组织质量员、施工员等复核,并做好模板安装检验批等资料,及时报监理公司进行复检,合格后方可浇捣混凝土。

另外做到砼浇捣前检查、浇捣中复查、浇捣后核查等项工作,保证混凝土结构的质量。

模板尺寸偏差按规范要求验收。

2)钢筋工程本工程钢筋规格、型号较多,主要规格有xx.xx.xx ,钢筋用量较大。

钢筋从进场、取样复试、制作、绑扎、验收、成品保护都严格按照规范和技术要求进行操作,保证了钢筋分项工程的质量。

在钢筋绑扎过程中严格按照图纸和规范进行绑扎,对主筋位置、箍筋加密区范围、钢筋的锚固长度、搭接长度等严格控制。

在定位措施上,墙柱钢筋分别采用水平定位筋及竖向梯子筋进行定位、控制筋距。

采用塑料垫片、20*20砼控制筋控制保护层厚度及墙体截面尺寸;梁、板底筋用砂浆垫块,面筋用马凳加短钢筋固定,控制保护层。

钢筋绑扎完后,由班组自检、项目部预检合格后,报监理单位进行验收,验收合格后签写隐蔽验收记录,再进入下道工序。

在砼浇捣过程中,避免踩踏板面筋,由专人负责钢筋修整,加绑马凳筋和支垫砼垫块,以免钢筋位移。

3)混凝土工程为保证结构质量,提高文明施工水平,主体全部采用商品砼。

配备砼输送泵车和布料杆等,满足施工需要。

对混凝土浇筑采取施工员现场跟踪检查,安排专人进行塌落度测试、砼试块制作等,进行全过程的控制;另外派专人到商品砼搅拌站进行现场监督,检查原材料、外加剂质量及配合比电子计量情况,根据施工要求,及时调整砼塌落度。

砼浇捣完成后,及时进行洒水养护,不少于I4d。

砼试块同条件养护和标准养护,至龄期做好试压工作。

4)砌体工程本工程砌体采用混凝土小型空心砌块,混凝土空心砌块的优点是自重较轻、强度高、尺寸偏差小,且属于环保型材料,采用MX水泥砂浆砌筑。

在拌制砂浆过程中严格控制砂浆配合比,按要求进行试块制作。

在砌筑前确立皮数和规格搭配,提前种植拉接钢筋,钢筋的锚固长度、种植深度、间距满足规范要求,同时按要求进行抗拉实验。

砌筑时严格控制砂浆的饱满度、灰缝的厚度,杜绝通缝、串缝,确保墙面的平整度和观感。

墙面与顶棚(梁)交接处用斜砖和三角砖进行砌筑。

在砌体施工过程中加强自检、互检,严格按照工艺和规范要求进行验收,做好记录。

5)地下室防水工程本工程地下防水采用SBC-120聚乙烯丙纶防水卷材,在防水工程的质量控制上。

第一、确保进场材料的质量合格。

第二、根据材料的特性和防水的要求编制专项施工方案和技术交底。

第三、注意作业条件和施工的外部环境的影响,包括做好基层的处理工作。

第四、严格按照规范和工艺要求进行施工。

第五、加强自检互检,对起泡、起鼓、松动的部位及时按要求进行加强处理。

第六、注意成品保护,做好防水保护层的施工。

在施工过程中,严格按规范要求进行质量控制,做好验收记录。

3、装饰装修工程1)本工程室内装饰工程以白色调为主,根据功能要求进行合理的色彩转变。

整体线条流畅、美观大方,在满足使用功能的前提下,力求简约。

我们通过合理安排,精心施工,使装饰工程无论在内在质量上,还是观感上,都取得较为满意的效果。